1 |
47838660 |
CONST. OF CULVERT AND GUARDWALL AT BADTARAKMUNDA MELCHHA MUNDA |
270000 |
CONST. OF CULVERT AND GUARDWALL AT BADTARAKMUNDA MELCHHA MUNDA1 |
Completion of work |
-
latitude : 20.443451666666665,20.443473333333333
Longitude : 83.59579333333335,83.59582
file name : Image_07102021154511360.png
|
2021-10-07 15:45:11.537452 |
2 |
38582570 |
REPAIRING OF WATER SUPPLY PIPE LINE MOTOR |
100000 |
REPAIRING OF WATER SUPPLY PIPE LINE MOTOR1 |
Completion of work |
-
latitude : 20.467848333333333
Longitude : 83.58771999999999
file name : Image_21092021125508072.png
|
2021-09-21 12:55:08.223454 |
3 |
38582570 |
REPAIRING OF WATER SUPPLY PIPE LINE MOTOR |
100000 |
REPAIRING OF WATER SUPPLY PIPE LINE MOTOR1 |
Completion of work |
-
latitude : 20.46809774
Longitude : 83.58757106
file name : Image_27072021132447419.png
|
2021-07-27 13:24:47.538395 |
4 |
44045677 |
CONST. BATHING STEP AT SANDHISARA BANDH GHAT |
200000 |
CONST. BATHING STEP AT SANDHISARA BANDH GHAT1 |
Completion of work |
-
latitude : 20.468193333333332
Longitude : 83.57315666666666
file name : Image_21092021130030860.png
|
2021-09-21 13:00:30.9584 |
5 |
44045677 |
CONST. BATHING STEP AT SANDHISARA BANDH GHAT |
200000 |
CONST. BATHING STEP AT SANDHISARA BANDH GHAT1 |
Completion of work |
-
latitude : 20.468104999999998
Longitude : 83.57316999999999
file name : Image_21092021130347034.png
|
2021-09-21 13:03:47.116311 |
6 |
47835895 |
5 NOS. OF JALACHHATRA FOR PILGRIMS IN SUMMER |
115600 |
5 NOS. OF JALACHHATRA FOR PILGRIMS IN SUMMER 1 |
Completion of work |
-
latitude : 20.38287819363177,20.382860717363656
Longitude : 83.64537611603737,83.64538215100765
file name : Image_16112021131602509.png
|
2021-11-16 13:16:02.620731 |
7 |
38582595 |
DIGGING OF NEW TUBE WELL |
72500 |
DIGGING OF NEW TUBE WELL1 |
Completion of work |
-
latitude : 20.44170666666667
Longitude : 83.593035
file name : Image_02102021132045905.png
|
2021-10-02 13:20:46.018542 |
8 |
44045551 |
CONST. OF TOILET AT GP OFFICE |
50000 |
CONST. OF TOILET AT GP OFFICE1 |
Completion of work |
-
latitude : 20.46789
Longitude : 83.58770833333334
file name : Image_02102021132107098.png
|
2021-10-02 13:21:07.221298 |
9 |
44045551 |
CONST. OF TOILET AT GP OFFICE |
50000 |
CONST. OF TOILET AT GP OFFICE1 |
Completion of work |
-
latitude : 20.467883333333337
Longitude : 83.58773166666667
file name : Image_02102021132117109.png
|
2021-10-02 13:21:17.220096 |
10 |
47836014 |
WATER SUPPLY ELECTRIC BILL DUES |
90000 |
WATER SUPPLY ELECTRIC BILL DUES1 |
Completion of work |
-
latitude : 20.469852425158024,20.469784657470882
Longitude : 83.59551837667823,83.59547579661012
file name : Image_14112021153236690.png
|
2021-11-14 15:32:36.771163 |
11 |
47838986 |
IMP. OF BOUNDARY WALL AT GP OFFICE BIRAMUNDA |
150000 |
IMP. OF BOUNDARY WALL AT GP OFFICE BIRAMUNDA1 |
Completion of work |
-
latitude : 20.46791071537882
Longitude : 83.58747309073806
file name : Image_13052022110009517.png
|
2022-05-13 11:00:09.616074 |
12 |
44045701 |
CONST. OF GUARDWALL AT JOGIMARA SCHOOL ROAD |
200000 |
CONST. OF GUARDWALL AT JOGIMARA SCHOOL ROAD 1 |
Completion of work |
-
latitude : 20.44415920972824,20.444113863632083
Longitude : 83.58082741498947,83.58086504973471
file name : Image_13052022103718854.png
|
2022-05-13 10:37:18.972436 |
13 |
47837023 |
CONST. OF BATHING STEP AT KARLAKHAMAN KHALIAMUNDA |
100000 |
