1 |
44019243 |
Constructio of Boundary Wall of ME School,Tetelmunda |
200000 |
Constructio of Boundary Wall of ME School,Tetelmunda1 |
Completion of work |
-
latitude : 20.603755
Longitude : 83.04164333333334
file name : Image_11102021163454489.png
|
2021-10-11 16:34:54.592292 |
2 |
44015863 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc) |
63840 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc)1 |
Completion of work |
-
latitude : 20.605135
Longitude : 83.03567
file name : Image_29102021162142749.png
|
2021-10-29 16:21:42.878455 |
3 |
48321776 |
Opening of Jalachhatra ( Busstop , Market Place , Main Chowk etc) |
108205 |
Opening of Jalachhatra ( Busstop , Market Place , Main Chowk etc)1 |
Completion of work |
-
latitude : 20.602116666666667,20.602085
Longitude : 83.04843166666666,83.04843000000001
file name : Image_29102021111149419.png
|
2021-10-29 11:11:49.530099 |
4 |
48327302 |
Construction of bathing step with dress changing room at New Bandh Debripali |
150000 |
Construction of bathing step with dress changing room at New Bandh Debripali1 |
Completion of work |
-
latitude : 20.58277
Longitude : 83.05011166666667
file name : Image_11102021170112656.png
|
2021-10-11 17:01:12.750858 |
5 |
48327861 |
Construction of Bathing step with dress changing room at Nuabandh of Bagudar |
150000 |
Construction of Bathing step with dress changing room at Nuabandh of Bagudar1 |
Completion of work |
-
latitude : 20.599513333333334,20.599515
Longitude : 83.02903666666667,83.02904666666667
file name : Image_11102021164451837.png
|
2021-10-11 16:44:51.938049 |
6 |
44019328 |
Repair and Improvement of Basti Road Chahalapada |
200000 |
Repair and Improvement of Basti Road Chahalapada1 |
Completion of work |
-
latitude : 20.602073333333333,20.602085
Longitude : 83.04269666666666,83.04267499999999
file name : Image_28042021131145733.png
|
2021-04-28 13:11:45.836276 |
7 |
44019348 |
Repair and Improvement of Basti Road Nagabali Pada |
150000 |
Repair and Improvement of Basti Road Nagabali Pada1 |
Completion of work |
-
latitude : 20.602880000000003,20.602885
Longitude : 83.04158166666666,83.04157833333332
file name : Image_28042021135815351.png
|
2021-04-28 13:58:15.486966 |
8 |
44024911 |
Improvement of Road from Mudodarha to Talpali |
200000 |
Improvement of Road from Mudodarha to Talpali1 |
Completion of work |
-
latitude : 20.634826666666665,20.634826666666665
Longitude : 83.050125,83.050125
file name : Image_28042021135838550.png
|
2021-04-28 13:58:38.680321 |
9 |
44015888 |
Honorarium to SEMs & Pump Driver |
72000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.584783333333334
Longitude : 83.04657
file name : Image_08052021061434827.png
|
2021-05-08 06:14:34.762404 |
10 |
44015888 |
Honorarium to SEMs & Pump Driver |
72000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.584758333333333
Longitude : 83.04656166666668
file name : Image_08052021061825503.png
|
2021-05-08 06:18:25.385088 |
11 |
44015888 |
Honorarium to SEMs & Pump Driver |
72000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.584758333333333
Longitude : 83.04656166666668
file name : Image_08052021061734004.png
|
2021-05-08 06:17:33.888691 |
12 |
44015888 |
Honorarium to SEMs & Pump Driver |
72000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.584736666666668
Longitude : 83.04654333333335
file name : Image_08052021061802822.png
|
2021-05-08 06:18:02.72284 |
13 |
44015888 |
Honorarium to SEMs & Pump Driver |
72000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.584736666666668
Longitude : 83.04654333333335
file name : Image_08052021061856138.png
|
2021-05-08 06:18:56.037684 |
14 |
44019376 |
Maintenance of Village Road between Debripali to Satchuan |
