1 |
35558092 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land |
150000 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land1 |
Plinth level |
-
latitude : 23.210386242717505,23.210386242717505
Longitude : 86.5731097664684,86.5731097664684
file name : Image_07102021142427058.png
|
2021-10-07 14:24:27.185875 |
2 |
35558092 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land |
150000 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land1 |
Roof laid |
-
latitude : 23.21041604038328,23.210381171666086
Longitude : 86.5731499157846,86.5731028933078
file name : Image_07102021143011753.png
|
2021-10-07 14:30:11.884132 |
3 |
35558092 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land |
150000 |
PCC Road from Nidhiram Mahato House to Nilkamal Sarkar Land1 |
Completion of work |
-
latitude : 23.210392906330526,23.21033083833754
Longitude : 86.57322954386473,86.57314865849912
file name : Image_07102021135438354.png
|
2021-10-07 13:54:38.488375 |
4 |
35556586 |
PCC Road from Bhairab yogi to subodh yogi |
150000 |
PCC Road from Bhairab yogi to subodh yogi1 |
Plinth level |
-
latitude : 23.215665123425424,23.215883681550622
Longitude : 86.57169146463275,86.57398668117821
file name : Image_07102021141513100.png
|
2021-10-07 14:15:13.209673 |
5 |
35556586 |
PCC Road from Bhairab yogi to subodh yogi |
150000 |
PCC Road from Bhairab yogi to subodh yogi1 |
Roof laid |
-
latitude : 23.21587056387216,23.21590991690755
Longitude : 86.57400512136519,86.57398232258856
file name : Image_07102021141937654.png
|
2021-10-07 14:19:37.759917 |
6 |
35556586 |
PCC Road from Bhairab yogi to subodh yogi |
150000 |
PCC Road from Bhairab yogi to subodh yogi1 |
Completion of work |
-
latitude : 23.215928273275495,23.215973703190684
Longitude : 86.57396597787738,86.57397410832345
file name : Image_07102021134116510.png
|
2021-10-07 13:41:16.639648 |
7 |
35559676 |
Caravansary near Kalimela Big |
350000 |
Caravansary near Kalimela Big1 |
Completion of work |
-
latitude : 23.21479365695268
Longitude : 86.57293953001499
file name : Image_07102021131820008.png
|
2021-10-07 13:18:20.117662 |
8 |
35559676 |
Caravansary near Kalimela Big |
350000 |
Caravansary near Kalimela Big1 |
Plinth level |
-
latitude : 23.214788334444165
Longitude : 86.5729308128357
file name : Image_07102021132126448.png
|
2021-10-07 13:21:26.545656 |
9 |
35559676 |
Caravansary near Kalimela Big |
350000 |
Caravansary near Kalimela Big1 |
Roof laid |
-
latitude : 23.21473498363048
Longitude : 86.57299409620464
file name : Image_07102021132406398.png
|
2021-10-07 13:24:06.515648 |
10 |
39089475 |
Maheshpur paharadih solar system dip tube well |
350000 |
Maheshpur paharadih solar system dip tube well 1 |
Roof laid |
-
latitude : 23.207547166384757,23.207623483613133
Longitude : 86.5871094726026,86.58716915175319
file name : Image_11102021134825546.png
|
2021-10-11 13:48:25.638539 |
11 |
39089475 |
Maheshpur paharadih solar system dip tube well |
350000 |
Maheshpur paharadih solar system dip tube well 1 |
Plinth level |
-
latitude : 23.207548297941685,23.207548297941685
Longitude : 86.587123721838,86.587123721838
file name : Image_07102021163729514.png
|
2021-10-07 16:37:29.600768 |
12 |
39089475 |
Maheshpur paharadih solar system dip tube well |
350000 |
Maheshpur paharadih solar system dip tube well 1 |
Completion of work |
-
latitude : 23.20753145031631,23.207517159171402
Longitude : 86.5871065389365,86.58715423196554
file name : Image_07102021163300194.png
|
2021-10-07 16:33:00.265111 |
13 |
39089585 |
Dharampur Bagan Bati solar system dip tube well |
350000 |
Dharampur Bagan Bati solar system dip tube well 1 |
Roof laid |
-
latitude : 23.203092268668115
Longitude : 86.54909502714872
file name : Image_01112021152359047.png
|
2021-11-01 15:23:59.144736 |
14 |
39089585 |
Dharampur Bagan Bati solar system dip tube well |
350000 |
Dharampur Bagan Bati solar system dip tube well 1 |
Plinth level |
-
latitude : 23.203099477104843
Longitude : 86.54905311763287
file name : Image_11102021164024127.png
|
2021-10-11 16:40:24.20531 |
15 |
39089585 |
Dharampur Bagan Bati solar system dip tube well |
350000 |
Dharampur Bagan Bati solar system dip tube well 1 |
Completion of work |
-
latitude : 23.20319297723472
Longitude : 86.54903844930232
file name : Image_11102021163544726.png
|
2021-10-11 16:35:44.803839 |
16 |
35475936 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit |
80000 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit1 |
Roof laid |
-
latitude : 23.191975
Longitude : 86.5210293
file name : Image_28012021093527156.png
|
2021-01-28 09:35:27.237839 |
17 |
35475936 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit |
80000 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit1 |
Plinth level |
-
latitude : 23.191975
Longitude : 86.5210293
file name : Image_28012021093201959.png
|
2021-01-28 09:32:02.023416 |
18 |
35475936 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit |
80000 |
Bargora Football ground tubewell boring fitting fixing,chatal drain sokhpit1 |
Completion of work |
-
latitude : 23.191975
Longitude : 86.5210293
file name : Image_28012021092807888.png
|
2021-01-28 09:28:07.999967 |
19 |
39089593 |
Jotiatard Pry. School Tube well |
80000 |
Jotiatard Pry. School Tube well 1 |
Roof laid |
-
latitude : 23.159838756546378
Longitude : 86.5918948687613
file name : Image_28012021114556148.png
|
2021-01-28 11:45:56.231735 |
20 |
39089593 |
Jotiatard Pry. School Tube well |
80000 |
Jotiatard Pry. School Tube well 1 |
Plinth level |
-
latitude : 23.159774341620505
Longitude : 86.59188715741038
file name : Image_28012021114048719.png
|
2021-01-28 11:40:48.807223 |
21 |
39089593 |
Jotiatard Pry. School Tube well |
80000 |
Jotiatard Pry. School Tube well 1 |
Completion of work |
-
latitude : 23.159882090985775
Longitude : 86.59177341498435
file name : Image_28012021113531856.png
|
2021-01-28 11:35:31.931461 |
22 |
35560022 |
Tube Well near Dapur Goria |
80000 |
Tube Well near Dapur Goria1 |
Roof laid |
-
latitude : 23.21483200415969
Longitude : 86.56774224713445
file name : Image_28012021095037321.png
|
2021-01-28 09:50:37.409324 |
23 |
35560022 |
Tube Well near Dapur Goria |
80000 |
Tube Well near Dapur Goria1 |
Completion of work |
-
latitude : 23.21563846897334
Longitude : 86.57146289013326
file name : Image_27012021170231137.png
|
2021-01-27 17:02:31.195575 |
24 |
39089589 |
Kuldih Tube well near Khepar Bandh |
80000 |
Kuldih Tube well near Khepar Bandh1 |
Roof laid |
-
latitude : 23.164148018695414
Longitude : 86.57861080951989
file name : Image_28012021112509560.png
|
2021-01-28 11:25:09.634278 |
25 |
39089589 |
Kuldih Tube well near Khepar Bandh |
80000 |
Kuldih Tube well near Khepar Bandh1 |
Plinth level |
-
latitude : 23.164202836342156
Longitude : 86.57865204848349
file name : Image_28012021112241349.png
|
2021-01-28 11:22:41.422186 |
26 |
39089589 |
Kuldih Tube well near Khepar Bandh |
80000 |
Kuldih Tube well near Khepar Bandh1 |
Completion of work |
-
latitude : 23.164157615974545
Longitude : 86.57862287946045
file name : Image_28012021110712058.png
|
2021-01-28 11:07:12.125063 |
27 |
35461802 |
pcc road from Niranjan sing house to Durjodhan Majhi house |
300000 |
pcc road from Niranjan sing house to Durjodhan Majhi house1 |
Roof laid |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021091806711.png
|
2021-01-28 09:18:06.779244 |
28 |
35461802 |
pcc road from Niranjan sing house to Durjodhan Majhi house |
300000 |
pcc road from Niranjan sing house to Durjodhan Majhi house1 |
Plinth level |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021091247703.png
|
2021-01-28 09:12:47.757153 |
29 |
35461802 |
pcc road from Niranjan sing house to Durjodhan Majhi house |
300000 |
pcc road from Niranjan sing house to Durjodhan Majhi house1 |
Completion of work |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021090745427.png
|
2021-01-28 09:07:45.493041 |
30 |
35463251 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house |
300000 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house1 |
Roof laid |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021090006247.png
|
2021-01-28 09:00:06.349139 |
31 |
35463251 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house |
300000 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house1 |
Completion of work |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021085239259.png
|
2021-01-28 08:52:39.410076 |
32 |
35463251 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house |
300000 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house1 |
Completion of work |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_28012021085247572.png
|
2021-01-28 08:52:47.649896 |
33 |
35463251 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house |
300000 |
pcc road from Durjodhan Majhi house to Ramchandra Tudu house1 |
Completion of work |
-
latitude : 23.191975,23.191975
Longitude : 86.5210293,86.5210293
file name : Image_27012021180008127.png
|
2021-01-27 18:00:08.213706 |
34 |
35560297 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House |
150000 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House1 |
Roof laid |
-
latitude : 23.210078040137887,23.21006102487445
Longitude : 86.57412841916084,86.57413143664598
file name : Image_28012021101955045.png
|
