1 |
48179956 |
Impv. of Tank with inlet and Outlet |
349312 |
Impv. of Tank with inlet and Outlet 1 |
Completion of work |
-
latitude : 20.504831666666668
Longitude : 82.97107499999998
file name : Image_04022022153816920.png
|
2022-02-04 15:38:17.033574 |
2 |
44070871 |
Completionof CC Road near Gaintapada, Near jayalal Majhi House at Bichubahali |
100000 |
Completionof CC Road near Gaintapada, Near jayalal Majhi House at Bichubahali1 |
Completion of work |
-
latitude : 20.499323333333333,20.499323333333333
Longitude : 82.95035166666666,82.95035166666666
file name : Image_17052021130211557.png
|
2021-05-17 13:02:11.618001 |
3 |
44070871 |
Completionof CC Road near Gaintapada, Near jayalal Majhi House at Bichubahali |
100000 |
Completionof CC Road near Gaintapada, Near jayalal Majhi House at Bichubahali1 |
Completion of work |
-
latitude : 20.514535000000002,20.514538333333334
Longitude : 82.98916,82.989155
file name : Image_09062021071915285.png
|
2021-06-09 07:19:15.345456 |
4 |
44071094 |
Supply of Drinking Water to UP School, TMC Bichubahali |
50000 |
Supply of Drinking Water to UP School, TMC Bichubahali1 |
Completion of work |
-
latitude : 20.503615,20.50362
Longitude : 82.95098333333333,82.95101166666667
file name : Image_07072021171244726.png
|
2021-07-07 17:12:44.827721 |
5 |
44071094 |
Supply of Drinking Water to UP School, TMC Bichubahali |
50000 |
Supply of Drinking Water to UP School, TMC Bichubahali1 |
Completion of work |
-
latitude : 20.503365,20.503365
Longitude : 82.95085333333333,82.95085333333333
file name : Image_07072021171726467.png
|
2021-07-07 17:17:26.587652 |
6 |
44071094 |
Supply of Drinking Water to UP School, TMC Bichubahali |
50000 |
Supply of Drinking Water to UP School, TMC Bichubahali1 |
Completion of work |
-
latitude : 20.49923,20.49928
Longitude : 82.95031666666667,82.95033833333333
file name : Image_30012021172815928.png
|
2021-01-30 17:28:15.99371 |
7 |
44070363 |
Provide of Drinking Water to water scarcity Villages during peak summer by Mobile Tanker |
250000 |
Provide of Drinking Water to water scarcity Villages during peak summer by Mobile Tanker1 |
Completion of work |
-
latitude : 20.476615
Longitude : 82.99812166666668
file name : Image_30012021173054511.png
|
2021-01-30 17:30:54.613643 |
8 |
44070655 |
Construction of PWS to GP Office |
150000 |
Construction of PWS to GP Office1 |
Completion of work |
-
latitude : 20.50811,20.508108333333332
Longitude : 82.96891166666667,82.96889666666667
file name : Image_21052021091118004.png
|
2021-05-21 09:11:18.05906 |
9 |
44070655 |
Construction of PWS to GP Office |
150000 |
Construction of PWS to GP Office1 |
Completion of work |
-
latitude : 20.508115,20.508111666666665
Longitude : 82.96898166666666,82.96897166666668
file name : Image_21052021090929108.png
|
2021-05-21 09:09:29.173218 |
10 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.55985666666667
Longitude : 82.98987666666666
file name : Image_26052021215455421.png
|
2021-05-26 21:54:55.490861 |
11 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.508381666666665
Longitude : 82.96904666666666
file name : Image_05082021130136799.png
|
2021-08-05 13:01:36.891985 |
12 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.508321666666667
Longitude : 82.96908
file name : Image_01112021120337933.png
|
2021-11-01 12:03:38.024188 |
13 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.559823333333334
Longitude : 82.98989333333333
file name : Image_26052021215212654.png
|
2021-05-26 21:52:12.734897 |
14 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver2 |
Completion of work |
-
latitude : 20.508390000000002
Longitude : 82.96909333333333
file name : Image_24082021175209820.png
|
2021-08-24 17:52:09.909856 |
15 |
44070389 |
Honorarium to SEMs & Pump Driver |
96000 |
Honorarium to SEMs & Pump Driver2 |