150000 |
Maintenance of Village Road between Debripali to Satchuan1 |
Completion of work |
-
latitude : 20.591978333333333,20.591978333333333,20.591948333333335
Longitude : 83.04975833333334,83.04975833333334,83.04975666666665
file name : Image_08062021091328581.png
|
2021-06-08 09:13:28.673041 |
15 |
44024994 |
Improvement of Road from Satchuan to Podhpali |
100000 |
Improvement of Road from Satchuan to Podhpali1 |
Completion of work |
-
latitude : 20.60003,20.600031666666666,20.60002666666667,20.60002666666667
Longitude : 83.061905,83.061905,83.06189666666666,83.061895
file name : Image_08062021091331920.png
|
2021-06-08 09:13:32.007124 |
16 |
44024994 |
Improvement of Road from Satchuan to Podhpali |
100000 |
Improvement of Road from Satchuan to Podhpali1 |
Completion of work |
-
latitude : 20.60003,20.600031666666666,20.60002666666667,20.60002666666667
Longitude : 83.061905,83.061905,83.06189666666666,83.061895
file name : Image_08062021091435455.png
|
2021-06-08 09:14:35.534764 |
17 |
44025013 |
Construction of Bathing Step with Dress Changing Room at Bhuliabandh |
100000 |
Construction of Bathing Step with Dress Changing Room at Bhuliabandh1 |
Completion of work |
-
latitude : 20.630139999999997
Longitude : 83.03630833333334
file name : Image_03072021083125021.png
|
2021-07-03 08:31:25.128662 |
18 |
44025028 |
Construction of Bathing step with Dress Changing at Talbandh |
114032 |
Construction of Bathing step with Dress Changing at Talbandh1 |
Completion of work |
-
latitude : 20.582913333333334
Longitude : 83.05080500000001
file name : Image_30062021164936882.png
|
2021-06-30 16:49:36.985181 |
19 |
44015919 |
Const. of Drain at Harijan Pada DEBRIPALI |
100000 |
Const. of Drain at Harijan Pada DEBRIPALI1 |
Completion of work |
-
latitude : 20.584555,20.584555
Longitude : 83.04861333333335,83.04861333333335
file name : Image_30062021164056939.png
|
2021-06-30 16:40:57.067645 |
20 |
44019425 |
Improvement of Waterbodies facility at Badkata with Repair and Maintenance of Bathing steps at Bad |
75000 |
Improvement of Waterbodies facility at Badkata with Repair and Maintenance of Bathing steps at Bad1 |
Completion of work |
-
latitude : 20.601118333333332
Longitude : 83.04224666666666
file name : Image_08082021085508473.png
|
2021-08-08 08:55:08.595844 |
21 |
44024886 |
PWS to GP Office |
150000 |
PWS to GP Office1 |
Completion of work |
-
latitude : 20.603126666666665
Longitude : 83.04154666666666
file name : Image_27082021080413613.png
|
2021-08-27 08:04:13.684557 |
22 |
44015829 |
Repair and Maintenance PWS Pipelines |
50000 |
Repair and Maintenance PWS Pipelines1 |
Completion of work |
-
latitude : 20.60152,20.601508333333335
Longitude : 83.02207833333333,83.02206999999999
file name : Image_04092021085117197.png
|
2021-09-04 08:51:17.310161 |
23 |
44015829 |
Repair and Maintenance PWS Pipelines |
50000 |
Repair and Maintenance PWS Pipelines1 |
Completion of work |
-
latitude : 20.600493333333336,20.600483333333333
Longitude : 83.04524333333332,83.04524333333332
file name : Image_03092021121148881.png
|
2021-09-03 12:11:48.990647 |
24 |
44015798 |
Operation and Maintenance Existing Piped water supply system as & when required |
50000 |
Operation and Maintenance Existing Piped water supply system as & when required1 |
Completion of work |
-
latitude : 20.601571666666665
Longitude : 83.02203499999999
file name : Image_03092021121219826.png
|
2021-09-03 12:12:19.925686 |
25 |
44015798 |
Operation and Maintenance Existing Piped water supply system as & when required |
50000 |
Operation and Maintenance Existing Piped water supply system as & when required1 |
Completion of work |
-
latitude : 20.62477
