1 |
44210869 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI |
150000 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI 1 |
Completion of work |
-
latitude : 21.4420403,21.44166551
Longitude : 86.90402567,86.90397127
file name : Image_07112020065200048.png
|
2020-11-07 06:52:01.963176 |
2 |
44210869 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI |
150000 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI 1 |
Completion of work |
-
latitude : 21.44205394,21.44205455
Longitude : 86.90401047,86.90402822
file name : Image_07112020065204969.png
|
2020-11-07 06:52:06.872306 |
3 |
44210869 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI |
150000 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI 1 |
Completion of work |
-
latitude : 21.4420403,21.44166551
Longitude : 86.90402567,86.90397127
file name : Image_07112020065210190.png
|
2020-11-07 06:52:12.095194 |
4 |
44210869 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI |
150000 |
CONSTRUCTION OF CC ROAD FROM RD ROAD TO ADIBASI SAHI 1 |
Completion of work |
-
latitude : 21.44205394,21.44205455
Longitude : 86.90401047,86.90402822
file name : Image_07112020065217377.png
|
2020-11-07 06:52:19.281175 |
5 |
44206571 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR DURGA MANDAP |
15000 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR DURGA MANDAP1 |
Completion of work |
-
latitude : 21.4429035
Longitude : 86.89327401
file name : Image_27102020170257520.png
|
2020-10-27 17:03:04.357578 |
6 |
44206571 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR DURGA MANDAP |
15000 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR DURGA MANDAP1 |
Completion of work |
-
latitude : 21.44291142
Longitude : 86.89329005
file name : Image_27102020170319923.png
|
2020-10-27 17:03:26.761733 |
7 |
52680990 |
CONST OF CC DRAIN FROM SAHADEVKHUNTA CHHAKA TO BHABANI SANKAR PANIGRAHI HOUSE WITH CULVERT AT JAMBES |
100000 |
CONST OF CC DRAIN FROM SAHADEVKHUNTA CHHAKA TO BHABANI SANKAR PANIGRAHI HOUSE WITH CULVERT AT JAMBES1 |
Completion of work |
-
latitude : 21.43058114,21.43057444
Longitude : 86.88081069,86.88080732
file name : Image_08102021160201450.png
|
2021-10-08 16:02:01.560779 |
8 |
32403578 |
CONSTRUCTION OF CREMATORIUM AT GENGUTI SMASAN PADA AT-GENGUTI |
200000 |
CONSTRUCTION OF CREMATORIUM AT GENGUTI SMASAN PADA AT-GENGUTI1 |
Commenced |
-
latitude : 21.43206012
Longitude : 86.89605419
file name : Image_17102020155031428.png
|
2020-10-17 15:50:31.532523 |
9 |
32403578 |
CONSTRUCTION OF CREMATORIUM AT GENGUTI SMASAN PADA AT-GENGUTI |
200000 |
CONSTRUCTION OF CREMATORIUM AT GENGUTI SMASAN PADA AT-GENGUTI1 |
Commenced |
-
latitude : 21.43216877
Longitude : 86.89595278
file name : Image_17102020155035363.png
|
2020-10-17 15:50:35.465307 |
10 |
32402759 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR DHIRENDRA PARIDA HOUSE AT-PAKHARSAUN |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR DHIRENDRA PARIDA HOUSE AT-PAKHARSAUN1 |
Commenced |
-
latitude : 21.44224559
Longitude : 86.89870251
file name : Image_21102020200101565.png
|
2020-10-21 20:01:05.342571 |
11 |
32402759 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR DHIRENDRA PARIDA HOUSE AT-PAKHARSAUN |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR DHIRENDRA PARIDA HOUSE AT-PAKHARSAUN1 |
Commenced |
-
latitude : 21.44225644
Longitude : 86.89867298
file name : Image_21102020200124038.png
|
2020-10-21 20:01:27.788633 |
12 |
32402735 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR ASTIA POKHARI AT-KANTABANIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR ASTIA POKHARI AT-KANTABANIA1 |
Commenced |
-
latitude : 21.42814438
Longitude : 86.90366286
file name : Image_17102020132611287.png
|
2020-10-17 13:26:11.374158 |
13 |
32402735 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR ASTIA POKHARI AT-KANTABANIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR ASTIA POKHARI AT-KANTABANIA1 |
Commenced |
-
latitude : 21.4281462
Longitude : 86.90369205
file name : Image_17102020132655535.png
|
2020-10-17 13:26:55.629264 |
14 |