2021-01-28 10:19:55.113381 |
35 |
35560297 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House |
150000 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House1 |
Plinth level |
-
latitude : 23.21002175565809,23.209999669343233
Longitude : 86.57416999340057,86.57419639639556
file name : Image_28012021101734684.png
|
2021-01-28 10:17:34.750073 |
36 |
35560297 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House |
150000 |
PCC Road from Manatosh Mahato House to Sashibhusun Mahato House1 |
Completion of work |
-
latitude : 23.21004229132086,23.21003277786076
Longitude : 86.57410997897387,86.57416387461126
file name : Image_28012021101524791.png
|
2021-01-28 10:15:24.856453 |
37 |
35476571 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House |
150000 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House1 |
Roof laid |
-
latitude : 23.21485333610326,23.21481004357338
Longitude : 86.57209211960435,86.5721173491329
file name : Image_28012021100658654.png
|
2021-01-28 10:06:58.712271 |
38 |
35476571 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House |
150000 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House1 |
Plinth level |
-
latitude : 23.214798937551677,23.214798937551677
Longitude : 86.57213218510151,86.57213218510151
file name : Image_28012021100131296.png
|
2021-01-28 10:01:31.355062 |
39 |
35476571 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House |
150000 |
Pcc Road From Amulya Sahis House to Bhajahari Banerjee House1 |
Completion of work |
-
latitude : 23.214811217039824,23.214844074100256
Longitude : 86.57211198471487,86.57208784483373
file name : Image_28012021095754029.png
|
2021-01-28 09:57:54.110534 |
40 |
35537639 |
Pcc Road from Amtal to Sahardhar |
100000 |
Pcc Road from Amtal to Sahardhar1 |
Roof laid |
-
latitude : 23.19962417241186,23.19961859844625
Longitude : 86.58385352231562,86.58388210460544
file name : Image_28012021121504434.png
|
2021-01-28 12:15:04.510855 |
41 |
35537639 |
Pcc Road from Amtal to Sahardhar |
100000 |
Pcc Road from Amtal to Sahardhar1 |
Plinth level |
-
latitude : 23.19963833782822,23.199622496031225
Longitude : 86.58383742906153,86.58386441878974
file name : Image_28012021121256381.png
|
2021-01-28 12:12:56.455809 |
42 |
35537639 |
Pcc Road from Amtal to Sahardhar |
100000 |
Pcc Road from Amtal to Sahardhar1 |
Completion of work |
-
latitude : 23.199632596224546,23.1996678840369
Longitude : 86.58388160169125,86.58382996916771
file name : Image_28012021121059803.png
|
2021-01-28 12:10:59.878027 |
43 |
35534924 |
PCC Road from Bansa ICDS to Jatra Tard |
100000 |
PCC Road from Bansa ICDS to Jatra Tard1 |
Roof laid |
-
latitude : 23.174744630232453,23.174744630232453
Longitude : 86.58850623294711,86.58850623294711
file name : Image_28012021115826080.png
|
2021-01-28 11:58:26.17212 |
44 |
35534924 |
PCC Road from Bansa ICDS to Jatra Tard |
100000 |
PCC Road from Bansa ICDS to Jatra Tard1 |
Plinth level |
-
latitude : 23.17469274625182,23.174714078195393
Longitude : 86.58854378387332,86.58853037282825
file name : Image_28012021115623694.png
|
2021-01-28 11:56:23.781409 |
45 |
35534924 |
PCC Road from Bansa ICDS to Jatra Tard |
100000 |
PCC Road from Bansa ICDS to Jatra Tard1 |
Completion of work |
-
latitude : 23.174744420684874,23.174744420684874
Longitude : 86.58851302228868,86.58851302228868
file name : Image_28012021115407336.png
|
2021-01-28 11:54:07.418275 |
46 |
35530959 |
PCC Road from Prabhat Mahato Land to Jabla Tard |
200000 |
PCC Road from Prabhat Mahato Land to Jabla Tard1 |
Roof laid |
-
latitude : 23.160649831406772,23.160613412037492
Longitude : 86.57641223631799,86.5763757750392
file name : Image_28012021111505619.png
|
2021-01-28 11:15:05.687149 |
47 |
35530959 |
PCC Road from Prabhat Mahato Land to Jabla Tard |
200000 |
PCC Road from Prabhat Mahato Land to Jabla Tard1 |
Plinth level |
-
latitude : 23.160664541646838,23.160664541646838
Longitude : 86.57637401483953,86.57637401483953
file name : Image_28012021111045762.png
|
2021-01-28 11:10:45.828592 |
48 |
39089502 |
Jambad Gusaithan solar system dip tube well pump |
350000 |
Jambad Gusaithan solar system dip tube well pump1 |
Roof laid |
-
latitude : 23.213148,23.213148
Longitude : 86.5691923,86.5691923
file name : Image_21062021182435950.png
|
2021-06-21 18:24:36.00915 |
49 |
39089502 |
Jambad Gusaithan solar system dip tube well pump |
350000 |
Jambad Gusaithan solar system dip tube well pump1 |
Plinth level |
-
latitude : 23.213148,23.213148
Longitude : 86.5691923,86.5691923
file name : Image_21062021182106882.png
|
2021-06-21 18:21:06.942737 |
50 |
39089502 |
Jambad Gusaithan solar system dip tube well pump |
350000 |
Jambad Gusaithan solar system dip tube well pump1 |
Completion of work |
-
latitude : 23.215487636625767,23.21556185837835
Longitude : 86.57171778380871,86.57148250378668
file name : Image_21062021175902976.png
|
2021-06-21 17:59:03.076715 |
51 |
39089613 |
solar system dip tube well pump near Jambad Shib Mandir |
350000 |
solar system dip tube well pump near Jambad Shib Mandir1 |
Roof laid |
-
latitude : 23.213384868577123
Longitude : 86.57550958916545
file name : Image_21062021183220804.png
|
2021-06-21 18:32:20.867213 |
52 |
39089613 |
solar system dip tube well pump near Jambad Shib Mandir |
350000 |
solar system dip tube well pump near Jambad Shib Mandir1 |
Plinth level |
-
latitude : 23.21332711726427
Longitude : 86.57558385282755
file name : Image_21062021183012606.png
|
2021-06-21 18:30:12.669761 |
53 |
39089609 |
Guguitard solar system dip tube well pump |
350000 |
Guguitard solar system dip tube well pump1 |
Roof laid |
-
latitude : 23.179360209032893
Longitude : 86.59521670080721
file name : Image_22062021093317807.png
|
2021-06-22 09:33:17.888021 |
54 |
39089609 |
Guguitard solar system dip tube well pump |
350000 |
Guguitard solar system dip tube well pump1 |
Roof laid |
-
latitude : 23.1793832173571
Longitude : 86.59523086622357
file name : Image_22062021093314706.png
|
2021-06-22 09:33:14.787953 |
55 |
39089609 |
Guguitard solar system dip tube well pump |
350000 |
Guguitard solar system dip tube well pump1 |
Plinth level |
-
latitude : 23.179392982274294
Longitude : 86.59521653316915
file name : Image_22062021090915611.png
|
2021-06-22 09:09:15.670158 |
56 |
39089609 |
Guguitard solar system dip tube well pump |
350000 |
Guguitard solar system dip tube well pump1 |
Completion of work |
-
latitude : 23.179349438287318
Longitude : 86.5951759647578
file name : Image_22062021090409012.png
|
2021-06-22 09:04:09.081422 |
57 |
35563450 |
Solar System deep tubewell at Gopinathpur |
300000 |
Solar System deep tubewell at Gopinathpur1 |
Roof laid |
-
latitude : 23.184120920486748
Longitude : 86.57187703996897
file name : Image_01112021164602893.png
|
2021-11-01 16:46:02.975302 |
58 |
35563450 |
Solar System deep tubewell at Gopinathpur |
300000 |
Solar System deep tubewell at Gopinathpur1 |
Plinth level |
-
latitude : 23.184170331805944
Longitude : 86.5719048678875
file name : Image_01112021164347368.png
|
2021-11-01 16:43:47.45782 |
59 |
35563450 |
Solar System deep tubewell at Gopinathpur |
300000 |
Solar System deep tubewell at Gopinathpur1 |
Completion of work |
-
latitude : 23.18413940258324
Longitude : 86.571882404387
file name : Image_01112021155416779.png
|
2021-11-01 15:54:16.881171 |
60 |
67771512 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sansad IV |
Roof laid |
-
latitude : 23.20950833333333
Longitude : 86.56463666666666
file name : Image_18112023111058363.png
|
2023-11-18 11:10:58.466054 |
61 |
67771512 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sansad IV |
Plinth level |
-
latitude : 23.209495
Longitude : 86.56467833333333
file name : Image_18112023094338335.png
|
2023-11-18 09:43:38.42306 |
62 |
67771512 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sansad IV |
Plinth level |
-
latitude : 23.209500000000002
Longitude : 86.56465333333333
file name : Image_18112023094408841.png
|
2023-11-18 09:44:08.927324 |
63 |
67771512 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sansad IV |
Completion of work |
-
latitude : 23.209458333333334
Longitude : 86.56464166666667
file name : Image_17112023135139948.png
|
2023-11-17 13:51:40.039995 |
64 |
35530229 |
PCC Road from M S K to Ramdhan Mandi house |
100000 |
PCC Road from M S K to Ramdhan Mandi house1 |
Roof laid |
-
latitude : 23.159784735180438,23.159784735180438
Longitude : 86.59301519393921,86.59301519393921
file name : Image_07122021151333401.png
|
2021-12-07 15:13:33.477457 |
65 |
35530229 |
PCC Road from M S K to Ramdhan Mandi house |
100000 |
PCC Road from M S K to Ramdhan Mandi house1 |
Plinth level |
-
latitude : 23.159783561713994,23.15978360362351
Longitude : 86.59297135658562,86.59297144040465
file name : Image_07122021151039261.png
|
2021-12-07 15:10:39.335354 |
66 |
35530229 |
PCC Road from M S K to Ramdhan Mandi house |
100000 |
PCC Road from M S K to Ramdhan Mandi house1 |
Completion of work |
-
latitude : 23.15978289116174,23.159772413782775
Longitude : 86.59300756640732,86.5929813310504
file name : Image_07122021150636072.png
|
2021-12-07 15:06:36.157139 |
67 |
48632771 |
SOLAR SYSTEM SUBMERSIBAL PUMP INSTALATION AT BANSA |
300000 |
SOLAR SYSTEM SUBMERSIBAL PUMP INSTALATION AT BANSA1 |
Completion of work |
-
latitude : 23.172332486137748