Longitude : 83.03714999999998
file name : Image_04092021083031897.png
|
2021-09-04 08:30:32.01851 |
26 |
44015951 |
Cleaning of Bathing Ghat, Street/AWC/Schools/Drain etc |
94472 |
Cleaning of Bathing Ghat, Street/AWC/Schools/Drain etc1 |
Completion of work |
-
latitude : 20.624591666666667
Longitude : 83.03786999999998
file name : Image_04092021081358140.png
|
2021-09-04 08:13:58.244379 |
27 |
44015881 |
Provide of Drinking Water to water scarcity Villages during peak summer by Mobile Tanker |
500000 |
Provide of Drinking Water to water scarcity Villages during peak summer by Mobile Tanker1 |
Completion of work |
-
latitude : 20.59996
Longitude : 83.04913833333333
file name : Image_09122021152254968.png
|
2021-12-09 15:22:55.063535 |
28 |
44015937 |
Construction of Drain at Meherpada |
150000 |
Construction of Drain at Meherpada1 |
Completion of work |
-
latitude : 20.62489,20.624928333333333
Longitude : 83.03707000000001,83.03710500000001
file name : Image_19122021113139097.png
|
2021-12-19 11:31:39.209779 |
29 |
48322225 |
Construction of Temporary Chahalas |
53451 |
Construction of Temporary Chahalas 1 |
Completion of work |
-
latitude : 20.5904
Longitude : 83.04909833333335
file name : Image_03012022122015705.png
|
2022-01-03 12:20:15.82065 |
30 |
48323127 |
Construction of Drain at Meherpada of Mudodoha |
250000 |
Construction of Drain at Meherpada of Mudodoha1 |
Completion of work |
-
latitude : 20.625488333333333
Longitude : 83.03683833333335
file name : Image_07012022103358874.png
|
2022-01-07 10:33:58.996148 |
31 |
48326410 |
Completion of Incomplete drain at Chandan pada of Bagudar |
89312 |
Completion of Incomplete drain at Chandan pada of Bagudar1 |
Completion of work |
-
latitude : 20.601466666666667,20.601471666666665
Longitude : 83.02240166666667,83.02242
file name : Image_07012022100816675.png
|
2022-01-07 10:08:16.780811 |
32 |
54161381 |
Repair and Mainetenance of Existing Solar Piped Water System in all Villages |
150000 |
Repair and Mainetenance of Existing Solar Piped Water System in all Villages1 |
Completion of work |
-
latitude : 20.624745
Longitude : 83.03712500000002
file name : Image_03032022163720289.png
|
2022-03-03 16:37:20.399536 |
33 |
48325615 |
Purchase of school furniture of all UP School and ME School all village |
500000 |
Purchase of school furniture of all UP School and ME School all village1 |
Completion of work |
-
latitude : 20.588606666666667
Longitude : 83.044465
file name : Image_04032022103059045.png
|
2022-03-04 10:30:59.197208 |
34 |
48325615 |
Purchase of school furniture of all UP School and ME School all village |
500000 |
Purchase of school furniture of all UP School and ME School all village1 |
Completion of work |
-
latitude : 20.603546666666666
Longitude : 83.040865
file name : Image_21012022122425073.png
|
2022-01-21 12:24:25.17733 |
35 |
54161193 |
Installation of Solar Piped Water System in Debripali |
404662 |
Installation of Solar Piped Water System in Debripali1 |
Completion of work |
-
latitude : 20.583895
Longitude : 83.05037333333333
file name : Image_03032022103815278.png
|
2022-03-03 10:38:15.38141 |
36 |
61962955 |
Improvement of Tank at Mudodarha Talpali Tank |
200032 |
Improvement of Tank at Mudodarha Talpali Tank1 |
Completion of work |
-
latitude : 20.634093333333333
Longitude : 83.04752666666667
file name : Image_07082022131152278.png
|
2022-08-07 13:11:52.366447 |
37 |
61953097 |
JalaChhatras at all Villages |
108205 |
JalaChhatras at all Villages1 |
Completion of work |
-
latitude : 20.633935
Longitude : 83.03079666666666
file name : Image_07082022171412509.png
|
2022-08-07 17:14:12.63654 |
38 |
61953320 |
Drinking Water through Tanker in Debripali, Bagudar, Satchuan |