32402711 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR UPENDRA KHANDA HOUSE AT-KANTABANIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR UPENDRA KHANDA HOUSE AT-KANTABANIA1 |
Commenced |
-
latitude : 21.42692259
Longitude : 86.90222982
file name : Image_17102020132401914.png
|
2020-10-17 13:24:02.002051 |
15 |
32402711 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR UPENDRA KHANDA HOUSE AT-KANTABANIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR UPENDRA KHANDA HOUSE AT-KANTABANIA1 |
Commenced |
-
latitude : 21.42691354
Longitude : 86.90222092
file name : Image_17102020132513193.png
|
2020-10-17 13:25:13.285792 |
16 |
32402687 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR BABAJI SING HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR BABAJI SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.42882309
Longitude : 86.89741741
file name : Image_17102020132814067.png
|
2020-10-17 13:28:14.157995 |
17 |
32402687 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR BABAJI SING HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR BABAJI SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.42884339
Longitude : 86.89744133
file name : Image_17102020132910060.png
|
2020-10-17 13:29:10.154126 |
18 |
32402660 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR SHYAM SING HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR SHYAM SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.42929042
Longitude : 86.89607678
file name : Image_17102020155004667.png
|
2020-10-17 15:50:04.770093 |
19 |
32402660 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR SHYAM SING HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR SHYAM SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.42929784
Longitude : 86.89608946
file name : Image_17102020155011260.png
|
2020-10-17 15:50:11.363607 |
20 |
32400984 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI1 |
Commenced |
-
latitude : 21.43053644
Longitude : 86.8969224
file name : Image_17102020155015369.png
|
2020-10-17 15:50:15.475808 |
21 |
32400984 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI1 |
Commenced |
-
latitude : 21.43052608
Longitude : 86.89697311
file name : Image_17102020155019233.png
|
2020-10-17 15:50:19.333067 |
22 |
32400984 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI1 |
Commenced |
-
latitude : 21.43053644
Longitude : 86.8969224
file name : Image_17102020155237907.png
|
2020-10-17 15:52:38.014997 |
23 |
32400984 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR ADIVASI SAHI AWC AT-GENGUTI1 |
Commenced |
-
latitude : 21.43052608
Longitude : 86.89697311
file name : Image_17102020155302123.png
|
2020-10-17 15:53:02.223937 |
24 |
32400947 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.43212027
Longitude : 86.89969279
file name : Image_17102020155023366.png
|
2020-10-17 15:50:23.472213 |
25 |
32400947 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.43211048
Longitude : 86.89967211
file name : Image_17102020155027758.png
|
2020-10-17 15:50:27.866382 |
26 |
32400947 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR BHARAT MAHANTY HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.43212027
Longitude : 86.89969279
file name : Image_17102020155311167.png
|
2020-10-17 15:53:11.30573 |
27 |
38062938 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR |
15000 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR1 |
Commenced |
-
latitude : 21.43951165
Longitude : 86.88865718
file name : Image_21102020195954561.png
|
2020-10-21 19:59:58.303891 |
28 |
38062938 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR |
15000 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR1 |
Commenced |
-
latitude : 21.43945932
Longitude : 86.88862671
file name : Image_21102020195959869.png
|
2020-10-21 20:00:03.614276 |
29 |
38062938 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR |
15000 |
CONSTRUCTION OF TUBEWELL PLATFORM NEAR HANUMAN TEMPLE AT-PALASPUR1 |
Commenced |
-
latitude : 21.43945932
Longitude : 86.88862671
file name : Image_21102020200129018.png
|
2020-10-21 20:01:32.755598 |
30 |
32400898 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.42915313