CONST. OF BATHING STEP AT KARLAKHAMAN KHALIAMUNDA1 |
Completion of work |
-
latitude : 20.450335456989706
Longitude : 83.57072378508747
file name : Image_13052022102734571.png
|
2022-05-13 10:27:34.651244 |
14 |
47836894 |
IMP. OF KARLAKHAMAN JHINKI DUNGURI NADI KHANDI ROAD |
191772 |
IMP. OF KARLAKHAMAN JHINKI DUNGURI NADI KHANDI ROAD1 |
Completion of work |
-
latitude : 20.44762273784727,20.447643818333745
Longitude : 83.56920523568988,83.56919827871025
file name : Image_13052022103146428.png
|
2022-05-13 10:31:46.520696 |
15 |
47839148 |
CONST. OF BOUNDARY WALL AT SANDHISARA PRIMARY SCHOOL |
200000 |
CONST. OF BOUNDARY WALL AT SANDHISARA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.46886561
Longitude : 83.57433794
file name : Image_31032023164620599.png
|
2023-03-31 16:46:20.694596 |
16 |
47839148 |
CONST. OF BOUNDARY WALL AT SANDHISARA PRIMARY SCHOOL |
200000 |
CONST. OF BOUNDARY WALL AT SANDHISARA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.46769098378718
Longitude : 83.57512512244284
file name : Image_13052022100855952.png
|
2022-05-13 10:08:56.020287 |
17 |
47837166 |
IMP. OF ROAD WITH GUARDWALL FROM PHALSAPADA TO KARLAKHAMAN BASTI ROAD |
200000 |
IMP. OF ROAD WITH GUARDWALL FROM PHALSAPADA TO KARLAKHAMAN BASTI ROAD1 |
Completion of work |
-
latitude : 20.453084176406264,20.45308120083064
Longitude : 83.56611147522926,83.56611298397183
file name : Image_18052022170655404.png
|
2022-05-18 17:06:55.485416 |
18 |
61631795 |
ELECTRIC BILL DUES OF WATER SUPPLY AND STREET LIGHT |
456744 |
ELECTRIC BILL DUES OF WATER SUPPLY AND STREET LIGHT1 |
Completion of work |
-
latitude : 20.39572307,20.39575854
Longitude : 83.65614967,83.65620878
file name : Image_24032023101239509.png
|
2023-03-24 10:12:39.615383 |
19 |
61631795 |
ELECTRIC BILL DUES OF WATER SUPPLY AND STREET LIGHT |
456744 |
ELECTRIC BILL DUES OF WATER SUPPLY AND STREET LIGHT1 |
Completion of work |
-
latitude : 20.47009851783514,20.470103546977043
Longitude : 83.5952503234148,83.59529005363584
file name : Image_20072022151505322.png
|
2022-07-20 15:15:05.407715 |
20 |
59178270 |
5 NOS. OF JALACHHATRA FOR PILGRIMS IN SUMMER SEASON |
121600 |
5 NOS. OF JALACHHATRA FOR PILGRIMS IN SUMMER SEASON1 |
Completion of work |
-
latitude : 20.383031582459807
Longitude : 83.64547485485673
file name : Image_26072022152340014.png
|
2022-07-26 15:23:40.08781 |
21 |
64042230 |
SBM-G PHASE-II ODF Plus 30% |
101600 |
SBM-G PHASE-II ODF Plus 30%1 |
Completion of work |
-
latitude : 20.41756169
Longitude : 83.64387357
file name : Image_26082022155536443.png
|
2022-08-26 15:55:36.565366 |
22 |
59185052 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER |
145000 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER1 |
Completion of work |
-
latitude : 20.3998212
Longitude : 83.64788312
file name : Image_24032023102521962.png
|
2023-03-24 10:25:22.059544 |
23 |
59185052 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER |
145000 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER1 |
Completion of work |
-
latitude : 20.42856167
Longitude : 83.65233049
file name : Image_27022023161857057.png
|
2023-02-27 16:18:57.145573 |
24 |
59185052 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER |
145000 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER1 |
Completion of work |
-
latitude : 20.40913046
Longitude : 83.64559359
file name : Image_29112022092918294.png