Longitude : 86.57949836924672
file name : Image_16092022144646511.png
|
2022-09-16 14:46:46.649738 |
68 |
35532057 |
Bansa Godown Shed |
300000 |
Bansa Godown Shed1 |
Roof laid |
-
latitude : 23.1724740145728
Longitude : 86.57987019047141
file name : Image_09032022162019160.png
|
2022-03-09 16:20:19.288363 |
69 |
35532057 |
Bansa Godown Shed |
300000 |
Bansa Godown Shed1 |
Roof laid |
-
latitude : 23.17249098792672
Longitude : 86.57983456738293
file name : Image_09032022162110256.png
|
2022-03-09 16:21:10.361211 |
70 |
48633986 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD SADHU ASHARAM |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD SADHU ASHARAM1 |
Roof laid |
-
latitude : 23.21714545134455
Longitude : 86.57415884546936
file name : Image_05052022124418996.png
|
2022-05-05 12:44:19.080649 |
71 |
48633986 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD SADHU ASHARAM |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD SADHU ASHARAM1 |
Plinth level |
-
latitude : 23.217050610110164
Longitude : 86.57415624707937
file name : Image_05052022123724968.png
|
2022-05-05 12:37:25.048887 |
72 |
48633693 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD RANGAGORA |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD RANGAGORA1 |
Roof laid |
-
latitude : 23.220904441550374
Longitude : 86.562640350312
file name : Image_05052022145941692.png
|
2022-05-05 14:59:41.778332 |
73 |
48633693 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD RANGAGORA |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT JAMBAD RANGAGORA1 |
Plinth level |
-
latitude : 23.220932562835515
Longitude : 86.5626781526953
file name : Image_05052022145411652.png
|
2022-05-05 14:54:11.740555 |
74 |
48592377 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan |
350000 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan1 |
Roof laid |
-
latitude : 23.215350969694555
Longitude : 86.5728438924998
file name : Image_05052022153333271.png
|
2022-05-05 15:33:33.375395 |
75 |
48592377 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan |
350000 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan1 |
Plinth level |
-
latitude : 23.215367230586708
Longitude : 86.57276853919029
file name : Image_05052022151429662.png
|
2022-05-05 15:14:29.751461 |
76 |
48592377 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan |
350000 |
Solar System Submersibal Pump Instalation at Jambad Hat Moidan1 |
Completion of work |
-
latitude : 23.21537791751325
Longitude : 86.57279904931784
file name : Image_05052022151136335.png
|
2022-05-05 15:11:36.422878 |
77 |
47474040 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE |
200000 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE1 |
Roof laid |
-
latitude : 23.211822230368853,23.211822230368853
Longitude : 86.57281723804772,86.57281723804772
file name : Image_05052022153723607.png
|
2022-05-05 15:37:23.717857 |
78 |
47474040 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE |
200000 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE1 |
Plinth level |
-
latitude : 23.211827469058335,23.211827469058335
Longitude : 86.5728454850614,86.5728454850614
file name : Image_05052022153502612.png
|
2022-05-05 15:35:02.700897 |
79 |
47474040 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE |
200000 |
PCC ROAD FROM SRISTIDHAR MAHATO HOUSE TO MARIRAM MAHATO HOUSE1 |
Completion of work |
-
latitude : 23.211779189296067,23.21184532251209
Longitude : 86.57284020446241,86.57281447201967
file name : Image_05052022153338822.png
|
2022-05-05 15:33:38.925923 |
80 |
48632215 |
TUBEWELL,BORRING, FITTING, SOCKPIT AND DRAIN AT KASHITARD JAMBAD IV |
80000 |
TUBEWELL,BORRING, FITTING, SOCKPIT AND DRAIN AT KASHITARD JAMBAD IV1 |
Roof laid |
-
latitude : 23.208729936741292
Longitude : 86.57133657485247
file name : Image_05052022154508419.png
|
2022-05-05 15:45:08.518052 |
81 |
48632215 |
TUBEWELL,BORRING, FITTING, SOCKPIT AND DRAIN AT KASHITARD JAMBAD IV |
80000 |
TUBEWELL,BORRING, FITTING, SOCKPIT AND DRAIN AT KASHITARD JAMBAD IV1 |
Plinth level |
-
latitude : 23.208761243149638
Longitude : 86.57130698673427
file name : Image_05052022154207384.png
|
2022-05-05 15:42:07.498341 |
82 |
47476410 |
PCC ROAD FROM GUGUITARD ICDS TO AMTAL |
250000 |
PCC ROAD FROM GUGUITARD ICDS TO AMTAL 1 |
Roof laid |
-
latitude : 23.17524486221373,23.17524486221373
Longitude : 86.5892427507788,86.5892427507788
file name : Image_05052022160554169.png
|
2022-05-05 16:05:54.243257 |
83 |
47476410 |
PCC ROAD FROM GUGUITARD ICDS TO AMTAL |
250000 |
PCC ROAD FROM GUGUITARD ICDS TO AMTAL 1 |
Plinth level |
-
latitude : 23.175242892466486,23.175242892466486
Longitude : 86.58927032724023,86.58927032724023
file name : Image_05052022160331239.png
|
2022-05-05 16:03:31.315192 |
84 |
48559047 |
pcc road from kuldih kulimatha to jabla jore |
200000 |
pcc road from kuldih kulimatha to jabla jore1 |
Plinth level |
-
latitude : 23.163892035372555,23.163892035372555
Longitude : 86.5779934823513,86.5779934823513
file name : Image_05052022162103129.png
|
2022-05-05 16:21:03.195841 |
85 |
48559047 |
pcc road from kuldih kulimatha to jabla jore |
200000 |
pcc road from kuldih kulimatha to jabla jore1 |
Completion of work |
-
latitude : 23.163870368152857,23.163870368152857
Longitude : 86.57789935357869,86.57789935357869
file name : Image_05052022161749322.png
|
2022-05-05 16:17:49.405647 |
86 |
47472112 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR |
200000 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR1 |
Plinth level |
-
latitude : 23.21364,23.21364
Longitude : 86.573667,86.573667
file name : Image_10052022125518076.png
|
2022-05-10 12:55:18.168103 |
87 |
47472112 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR |
200000 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR1 |
Roof laid |
-
latitude : 23.214840763248503,23.214840763248503
Longitude : 86.57264314591885,86.57264314591885
file name : Image_10052022132005565.png
|
2022-05-10 13:20:05.632947 |
88 |
47472112 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR |
200000 |
PCC ROAD FROM ANANDA BANERJEE HOUSE TO KALIMANDIR1 |
Completion of work |
-
latitude : 23.2140049,23.2140049
Longitude : 86.5733516,86.5733516
file name : Image_05052022123718642.png
|
2022-05-05 12:37:18.721546 |
89 |
47470972 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA |
150000 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA1 |
Plinth level |
-
latitude : 23.21484223008156,23.214789633639157
Longitude : 86.57230610959232,86.57299803569913
file name : Image_10052022125418247.png
|
2022-05-10 12:54:18.334104 |
90 |
47470972 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA |
150000 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA1 |
Roof laid |
-
latitude : 23.214810462668538,23.2148021645844
Longitude : 86.57288052141666,86.57288043759763
file name : Image_10052022131934439.png
|
2022-05-10 13:19:34.506207 |
91 |
47470972 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA |
150000 |
PCC ROAD FROM CHANDAN MUKHERJEE HOUSE TO KALIMELA1 |
Completion of work |
-
latitude : 23.2140049,23.2140049
Longitude : 86.5733516,86.5733516
file name : Image_05052022123710245.png
|
2022-05-05 12:37:10.323841 |
92 |
48560514 |
PCC ROAD FROM BARGORA SARBESWAR SAREN HOUSE TO SUBODH HOUSE |
200000 |
PCC ROAD FROM BARGORA SARBESWAR SAREN HOUSE TO SUBODH HOUSE1 |
Roof laid |
-
latitude : 23.20074780844152,23.20074780844152
Longitude : 86.55047309584916,86.55047309584916
file name : Image_12052022164146218.png
|
2022-05-12 16:41:46.336713 |
93 |
48560514 |
PCC ROAD FROM BARGORA SARBESWAR SAREN HOUSE TO SUBODH HOUSE |
200000 |
PCC ROAD FROM BARGORA SARBESWAR SAREN HOUSE TO SUBODH HOUSE1 |
Plinth level |
-
latitude : 23.200356834568083,23.200356834568083
Longitude : 86.5508907660842,86.5508907660842
file name : Image_12052022155937331.png
|
2022-05-12 15:59:37.436306 |
94 |
47473065 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE |
200000 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE1 |
Roof laid |
-
latitude : 23.20033298805356,23.20033298805356
Longitude : 86.55093368142843,86.55093368142843
file name : Image_12052022160553332.png
|
2022-05-12 16:05:53.395317 |
95 |
47473065 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE |
200000 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE1 |
Plinth level |
-
latitude : 23.200320792384446,23.200320792384446
Longitude : 86.55091239139438,86.55091239139438
file name : Image_12052022155806433.png
|
2022-05-12 15:58:06.54112 |
96 |
47473065 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE |
200000 |
PCC ROAD FROM BARGORA BLACK TOP ROAD TO SARBESWAR SAREN HOUSE1 |
Completion of work |
-
latitude : 23.20032167248428,23.20032167248428
Longitude : 86.5508873295039,86.5508873295039
file name : Image_10052022125018765.png
|
2022-05-10 12:50:18.857967 |
97 |
47476785 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA |
200000 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA 1 |
Roof laid |
-
latitude : 23.157650912180543,23.157654935494065
Longitude : 86.59713037312031,86.5971290320158
file name : Image_12052022151446800.png
|
2022-05-12 15:14:46.86728 |
98 |
47476785 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA |
200000 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA 1 |
Plinth level |