Longitude : 86.88201722
file name : Image_21102020200032236.png
|
2020-10-21 20:00:35.980938 |
31 |
32400898 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.4291654
Longitude : 86.88202414
file name : Image_21102020200053941.png
|
2020-10-21 20:00:57.689985 |
32 |
32400898 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR HARISABHA HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.42915313
Longitude : 86.88201722
file name : Image_21102020200142600.png
|
2020-10-21 20:01:46.376347 |
33 |
32400883 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.43337846
Longitude : 86.88166257
file name : Image_21102020200021053.png
|
2020-10-21 20:00:24.842019 |
34 |
32400883 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.43338136
Longitude : 86.88166557
file name : Image_21102020200027490.png
|
2020-10-21 20:00:31.230895 |
35 |
32400883 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.43337846
Longitude : 86.88166257
file name : Image_21102020200133852.png
|
2020-10-21 20:01:37.59052 |
36 |
32400883 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR UPENDRA DAS HOUSE AT-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.43338136
Longitude : 86.88166557
file name : Image_21102020200138110.png
|
2020-10-21 20:01:41.855537 |
37 |
44206428 |
CONSTRUCTION OF CC DRAIN FROM HARIHAT CHHAK TO SCHOOL CHHAK |
100000 |
CONSTRUCTION OF CC DRAIN FROM HARIHAT CHHAK TO SCHOOL CHHAK1 |
Completion of work |
-
latitude : 21.42787807,21.42775535,21.42776023
Longitude : 86.88168773,86.88194587,86.88191289
file name : Image_17102020155121967.png
|
2020-10-17 15:51:22.070881 |
38 |
44206428 |
CONSTRUCTION OF CC DRAIN FROM HARIHAT CHHAK TO SCHOOL CHHAK |
100000 |
CONSTRUCTION OF CC DRAIN FROM HARIHAT CHHAK TO SCHOOL CHHAK1 |
Completion of work |
-
latitude : 21.42787926,21.42787984
Longitude : 86.88166755,86.88166788
file name : Image_17102020155126071.png
|
2020-10-17 15:51:26.177054 |
39 |
44210844 |
CONSTRUCTION OF CC ROAD FROM PRASANA ACHARJYA HOUSE TO BALABHADAR CHHAK |
200000 |
CONSTRUCTION OF CC ROAD FROM PRASANA ACHARJYA HOUSE TO BALABHADAR CHHAK1 |
Completion of work |
-
latitude : 21.43135782,21.43190107
Longitude : 86.88335368,86.88341641
file name : Image_17102020155039818.png
|
2020-10-17 15:50:39.92512 |
40 |
44210844 |
CONSTRUCTION OF CC ROAD FROM PRASANA ACHARJYA HOUSE TO BALABHADAR CHHAK |
200000 |
CONSTRUCTION OF CC ROAD FROM PRASANA ACHARJYA HOUSE TO BALABHADAR CHHAK1 |
Completion of work |
-
latitude : 21.43161326,21.43182226
Longitude : 86.8833797,86.88336605
file name : Image_17102020155101676.png
|
2020-10-17 15:51:01.776654 |
41 |
21143180 |
MAINTENANCE OF ROAD FROM BARINGIA GUDI POKHARI TO PABITRAPUR. |
50000 |
MAINTENANCE OF ROAD FROM BARINGIA GUDI POKHARI TO PABITRAPUR.1 |
Commenced |
-
latitude : 21.45433931,21.45434017,21.45434037
Longitude : 86.90659938,86.90659189,86.90658571
file name : Image_17102020155130282.png
|
2020-10-17 15:51:30.409777 |
42 |
21143180 |
MAINTENANCE OF ROAD FROM BARINGIA GUDI POKHARI TO PABITRAPUR. |
50000 |
MAINTENANCE OF ROAD FROM BARINGIA GUDI POKHARI TO PABITRAPUR.1 |
Commenced |
-
latitude : 21.45432134,21.4543152
Longitude : 86.90660557,86.90658173
file name : Image_17102020155200917.png
|
2020-10-17 15:52:00.741186 |
43 |
44206554 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR ADIBASI SAHI |
15000 |
CONSTRUCTION OF TUBE WELL PLATFORM NEAR ADIBASI SAHI 1 |
Completion of work |
-
latitude : 21.4414897
Longitude : 86.90408218
file name : Image_08032022091203078.png
|
2022-03-08 09:12:03.180827 |
44 |
32400919 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR SURENDRA DALEI HOUSE AT-PALASPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR SURENDRA DALEI HOUSE AT-PALASPUR1 |
Commenced |
-
latitude : 21.43934544
Longitude : 86.88449711
file name : Image_27102020170343589.png
|
2020-10-27 17:03:50.441916 |
45 |
32400919 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR SURENDRA DALEI HOUSE AT-PALASPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR SURENDRA DALEI HOUSE AT-PALASPUR1 |
Commenced |
-
latitude : 21.43933433
