1 |
45342760 |
GADBHANG-II-REPAIR OF KITCHEN ROOM NEAR HANUMAN MANDIR |
35000 |
GADBHANG-II-REPAIR OF KITCHEN ROOM NEAR HANUMAN MANDIR1 |
Roof laid |
-
latitude : 21.424136666666662
Longitude : 86.79265500000001
file name : Image_24032021103442804.png
|
2021-03-24 10:34:42.929267 |
2 |
45343358 |
GADBHANG-II-IMP. OF ROAD(MORRUM) VILLAGE ROAD |
35952 |
GADBHANG-II-IMP. OF ROAD(MORRUM) VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.4246642,21.4246642
Longitude : 86.792851,86.792851
file name : Image_31012021162523555.png
|
2021-01-31 16:25:23.614541 |
3 |
45343352 |
KHANTAPADA-IMP. OF ROAD(MORRUM) FROM MSY ROAD TO POHATARA ADIBASI SAHI |
50000 |
KHANTAPADA-IMP. OF ROAD(MORRUM) FROM MSY ROAD TO POHATARA ADIBASI SAHI1 |
Roof laid |
-
latitude : 21.3387916,21.3387916
Longitude : 86.758109,86.758109
file name : Image_09032022204924529.png
|
2022-03-09 20:49:24.602566 |
4 |
45343352 |
KHANTAPADA-IMP. OF ROAD(MORRUM) FROM MSY ROAD TO POHATARA ADIBASI SAHI |
50000 |
KHANTAPADA-IMP. OF ROAD(MORRUM) FROM MSY ROAD TO POHATARA ADIBASI SAHI1 |
Roof laid |
-
latitude : 21.406313333333333,21.406313333333333
Longitude : 86.817585,86.817585
file name : Image_31012021160700894.png
|
2021-01-31 16:07:00.936566 |
5 |
45342824 |
RAIM-CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BRAHMAN SASAN |
200000 |
RAIM-CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BRAHMAN SASAN1 |
Roof laid |
-
latitude : 21.408406666666664,21.408406666666664
Longitude : 86.79606666666665,86.79606666666665
file name : Image_31012021141644721.png
|
2021-01-31 14:16:44.781784 |
6 |
45342824 |
RAIM-CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BRAHMAN SASAN |
200000 |
RAIM-CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BRAHMAN SASAN1 |
Roof laid |
-
latitude : 21.408406666666664,21.408406666666664
Longitude : 86.79606666666665,86.79606666666665
file name : Image_31012021141749463.png
|
2021-01-31 14:17:49.525374 |
7 |
45343300 |
NAICHHANPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD |
50000 |
NAICHHANPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.39645666666667,21.39645833333333
Longitude : 86.81858833333332,86.81858833333332
file name : Image_31012021151012211.png
|
2021-01-31 15:10:12.263257 |
8 |
45343311 |
GOBINDAPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD |
50000 |
GOBINDAPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.338791,21.3387917
Longitude : 86.7581192,86.7581198
file name : Image_09032022204526133.png
|
2022-03-09 20:45:26.22851 |
9 |
45343311 |
GOBINDAPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD |
50000 |
GOBINDAPUR-IMP OF ROAD(MORRUM) VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.397334999999998,21.397334999999998
Longitude : 86.81326833333333,86.81326833333333
file name : Image_31012021154448758.png
|
2021-01-31 15:44:48.825846 |
10 |
45343343 |
MULKUDEI-IMP. OF ROAD (MORRUM) VILLAGE ROAD |
50000 |
MULKUDEI-IMP. OF ROAD (MORRUM) VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.40631166666667,21.40631166666667
Longitude : 86.81758166666665,86.81758166666665
file name : Image_31012021162208187.png
|
2021-01-31 16:22:08.24391 |
11 |
45343280 |
GADBHANG-II-DITCH FILLING NEAR NUA POKHARI(PALA SAHI) |
50000 |
GADBHANG-II-DITCH FILLING NEAR NUA POKHARI(PALA SAHI)1 |
Roof laid |
-
latitude : 21.42455166666667
Longitude : 86.79300666666668
file name : Image_31012021125709466.png
|
2021-01-31 12:57:09.537419 |
12 |
45343120 |
DITCH FILLING NEAR AWC GADBHANG-II AWC MULKUDEI(MAHALIK SAHI) |
50000 |
DITCH FILLING NEAR AWC GADBHANG-II AWC MULKUDEI(MAHALIK SAHI)1 |
Roof laid |
-
latitude : 21.4012552
Longitude : 86.8034293
file name : Image_11052021110743612.png
|
2021-05-11 11:07:43.672233 |
13 |
45343120 |
DITCH FILLING NEAR AWC GADBHANG-II AWC MULKUDEI(MAHALIK SAHI) |
50000 |
DITCH FILLING NEAR AWC GADBHANG-II AWC MULKUDEI(MAHALIK SAHI)1 |
Roof laid |
-
latitude : 21.424455
Longitude : 86.79317166666667
file name : Image_31012021125406560.png
|
2021-01-31 12:54:06.63849 |
14 |
45342838 |
PURCHASE OF FURNITURE TOYS,UTENSILS FOR AWC AND SCHOOL BEAUTIFICATION AND REPAIR-GADBHANG,HARIPALPUR |
135000 |
PURCHASE OF FURNITURE TOYS,UTENSILS FOR AWC AND SCHOOL BEAUTIFICATION AND REPAIR-GADBHANG,HARIPALPUR1 |
Roof laid |
-
latitude : 21.423405000000002
Longitude : 86.79968
file name : Image_02032021093748988.png
|
2021-03-02 09:37:49.067749 |
15 |