120000 |
Drinking Water through Tanker in Debripali, Bagudar, Satchuan1 |
Completion of work |
-
latitude : 20.599285000000002
Longitude : 83.04987833333334
file name : Image_07082022163731281.png
|
2022-08-07 16:37:31.40386 |
39 |
48323570 |
Construction of Bathing step with Dress Changing room at Badkata Harijan pada |
150000 |
Construction of Bathing step with Dress Changing room at Badkata Harijan pada1 |
Completion of work |
-
latitude : 20.600368333333332
Longitude : 83.04220333333333
file name : Image_07082022161920951.png
|
2022-08-07 16:19:21.055559 |
40 |
65816847 |
Creation of community soak pits for group of Households |
63000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.605151666666664
Longitude : 83.035855
file name : Image_04052023175807308.png
|
2023-05-04 17:58:07.435146 |
41 |
61954349 |
Construction Bathing Step at Tali Kata, Tentelumuda |
100000 |
Construction Bathing Step at Tali Kata, Tentelumuda1 |
Completion of work |
-
latitude : 20.600328333333334
Longitude : 83.04328166666667
file name : Image_11092022123902384.png
|
2022-09-11 12:39:02.602822 |
42 |
61961913 |
Construction of Bathing Step at Balibandh |
100000 |
Construction of Bathing Step at Balibandh1 |
Completion of work |
-
latitude : 20.586711666666666
Longitude : 83.0491
file name : Image_12092022164942464.png
|
2022-09-12 16:49:42.580761 |
43 |
61962591 |
Improvement of Tank at Debripali |
200000 |
Improvement of Tank at Debripali1 |
Completion of work |
-
latitude : 20.579555000000003
Longitude : 83.05021333333335
file name : Image_09072023093921564.png
|
2023-07-09 09:39:21.688507 |
44 |
61962591 |
Improvement of Tank at Debripali |
200000 |
Improvement of Tank at Debripali1 |
Completion of work |
-
latitude : 20.579506666666667
Longitude : 83.05018666666668
file name : Image_09072023093754174.png
|
2023-07-09 09:37:54.301419 |
45 |
61962218 |
Improvement of Play ground at Tetelmunda |
151392 |
Improvement of Play ground at Tetelmunda1 |
Completion of work |
-
latitude : 20.608130000000003,20.60813166666667
Longitude : 83.03632833333334,83.03632666666665
file name : Image_10072023101059336.png
|
2023-07-10 10:10:59.472945 |
46 |
61961774 |
Repair and Maintenance of GP Office with Goodwin |
200000 |
Repair and Maintenance of GP Office with Goodwin1 |
Completion of work |
-
latitude : 20.603103333333333
Longitude : 83.04173333333334
file name : Image_05112022100554274.png
|
2022-11-05 10:05:54.312936 |
47 |
61952975 |
Repair and Maintenance of Existing PWS |
50000 |
Repair and Maintenance of Existing PWS1 |
Completion of work |
-
latitude : 20.60021833333333,20.600211666666667
Longitude : 83.04350333333332,83.04350000000001
file name : Image_19122022105038108.png
|
2022-12-19 10:50:38.206622 |
48 |
61953036 |
Repair and Maintenance of Pipelines |
50000 |
Repair and Maintenance of Pipelines 1 |
Completion of work |
-
latitude : 20.600203333333333,20.600208333333335
Longitude : 83.04348,83.04350166666667
file name : Image_19122022104432285.png
|
2022-12-19 10:44:32.370822 |
49 |
65816817 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.6049488
Longitude : 83.0371638
file name : Image_28012023161058866.png
|
2023-01-28 16:10:58.922512 |
50 |
61954237 |
Construction of Drain at Majhia Pada, Bag Udar( 100 Mt) |
200000 |
Construction of Drain at Majhia Pada, Bag Udar( 100 Mt)1 |
Completion of work |
-
latitude : 20.60155166666667,20.601498333333332
Longitude : 83.02192500000001,83.02192833333332
file name : Image_28012023122946788.png
|
2023-01-28 12:29:46.853914 |
51 |
61953143 |
Installation of PWS at UP School Tentulimunda |
100000 |
Installation of PWS at UP School Tentulimunda1 |
Completion of work |