-
latitude : 23.157650283537805,23.157650283537805
Longitude : 86.59712970256805,86.59712970256805
file name : Image_12052022150902552.png
|
2022-05-12 15:09:02.628085 |
99 |
47476785 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA |
200000 |
PCC ROAD FROM JYOTIATARD KESHAB MORE TO CHOUMATHA 1 |
Completion of work |
-
latitude : 23.157710884697735,23.157710884697735
Longitude : 86.59718619659543,86.59718619659543
file name : Image_05052022163149993.png
|
2022-05-05 16:31:50.069754 |
100 |
47473601 |
PCC ROAD FROM DHARAMPUR HARIMANDIR PREMISESH |
150000 |
PCC ROAD FROM DHARAMPUR HARIMANDIR PREMISESH1 |
Plinth level |
-
latitude : 23.19650375749916,23.19650375749916
Longitude : 86.54349298216403,86.54349298216403
file name : Image_16052022173724909.png
|
2022-05-16 17:37:24.98547 |
101 |
47473601 |
PCC ROAD FROM DHARAMPUR HARIMANDIR PREMISESH |
150000 |
PCC ROAD FROM DHARAMPUR HARIMANDIR PREMISESH1 |
Completion of work |
-
latitude : 23.215650790371,23.215650790371
Longitude : 86.57157864421606,86.57157864421606
file name : Image_16052022172037645.png
|
2022-05-16 17:20:37.749584 |
102 |
47472510 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE |
200000 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE1 |
Roof laid |
-
latitude : 23.215480595827103,23.215480595827103
Longitude : 86.57217828556895,86.57217828556895
file name : Image_19052022172711087.png
|
2022-05-19 17:27:11.178309 |
103 |
47472510 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE |
200000 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE1 |
Plinth level |
-
latitude : 23.21852750144899,23.2185304351151
Longitude : 86.56223122961819,86.56221974641085
file name : Image_05052022150530636.png
|
2022-05-05 15:05:30.725819 |
104 |
47472510 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE |
200000 |
PCC ROAD FROM ASHOK PARAMANIK HOUSE TO MATILAL PARAMANIK HOUSE1 |
Completion of work |
-
latitude : 23.218505792319775,23.218535464257002
Longitude : 86.56220608390868,86.5622304752469
file name : Image_05052022144822081.png
|
2022-05-05 14:48:22.181219 |
105 |
48592727 |
Jambad Kumar Hir Mini Check Dam |
349929 |
Jambad Kumar Hir Mini Check Dam1 |
Completion of work |
-
latitude : 23.197618131525815
Longitude : 86.56681504100561
file name : Image_30062022161457562.png
|
2022-06-30 16:14:57.644047 |
106 |
48633448 |
Hand Tube well Repairing and head water testing |
350000 |
Hand Tube well Repairing and head water testing 1 |
Completion of work |
-
latitude : 23.215562109835446
Longitude : 86.57182674854994
file name : Image_07092022170426832.png
|
2022-09-07 17:04:26.895934 |
107 |
48632457 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT MAHESHPUR MASJID |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT MAHESHPUR MASJID1 |
Completion of work |
-
latitude : 23.205245286226273
Longitude : 86.58696731552482
file name : Image_24122022134601564.png
|
2022-12-24 13:46:01.655361 |
108 |
48632457 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT MAHESHPUR MASJID |
80000 |
TUBEWELL BORRING, FITTING, CHATAL, SOCKPIT AND DRAIN AT MAHESHPUR MASJID1 |
Completion of work |
-
latitude : 23.205294529907405
Longitude : 86.58691953867674
file name : Image_24122022131757241.png
|
2022-12-24 13:17:57.314302 |
109 |
48633028 |
TUBEWELL BORRING, FITTING, CHATAL SOCKPIT AND DRAIN AT BANSA SAHIS PARA |
80000 |
TUBEWELL BORRING, FITTING, CHATAL SOCKPIT AND DRAIN AT BANSA SAHIS PARA1 |
Completion of work |
-
latitude : 23.169472329318523
Longitude : 86.58261576667428
file name : Image_24122022131800314.png
|
2022-12-24 13:18:00.381085 |
110 |
48633028 |
TUBEWELL BORRING, FITTING, CHATAL SOCKPIT AND DRAIN AT BANSA SAHIS PARA |
80000 |
TUBEWELL BORRING, FITTING, CHATAL SOCKPIT AND DRAIN AT BANSA SAHIS PARA1 |
Completion of work |
-
latitude : 23.169472790323198
Longitude : 86.58256195485592
file name : Image_24122022131803331.png
|
2022-12-24 13:18:03.406037 |
111 |
57984801 |
Tubewell instalation with sockpit and drain at Majhipara |
80000 |
Tubewell instalation with sockpit and drain at Majhipara1 |
Completion of work |
-
latitude : 23.210549999999998
Longitude : 86.57617
file name : Image_13042023165917396.png
|
2023-04-13 16:59:17.480953 |
112 |
57983424 |
Tubewell instalation with sockpit and drain at Islampur |
80000 |
Tubewell instalation with sockpit and drain at Islampur1 |
Completion of work |
-
latitude : 23.21184166666667
Longitude : 86.566655
file name : Image_13042023163606615.png
|
2023-04-13 16:36:06.698144 |
113 |
58003885 |
Tubewell instalation with sockpit and drain at Kashitair |
80000 |
Tubewell instalation with sockpit and drain at Kashitair1 |
Completion of work |
-
latitude : 23.206708333333335
Longitude : 86.57427166666666
file name : Image_19042023160421658.png
|
2023-04-19 16:04:21.756162 |
114 |
58003885 |
Tubewell instalation with sockpit and drain at Kashitair |
80000 |
Tubewell instalation with sockpit and drain at Kashitair1 |
Completion of work |
-
latitude : 23.206611666666664
Longitude : 86.57435666666667
file name : Image_19042023160459200.png
|
2023-04-19 16:04:59.288163 |
115 |
57984056 |
Tubewell instalation with sockpit and drain at Haldagora |
80000 |
Tubewell instalation with sockpit and drain at Haldagora1 |
Completion of work |
-
latitude : 23.201246666666666
Longitude : 86.57335166666665
file name : Image_13042023164418793.png
|
2023-04-13 16:44:18.883243 |
116 |
57981838 |
Tubewell Instalation with sockpit and drain at Rangagora |
80000 |
Tubewell Instalation with sockpit and drain at Rangagora1 |
Completion of work |
-
latitude : 23.219772591255605
Longitude : 86.56159873120487
file name : Image_16032023134344472.png
|
2023-03-16 13:43:44.548473 |
117 |
57981838 |
Tubewell Instalation with sockpit and drain at Rangagora |
80000 |
Tubewell Instalation with sockpit and drain at Rangagora1 |
Completion of work |
-
latitude : 23.219772591255605
Longitude : 86.56159873120487
file name : Image_16032023134348628.png
|
2023-03-16 13:43:48.697825 |
118 |
57661145 |
PCC Road from Chepu sing house to Manasamela |
100000 |
PCC Road from Chepu sing house to Manasamela1 |
Completion of work |
-
latitude : 23.2156534306705,23.215566216968
Longitude : 86.5732862893492,86.57339223660529
file name : Image_16032023124844322.png
|
2023-03-16 12:48:44.410682 |
119 |
39089621 |
Hand Tube well Repairing and head water tasting |
290000 |
Hand Tube well Repairing and head water tasting 1 |
Completion of work |
-
latitude : 23.215672834776342
Longitude : 86.57166707329452
file name : Image_23122021161342311.png
|
2021-12-23 16:13:42.402227 |
120 |
57832020 |
PCC Road From Rajabandh to Jaladhar House |
100000 |
PCC Road From Rajabandh to Jaladhar House1 |
Completion of work |
-
latitude : 23.197944999999997,23.198150000000002
Longitude : 86.58907666666667,86.58899666666666
file name : Image_15042023092834306.png
|
2023-04-15 09:28:34.383945 |
121 |
57825621 |
PCC Road from Thulku Mahato House to Jahur House |
100000 |
PCC Road from Thulku Mahato House to Jahur House1 |
Completion of work |
-
latitude : 23.205379999999998,23.205648333333336
Longitude : 86.58703166666668,86.58702333333333
file name : Image_13042023170058945.png
|
2023-04-13 17:00:59.029678 |
122 |
57833036 |
PCC Road at Bansa Majhi Kuli |
100000 |
PCC Road at Bansa Majhi Kuli1 |
Completion of work |
-
latitude : 23.173681666666667,23.173403333333333
Longitude : 86.586955,86.58688
file name : Image_14042023104608567.png
|
2023-04-14 10:46:08.659215 |
123 |
57824536 |
PCC Road from Rabilochan Mahato House to Baneswar Mahato House |
250000 |
PCC Road from Rabilochan Mahato House to Baneswar Mahato House1 |
Completion of work |
-
latitude : 23.20553333333333,23.20597
Longitude : 86.57474166666667,86.57454000000001
file name : Image_29052023145539576.png
|
2023-05-29 14:55:39.681601 |
124 |
48635585 |
GP OFFICE TOILET( MALE AND FEMALE) |
150000 |
GP OFFICE TOILET( MALE AND FEMALE)1 |
Completion of work |
-
latitude : 23.215619
Longitude : 86.5717155
file name : Image_24112022134519480.png
|
2022-11-24 13:45:19.560335 |
125 |
48635585 |
GP OFFICE TOILET( MALE AND FEMALE) |
150000 |
GP OFFICE TOILET( MALE AND FEMALE)1 |
Completion of work |
-
latitude : 23.215619
Longitude : 86.5717155
file name : Image_24112022133754394.png
|
2022-11-24 13:37:54.466407 |
126 |
48635585 |
GP OFFICE TOILET( MALE AND FEMALE) |
150000 |
GP OFFICE TOILET( MALE AND FEMALE)1 |
Completion of work |
-
latitude : 23.21557065937668
Longitude : 86.57184393145144
file name : Image_24112022132925943.png
|
2022-11-24 13:29:26.017308 |
127 |
58025178 |
Instalation of Tubewell with drain and sockpit at Jyotiatard Pry School |
80000 |
Instalation of Tubewell with drain and sockpit at Jyotiatard Pry School1 |
Completion of work |
-
latitude : 23.160722670145333
Longitude : 86.5924028120935
file name : Image_16032023134339570.png
|
2023-03-16 13:43:39.72114 |
128 |
58024002 |
Inatalation of Tubewell with drain and sockpit at Bansa |
80000 |
Inatalation of Tubewell with drain and sockpit at Bansa1 |
Completion of work |
-
latitude : 23.171974999999996
Longitude : 86.58536166666666
file name : Image_14042023105212618.png
|
2023-04-14 10:52:12.72048 |
129 |
48639792 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE) |
150000 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE)1 |
Roof laid |