Completion of work |
-
latitude : 20.508390000000002
Longitude : 82.96909333333333
file name : Image_24082021175329293.png
|
2021-08-24 17:53:29.401654 |
16 |
44070881 |
Completion of CC Road at Majhipada Gali, Bhalubahali |
100000 |
Completion of CC Road at Majhipada Gali, Bhalubahali1 |
Completion of work |
-
latitude : 20.515218333333333,20.51522
Longitude : 82.98780000000001,82.98779666666665
file name : Image_09062021071906629.png
|
2021-06-09 07:19:06.709474 |
17 |
44071069 |
Improvement of UP School, Bichubahali with Drinking Water Facility. |
300000 |
Improvement of UP School, Bichubahali with Drinking Water Facility.1 |
Completion of work |
-
latitude : 20.502758333333336,20.502765,20.502763333333334,20.502761666666668
Longitude : 82.95081166666665,82.95081833333333,82.95082833333332,82.95083166666667
file name : Image_24082021175146361.png
|
2021-08-24 17:51:46.452641 |
18 |
44071069 |
Improvement of UP School, Bichubahali with Drinking Water Facility. |
300000 |
Improvement of UP School, Bichubahali with Drinking Water Facility.1 |
Completion of work |
-
latitude : 20.50359,20.50357
Longitude : 82.95099166666665,82.95096333333335
file name : Image_11072021103824324.png
|
2021-07-11 10:38:24.393641 |
19 |
44070861 |
Completion of CC Road of Approach Road to the UP School, Bichu Bahali |
200000 |
Completion of CC Road of Approach Road to the UP School, Bichu Bahali1 |
Completion of work |
-
latitude : 20.50344,20.503429999999998,20.50336666666667
Longitude : 82.95061,82.95066,82.95069333333335
file name : Image_05082021125521585.png
|
2021-08-05 12:55:21.72788 |
20 |
44070861 |
Completion of CC Road of Approach Road to the UP School, Bichu Bahali |
200000 |
Completion of CC Road of Approach Road to the UP School, Bichu Bahali1 |
Completion of work |
-
latitude : 20.503413333333334,20.50340333333333,20.503401666666665
Longitude : 82.95066666666668,82.95068833333335,82.95069166666666
file name : Image_15072021104512199.png
|
2021-07-15 10:45:12.262553 |
21 |
48189304 |
Repair and maintenance of Road from Basti to UP School |
250000 |
Repair and maintenance of Road from Basti to UP School1 |
Completion of work |
-
latitude : 20.503605,20.503435000000003
Longitude : 82.95051666666669,82.95065166666667
file name : Image_29092021141352131.png
|
2021-09-29 14:13:52.208187 |
22 |
48189304 |
Repair and maintenance of Road from Basti to UP School |
250000 |
Repair and maintenance of Road from Basti to UP School1 |
Completion of work |
-
latitude : 20.50259833333333,20.502591666666667
Longitude : 82.95089333333333,82.95090166666665
file name : Image_24082021181253665.png
|
2021-08-24 18:12:53.717192 |
23 |
48178669 |
Const of Bathing ghat with Dress Changing Room at Mundapala Tank |
150000 |
Const of Bathing ghat with Dress Changing Room at Mundapala Tank 1 |
Completion of work |
-
latitude : 20.500504999999997
Longitude : 82.99688166666668
file name : Image_19112021125904117.png
|
2021-11-19 12:59:04.248103 |
24 |
48177743 |
Opening of Jalachhatra ( Bus Stop, Market Place, Minchowk etc..) |
86564 |
Opening of Jalachhatra ( Bus Stop, Market Place, Minchowk etc..)1 |
Completion of work |
-
latitude : 20.508016666666666
Longitude : 82.96908
file name : Image_23112021133852200.png
|
2021-11-23 13:38:52.311606 |
25 |
44070901 |
Improvement of UP School, Gitmal |
100000 |
Improvement of UP School, Gitmal1 |
Completion of work |
-
latitude : 20.493103333333334
Longitude : 82.98872333333333
file name : Image_01122021131240157.png
|
2021-12-01 13:12:40.252322 |
26 |
48176013 |
Provide of Drinking water to Water scarcity villages during peak summer by mobile tanker |
225092 |
Provide of Drinking water to Water scarcity villages during peak summer by mobile tanker 1 |
Completion of work |
-
latitude : 20.476638333333334
Longitude : 82.998115
