1 |
35894069 |
CONS PCC RD FROM MANMATH RAJWAR HOUSE TO BHADARI MAHATO HOUSE |
200000 |
CONS PCC RD FROM MANMATH RAJWAR HOUSE TO BHADARI MAHATO HOUSE1 |
Plinth level |
-
latitude : 23.374694217927754,23.374684285372496
Longitude : 86.30546369589865,86.30544844083488
file name : Image_26102021124145945.png
|
2021-10-26 12:41:46.05888 |
2 |
35894069 |
CONS PCC RD FROM MANMATH RAJWAR HOUSE TO BHADARI MAHATO HOUSE |
200000 |
CONS PCC RD FROM MANMATH RAJWAR HOUSE TO BHADARI MAHATO HOUSE1 |
Completion of work |
-
latitude : 23.37494152598083,23.3748093014583
Longitude : 86.30547031760216,86.30625436082482
file name : Image_09102021100730632.png
|
2021-10-09 10:07:30.731266 |
3 |
35897384 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD |
200000 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD1 |
Roof laid |
-
latitude : 23.36934446822852,23.369343630038202
Longitude : 86.28314947709441,86.283164229244
file name : Image_26102021093427741.png
|
2021-10-26 09:34:27.856944 |
4 |
35897384 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD |
200000 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD1 |
Plinth level |
-
latitude : 23.369421875104308,23.36943704634905
Longitude : 86.2830445356667,86.2830640655011
file name : Image_09102021122828266.png
|
2021-10-09 12:28:28.367851 |
5 |
35897384 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD |
200000 |
CONS PCC RD FROM PAKA RASTA TO SAHADEB MAHATO FIELD1 |
Completion of work |
-
latitude : 23.3695275709033,23.369544502347708
Longitude : 86.28280539996922,86.28282300196588
file name : Image_08102021152748701.png
|
2021-10-08 15:27:48.814462 |
6 |
36048979 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL |
30000 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL1 |
Roof laid |
-
latitude : 23.380869375541806
Longitude : 86.32627805694938
file name : Image_03092022112432578.png
|
2022-09-03 11:24:32.68842 |
7 |
36048979 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL |
30000 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL1 |
Plinth level |
-
latitude : 23.380873608402908
Longitude : 86.32632533088326
file name : Image_03092022112140640.png
|
2022-09-03 11:21:40.750401 |
8 |
36048979 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL |
30000 |
CONS SOAKPIT NEAR DURGA MELA TUBE WELL1 |
Completion of work |
-
latitude : 23.380871848203242
Longitude : 86.32628082297742
file name : Image_31082022161955067.png
|
2022-08-31 16:19:55.160122 |
9 |
47280520 |
Construction of Soak Pit near Chakra Pradip Mahato House |
30000 |
Construction of Soak Pit near Chakra Pradip Mahato House1 |
Roof laid |
-
latitude : 23.3762672
Longitude : 86.3112327
file name : Image_02052023103958386.png
|
2023-05-02 10:39:58.483111 |
10 |
47280520 |
Construction of Soak Pit near Chakra Pradip Mahato House |
30000 |
Construction of Soak Pit near Chakra Pradip Mahato House1 |
Plinth level |
-
latitude : 23.37853262666613
Longitude : 86.30827389657497
file name : Image_25042023111150460.png
|
2023-04-25 11:11:50.559677 |
11 |
47280520 |
Construction of Soak Pit near Chakra Pradip Mahato House |
30000 |
Construction of Soak Pit near Chakra Pradip Mahato House1 |
Completion of work |
-
latitude : 23.378523071296513
Longitude : 86.30831513553858
file name : Image_25042023110322979.png
|
2023-04-25 11:03:23.081826 |
12 |
47275194 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara |
30000 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara1 |
Roof laid |
-
latitude : 23.382342620752752
Longitude : 86.3288549054414
file name : Image_25042023095910412.png
|
2023-04-25 09:59:10.510949 |
13 |
47275194 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara |
30000 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.382355445064604
Longitude : 86.32885708473623
file name : Image_07042023123223722.png
|
2023-04-07 12:32:23.811661 |
14 |
47275194 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara |
30000 |
Construction of Soakpit Nadiara Kalimela tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.382329712621868
Longitude : 86.32887879386544
file name : Image_07042023122539310.png
|
2023-04-07 12:25:39.404214 |
15 |
47274868 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara |
30000 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara1 |
Roof laid |
-
latitude : 23.387506459839642
Longitude : 86.33104442618787
file name : Image_25042023100400368.png
|
2023-04-25 10:04:00.44612 |
16 |
47274868 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara |
30000 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.38750092778355
Longitude : 86.3308389019221
file name : Image_30032023120524601.png
|
2023-03-30 12:05:24.704573 |
17 |
47274868 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara |
30000 |
Construction of soakpit at Mudipara Bajrang bali Mandir tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.387427208945155
Longitude : 86.33105364628136
file name : Image_30032023115114467.png
|
2023-03-30 11:51:14.558613 |
18 |
47274718 |
Construction of soakpit Bhiswma Rajwar house tubewell at Nadiara |
30000 |
Construction of soakpit Bhiswma Rajwar house tubewell at Nadiara1 |
Roof laid |
-
latitude : 23.385922615416348
Longitude : 86.32903662510216
file name : Image_25042023100940913.png
|
2023-04-25 10:09:41.00694 |
19 |
47274718 |
Construction of soakpit Bhiswma Rajwar house tubewell at Nadiara |
30000 |
Construction of soakpit Bhiswma Rajwar house tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.38590044528246
Longitude : 86.32909052073956
file name : Image_30032023121217267.png
|
2023-03-30 12:12:17.353221 |
20 |
47274593 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara |
30000 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara1 |
Roof laid |
-
latitude : 23.385607455857098
Longitude : 86.32874216884375
file name : Image_25042023101205879.png
|
2023-04-25 10:12:05.979755 |
21 |
47274593 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara |
30000 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.384679411537945
Longitude : 86.32787849754095
file name : Image_30032023123159102.png
|
2023-03-30 12:31:59.201035 |
22 |
47274593 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara |
30000 |
Construction of soakpit near Pagal Roy house tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.38466134853661
Longitude : 86.32790020667017
file name : Image_30032023122016300.png
|
2023-03-30 12:20:16.397027 |
23 |
47272950 |
Construction of Soakpit Near Nadiara Tower at Nadiara |
30000 |
Construction of Soakpit Near Nadiara Tower at Nadiara1 |
Roof laid |
-
latitude : 23.375828582793474
Longitude : 86.33154449053109
file name : Image_25042023093643447.png
|
2023-04-25 09:36:43.544635 |
24 |
47272950 |
Construction of Soakpit Near Nadiara Tower at Nadiara |
30000 |
Construction of Soakpit Near Nadiara Tower at Nadiara1 |
Plinth level |
-
latitude : 23.375713038258255
Longitude : 86.33152605034411
file name : Image_07042023112804087.png
|
2023-04-07 11:28:04.180967 |
25 |
47272950 |
Construction of Soakpit Near Nadiara Tower at Nadiara |
30000 |
Construction of Soakpit Near Nadiara Tower at Nadiara1 |
Completion of work |
-
latitude : 23.375740237534046
Longitude : 86.33153267204762
file name : Image_07042023111908322.png
|
2023-04-07 11:19:08.410851 |
26 |
47272764 |
Construction of Soakpit Near Shiba Mandir at Nadiara |
30000 |
Construction of Soakpit Near Shiba Mandir at Nadiara1 |
Roof laid |
-
latitude : 23.381124478764832
Longitude : 86.33351759053767
file name : Image_25042023094448904.png
|
2023-04-25 09:44:48.997902 |
27 |
47272764 |
Construction of Soakpit Near Shiba Mandir at Nadiara |
30000 |
Construction of Soakpit Near Shiba Mandir at Nadiara1 |
Roof laid |
-
latitude : 23.386600627563894
Longitude : 86.33000129833817
file name : Image_25042023100653447.png
|
2023-04-25 10:06:53.547225 |
28 |
47272764 |
Construction of Soakpit Near Shiba Mandir at Nadiara |
30000 |
Construction of Soakpit Near Shiba Mandir at Nadiara1 |
Plinth level |
-
latitude : 23.38114321231842
Longitude : 86.33352228440344
file name : Image_07042023120537385.png
|
2023-04-07 12:05:37.477246 |
29 |
47272764 |
Construction of Soakpit Near Shiba Mandir at Nadiara |
30000 |
Construction of Soakpit Near Shiba Mandir at Nadiara1 |
Completion of work |
-
latitude : 23.38110012933612
Longitude : 86.33349596522748
file name : Image_07042023115521640.png
|
2023-04-07 11:55:21.72319 |
30 |
47272534 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara |
30000 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara1 |
Roof laid |
-
latitude : 23.381562097929418
Longitude : 86.32574521936476
file name : Image_25042023101917008.png
|
2023-04-25 10:19:17.104099 |
31 |
47272534 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara |
30000 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara1 |
Plinth level |
-
latitude : 23.38157634716481
Longitude : 86.32569023407996
file name : Image_07042023131341726.png
|
2023-04-07 13:13:41.821082 |
32 |
47272534 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara |
30000 |
Construction of Soakpit Near Biswanath Mishra house at Nadiara1 |
Completion of work |
-
latitude : 23.381576263345778
Longitude : 86.32566835731268
file name : Image_07042023130715319.png
|
2023-04-07 13:07:15.41741 |
33 |
47272091 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara |
30000 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara1 |
Roof laid |
-
latitude : 23.381441314704716
Longitude : 86.32735848426819
file name : Image_25042023101625146.png
|
2023-04-25 10:16:25.238124 |
34 |
47272091 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara |
30000 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara1 |
Plinth level |
-
latitude : 23.381434022448957
Longitude : 86.32739653810859
file name : Image_07042023130021655.png
|
2023-04-07 13:00:21.752621 |
35 |
47272091 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara |
30000 |
Construction of Soakpit at Bauri Para near Sanjay Das house at Nadiara1 |
Completion of work |
-
latitude : 23.381475554779172
Longitude : 86.32741271518171
file name : Image_07042023124909017.png
|
2023-04-07 12:49:09.107828 |
36 |
39067956 |
Installation of New Tube well near near Raibaghini Pry School |
85000 |
Installation of New Tube well near near Raibaghini Pry School1 |
Completion of work |
-
latitude : 23.363075139932334
Longitude : 86.33848235942423
file name : Image_20072021115251050.png
|
2021-07-20 11:52:51.157475 |
37 |
39067956 |
Installation of New Tube well near near Raibaghini Pry School |
85000 |
Installation of New Tube well near near Raibaghini Pry School1 |
Completion of work |
-
latitude : 23.3615247
Longitude : 86.3390017
file name : Image_15072021102140861.png
|
2021-07-15 10:21:40.971035 |
38 |
35999569 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL |
80000 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL1 |
Roof laid |
-
latitude : 23.38583934120834
Longitude : 86.2915909755975
file name : Image_26062021125305215.png
|
2021-06-26 12:53:05.308393 |
39 |
35999569 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL |
80000 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL1 |
Plinth level |
-
latitude : 23.385816039517522
Longitude : 86.29161955788732
file name : Image_25062021124703156.png
|
2021-06-25 12:47:03.270607 |
40 |
35999569 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL |
80000 |
FITTING AND FIXING TUBE WELL NEAR BELKURI HIGH SCHOOL1 |
Completion of work |
-
latitude : 23.385852500796318
Longitude : 86.29160849377513
file name : Image_24062021183441576.png
|
2021-06-24 18:34:41.658735 |
41 |
35969259 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH |
80000 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH1 |
Roof laid |
-
latitude : 23.350190981291234
Longitude : 86.31075284443796
file name : Image_14072021132851515.png
|
2021-07-14 13:28:51.601547 |
42 |
35969259 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH |
80000 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH1 |
Plinth level |
-
latitude : 23.35015703458339
Longitude : 86.31069241091609
file name : Image_14072021131245839.png
|
2021-07-14 13:12:45.931574 |
43 |
35969259 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH |
80000 |
FITTING AND FIXING TUBEWELL AT BAGHUDIH1 |
Completion of work |
-
latitude : 23.35017199628055
Longitude : 86.31080020219088
file name : Image_26062021102925255.png
|
2021-06-26 10:29:25.344777 |
44 |
35991557 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI |
80000 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI1 |
Roof laid |
-
latitude : 23.362948489375412
Longitude : 86.32251818664372
file name : Image_14072021134106142.png
|
2021-07-14 13:41:06.249205 |
45 |
35991557 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI |
80000 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI1 |
Plinth level |
-
latitude : 23.362924894317985
Longitude : 86.32253788411617
file name : Image_14072021130104307.png
|
2021-07-14 13:01:04.414607 |
46 |
35991557 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI |
80000 |
FITTING AND FIXING TUBEWELL AT BAGAL KULI1 |
Completion of work |
-
latitude : 23.36295641027391
Longitude : 86.32253092713654
file name : Image_26062021104133447.png
|
2021-06-26 10:41:33.545622 |
47 |
36047536 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA |
80000 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA1 |
Roof laid |
-
latitude : 23.377226684242487
Longitude : 86.32898340001702
file name : Image_28062021140225545.png
|
2021-06-28 14:02:25.634727 |
48 |
36047536 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA |
80000 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA1 |
Plinth level |
-
latitude : 23.377224798314273
Longitude : 86.32902053184807
file name : Image_28062021100942279.png
|
2021-06-28 10:09:42.371465 |
49 |
36047536 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA |
80000 |
FITING AND FIXING TUBE WELL AT ASHRAM MORE AT NADIARA1 |
Completion of work |
-
latitude : 23.377288416959345
Longitude : 86.32897811941803
file name : Image_26062021141358335.png
|
2021-06-26 14:13:58.428907 |
50 |
36002803 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR |
80000 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR1 |
Roof laid |
-
latitude : 23.389114988967776
Longitude : 86.31774377077818
file name : Image_29062021115901695.png
|
2021-06-29 11:59:01.803655 |
51 |
36002803 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR |
80000 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR1 |
Plinth level |
-
latitude : 23.389123077504337
Longitude : 86.3177631329745
file name : Image_28062021134928602.png
|
2021-06-28 13:49:28.710842 |
52 |
36002803 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR |
80000 |
FITTING AND FIXING TUBE WELL NEAR HARIMANDIR KULTAR1 |
Completion of work |
-
latitude : 23.38915874250233
Longitude : 86.31778090260923
file name : Image_28062021102201056.png
|
2021-06-28 10:22:01.156262 |
53 |
36042222 |
FITTING AND FIXING TUBE WELL AT BELKURI |
80000 |
FITTING AND FIXING TUBE WELL AT BELKURI1 |
Plinth level |
-
latitude : 23.368902406655252
Longitude : 86.28315073437989
file name : Image_26062021124455827.png
|
2021-06-26 12:44:55.928711 |
54 |
36042222 |
FITTING AND FIXING TUBE WELL AT BELKURI |
80000 |
FITTING AND FIXING TUBE WELL AT BELKURI1 |
Completion of work |
-
latitude : 23.36883887182921
Longitude : 86.28308560699224
file name : Image_25062021123536877.png
|
2021-06-25 12:35:36.975008 |
55 |
35992332 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE |
80000 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE1 |
Roof laid |
-
latitude : 23.3683916
Longitude : 86.3267849
file name : Image_14072021134623192.png
|
2021-07-14 13:46:23.302648 |