-
latitude : 23.20621385704726
Longitude : 86.58714182674885
file name : Image_23112022140700373.png
|
2022-11-23 14:07:00.469104 |
130 |
48639792 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE) |
150000 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE)1 |
Completion of work |
-
latitude : 23.20623812265694
Longitude : 86.58713897690177
file name : Image_23112022140211894.png
|
2022-11-23 14:02:11.979492 |
131 |
48639792 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE) |
150000 |
BATHING GHAT AT MAHESHPUR PAHAR BANDH ( FEMALE)1 |
Completion of work |
-
latitude : 23.206189046613872
Longitude : 86.5870856679976
file name : Image_23112022134528399.png
|
2022-11-23 13:45:28.484901 |
132 |
48640916 |
BATHING GHAT AT KULDIH KHEPUR BANDH (FEMALE) |
150000 |
BATHING GHAT AT KULDIH KHEPUR BANDH (FEMALE)1 |
Completion of work |
-
latitude : 23.163873385638
Longitude : 86.57966651022434
file name : Image_16092022145741896.png
|
2022-09-16 14:57:41.997191 |
133 |
48637221 |
BATHING GHAT AT MAHESHPUR BARABANDH (FEMALE) |
150000 |
BATHING GHAT AT MAHESHPUR BARABANDH (FEMALE)1 |
Completion of work |
-
latitude : 23.20108744315803
Longitude : 86.58661561086774
file name : Image_16092022143425742.png
|
2022-09-16 14:34:25.850799 |
134 |
58010976 |
Drain from Jambad Road to Hapa |
100000 |
Drain from Jambad Road to Hapa1 |
Completion of work |
-
latitude : 23.214944999999997,23.214765000000003
Longitude : 86.57131,86.57130333333335
file name : Image_10082023104525767.png
|
2023-08-10 10:45:25.861324 |
135 |
57874437 |
Installation of Solar High Mast light at Jambad Hat Maidan |
300000 |
Installation of Solar High Mast light at Jambad Hat Maidan1 |
Completion of work |
-
latitude : 23.21517833333333
Longitude : 86.57290499999999
file name : Image_24052023164615807.png
|
2023-05-24 16:46:15.929429 |
136 |
57830794 |
PCC Road from Kalipada Ganguly House to Manoranjan Mujherjee House |
250000 |
PCC Road from Kalipada Ganguly House to Manoranjan Mujherjee House1 |
Completion of work |
-
latitude : 23.215559999999996,23.213601666666666
Longitude : 86.57165666666667,86.57486833333333
file name : Image_29052023145534150.png
|
2023-05-29 14:55:34.236217 |
137 |
58015029 |
Drain cum gardwell at near Haldagora jore bridge` |
100000 |
Drain cum gardwell at near Haldagora jore bridge`1 |
Completion of work |
-
latitude : 23.2156188,23.215555000000002
Longitude : 86.5717157,86.57172666666665
file name : Image_01062023132134899.png
|
2023-06-01 13:21:34.987954 |
138 |
58009604 |
Drain from Ratan Sing House to Dipankar Sing House |
300000 |
Drain from Ratan Sing House to Dipankar Sing House1 |
Completion of work |
-
latitude : 23.1863522,23.195674999999998
Longitude : 86.5326503,86.54210833333333
file name : Image_08082023080039722.png
|
2023-08-08 08:00:39.831652 |
139 |
57892546 |
Computer Purchasing and Repairing and Others |
100000 |
Computer Purchasing and Repairing and Others 1 |
|
-
latitude : 23.2156616
Longitude : 86.5717056
file name : Image_10082023132033883.png
|
2023-08-10 13:20:33.970354 |
140 |
57989072 |
Kuldih deep tubewell boring with pump |
300000 |
Kuldih deep tubewell boring with pump1 |
Completion of work |
-
latitude : 23.164928333333332
Longitude : 86.58006833333333
file name : Image_16092023085527592.png
|
2023-09-16 08:55:27.796264 |
141 |
57987607 |
Solar submersible pump at Bansa Dhangabandh |
350000 |
Solar submersible pump at Bansa Dhangabandh1 |
Completion of work |
-
latitude : 23.17258
Longitude : 86.58762666666668
file name : Image_16092023090509037.png
|
2023-09-16 09:05:09.123984 |
142 |
57884189 |
GP OFFICE FURNITURE PURCHASING |
80000 |
GP OFFICE FURNITURE PURCHASING1 |
|
-
latitude : 23.215618333333335
Longitude : 86.57168666666666
file name : Image_29092023173621746.png
|
2023-09-29 17:36:21.855257 |
143 |
57990848 |
Purified drinking water instalation at GP office |
45995 |
Purified drinking water instalation at GP office1 |
Completion of work |
-
latitude : 23.3434828
Longitude : 86.3605993
file name : Image_06102023171414133.png
|
2023-10-06 17:14:14.311739 |
144 |
58015601 |
GP OFFICE LADIES TOILET |
300000 |
GP OFFICE LADIES TOILET 1 |
Completion of work |
-
latitude : 23.2166962
Longitude : 86.5678516
file name : Image_23092023171437788.png
|
2023-09-23 17:14:37.863846 |
145 |
58015601 |
GP OFFICE LADIES TOILET |
300000 |
GP OFFICE LADIES TOILET 1 |
Completion of work |
-
latitude : 23.2166962
Longitude : 86.5678516
file name : Image_23092023171434947.png
|
2023-09-23 17:14:35.02459 |
146 |
67796554 |
Operation and Maintenance of drinking water supply system |
363995 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.21258833333333
Longitude : 86.57447166666667
file name : Image_13082024123437538.png
|
2024-08-13 12:34:37.66947 |
147 |
67796554 |
Operation and Maintenance of drinking water supply system |
363995 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.21567333333333
Longitude : 86.57181999999999
file name : Image_12072024150409847.png
|
2024-07-12 15:04:09.933066 |
148 |
67796554 |
Operation and Maintenance of drinking water supply system |
363995 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.21580833333333
Longitude : 86.57163999999999
file name : Image_12072024145343642.png
|
2024-07-12 14:53:43.736477 |
149 |
67796554 |
Operation and Maintenance of drinking water supply system |
363995 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_31122023153155001.png
|
2023-12-31 15:31:55.084648 |
150 |
57872396 |
Maheshpur Shasanghat Rest House |
250000 |
Maheshpur Shasanghat Rest House 1 |
Completion of work |
-
latitude : 23.19368833333333
Longitude : 86.59130666666667
file name : Image_29092023144928231.png
|
2023-09-29 14:49:28.331519 |
151 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Roof laid |
-
latitude : 23.21550333333333
Longitude : 86.576415
file name : Image_18112023110256525.png
|
2023-11-18 11:02:56.652453 |
152 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Plinth level |
-
latitude : 23.21550666666667
Longitude : 86.57645666666667
file name : Image_18112023103339384.png
|
2023-11-18 10:33:39.471024 |
153 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Plinth level |
-
latitude : 23.21552
Longitude : 86.57645333333333
file name : Image_18112023103307257.png
|
2023-11-18 10:33:07.341504 |
154 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Completion of work |
-
latitude : 23.2155
Longitude : 86.57643666666667
file name : Image_18112023093214548.png
|
2023-11-18 09:32:14.630579 |
155 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Completion of work |
-
latitude : 23.215510000000002
Longitude : 86.57644
file name : Image_18112023093141348.png
|
2023-11-18 09:31:41.436204 |
156 |
67770843 |
Creation of a new source of drinking water |
90000 |
Installation of new tubewell at Jambad Barabaid |
Completion of work |
-
latitude : 23.215514999999996
Longitude : 86.576475
file name : Image_18112023093102780.png
|
2023-11-18 09:31:02.869486 |
157 |
67771532 |
Creation of a new source of drinking water |
89965 |
Insallation of new tubewell at Jambad Bijoydih |
Roof laid |
-
latitude : 23.21145166666667
Longitude : 86.56438666666666
file name : Image_18112023111356293.png
|
2023-11-18 11:13:56.392289 |
158 |
67771532 |
Creation of a new source of drinking water |
89965 |
Insallation of new tubewell at Jambad Bijoydih |
Plinth level |
-
latitude : 23.211433333333336
Longitude : 86.56437166666667
file name : Image_18112023094904235.png
|
2023-11-18 09:49:04.321038 |
159 |
67771532 |
Creation of a new source of drinking water |
89965 |
Insallation of new tubewell at Jambad Bijoydih |
Plinth level |
-
latitude : 23.211436666666668
Longitude : 86.56438333333332
file name : Image_18112023094833054.png
|
2023-11-18 09:48:33.136498 |
160 |
67771532 |
Creation of a new source of drinking water |
89965 |
Insallation of new tubewell at Jambad Bijoydih |
Completion of work |
-
latitude : 23.21139333333333
Longitude : 86.56441333333332
file name : Image_17112023140016436.png
|
2023-11-17 14:00:16.527963 |
161 |
67771938 |
Creation of drainage channel for management of grey water |
199809 |
Construction of drain at Maheshpur Jr High School |
Roof laid |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_05012024155053172.png
|
2024-01-05 15:50:53.308079 |
162 |
67771938 |
Creation of drainage channel for management of grey water |
199809 |
Construction of drain at Maheshpur Jr High School |
Plinth level |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_05012024154352057.png
|
2024-01-05 15:43:52.136858 |
163 |
67771938 |
Creation of drainage channel for management of grey water |
199809 |
Construction of drain at Maheshpur Jr High School |
Completion of work |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_05012024152958306.png
|
2024-01-05 15:29:58.389465 |
164 |
67771332 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community toilet near Jambad Health Centre |
Roof laid |
-
latitude : 23.21507
Longitude : 86.57062833333333
file name : Image_18062024165413808.png
|
2024-06-18 16:54:13.903952 |
165 |
67771332 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community toilet near Jambad Health Centre |
Plinth level |
-
latitude : 23.215075000000002
Longitude : 86.57078333333332
file name : Image_18062024165107877.png