file name : Image_29092021141344942.png
|
2021-09-29 14:13:44.998501 |
27 |
54538849 |
Repair and Maintenance of Road from Basti to UP School at Bichubahali |
250000 |
Repair and Maintenance of Road from Basti to UP School at Bichubahali1 |
Completion of work |
-
latitude : 20.5034,20.503383333333332,20.503390000000003
Longitude : 82.95038333333332,82.95059166666667,82.95059833333335
file name : Image_30092021150002132.png
|
2021-09-30 15:00:02.225507 |
28 |
44070479 |
Constructionof New Tubewells Majhimeher Pada |
73000 |
Constructionof New Tubewells Majhimeher Pada1 |
Completion of work |
-
latitude : 20.492776666666668
Longitude : 82.98896166666667
file name : Image_06102021121409186.png
|
2021-10-06 12:14:09.241262 |
29 |
44070525 |
Constructionof New Tubewells at San Hatipada, Gitmal |
73000 |
Constructionof New Tubewells at San Hatipada, Gitmal1 |
Completion of work |
-
latitude : 20.492015
Longitude : 82.99149666666666
file name : Image_06102021120910933.png
|
2021-10-06 12:09:10.992668 |
30 |
44070606 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada, |
219000 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada,1 |
Completion of work |
-
latitude : 20.494005
Longitude : 82.94224000000001
file name : Image_18052022090957330.png
|
2022-05-18 09:09:57.436204 |
31 |
44070606 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada, |
219000 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada,2 |
Completion of work |
-
latitude : 20.503398333333333
Longitude : 82.95056000000001
file name : Image_06102021114355045.png
|
2021-10-06 11:43:55.116938 |
32 |
44070606 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada, |
219000 |
Construction of New Tubewells near Tanka Majhi House, near Jayaballbha Nag House, Near Gosala Pada,3 |
Completion of work |
-
latitude : 20.49961
Longitude : 82.95150666666665
file name : Image_06102021114358437.png
|
2021-10-06 11:43:58.530601 |
33 |
48189129 |
Const. of Guardwall on the Road from Karlabahlai to Mundapala |
200000 |
Const. of Guardwall on the Road from Karlabahlai to Mundapala 1 |
Completion of work |
-
latitude : 20.487166666666667,20.487188333333332
Longitude : 82.99677166666667,82.99705833333334
file name : Image_30112021114250719.png
|
2021-11-30 11:42:50.841535 |
34 |
44070891 |
Improvement of UP School, Pandrijor |
100000 |
Improvement of UP School, Pandrijor1 |
Completion of work |
-
latitude : 20.493119999999998
Longitude : 82.98871333333334
file name : Image_01122021131407893.png
|
2021-12-01 13:14:07.969714 |
35 |
54538748 |
Construction of Guardwall on the Road from Karlabahaoi to Mundapala |
200000 |
Construction of Guardwall on the Road from Karlabahaoi to Mundapala1 |
Completion of work |
-
latitude : 20.487231666666666
Longitude : 82.99713500000001
file name : Image_15122021105613434.png
|
2021-12-15 10:56:13.544371 |
36 |
66779152 |
Completion of Guard wall at Bichhubahali Tank |
120000 |
Completion of Guard wall at Bichhubahali Tank1 |
Completion of work |
-
latitude : 20.49605,20.49632
Longitude : 82.94783000000001,82.94724833333333
file name : Image_13022023130303409.png
|
2023-02-13 13:03:03.507329 |
37 |
44070721 |
Construction of PWS to UP School, Gitmal |
50000 |
Construction of PWS to UP School, Gitmal1 |
Completion of work |
-
latitude : 20.493106666666666,20.49307333333333,20.493058333333334
Longitude : 82.98866000000001,82.98866166666667,82.98865499999998
file name : Image_18052022081329557.png
|
2022-05-18 08:13:29.689073 |
38 |
44070925 |
Repair and Maintenance of GP Office including Boundary wall and Main gate |
200000 |
Repair and Maintenance of GP Office including Boundary wall and Main gate1 |
Completion of work |
-
latitude : 20.508106666666666
Longitude : 82.96894666666667
file name : Image_26052022105952744.png
|
2022-05-26 10:59:52.861937 |
39 |