45342742 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI |
200000 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI1 |
Roof laid |
-
latitude : 21.42281403,21.42281609
Longitude : 86.79472162,86.79472357
file name : Image_23042021092125856.png
|
2021-04-23 09:21:25.895401 |
16 |
45342742 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI |
200000 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI1 |
Roof laid |
-
latitude : 21.422845,21.422845
Longitude : 86.79481,86.79481
file name : Image_10032021154157870.png
|
2021-03-10 15:41:57.956313 |
17 |
45342742 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI |
200000 |
MULKUDEI-CONST OF GUARDWALL FROM CHINTAMANI DAS HOUSE TO PUTI SAHI1 |
Roof laid |
-
latitude : 21.422845,21.422845
Longitude : 86.79480333333335,86.794805
file name : Image_10032021154150201.png
|
2021-03-10 15:41:50.287946 |
18 |
45342784 |
GADBHANG-IV-CONST OF CC ROAD FROM JADUNATH DAS HOUSE TO SCHOOL |
300000 |
GADBHANG-IV-CONST OF CC ROAD FROM JADUNATH DAS HOUSE TO SCHOOL1 |
Roof laid |
-
latitude : 21.423631666666665,21.423631666666665
Longitude : 86.81430833333334,86.81430833333334
file name : Image_15032021160244763.png
|
2021-03-15 16:02:44.858768 |
19 |
45342784 |
GADBHANG-IV-CONST OF CC ROAD FROM JADUNATH DAS HOUSE TO SCHOOL |
300000 |
GADBHANG-IV-CONST OF CC ROAD FROM JADUNATH DAS HOUSE TO SCHOOL1 |
Roof laid |
-
latitude : 21.423688333333335,21.423688333333335
Longitude : 86.81431166666668,86.81431166666668
file name : Image_15032021160238015.png
|
2021-03-15 16:02:38.11704 |
20 |
45342348 |
PROVISION OF RAISED PLATFORM |
40000 |
PROVISION OF RAISED PLATFORM1 |
Roof laid |
-
latitude : 21.420104999999996
Longitude : 86.79380333333332
file name : Image_27032021110745994.png
|
2021-03-27 11:07:46.052064 |
21 |
45342773 |
GADBHANG-II-CONST OF PUCCA GHAT NEAR NUA POKHARI |
60000 |
GADBHANG-II-CONST OF PUCCA GHAT NEAR NUA POKHARI1 |
Roof laid |
-
latitude : 21.42416456
Longitude : 86.79289408
file name : Image_23042021085138189.png
|
2021-04-23 08:51:38.275973 |
22 |
45342570 |
CONST. OF CC ROAD WITH DRAIN FROM SUDHIR PATTANAYAK HOUSE TO NALI POLA IN VILLAGE GADBHANG-II |
200000 |
CONST. OF CC ROAD WITH DRAIN FROM SUDHIR PATTANAYAK HOUSE TO NALI POLA IN VILLAGE GADBHANG-II1 |
Roof laid |
-
latitude : 21.4012552,21.4012552
Longitude : 86.8034294,86.8034294
file name : Image_11052021111152851.png
|
2021-05-11 11:11:52.910318 |
23 |
45342570 |
CONST. OF CC ROAD WITH DRAIN FROM SUDHIR PATTANAYAK HOUSE TO NALI POLA IN VILLAGE GADBHANG-II |
200000 |
CONST. OF CC ROAD WITH DRAIN FROM SUDHIR PATTANAYAK HOUSE TO NALI POLA IN VILLAGE GADBHANG-II1 |
Roof laid |
-
latitude : 21.42422316,21.42433382
Longitude : 86.78961323,86.78967516
file name : Image_23042021085837109.png
|
2021-04-23 08:58:37.198913 |
24 |
49502738 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO BABURAM PATRA HOUSE,GADABHANG-4 |
80000 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO BABURAM PATRA HOUSE,GADABHANG-41 |
Roof laid |
-
latitude : 21.3387907,21.3387917
Longitude : 86.7581294,86.7581233
file name : Image_18102021170402560.png
|
2021-10-18 17:04:02.615081 |
25 |
49502718 |
INCOMPLETE CC ROAD AKADASI PATRA HOUSE RD ROAD ,GADABHANG-4 |
100000 |
INCOMPLETE CC ROAD AKADASI PATRA HOUSE RD ROAD ,GADABHANG-41 |
Roof laid |
-
latitude : 21.3387898,21.3387898
Longitude : 86.7581065,86.7581065
file name : Image_18102021171205999.png
|
2021-10-18 17:12:06.055738 |
26 |
45342252 |
REPAIR PWS PROJECTS |
425251 |
REPAIR PWS PROJECTS1 |
Roof laid |
-
latitude : 21.4012316,21.4012356
Longitude : 86.8034285,86.8034265
file name : Image_04052021111028525.png
|
2021-05-04 11:10:28.689892 |
27 |
45342252 |
REPAIR PWS PROJECTS |
425251 |
REPAIR PWS PROJECTS1 |
Roof laid |
-
latitude : 21.4012327,21.4012327
Longitude : 86.803428,86.803428
file name : Image_04052021111235374.png
|
2021-05-04 11:12:35.440558 |
28 |
45342550 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI |
20000 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI1 |
Roof laid |
-
latitude : 21.4012551
Longitude : 86.8034292
file name : Image_27082021152858618.png
|
2021-08-27 15:28:58.692087 |
29 |
45342550 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI |
20000 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI1 |
Roof laid |
-
latitude : 21.4012551
Longitude : 86.8034292
file name : Image_19052021125448447.png
|
2021-05-19 12:54:48.520656 |
30 |