56 |
35992332 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE |
80000 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE1 |
Plinth level |
-
latitude : 23.36702272295952
Longitude : 86.32552326656878
file name : Image_14072021125208734.png
|
2021-07-14 12:52:08.838933 |
57 |
35992332 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE |
80000 |
FITTING AND FIXING TUBEWELL AT BANIBANDANA CLUBE1 |
Completion of work |
-
latitude : 23.36701807100326
Longitude : 86.32551748305559
file name : Image_26062021101737907.png
|
2021-06-26 10:17:38.028681 |
58 |
35867784 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
200000 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Roof laid |
-
latitude : 23.376964540220797,23.376955236308277
Longitude : 86.30176518112421,86.30180281586945
file name : Image_30062021110139214.png
|
2021-06-30 11:01:39.307589 |
59 |
35867784 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
200000 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Plinth level |
-
latitude : 23.377026650123298,23.377028116956353
Longitude : 86.30178605206311,86.30175990052521
file name : Image_26062021134440694.png
|
2021-06-26 13:44:40.80995 |
60 |
35867784 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
200000 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Completion of work |
-
latitude : 23.377023716457188,23.3770144963637
Longitude : 86.30173534154892,86.30174062214792
file name : Image_26062021111352661.png
|
2021-06-26 11:13:52.748162 |
61 |
35904202 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR |
200000 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR1 |
Roof laid |
-
latitude : 23.390641836449504,23.390632909722626
Longitude : 86.31895336322486,86.31898630410433
file name : Image_29062021120215836.png
|
2021-06-29 12:02:15.929076 |
62 |
35904202 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR |
200000 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR1 |
Plinth level |
-
latitude : 23.39054058305919,23.390614637173712
Longitude : 86.31894682534039,86.31901622749865
file name : Image_28062021135259800.png
|
2021-06-28 13:52:59.911213 |
63 |
35904202 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR |
200000 |
CONS PCC RD FROM SAMAR PANRE HOUSE TO BAUL MAHATO HOUSE KULTAR1 |
Completion of work |
-
latitude : 23.390603070147336,23.390648625791073
Longitude : 86.3190448936075,86.31895780563354
file name : Image_28062021102655207.png
|
2021-06-28 10:26:55.301108 |
64 |
35905101 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE |
200000 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE1 |
Roof laid |
-
latitude : 23.386869225651026,23.38686960283667
Longitude : 86.32762863300741,86.32761639542878
file name : Image_15072021093814534.png
|
2021-07-15 09:38:14.637959 |
65 |
35905101 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE |
200000 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE1 |
Plinth level |
-
latitude : 23.38690489064902,23.38688242714852
Longitude : 86.32757591083646,86.32757096551359
file name : Image_14072021103604504.png
|
2021-07-14 10:36:04.609459 |
66 |
35905101 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE |
200000 |
CONS PCC RD FROM UDDHARAN RAJWAR HOUSE TO MANBUL RAJWAR HOUSE1 |
Completion of work |
-
latitude : 23.386851958930492,23.38688284624368
Longitude : 86.32762813009322,86.32765805348754
file name : Image_12072021100847013.png
|
2021-07-12 10:08:47.099462 |
67 |
35908920 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH |
200000 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH1 |
Roof laid |
-
latitude : 23.381001809611917,23.380997451022267
Longitude : 86.33008888922632,86.33009165525436
file name : Image_15072021091027396.png
|
2021-07-15 09:10:27.484878 |
68 |
35908920 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH |
200000 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH1 |
Plinth level |
-
latitude : 23.38099983986467,23.38102293200791
Longitude : 86.33000599220395,86.3300222530961
file name : Image_14072021102713361.png
|
2021-07-14 10:27:13.46424 |
69 |
35908920 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH |
200000 |
CONS PCC RD FROM SARASWATI MELA TO BURI BANDH1 |
Completion of work |
-
latitude : 23.381013879552484,23.381010233424604
Longitude : 86.33010691031814,86.33007866330445
file name : Image_12072021095853506.png
|
2021-07-12 09:58:53.609796 |
70 |
35907917 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE |
200000 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE1 |
Roof laid |
-
latitude : 23.380580493249,23.380607776343822
Longitude : 86.32674006745219,86.32680100388825
file name : Image_15072021092238266.png
|
2021-07-15 09:22:38.362816 |
71 |
35907917 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE |
200000 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE1 |
Plinth level |
-
latitude : 23.38060404639691,23.380568716675043
Longitude : 86.3266288395971,86.32672405801713
file name : Image_14072021103112396.png
|
2021-07-14 10:31:12.498564 |
72 |
35907917 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE |
200000 |
CONS PCC RD FROM CHANDAN KIYARY RD TO ARJUN BAURI HOUSE1 |
Completion of work |
-
latitude : 23.380591850727797,23.380803326144814
Longitude : 86.32675096392632,86.32954423315823
file name : Image_12072021100351355.png
|
2021-07-12 10:03:51.444135 |
73 |
35914299 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI |
250000 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI1 |
Roof laid |
-
latitude : 23.365352670662105,23.365230755880475
Longitude : 86.32325101643801,86.32334883324802
file name : Image_14072021125748843.png
|
2021-07-14 12:57:49.091572 |
74 |
35914299 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI |
250000 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI1 |
Plinth level |
-
latitude : 23.3652466814965,23.365225265733898
Longitude : 86.32343675941229,86.32321740500629
file name : Image_05072021130837565.png
|
2021-07-05 13:08:37.802263 |
75 |
35914299 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI |
250000 |
CONS PCC RD AT MARAL GALI MAJHI GALI RAGHU GALI1 |
Completion of work |
-
latitude : 23.3652144,23.36520267650485
Longitude : 86.3235731,86.32322637364268
file name : Image_30062021103521879.png
|
2021-06-30 10:35:21.980542 |
76 |
35846474 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE |
200000 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE1 |
Plinth level |
-
latitude : 23.363504041917622,23.363487194292247
Longitude : 86.33932951837778,86.33935474790633
file name : Image_22092021101415267.png
|
2021-09-22 10:14:15.34535 |
77 |
35846474 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE |
200000 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE1 |
Plinth level |
-
latitude : 23.36345023009926,23.36345023009926
Longitude : 86.33939120918512,86.33939120918512
file name : Image_17082021100407802.png
|
2021-08-17 10:04:07.909251 |
78 |
35846474 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE |
200000 |
CONS PCC ROAD FROM ASWINI GOPE HOUSE TO UTPAL GOPE HOUSE1 |
Completion of work |
-
latitude : 23.36345743853599,23.36347420234233
Longitude : 86.33929012343287,86.33931367658079
file name : Image_16082021103104167.png
|
2021-08-16 10:31:04.270999 |
79 |
35843007 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE |
200000 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE1 |
Plinth level |
-
latitude : 23.373156851157546,23.3673223759979
Longitude : 86.32074382156134,86.33534375578165
file name : Image_22092021103000193.png
|
2021-09-22 10:30:00.291095 |
80 |
35843007 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE |
200000 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE1 |
Plinth level |
-
latitude : 23.365576844662428,23.367240903899074
Longitude : 86.33681310340762,86.33531634695828
file name : Image_17082021100858872.png
|
2021-08-17 10:08:58.957656 |
81 |
35843007 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE |
200000 |
CONS PCC RD FROM GOPAL MAHATO HOUSE TO ASUTOSH MAHATO HOUSE1 |
Completion of work |
-
latitude : 23.365661250427365,23.36734475567937
Longitude : 86.33695081807673,86.33530016988516
file name : Image_16082021103606115.png
|
2021-08-16 10:36:06.215144 |
82 |
35870169 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
271052 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Roof laid |
-
latitude : 23.37710393127054,23.377075265161693
Longitude : 86.30180625244975,86.30173567682505
file name : Image_30062021105226627.png
|
2021-06-30 10:52:26.725649 |
83 |
35870169 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
271052 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Plinth level |
-
latitude : 23.377111474983394,23.37707409169525
Longitude : 86.30180784501135,86.301851850003
file name : Image_26062021134242369.png
|
2021-06-26 13:42:42.462084 |
84 |
35870169 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD |
271052 |
CONS PCC RD FROM USMAN ANSARY HOUSE TO NASAD1 |
Completion of work |
-
latitude : 23.37712781969458,23.377080420032144
Longitude : 86.30184615030885,86.30184874869883
file name : Image_26062021111052392.png
|
2021-06-26 11:10:52.463191 |
85 |
35845760 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA |
200000 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA1 |
Roof laid |
-
latitude : 23.376806834712625,23.376815929077566
Longitude : 86.30172142758965,86.301653617993
file name : Image_30062021110245305.png
|
2021-06-30 11:02:45.373211 |
86 |
35845760 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA |
200000 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA1 |
Plinth level |
-
latitude : 23.376795519143343,23.37679292075336
Longitude : 86.30175403319299,86.30170960910618
file name : Image_26062021134749777.png
|
2021-06-26 13:47:49.876649 |
87 |
35845760 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA |
200000 |
CONS PCC RD AT BAHADUR PACONS PCC RD FROM HELU SAHIS HOUSE TO USMAN ANSARY HOUSERA1 |
Completion of work |
-
latitude : 23.376773851923645,23.376794806681573
Longitude : 86.30169544368982,86.30171807482839
file name : Image_26062021111507690.png
|
2021-06-26 11:15:07.776522 |
88 |
35833111 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH |
200000 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH1 |
Roof laid |
-
latitude : 23.318011346273124,23.318011346273124
Longitude : 86.36076824739575,86.36076824739575
file name : Image_19072021103139638.png
|
2021-07-19 10:31:39.741803 |
89 |
35833111 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH |
200000 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH1 |
Plinth level |
-
latitude : 23.366969414055347,23.366953027434647
Longitude : 86.32716762833297,86.32716737687588
file name : Image_19072021051421688.png
|
2021-07-19 05:14:21.79734 |
90 |
35833111 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH |
200000 |
CONS PCC RD FROM BURI BANDH TO MUKHERJEE BANDH1 |
Completion of work |
-
latitude : 23.3676673,23.3676673
Longitude : 86.3283108,86.3283108
file name : Image_17072021095326791.png
|
2021-07-17 09:53:26.928547 |
91 |
35823354 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR |
200000 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR1 |
Roof laid |
-
latitude : 23.353468598797917,23.353471658192575
Longitude : 86.31121049635112,86.31119742058218
file name : Image_11082021085846392.png
|
2021-08-11 08:58:46.49852 |
92 |
35823354 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR |
200000 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR1 |
Plinth level |
-
latitude : 23.362774732522666,23.362774732522666
Longitude : 86.31629135459661,86.31629135459661
file name : Image_19072021105405023.png
|
2021-07-19 10:54:05.159404 |
93 |
35823354 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR |
200000 |
CONS PCC RD FROM ASWINI RAJWAR HOUSE TO JALADHAR RAJWAR1 |
Completion of work |
-
latitude : 23.353307163342834,23.353363908827305
Longitude : 86.31122239865363,86.3112151902169
file name : Image_17072021101538726.png
|
2021-07-17 10:15:38.820673 |
94 |
35822262 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE |
200000 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE1 |
Roof laid |
-
latitude : 23.353156121447682,23.353159306570888
Longitude : 86.31101234816015,86.31103984080255
file name : Image_11082021085932776.png
|
2021-08-11 08:59:32.888107 |
95 |
35822262 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE |
200000 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE1 |
Plinth level |
-
latitude : 23.353172298520803,23.353172298520803
Longitude : 86.31106062792242,86.31106062792242
file name : Image_19072021105818697.png
|
2021-07-19 10:58:18.834298 |
96 |
35822262 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE |
200000 |
CONS PCC ROAD FROM BAGHUDIH SSK TO SANKAR RAJWAR HOUSE1 |
Completion of work |
-
latitude : 23.353062830865383,23.352977503091097
Longitude : 86.31099072284997,86.31101033650339
file name : Image_17072021100840983.png
|
2021-07-17 10:08:41.100566 |
97 |
35901814 |
CONS PCC RD FROM GURUPADA MAHATO HOUSE TO SIBMELA |
200000 |
CONS PCC RD FROM GURUPADA MAHATO HOUSE TO SIBMELA1 |
Plinth level |
-
latitude : 23.373514129780233,23.373534455895424
Longitude : 86.28705971874297,86.28707405179739
file name : Image_27102021133718319.png
|
2021-10-27 13:37:18.410901 |
98 |
35901814 |
CONS PCC RD FROM GURUPADA MAHATO HOUSE TO SIBMELA |
200000 |
CONS PCC RD FROM GURUPADA MAHATO HOUSE TO SIBMELA1 |
Completion of work |
-
latitude : 23.373538814485073,23.37347984779626
Longitude : 86.28713976591825,86.28713255748153
file name : Image_26102021091959229.png
|
2021-10-26 09:19:59.335306 |
99 |
35830502 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE |
200000 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE1 |
Roof laid |
-
latitude : 23.368240697309375,23.36824136786163
Longitude : 86.32348386570811,86.32351144216955
file name : Image_17082021105206740.png
|
2021-08-17 10:52:06.841877 |
100 |
35830502 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE |
200000 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE1 |
Plinth level |
-
latitude : 23.36816396098584,23.36821462959051
Longitude : 86.32353264838457,86.32354999892414
file name : Image_11082021085706953.png
|
2021-08-11 08:57:07.059394 |
101 |
35830502 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE |
200000 |
CONS PCC RD FROM HANUMAN MANDIR TO GAJEN BAURI HOUSE1 |
Completion of work |
-
latitude : 23.368253940716386,23.368171504698694
Longitude : 86.32355821318924,86.3235554471612
file name : Image_22072021135050452.png
|
2021-07-22 13:50:50.596315 |
102 |
67604164 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.358166529797018
Longitude : 86.3137378077954
file name : Image_16102023092305135.png
|
2023-10-16 09:23:05.214442 |
103 |
67604164 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.35824167355895
Longitude : 86.3137689884752
file name : Image_14102023103016322.png
|
2023-10-14 10:30:16.412152 |
104 |
39065775 |
Installation of Solar Power Submersible Pump with over head tank at Belkuri |
500000 |
Installation of Solar Power Submersible Pump with over head tank at Belkuri1 |
Plinth level |
-
latitude : 23.368734223768115
Longitude : 86.29262781701982
file name : Image_26102021092654265.png
|
2021-10-26 09:26:54.370593 |
105 |
39065775 |
Installation of Solar Power Submersible Pump with over head tank at Belkuri |
500000 |
Installation of Solar Power Submersible Pump with over head tank at Belkuri1 |
Completion of work |
-
latitude : 23.368707485496998
Longitude : 86.29259227775037
file name : Image_01102021110116449.png
|
2021-10-01 11:01:16.558927 |
106 |
39071400 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Nadiara Pry School |