48189499 |
Repair and Maintenance of Road at Jhankar Pada,Pandrijore |
100000 |
Repair and Maintenance of Road at Jhankar Pada,Pandrijore 1 |
Completion of work |
-
latitude : 20.507748333333332,20.507766666666665
Longitude : 82.96770999999998,82.96766333333335
file name : Image_18052022083954594.png
|
2022-05-18 08:39:54.724188 |
40 |
48179129 |
Installation of Dustbin |
350000 |
Installation of Dustbin1 |
Completion of work |
-
latitude : 20.50752
Longitude : 82.96807833333332
file name : Image_26052022105601123.png
|
2022-05-26 10:56:01.234468 |
41 |
48179129 |
Installation of Dustbin |
350000 |
Installation of Dustbin1 |
Completion of work |
-
latitude : 20.507461666666664
Longitude : 82.96825166666667
file name : Image_26052022111222875.png
|
2022-05-26 11:12:22.977799 |
42 |
48179542 |
Impv. of Play Ground with stage |
240000 |
Impv. of Play Ground with stage1 |
Completion of work |
-
latitude : 20.506298333333334,20.506278333333334
Longitude : 82.95193666666667,82.95193166666668
file name : Image_18052022093503575.png
|
2022-05-18 09:35:03.673152 |
43 |
54538928 |
Repair and Maintenance of Road at Jhankar Pada pandrijor |
100000 |
Repair and Maintenance of Road at Jhankar Pada pandrijor1 |
Completion of work |
-
latitude : 20.507761666666667,20.507793333333332
Longitude : 82.96765166666667,82.96768500000002
file name : Image_26052022110910920.png
|
2022-05-26 11:09:10.998991 |
44 |
44070558 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor |
73000 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor1 |
Completion of work |
-
latitude : 20.520958333333333
Longitude : 82.97891999999999
file name : Image_21062022145213551.png
|
2022-06-21 14:52:13.670159 |
45 |
44070558 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor |
73000 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor1 |
Completion of work |
-
latitude : 20.500425
Longitude : 82.95262666666667
file name : Image_21062022145315765.png
|
2022-06-21 14:53:15.878398 |
46 |
44070558 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor |
73000 |
Constalalltion of New Tubewell near Crosser Siba Mandir, Pandrijor1 |
Completion of work |
-
latitude : 20.509998333333332
Longitude : 82.97427
file name : Image_24062022134521178.png
|
2022-06-24 13:45:21.28956 |
47 |
62007440 |
Improvement of Tank with formation of a Model Tank in convergence with MGNREGA |
347392 |
Improvement of Tank with formation of a Model Tank in convergence with MGNREGA1 |
Completion of work |
-
latitude : 20.49604
Longitude : 82.94793333333334
file name : Image_25082022112857020.png
|
2022-08-25 11:28:57.141936 |
48 |
62006656 |
Drinking Water through Tanker all villages |
240000 |
Drinking Water through Tanker all villages1 |
Completion of work |
-
latitude : 20.476581666666668
Longitude : 82.99797666666667
file name : Image_24072022101601480.png
|
2022-07-24 10:16:01.581762 |
49 |
62006635 |
Jala Chhatras at all Villages |
129846 |
Jala Chhatras at all Villages1 |
Completion of work |
-
latitude : 20.507973333333332
Longitude : 82.96882166666667
file name : Image_25072022081058950.png
|
2022-07-25 08:10:59.035955 |
50 |
62006635 |
Jala Chhatras at all Villages |
129846 |
Jala Chhatras at all Villages2 |
Completion of work |
-
latitude : 20.508005
Longitude : 82.96893999999999
file name : Image_05082022101950634.png
|
2022-08-05 10:19:50.731966 |
51 |
44071112 |
Completion of AWC Mundapala with Boundary Wall |
350000 |
Completion of AWC Mundapala with Boundary Wall1 |
Completion of work |
-
latitude : 20.503275
Longitude : 82.99874666666668
file name : Image_05082022121600772.png
|
2022-08-05 12:16:00.866778 |
52 |
44071082 |
Improvement of UP School, Bhalubahali |
100000 |
Improvement of UP School, Bhalubahali1 |
Completion of work |
-
latitude : 20.518206666666668
Longitude : 82.98618