45342550 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI |
20000 |
PROVISION OF HUME PIPELINE IN VILLAGE GADBHANG IV NEAR NAYAK SAHI1 |
Roof laid |
-
latitude : 21.4012551
Longitude : 86.8034286
file name : Image_19052021125551694.png
|
2021-05-19 12:55:51.772092 |
31 |
49502683 |
CONSTRUCTION OF CC ROAD IN ANANDA NODAL SCHOOL,MULKUDAL |
100000 |
CONSTRUCTION OF CC ROAD IN ANANDA NODAL SCHOOL,MULKUDAL1 |
Roof laid |
-
latitude : 21.3387906,21.3387906
Longitude : 86.7581117,86.7581117
file name : Image_03112021151332961.png
|
2021-11-03 15:13:33.019991 |
32 |
45342498 |
CLEANING OF VILLAGE STREET SCHOOL ANGANWADI AREAS MARKET PLACE BUILDING GHAT |
10000 |
CLEANING OF VILLAGE STREET SCHOOL ANGANWADI AREAS MARKET PLACE BUILDING GHAT1 |
Roof laid |
-
latitude : 21.401255
Longitude : 86.8034288
file name : Image_27082021152644818.png
|
2021-08-27 15:26:44.892695 |
33 |
45343288 |
MAINTENANCE OF STREET LIGHTS |
50000 |
MAINTENANCE OF STREET LIGHTS1 |
Roof laid |
-
latitude : 21.4012549
Longitude : 86.8034292
file name : Image_27082021145658396.png
|
2021-08-27 14:56:58.487551 |
34 |
49501239 |
IMPROVEMENT OF ROAD (MORRUM) RAMANAGAR,VILL-RAMANAGAR |
100000 |
IMPROVEMENT OF ROAD (MORRUM) RAMANAGAR,VILL-RAMANAGAR1 |
Roof laid |
-
latitude : 21.4012549,21.4012549,21.401255
Longitude : 86.8034292,86.8034292,86.803429
file name : Image_27082021153439408.png
|
2021-08-27 15:34:39.492604 |
35 |
49501815 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO MANORANJAN PATRA HOUSE GADABHANG-4 |
70000 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO MANORANJAN PATRA HOUSE GADABHANG-41 |
Roof laid |
-
latitude : 21.4012549,21.4012549
Longitude : 86.8034286,86.8034286
file name : Image_27082021153313093.png
|
2021-08-27 15:33:13.186257 |
36 |
49500345 |
CONSTRUCTION OF HUME PIPE CULVERT NEAR PWD ROAD VILLAGE GOVINDAPUR |
100000 |
CONSTRUCTION OF HUME PIPE CULVERT NEAR PWD ROAD VILLAGE GOVINDAPUR1 |
Roof laid |
-
latitude : 21.3387929,21.3387929
Longitude : 86.7581035,86.7581035
file name : Image_12112021175446106.png
|
2021-11-12 17:54:46.175898 |
37 |
49499718 |
REPAIRING AND MAINTENANCE OF THE PWS PROJECTS |
200000 |
REPAIRING AND MAINTENANCE OF THE PWS PROJECTS1 |
Roof laid |
-
latitude : 21.3387886,21.3387922
Longitude : 86.7581054,86.7581047
file name : Image_12112021174808048.png
|
2021-11-12 17:48:08.116858 |
38 |
49499742 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR |
120000 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR1 |
Roof laid |
-
latitude : 21.3388152
Longitude : 86.7581276
file name : Image_23122021155522373.png
|
2021-12-23 15:55:22.478969 |
39 |
49499742 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR |
120000 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR1 |
Roof laid |
-
latitude : 21.3388361
Longitude : 86.7581276
file name : Image_18122021161727340.png
|
2021-12-18 16:17:27.410432 |
40 |
49499742 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR |
120000 |
SINKING OF NEW 1 NO OF TUBE WELLS BHAGATPUR SHIBA MANDIR1 |
Roof laid |
-
latitude : 21.3388152
Longitude : 86.7581276
file name : Image_18122021161745298.png
|
2021-12-18 16:17:45.372541 |
41 |
49499607 |
ENERGY BILL FOR PWS PROJECTS AND STREET LIGHT |
150000 |
ENERGY BILL FOR PWS PROJECTS AND STREET LIGHT1 |
Roof laid |
-
latitude : 21.3388138,21.3388138
Longitude : 86.7581369,86.7581369
file name : Image_24012022162025331.png
|
2022-01-24 16:20:25.414195 |
42 |
49501443 |
CHITAPADA PMGSY ROAD TO KALIA BEHERA HOUSE |
150000 |
CHITAPADA PMGSY ROAD TO KALIA BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.3387911,21.3387911
Longitude : 86.7581267,86.7581267
file name : Image_09032022092851074.png
|
2022-03-09 09:28:51.142471 |
43 |
49500242 |
CONSTRUCTION OF GUARDWALL RD ROAD TO SETHI SAHI VILLAGE MULAKUDAL |
250000 |
CONSTRUCTION OF GUARDWALL RD ROAD TO SETHI SAHI VILLAGE MULAKUDAL1 |
Roof laid |
-
latitude : 21.3387905
Longitude : 86.7581165
file name : Image_09032022092725340.png
|
2022-03-09 09:27:25.407835 |
44 |
49501764 |
CONSTRUCTION OF COMPOUND WALL NEAR KHANTAPADA GIRLS SCHOOL |
200000 |
CONSTRUCTION OF COMPOUND WALL NEAR KHANTAPADA GIRLS SCHOOL1 |
Roof laid |
-
latitude : 21.3387916
Longitude : 86.7581161
file name : Image_09032022092553264.png
|
2022-03-09 09:25:53.335552 |
45 |
49501271 |
CONSTRUCTION OF PINDI NEAR BHAGABATPUR HARIHAT HOUSE |
100000 |
CONSTRUCTION OF PINDI NEAR BHAGABATPUR HARIHAT HOUSE1 |