Longitude : 86.88445878
file name : Image_27102020170359900.png
|
2020-10-27 17:04:06.746188 |
46 |
32403628 |
CONSTRUCTION OF CREMATORIUM AT JUDHISTIRPUR SMASAN PADA AT-JUDHISTIRAPUR |
200000 |
CONSTRUCTION OF CREMATORIUM AT JUDHISTIRPUR SMASAN PADA AT-JUDHISTIRAPUR1 |
Commenced |
-
latitude : 21.467278333333336
Longitude : 86.91453333333332
file name : Image_04022021105740191.png
|
2021-02-04 10:57:40.314188 |
47 |
32403628 |
CONSTRUCTION OF CREMATORIUM AT JUDHISTIRPUR SMASAN PADA AT-JUDHISTIRAPUR |
200000 |
CONSTRUCTION OF CREMATORIUM AT JUDHISTIRPUR SMASAN PADA AT-JUDHISTIRAPUR1 |
Commenced |
-
latitude : 21.46729833333333
Longitude : 86.91443666666667
file name : Image_04022021105744522.png
|
2021-02-04 10:57:44.632388 |
48 |
44206625 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE SAMITI CC ROAD TO SULOCHANA MOHANTY HOUSE |
200000 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE SAMITI CC ROAD TO SULOCHANA MOHANTY HOUSE1 |
Completion of work |
-
latitude : 21.43107092,21.4310607
Longitude : 86.89764634,86.89767621
file name : Image_14112020134749342.png
|
2020-11-14 13:47:54.637481 |
49 |
44206625 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE SAMITI CC ROAD TO SULOCHANA MOHANTY HOUSE |
200000 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE SAMITI CC ROAD TO SULOCHANA MOHANTY HOUSE1 |
Completion of work |
-
latitude : 21.43110235,21.43109688
Longitude : 86.89795401,86.89796034
file name : Image_14112020134753519.png
|
2020-11-14 13:47:58.818794 |
50 |
21150443 |
MAINTENANCE OF ROAD NEAR ABANDHA CHHAK GENGUTI P.S. ROAD. |
50000 |
MAINTENANCE OF ROAD NEAR ABANDHA CHHAK GENGUTI P.S. ROAD.1 |
Commenced |
-
latitude : 21.43112833333333,21.431148333333333
Longitude : 86.89788166666668,86.89788166666668
file name : Image_24112020150853782.png
|
2020-11-24 15:08:53.881075 |
51 |
21150443 |
MAINTENANCE OF ROAD NEAR ABANDHA CHHAK GENGUTI P.S. ROAD. |
50000 |
MAINTENANCE OF ROAD NEAR ABANDHA CHHAK GENGUTI P.S. ROAD.1 |
Commenced |
-
latitude : 21.431148333333333,21.43108666666667
Longitude : 86.89780666666665,86.89778999999999
file name : Image_24112020150904126.png
|
2020-11-24 15:09:04.207237 |
52 |
44206638 |
CONSTRUCTION OF CC ROAD FROM SUBRAT MOHANTY HOUSE TO BHOYA POKHARI |
200000 |
CONSTRUCTION OF CC ROAD FROM SUBRAT MOHANTY HOUSE TO BHOYA POKHARI1 |
Completion of work |
-
latitude : 21.46754333333333,21.467618333333334
Longitude : 86.91418666666665,86.9133
file name : Image_19112020112745620.png
|
2020-11-19 11:27:45.73132 |
53 |
44206638 |
CONSTRUCTION OF CC ROAD FROM SUBRAT MOHANTY HOUSE TO BHOYA POKHARI |
200000 |
CONSTRUCTION OF CC ROAD FROM SUBRAT MOHANTY HOUSE TO BHOYA POKHARI1 |
Completion of work |
-
latitude : 21.467378333333333,21.467375
Longitude : 86.91397833333333,86.91394166666666
file name : Image_19112020112749869.png
|
2020-11-19 11:27:49.967592 |
54 |
32403483 |
COMPLETION OF SLAB CULVERT AT-DANDAPADA WITH APPROACH ROAD AT-PACHHUDIA |
120000 |
COMPLETION OF SLAB CULVERT AT-DANDAPADA WITH APPROACH ROAD AT-PACHHUDIA1 |
Commenced |
-
latitude : 21.46580833333333,21.46580833333333
Longitude : 86.90601666666667,86.90601666666667
file name : Image_04022021105727535.png
|
2021-02-04 10:57:27.649607 |
55 |
32403483 |
COMPLETION OF SLAB CULVERT AT-DANDAPADA WITH APPROACH ROAD AT-PACHHUDIA |
120000 |
COMPLETION OF SLAB CULVERT AT-DANDAPADA WITH APPROACH ROAD AT-PACHHUDIA1 |
Commenced |
-
latitude : 21.465838333333334,21.46585166666667
Longitude : 86.90566500000001,86.90562166666665
file name : Image_04022021105723790.png
|
2021-02-04 10:57:23.913352 |
56 |
32403606 |
CONSTRUCTION OF CREMATORIUM AT SANASAUN SMASAN PADA AT-SANASAUN |
200000 |
CONSTRUCTION OF CREMATORIUM AT SANASAUN SMASAN PADA AT-SANASAUN1 |
Commenced |
-
latitude : 21.443770000000004
Longitude : 86.904055
file name : Image_27042021101825333.png
|
2021-04-27 10:18:25.42205 |
57 |
44206938 |
COMPLETION OF NABADIGANTA COMMUNITY CENTER |
100000 |
COMPLETION OF NABADIGANTA COMMUNITY CENTER1 |
Completion of work |
-
latitude : 21.46692666666667
Longitude : 86.91327666666666
file name : Image_04022021105735147.png
|
2021-02-04 10:57:35.253383 |