file name : Image_05082022121607969.png
|
2022-08-05 12:16:08.071372 |
53 |
44070912 |
Improvement of UP School, Karlabahali |
89312 |
Improvement of UP School, Karlabahali1 |
Completion of work |
-
latitude : 20.47625833333333
Longitude : 82.99779833333332
file name : Image_05082022102320982.png
|
2022-08-05 10:23:21.088541 |
54 |
64763224 |
Completion of Guardwall at Bichubahali tank |
120000 |
Completion of Guardwall at Bichubahali tank1 |
Completion of work |
-
latitude : 20.496358333333333
Longitude : 82.94720666666666
file name : Image_30092022095629441.png
|
2022-09-30 09:56:29.548412 |
55 |
64763213 |
Construction of Guardwall at Bichubahali Tank |
150000 |
Construction of Guardwall at Bichubahali Tank1 |
Completion of work |
-
latitude : 20.496095
Longitude : 82.94772833333333
file name : Image_30092022095621662.png
|
2022-09-30 09:56:21.766125 |
56 |
62007566 |
Construction of Drain at Kumbharpada of Mundapala |
100000 |
Construction of Drain at Kumbharpada of Mundapala1 |
Completion of work |
-
latitude : 20.503835,20.503803333333334
Longitude : 82.99788666666667,82.997895
file name : Image_04042023140952614.png
|
2023-04-04 14:09:52.714484 |
57 |
64763158 |
Providing piped water supply to public institutions |
100000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.496598333333335
Longitude : 82.95057333333334
file name : Image_07022023121205345.png
|
2023-02-07 12:12:05.486134 |
58 |
64763175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.499000000000002
Longitude : 82.94955999999999
file name : Image_11022023143342412.png
|
2023-02-11 14:33:42.558108 |
59 |
64763175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.503856666666664
Longitude : 82.99775666666667
file name : Image_11022023143433599.png
|
2023-02-11 14:34:33.719645 |
60 |
64763175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.503856666666664
Longitude : 82.99775666666667
file name : Image_11022023143457309.png
|
2023-02-11 14:34:57.424495 |
61 |
65805922 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.53286166666667
Longitude : 82.97863666666666
file name : Image_23022023164343113.png
|
2023-02-23 16:43:43.217515 |
62 |
62007162 |
Cleaning of Bathing Steps, AWC, Streets, Schools etc all village |
50000 |
Cleaning of Bathing Steps, AWC, Streets, Schools etc all village1 |
Completion of work |
-
latitude : 20.476538333333334
Longitude : 82.99710666666667
file name : Image_12032023123729539.png
|
2023-03-12 12:37:29.681686 |
63 |
83154217 |
Amrit Sarovar |
212000 |
Amrit Sarovar1 |
Roof laid |
-
latitude : 20.47313
Longitude : 82.99742499999999
file name : Image_16082023180404151.png
|
2023-08-16 18:04:04.215008 |
64 |
83154217 |
Amrit Sarovar |
212000 |
Amrit Sarovar1 |
Plinth level |
-
latitude : 20.473133333333333
Longitude : 82.99742999999998
file name : Image_16082023180228084.png
|
2023-08-16 18:02:28.151818 |
65 |
83154217 |
Amrit Sarovar |
212000 |
Amrit Sarovar1 |
Completion of work |
-
latitude : 20.47321833333333
Longitude : 82.99727333333334
file name : Image_16082023175716335.png
|
2023-08-16 17:57:16.377262 |
66 |
83154403 |
Creation of community soak pits for group of Households |
58800 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 20.475883333333336
Longitude : 82.99631833333333
file name : Image_16082023183809026.png
|
2023-08-16 18:38:09.08288 |
67 |
83154403 |
Creation of community soak pits for group of Households |
58800 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 20.475888333333334
Longitude : 82.9963
file name : Image_16082023183620289.png
|
2023-08-16 18:36:20.348229 |
68 |
83154403 |
Creation of community soak pits for group of Households |
58800 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.475871666666666
Longitude : 82.99627333333335
file name : Image_16082023183152102.png
|
2023-08-16 18:31:52.157583 |