500000 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Nadiara Pry School1 |
Plinth level |
-
latitude : 23.3812203258276
Longitude : 86.32594940252602
file name : Image_29102021171007376.png
|
2021-10-29 17:10:07.468985 |
107 |
39071400 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Nadiara Pry School |
500000 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Nadiara Pry School1 |
Completion of work |
-
latitude : 23.38112074881792
Longitude : 86.3260608818382
file name : Image_01102021102627112.png
|
2021-10-01 10:26:27.230047 |
108 |
39051873 |
INSTALLATION OF SOLAR POWER SUBMERSIBLE PUMP WITH OVER TANK AT KULTAR |
500000 |
INSTALLATION OF SOLAR POWER SUBMERSIBLE PUMP WITH OVER TANK AT KULTAR1 |
Plinth level |
-
latitude : 23.38590933009982
Longitude : 86.31864432245493
file name : Image_29102021170318843.png
|
2021-10-29 17:03:18.955894 |
109 |
39051873 |
INSTALLATION OF SOLAR POWER SUBMERSIBLE PUMP WITH OVER TANK AT KULTAR |
500000 |
INSTALLATION OF SOLAR POWER SUBMERSIBLE PUMP WITH OVER TANK AT KULTAR1 |
Completion of work |
-
latitude : 23.3858577394858
Longitude : 86.31855287589133
file name : Image_01102021103546853.png
|
2021-10-01 10:35:46.975388 |
110 |
39065933 |
Installation of Solar Power Submersible Pump with over head tank near Lagda GP office |
500000 |
Installation of Solar Power Submersible Pump with over head tank near Lagda GP office1 |
Plinth level |
-
latitude : 23.3872098
Longitude : 86.2922451
file name : Image_28092021143531076.png
|
2021-09-28 14:35:31.170381 |
111 |
39065933 |
Installation of Solar Power Submersible Pump with over head tank near Lagda GP office |
500000 |
Installation of Solar Power Submersible Pump with over head tank near Lagda GP office1 |
Completion of work |
-
latitude : 23.3871283
Longitude : 86.2922898
file name : Image_28092021142502630.png
|
2021-09-28 14:25:02.731026 |
112 |
35919794 |
CONS PCC RD FROM PAHALAD GANGULY HOUSE TO UJJAL HOUSE |
200000 |
CONS PCC RD FROM PAHALAD GANGULY HOUSE TO UJJAL HOUSE1 |
Plinth level |
-
latitude : 23.3488787105307,23.348874771036208
Longitude : 86.30368530750275,86.30377792753279
file name : Image_05102021083626456.png
|
2021-10-05 08:36:26.584481 |
113 |
35919794 |
CONS PCC RD FROM PAHALAD GANGULY HOUSE TO UJJAL HOUSE |
200000 |
CONS PCC RD FROM PAHALAD GANGULY HOUSE TO UJJAL HOUSE1 |
Completion of work |
-
latitude : 23.3649720903486,23.3649720903486
Longitude : 86.32371319457889,86.32371319457889
file name : Image_04102021112040939.png
|
2021-10-04 11:20:41.051192 |
114 |
35918939 |
CONS PCC RD FROM KALSAL TO MARAL BANDH |
200000 |
CONS PCC RD FROM KALSAL TO MARAL BANDH1 |
Plinth level |
-
latitude : 23.36652907077223,23.36652907077223
Longitude : 86.3269570749253,86.3269570749253
file name : Image_25112021102934476.png
|
2021-11-25 10:29:34.581101 |
115 |
35918939 |
CONS PCC RD FROM KALSAL TO MARAL BANDH |
200000 |
CONS PCC RD FROM KALSAL TO MARAL BANDH1 |
Completion of work |
-
latitude : 23.3694016,23.3694016
Longitude : 86.3267133,86.3267133
file name : Image_22112021110511497.png
|
2021-11-22 11:05:11.626608 |
116 |
35844203 |
CONS PCC RD AT BAHADUR PARA |
200000 |
CONS PCC RD AT BAHADUR PARA1 |
Completion of work |
-
latitude : 23.36607611272484,23.36607502307743
Longitude : 86.33751098066568,86.33750963956118
file name : Image_24122021150614384.png
|
2021-12-24 15:06:14.491981 |
117 |
35895831 |
CONS PCC RD FROM HELU GOPE HOUSE TO HAGRU SARDAR HOUSE |
200000 |
CONS PCC RD FROM HELU GOPE HOUSE TO HAGRU SARDAR HOUSE1 |
Completion of work |
-
latitude : 23.371916958130896,23.371916958130896
Longitude : 86.28910649567842,86.28910649567842
file name : Image_29122021135756674.png
|
2021-12-29 13:57:56.843027 |
118 |
35896420 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE |
200000 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE1 |
Plinth level |
-
latitude : 23.371868594549596,23.371866163797677
Longitude : 86.28911001607776,86.28910884261131
file name : Image_02012022112524112.png
|
2022-01-02 11:25:24.235503 |
119 |
35896420 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE |
200000 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE1 |
Plinth level |
-
latitude : 23.37176788598299,23.37176788598299
Longitude : 86.28930405713618,86.28930405713618
file name : Image_02012022112624031.png
|
2022-01-02 11:26:24.127199 |
120 |
35896420 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE |
200000 |
PCC RD FROM HAGRU SARDAR HOUSE TO NIBARAN PARAMANIK HOUSE1 |
Completion of work |
-
latitude : 23.371831588447094,23.37183133699
Longitude : 86.28922937437892,86.2892285361886
file name : Image_29122021135905147.png
|
2021-12-29 13:59:05.288541 |
121 |
35841636 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE |
200000 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE1 |
Roof laid |
-
latitude : 23.37001535575837,23.37002658750862
Longitude : 86.33551374077797,86.33557358756661
file name : Image_01022022104342618.png
|
2022-02-01 10:43:42.756461 |
122 |
35841636 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE |
200000 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE1 |
Plinth level |
-
latitude : 23.37000227998942,23.36999419145286
Longitude : 86.3355656247586,86.33556277491152
file name : Image_31012022104826316.png
|
2022-01-31 10:48:26.480094 |
123 |
35841636 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE |
200000 |
CONS PCC RD FROM SASADHAR KARMAKAR HOUSE TO TARANI KARMAKAR HOUSE1 |
Completion of work |
-
latitude : 23.369808364659548,23.36988120339811
Longitude : 86.33595010265708,86.33587751537561
file name : Image_29012022111626694.png
|
2022-01-29 11:16:26.57068 |
124 |
47305997 |
Installation of new tube well at Baghudih Majhi baid |
80000 |
Installation of new tube well at Baghudih Majhi baid1 |
Roof laid |
-
latitude : 23.34946812596172
Longitude : 86.31060247309506
file name : Image_12072022095048249.png
|
2022-07-12 09:50:48.370859 |
125 |
47305997 |
Installation of new tube well at Baghudih Majhi baid |
80000 |
Installation of new tube well at Baghudih Majhi baid1 |
Plinth level |
-
latitude : 23.350457400083542
Longitude : 86.31063734181225
file name : Image_11062022091431020.png
|
2022-06-11 09:14:31.114109 |
126 |
47305997 |
Installation of new tube well at Baghudih Majhi baid |
80000 |
Installation of new tube well at Baghudih Majhi baid1 |
Completion of work |
-
latitude : 23.34943749010563
Longitude : 86.31060213781893
file name : Image_11062022090817060.png
|
2022-06-11 09:08:17.138688 |
127 |
47305869 |
Installation of new tube well near Sanjib Rajowar House at Baghudih |
80000 |
Installation of new tube well near Sanjib Rajowar House at Baghudih1 |
Roof laid |
-
latitude : 23.352137762121856
Longitude : 86.31061848253012
file name : Image_12072022095511863.png
|
2022-07-12 09:55:11.975329 |
128 |
47305869 |
Installation of new tube well near Sanjib Rajowar House at Baghudih |
80000 |
Installation of new tube well near Sanjib Rajowar House at Baghudih1 |
Plinth level |
-
latitude : 23.352065719664097
Longitude : 86.31067237816751
file name : Image_11062022091725976.png
|
2022-06-11 09:17:26.075242 |
129 |
47305869 |
Installation of new tube well near Sanjib Rajowar House at Baghudih |
80000 |
Installation of new tube well near Sanjib Rajowar House at Baghudih1 |
Completion of work |
-
latitude : 23.35207561030984
Longitude : 86.31067615002394
file name : Image_11062022090608616.png
|
2022-06-11 09:06:08.70383 |
130 |
47276774 |
Construction of PCC road from Hulka More Pitch Road towards North Side Field |
200000 |
Construction of PCC road from Hulka More Pitch Road towards North Side Field1 |
Plinth level |
-
latitude : 23.392509995028377,23.392529147677124
Longitude : 86.30468820221722,86.30468543618917
file name : Image_30042022112600637.png
|
2022-04-30 11:26:00.77693 |
131 |
47276774 |
Construction of PCC road from Hulka More Pitch Road towards North Side Field |
200000 |
Construction of PCC road from Hulka More Pitch Road towards North Side Field1 |
Completion of work |
-
latitude : 23.392554628662765,23.392554628662765
Longitude : 86.30458141677082,86.30458141677082
file name : Image_29042022102056256.png
|
2022-04-29 10:20:56.37443 |
132 |
47303985 |
Construction of PCC Road from Islamdih Pan Dokan towards Rail Gate |
300000 |
Construction of PCC Road from Islamdih Pan Dokan towards Rail Gate1 |
Completion of work |
-
latitude : 23.375766472890973,23.375766472890973
Longitude : 86.32706444710493,86.32706444710493
file name : Image_29042022100840389.png
|
2022-04-29 10:08:40.488301 |
133 |
47302220 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora |
200000 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora1 |
Roof laid |
-
latitude : 23.370026126503944,23.369982289150357
Longitude : 86.33546554483473,86.3355262298137
file name : Image_17052022101624295.png
|
2022-05-17 10:16:24.387602 |
134 |
47302220 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora |
200000 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora1 |
Plinth level |
-
latitude : 23.369932123459876,23.37003962136805
Longitude : 86.33530989289284,86.3355828076601
file name : Image_12052022104311261.png
|
2022-05-12 10:43:11.374321 |
135 |
47302220 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora |
200000 |
Construction of PCC road from near Tarani Karmakar house to Shukdeb Mahato house at Mahalitora1 |
Completion of work |
-
latitude : 23.37001514621079,23.37001657113433
Longitude : 86.33554056286812,86.33554047904909
file name : Image_11052022173931562.png
|
2022-05-11 17:39:31.706179 |
136 |
47280946 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra |
80000 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra1 |
Roof laid |
-
latitude : 23.36199869401753
Longitude : 86.29864485003054
file name : Image_12072022105743633.png
|
2022-07-12 10:57:43.77467 |
137 |
47280946 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra |
80000 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra1 |
Plinth level |
-
latitude : 23.36198352277279
Longitude : 86.29865650087595
file name : Image_11062022104651518.png
|
2022-06-11 10:46:51.623534 |
138 |
47280946 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra |
80000 |
Installation of new Tubewell at Karadhua Shamshan ghat at Chakra1 |
Completion of work |
-
latitude : 23.36199513170868
Longitude : 86.2987026013434
file name : Image_11062022104109564.png
|
2022-06-11 10:41:09.65419 |
139 |
47304959 |
Construction of Boundary wall of Lagda SSK at Lagda |
100000 |
Construction of Boundary wall of Lagda SSK at Lagda 1 |
Roof laid |
-
latitude : 23.366784802637994
Longitude : 86.3255719654262
file name : Image_04062022093328205.png
|
2022-06-04 09:33:28.321027 |
140 |
47304959 |
Construction of Boundary wall of Lagda SSK at Lagda |
100000 |
Construction of Boundary wall of Lagda SSK at Lagda 1 |
Plinth level |
-
latitude : 23.366799177601933
Longitude : 86.32561965845525
file name : Image_23052022105243798.png
|
2022-05-23 10:52:43.933902 |
141 |
47304959 |
Construction of Boundary wall of Lagda SSK at Lagda |
100000 |
Construction of Boundary wall of Lagda SSK at Lagda 1 |
Completion of work |
-
latitude : 23.366812421008945
Longitude : 86.32551555521786
file name : Image_12052022105804060.png
|
2022-05-12 10:58:04.198796 |
142 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra1 |
Plinth level |
-
latitude : 23.374312799423933
Longitude : 86.30686950869858
file name : Image_11062022102945146.png
|
2022-06-11 10:29:45.240188 |
143 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra1 |
Completion of work |
-
latitude : 23.374377633444965
Longitude : 86.30692541599274
file name : Image_11062022102507127.png
|
2022-06-11 10:25:07.224491 |
144 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra2 |
Plinth level |
-
latitude : 23.37486919015646
Longitude : 86.30377641879022
file name : Image_11062022111403187.png
|
2022-06-11 11:14:03.27949 |
145 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra2 |
Completion of work |
-
latitude : 23.374832225963473
Longitude : 86.30371539853513
file name : Image_11062022111021694.png
|
2022-06-11 11:10:21.783467 |
146 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra3 |
Plinth level |
-
latitude : 23.383349077776074
Longitude : 86.30965841934085
file name : Image_11062022113801496.png
|
2022-06-11 11:38:01.605531 |
147 |
47280225 |
Installation of new tubewell 04(four) nos at Chakra |
320000 |
Installation of new tubewell 04(four) nos at Chakra3 |
Completion of work |
-
latitude : 23.38335490319878
Longitude : 86.30963930860162
file name : Image_11062022112958676.png
|
2022-06-11 11:29:58.780198 |
148 |
47280833 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra |
80000 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra1 |
Roof laid |
-
latitude : 23.37686655577272
Longitude : 86.30506848916411
file name : Image_12072022111323454.png
|
2022-07-12 11:13:23.552673 |
149 |
47280833 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra |
80000 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra1 |
Plinth level |
-
latitude : 23.375774645246565
Longitude : 86.30435996688902
file name : Image_11062022110322952.png
|
2022-06-11 11:03:23.037717 |
150 |
47280833 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra |
80000 |
Installation of new tubewell near Ashok Mahato house at Pattanr at Chakra1 |
Completion of work |
-
latitude : 23.375754109583795
Longitude : 86.30438108928502
file name : Image_11062022105811764.png
|
2022-06-11 10:58:11.882366 |
151 |
47316479 |
Installation of new tubewell near Bhul Garia at Chakra |
80000 |
Installation of new tubewell near Bhul Garia at Chakra1 |
Plinth level |
-
latitude : 23.376853899098933
Longitude : 86.30509849637747
file name : Image_11062022112231551.png
|
2022-06-11 11:22:31.663746 |
152 |
47316479 |
Installation of new tubewell near Bhul Garia at Chakra |
80000 |
Installation of new tubewell near Bhul Garia at Chakra1 |
Completion of work |
-
latitude : 23.376035573892295
Longitude : 86.30457672290504
file name : Image_11062022112002227.png
|
2022-06-11 11:20:02.336323 |
153 |
47305731 |
Installation of new tube well near Bajrang Mandir at Baghudih |
80000 |
Installation of new tube well near Bajrang Mandir at Baghudih1 |
Plinth level |
-
latitude : 23.355100387707353
Longitude : 86.30787122994661
file name : Image_12072022100057479.png
|
2022-07-12 10:00:57.580583 |
154 |
47305731 |
Installation of new tube well near Bajrang Mandir at Baghudih |
80000 |
Installation of new tube well near Bajrang Mandir at Baghudih1 |
Plinth level |
-
latitude : 23.35516618564725
Longitude : 86.30788095295429
file name : Image_11062022090202783.png
|
2022-06-11 09:02:02.87079 |
155 |
47305731 |
Installation of new tube well near Bajrang Mandir at Baghudih |
80000 |
Installation of new tube well near Bajrang Mandir at Baghudih1 |
Completion of work |
-
latitude : 23.355101477354765
Longitude : 86.30790618248284
file name : Image_11062022084103963.png
|
2022-06-11 08:41:04.084928 |
156 |
47274076 |
Installation of new tubewell near Dinu Gope house at Nadiara |
80000 |
Installation of new tubewell near Dinu Gope house at Nadiara1 |
Plinth level |
-
latitude : 23.387436638586223
Longitude : 86.33107996545732
file name : Image_13062022101131541.png
|
2022-06-13 10:11:31.621136 |
157 |
47274076 |
Installation of new tubewell near Dinu Gope house at Nadiara |
80000 |
Installation of new tubewell near Dinu Gope house at Nadiara1 |
Completion of work |
-
latitude : 23.387389238923788
Longitude : 86.33103646337986
file name : Image_13062022100644776.png
|
2022-06-13 10:06:44.855979 |
158 |
47273758 |
Installation of New tube well near Laheri Gope house at Nadiara |
80000 |
Installation of New tube well near Laheri Gope house at Nadiara1 |
Plinth level |