58 |
44206938 |
COMPLETION OF NABADIGANTA COMMUNITY CENTER |
100000 |
COMPLETION OF NABADIGANTA COMMUNITY CENTER1 |
Completion of work |
-
latitude : 21.46695333333333
Longitude : 86.91328333333334
file name : Image_04022021105731265.png
|
2021-02-04 10:57:31.380079 |
59 |
46489706 |
PURCHASE OF ESSENTIAL FURNITURE FOR GP OFFICE CONFERENCE HALL(COFERENCE HALL TABLE-1,EXECUTIVE REVOL |
100000 |
PURCHASE OF ESSENTIAL FURNITURE FOR GP OFFICE CONFERENCE HALL(COFERENCE HALL TABLE-1,EXECUTIVE REVOL1 |
Commenced |
-
latitude : 21.439943333333336
Longitude : 86.89279
file name : Image_08052021130444145.png
|
2021-05-08 13:04:44.209119 |
60 |
46489086 |
PURCHASE OF BABY DESK,TOYS,DUSTBIN AND UTENSIL FOR JAMBESWARPUR AWC VILLAGE-JAMBESWARPUR |
50000 |
PURCHASE OF BABY DESK,TOYS,DUSTBIN AND UTENSIL FOR JAMBESWARPUR AWC VILLAGE-JAMBESWARPUR1 |
Commenced |
-
latitude : 21.431838333333335
Longitude : 86.88193833333335
file name : Image_08052021140203514.png
|
2021-05-08 14:02:03.631379 |
61 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.4396388
Longitude : 86.8928691
file name : Image_17022021162323084.png
|
2021-02-17 16:23:23.195541 |
62 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.4396381
Longitude : 86.8928676
file name : Image_17022021162332599.png
|
2021-02-17 16:23:32.698956 |
63 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.4396384
Longitude : 86.8928685
file name : Image_17022021162341718.png
|
2021-02-17 16:23:41.822093 |
64 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.439976666666666
Longitude : 86.89276
file name : Image_17022021162351586.png
|
2021-02-17 16:23:51.688468 |
65 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.4396388
Longitude : 86.8928691
file name : Image_17022021162401674.png
|
2021-02-17 16:24:01.782511 |
66 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.4396378
Longitude : 86.8928666
file name : Image_17022021162409134.png
|
2021-02-17 16:24:09.226061 |
67 |
48654479 |
IMPROVEMENT OF GP OFFICE BUILDING |
400000 |
IMPROVEMENT OF GP OFFICE BUILDING1 |
Commenced |
-
latitude : 21.439903333333337
Longitude : 86.892815
file name : Image_17022021162418021.png
|
2021-02-17 16:24:18.131175 |
68 |
44210726 |
CONSTRUCTION OF SIDDHESWAR COMMUNITY CENTER |
164032 |
CONSTRUCTION OF SIDDHESWAR COMMUNITY CENTER 1 |
Completion of work |
-
latitude : 21.441505
Longitude : 86.89164833333334
file name : Image_03042021142124361.png
|
2021-04-03 14:21:24.458688 |
69 |
44210726 |
CONSTRUCTION OF SIDDHESWAR COMMUNITY CENTER |
164032 |
CONSTRUCTION OF SIDDHESWAR COMMUNITY CENTER 1 |
Completion of work |
-
latitude : 21.441543333333335
Longitude : 86.89159999999998
file name : Image_03042021142210657.png
|
2021-04-03 14:22:10.755921 |
70 |
44210778 |
CONSTRUCTION OF HARISABHA COMMUNITY CENTER |
200000 |
CONSTRUCTION OF HARISABHA COMMUNITY CENTER 1 |
Completion of work |
-
latitude : 21.44244
Longitude : 86.89903666666666
file name : Image_03042021141734675.png
|
2021-04-03 14:17:34.773654 |
71 |
44206652 |
CONSTRUCTION OF CC ROAD FROM KUA POKHARI TO CLUB CHHAK |
200000 |
CONSTRUCTION OF CC ROAD FROM KUA POKHARI TO CLUB CHHAK 1 |
Completion of work |
-
latitude : 21.459801666666667,21.459805
Longitude : 86.911555,86.91155666666667
file name : Image_03042021140643571.png
|
2021-04-03 14:06:43.664851 |
72 |
44206413 |
CONSTRUCTION OF CC DRAIN FROM KUNA MAHANTI HOUSE TO HARIHAT CHHAK |
100000 |
CONSTRUCTION OF CC DRAIN FROM KUNA MAHANTI HOUSE TO HARIHAT CHHAK1 |
Completion of work |
-
latitude : 21.452699999999997,21.452688333333338
Longitude : 86.908475,86.90851666666667
file name : Image_03042021141106881.png
|
2021-04-03 14:11:06.978228 |
73 |
44206447 |
CONSTRUCTION OF CC DRAIN FROM INCOMPLETE CC DRAIN TO MANMATH MOHANTY HOUSE |
100000 |
CONSTRUCTION OF CC DRAIN FROM INCOMPLETE CC DRAIN TO MANMATH MOHANTY HOUSE 1 |
Completion of work |
-
latitude : 21.465988333333332,21.465988333333332
Longitude : 86.91177666666665,86.91177666666665
file name : Image_03042021135902937.png
|
2021-04-03 13:59:03.098452 |
74 |
46489555 |
CONST. OF CC ROAD FROM TALA POKHARI TO JUDHISTIRPUR SHIBA TEMPLE AT-PACHUDIA |