69 |
65806084 |
Repair & Maintenance of Karlabahali basti to School road |
300000 |
Repair & Maintenance of Karlabahali basti to School road1 |
Completion of work |
-
latitude : 20.475581666666667,20.47558666666667
Longitude : 82.99646333333334,82.996495
file name : Image_04042023133249470.png
|
2023-04-04 13:32:49.575297 |
70 |
62007518 |
Repair and Maintenance of Road from Kumbharpada CC. of Mundapala |
150000 |
Repair and Maintenance of Road from Kumbharpada CC. of Mundapala1 |
Completion of work |
-
latitude : 20.503545,20.503781666666665
Longitude : 82.99711166666665,82.99712833333334
file name : Image_05042023110838241.png
|
2023-04-05 11:08:38.338181 |
71 |
65805915 |
Creation of community compost pits for a group of Households |
36000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.516923333333335
Longitude : 82.98673166666667
file name : Image_29052023112627297.png
|
2023-05-29 11:26:27.38446 |
72 |
65805935 |
Creation of community soak pits for group of Households |
84000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.501098333333335
Longitude : 82.998955
file name : Image_29052023114752373.png
|
2023-05-29 11:47:52.466723 |
73 |
48180838 |
Const of UP School Boundary at Bichhubahali |
150000 |
Const of UP School Boundary at Bichhubahali 1 |
Completion of work |
-
latitude : 20.55664833333333
Longitude : 82.98803000000001
file name : Image_26062023154313931.png
|
2023-06-26 15:43:13.987334 |
74 |
62007498 |
Construction of Bichhubahali UP School Boundary |
150000 |
Construction of Bichhubahali UP School Boundary1 |
Completion of work |
-
latitude : 20.50345666666667
Longitude : 82.95091
file name : Image_25062023174516530.png
|
2023-06-25 17:45:16.590725 |
75 |
62007498 |
Construction of Bichhubahali UP School Boundary |
150000 |
Construction of Bichhubahali UP School Boundary1 |
Completion of work |
-
latitude : 20.503486666666667
Longitude : 82.95091166666667
file name : Image_25062023174751130.png
|
2023-06-25 17:47:51.21531 |
76 |
84330490 |
CONST OF BIOUNRTY WALL UPS BICHUBAHALI |
150000 |
CONST OF BIOUNRTY WALL UPS BICHUBAHALI1 |
Completion of work |
-
latitude : 20.556876666666668
Longitude : 82.98799833333332
file name : Image_16082023173652448.png
|
2023-08-16 17:36:52.504337 |
77 |
83154548 |
Repairing and maintenance of roads |
210000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.48098,20.481018333333335
Longitude : 82.99360499999999,82.99359166666666
file name : Image_16082023184948163.png
|
2023-08-16 18:49:48.276564 |
78 |
83154548 |
Repairing and maintenance of roads |
210000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.480936666666665,20.480976666666667
Longitude : 82.993665,82.99355666666666
file name : Image_16082023184732894.png
|
2023-08-16 18:47:32.961706 |
79 |
83154548 |
Repairing and maintenance of roads |
210000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.48100833333333,20.48102833333333
Longitude : 82.9936,82.99358666666667
file name : Image_16082023184343539.png
|
2023-08-16 18:43:43.605666 |
80 |
83154175 |
Creation of a new source of drinking water |
102900 |
Creation of a new source of drinking water1 |
|
-
latitude : 20.476916666666668
Longitude : 82.99823333333333
file name : Image_16082023175450730.png
|
2023-08-16 17:54:50.772507 |
81 |
83154190 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
|
-
latitude : 20.56063
Longitude : 82.98836666666666
file name : Image_22092023175903575.png
|
2023-09-22 17:59:03.654002 |
82 |
83154651 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 20.5921092,20.5921042
Longitude : 82.961399,82.9614002
file name : Image_21062024135509141.png
|
2024-06-21 13:55:09.244003 |
83 |
83154651 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 20.5921388,20.5921386
Longitude : 82.9613659,82.9613645
file name : Image_18012024181608950.png