-
latitude : 23.378186328336596
Longitude : 86.32890922017395
file name : Image_13062022104109456.png
|
2022-06-13 10:41:09.559087 |
159 |
47273758 |
Installation of New tube well near Laheri Gope house at Nadiara |
80000 |
Installation of New tube well near Laheri Gope house at Nadiara1 |
Completion of work |
-
latitude : 23.37818377185613
Longitude : 86.3288966473192
file name : Image_13062022103747506.png
|
2022-06-13 10:37:47.608603 |
160 |
47282607 |
Installation of new tubewell at Bahadur para at Mahalitora |
80000 |
Installation of new tubewell at Bahadur para at Mahalitora1 |
Plinth level |
-
latitude : 23.36658372078091
Longitude : 86.33778196759522
file name : Image_13062022091706182.png
|
2022-06-13 09:17:06.26745 |
161 |
47282607 |
Installation of new tubewell at Bahadur para at Mahalitora |
80000 |
Installation of new tubewell at Bahadur para at Mahalitora1 |
Completion of work |
-
latitude : 23.366556940600276
Longitude : 86.33778263814747
file name : Image_13062022085345188.png
|
2022-06-13 08:53:45.306138 |
162 |
47285008 |
Installation of new tubewell near Nitai Mahato house at Mahalitora |
80000 |
Installation of new tubewell near Nitai Mahato house at Mahalitora1 |
Plinth level |
-
latitude : 23.372156345285475
Longitude : 86.3338369410485
file name : Image_13062022093309667.png
|
2022-06-13 09:33:09.75266 |
163 |
47285008 |
Installation of new tubewell near Nitai Mahato house at Mahalitora |
80000 |
Installation of new tubewell near Nitai Mahato house at Mahalitora1 |
Completion of work |
-
latitude : 23.372131660580635
Longitude : 86.33383627049625
file name : Image_13062022084825883.png
|
2022-06-13 08:48:26.01145 |
164 |
47309581 |
Tube-Well Repairing and Maintenance |
376492 |
Tube-Well Repairing and Maintenance1 |
Plinth level |
-
latitude : 23.37777075357735
Longitude : 86.28562431782484
file name : Image_14062022092616360.png
|
2022-06-14 09:26:16.46324 |
165 |
47309581 |
Tube-Well Repairing and Maintenance |
376492 |
Tube-Well Repairing and Maintenance1 |
Completion of work |
-
latitude : 23.37792808189988
Longitude : 86.28670130856335
file name : Image_14062022082719010.png
|
2022-06-14 08:27:19.095129 |
166 |
47302017 |
Installation of new tubewell near Krishnapada Mahato house at Mahalitora |
80000 |
Installation of new tubewell near Krishnapada Mahato house at Mahalitora1 |
Plinth level |
-
latitude : 23.36769935209304
Longitude : 86.3377245515585
file name : Image_13062022091438165.png
|
2022-06-13 09:14:38.2574 |
167 |
47302017 |
Installation of new tubewell near Krishnapada Mahato house at Mahalitora |
80000 |
Installation of new tubewell near Krishnapada Mahato house at Mahalitora1 |
Completion of work |
-
latitude : 23.367732292972505
Longitude : 86.33777660317719
file name : Image_13062022085643445.png
|
2022-06-13 08:56:43.538612 |
168 |
47279255 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V |
500000 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V1 |
Roof laid |
-
latitude : 23.3871507
Longitude : 86.2922296
file name : Image_12072022122346531.png
|
2022-07-12 12:23:46.617211 |
169 |
47279255 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V |
500000 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V1 |
Plinth level |
-
latitude : 23.373993868008256
Longitude : 86.28904941491783
file name : Image_14062022091510165.png
|
2022-06-14 09:15:10.262697 |
170 |
47279255 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V |
500000 |
Installation of Solar Power Submersible Pump with Soakpit and Over Head Tank at Belkuri-V1 |
Completion of work |
-
latitude : 23.373962896876037
Longitude : 86.28911521285772
file name : Image_14062022084239693.png
|
2022-06-14 08:42:39.795794 |
171 |
47278150 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri |
80000 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri1 |
Roof laid |
-
latitude : 23.3871502
Longitude : 86.2922328
file name : Image_12072022124012093.png
|
2022-07-12 12:40:12.197532 |
172 |
47278150 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri |
80000 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri1 |
Plinth level |
-
latitude : 23.37744993623346
Longitude : 86.28312391228974
file name : Image_14062022092306936.png
|
2022-06-14 09:23:07.036579 |
173 |
47278150 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri |
80000 |
Installation of new Tubewell with soakpit at Dumurcher at Belkuri1 |
Completion of work |
-
latitude : 23.37743870448321
Longitude : 86.28314235247672
file name : Image_14062022083415432.png
|
2022-06-14 08:34:15.579149 |
174 |
47277113 |
Installation of new tubewell at Cherdhar at Kultar |
80000 |
Installation of new tubewell at Cherdhar at Kultar1 |
Plinth level |
-
latitude : 23.39121038094163
Longitude : 86.31926349364221
file name : Image_13062022110755428.png
|
2022-06-13 11:07:55.52199 |
175 |
47277113 |
Installation of new tubewell at Cherdhar at Kultar |
80000 |
Installation of new tubewell at Cherdhar at Kultar1 |
Completion of work |
-
latitude : 23.391168219968677
Longitude : 86.31922812201083
file name : Image_13062022110330501.png
|
2022-06-13 11:03:30.602002 |
176 |
47273359 |
Installation of New tube well Near Kuber Kaibarta house at Nadiara |
80000 |
Installation of New tube well Near Kuber Kaibarta house at Nadiara1 |
Plinth level |
-
latitude : 23.3817043
Longitude : 86.3270701
file name : Image_13062022103031669.png
|
2022-06-13 10:30:31.770024 |
177 |
47273359 |
Installation of New tube well Near Kuber Kaibarta house at Nadiara |
80000 |
Installation of New tube well Near Kuber Kaibarta house at Nadiara1 |
Completion of work |
-
latitude : 23.3817043
Longitude : 86.3270701
file name : Image_13062022102750433.png
|
2022-06-13 10:27:50.548881 |
178 |
47282186 |
Installation of new tubewell near Baral bandh at Chakjharia |
80000 |
Installation of new tubewell near Baral bandh at Chakjharia1 |
Plinth level |
-
latitude : 23.364369431510568
Longitude : 86.34009973146021
file name : Image_13062022092524215.png
|
2022-06-13 09:25:24.310524 |
179 |
47282186 |
Installation of new tubewell near Baral bandh at Chakjharia |
80000 |
Installation of new tubewell near Baral bandh at Chakjharia1 |
Completion of work |
-
latitude : 23.364332928322256
Longitude : 86.34011481888592
file name : Image_13062022092136557.png
|
2022-06-13 09:21:36.645675 |
180 |
47281190 |
Installation of new Tubewell near Bikash Mahato house at Chakra |
80000 |
Installation of new Tubewell near Bikash Mahato house at Chakra1 |
Roof laid |
-
latitude : 23.38093387428671
Longitude : 86.30327065475285
file name : Image_12072022111701870.png
|
2022-07-12 11:17:01.970972 |
181 |
47281190 |
Installation of new Tubewell near Bikash Mahato house at Chakra |
80000 |
Installation of new Tubewell near Bikash Mahato house at Chakra1 |
Plinth level |
-
latitude : 23.3809534041211
Longitude : 86.30329328589141
file name : Image_10062022105212186.png
|
2022-06-10 10:52:12.299001 |
182 |
47281190 |
Installation of new Tubewell near Bikash Mahato house at Chakra |
80000 |
Installation of new Tubewell near Bikash Mahato house at Chakra1 |
Completion of work |
-
latitude : 23.38090323843062
Longitude : 86.30326554179192
file name : Image_08062022171913290.png
|
2022-06-08 17:19:13.391595 |
183 |
47275429 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House |
150948 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House 1 |
Roof laid |
-
latitude : 23.386727068573236,23.386726607568562
Longitude : 86.32753349840641,86.3275326602161
file name : Image_16062022091621769.png
|
2022-06-16 09:16:21.857863 |
184 |
47275429 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House |
150948 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House 1 |
Plinth level |
-
latitude : 23.3867298765108,23.38672975078225
Longitude : 86.32753257639706,86.327532408759
file name : Image_13062022105104908.png
|
2022-06-13 10:51:05.012837 |
185 |
47275429 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House |
150948 |
Construction of PCC road from Nadiara Madhab Roy House to Laxman Majhi House 1 |
Completion of work |
-
latitude : 23.386755315586925,23.386755315586925
Longitude : 86.32755126804113,86.32755126804113
file name : Image_01062022165650302.png
|
2022-06-01 16:56:50.417288 |
186 |
47273605 |
Installation of New tube well near Badan Gope house at Nadiara |
80000 |
Installation of New tube well near Badan Gope house at Nadiara1 |
Plinth level |
-
latitude : 23.386020055040717
Longitude : 86.32989501580596
file name : Image_13062022102115378.png
|
2022-06-13 10:21:15.472852 |
187 |
47273605 |
Installation of New tube well near Badan Gope house at Nadiara |
80000 |
Installation of New tube well near Badan Gope house at Nadiara1 |
Completion of work |
-
latitude : 23.385890051722527
Longitude : 86.32904131896794
file name : Image_13062022101714466.png
|
2022-06-13 10:17:14.557408 |
188 |
47278810 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri |
80000 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri1 |
Roof laid |
-
latitude : 23.38703631889075
Longitude : 86.29231349565089
file name : Image_12072022122027373.png
|
2022-07-12 12:20:27.464205 |
189 |
47278810 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri |
80000 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri1 |
Plinth level |
-
latitude : 23.377124634571373
Longitude : 86.29041709005833
file name : Image_14062022091908637.png
|
2022-06-14 09:19:08.728536 |
190 |
47278810 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri |
80000 |
Installation of new tubewell with soakpit at Majhi Bagan at Belkuri1 |
Completion of work |
-
latitude : 23.377112480811775
Longitude : 86.29037409089506
file name : Image_14062022083842854.png
|
2022-06-14 08:38:42.947975 |
191 |
47278277 |
Installation of new Tubewell at Kocha kuli at Belkuri |
80000 |
Installation of new Tubewell at Kocha kuli at Belkuri1 |
Roof laid |
-
latitude : 23.3871507
Longitude : 86.2922296
file name : Image_12072022123153536.png
|
2022-07-12 12:31:53.632666 |
192 |
47278277 |
Installation of new Tubewell at Kocha kuli at Belkuri |
80000 |
Installation of new Tubewell at Kocha kuli at Belkuri1 |
Plinth level |
-
latitude : 23.37399340700358
Longitude : 86.28389932215214
file name : Image_14062022090653645.png
|
2022-06-14 09:06:53.727817 |
193 |
47278277 |
Installation of new Tubewell at Kocha kuli at Belkuri |
80000 |
Installation of new Tubewell at Kocha kuli at Belkuri1 |
Completion of work |
-
latitude : 23.37394353467971
Longitude : 86.28389337100089
file name : Image_14062022085038671.png
|
2022-06-14 08:50:38.774856 |
194 |
47276629 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar |
200000 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar1 |
Roof laid |
-
latitude : 23.390832566656172,23.390838685445487
Longitude : 86.31909049116075,86.31911211647093
file name : Image_18062022094116395.png
|
2022-06-18 09:41:16.506187 |
195 |
47276629 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar |
200000 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar1 |
Plinth level |
-
latitude : 23.390833153389394,23.390833153389394
Longitude : 86.31907364353538,86.31907364353538
file name : Image_17062022115124141.png
|
2022-06-17 11:51:24.253043 |
196 |
47276629 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar |
200000 |
Construction of PCC road from Samar Pandey house to Satyapada Pandey house at Kultar1 |
Completion of work |
-
latitude : 23.390772216953337,23.390747867524624
Longitude : 86.31911127828062,86.31908755749464
file name : Image_24052022104934429.png
|
2022-05-24 10:49:34.548753 |
197 |
47276971 |
Installation of new tubewell 02(two) nos at Hulka Village |
160000 |
Installation of new tubewell 02(two) nos at Hulka Village1 |
Completion of work |
-
latitude : 23.391151539981365
Longitude : 86.30530469119549
file name : Image_30062022104850790.png
|
2022-06-30 10:48:50.903322 |
198 |
47276971 |
Installation of new tubewell 02(two) nos at Hulka Village |
160000 |
Installation of new tubewell 02(two) nos at Hulka Village2 |
Completion of work |
-
latitude : 23.392138173803687
Longitude : 86.30450111813843
file name : Image_30062022111728844.png
|
2022-06-30 11:17:28.938343 |
199 |
47305366 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih |
300000 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih1 |
Roof laid |
-
latitude : 23.35489918012172,23.354902784340084
Longitude : 86.30736554972827,86.30736337043345
file name : Image_02072022131437521.png
|
2022-07-02 13:14:37.604597 |
200 |
47305366 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih |
300000 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih1 |
Plinth level |
-
latitude : 23.354785940609872,23.354785940609872
Longitude : 86.30667563527822,86.30667563527822
file name : Image_01072022112517765.png
|
2022-07-01 11:25:17.870428 |
201 |
47305366 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih |
300000 |
Construction of PCC road from Narayan Rajwar land to Nepal Rajwar land at Baghudih1 |
Completion of work |
-
latitude : 23.354921517893672,23.354921517893672
Longitude : 86.30744928494096,86.30744928494096
file name : Image_24062022100646933.png
|
2022-06-24 10:06:47.025668 |
202 |
47273960 |
Construction of Boundary wall of Nadiara SSK at Nadiara |
400000 |
Construction of Boundary wall of Nadiara SSK at Nadiara1 |
Roof laid |
-
latitude : 23.38384964503348
Longitude : 86.3270680513233
file name : Image_27082022111503372.png
|
2022-08-27 11:15:03.584359 |
203 |
47273960 |
Construction of Boundary wall of Nadiara SSK at Nadiara |
400000 |
Construction of Boundary wall of Nadiara SSK at Nadiara1 |
Plinth level |
-
latitude : 23.384003536775708
Longitude : 86.32721297442913
file name : Image_25072022111626360.png
|
2022-07-25 11:16:26.465033 |
204 |
47273960 |
Construction of Boundary wall of Nadiara SSK at Nadiara |
400000 |
Construction of Boundary wall of Nadiara SSK at Nadiara1 |
Completion of work |
-
latitude : 23.384106340818107
Longitude : 86.32725329138339
file name : Image_14072022163444339.png
|
2022-07-14 16:34:44.450159 |
205 |
47306827 |
White wash of Lagda ICDS centre |
30000 |
White wash of Lagda ICDS centre1 |
Plinth level |
-
latitude : 23.365415325388312
Longitude : 86.31890675984323
file name : Image_12092022150206052.png
|
2022-09-12 15:02:06.151874 |
206 |
47306827 |
White wash of Lagda ICDS centre |
30000 |
White wash of Lagda ICDS centre1 |
Completion of work |
-
latitude : 23.365373122505844
Longitude : 86.31898689083755
file name : Image_12072022103940673.png
|
2022-07-12 10:39:40.783888 |
207 |
47307266 |
Construction of Drainage System with Pipe line at Lagda Girl's High School to Dom Ghar |
200000 |
Construction of Drainage System with Pipe line at Lagda Girl's High School to Dom Ghar1 |
Completion of work |
-
latitude : 23.367113289423287,23.367113289423287
Longitude : 86.31982726044953,86.31982726044953
file name : Image_12092022150303588.png
|
2022-09-12 15:03:03.671517 |
208 |
47309184 |
Installation of new tubewell near Dasarath Rajwar house at Lagda |
80000 |
Installation of new tubewell near Dasarath Rajwar house at Lagda 1 |
Completion of work |
-
latitude : 23.366901478730142
Longitude : 86.31928176619112
file name : Image_20122022121000096.png
|
2022-12-20 12:10:00.192257 |
209 |
35677941 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD |
250000 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD1 |
Roof laid |
-
latitude : 23.3665963,23.3665963
Longitude : 86.3216734,86.3216734
file name : Image_20032023104303812.png
|
2023-03-20 10:43:03.906658 |
210 |
35677941 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD |
250000 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD1 |
Plinth level |
-
latitude : 23.366679358296096,23.366677472367883