|
2022-11-29 09:29:18.376921 |
25 |
59185052 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER |
145000 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER1 |
Completion of work |
-
latitude : 20.41751038
Longitude : 83.64379044
file name : Image_26082022155544048.png
|
2022-08-26 15:55:44.177355 |
26 |
59185052 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER |
145000 |
SALARIES OF 2 NOS. SEM AND 3 NOS PUMP DRIVER1 |
Completion of work |
-
latitude : 20.387894385494292
Longitude : 83.64791365340352
file name : Image_26072022152840101.png
|
2022-07-26 15:28:40.176474 |
27 |
61631907 |
SBM G PHASE II ODF Plus 30 PERCENT |
100000 |
SBM G PHASE II ODF Plus 30 PERCENT1 |
Completion of work |
-
latitude : 20.40913811,20.40915885
Longitude : 83.64552486,83.64554776
file name : Image_27022023163013474.png
|
2023-02-27 16:30:13.573236 |
28 |
61631907 |
SBM G PHASE II ODF Plus 30 PERCENT |
100000 |
SBM G PHASE II ODF Plus 30 PERCENT1 |
Completion of work |
-
latitude : 20.46468269,20.46468326
Longitude : 83.57940861,83.57940874
file name : Image_12012023174514265.png
|
2023-01-12 17:45:14.374093 |
29 |
47838899 |
CLEANING OF VILLAGE AND SCHOOL AREAS |
30000 |
CLEANING OF VILLAGE AND SCHOOL AREAS1 |
Completion of work |
-
latitude : 20.39800312
Longitude : 83.64768684
file name : Image_28022023162925341.png
|
2023-02-28 16:29:25.440266 |
30 |
47836687 |
CONST. OF CHANDNI AT SANDHISARA HARIJAN PADA TUBE WELL |
50000 |
CONST. OF CHANDNI AT SANDHISARA HARIJAN PADA TUBE WELL1 |
Completion of work |
-
latitude : 20.46890999
Longitude : 83.57438822
file name : Image_15042023103209998.png
|
2023-04-15 10:32:10.096225 |
31 |
47836687 |
CONST. OF CHANDNI AT SANDHISARA HARIJAN PADA TUBE WELL |
50000 |
CONST. OF CHANDNI AT SANDHISARA HARIJAN PADA TUBE WELL1 |
Completion of work |
-
latitude : 20.62712944
Longitude : 83.51756495
file name : Image_05042023125432947.png
|
2023-04-05 12:54:33.051541 |
32 |
47836415 |
CONST. OF CC ROAD WITH DRAIN AT JANAKPUR |
100000 |
CONST. OF CC ROAD WITH DRAIN AT JANAKPUR1 |
Completion of work |
-
latitude : 20.46338531,20.46340067
Longitude : 83.58439942,83.58435016
file name : Image_31032023163519584.png
|
2023-03-31 16:35:19.681256 |
33 |
47836570 |
CONST. OF DRAIN AT DEMUHAN HERNA PADA TUBE WELL |
150000 |
CONST. OF DRAIN AT DEMUHAN HERNA PADA TUBE WELL1 |
Completion of work |
-
latitude : 20.47711133,20.47707093
Longitude : 83.58919674,83.58918831
file name : Image_31032023162108603.png
|
2023-03-31 16:21:08.712023 |
34 |
68138104 |
Imp of road from Badtarakmunda to Biramunda |
200000 |
Imp of road from Badtarakmunda to Biramunda1 |
Completion of work |
-
latitude : 20.45925592,20.45926867
Longitude : 83.58731314,83.58729936
file name : Image_12062023100944671.png
|
2023-06-12 10:09:44.766411 |
35 |
47829846 |
REPARING OF WATER SUPPLY PIPE LINE |
134786 |
REPARING OF WATER SUPPLY PIPE LINE 1 |
Completion of work |
-
latitude : 20.47575091,20.47577601
Longitude : 83.59583464,83.59586511
file name : Image_25072023101030248.png
|
2023-07-25 10:10:30.348577 |
36 |
59186752 |
REPAIR AND MAINTENANCE OF STREET LIGHT |
50990 |
REPAIR AND MAINTENANCE OF STREET LIGHT1 |
Roof laid |
-
latitude : 20.44561983
Longitude : 83.61454312
file name : Image_02092024131716544.png
|
2024-09-02 13:17:16.8452 |
37 |
59186752 |
REPAIR AND MAINTENANCE OF STREET LIGHT |
50990 |
REPAIR AND MAINTENANCE OF STREET LIGHT1 |