|
2024-01-18 18:16:09.037564 |
84 |
83154651 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 20.5921387,20.5921402
Longitude : 82.9613668,82.961364
file name : Image_18012024181356742.png
|
2024-01-18 18:13:56.813922 |
85 |
83154651 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 20.592138,20.5921379
Longitude : 82.9613646,82.9613641
file name : Image_18012024180930721.png
|
2024-01-18 18:09:30.803259 |
86 |
83154589 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.5921477,20.592148
Longitude : 82.9613551,82.9613552
file name : Image_18012024180723873.png
|
2024-01-18 18:07:23.937853 |
87 |
83154589 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.5921385,20.592148
Longitude : 82.9613646,82.9613564
file name : Image_18012024175716448.png
|
2024-01-18 17:57:16.545861 |
88 |
83154589 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.5921364,20.592149,20.592149
Longitude : 82.9613638,82.9613521,82.9613521
file name : Image_18012024174041761.png
|
2024-01-18 17:40:41.829107 |
89 |
83154514 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.47566833333333,20.475669999999997
Longitude : 82.99751833333333,82.99750166666666
file name : Image_16082023182629434.png
|
2023-08-16 18:26:29.504591 |
90 |
83154514 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.475701666666666,20.47567666666667,20.475711666666665
Longitude : 82.997535,82.99746166666667,82.99753000000001
file name : Image_16082023182417487.png
|
2023-08-16 18:24:17.563201 |
91 |
83154514 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.475685,20.47573
Longitude : 82.99750999999999,82.99762666666666
file name : Image_16082023182205256.png
|
2023-08-16 18:22:05.34025 |
92 |
83154235 |
Operation and Maintenance of drinking water supply system |
60000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.5921385
Longitude : 82.9613646
file name : Image_18012024180600939.png
|
2024-01-18 18:06:01.013094 |
93 |
83154235 |
Operation and Maintenance of drinking water supply system |
60000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.5921362
Longitude : 82.9613648
file name : Image_18012024175727612.png
|
2024-01-18 17:57:27.68132 |
94 |
83154235 |
Operation and Maintenance of drinking water supply system |
60000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.5921355
Longitude : 82.9613651
file name : Image_18012024174445825.png
|
2024-01-18 17:44:45.896063 |
95 |
105361376 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.56922608
Longitude : 82.9736124
file name : Image_05092024121930217.png
|
2024-09-05 12:19:30.365616 |
96 |
105361376 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 20.56921595
Longitude : 82.97362868
file name : Image_05092024121627475.png
|
2024-09-05 12:16:27.57791 |
97 |
105361376 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.56923392
Longitude : 82.97361273
file name : Image_05092024120705036.png
|
2024-09-05 12:07:05.1331 |
98 |
105361376 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.56924262
Longitude : 82.97362255
file name : Image_05092024115813363.png
|
2024-09-05 11:58:13.489772 |
99 |
83154321 |
Any other operation and maintenance needs related to solid waste management |
115800 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 20.5563004
Longitude : 82.9872725
file name : Image_01022024172956334.png
|
2024-02-01 17:29:56.389905 |
100 |
83154321 |
Any other operation and maintenance needs related to solid waste management |
115800 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 20.5920915
Longitude : 82.9614082
file name : Image_01022024172519254.png
|
2024-02-01 17:25:19.31137 |
101 |
83154321 |
Any other operation and maintenance needs related to solid waste management |
115800 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 20.5562986
Longitude : 82.9872687