Longitude : 86.32179088890553,86.32181402295828
file name : Image_18032023120522207.png
|
2023-03-18 12:05:22.305944 |
211 |
35677941 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD |
250000 |
CONS PCC ROAD FROM KALIMELA TO MANATOSH BANERJEE ROAD1 |
Completion of work |
-
latitude : 23.3665816,23.3665816
Longitude : 86.3216991,86.3216991
file name : Image_10022023110344286.png
|
2023-02-10 11:03:44.369684 |
212 |
47307705 |
Construction of PCC road of Lagda Health Centre |
300000 |
Construction of PCC road of Lagda Health Centre1 |
Roof laid |
-
latitude : 23.36548950523138,23.365557985380292
Longitude : 86.31890214979649,86.31893089972436
file name : Image_14022023111130788.png
|
2023-02-14 11:11:30.882987 |
213 |
47307705 |
Construction of PCC road of Lagda Health Centre |
300000 |
Construction of PCC road of Lagda Health Centre1 |
Plinth level |
-
latitude : 23.36541038006544,23.36541038006544
Longitude : 86.31898269988596,86.31898269988596
file name : Image_10022023104040713.png
|
2023-02-10 10:40:40.809481 |
214 |
47307705 |
Construction of PCC road of Lagda Health Centre |
300000 |
Construction of PCC road of Lagda Health Centre1 |
Completion of work |
-
latitude : 23.36558401118964,23.365580197423697
Longitude : 86.31861054338515,86.31860232912004
file name : Image_09022023130021950.png
|
2023-02-09 13:00:22.061521 |
215 |
47279653 |
Construction of PCC road from Chakra Pakka Rasta to SSK |
200000 |
Construction of PCC road from Chakra Pakka Rasta to SSK1 |
Roof laid |
-
latitude : 23.374320468865335,23.37435533758253
Longitude : 86.3067836780101,86.30679457448423
file name : Image_03032023102739801.png
|
2023-03-03 10:27:39.903154 |
216 |
47279653 |
Construction of PCC road from Chakra Pakka Rasta to SSK |
200000 |
Construction of PCC road from Chakra Pakka Rasta to SSK1 |
Plinth level |
-
latitude : 23.3762928,23.3762928
Longitude : 86.3112913,86.3112913
file name : Image_02032023112102275.png
|
2023-03-02 11:21:02.390431 |
217 |
47279653 |
Construction of PCC road from Chakra Pakka Rasta to SSK |
200000 |
Construction of PCC road from Chakra Pakka Rasta to SSK1 |
Completion of work |
-
latitude : 23.376293,23.376293
Longitude : 86.3112934,86.3112934
file name : Image_25022023145257645.png
|
2023-02-25 14:52:57.744307 |
218 |
57818704 |
Construction of PCC Road at Lagga Machh Bika Kuli |
200000 |
Construction of PCC Road at Lagga Machh Bika Kuli1 |
Roof laid |
-
latitude : 23.3688887860626,23.368930486030877
Longitude : 86.32194352336228,86.32197244092822
file name : Image_17032023123023718.png
|
2023-03-17 12:30:23.827249 |
219 |
57818704 |
Construction of PCC Road at Lagga Machh Bika Kuli |
200000 |
Construction of PCC Road at Lagga Machh Bika Kuli1 |
Plinth level |
-
latitude : 23.368901736103,23.368901736103
Longitude : 86.32195349782705,86.32195349782705
file name : Image_16032023121329068.png
|
2023-03-16 12:13:29.165874 |
220 |
57818704 |
Construction of PCC Road at Lagga Machh Bika Kuli |
200000 |
Construction of PCC Road at Lagga Machh Bika Kuli1 |
Completion of work |
-
latitude : 23.369011161848903,23.369008395820856
Longitude : 86.32207252085209,86.32211660966277
file name : Image_03032023144250259.png
|
2023-03-03 14:42:50.450581 |
221 |
57819587 |
Construction of PCC Road at Lagda Chepu Gali |
200000 |
Construction of PCC Road at Lagda Chepu Gali1 |
Roof laid |
-
latitude : 23.36757471319288,23.36758452001959
Longitude : 86.32361177355051,86.32361152209342
file name : Image_01062023094636624.png
|
2023-06-01 09:46:36.715773 |
222 |
57819587 |
Construction of PCC Road at Lagda Chepu Gali |
200000 |
Construction of PCC Road at Lagda Chepu Gali1 |
Plinth level |
-
latitude : 23.367621190845966,23.367617879994214
Longitude : 86.32354178465903,86.32357086986303
file name : Image_01062023094352276.png
|
2023-06-01 09:43:52.358233 |
223 |
57819587 |
Construction of PCC Road at Lagda Chepu Gali |
200000 |
Construction of PCC Road at Lagda Chepu Gali1 |
Completion of work |
-
latitude : 23.35908233653754,23.35908233653754
Longitude : 86.34095686487854,86.34095686487854
file name : Image_01062023093443845.png
|
2023-06-01 09:34:43.934408 |
224 |
57875132 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Belkuri Majhi Bagan |
500000 |
Installation of Solar Power Submerssible Pump with Over Head Tank at Belkuri Majhi Bagan1 |
Completion of work |
-
latitude : 23.37596520781517
Longitude : 86.29121068865061
file name : Image_17032023130218453.png
|
2023-03-17 13:02:18.562794 |
225 |
57817812 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House |
200000 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House1 |
Roof laid |
-
latitude : 23.38850143365562,23.388468786142766
Longitude : 86.30419953726232,86.30418352782726
file name : Image_18032023125505244.png
|
2023-03-18 12:55:05.340442 |
226 |
57817812 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House |
200000 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House1 |
Plinth level |
-
latitude : 23.38850700762123,23.38853378780186,23.388524735346437
Longitude : 86.30413751117885,86.3041659258306,86.30417824722826
file name : Image_17032023104155858.png
|
2023-03-17 10:41:55.958393 |
227 |
57817812 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House |
200000 |
Construction of PCC Road from Hulka Kailash Mahato House to Prafullya Mahato House1 |
Completion of work |
-
latitude : 23.3885977,23.3885977
Longitude : 86.3041454,86.3041454
file name : Image_14032023104746097.png
|
2023-03-14 10:47:46.191569 |
228 |
57888633 |
Construction of Protection wall at Lagda Suri Goria |
250000 |
Construction of Protection wall at Lagda Suri Goria1 |
Roof laid |
-
latitude : 23.36459008511156
Longitude : 86.32232959382236
file name : Image_27032023101913954.png
|
2023-03-27 10:19:14.04517 |
229 |
57888633 |
Construction of Protection wall at Lagda Suri Goria |
250000 |
Construction of Protection wall at Lagda Suri Goria1 |
Plinth level |
-
latitude : 23.36454867850989
Longitude : 86.32236982695758
file name : Image_25032023105816120.png
|
2023-03-25 10:58:16.215941 |
230 |
57888633 |
Construction of Protection wall at Lagda Suri Goria |
250000 |
Construction of Protection wall at Lagda Suri Goria1 |
Completion of work |
-
latitude : 23.364571477286518
Longitude : 86.32243193686008
file name : Image_03032023145605280.png
|
2023-03-03 14:56:05.382919 |
231 |
36048635 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL |
30000 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL1 |
Roof laid |
-
latitude : 23.382319025695324
Longitude : 86.32882464677095
file name : Image_03092022120024574.png
|
2022-09-03 12:00:24.693951 |
232 |
36048635 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL |
30000 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL1 |
Plinth level |
-
latitude : 23.382345428690314
Longitude : 86.32879019714892
file name : Image_03092022115808545.png
|
2022-09-03 11:58:08.675831 |
233 |
36048635 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL |
30000 |
CONS SOAKPIT NEAR KALIMANDIR TUBE WELL1 |
Completion of work |
-
latitude : 23.3823461830616
Longitude : 86.32884819991887
file name : Image_03092022115518107.png
|
2022-09-03 11:55:18.230295 |
234 |
57914279 |
Construction of Soak Pit at Lagda Harijan Pry School |
30000 |
Construction of Soak Pit at Lagda Harijan Pry School1 |
Roof laid |
-
latitude : 23.36812653578818
Longitude : 86.3226989004761
file name : Image_05042023124450317.png
|
2023-04-05 12:44:50.433409 |
235 |
57914279 |
Construction of Soak Pit at Lagda Harijan Pry School |
30000 |
Construction of Soak Pit at Lagda Harijan Pry School1 |
Plinth level |
-
latitude : 23.36817527655512
Longitude : 86.32278062403202
file name : Image_05042023112758610.png
|
2023-04-05 11:27:58.716805 |
236 |
57914279 |
Construction of Soak Pit at Lagda Harijan Pry School |
30000 |
Construction of Soak Pit at Lagda Harijan Pry School1 |
Completion of work |
-
latitude : 23.36818135343492
Longitude : 86.32277416996658
file name : Image_02042023120841011.png
|
2023-04-02 12:08:41.105423 |
237 |
57820325 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House |
200000 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House1 |
Roof laid |
-
latitude : 23.366047404706478,23.366047404706478
Longitude : 86.32235239259899,86.32235239259899
file name : Image_05042023124737779.png
|
2023-04-05 12:47:37.875992 |
238 |
57820325 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House |
200000 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House1 |
Plinth level |
-
latitude : 23.3660212950781,23.3660212950781
Longitude : 86.32242548279464,86.32242548279464
file name : Image_05042023115004121.png
|
2023-04-05 11:50:04.223373 |
239 |
57820325 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House |
200000 |
Construction of PCC Road from Lagda Manik Gayen house to Tapan Gayen House1 |
Completion of work |
-
latitude : 23.36601693648845,23.36601693648845
Longitude : 86.32239648140967,86.32239648140967
file name : Image_02042023120317490.png
|
2023-04-02 12:03:17.583753 |
240 |
57821152 |
Construction of Shed at Lagda Health Centre |
300000 |
Construction of Shed at Lagda Health Centre1 |
Roof laid |
-
latitude : 23.36552177555859
Longitude : 86.3168777525425
file name : Image_05042023125407577.png
|
2023-04-05 12:54:07.714517 |
241 |
57821152 |
Construction of Shed at Lagda Health Centre |
300000 |
Construction of Shed at Lagda Health Centre1 |
Plinth level |
-
latitude : 23.365486236289144
Longitude : 86.31686777807772
file name : Image_05042023093103827.png
|
2023-04-05 09:31:03.953961 |
242 |
57821152 |
Construction of Shed at Lagda Health Centre |
300000 |
Construction of Shed at Lagda Health Centre1 |
Completion of work |
-
latitude : 23.365666908212006
Longitude : 86.316799800843
file name : Image_17032023123836154.png
|
2023-03-17 12:38:36.345833 |
243 |
47304494 |
Construction of soakpit near Sushen Bauri house at Lagda |
32000 |
Construction of soakpit near Sushen Bauri house at Lagda 1 |
Plinth level |
-
latitude : 23.367698513902724
Longitude : 86.32363054901361
file name : Image_05042023114334804.png
|
2023-04-05 11:43:34.900155 |
244 |
47304494 |
Construction of soakpit near Sushen Bauri house at Lagda |
32000 |
Construction of soakpit near Sushen Bauri house at Lagda 1 |
Completion of work |
-
latitude : 23.36772181559354
Longitude : 86.32363784126937
file name : Image_02042023133339948.png
|
2023-04-02 13:33:40.032297 |
245 |
57876835 |
Construction of Protection Wall at Baghudih Jore Dhar |
350000 |
Construction of Protection Wall at Baghudih Jore Dhar1 |
Roof laid |
-
latitude : 23.356272052042186
Longitude : 86.30157524719834
file name : Image_14042023100506387.png
|
2023-04-14 10:05:06.47662 |
246 |
57876835 |
Construction of Protection Wall at Baghudih Jore Dhar |
350000 |
Construction of Protection Wall at Baghudih Jore Dhar1 |
Plinth level |
-
latitude : 23.356263963505626
Longitude : 86.30155865103006
file name : Image_01042023122229480.png
|
2023-04-01 12:22:29.58684 |
247 |
57876835 |
Construction of Protection Wall at Baghudih Jore Dhar |
350000 |
Construction of Protection Wall at Baghudih Jore Dhar1 |
Completion of work |
-
latitude : 23.35619380697608
Longitude : 86.30153710953891
file name : Image_27022023132724341.png
|
2023-02-27 13:27:24.433374 |
248 |
36045805 |
CONS SOAKPIT NEAR SSK TUBE WELL |
30000 |
CONS SOAKPIT NEAR SSK TUBE WELL1 |
Roof laid |
-
latitude : 23.384176790714264
Longitude : 86.32728841155767
file name : Image_03092022121048609.png
|
2022-09-03 12:10:48.718131 |
249 |
36045805 |
CONS SOAKPIT NEAR SSK TUBE WELL |
30000 |
CONS SOAKPIT NEAR SSK TUBE WELL1 |
Plinth level |
-
latitude : 23.384159146808088
Longitude : 86.32732411846519
file name : Image_03092022120759077.png
|
2022-09-03 12:07:59.180648 |
250 |
36045805 |
CONS SOAKPIT NEAR SSK TUBE WELL |
30000 |
CONS SOAKPIT NEAR SSK TUBE WELL1 |
Completion of work |
-
latitude : 23.38417431805283
Longitude : 86.32729277014732
file name : Image_03092022120549233.png
|
2022-09-03 12:05:49.34122 |
251 |
36049345 |
CONS SLAB OF LAGDA BARA DRAIN |
476052 |
CONS SLAB OF LAGDA BARA DRAIN1 |
Completion of work |
-
latitude : 23.3656472,23.3656472
Longitude : 86.3227655,86.3227655
file name : Image_31032022172100583.png
|
2022-03-31 17:21:00.68003 |
252 |
47275028 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara |
30000 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara1 |
Roof laid |
-
latitude : 23.382306369021535
Longitude : 86.32940341718495
file name : Image_25042023095740037.png
|
2023-04-25 09:57:40.129143 |
253 |
47275028 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara |
30000 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.382354355417192
Longitude : 86.32940190844238
file name : Image_07042023122011890.png
|
2023-04-07 12:20:11.985398 |
254 |
47275028 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara |
30000 |
Construction of soakpit at Abhijan Sangha tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.3824082929641
Longitude : 86.32945898920298
file name : Image_07042023121208450.png
|
2023-04-07 12:12:08.540128 |
255 |
47274458 |
Construction of soakpit at Bajrang bali tubewell at Nadiara |
30000 |
Construction of soakpit at Bajrang bali tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.386654062196612
Longitude : 86.33000741712749
file name : Image_30032023114208950.png
|
2023-03-30 11:42:09.053522 |
256 |
47274458 |
Construction of soakpit at Bajrang bali tubewell at Nadiara |
30000 |
Construction of soakpit at Bajrang bali tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.386607291176915
Longitude : 86.3300568703562
file name : Image_30032023112851913.png
|
2023-03-30 11:28:52.019532 |
257 |
39066128 |
Tube well repairing and Maintenance |
550000 |
Tube well repairing and Maintenance 1 |
Completion of work |
-
latitude : 23.3872079
Longitude : 86.2922689
file name : Image_06102021010017260.png
|
2021-10-06 01:00:17.412912 |
258 |
39066128 |
Tube well repairing and Maintenance |
550000 |
Tube well repairing and Maintenance 13 |
Completion of work |
-
latitude : 23.3872323
Longitude : 86.2922271
file name : Image_28092021142620871.png
|
2021-09-28 14:26:20.964898 |
259 |
36046443 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE |
30000 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE1 |
Roof laid |
-
latitude : 23.381870090961456
Longitude : 86.32794572040439
file name : Image_03092022114704142.png
|
2022-09-03 11:47:04.251342 |
260 |
36046443 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE |
30000 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE1 |
Plinth level |
-
latitude : 23.38187268935144
Longitude : 86.32793867960572
file name : Image_03092022114332997.png
|
2022-09-03 11:43:33.130882 |
261 |
36046443 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE |
30000 |
CONS SOAKPIT NEAR TUBE WELL NEAR BHSWA RAJWAR HOUSE1 |
Completion of work |
-
latitude : 23.38186619337648
Longitude : 86.32791093550622
file name : Image_03092022114006771.png
|
2022-09-03 11:40:06.897036 |
262 |
35921634 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR |
30000 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR1 |
Roof laid |
-
latitude : 23.381488965824246
Longitude : 86.32737399078906
file name : Image_03092022113604649.png
|
2022-09-03 11:36:04.77264 |
263 |
35921634 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR |
30000 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR1 |
Plinth level |
-
latitude : 23.381435279734433
Longitude : 86.32736912928522
file name : Image_03092022113202225.png
|
2022-09-03 11:32:02.342218 |
264 |
35921634 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR |
30000 |
CONSTRUCTION SOAKPIT OF TUBEWELL NEAR BUDDHESWAR RAJWAR1 |
Completion of work |
-
latitude : 23.3810334