-
latitude : 20.600469999999998
Longitude : 83.04549333333334
file name : Image_19022023172715312.png
|
2023-02-19 17:27:15.37193 |
52 |
48325429 |
Water supply system with tap water facility to AWC-1 and -2 |
100000 |
Water supply system with tap water facility to AWC-1 and -21 |
Completion of work |
-
latitude : 20.603498333333334,20.60349666666667
Longitude : 83.04174666666668,83.04174833333333
file name : Image_19022023173636545.png
|
2023-02-19 17:36:36.603903 |
53 |
48322888 |
Installation of PWS with existing Borewell and Tap water facilities at UPS Mudodorha |
100000 |
Installation of PWS with existing Borewell and Tap water facilities at UPS Mudodorha1 |
Completion of work |
-
latitude : 20.624526666666668,20.624513333333333
Longitude : 83.040095,83.040055
file name : Image_22022023104609016.png
|
2023-02-22 10:46:09.108702 |
54 |
61962051 |
Repair and Maintenance of Tube well Chandni all villages |
120000 |
Repair and Maintenance of Tube well Chandni all villages1 |
Completion of work |
-
latitude : 20.60516
Longitude : 83.03579999999998
file name : Image_17052023182547167.png
|
2023-05-17 18:25:47.280496 |
55 |
61961836 |
Completion of Boundary Wall at Tetelmunda ME school |
200000 |
Completion of Boundary Wall at Tetelmunda ME school1 |
Completion of work |
-
latitude : 20.60417
Longitude : 83.04145500000001
file name : Image_30052023101258637.png
|
2023-05-30 10:12:58.781327 |
56 |
61953230 |
Installation of PWS at UP School Bag Udar |
80000 |
Installation of PWS at UP School Bag Udar1 |
Completion of work |
-
latitude : 20.60349
Longitude : 83.01815166666665
file name : Image_09062023171844146.png
|
2023-06-09 17:18:44.276372 |
57 |
48324873 |
Construction of bathing step at Bhulia Banda Mandodarho |
150000 |
Construction of bathing step at Bhulia Banda Mandodarho1 |
Completion of work |
-
latitude : 20.630105
Longitude : 83.03648666666668
file name : Image_31072023100727886.png
|
2023-07-31 10:07:27.962275 |
58 |
65817059 |
Repair and Maintenance of GP Office |
30000 |
Repair and Maintenance of GP Office1 |
Completion of work |
-
latitude : 20.603321
Longitude : 83.0415706
file name : Image_15072023094715163.png
|
2023-07-15 09:47:15.252258 |
59 |
82825239 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.60511
Longitude : 83.035675
file name : Image_12102023132819444.png
|
2023-10-12 13:28:19.537798 |
60 |
82825239 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 20.605151666666664
Longitude : 83.03577166666668
file name : Image_12102023132514860.png
|
2023-10-12 13:25:14.937423 |
61 |
82825239 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.605124999999997
Longitude : 83.03578833333334
file name : Image_12102023132155126.png
|
2023-10-12 13:21:55.201744 |
62 |
83079050 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.600561666666668,20.600561666666668
Longitude : 83.04460499999999,83.04460499999999
file name : Image_22042024111012329.png
|
2024-04-22 11:10:12.407829 |
63 |
83079050 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.600559999999998,20.600575
Longitude : 83.04458666666666,83.04459999999999
file name : Image_22042024105530264.png
|
2024-04-22 10:55:30.341349 |
64 |
83079050 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.600540000000002,20.600558333333332
Longitude : 83.04456666666668,83.04455000000002
file name : Image_22042024105000273.png
|
2024-04-22 10:50:00.352584 |
65 |
54161435 |
Repair and Maintenance of Pipelines from Solar Piped Water Projects |
150000 |
Repair and Maintenance of Pipelines from Solar Piped Water Projects1 |
Completion of work |
-
latitude : 20.571618333333333,20.571604999999998
Longitude : 83.01492166666667,83.01508666666665