|
2024-06-18 16:51:07.966541 |
166 |
67771332 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community toilet near Jambad Health Centre |
Completion of work |
-
latitude : 23.21501166666667
Longitude : 86.57062166666668
file name : Image_18062024164617696.png
|
2024-06-18 16:46:17.788235 |
167 |
67750441 |
Construction of roads |
200000 |
Construction of roads Amtala to Jahirthan Bansa |
Roof laid |
-
latitude : 23.17525,23.175413333333335
Longitude : 86.58921333333335,86.58967
file name : Image_23032024102239673.png
|
2024-03-23 10:22:39.764139 |
168 |
67750441 |
Construction of roads |
200000 |
Construction of roads Amtala to Jahirthan Bansa |
Plinth level |
-
latitude : 23.175248333333336,23.17542166666666
Longitude : 86.58920666666667,86.58967
file name : Image_23032024101124531.png
|
2024-03-23 10:11:24.631227 |
169 |
67750441 |
Construction of roads |
200000 |
Construction of roads Amtala to Jahirthan Bansa |
Completion of work |
-
latitude : 23.175416666666667,23.175236666666667
Longitude : 86.58971666666666,86.58925833333333
file name : Image_15032024133033386.png
|
2024-03-15 13:30:33.510891 |
170 |
67748289 |
Construction of roads |
100000 |
Construction of roadsJore to Gouranga Mahato House |
Roof laid |
-
latitude : 23.205345000000005,23.205601666666666
Longitude : 86.57477833333333,86.57474666666667
file name : Image_27032024153023724.png
|
2024-03-27 15:30:23.81408 |
171 |
67748289 |
Construction of roads |
100000 |
Construction of roadsJore to Gouranga Mahato House |
Plinth level |
-
latitude : 23.205601666666666,23.205343333333335
Longitude : 86.574785,86.57481333333332
file name : Image_27032024151255633.png
|
2024-03-27 15:12:55.723655 |
172 |
67748289 |
Construction of roads |
100000 |
Construction of roadsJore to Gouranga Mahato House |
Completion of work |
-
latitude : 23.2030303,23.20558
Longitude : 86.5815509,86.57475333333332
file name : Image_15032024123928500.png
|
2024-03-15 12:39:28.596272 |
173 |
67771349 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Gosai More |
Roof laid |
-
latitude : 23.213913333333334
Longitude : 86.56981166666668
file name : Image_18112023111758136.png
|
2023-11-18 11:17:58.238603 |
174 |
67771349 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Gosai More |
Plinth level |
-
latitude : 23.213896666666663
Longitude : 86.56982500000001
file name : Image_18112023095214341.png
|
2023-11-18 09:52:14.422339 |
175 |
67771349 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Gosai More |
Plinth level |
-
latitude : 23.213881666666666
Longitude : 86.56983333333334
file name : Image_18112023095247774.png
|
2023-11-18 09:52:47.861347 |
176 |
67771349 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Gosai More |
Completion of work |
-
latitude : 23.21389333333333
Longitude : 86.56987166666667
file name : Image_17112023133819573.png
|
2023-11-17 13:38:19.670424 |
177 |
67771349 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Gosai More |
Completion of work |
-
latitude : 23.213913333333334
Longitude : 86.56984166666668
file name : Image_17112023133747666.png
|
2023-11-17 13:37:47.807464 |
178 |
67745661 |
Construction of roads |
149749 |
Construction of PCC Road from Bipin Soren House to Sarbeswar Soren House at Bargora |
Roof laid |
-
latitude : 23.202403333333336,23.202045
Longitude : 86.55177,86.551385
file name : Image_01122023094211771.png
|
2023-12-01 09:42:11.854997 |
179 |
67745661 |
Construction of roads |
149749 |
Construction of PCC Road from Bipin Soren House to Sarbeswar Soren House at Bargora |
Plinth level |
-
latitude : 23.202403333333336,23.202021666666663
Longitude : 86.55177166666665,86.55134500000001
file name : Image_01122023093304370.png
|
2023-12-01 09:33:04.457356 |
180 |
67745661 |
Construction of roads |
149749 |
Construction of PCC Road from Bipin Soren House to Sarbeswar Soren House at Bargora |
Completion of work |
-
latitude : 23.202383333333334,23.20200333333333
Longitude : 86.55173166666667,86.55132499999999
file name : Image_01122023090618559.png
|
2023-12-01 09:06:18.647569 |
181 |
67744775 |
Construction of roads |
149749 |
Construction of PCC Road from Ruhidas House to Bipin Soren House at Barg |
Roof laid |
-
latitude : 23.202414999999995,23.202628333333337
Longitude : 86.55175666666668,86.55199166666668
file name : Image_01122023094038356.png
|
2023-12-01 09:40:38.440125 |
182 |
67744775 |
Construction of roads |
149749 |
Construction of PCC Road from Ruhidas House to Bipin Soren House at Barg |
Plinth level |
-
latitude : 23.20245166666667,23.202620000000003
Longitude : 86.55183000000001,86.55199166666668
file name : Image_01122023093059915.png
|
2023-12-01 09:31:00.000422 |
183 |
67744775 |
Construction of roads |
149749 |
Construction of PCC Road from Ruhidas House to Bipin Soren House at Barg |
Completion of work |
-
latitude : 23.202401666666667,23.202628333333337
Longitude : 86.55174166666666,86.55202333333334
file name : Image_01122023090939061.png
|
2023-12-01 09:09:39.141012 |
184 |
67751137 |
Construction of roads |
199549 |
Construction of PCC Road from Kuldih Dilip Mahato land to Tematha |
Roof laid |
-
latitude : 23.162151666666666,23.16257166666667
Longitude : 86.57684166666668,86.57683999999999
file name : Image_03122023100918058.png
|
2023-12-03 10:09:18.137906 |
185 |
67751137 |
Construction of roads |
199549 |
Construction of PCC Road from Kuldih Dilip Mahato land to Tematha |
Plinth level |
-
latitude : 23.162148333333334,23.16257333333333
Longitude : 86.57686,86.57684499999999
file name : Image_03122023095921713.png
|
2023-12-03 09:59:21.782456 |
186 |
67751137 |
Construction of roads |
199549 |
Construction of PCC Road from Kuldih Dilip Mahato land to Tematha |
Completion of work |
-
latitude : 23.162149999999997,23.162566666666667
Longitude : 86.57685166666667,86.57683999999999
file name : Image_03122023091900977.png
|
2023-12-03 09:19:01.051753 |
187 |
67749988 |
Construction of roads |
199549 |
Construction of PCC Road from Biswanath Sing House to Tube Wel |
Roof laid |
-
latitude : 23.203100000000003,23.203584999999997
Longitude : 86.59031000000002,86.59027499999999
file name : Image_03122023110633964.png
|
2023-12-03 11:06:34.046655 |
188 |
67749988 |
Construction of roads |
199549 |
Construction of PCC Road from Biswanath Sing House to Tube Wel |
Plinth level |
-
latitude : 23.203605,23.20312666666667
Longitude : 86.59031666666667,86.59029833333334
file name : Image_03122023110222075.png
|
2023-12-03 11:02:21.749369 |
189 |
67749988 |
Construction of roads |
199549 |
Construction of PCC Road from Biswanath Sing House to Tube Wel |
Completion of work |
-
latitude : 23.203083333333332,23.203598333333336
Longitude : 86.59031333333333,86.59027666666667
file name : Image_03122023104714566.png
|
2023-12-03 10:47:14.647254 |
190 |
67747838 |
Construction of roads |
99893 |
Construction of PCC Road from Ananda Mahato House to Kantiram Mahato House |
Roof laid |
-
latitude : 23.211576666666662,23.211531666666662
Longitude : 86.56376,86.56408166666667
file name : Image_03122023115228795.png
|
2023-12-03 11:52:28.875248 |
191 |
67747838 |
Construction of roads |
99893 |
Construction of PCC Road from Ananda Mahato House to Kantiram Mahato House |
Plinth level |
-
latitude : 23.211523333333336,23.211515000000002
Longitude : 86.56408000000002,86.56378333333332
file name : Image_03122023114811278.png
|
2023-12-03 11:48:11.350381 |
192 |
67747838 |
Construction of roads |
99893 |
Construction of PCC Road from Ananda Mahato House to Kantiram Mahato House |
Completion of work |
-
latitude : 23.211508333333335,23.211523333333336
Longitude : 86.56408666666667,86.56375666666666
file name : Image_03122023114233923.png
|
2023-12-03 11:42:33.994264 |
193 |
67740492 |
Electricity |
40000 |
Electricity1 |
Roof laid |
-
latitude : 23.2157213
Longitude : 86.5716635
file name : Image_08062024115146525.png
|
2024-06-08 11:51:46.603777 |
194 |
67740492 |
Electricity |
40000 |
Electricity1 |
Plinth level |
-
latitude : 23.215722
Longitude : 86.5716575
file name : Image_08062024114743272.png
|
2024-06-08 11:47:43.352773 |
195 |
67740492 |
Electricity |
40000 |
Electricity1 |
Completion of work |
-
latitude : 23.2157204
Longitude : 86.5716586
file name : Image_03062024163245201.png
|
2024-06-03 16:32:45.28975 |
196 |
67738199 |
Procurement of Printer |
20000 |
Procurement of Printer1 |
|
-
latitude : 23.2157211
Longitude : 86.5716623
file name : Image_08062024114612739.png
|
2024-06-08 11:46:12.815308 |
197 |
67771905 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drain with Slab at Gopinathpur Village |
Roof laid |
-
latitude : 23.18416
Longitude : 86.57196166666667
file name : Image_23032024105852832.png
|
2024-03-23 10:58:52.994184 |
198 |
67771905 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drain with Slab at Gopinathpur Village |
Plinth level |
-
latitude : 23.18409166666667
Longitude : 86.57266499999999
file name : Image_23032024091858415.png
|
2024-03-23 09:18:58.499125 |
199 |
67771905 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drain with Slab at Gopinathpur Village |
Completion of work |
-
latitude : 23.184143333333335
Longitude : 86.57264333333333
file name : Image_15032024131741625.png
|
2024-03-15 13:17:41.82041 |
200 |
67747096 |
Repairing and maintenance of roads |