176064 |
CONST. OF CC ROAD FROM TALA POKHARI TO JUDHISTIRPUR SHIBA TEMPLE AT-PACHUDIA1 |
Commenced |
-
latitude : 21.462786666666663,21.462788333333332
Longitude : 86.90892166666666,86.90890333333333
file name : Image_03042021140306438.png
|
2021-04-03 14:03:06.541613 |
75 |
46489555 |
CONST. OF CC ROAD FROM TALA POKHARI TO JUDHISTIRPUR SHIBA TEMPLE AT-PACHUDIA |
176064 |
CONST. OF CC ROAD FROM TALA POKHARI TO JUDHISTIRPUR SHIBA TEMPLE AT-PACHUDIA1 |
Commenced |
-
latitude : 21.462803333333333,21.46278333333333
Longitude : 86.90889166666666,86.90888666666666
file name : Image_03042021140309715.png
|
2021-04-03 14:03:09.796807 |
76 |
44206588 |
SINKING OF NEW TUBE WELL NEAR AWC-1 |
125000 |
SINKING OF NEW TUBE WELL NEAR AWC-11 |
Completion of work |
-
latitude : 21.459138333333332
Longitude : 86.911955
file name : Image_27042021100955552.png
|
2021-04-27 10:09:55.637665 |
77 |
44206927 |
COMPLETION OF PALASPUR HARISABHA COMMUNITY CENTER |
150000 |
COMPLETION OF PALASPUR HARISABHA COMMUNITY CENTER1 |
Completion of work |
-
latitude : 21.438313333333333
Longitude : 86.88853499999999
file name : Image_08052021140721579.png
|
2021-05-08 14:07:21.704491 |
78 |
44210883 |
COMPLETION OF BASANTAPUR HARISABHA COMMUNITY CENTER |
100000 |
COMPLETION OF BASANTAPUR HARISABHA COMMUNITY CENTER1 |
Completion of work |
-
latitude : 21.427101666666665
Longitude : 86.88261833333333
file name : Image_08052021140211810.png
|
2021-05-08 14:02:11.953431 |
79 |
44206497 |
CONSTRUCTION OF CC DRAIN FROM SIBA MAHALIK HOUSE TO DEBENDRA PARIDA HOUSE |
94312 |
CONSTRUCTION OF CC DRAIN FROM SIBA MAHALIK HOUSE TO DEBENDRA PARIDA HOUSE1 |
Completion of work |
-
latitude : 21.446749999999998,21.446746666666666
Longitude : 86.89569833333334,86.89570666666665
file name : Image_08052021141816830.png
|
2021-05-08 14:18:16.956443 |
80 |
32404743 |
MAINTENANCE OF ROAD FROM BIKRAM SING HOUSE TO GUBA SING HOUSE AT-GENGUTI |
60000 |
MAINTENANCE OF ROAD FROM BIKRAM SING HOUSE TO GUBA SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.430161666666663,21.43014833333333
Longitude : 86.89618166666666,86.89617166666667
file name : Image_08052021130231623.png
|
2021-05-08 13:02:31.659765 |
81 |
32404743 |
MAINTENANCE OF ROAD FROM BIKRAM SING HOUSE TO GUBA SING HOUSE AT-GENGUTI |
60000 |
MAINTENANCE OF ROAD FROM BIKRAM SING HOUSE TO GUBA SING HOUSE AT-GENGUTI1 |
Commenced |
-
latitude : 21.43014333333333,21.430153333333337
Longitude : 86.89610833333333,86.89610333333333
file name : Image_08052021130354159.png
|
2021-05-08 13:03:54.225333 |
82 |
46488885 |
CONSTRUCTION OF CULTURAL PUCCA STAGE AT PALASHPUR SCHOOL VILLAGE-PALASPUR |
50000 |
CONSTRUCTION OF CULTURAL PUCCA STAGE AT PALASHPUR SCHOOL VILLAGE-PALASPUR1 |
Commenced |
-
latitude : 21.44228666666667
Longitude : 86.89117333333334
file name : Image_08052021141236145.png
|
2021-05-08 14:12:36.29645 |
83 |
46488974 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN |
70400 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN1 |
Commenced |
-
latitude : 21.44137,21.441368333333337
Longitude : 86.900715,86.90072166666666
file name : Image_08052021142517499.png
|
2021-05-08 14:25:17.641323 |
84 |
46488974 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN |
70400 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN1 |
Commenced |
-
latitude : 21.44137,21.441368333333337
Longitude : 86.900715,86.90072166666666
file name : Image_08052021142525942.png
|
2021-05-08 14:25:26.082815 |
85 |
46488974 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN |
70400 |
DEVELOPMENT OF SANSAUN PLAY GROUND VILLAGE-SANSAUN1 |
Commenced |
-
latitude : 21.441405,21.441415
Longitude : 86.90070166666668,86.90071833333334
file name : Image_08052021142435203.png
|
2021-05-08 14:24:35.339039 |
86 |
32403427 |
MAINTENANCE OF ROAD NEAR KHAJIRA POND ADIBASI SAHI AT-JAMBESWARAPUR |
130000 |
MAINTENANCE OF ROAD NEAR KHAJIRA POND ADIBASI SAHI AT-JAMBESWARAPUR1 |
Commenced |
-
latitude : 21.432513333333336,21.432516666666668
Longitude : 86.88146,86.88146
file name : Image_08052021140221608.png
|
2021-05-08 14:02:21.800235 |
87 |
46489139 |