file name : Image_01022024172653415.png
|
2024-02-01 17:26:53.471453 |
102 |
83154321 |
Any other operation and maintenance needs related to solid waste management |
115800 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 20.559883333333335
Longitude : 82.989785
file name : Image_29012024215209705.png
|
2024-01-29 21:52:09.764501 |
103 |
83154632 |
Maintenance of traditional Ponds / Tanks |
50000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.559776666666668
Longitude : 82.98890000000002
file name : Image_01122023170954939.png
|
2023-12-01 17:09:55.004282 |
104 |
83154632 |
Maintenance of traditional Ponds / Tanks |
50000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.559755
Longitude : 82.98887666666666
file name : Image_01122023171113251.png
|
2023-12-01 17:11:13.317536 |
105 |
83154632 |
Maintenance of traditional Ponds / Tanks |
50000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 20.55981166666667
Longitude : 82.98907499999999
file name : Image_01122023170638388.png
|
2023-12-01 17:06:38.4702 |
106 |
83154632 |
Maintenance of traditional Ponds / Tanks |
50000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.5921653
Longitude : 82.9614351
file name : Image_01122023150132880.png
|
2023-12-01 15:01:32.937263 |
107 |
83154859 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 20.5921167
Longitude : 82.9613607
file name : Image_21062024140517455.png
|
2024-06-21 14:05:17.561802 |
108 |
83154859 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 20.5921206
Longitude : 82.9613531
file name : Image_21062024140317441.png
|
2024-06-21 14:03:17.533124 |
109 |
83154859 |
Maintenance of Street Lights |
50000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 20.5921225
Longitude : 82.9613534
file name : Image_21062024140128090.png
|
2024-06-21 14:01:28.184416 |
110 |
83154573 |
Constructions of Hostels and Schools |
210372 |
Constructions of Hostels and Schools1 |
Roof laid |
-
latitude : 20.56759849
Longitude : 82.97688162
file name : Image_30052024122624148.png
|
2024-05-30 12:26:24.242472 |
111 |
83154573 |
Constructions of Hostels and Schools |
210372 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 20.5675836
Longitude : 82.97688781
file name : Image_30052024122154464.png
|
2024-05-30 12:21:54.547021 |
112 |
83154573 |
Constructions of Hostels and Schools |
210372 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 20.5921445
Longitude : 82.9613423
file name : Image_30052024113314043.png
|
2024-05-30 11:33:14.165061 |
113 |
62007589 |
Repair and Maintenance of GP Office |
94032 |
Repair and Maintenance of GP Office 1 |
Completion of work |
-
latitude : 20.5921487
Longitude : 82.96134
file name : Image_25072024142244098.png
|
2024-07-25 14:22:44.232653 |
114 |
107155845 |
R/M OF GP GOWDOWN |
105593 |
R/M OF GP GOWDOWN1 |
Completion of work |
-
latitude : 20.5921506
Longitude : 82.9613409
file name : Image_25072024143945404.png
|
2024-07-25 14:39:45.495408 |
115 |
107155801 |
Operation & maintenance of community soak pits |
111656 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 20.5919362
Longitude : 82.9614878
file name : Image_25072024145115584.png
|
2024-07-25 14:51:15.684892 |
116 |
83154910 |
Maintenance of Panchayat Bhawan |
300000 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.5921457
Longitude : 82.9613462
file name : Image_16082024120544644.png
|
2024-08-16 12:05:44.726936 |
117 |
83154910 |
Maintenance of Panchayat Bhawan |
300000 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.5921444
Longitude : 82.9613477
file name : Image_16082024120338204.png
|
2024-08-16 12:03:38.296773 |
118 |
83154910 |
Maintenance of Panchayat Bhawan |
300000 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.5921455
Longitude : 82.9613475
file name : Image_16082024120123453.png
|
2024-08-16 12:01:23.54245 |