Plinth level |
-
latitude : 20.44551497
Longitude : 83.61457835
file name : Image_02092024131018269.png
|
2024-09-02 13:10:18.473549 |
38 |
59186752 |
REPAIR AND MAINTENANCE OF STREET LIGHT |
50990 |
REPAIR AND MAINTENANCE OF STREET LIGHT1 |
Completion of work |
-
latitude : 20.44556253
Longitude : 83.61452788
file name : Image_02092024130115338.png
|
2024-09-02 13:01:15.443669 |
39 |
59184152 |
CONST. OF BATHING STEP AT DEMUHAN MAHAJANPADA NADI GHAT |
100000 |
CONST. OF BATHING STEP AT DEMUHAN MAHAJANPADA NADI GHAT1 |
Completion of work |
-
latitude : 20.48100276
Longitude : 83.57413952
file name : Image_25072023103929068.png
|
2023-07-25 10:39:29.161726 |
40 |
83033313 |
Creation of a new source of drinking water |
129494 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.4160652
Longitude : 83.5648614
file name : Image_15112023160924858.png
|
2023-11-15 16:09:24.976152 |
41 |
83033313 |
Creation of a new source of drinking water |
129494 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.4160638
Longitude : 83.5648678
file name : Image_15112023160700250.png
|
2023-11-15 16:07:00.356426 |
42 |
83033313 |
Creation of a new source of drinking water |
129494 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.4165343
Longitude : 83.5687369
file name : Image_15112023160420442.png
|
2023-11-15 16:04:20.555942 |
43 |
47836802 |
WATER SUPPLY TO BIRAMUNDA PRIMARY SCHOOL |
70000 |
WATER SUPPLY TO BIRAMUNDA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.4165115,20.4165128
Longitude : 83.5682813,83.5682104
file name : Image_20112023151702553.png
|
2023-11-20 15:17:02.672153 |
44 |
82972403 |
Construction of Community Sanitary Complex |
162060 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 20.4165209
Longitude : 83.5682459
file name : Image_20032024153611150.png
|
2024-03-20 15:36:11.229437 |
45 |
82972403 |
Construction of Community Sanitary Complex |
162060 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 20.4165217
Longitude : 83.5682472
file name : Image_20032024153155539.png
|
2024-03-20 15:31:55.641972 |
46 |
82972403 |
Construction of Community Sanitary Complex |
162060 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.416525
Longitude : 83.5682479
file name : Image_20032024152207050.png
|
2024-03-20 15:22:07.145359 |
47 |
61631858 |
IMP. OF ROAD FROM BADTARAKMUNDA TO BIRAMUNDA |
115144 |
IMP. OF ROAD FROM BADTARAKMUNDA TO BIRAMUNDA1 |
Completion of work |
-
latitude : 20.416517
Longitude : 83.5682495
file name : Image_20032024151511574.png
|
2024-03-20 15:15:11.675784 |
48 |
83035550 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.4165209
Longitude : 83.5682459
file name : Image_20032024153657691.png
|
2024-03-20 15:36:57.780386 |
49 |
83035550 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.4165217
Longitude : 83.5682472
file name : Image_20032024153051336.png
|
2024-03-20 15:30:51.433444 |
50 |
83035550 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.416523
Longitude : 83.5682495
file name : Image_20032024152256953.png
|
2024-03-20 15:22:57.038138 |
51 |
68138323 |
Water Supply to villages |
115144 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.4164783
Longitude : 83.5682271
file name : Image_20032024161010675.png
|
2024-03-20 16:10:10.745226 |
52 |
83053018 |
Creation of Small-bore pipe conveyance system |