PURCHASE OF BABY DESK,TOYS,DUSTBIN AND UTENSIL FOR GENGUTI AWC-1 VILLAGE-GENGUTI |
40000 |
PURCHASE OF BABY DESK,TOYS,DUSTBIN AND UTENSIL FOR GENGUTI AWC-1 VILLAGE-GENGUTI1 |
Commenced |
-
latitude : 21.432366666666667
Longitude : 86.90012
file name : Image_08052021130430852.png
|
2021-05-08 13:04:30.914862 |
88 |
57002104 |
COMPLETION OF SIDDHESWAR COMMUNITY CENTRE AT PALASHPUR |
100000 |
COMPLETION OF SIDDHESWAR COMMUNITY CENTRE AT PALASHPUR1 |
Completion of work |
-
latitude : 21.44153111
Longitude : 86.89163168
file name : Image_08032022084336024.png
|
2022-03-08 08:43:36.15114 |
89 |
46488938 |
CONSTRUCTION OF CULTURAL PUCCA STAGE AT BASANTAPUR SCHOOL VILLAGE-BASANTAPUR |
50000 |
CONSTRUCTION OF CULTURAL PUCCA STAGE AT BASANTAPUR SCHOOL VILLAGE-BASANTAPUR1 |
Commenced |
-
latitude : 21.42735771
Longitude : 86.88107303
file name : Image_08032022082048943.png
|
2022-03-08 08:20:49.056814 |
90 |
48258278 |
Construction of Boundary Wall at Samarai Community Centre |
100000 |
Construction of Boundary Wall at Samarai Community Centre 1 |
Completion of work |
-
latitude : 21.5035402
Longitude : 86.925596
file name : Image_08032022082039966.png
|
2022-03-08 08:20:40.061585 |
91 |
48236457 |
Construction of CC drian from Kanaka Durga Culvert to Umakanta Gochhayat house |
100000 |
Construction of CC drian from Kanaka Durga Culvert to Umakanta Gochhayat house1 |
Completion of work |
-
latitude : 21.5035347,21.5035392
Longitude : 86.9256001,86.9255999
file name : Image_08032022082033581.png
|
2022-03-08 08:20:33.683159 |
92 |
32404692 |
CONSTRUCTION OF CREMATORIUM AT BASANTAPUR SMASAN PADA AT-BASANTAPUR |
200000 |
CONSTRUCTION OF CREMATORIUM AT BASANTAPUR SMASAN PADA AT-BASANTAPUR1 |
Commenced |
-
latitude : 21.5035025
Longitude : 86.9256086
file name : Image_07032022165832827.png
|
2022-03-07 16:58:32.960147 |
93 |
46488719 |
CONSTRUCTION OF CREMATORIUM AT PACHUDIA SMASANA FIELD VILL-PACHUDIA |
191500 |
CONSTRUCTION OF CREMATORIUM AT PACHUDIA SMASANA FIELD VILL-PACHUDIA1 |
Commenced |
-
latitude : 21.46334543
Longitude : 86.90885331
file name : Image_12112021175755112.png
|
2021-11-12 17:57:55.231661 |
94 |
48256511 |
Construction of CC road from Arjun Barik house to Sapneswar temple |
200000 |
Construction of CC road from Arjun Barik house to Sapneswar temple1 |
Completion of work |
-
latitude : 21.4527114,21.45272314,21.45273147,21.45274718,21.45277178,21.45277175
Longitude : 86.90651083,86.90651446,86.90651896,86.9065368,86.90654096,86.90654099
file name : Image_02082021105807296.png
|
2021-08-02 10:58:07.400442 |
95 |
44206458 |
CONSTRUCTION OF CC DRAIN FROM INCOMPLETE CC DRAIN TO BIJAY SENAPATI HOUSE |
100000 |
CONSTRUCTION OF CC DRAIN FROM INCOMPLETE CC DRAIN TO BIJAY SENAPATI HOUSE1 |
Completion of work |
-
latitude : 21.45547058,21.45547054
Longitude : 86.90777171,86.90777172
file name : Image_02082021114835261.png
|
2021-08-02 11:48:35.365456 |
96 |
44206478 |
CONSTRUCTION OF CC DRAIN FROM KAMAL LOCHAN SENAPTI HOUSE TO ABHI SING HOUSE |
100000 |
CONSTRUCTION OF CC DRAIN FROM KAMAL LOCHAN SENAPTI HOUSE TO ABHI SING HOUSE1 |
Completion of work |
-
latitude : 21.4542414,21.45405962,21.45406783
Longitude : 86.9074103,86.90739727,86.90739758
file name : Image_02082021113555121.png
|
2021-08-02 11:35:55.216051 |
97 |
52680938 |
CONST OF CC DRAIN FROM INCOMPLETE CC DRAIN TO DOLA MANDAP CHHAKA AT BARINGIA |
100000 |
CONST OF CC DRAIN FROM INCOMPLETE CC DRAIN TO DOLA MANDAP CHHAKA AT BARINGIA1 |
Completion of work |
-
latitude : 21.45250404,21.45248271,21.45248271,21.45248271,21.45248273,21.45248273
Longitude : 86.90746687,86.90747071,86.90747049,86.90747044,86.90747041,86.90747041
file name : Image_02082021112109508.png
|
2021-08-02 11:21:09.597283 |
98 |
52680938 |
CONST OF CC DRAIN FROM INCOMPLETE CC DRAIN TO DOLA MANDAP CHHAKA AT BARINGIA |
100000 |
CONST OF CC DRAIN FROM INCOMPLETE CC DRAIN TO DOLA MANDAP CHHAKA AT BARINGIA1 |
Completion of work |
-
latitude : 21.45248223,21.45248164
Longitude : 86.90746889,86.90746824
file name : Image_02082021112209180.png
|
2021-08-02 11:22:09.272815 |
99 |
52680888 |