Longitude : 86.3272095
file name : Image_03092022112824841.png
|
2022-09-03 11:28:24.951784 |
265 |
47278514 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House |
300000 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House1 |
Roof laid |
-
latitude : 23.378227190114558,23.37822199333459
Longitude : 86.28682158887386,86.28680281341076
file name : Image_03062022130313324.png
|
2022-06-03 13:03:13.413942 |
266 |
47278514 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House |
300000 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House1 |
Plinth level |
-
latitude : 23.37822454981506,23.378223795443773
Longitude : 86.28692887723446,86.28692854195833
file name : Image_23052022111402667.png
|
2022-05-23 11:14:02.791775 |
267 |
47278514 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House |
300000 |
Construction of Drain from Brelkuri Bouri para Mahabir Bauri's House Gali to Bular Bouri House1 |
Completion of work |
-
latitude : 23.378213359974325,23.3782069478184
Longitude : 86.28689778037369,86.28688654862344
file name : Image_11052022131114314.png
|
2022-05-11 13:11:14.404721 |
268 |
47308885 |
Installation of new tubewell near Musuri kanali road at Lagda |
80000 |
Installation of new tubewell near Musuri kanali road at Lagda 1 |
Completion of work |
-
latitude : 23.372678202576935
Longitude : 86.31251220591366
file name : Image_22062023102319313.png
|
2023-06-22 10:23:19.401719 |
269 |
47274307 |
Construction of soakpit at SSK tubewell at Nadiara |
30000 |
Construction of soakpit at SSK tubewell at Nadiara1 |
Plinth level |
-
latitude : 23.384150806814432
Longitude : 86.32721154950559
file name : Image_06062023105215776.png
|
2023-06-06 10:52:15.865686 |
270 |
47274307 |
Construction of soakpit at SSK tubewell at Nadiara |
30000 |
Construction of soakpit at SSK tubewell at Nadiara1 |
Completion of work |
-
latitude : 23.384110238403082
Longitude : 86.32724775932729
file name : Image_11052023082248185.png
|
2023-05-11 08:22:48.282163 |
271 |
57911960 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House |
250000 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House1 |
Roof laid |
-
latitude : 23.378444826230407,23.378469343297184
Longitude : 86.28703264519572,86.28703088499606
file name : Image_21032023135910346.png
|
2023-03-21 13:59:10.446609 |
272 |
57911960 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House |
250000 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House1 |
Plinth level |
-
latitude : 23.378538829274476,23.37854385841638
Longitude : 86.28700515255332,86.28696735017002
file name : Image_11032023123257745.png
|
2023-03-11 12:32:57.831858 |
273 |
57911960 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House |
250000 |
Construction of Drain from Belkuri Pry School to Kinkar Bauri House1 |
Completion of work |
-
latitude : 23.378654499538243,23.378654499538243
Longitude : 86.28691085614264,86.28691085614264
file name : Image_23022023155222323.png
|
2023-02-23 15:52:22.426974 |
274 |
47277834 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri |
300000 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri1 |
Roof laid |
-
latitude : 23.371568899601698,23.371544256806374
Longitude : 86.2763996142894,86.27642216160893
file name : Image_21042023113010998.png
|
2023-04-21 11:30:11.114738 |
275 |
47277834 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri |
300000 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri1 |
Plinth level |
-
latitude : 23.371495096944273,23.371506328694522
Longitude : 86.27640690654516,86.27641880884767
file name : Image_14042023110440522.png
|
2023-04-14 11:04:40.623263 |
276 |
47277834 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri |
300000 |
Construction of PCC road from Dilip Rajak house to Rajkishore Mahato house at Belkuri1 |
Completion of work |
-
latitude : 23.37150058709085,23.371511986479163
Longitude : 86.27641218714416,86.27639181911945
file name : Image_14042023104851859.png
|
2023-04-14 10:48:51.955504 |
277 |
47304720 |
Construction of soakpit near Gumura Bauri house at Lagda |
30000 |
Construction of soakpit near Gumura Bauri house at Lagda 1 |
Completion of work |
-
latitude : 23.367602708749473
Longitude : 86.32354161702096
file name : Image_06062023100219203.png
|
2023-06-06 10:02:19.297488 |
278 |
57914648 |
Construction of Soak Pit at Lagda Bagan Kuli |
60000 |
Construction of Soak Pit at Lagda Bagan Kuli1 |
Plinth level |
-
latitude : 23.369670985266566
Longitude : 86.3229407183826
file name : Image_05042023113047414.png
|
2023-04-05 11:30:47.516411 |
279 |
57914648 |
Construction of Soak Pit at Lagda Bagan Kuli |
60000 |
Construction of Soak Pit at Lagda Bagan Kuli1 |
Completion of work |
-
latitude : 23.369656149297953
Longitude : 86.32305479608476
file name : Image_02042023121142069.png
|
2023-04-02 12:11:42.185312 |
280 |
57915702 |
Construction of Soak Pit at Chakra Near Nakul Sahish House |
30000 |
Construction of Soak Pit at Chakra Near Nakul Sahish House1 |
Plinth level |
-
latitude : 23.377189091406763
Longitude : 86.30173601210117
file name : Image_16062023100603556.png
|
2023-06-16 10:06:03.649693 |
281 |
57915702 |
Construction of Soak Pit at Chakra Near Nakul Sahish House |
30000 |
Construction of Soak Pit at Chakra Near Nakul Sahish House1 |
Completion of work |
-
latitude : 23.377184397540987
Longitude : 86.30176945589483
file name : Image_09062023104607091.png
|
2023-06-09 10:46:07.200924 |
282 |
47303267 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda |
150000 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda1 |
Roof laid |
-
latitude : 23.36297736503184,23.36297736503184
Longitude : 86.32860311307013,86.32860311307013
file name : Image_13062023182116602.png
|
2023-06-13 18:21:16.833042 |
283 |
47303267 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda |
150000 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda1 |
Plinth level |
-
latitude : 23.362986585125327,23.36299790069461
Longitude : 86.32857092656195,86.3285858463496
file name : Image_13062023181757564.png
|
2023-06-13 18:17:57.67745 |
284 |
47303267 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda |
150000 |
Construction of PCC road from Asit Banerjee house to Susanta Banerjee house at Lagda1 |
Completion of work |
-
latitude : 23.362988806329668,23.362959679216146
Longitude : 86.32861912250519,86.3286355510354
file name : Image_13062023181240939.png
|
2023-06-13 18:12:41.050414 |
285 |
47305195 |
Installation of new tube well at Baka Bandh at Lagda |
80000 |
Installation of new tube well at Baka Bandh at Lagda 1 |
Completion of work |
-
latitude : 23.367663770914078
Longitude : 86.31972474977374
file name : Image_20122022121652912.png
|
2022-12-20 12:16:53.00726 |
286 |
47308723 |
Installation of new tubewell with soak pit near Biswanath Ghari at Lagda |
92000 |
Installation of new tubewell with soak pit near Biswanath Ghari at Lagda1 |
Completion of work |
-
latitude : 23.36883141193539
Longitude : 86.32013370282948
file name : Image_22062023101718386.png
|
2023-06-22 10:17:18.478708 |
287 |
47278716 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house |
120052 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house1 |
Roof laid |
-
latitude : 23.377009006217122,23.377009006217122
Longitude : 86.29084339365363,86.29084339365363
file name : Image_13062023184658285.png
|
2023-06-13 18:46:58.357029 |
288 |
47278716 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house |
120052 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house1 |
Plinth level |
-
latitude : 23.377087460830808,23.377087460830808
Longitude : 86.29088153131306,86.29088153131306
file name : Image_13062023184433537.png
|
2023-06-13 18:44:33.661389 |
289 |
47278716 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house |
120052 |
Construction of PCC Road from Belkuri Paran Kaibarta House to Chaitu Karbarta house1 |
Completion of work |
-
latitude : 23.376968982629478,23.37697258684784
Longitude : 86.29086686298251,86.29091983661056
file name : Image_13062023183835637.png
|
2023-06-13 18:38:35.737283 |
290 |
57884403 |
Installation of New Tube Well one Nos at Hulka near Gouranga Mahato House |
100000 |
Installation of New Tube Well one Nos at Hulka near Gouranga Mahato House1 |
Plinth level |
-
latitude : 23.391225216910243
Longitude : 86.30267780274153
file name : Image_20062023085155293.png
|
2023-06-20 08:51:55.382965 |
291 |
57884403 |
Installation of New Tube Well one Nos at Hulka near Gouranga Mahato House |
100000 |
Installation of New Tube Well one Nos at Hulka near Gouranga Mahato House1 |
Completion of work |
-
latitude : 23.391134063713253
Longitude : 86.30260085687041
file name : Image_13062023082645472.png
|
2023-06-13 08:26:45.570467 |
292 |
57916089 |
Construction of Soak Pit at Chakra Near Mihir Rajowar House |
30000 |
Construction of Soak Pit at Chakra Near Mihir Rajowar House1 |
Plinth level |
-
latitude : 23.377053597941995
Longitude : 86.30169217474759
file name : Image_16062023101034157.png
|
2023-06-16 10:10:34.245541 |
293 |
57916089 |
Construction of Soak Pit at Chakra Near Mihir Rajowar House |
30000 |
Construction of Soak Pit at Chakra Near Mihir Rajowar House1 |
Completion of work |
-
latitude : 23.377066254615784
Longitude : 86.30172125995159
file name : Image_09062023104906077.png
|
2023-06-09 10:49:06.164866 |
294 |
57915306 |
Construction of Soak Pit at Chakra Near Nousad Sah House |
30000 |
Construction of Soak Pit at Chakra Near Nousad Sah House1 |
Plinth level |
-
latitude : 23.3808939345181
Longitude : 86.30322715267539
file name : Image_16062023095756757.png
|
2023-06-16 09:57:56.86314 |
295 |
57915306 |
Construction of Soak Pit at Chakra Near Nousad Sah House |
30000 |
Construction of Soak Pit at Chakra Near Nousad Sah House1 |
Completion of work |
-
latitude : 23.38095453567803
Longitude : 86.3032750133425
file name : Image_09062023103930193.png
|
2023-06-09 10:39:30.281695 |
296 |
57914981 |
Construction of Soak Pit at Chakra Bhadari Sahish House |
30000 |
Construction of Soak Pit at Chakra Bhadari Sahish House1 |
Plinth level |
-
latitude : 23.37717081885785
Longitude : 86.30173592828214
file name : Image_16062023100441824.png
|
2023-06-16 10:04:41.918547 |
297 |
57914981 |
Construction of Soak Pit at Chakra Bhadari Sahish House |
30000 |
Construction of Soak Pit at Chakra Bhadari Sahish House1 |
Completion of work |
-
latitude : 23.377166921272874
Longitude : 86.30180709064007
file name : Image_09062023104708808.png
|
2023-06-09 10:47:08.897693 |
298 |
57814318 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House |
350000 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House1 |
Roof laid |
-
latitude : 23.38070777244866,23.380787861533463
Longitude : 86.3268896844238,86.32690259255469
file name : Image_20062023090613426.png
|
2023-06-20 09:06:13.52158 |
299 |
57814318 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House |
350000 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House1 |
Plinth level |
-
latitude : 23.380662300623953,23.380656181834638
Longitude : 86.32685791701078,86.32687032222748
file name : Image_16062023080751494.png
|
2023-06-16 08:07:51.63321 |
300 |
57814318 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House |
350000 |
Construction of PCC Road from Nadiara Das Para Avijit Das House to Sanjoy Bauri House1 |
Completion of work |
-
latitude : 23.380710370838642,23.38070714380592
Longitude : 86.32689756341279,86.32688197307289
file name : Image_06062023103836748.png
|
2023-06-06 10:38:36.834699 |
301 |
47280689 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra |
150000 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra1 |
Roof laid |
-
latitude : 23.376364479772747,23.3763186307624
Longitude : 86.30434202961624,86.30438058637083
file name : Image_20062023081557248.png
|
2023-06-20 08:15:57.336942 |
302 |
47280689 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra |
150000 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra1 |
Plinth level |
-
latitude : 23.376335646025836,23.376335646025836
Longitude : 86.30433482117951,86.30433482117951
file name : Image_16062023101837743.png
|
2023-06-16 10:18:37.833715 |
303 |
47280689 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra |
150000 |
Construction of PCC road from Nitai Mahato house to Tarapada Rajwar house at Chakra1 |
Completion of work |
-
latitude : 23.376267249695957,23.376303417608142
Longitude : 86.30439139902592,86.30437061190605
file name : Image_09062023114032136.png
|
2023-06-09 11:40:32.225566 |
304 |
57886160 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House |
100000 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House1 |
Plinth level |
-
latitude : 23.3626662
Longitude : 86.3390675
file name : Image_20062023092057550.png
|
2023-06-20 09:20:57.635673 |
305 |
57886160 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House |
100000 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House1 |
Completion of work |
-
latitude : 23.3628224
Longitude : 86.3389844
file name : Image_13062023072128720.png
|
2023-06-13 07:21:28.82176 |
306 |
57886160 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House |
100000 |
Installation of new Tube well one Nos near Mahalitora Gita Gope House1 |
Completion of work |
-
latitude : 23.366784090176225
Longitude : 86.33694855496287
file name : Image_13062023074711568.png
|
2023-06-13 07:47:11.658319 |
307 |
57881236 |
Installation of New Tube Well one nos at Nadiara near Bharat Rajwar House |
100000 |
Installation of New Tube Well one nos at Nadiara near Bharat Rajwar House1 |
Plinth level |
-
latitude : 23.37838803883642
Longitude : 86.32782183587551
file name : Image_20062023090953933.png
|
2023-06-20 09:09:54.014445 |
308 |
57881236 |
Installation of New Tube Well one nos at Nadiara near Bharat Rajwar House |
100000 |
Installation of New Tube Well one nos at Nadiara near Bharat Rajwar House1 |
Completion of work |
-
latitude : 23.378411047160625
Longitude : 86.3279000390321
file name : Image_13062023075754859.png
|
2023-06-13 07:57:54.95936 |
309 |
57878203 |
Installation of New Tube well one nos at Nadiara Near Kalipada Rajwar House |
100000 |
Installation of New Tube well one nos at Nadiara Near Kalipada Rajwar House1 |
Plinth level |
-
latitude : 23.382500032894313
Longitude : 86.32789274677634
file name : Image_20062023090245925.png
|
2023-06-20 09:02:46.01705 |
310 |
57878203 |
Installation of New Tube well one nos at Nadiara Near Kalipada Rajwar House |
100000 |
Installation of New Tube well one nos at Nadiara Near Kalipada Rajwar House1 |
Completion of work |
-
latitude : 23.380956379696727
Longitude : 86.32794261910021
file name : Image_13062023080404858.png
|
2023-06-13 08:04:04.948373 |
311 |
57824382 |
construction of PCC road from Chakra Dipak Mahato House to Bangshi Mahato House |
350000 |
construction of PCC road from Chakra Dipak Mahato House to Bangshi Mahato House1 |
Plinth level |
-
latitude : 23.3767203,23.3767203
Longitude : 86.303642,86.303642
file name : Image_20062023081947361.png
|
2023-06-20 08:19:47.448036 |
312 |
57824382 |
construction of PCC road from Chakra Dipak Mahato House to Bangshi Mahato House |
350000 |
construction of PCC road from Chakra Dipak Mahato House to Bangshi Mahato House1 |
Completion of work |
-
latitude : 23.37685603648424,23.37679677642882
Longitude : 86.30376510322094,86.3038569688797
file name : Image_31052023085716979.png
|
2023-05-31 08:57:17.059598 |
313 |
57887007 |
Installation of New Tube Well one Nos at Mahalitora Bahadur Para |
100000 |
Installation of New Tube Well one Nos at Mahalitora Bahadur Para1 |
Plinth level |
-
latitude : 23.36677868384868
Longitude : 86.33688342757523
file name : Image_20062023091721356.png
|
2023-06-20 09:17:21.440873 |
314 |