file name : Image_05092024193905091.png
|
2024-09-05 19:39:05.174744 |
66 |
103011317 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.57169
Longitude : 83.01485
file name : Image_06092024110520949.png
|
2024-09-06 11:06:05.042714 |
67 |
103011317 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 20.571646666666666
Longitude : 83.01485333333333
file name : Image_06092024105520520.png
|
2024-09-06 10:56:04.474478 |
68 |
103011317 |
Augmentation of existing sources of Drinking Water |
205200 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.571596666666668
Longitude : 83.01494
file name : Image_05092024194315906.png
|
2024-09-05 19:43:15.999403 |
69 |
83066558 |
Operation and Maintenance of drinking water supply system |
157544 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.57163166666667
Longitude : 83.01482499999999
file name : Image_06092024110117529.png
|
2024-09-06 11:02:01.563743 |
70 |
83066558 |
Operation and Maintenance of drinking water supply system |
157544 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.57068333333333
Longitude : 83.0144
file name : Image_06092024105331514.png
|
2024-09-06 10:54:15.443464 |
71 |
83066558 |
Operation and Maintenance of drinking water supply system |
157544 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.571540000000002
Longitude : 83.01489166666667
file name : Image_05092024193325168.png
|
2024-09-05 19:33:25.255854 |
72 |
83065984 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.602421666666665
Longitude : 83.04146833333334
file name : Image_27122023122125476.png
|
2023-12-27 12:21:25.55727 |
73 |
83065984 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.602431666666668
Longitude : 83.04147333333334
file name : Image_27122023121836960.png
|
2023-12-27 12:18:37.040585 |
74 |
83065984 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.599998333333335
Longitude : 83.04595833333333
file name : Image_22122023154906292.png
|
2023-12-22 15:49:06.369523 |
75 |
61953378 |
Installation of Ro Water system in High School |
70339 |
Installation of Ro Water system in High School1 |
Completion of work |
-
latitude : 20.603353333333335
Longitude : 83.04168333333334
file name : Image_22122023161557073.png
|
2023-12-22 16:15:57.1477 |
76 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.601969999999998
Longitude : 83.021275
file name : Image_16022024123521615.png
|
2024-02-16 12:35:21.681689 |
77 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.60202
Longitude : 83.02128499999999
file name : Image_16022024123939819.png
|
2024-02-16 12:39:39.894002 |
78 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.602053333333334
Longitude : 83.02129833333332
file name : Image_16022024123946008.png
|
2024-02-16 12:39:46.08756 |
79 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.602028333333333
Longitude : 83.02129333333332
file name : Image_16022024121342921.png
|
2024-02-16 12:13:42.996761 |
80 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.601973333333333
Longitude : 83.021275
file name : Image_16022024121542826.png
|
2024-02-16 12:15:42.89549 |
81 |
83068741 |
Repair of drainage channel |
106737 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 20.601971666666667
Longitude : 83.02128166666668
file name : Image_16022024120759918.png
|
2024-02-16 12:07:59.988488 |
82 |
83081579 |
Providing piped water supply to public institutions |
72000 |
Providing piped water supply to public institutions1 |
|
-
latitude : 20.6033227
Longitude : 83.0416132
file name : Image_27032024120821400.png
|
2024-03-27 12:08:22.221183 |
83 |
83066934 |
Pipe water supply to village health centre |
106737 |
Pipe water supply to village health centre1 |
Roof laid |