Roof laid |
-
latitude : 21.3387914
Longitude : 86.7581228
file name : Image_09032022153414845.png
|
2022-03-09 15:34:14.905196 |
46 |
49501392 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO PMGSY ROAD VILL-SANKHUA |
200000 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO PMGSY ROAD VILL-SANKHUA1 |
Roof laid |
-
latitude : 21.33881641,21.33881641
Longitude : 86.75815434,86.75815434
file name : Image_09032022153248060.png
|
2022-03-09 15:32:48.133939 |
47 |
49501918 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO RAILWAY SIMA,VILL-NAICHHANAPUR |
100000 |
CONSTRUCTION OF CC ROAD INCOMPLETE CC ROAD TO RAILWAY SIMA,VILL-NAICHHANAPUR1 |
Roof laid |
-
latitude : 21.3387891,21.3387891
Longitude : 86.7581259,86.7581259
file name : Image_09032022154403438.png
|
2022-03-09 15:44:03.502539 |
48 |
45342587 |
CONST. OF DRAIN FROM HARIHAR SETHI HOUSE TO SOMANATH BEHERA HOUSE |
250000 |
CONST. OF DRAIN FROM HARIHAR SETHI HOUSE TO SOMANATH BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.33878793,21.33878793
Longitude : 86.758046,86.758046
file name : Image_09032022154407856.png
|
2022-03-09 15:44:07.922179 |
49 |
55919892 |
KHANTAPADA CONST OF COMPOUND WALL KHANTAPADA HIGH SCHOLL EAST SIDE |
200000 |
KHANTAPADA CONST OF COMPOUND WALL KHANTAPADA HIGH SCHOLL EAST SIDE1 |
Roof laid |
-
latitude : 21.3387896
Longitude : 86.7581278
file name : Image_09032022154533249.png
|
2022-03-09 15:45:33.314124 |
50 |
49500186 |
CONSTRUCTION OF GUARDWALL RD ROAD TO SHAKTIDHAR HOUSE VILLAGE GADABHANG-II |
200000 |
CONSTRUCTION OF GUARDWALL RD ROAD TO SHAKTIDHAR HOUSE VILLAGE GADABHANG-II1 |
Roof laid |
-
latitude : 21.3387918
Longitude : 86.7581184
file name : Image_09032022205202759.png
|
2022-03-09 20:52:02.833369 |
51 |
55926550 |
GADABHANG NO 1 IMP OF GADABHANG 1 VILLAGE ROAD |
25000 |
GADABHANG NO 1 IMP OF GADABHANG 1 VILLAGE ROAD1 |
Roof laid |
-
latitude : 21.3387917,21.3387917
Longitude : 86.7581174,86.7581174
file name : Image_09032022204702427.png
|
2022-03-09 20:47:02.508121 |
52 |
55926587 |
PROVISION HUME PIPE IN KHANTAPADA GP |
44000 |
PROVISION HUME PIPE IN KHANTAPADA GP1 |
Roof laid |
-
latitude : 21.3387906,21.3387906
Longitude : 86.7581147,86.7581147
file name : Image_09032022204320044.png
|
2022-03-09 20:43:20.113897 |
53 |
49501873 |
DITCH FILLING AND HUME PIPE PWD ROAD TO JHALAMAL SINGH AND MAHENDRA HOUSE NAICHHANAPUR |
70000 |
DITCH FILLING AND HUME PIPE PWD ROAD TO JHALAMAL SINGH AND MAHENDRA HOUSE NAICHHANAPUR1 |
Roof laid |
-
latitude : 21.3387924,21.3387924
Longitude : 86.7581073,86.7581073
file name : Image_09032022205459418.png
|
2022-03-09 20:54:59.491326 |
54 |
49502655 |
IMPROVEMENT OF MORRUM RAIM VILL-NIHARI SAHI |
70000 |
IMPROVEMENT OF MORRUM RAIM VILL-NIHARI SAHI1 |
Roof laid |
-
latitude : 21.3387929,21.3387929
Longitude : 86.7581268,86.7581268
file name : Image_09032022205718127.png
|
2022-03-09 20:57:18.205371 |
55 |
49500393 |
REPAIR OF PWS PROJECTS |
80426 |
REPAIR OF PWS PROJECTS1 |
Roof laid |
-
latitude : 21.33868,21.338673333333336
Longitude : 86.75797499999999,86.75809666666667
file name : Image_22092022142049961.png
|
2022-09-22 14:20:50.126372 |
56 |
49500393 |
REPAIR OF PWS PROJECTS |
80426 |
REPAIR OF PWS PROJECTS1 |
Roof laid |
-
latitude : 21.3387922,21.3387922
Longitude : 86.758125,86.758125
file name : Image_09032022210248191.png
|
2022-03-09 21:02:48.23718 |
57 |
49501191 |
IMPROVEMENT OF ROAD (MORRUM) TALAPOKHARI,VILL-CHITAPADA |
60000 |
IMPROVEMENT OF ROAD (MORRUM) TALAPOKHARI,VILL-CHITAPADA1 |
Roof laid |
-
latitude : 21.338924,21.338924
Longitude : 86.75807343,86.75807343
file name : Image_09032022210537623.png
|
2022-03-09 21:05:37.674835 |
58 |
62889737 |
Energy charges of PWS Projects and street light |
300000 |
Energy charges of PWS Projects and street light1 |
Roof laid |
-
latitude : 21.338703333333335,21.3393062
Longitude : 86.75797333333334,86.7583603
file name : Image_22092022142315779.png
|
2022-09-22 14:23:15.953824 |
59 |
62889771 |
Honorarium of SEM and Pump Driver |
168000 |
Honorarium of SEM and Pump Driver1 |
Roof laid |
-
latitude : 21.3389561
Longitude : 86.7581644
file name : Image_29092022181401387.png
|
2022-09-29 18:14:01.531807 |
60 |
56646541 |
SBM PHASE 2 WORK |
71142 |
SBM PHASE 2 WORK1 |
Roof laid |
-
latitude : 21.33882833333333
Longitude : 86.75814666666665
file name : Image_29092022181551054.png
|
2022-09-29 18:15:51.278664 |
61 |
45343085 |