47309825 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank near Lagda GP Office |
200000 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank near Lagda GP Office1 |
Completion of work |
-
latitude : 23.389472980052233
Longitude : 86.29331764765084
file name : Image_27062023114238785.png
|
2023-06-27 11:42:38.929956 |
315 |
57816320 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House |
224758 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House1 |
Roof laid |
-
latitude : 23.3786314,23.3786314
Longitude : 86.3060085,86.3060085
file name : Image_16102023163101215.png
|
2023-10-16 16:31:01.300648 |
316 |
57816320 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House |
224758 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House1 |
Plinth level |
-
latitude : 23.3786314,23.3786314
Longitude : 86.3060086,86.3060086
file name : Image_12102023110105321.png
|
2023-10-12 11:01:05.447613 |
317 |
57816320 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House |
224758 |
Construction of PCC Road from Chakra Harimandir to Chamtu Mahato House1 |
Completion of work |
-
latitude : 23.3786547,23.3786547
Longitude : 86.3060278,86.3060278
file name : Image_01062023095704309.png
|
2023-06-01 09:57:04.387635 |
318 |
57817059 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee |
200000 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee1 |
Roof laid |
-
latitude : 23.374438737519085,23.374491040594876
Longitude : 86.3031647913158,86.30314878188074
file name : Image_17102023110447872.png
|
2023-10-17 11:04:47.96577 |
319 |
57817059 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee |
200000 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee1 |
Plinth level |
-
latitude : 23.37447096593678,23.374526076950133
Longitude : 86.30320309661329,86.3031592592597
file name : Image_15092023120707916.png
|
2023-09-15 12:07:08.0007 |
320 |
57817059 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee |
200000 |
Cons of PCC Road from Chakra Bahadur Mahato House to Laxmikanta Mahato Housee1 |
Completion of work |
-
latitude : 23.374457345344126,23.374457345344126
Longitude : 86.30324341356754,86.30324341356754
file name : Image_31052023090946398.png
|
2023-05-31 09:09:46.481315 |
321 |
57913955 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria |
250000 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria1 |
Roof laid |
-
latitude : 23.36426076013595,23.36426076013595
Longitude : 86.33986093103886,86.33986093103886
file name : Image_02112023152352832.png
|
2023-11-02 15:23:52.930012 |
322 |
57913955 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria |
250000 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria1 |
Plinth level |
-
latitude : 23.36417111568153,23.364165709353983
Longitude : 86.33982572704554,86.33984726853669
file name : Image_02112023150154520.png
|
2023-11-02 15:01:54.750984 |
323 |
57913955 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria |
250000 |
Construction of Drain from Mahalitora Batu Ray Tube Well to Ajit Ray Goria1 |
Completion of work |
-
latitude : 23.364166296087205,23.364166296087205
Longitude : 86.33983762934804,86.33983762934804
file name : Image_12102023101157913.png
|
2023-10-12 10:11:58.002062 |
324 |
57809730 |
Construction of Boundary wall of Nadiara SSK |
200000 |
Construction of Boundary wall of Nadiara SSK1 |
Roof laid |
-
latitude : 23.38431471493095
Longitude : 86.32685230113566
file name : Image_17102023102531207.png
|
2023-10-17 10:25:31.298311 |
325 |
57809730 |
Construction of Boundary wall of Nadiara SSK |
200000 |
Construction of Boundary wall of Nadiara SSK1 |
Plinth level |
-
latitude : 23.38431727141142
Longitude : 86.32683771662414
file name : Image_27092023094811041.png
|
2023-09-27 09:48:11.125288 |
326 |
57809730 |
Construction of Boundary wall of Nadiara SSK |
200000 |
Construction of Boundary wall of Nadiara SSK1 |
Completion of work |
-
latitude : 23.384198751300573
Longitude : 86.32723401300609
file name : Image_06062023105103673.png
|
2023-06-06 10:51:03.763763 |
327 |
57911564 |
Construction of Drain from Belkuri Vulan Bauri house to Makhan Sardar House |
200000 |
Construction of Drain from Belkuri Vulan Bauri house to Makhan Sardar House1 |
Plinth level |
-
latitude : 23.378992835059762,23.378988727927208
Longitude : 86.28710179589689,86.28708033822477
file name : Image_09102023114652152.png
|
2023-10-09 11:46:52.269016 |
328 |
57911564 |
Construction of Drain from Belkuri Vulan Bauri house to Makhan Sardar House |
200000 |
Construction of Drain from Belkuri Vulan Bauri house to Makhan Sardar House1 |
Completion of work |
-
latitude : 23.378953943029046,23.378952727653086
Longitude : 86.28698034211993,86.287025436759
file name : Image_30092023115700226.png
|
2023-09-30 11:57:00.311785 |
329 |
57887745 |
Construction of Protection Wall at Mahalitora Kamar Goria |
250000 |
Construction of Protection Wall at Mahalitora Kamar Goria1 |
Roof laid |
-
latitude : 23.369246064685285
Longitude : 86.33663842454553
file name : Image_07042023104846220.png
|
2023-04-07 10:48:46.310406 |
330 |
57887745 |
Construction of Protection Wall at Mahalitora Kamar Goria |
250000 |
Construction of Protection Wall at Mahalitora Kamar Goria1 |
Plinth level |
-
latitude : 23.369232737459242
Longitude : 86.33661369793117
file name : Image_02042023112814015.png
|
2023-04-02 11:28:14.109491 |
331 |
57887745 |
Construction of Protection Wall at Mahalitora Kamar Goria |
250000 |
Construction of Protection Wall at Mahalitora Kamar Goria1 |
Completion of work |
-
latitude : 23.36938977241516
Longitude : 86.33658955805004
file name : Image_23022023160159260.png
|
2023-02-23 16:01:59.364406 |
332 |
66837153 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.365754247643054,23.36578220129013
Longitude : 86.31785064004362,86.31775961257517
file name : Image_02112023144424170.png
|
2023-11-02 14:44:24.291941 |
333 |
66837153 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.365821009501815,23.365821009501815
Longitude : 86.31775475107133,86.31775475107133
file name : Image_17102023105138272.png
|
2023-10-17 10:51:38.367411 |
334 |
66837153 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.365691718645394,23.3656922634691
Longitude : 86.31786396726966,86.3178637996316
file name : Image_16102023155528479.png
|
2023-10-16 15:55:28.72951 |
335 |
66836923 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.37675792630762,23.37680951692164
Longitude : 86.30663003772497,86.30661620758474
file name : Image_11112023111515913.png
|
2023-11-11 11:15:16.027326 |
336 |
66836923 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.376702521927655,23.376702521927655
Longitude : 86.3065592944622,86.3065592944622
file name : Image_10112023130750711.png
|
2023-11-10 13:07:50.862114 |
337 |
66836923 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.376807337626815,23.376807337626815
Longitude : 86.30659843795002,86.30659843795002
file name : Image_30102023131431741.png
|
2023-10-30 13:14:31.844573 |
338 |
67587664 |
Construction of roads |
324756 |
Construction of roads1 |
Roof laid |
-
latitude : 23.36723587475717,23.367247190326452
Longitude : 86.32430931553245,86.32429858669639
file name : Image_26122023101711205.png
|
2023-12-26 10:17:11.011634 |
339 |
67587664 |
Construction of roads |
324756 |
Construction of roads1 |
Plinth level |
-
latitude : 23.36728331632912,23.36728331632912
Longitude : 86.32431275211275,86.32431275211275
file name : Image_19122023111611652.png
|
2023-12-19 11:16:11.748584 |
340 |
67587664 |
Construction of roads |
324756 |
Construction of roads1 |
Completion of work |
-
latitude : 23.367204191163182,23.367204191163182
Longitude : 86.32427654229105,86.32427654229105
file name : Image_19122023100153492.png
|
2023-12-19 10:01:53.572815 |
341 |
67586282 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.35486640688032,23.354850439354777
Longitude : 86.3066319655627,86.30660899914801
file name : Image_01112023102848435.png
|
2023-11-01 10:28:48.525696 |
342 |
67586282 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.354893354699016,23.354898509569466
Longitude : 86.30658779293299,86.30659667775035
file name : Image_30102023132858861.png
|
2023-10-30 13:28:58.96091 |
343 |
67586282 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.354864311404526,23.354864311404526
Longitude : 86.30666465498507,86.30666465498507
file name : Image_28102023104833231.png
|
2023-10-28 10:48:33.356568 |
344 |
66836505 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.381253937259316,23.381253937259316
Longitude : 86.32641971111298,86.32641971111298
file name : Image_19032024133445807.png
|
2024-03-19 13:34:45.901856 |
345 |
66836505 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.381256912834942,23.381256912834942
Longitude : 86.32642700336874,86.32642700336874
file name : Image_06012024104701567.png
|
2024-01-06 10:47:01.715531 |
346 |
66836505 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.38123851455748,23.381368056870997
Longitude : 86.32646723650396,86.32641141302884
file name : Image_02012024103651823.png
|
2024-01-02 10:36:51.916093 |
347 |
67603847 |
Providing piped water supply to public institutions |
400000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 23.379887477494776
Longitude : 86.28781559877098
file name : Image_02022024120159882.png
|
2024-02-02 12:01:59.984513 |
348 |
67603847 |
Providing piped water supply to public institutions |
400000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.3798862202093
Longitude : 86.28788550384343
file name : Image_29122023132821464.png
|
2023-12-29 13:28:21.566512 |
349 |
67603847 |
Providing piped water supply to public institutions |
400000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.379900846630335
Longitude : 86.28783043473959
file name : Image_29122023112647240.png
|
2023-12-29 11:26:47.329469 |
350 |
67604445 |
Drainage Construction |
500000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.3816355234012
Longitude : 86.3264961540699
file name : Image_13072024103827478.png
|
2024-07-13 10:38:27.578659 |
351 |
67604445 |
Drainage Construction |
500000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.3818739047274
Longitude : 86.32652079686522
file name : Image_04072024103847013.png
|
2024-07-04 10:38:47.099586 |
352 |
67604137 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.35689139086753
Longitude : 86.31287220865488
file name : Image_16102023092102025.png
|
2023-10-16 09:21:02.113408 |
353 |
67604137 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.356861425563693
Longitude : 86.31292375735939
file name : Image_14102023102744499.png
|
2023-10-14 10:27:44.591891 |
354 |
67604195 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.365601990371943
Longitude : 86.31676736287773
file name : Image_16102023093212074.png
|
2023-10-16 09:32:12.158698 |
355 |
67604195 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.365576174110174
Longitude : 86.31684003397822
file name : Image_14102023103859293.png
|
2023-10-14 10:38:59.392357 |
356 |
67604251 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.378529231995344
Longitude : 86.30822259932756
file name : Image_17102023110936750.png
|
2023-10-17 11:09:36.843753 |
357 |
67604251 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.378427852876484
Longitude : 86.30831136368215
file name : Image_16102023152924025.png
|
2023-10-16 15:29:24.158333 |
358 |
67604251 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.37854302022606
Longitude : 86.30835964344442
file name : Image_14102023112151497.png
|
2023-10-14 11:21:51.589085 |
359 |
67604180 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.365413062274456
Longitude : 86.31898672319949
file name : Image_16102023092812780.png
|
2023-10-16 09:28:12.907748 |
360 |
67604180 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.36551812943071
Longitude : 86.31900206208229
file name : Image_14102023103435797.png
|
2023-10-14 10:34:35.885131 |
361 |
67604291 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.37821453344077
Longitude : 86.28674455918372
file name : Image_16102023102643214.png
|
2023-10-16 10:26:43.288428 |
362 |
67604291 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.378271027468145
Longitude : 86.2868303898722
file name : Image_14102023113342040.png
|
2023-10-14 11:33:42.134191 |
363 |
67604211 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.365740459412336
Longitude : 86.31951310671866
file name : Image_16102023093915780.png
|
2023-10-16 09:39:15.857608 |
364 |
67604211 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.365834546275437
Longitude : 86.31954462267458
file name : Image_14102023104305678.png
|
2023-10-14 10:43:05.7644 |
365 |
67604235 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.36253228597343
Longitude : 86.33506312966347
file name : Image_16102023094710058.png
|
2023-10-16 09:47:10.140797 |
366 |
67604235 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.362567238509655
Longitude : 86.33517754264176
file name : Image_14102023110522625.png
|
2023-10-14 11:05:22.711725 |
367 |
67604270 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.378955367952585
Longitude : 86.28707556053996
file name : Image_16102023102402943.png
|
2023-10-16 10:24:03.068903 |
368 |
67604270 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.37893185671419
Longitude : 86.28713943064213
file name : Image_14102023112931337.png
|
2023-10-14 11:29:31.439091 |
369 |
67604309 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.39231054764241
Longitude : 86.3011305872351
file name : Image_17102023101035294.png
|
2023-10-17 10:10:35.374855 |
370 |
67604309 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.392302836291492
Longitude : 86.30115858279169
file name : Image_16102023101436853.png
|
2023-10-16 10:14:36.943331 |
371 |
67604309 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.392298477701843
Longitude : 86.3011715747416
file name : Image_14102023154154553.png
|
2023-10-14 15:41:54.638239 |
372 |
67604329 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.383189947344363
Longitude : 86.3260159548372
file name : Image_17102023101909330.png
|
2023-10-17 10:19:09.429532 |
373 |
67604329 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.383160987868905
Longitude : 86.32609005086124
file name : Image_16102023100548067.png
|
2023-10-16 10:05:48.154436 |
374 |
67604329 |
Operation and Maintenance of drinking water supply system |
70000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.383213919587433
Longitude : 86.32610480301082
file name : Image_14102023155030899.png
|
2023-10-14 15:50:30.980948 |
375 |
67604362 |
Operation and Maintenance of drinking water supply system |
80630 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.382649063132703
Longitude : 86.32788034155965
file name : Image_17102023102230928.png
|
2023-10-17 10:22:31.019476 |
376 |
67604362 |
Operation and Maintenance of drinking water supply system |
80630 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.382537164725363
Longitude : 86.32788578979671
file name : Image_16102023100246622.png
|
2023-10-16 10:02:46.709904 |
377 |
67604362 |
Operation and Maintenance of drinking water supply system |
80630 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.38255430571735
Longitude : 86.32789081893861
file name : Image_14102023155247111.png
|
2023-10-14 15:52:47.187683 |
378 |
67586848 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.386786454357207,23.386786705814302
Longitude : 86.3304245006293,86.33042324334383
file name : Image_11062024095324090.png
|
2024-06-11 09:53:24.178242 |
379 |
67586848 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.386741527356207,23.386738719418645
Longitude : 86.33048376068473,86.33040036074817