-
latitude : 20.596068333333335
Longitude : 83.06168833333335
file name : Image_19042024123715877.png
|
2024-04-19 12:37:15.952502 |
84 |
83066934 |
Pipe water supply to village health centre |
106737 |
Pipe water supply to village health centre1 |
Roof laid |
-
latitude : 20.6033226
Longitude : 83.0416126
file name : Image_28032024101406248.png
|
2024-03-28 10:14:06.339558 |
85 |
83066934 |
Pipe water supply to village health centre |
106737 |
Pipe water supply to village health centre1 |
Plinth level |
-
latitude : 20.6033227
Longitude : 83.041613
file name : Image_28032024100721465.png
|
2024-03-28 10:07:21.537257 |
86 |
83066934 |
Pipe water supply to village health centre |
106737 |
Pipe water supply to village health centre1 |
Completion of work |
-
latitude : 20.596098333333334
Longitude : 83.06160666666668
file name : Image_27032024161159991.png
|
2024-03-27 16:12:00.062622 |
87 |
83067133 |
Operation and Maintenance of piped water supply system |
63248 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 20.6033227
Longitude : 83.0416132
file name : Image_28032024101226947.png
|
2024-03-28 10:12:27.010817 |
88 |
83067133 |
Operation and Maintenance of piped water supply system |
63248 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 20.6033228
Longitude : 83.0416131
file name : Image_28032024100505669.png
|
2024-03-28 10:05:05.739911 |
89 |
83067133 |
Operation and Maintenance of piped water supply system |
63248 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.584825000000002
Longitude : 83.04637833333332
file name : Image_27032024152012174.png
|
2024-03-27 15:20:12.246867 |
90 |
83070798 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.600886666666668
Longitude : 83.04573833333333
file name : Image_16072024124736884.png
|
2024-07-16 12:47:36.971254 |
91 |
83070798 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 20.60091
Longitude : 83.045735
file name : Image_16072024124524168.png
|
2024-07-16 12:45:24.251637 |
92 |
83070798 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.600804999999998
Longitude : 83.04550833333333
file name : Image_16072024124253255.png
|
2024-07-16 12:42:53.340069 |
93 |
83068487 |
Drainage Construction |
115472 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.575145000000003
Longitude : 83.07043833333334
file name : Image_20082024142723951.png
|
2024-08-20 14:27:23.130986 |
94 |
83068487 |
Drainage Construction |
115472 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.5528014
Longitude : 83.077711
file name : Image_20082024125932171.png
|
2024-08-20 12:59:32.251075 |
95 |
83068487 |
Drainage Construction |
115472 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.584778333333336
Longitude : 83.04652166666668
file name : Image_17082024093106841.png
|
2024-08-17 09:31:06.966728 |
96 |
83077173 |
Boundary wall and Gate |
270372 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 20.584715000000003
Longitude : 83.04649666666667
file name : Image_28082024124917847.png
|
2024-08-28 12:49:18.589752 |
97 |
83077173 |
Boundary wall and Gate |
270372 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 20.584751666666666
Longitude : 83.04655833333332
file name : Image_28082024122931611.png
|
2024-08-28 12:29:32.095166 |
98 |
83077173 |
Boundary wall and Gate |
270372 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 20.571603333333332
Longitude : 83.01487833333334
file name : Image_24082024135331796.png
|
2024-08-24 13:53:31.879488 |
99 |
83077173 |
Boundary wall and Gate |
270372 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 20.572364999999998
Longitude : 83.01459000000001
file name : Image_23082024164408897.png
|
2024-08-23 16:44:09.010095 |