SUTHANG-CONST OF CRC NEAR PANCHANAN DAS HOUSE |
250000 |
SUTHANG-CONST OF CRC NEAR PANCHANAN DAS HOUSE1 |
Roof laid |
-
latitude : 21.409768333333332
Longitude : 86.80792500000001
file name : Image_22112022145553482.png
|
2022-11-22 14:55:54.037071 |
62 |
55920102 |
BHAGABATPUR SINKING OF NEW 1 NO OF TUBE WELL NEAR BHAGABATPUR SIBA MANDIR |
34000 |
BHAGABATPUR SINKING OF NEW 1 NO OF TUBE WELL NEAR BHAGABATPUR SIBA MANDIR1 |
Roof laid |
-
latitude : 21.3388122
Longitude : 86.7581258
file name : Image_18122021160940921.png
|
2021-12-18 16:09:40.98635 |
63 |
63407310 |
Water supply, Sanitation and Colouring Mission Shakti Ghar at Khantapada (Untied) |
50000 |
Water supply, Sanitation and Colouring Mission Shakti Ghar at Khantapada (Untied)1 |
Roof laid |
-
latitude : 21.40143666666667
Longitude : 86.80325333333333
file name : Image_19012023122008840.png
|
2023-01-19 12:20:08.959829 |
64 |
62889884 |
Toilet complex for 5T School, Khantapada High School |
300000 |
Toilet complex for 5T School, Khantapada High School1 |
Roof laid |
-
latitude : 21.39869666666667
Longitude : 86.81134333333333
file name : Image_30122022110938076.png
|
2022-12-30 11:09:38.170067 |
65 |
66394519 |
Construction of Community Sanitary Complex |
200341 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 21.404235000000003
Longitude : 86.80799333333334
file name : Image_30122022141458128.png
|
2022-12-30 14:14:58.257298 |
66 |
66394536 |
Construction of drinking water cum sanitation complex at Khantapada Girls high school vill Suthang |
299659 |
Construction of drinking water cum sanitation complex at Khantapada Girls high school vill Suthang1 |
Roof laid |
-
latitude : 21.404239999999998
Longitude : 86.808005
file name : Image_30122022140801257.png
|
2022-12-30 14:08:01.370916 |
67 |
63407378 |
Drinking water and Sanitation of 5T School Khantapada High School (Tied) |
259283 |
Drinking water and Sanitation of 5T School Khantapada High School (Tied)1 |
Roof laid |
-
latitude : 21.39853833333333
Longitude : 86.81108333333334
file name : Image_04022023114519815.png
|
2023-02-04 11:45:19.891102 |
68 |
63407239 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied) |
140717 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied)1 |
Roof laid |
-
latitude : 21.39855166666667
Longitude : 86.81109
file name : Image_27032023173353765.png
|
2023-03-27 17:33:53.861443 |
69 |
63407239 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied) |
140717 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied)1 |
Roof laid |
-
latitude : 21.398511666666664
Longitude : 86.81108666666665
file name : Image_27032023173330987.png
|
2023-03-27 17:33:31.086209 |
70 |
63407239 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied) |
140717 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied)1 |
Roof laid |
-
latitude : 21.39864166666667
Longitude : 86.81121999999999
file name : Image_03022023173634241.png
|
2023-02-03 17:36:34.347507 |
71 |
63407239 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied) |
140717 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied)1 |
Roof laid |
-
latitude : 21.39867333333333
Longitude : 86.81126166666667
file name : Image_03022023173703052.png
|
2023-02-03 17:37:03.16095 |
72 |
63407239 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied) |
140717 |
Drinking water and Sanitation of 5T School Khantapada High School (Untied)1 |
Roof laid |
-
latitude : 21.398546666666668
Longitude : 86.81113333333333
file name : Image_04022023114628089.png
|
2023-02-04 11:46:28.172181 |
73 |
62889786 |
Repair and maintenance and PWS project |
120341 |
Repair and maintenance and PWS project1 |
Roof laid |
-
latitude : 21.452966666666665
Longitude : 86.86441166666667
file name : Image_31052023153306396.png
|
2023-05-31 15:33:06.504974 |
74 |
62889786 |
Repair and maintenance and PWS project |
120341 |
Repair and maintenance and PWS project1 |
Roof laid |
-
latitude : 21.4016896
Longitude : 86.8042709
file name : Image_28032023112931251.png
|
2023-03-28 11:29:31.40755 |
75 |
67383281 |
Operation & maintenance of community sanitary complex |
50000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 21.3388332
Longitude : 86.758126
file name : Image_27032023173549814.png
|
2023-03-27 17:35:49.921034 |
76 |
62890096 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim |
300000 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim1 |