file name : Image_10062024095855702.png
|
2024-06-10 09:58:55.805044 |
380 |
67586848 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.38680271524936,23.38680271524936
Longitude : 86.3304472155869,86.3304472155869
file name : Image_18042024100554995.png
|
2024-04-18 10:05:55.097359 |
381 |
67609446 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.3871809
Longitude : 86.2922725
file name : Image_12042024140604274.png
|
2024-04-12 14:06:04.352728 |
382 |
67609446 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.3872019
Longitude : 86.2922591
file name : Image_17112023151657286.png
|
2023-11-17 15:16:57.394807 |
383 |
67609446 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.3871538
Longitude : 86.292288
file name : Image_13102023154003110.png
|
2023-10-13 15:40:03.218101 |
384 |
57912517 |
Construction of Drain at Baghudih |
250000 |
Construction of Drain at Baghudih1 |
Roof laid |
-
latitude : 23.352587870322168,23.352587870322168
Longitude : 86.31080590188503,86.31080590188503
file name : Image_28122023151226498.png
|
2023-12-28 15:12:26.585062 |
385 |
57912517 |
Construction of Drain at Baghudih |
250000 |
Construction of Drain at Baghudih1 |
Plinth level |
-
latitude : 23.35263174958527,23.35263174958527
Longitude : 86.3107986934483,86.3107986934483
file name : Image_02122023113640142.png
|
2023-12-02 11:36:40.23105 |
386 |
57912517 |
Construction of Drain at Baghudih |
250000 |
Construction of Drain at Baghudih1 |
Completion of work |
-
latitude : 23.352612261660397,23.352612261660397
Longitude : 86.31083465181291,86.31083465181291
file name : Image_02122023112109884.png
|
2023-12-02 11:21:09.990159 |
387 |
67603922 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.364271530881524
Longitude : 86.33649291470647
file name : Image_15122023142028554.png
|
2023-12-15 14:20:28.630134 |
388 |
67603922 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.36427136324346
Longitude : 86.33653314784169
file name : Image_15122023141600367.png
|
2023-12-15 14:16:00.446765 |
389 |
67603922 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.364247139543295
Longitude : 86.33648185059428
file name : Image_15122023141200867.png
|
2023-12-15 14:12:00.951601 |
390 |
67603934 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.374027647078037
Longitude : 86.33549069054425
file name : Image_15122023135937006.png
|
2023-12-15 13:59:37.090798 |
391 |
67603934 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.37399868760258
Longitude : 86.33559487760067
file name : Image_15122023135705518.png
|
2023-12-15 13:57:05.600038 |
392 |
67603934 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.37397664319724
Longitude : 86.3355262298137
file name : Image_15122023135227766.png
|
2023-12-15 13:52:27.85104 |
393 |
67603949 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.371215602383018
Longitude : 86.33226717822254
file name : Image_15122023144129403.png
|
2023-12-15 14:41:29.478338 |
394 |
67603949 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.371225367300212
Longitude : 86.33228922262788
file name : Image_15122023143409529.png
|
2023-12-15 14:34:09.607629 |
395 |
67603949 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.371248333714902
Longitude : 86.33229265920818
file name : Image_15122023143112652.png
|
2023-12-15 14:31:12.728943 |
396 |
67603961 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.355721696279943
Longitude : 86.30961860530078
file name : Image_15122023101414991.png
|
2023-12-15 10:14:15.08385 |
397 |
67603961 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.35565879009664
Longitude : 86.30973343737423
file name : Image_15122023101001151.png
|
2023-12-15 10:10:01.233246 |
398 |
67603961 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.35572538431734
Longitude : 86.30968096666038
file name : Image_15122023095847078.png
|
2023-12-15 09:58:47.159348 |
399 |
67603977 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.369398908689618
Longitude : 86.30016775801778
file name : Image_15122023112130147.png
|
2023-12-15 11:21:30.232236 |
400 |
67603977 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.369359178468585
Longitude : 86.30007572472095
file name : Image_15122023111752475.png
|
2023-12-15 11:17:52.560941 |
401 |
67603977 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.36942619178444
Longitude : 86.3000787422061
file name : Image_15122023110630103.png
|
2023-12-15 11:06:30.208412 |
402 |
67603989 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.375552943907678
Longitude : 86.30356611683965
file name : Image_15122023113454458.png
|
2023-12-15 11:34:54.543605 |
403 |
67603989 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.375586974434555
Longitude : 86.30356133915484
file name : Image_15122023113036655.png
|
2023-12-15 11:30:36.749592 |
404 |
67603989 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.3787951
Longitude : 86.307074
file name : Image_15122023105833994.png
|
2023-12-15 10:58:34.104113 |
405 |
67604012 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.37970269843936
Longitude : 86.3277290482074
file name : Image_15122023133012877.png
|
2023-12-15 13:30:11.879249 |
406 |
67604012 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.379697459749877
Longitude : 86.32774178870022
file name : Image_15122023132622096.png
|
2023-12-15 13:26:21.614215 |
407 |
67604012 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.379680193029344
Longitude : 86.32773743011057
file name : Image_15122023132354972.png
|
2023-12-15 13:23:55.06541 |
408 |
67604001 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.379115043208003
Longitude : 86.30719020031393
file name : Image_15122023114937857.png
|
2023-12-15 11:49:37.948938 |
409 |
67604001 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.37915372569114
Longitude : 86.30714485421777
file name : Image_15122023114134758.png
|
2023-12-15 11:41:34.851104 |
410 |
67604001 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.3787951
Longitude : 86.307074
file name : Image_15122023105001161.png
|
2023-12-15 10:50:01.252285 |
411 |
67604019 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.386497027240694
Longitude : 86.32545067928731
file name : Image_15122023125601347.png
|
2023-12-15 12:56:01.427706 |
412 |
67604019 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.38652246631682
Longitude : 86.32546325214207
file name : Image_15122023125241697.png
|
2023-12-15 12:52:41.777958 |
413 |
67604019 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.386546564288437
Longitude : 86.32539728656411
file name : Image_15122023124823695.png
|
2023-12-15 12:48:23.781335 |
414 |
67604030 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 23.382575386203825
Longitude : 86.3289624452591
file name : Image_15122023131305940.png
|
2023-12-15 13:13:06.040542 |
415 |
67604030 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 23.382599651813507
Longitude : 86.32897870615125
file name : Image_15122023130851052.png
|
2023-12-15 13:08:51.144417 |
416 |
67604030 |
Converting abandoned borewells into water recharging structure |
100000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 23.3825956704095
Longitude : 86.32892958819866
file name : Image_15122023130554374.png
|
2023-12-15 13:05:54.466151 |
417 |
57913293 |
Construction of Soak Pit at Chakra |
60000 |
Construction of Soak Pit at Chakra1 |
Roof laid |
-
latitude : 23.3787462
Longitude : 86.307092
file name : Image_19012024103354107.png
|
2024-01-19 10:33:54.199554 |
418 |
57913293 |
Construction of Soak Pit at Chakra |
60000 |
Construction of Soak Pit at Chakra1 |
Plinth level |
-
latitude : 23.38736384175718
Longitude : 86.29224283620715
file name : Image_29122023111651850.png
|
2023-12-29 11:16:51.786365 |
419 |
57913293 |
Construction of Soak Pit at Chakra |
60000 |
Construction of Soak Pit at Chakra1 |
Completion of work |
-
latitude : 23.379087927751243
Longitude : 86.30729765631258
file name : Image_28122023235025516.png
|
2023-12-28 23:50:25.592505 |
420 |
47309905 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri |
200000 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri1 |
Roof laid |
-
latitude : 23.36875128094107
Longitude : 86.2926216982305
file name : Image_29122023134838847.png
|
2023-12-29 13:48:38.923749 |
421 |
47309905 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri |
200000 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri1 |
Plinth level |
-
latitude : 23.368775211274624
Longitude : 86.29259512759745
file name : Image_29122023133740502.png
|
2023-12-29 13:37:40.595911 |
422 |
47309905 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri |
200000 |
Up-Gradation of Soak pit and Solar Power Submersible Pump with Over Head Tank at Belkuri1 |
Completion of work |
-
latitude : 23.368720435537398
Longitude : 86.29253008402884
file name : Image_29122023113742570.png
|
2023-12-29 11:37:42.666494 |
423 |
66837128 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.36510938592255,23.36510938592255
Longitude : 86.31878077983856,86.31878077983856
file name : Image_17062024093259245.png
|
2024-06-17 09:32:59.344075 |
424 |
66837128 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.365246639586985,23.365237042307854
Longitude : 86.31885076873004,86.31886904127896
file name : Image_15062024102106311.png
|
2024-06-15 10:21:06.39352 |
425 |
66837128 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36536951828748,23.365366039797664
Longitude : 86.318826880306,86.31883308291435
file name : Image_16032024120805334.png
|
2024-03-16 12:08:05.520587 |
426 |
67609362 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.3656518
Longitude : 86.3170042
file name : Image_15062024104332739.png
|
2024-06-15 10:43:32.829512 |
427 |
67609362 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.3652634
Longitude : 86.318254
file name : Image_16032024121835119.png
|
2024-03-16 12:18:35.211678 |
428 |
67604709 |
Creation of Small-bore pipe conveyance system |
100000 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 23.366918577812612
Longitude : 86.31895512342453
file name : Image_11042024094240459.png
|
2024-04-11 09:42:40.548038 |
429 |
67604709 |
Creation of Small-bore pipe conveyance system |
100000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 23.367027291096747
Longitude : 86.31884322501719
file name : Image_03042024103019175.png
|
2024-04-03 10:30:19.274412 |
430 |
67604709 |
Creation of Small-bore pipe conveyance system |
100000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 23.367065931670368
Longitude : 86.31869142875075
file name : Image_16032024115603876.png
|
2024-03-16 11:56:03.961658 |
431 |
67604679 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.367198701016605
Longitude : 86.31989255547523
file name : Image_15062024094620281.png
|
2024-06-15 09:46:20.389225 |
432 |
67604679 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.367239646613598
Longitude : 86.31993857212365
file name : Image_15062024093922044.png
|
2024-06-15 09:39:22.155963 |
433 |
67604679 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.36725469212979
Longitude : 86.31990755908191
file name : Image_15062024092402478.png
|
2024-06-15 09:24:02.570096 |
434 |
66836983 |
Repairing of Hall |
50000 |
Repairing of Hall1 |
Roof laid |
-
latitude : 23.362088967114687
Longitude : 86.2987036909908
file name : Image_21112023114127353.png
|
2023-11-21 11:41:27.456003 |
435 |
66836983 |
Repairing of Hall |
50000 |
Repairing of Hall1 |
Plinth level |
-
latitude : 23.362126518040895
Longitude : 86.29866362549365
file name : Image_21112023112850905.png
|
2023-11-21 11:28:50.992705 |
436 |
66836983 |
Repairing of Hall |
50000 |
Repairing of Hall1 |
Completion of work |
-
latitude : 23.362081632949412
Longitude : 86.29866714589298
file name : Image_02112023101606256.png
|
2023-11-02 10:16:06.328098 |
437 |
67586646 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.375125885941088,23.375203292816877
Longitude : 86.30558280274272,86.30558070726693
file name : Image_24062024091240733.png
|
2024-06-24 09:12:40.823588 |
438 |
67586646 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.37507266085595,23.37508074939251
Longitude : 86.30556972697377,86.30554902367294
file name : Image_22062024083357259.png
|
2024-06-22 08:33:57.332205 |
439 |
67586646 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.37519901804626,23.37519901804626
Longitude : 86.30564055405557,86.30564055405557
file name : Image_16032024124233471.png
|
2024-03-16 12:42:33.575288 |
440 |
66836667 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.371151774190366,23.37109913583845
Longitude : 86.28988014534116,86.28983530215919
file name : Image_08072024111022163.png
|
2024-07-08 11:10:22.261943 |
441 |
66836667 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.371471711434424,23.371471711434424
Longitude : 86.28962525166571,86.28962525166571
file name : Image_05072024104733886.png
|
2024-07-05 10:47:33.971885 |
442 |
47316256 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar |
200000 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar1 |
Roof laid |
-
latitude : 23.38585593737662
Longitude : 86.3185353577137
file name : Image_13072024111305859.png
|
2024-07-13 11:13:05.951582 |
443 |
47316256 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar |
200000 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar1 |
Plinth level |
-
latitude : 23.3858794067055
Longitude : 86.31851876154542
file name : Image_13072024110724994.png
|
2024-07-13 11:07:25.09147 |
444 |
47316256 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar |
200000 |
Up-Gradation of Solar Power Submersible Pump with Over Head Tank at Kultar1 |
Completion of work |
-
latitude : 23.385899690911174
Longitude : 86.31853552535176
file name : Image_13072024105639443.png
|
2024-07-13 10:56:39.541342 |
445 |
97567229 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.3629283
Longitude : 86.3389631
file name : Image_30072024104726059.png
|
2024-07-30 10:47:26.201671 |
446 |
97567229 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.3629283
Longitude : 86.3389631
file name : Image_30072024100914436.png
|
2024-07-30 10:09:14.5208 |
447 |
97565400 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.381507364101708
Longitude : 86.32569811306894
file name : Image_30072024103747953.png
|
2024-07-30 10:37:48.040206 |
448 |
97565400 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.38115972466767
Longitude : 86.32595116272569
file name : Image_30072024101958166.png
|
2024-07-30 10:19:58.260421 |
449 |
97565073 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.381184535101056
Longitude : 86.32628115825355
file name : Image_30072024103908465.png
|
2024-07-30 10:39:08.547654 |
450 |
97565073 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.380843978375196
Longitude : 86.32620194926858
file name : Image_30072024101112638.png
|
2024-07-30 10:11:12.73241 |
451 |
47310018 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School |
200000 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School1 |
Roof laid |
-
latitude : 23.3839707
Longitude : 86.3267124
file name : Image_25072024101904511.png
|
2024-07-25 10:19:04.390524 |
452 |
47310018 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School |
200000 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School1 |
Plinth level |
-
latitude : 23.3839705
Longitude : 86.3267051
file name : Image_25072024101531315.png
|
2024-07-25 10:15:31.401627 |
453 |
47310018 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School |
200000 |
Up-Gradation of Soak pit & Solar Power Submersible Pump with Over Head Tank at Nadiara Pry School1 |
Completion of work |
-
latitude : 23.3839686
Longitude : 86.3267058
file name : Image_25072024100232036.png
|
2024-07-25 10:02:32.148557 |