300000 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 20.4160639
Longitude : 83.5648686
file name : Image_15112023160954818.png
|
2023-11-15 16:09:54.923824 |
53 |
83053018 |
Creation of Small-bore pipe conveyance system |
300000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 20.416065
Longitude : 83.5648621
file name : Image_15112023160728818.png
|
2023-11-15 16:07:28.91726 |
54 |
83053018 |
Creation of Small-bore pipe conveyance system |
300000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 20.416065
Longitude : 83.5648621
file name : Image_15112023160505491.png
|
2023-11-15 16:05:05.594248 |
55 |
74765524 |
Construction of Building |
300000 |
Construction of Building1 |
Roof laid |
-
latitude : 20.46871319
Longitude : 83.59029727
file name : Image_20092024160910337.png
|
2024-09-20 16:09:10.447964 |
56 |
74765524 |
Construction of Building |
300000 |
Construction of Building1 |
Plinth level |
-
latitude : 20.46867395
Longitude : 83.59026757
file name : Image_20092024160455510.png
|
2024-09-20 16:04:55.623356 |
57 |
74765524 |
Construction of Building |
300000 |
Construction of Building1 |
Completion of work |
-
latitude : 20.46858479
Longitude : 83.59030988
file name : Image_20092024155735023.png
|
2024-09-20 15:57:35.141267 |
58 |
74751816 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 20.44911753
Longitude : 83.58126971
file name : Image_24062024111813913.png
|
2024-06-24 11:18:14.001663 |
59 |
74751816 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 20.44904124
Longitude : 83.58123153
file name : Image_21062024115803628.png
|
2024-06-21 11:58:03.726772 |
60 |
74750308 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.47541436,20.47539672
Longitude : 83.58978315,83.58976821
file name : Image_24062024110631697.png
|
2024-06-24 11:06:31.78205 |
61 |
74750308 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.47552564,20.47554318
Longitude : 83.58978158,83.58980022
file name : Image_21062024105007950.png
|
2024-06-21 10:50:08.043652 |
62 |
82725554 |
Construction of roads |
179080 |
Construction of roads1 |
Roof laid |
-
latitude : 20.416555,20.416555
Longitude : 83.5682796,83.5682796
file name : Image_20032024151050614.png
|
2024-03-20 15:10:50.721743 |
63 |
82725554 |
Construction of roads |
179080 |
Construction of roads1 |
Plinth level |
-
latitude : 20.44406054,20.4440728
Longitude : 83.59399499,83.59399249
file name : Image_20032024141033661.png
|
2024-03-20 14:10:33.770832 |
64 |
82725554 |
Construction of roads |
179080 |
Construction of roads1 |
Completion of work |
-
latitude : 20.44420259,20.44420047
Longitude : 83.59462278,83.59464499
file name : Image_15032024103926395.png
|
2024-03-15 10:39:26.478654 |
65 |
74755678 |
Rejuvenation and desilting of tank/ water body |
182566 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 20.46802413
Longitude : 83.58981699
file name : Image_20092024162613837.png
|
2024-09-20 16:26:13.954668 |
66 |
74755678 |
Rejuvenation and desilting of tank/ water body |
182566 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 20.46804971
Longitude : 83.58983081
file name : Image_20092024162226685.png
|
2024-09-20 16:22:26.774349 |
67 |
74755678 |
Rejuvenation and desilting of tank/ water body |
182566 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 20.46808828
Longitude : 83.58987279
file name : Image_20092024161117882.png
|
2024-09-20 16:11:17.964776 |