Roof laid |
-
latitude : 21.338880000000003,21.338880000000003
Longitude : 86.75825166666667,86.75825166666667
file name : Image_10042023165232144.png
|
2023-04-10 16:52:32.256777 |
77 |
62890096 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim |
300000 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim1 |
Roof laid |
-
latitude : 21.407945,21.407958333333333
Longitude : 86.80033833333333,86.80032000000001
file name : Image_10042023165236372.png
|
2023-04-10 16:52:36.486052 |
78 |
62890096 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim |
300000 |
Construction of Road Parida Pokhari incomplete CC Road to Sanjay Rout House vill-Raim1 |
Roof laid |
-
latitude : 21.407945,21.407958333333333
Longitude : 86.80033833333333,86.80032000000001
file name : Image_10042023165246481.png
|
2023-04-10 16:52:46.585193 |
79 |
66394482 |
Operation & maintenance of drinking water supply system |
40000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3388147
Longitude : 86.7581074
file name : Image_29042023103124899.png
|
2023-04-29 10:31:25.084159 |
80 |
62890034 |
Renovation and New Construction of Pakka Ghata near Mill Adibasi Sahi Vill- Khantapada |
200000 |
Renovation and New Construction of Pakka Ghata near Mill Adibasi Sahi Vill- Khantapada1 |
Completion of work |
-
latitude : 21.39872833333333
Longitude : 86.806495
file name : Image_14082023101645278.png
|
2023-08-14 10:16:45.407769 |
81 |
62889829 |
Provision of incentive/ Purchase of Accessories Consumeable for Priasoft/ Plan plus Action soft /Nat |
12000 |
Provision of incentive/ Purchase of Accessories Consumeable for Priasoft/ Plan plus Action soft /Nat1 |
Completion of work |
-
latitude : 21.3388198
Longitude : 86.758088
file name : Image_17082023130829997.png
|
2023-08-17 13:08:30.125143 |
82 |
80694082 |
Operation and Maintenance of drinking water supply system |
540043 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3388505,21.3388232
Longitude : 86.7580502,86.7580686
file name : Image_07102023172800185.png
|
2023-10-07 17:28:00.340955 |
83 |
80694082 |
Operation and Maintenance of drinking water supply system |
540043 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.3388402,21.3388402
Longitude : 86.7580608,86.7580608
file name : Image_07102023172455089.png
|
2023-10-07 17:24:55.18305 |
84 |
80694082 |
Operation and Maintenance of drinking water supply system |
540043 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3388601,21.3388129
Longitude : 86.758075,86.7580581
file name : Image_06102023132134021.png
|
2023-10-06 13:21:34.178423 |
85 |
67383266 |
Creation of community compost pits for a group of Households |
150000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.489403333333332
Longitude : 86.91270333333333
file name : Image_26092023164452855.png
|
2023-09-26 16:44:52.984555 |
86 |
66394542 |
Completion of Gadabhang IV Primary School |
234141 |
Completion of Gadabhang IV Primary School1 |
Completion of work |
-
latitude : 21.422796666666667
Longitude : 86.81420166666666
file name : Image_08112023162129065.png
|
2023-11-08 16:21:29.854306 |
87 |
66394542 |
Completion of Gadabhang IV Primary School |
234141 |
Completion of Gadabhang IV Primary School1 |
Completion of work |
-
latitude : 21.422693333333335
Longitude : 86.81418333333335
file name : Image_08112023161817511.png
|
2023-11-08 16:18:17.70892 |
88 |
62890001 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan |
400000 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan1 |
Completion of work |
-
latitude : 21.424388333333333
Longitude : 86.79366833333333
file name : Image_08112023150601434.png
|
2023-11-08 15:06:01.549612 |
89 |
62890001 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan |
400000 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan1 |
Completion of work |
-
latitude : 21.424388333333333
Longitude : 86.79366833333333
file name : Image_08112023150555694.png
|
2023-11-08 15:05:55.917279 |
90 |
62890001 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan |
400000 |
Construction of New Building At- Annada Prasad Nodal School Vill- Padagan1 |
Completion of work |
-
latitude : 21.424438333333335
Longitude : 86.79362833333334
file name : Image_08112023150549822.png
|
2023-11-08 15:05:50.068917 |
91 |
87414198 |
Development work for Suthang High School Suthang |
70000 |
Development work for Suthang High School Suthang1 |
Completion of work |