250000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.223094999999997,23.223094999999997
Longitude : 86.56200333333332,86.56200333333332
file name : Image_07062024170124158.png
|
2024-06-07 17:01:24.242737 |
201 |
67747096 |
Repairing and maintenance of roads |
250000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.223115,23.223115
Longitude : 86.56198,86.56198166666667
file name : Image_07062024164231786.png
|
2024-06-07 16:42:31.892063 |
202 |
67747096 |
Repairing and maintenance of roads |
250000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.22311,23.223136666666665
Longitude : 86.56195166666666,86.56192833333334
file name : Image_07062024131723394.png
|
2024-06-07 13:17:23.500952 |
203 |
67735794 |
Functional Equipment |
100000 |
Functional Equipment1 |
|
-
latitude : 23.2157218
Longitude : 86.5716573
file name : Image_08062024114712476.png
|
2024-06-08 11:47:12.563196 |
204 |
67741539 |
Procurement of Furniture |
66000 |
Procurement of Furniture1 |
|
-
latitude : 23.3435111
Longitude : 86.3603127
file name : Image_22062024182417539.png
|
2024-06-22 18:24:17.615995 |
205 |
67771590 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Maheshpur Kachakuli Kulimora |
Roof laid |
-
latitude : 23.19822
Longitude : 86.58754166666668
file name : Image_03122023104344420.png
|
2023-12-03 10:43:44.498981 |
206 |
67771590 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Maheshpur Kachakuli Kulimora |
Plinth level |
-
latitude : 23.198198333333334
Longitude : 86.58751833333332
file name : Image_03122023102633098.png
|
2023-12-03 10:26:33.187819 |
207 |
67771590 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Maheshpur Kachakuli Kulimora |
Completion of work |
-
latitude : 23.198166666666665
Longitude : 86.58759333333334
file name : Image_17112023142239824.png
|
2023-11-17 14:22:39.95334 |
208 |
67771984 |
Creation of drainage channel for management of grey water |
199809 |
Construction of Drain with slab at Bansa Primary School |
Roof laid |
-
latitude : 23.1727399
Longitude : 86.5845373
file name : Image_30122023120021025.png
|
2023-12-30 12:00:21.105432 |
209 |
67771984 |
Creation of drainage channel for management of grey water |
199809 |
Construction of Drain with slab at Bansa Primary School |
Plinth level |
-
latitude : 23.1727387
Longitude : 86.5845371
file name : Image_30122023115718231.png
|
2023-12-30 11:57:18.301671 |
210 |
67771984 |
Creation of drainage channel for management of grey water |
199809 |
Construction of Drain with slab at Bansa Primary School |
Completion of work |
-
latitude : 23.1727383
Longitude : 86.5845365
file name : Image_30122023113944931.png
|
2023-12-30 11:39:45.006196 |
211 |
67771304 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sardar Parar Bottal |
Roof laid |
-
latitude : 23.215841666666666
Longitude : 86.57312833333332
file name : Image_18112023110558645.png
|
2023-11-18 11:05:58.779645 |
212 |
67771304 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sardar Parar Bottal |
Plinth level |
-
latitude : 23.21583666666667
Longitude : 86.57312333333333
file name : Image_18112023103759789.png
|
2023-11-18 10:37:59.886583 |
213 |
67771304 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sardar Parar Bottal |
Plinth level |
-
latitude : 23.215823333333333
Longitude : 86.57309
file name : Image_18112023103730059.png
|
2023-11-18 10:37:30.150511 |
214 |
67771304 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Jambad Sardar Parar Bottal |
Completion of work |
-
latitude : 23.215815
Longitude : 86.57313666666666
file name : Image_17112023134125839.png
|
2023-11-17 13:41:25.955793 |
215 |
67771373 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Siyalgara |
Roof laid |
-
latitude : 23.214985000000002
Longitude : 86.56681166666667
file name : Image_18112023112050510.png
|
2023-11-18 11:20:50.626808 |
216 |
67771373 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Siyalgara |
Plinth level |
-
latitude : 23.21499833333333
Longitude : 86.566725
file name : Image_18112023095622695.png
|
2023-11-18 09:56:22.775586 |
217 |
67771373 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Siyalgara |
Plinth level |
-
latitude : 23.214985000000002
Longitude : 86.566725
file name : Image_18112023095549260.png
|
2023-11-18 09:55:49.339319 |
218 |
67771373 |
Creation of a new source of drinking water |
89965 |
Installation of new tubewell at Siyalgara |
Completion of work |
-
latitude : 23.196944999999996
Longitude : 86.54404500000001
file name : Image_17112023132934202.png
|
2023-11-17 13:29:34.290433 |
219 |
67739433 |
Installation of Computer with Internet facility |
100000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 23.215529999999998
Longitude : 86.57176666666668
file name : Image_18062024155138545.png
|
2024-06-18 15:51:38.642677 |
220 |
67772099 |
Creation of drainage channel for management of grey water |
199809 |
Constraction of Drain with Slab at Jyotiatard Vallage |
Roof laid |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_30122023122353016.png
|
2023-12-30 12:23:53.100901 |
221 |
67772099 |
Creation of drainage channel for management of grey water |
199809 |
Constraction of Drain with Slab at Jyotiatard Vallage |
Roof laid |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_30122023122301428.png
|
2023-12-30 12:23:01.508253 |
222 |
67772099 |
Creation of drainage channel for management of grey water |
199809 |
Constraction of Drain with Slab at Jyotiatard Vallage |
Plinth level |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_30122023121847595.png
|
2023-12-30 12:18:47.673886 |
223 |
67772099 |
Creation of drainage channel for management of grey water |
199809 |
Constraction of Drain with Slab at Jyotiatard Vallage |
Completion of work |
-
latitude : 23.196706666666667
Longitude : 86.54407
file name : Image_30122023121458186.png
|
2023-12-30 12:14:58.274463 |
224 |
67772036 |
Construction of Community Sanitary Complex |
100000 |
Community toilet near Bansa Village |
Roof laid |
-
latitude : 23.172541666666667
Longitude : 86.57972999999998
file name : Image_22062024125123335.png
|
2024-06-22 12:51:23.414932 |
225 |
67772036 |
Construction of Community Sanitary Complex |
100000 |
Community toilet near Bansa Village |
Plinth level |
-
latitude : 23.17254833333333
Longitude : 86.579745
file name : Image_22062024124421860.png
|
2024-06-22 12:44:21.935395 |
226 |
67772036 |
Construction of Community Sanitary Complex |
100000 |
Community toilet near Bansa Village |
Completion of work |
-
latitude : 23.172540000000005
Longitude : 86.57976333333333
file name : Image_22062024123918611.png
|
2024-06-22 12:39:18.693454 |
227 |
67772036 |
Construction of Community Sanitary Complex |
100000 |
Community toilet near Bansa Village |
Completion of work |
-
latitude : 23.172535
Longitude : 86.57970500000002
file name : Image_22062024123931316.png
|
2024-06-22 12:39:31.401355 |
228 |
67772036 |
Construction of Community Sanitary Complex |
100000 |
Community toilet near Bansa Village |
Completion of work |
-
latitude : 23.172535
Longitude : 86.57970500000002
file name : Image_22062024123944466.png
|
2024-06-22 12:39:44.549583 |
229 |
90247891 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.214336666666668,23.214585000000003
Longitude : 86.57261666666666,86.57275666666668
file name : Image_11112024153845056.png
|
2024-11-11 15:38:45.166351 |
230 |
90247891 |
Construction of roads |
99000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.21463833333333,23.21431166666667
Longitude : 86.57274666666666,86.57267166666666
file name : Image_11112024153551802.png
|
2024-11-11 15:35:51.888538 |
231 |
90247891 |
Construction of roads |
99000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.21462166666667,23.21462166666667
Longitude : 86.57271999999999,86.57271999999999
file name : Image_11112024153124888.png
|
2024-11-11 15:31:24.985425 |
232 |
90247516 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.215055,23.214816666666668
Longitude : 86.57379999999999,86.57377333333334
file name : Image_11112024152636433.png
|
2024-11-11 15:26:36.521867 |
233 |
90247516 |
Construction of roads |
99000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.215046666666662,23.214814999999998
Longitude : 86.57379999999999,86.57377333333334
file name : Image_11112024152319024.png
|
2024-11-11 15:23:19.1142 |
234 |
90247516 |
Construction of roads |
99000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.21474166666667,23.215051666666668
Longitude : 86.57376000000001,86.57378333333332
file name : Image_11112024151412145.png
|
2024-11-11 15:14:12.240406 |
235 |
91368948 |
Creation of a new source of drinking water |
90000 |
Tubewell at Maheshpur Parsipara |
Roof laid |
-
latitude : 23.19955
Longitude : 86.58678166666665
file name : Image_21082024114748106.png
|
2024-08-21 11:47:48.201216 |
236 |
91368948 |
Creation of a new source of drinking water |
90000 |
Tubewell at Maheshpur Parsipara |
Plinth level |
-
latitude : 23.19961166666667
Longitude : 86.58675666666667
file name : Image_21082024112950377.png
|
2024-08-21 11:29:50.46642 |
237 |
91368948 |
Creation of a new source of drinking water |
90000 |
Tubewell at Maheshpur Parsipara |
Completion of work |
-
latitude : 23.199573333333333
Longitude : 86.58672999999999
file name : Image_21082024112400153.png
|