-
latitude : 21.404766666666667
Longitude : 86.80827166666668
file name : Image_13022024153220761.png
|
2024-02-13 15:32:20.875555 |
92 |
87414134 |
Operation & maintenance of community sanitary complex |
30000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.3388159
Longitude : 86.7581121
file name : Image_16022024160121250.png
|
2024-02-16 16:01:21.354403 |
93 |
87414183 |
Development work for Suthang High School Suthang |
140717 |
Development work for Suthang High School Suthang1 |
Completion of work |
-
latitude : 21.402399
Longitude : 86.8061107
file name : Image_16022024151031607.png
|
2024-02-16 15:10:31.709133 |
94 |
87414183 |
Development work for Suthang High School Suthang |
140717 |
Development work for Suthang High School Suthang1 |
Completion of work |
-
latitude : 21.402399
Longitude : 86.8061107
file name : Image_13022024153551508.png
|
2024-02-13 15:35:51.641773 |
95 |
87414183 |
Development work for Suthang High School Suthang |
140717 |
Development work for Suthang High School Suthang1 |
Completion of work |
-
latitude : 21.40483166666667
Longitude : 86.80831000000002
file name : Image_13022024153450888.png
|
2024-02-13 15:34:51.057039 |
96 |
62890113 |
Construction of Drain Khantapada Mahadev Mandir to Surendra Mohanty Hous vill- Khantapada |
186000 |
Construction of Drain Khantapada Mahadev Mandir to Surendra Mohanty Hous vill- Khantapada1 |
Completion of work |
-
latitude : 21.3388087
Longitude : 86.758107
file name : Image_16022024151217424.png
|
2024-02-16 15:12:17.524341 |
97 |
80533253 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.3388127,21.3387991
Longitude : 86.7580864,86.7580797
file name : Image_16052024112803762.png
|
2024-05-16 11:28:03.848183 |
98 |
80533253 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.3388032,21.3388032,21.3388122
Longitude : 86.7580829,86.7580829,86.7580891
file name : Image_16052024112410461.png
|
2024-05-16 11:24:10.56021 |
99 |
80533253 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3388085,21.3388201
Longitude : 86.7580871,86.7580943
file name : Image_16052024112113165.png
|
2024-05-16 11:21:13.264042 |
100 |
80694460 |
Operation and Maintenance of drinking water supply system |
98000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3388271,21.3388146
Longitude : 86.7581138,86.7581091
file name : Image_14032024172725224.png
|
2024-03-14 17:27:25.307844 |
101 |
80694460 |
Operation and Maintenance of drinking water supply system |
98000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.3388321,21.3388137
Longitude : 86.7581101,86.7581121
file name : Image_14032024172449610.png
|
2024-03-14 17:24:49.6943 |
102 |
80694460 |
Operation and Maintenance of drinking water supply system |
98000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3388135,21.3388135
Longitude : 86.7581124,86.7581084
file name : Image_14032024172136462.png
|
2024-03-14 17:21:36.548072 |
103 |
80532195 |
Construction of roads |
244058 |
Construction of roads1 |
Roof laid |
-
latitude : 21.3388126,21.3387988,21.3387988
Longitude : 86.7581058,86.7580957,86.7580957
file name : Image_22032024103248101.png
|
2024-03-22 10:32:48.212616 |
104 |
80532195 |
Construction of roads |
244058 |
Construction of roads1 |
Plinth level |
-
latitude : 21.3388155,21.3388122
Longitude : 86.7581076,86.7580471
file name : Image_22032024102934061.png
|
2024-03-22 10:29:34.158321 |
105 |
80532195 |
Construction of roads |
244058 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3388138,21.3388138
Longitude : 86.7581114,86.7581114
file name : Image_22032024102714039.png
|
2024-03-22 10:27:14.125284 |
106 |
80532516 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.3388201,21.3388201
Longitude : 86.7581131,86.7581131
file name : Image_19092024173602425.png
|
2024-09-19 17:36:02.507216 |
107 |
80532516 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3388216,21.40811242
Longitude : 86.7581121,86.80048595
file name : Image_19092024173405837.png
|
2024-09-19 17:34:05.904113 |
108 |
80532516 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3388215,21.3388215
Longitude : 86.7581041,86.7581041
file name : Image_19092024173402019.png
|
2024-09-19 17:34:02.079048 |
109 |
101103554 |
Operation and Maintenance of drinking/piped water supply system |
675174 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 21.33925805,21.3388109
Longitude : 86.75797445,86.7581122
file name : Image_27092024102212530.png
|
2024-09-27 10:22:12.599958 |
110 |
101103554 |
Operation and Maintenance of drinking/piped water supply system |
675174 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.3388072,21.3388105
Longitude : 86.7581098,86.758112
file name : Image_27092024102028025.png
|
2024-09-27 10:20:28.08739 |
111 |
80697399 |
Purchase of equipment (including safety equipment) for waste management |
27363 |
Purchase of equipment (including safety equipment) for waste management1 |
Roof laid |
-
latitude : 21.3388092
Longitude : 86.7580984
file name : Image_18072024160223299.png
|
2024-07-18 16:02:23.38833 |
112 |
80697399 |
Purchase of equipment (including safety equipment) for waste management |
27363 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 21.3388077
Longitude : 86.7580909
file name : Image_18072024154833761.png
|
2024-07-18 15:48:33.841505 |
113 |
80697399 |
Purchase of equipment (including safety equipment) for waste management |
27363 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 21.3388091
Longitude : 86.7580805
file name : Image_18072024154044461.png
|
2024-07-18 15:40:44.605171 |
114 |
80697147 |
Services of Collection & transportation of waste from household to treatment site |
35000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 21.33883
Longitude : 86.7580927
file name : Image_18072024160148320.png
|
2024-07-18 16:01:48.39826 |
115 |
80697147 |
Services of Collection & transportation of waste from household to treatment site |
35000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 21.3388166
Longitude : 86.7580925
file name : Image_18072024154959695.png
|
2024-07-18 15:49:59.770784 |
116 |
80697147 |
Services of Collection & transportation of waste from household to treatment site |
35000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.3388239
Longitude : 86.7580644
file name : Image_18072024153934922.png
|
2024-07-18 15:39:35.057237 |
117 |
80696798 |
Services of Collection & transportation of waste from household to treatment site |
41920 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 21.338823
Longitude : 86.7581019
file name : Image_18072024160449084.png
|
2024-07-18 16:04:49.166563 |
118 |
80696798 |
Services of Collection & transportation of waste from household to treatment site |
41920 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 21.3387284
Longitude : 86.75810734
file name : Image_18072024160251971.png
|
2024-07-18 16:02:52.062725 |
119 |
80696798 |
Services of Collection & transportation of waste from household to treatment site |
41920 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.3388233
Longitude : 86.7581017
file name : Image_18072024154915521.png
|
2024-07-18 15:49:15.60458 |
120 |
80696798 |
Services of Collection & transportation of waste from household to treatment site |
41920 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.33873289
Longitude : 86.75812883
file name : Image_18072024154254629.png
|
2024-07-18 15:42:54.756776 |
121 |
80696096 |
Services of Collection & transportation of waste from household to treatment site |
125760 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 21.3388225
Longitude : 86.758099
file name : Image_18072024160023613.png
|
2024-07-18 16:00:23.690636 |
122 |
80696096 |
Services of Collection & transportation of waste from household to treatment site |
125760 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 21.3388233
Longitude : 86.758102
file name : Image_18072024155146840.png
|
2024-07-18 15:51:46.992342 |
123 |
80696096 |
Services of Collection & transportation of waste from household to treatment site |
125760 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.3388161
Longitude : 86.7580955
file name : Image_18072024154508284.png
|
2024-07-18 15:45:08.369037 |
124 |
80534973 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
Roof laid |
-
latitude : 21.3388316
Longitude : 86.7580857
file name : Image_18072024160110097.png
|
2024-07-18 16:01:10.180974 |
125 |
80534973 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
Plinth level |
-
latitude : 21.3388182
Longitude : 86.7580685
file name : Image_18072024155054107.png
|
2024-07-18 15:50:54.187932 |
126 |
80534973 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
Completion of work |
-
latitude : 21.3388116
Longitude : 86.7580659
file name : Image_18072024152254320.png
|
2024-07-18 15:22:54.419977 |