2024-08-21 11:24:00.240078 |
238 |
91370444 |
Creation of a new source of drinking water |
90000 |
Tubewell at Shasangora Near Football Ground |
Roof laid |
-
latitude : 23.186596666666667
Longitude : 86.53633999999998
file name : Image_13082024132724732.png
|
2024-08-13 13:27:24.818361 |
239 |
91370444 |
Creation of a new source of drinking water |
90000 |
Tubewell at Shasangora Near Football Ground |
Plinth level |
-
latitude : 23.186563333333332
Longitude : 86.53631500000002
file name : Image_13082024132038290.png
|
2024-08-13 13:20:38.368148 |
240 |
91370444 |
Creation of a new source of drinking water |
90000 |
Tubewell at Shasangora Near Football Ground |
Completion of work |
-
latitude : 23.186538333333335
Longitude : 86.53629500000001
file name : Image_13082024125637743.png
|
2024-08-13 12:56:37.832638 |
241 |
97866756 |
Creation of a new source of drinking water |
90000 |
Tube well at Ghashibad near Nitai Das House |
Roof laid |
-
latitude : 23.214995
Longitude : 86.57020166666668
file name : Image_13082024150741349.png
|
2024-08-13 15:07:41.447133 |
242 |
97866756 |
Creation of a new source of drinking water |
90000 |
Tube well at Ghashibad near Nitai Das House |
Plinth level |
-
latitude : 23.214989999999997
Longitude : 86.570215
file name : Image_13082024150309294.png
|
2024-08-13 15:03:09.414092 |
243 |
97866756 |
Creation of a new source of drinking water |
90000 |
Tube well at Ghashibad near Nitai Das House |
Completion of work |
-
latitude : 23.21501166666667
Longitude : 86.57027333333332
file name : Image_13082024145606417.png
|
2024-08-13 14:56:06.523061 |
244 |
97868820 |
Creation of a new source of drinking water |
90000 |
Tube well at Bansa SKUS |
Roof laid |
-
latitude : 23.172424999999997
Longitude : 86.57986333333335
file name : Image_13082024135758832.png
|
2024-08-13 13:57:58.911333 |
245 |
97868820 |
Creation of a new source of drinking water |
90000 |
Tube well at Bansa SKUS |
Plinth level |
-
latitude : 23.172431666666665
Longitude : 86.57985166666667
file name : Image_13082024135525739.png
|
2024-08-13 13:55:25.83065 |
246 |
97868820 |
Creation of a new source of drinking water |
90000 |
Tube well at Bansa SKUS |
Completion of work |
-
latitude : 23.172473333333333
Longitude : 86.57988666666667
file name : Image_13082024134835305.png
|
2024-08-13 13:48:35.398652 |
247 |
97869206 |
Creation of a new source of drinking water |
90000 |
Tubewell at Jambad Kumarpara near Bholanath Mahato House |
Plinth level |
-
latitude : 23.212568333333333
Longitude : 86.57438166666667
file name : Image_13082024123120359.png
|
2024-08-13 12:31:20.453754 |
248 |
97869206 |
Creation of a new source of drinking water |
90000 |
Tubewell at Jambad Kumarpara near Bholanath Mahato House |
Plinth level |
-
latitude : 23.212538333333335
Longitude : 86.57438333333333
file name : Image_13082024123031448.png
|
2024-08-13 12:30:31.541124 |
249 |
97869206 |
Creation of a new source of drinking water |
90000 |
Tubewell at Jambad Kumarpara near Bholanath Mahato House |
Completion of work |
-
latitude : 23.212584999999997
Longitude : 86.57442999999999
file name : Image_13082024122353298.png
|
2024-08-13 12:23:53.390858 |
250 |
97866442 |
Creation of a new source of drinking water |
90000 |
Tube well at Rangagora near Nilkamal Mahato House |
Roof laid |
-
latitude : 23.218795
Longitude : 86.55972833333333
file name : Image_13082024121332388.png
|
2024-08-13 12:13:32.483203 |
251 |
97866442 |
Creation of a new source of drinking water |
90000 |
Tube well at Rangagora near Nilkamal Mahato House |
Plinth level |
-
latitude : 23.218804999999996
Longitude : 86.55968333333334
file name : Image_13082024120928475.png
|
2024-08-13 12:09:28.57018 |
252 |
97866442 |
Creation of a new source of drinking water |
90000 |
Tube well at Rangagora near Nilkamal Mahato House |
Plinth level |
-
latitude : 23.218765
Longitude : 86.55968
file name : Image_13082024115940695.png
|
2024-08-13 11:59:40.799373 |
253 |
97866442 |
Creation of a new source of drinking water |
90000 |
Tube well at Rangagora near Nilkamal Mahato House |
Completion of work |
-
latitude : 23.21878166666667
Longitude : 86.55965166666668
file name : Image_13082024115250500.png
|
2024-08-13 11:52:50.598323 |
254 |
91368608 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.175440000000002
Longitude : 86.589755
file name : Image_13082024141345824.png
|
2024-08-13 14:13:45.912458 |
255 |
91368608 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.175408333333333
Longitude : 86.58974000000002
file name : Image_13082024140836186.png
|
2024-08-13 14:08:36.274252 |
256 |
91368608 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.17542
Longitude : 86.58974833333332
file name : Image_13082024140540704.png
|
2024-08-13 14:05:40.795869 |
257 |
91368264 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.17334166666667
Longitude : 86.58501333333334
file name : Image_13082024142520939.png
|
2024-08-13 14:25:21.024676 |
258 |
91368264 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.17333833333333
Longitude : 86.585005
file name : Image_13082024142245103.png
|
2024-08-13 14:22:45.189169 |
259 |
91368264 |
Creation of a new source of drinking water |
90000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.17337166666667
Longitude : 86.58507166666668
file name : Image_13082024141834704.png
|
2024-08-13 14:18:34.79874 |
260 |
90481001 |
Construction of roads |
99000 |
PCC Road from Maheshpur pathragora to Biswanath sing House |
Roof laid |
-
latitude : 23.202936666666666,23.20303
Longitude : 86.59048,86.59032333333334
file name : Image_20112024161331099.png
|
2024-11-20 16:13:31.195346 |
261 |
90481001 |
Construction of roads |
99000 |
PCC Road from Maheshpur pathragora to Biswanath sing House |
Roof laid |
-
latitude : 23.20307833333333,23.20294833333333
Longitude : 86.59032833333335,86.59049333333333
file name : Image_20112024161203835.png
|
2024-11-20 16:12:03.910866 |
262 |
90481001 |
Construction of roads |
99000 |
PCC Road from Maheshpur pathragora to Biswanath sing House |
Plinth level |
-
latitude : 23.20292833333333,23.203076666666668
Longitude : 86.59048666666668,86.59032499999999
file name : Image_20112024160854756.png
|
2024-11-20 16:08:54.840496 |
263 |
90481001 |
Construction of roads |
99000 |
PCC Road from Maheshpur pathragora to Biswanath sing House |
Completion of work |
-
latitude : 23.202915,23.20308
Longitude : 86.59050333333334,86.59031833333331
file name : Image_20112024155959199.png
|
2024-11-20 15:59:59.271205 |
264 |
91363475 |
Construction of roads |
200000 |
PCC Road From Kuldih Culvert to Tematha |
Roof laid |
-
latitude : 23.16114166666667,23.160684999999997
Longitude : 86.57645499999998,86.576385
file name : Image_20112024151851710.png
|
2024-11-20 15:18:51.807847 |
265 |
91363475 |
Construction of roads |
200000 |
PCC Road From Kuldih Culvert to Tematha |
Plinth level |
-
latitude : 23.160635000000003,23.161074999999997
Longitude : 86.57637166666667,86.57644666666666
file name : Image_19112024154542255.png
|
2024-11-19 15:45:42.381153 |
266 |
91363475 |
Construction of roads |
200000 |
PCC Road From Kuldih Culvert to Tematha |
Completion of work |
-
latitude : 23.16107833333333,23.160608333333336
Longitude : 86.57646333333332,86.57640833333335
file name : Image_19112024145846541.png
|
2024-11-19 14:58:46.65633 |
267 |
90246782 |
Construction of roads |
200000 |
PCC Road From Dharampur Pashupati Sing House to Dhrubapada Sing House |
Roof laid |
-
latitude : 23.196061666666665,23.196523333333335
Longitude : 86.54477166666666,86.54511166666667
file name : Image_20112024143651634.png
|
2024-11-20 14:36:51.725793 |
268 |
90246782 |
Construction of roads |
200000 |
PCC Road From Dharampur Pashupati Sing House to Dhrubapada Sing House |
Plinth level |
-
latitude : 23.196090000000005,23.196466666666666
Longitude : 86.54477666666668,86.54508666666668
file name : Image_20112024143046353.png
|
2024-11-20 14:30:46.43338 |
269 |
90246782 |
Construction of roads |
200000 |
PCC Road From Dharampur Pashupati Sing House to Dhrubapada Sing House |
Completion of work |
-
latitude : 23.19654166666667,23.196115000000002
Longitude : 86.54511333333333,86.54482666666667
file name : Image_20112024142627020.png
|
2024-11-20 14:26:27.096267 |
270 |
97871802 |
Drainage Construction |
230000 |
Construction of Drain at Maheshpur Mansaram Sahis House to Luthur Sahis House |
Roof laid |
-
latitude : 23.19038333333333
Longitude : 86.58874333333333
file name : Image_20112024154940146.png
|
2024-11-20 15:49:40.240831 |
271 |
97871802 |
Drainage Construction |
230000 |
Construction of Drain at Maheshpur Mansaram Sahis House to Luthur Sahis House |
Plinth level |
-
latitude : 23.190805
Longitude : 86.58906333333334
file name : Image_20112024154344781.png
|
2024-11-20 15:43:44.872718 |
272 |
97871802 |
Drainage Construction |
230000 |
Construction of Drain at Maheshpur Mansaram Sahis House to Luthur Sahis House |
Completion of work |
-
latitude : 23.19088166666667
Longitude : 86.58907666666667
file name : Image_20112024153708942.png
|
2024-11-20 15:37:09.032428 |
273 |
91365257 |
Procurement of Computer Printer, UPS, etc. |
87990 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 23.215681
Longitude : 86.5717393
file name : Image_24112024140546733.png
|
2024-11-24 14:05:46.819436 |