CONST OF CC DRAIN FROM HARIHAT CHHAKA TO KESABA ACHARYA HOUSE AT-PALASPUR |
100000 |
CONST OF CC DRAIN FROM HARIHAT CHHAKA TO KESABA ACHARYA HOUSE AT-PALASPUR1 |
Completion of work |
-
latitude : 21.43810607,21.43810488
Longitude : 86.88845427,86.88845293
file name : Image_02082021160751775.png
|
2021-08-02 16:07:51.863843 |
100 |
52681351 |
REPAIR AND MAINTENANCE OF PUCCA GHATA AT BISESWAR MAHADEV TEMPLE AT PAKHARSAUN |
50000 |
REPAIR AND MAINTENANCE OF PUCCA GHATA AT BISESWAR MAHADEV TEMPLE AT PAKHARSAUN1 |
Commenced |
-
latitude : 21.44348114
Longitude : 86.89691408
file name : Image_04082021164338369.png
|
2021-08-04 16:43:38.472435 |
101 |
46489043 |
CONSTRUCTION OF CC ROAD FROM HARIHAT CHHAK TO KESABA ACHARYA HOUSE VILLAGE-PALASPUR |
90152 |
CONSTRUCTION OF CC ROAD FROM HARIHAT CHHAK TO KESABA ACHARYA HOUSE VILLAGE-PALASPUR1 |
Commenced |
-
latitude : 21.43813121,21.43813121
Longitude : 86.88836512,86.88836512
file name : Image_05082021114658726.png
|
2021-08-05 11:46:58.83471 |
102 |
48237065 |
Digging of new tube well near Digi Pokhari |
125000 |
Digging of new tube well near Digi Pokhari 1 |
Completion of work |
-
latitude : 21.46236934
Longitude : 86.9114425
file name : Image_06122021132658236.png
|
2021-12-06 13:26:58.38459 |
103 |
48237968 |
Digging of new tube well near Susanta Rout house |
125000 |
Digging of new tube well near Susanta Rout house1 |
Completion of work |
-
latitude : 21.46109774
Longitude : 86.90919241
file name : Image_06122021132000310.png
|
2021-12-06 13:20:00.415649 |
104 |
48236908 |
Digging of new tube well near Kaintapada Sahi |
125000 |
Digging of new tube well near Kaintapada Sahi1 |
Completion of work |
-
latitude : 21.42651756
Longitude : 86.88926594
file name : Image_06122021125352503.png
|
2021-12-06 12:53:52.649505 |
105 |
48256691 |
Construction of CC road from Gopinath Mahanty to Hanuman Temple |
250000 |
Construction of CC road from Gopinath Mahanty to Hanuman Temple1 |
Completion of work |
-
latitude : 21.43956318,21.43956772
Longitude : 86.88862835,86.88860729
file name : Image_08032022083852997.png
|
2022-03-08 08:38:53.095699 |
106 |
48260091 |
Construction of CC road from Rabindra Behera house to Budhibaishnabani chhaka |
100000 |
Construction of CC road from Rabindra Behera house to Budhibaishnabani chhaka1 |
Completion of work |
-
latitude : 21.46158162,21.46157853
Longitude : 86.90779344,86.90779231
file name : Image_02022022163203782.png
|
2022-02-02 16:32:03.908008 |
107 |
48260091 |
Construction of CC road from Rabindra Behera house to Budhibaishnabani chhaka |
100000 |
Construction of CC road from Rabindra Behera house to Budhibaishnabani chhaka1 |
Completion of work |
-
latitude : 21.46158162,21.46157853
Longitude : 86.90779344,86.90779231
file name : Image_02022022163221298.png
|
2022-02-02 16:32:21.420454 |
108 |
57002246 |
CONST OF CC ROAD FROM RATNAKAR SINGH HOUSE TO MADAN DOKAN CHHAKA,VILL GENGUTI |
100000 |
CONST OF CC ROAD FROM RATNAKAR SINGH HOUSE TO MADAN DOKAN CHHAKA,VILL GENGUTI1 |
Completion of work |
-
latitude : 21.43008299,21.43007076
Longitude : 86.89631775,86.89633615
file name : Image_02022022161851564.png
|
2022-02-02 16:18:51.665409 |
109 |
57002495 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO KARTIKA BEHERA HOUSE,VILL JAMBESWARPUR |
100000 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO KARTIKA BEHERA HOUSE,VILL JAMBESWARPUR1 |
Completion of work |
-
latitude : 21.42996059,21.42997053
Longitude : 86.88335271,86.88335534
file name : Image_02022022150924894.png
|
2022-02-02 15:09:25.027837 |
110 |
48260011 |
Construction of CC road from Goura Sahu house to Bijay Senapati house |
200000 |
Construction of CC road from Goura Sahu house to Bijay Senapati house1 |
Completion of work |
-
latitude : 21.45546432,21.45553666
Longitude : 86.90780073,86.9078176
file name : Image_02022022163105541.png
|
2022-02-02 16:31:05.651128 |
111 |
52681291 |
CONSTRUCTION CC ROAD FROM VILLAGE CC ROAD TO PITAMBAR MOHAPATRA BADI VIA-PRADHAN SAHI VILLAGE PAKHAR |
85463 |
CONSTRUCTION CC ROAD FROM VILLAGE CC ROAD TO PITAMBAR MOHAPATRA BADI VIA-PRADHAN SAHI VILLAGE PAKHAR1 |
Commenced |
-
latitude : 21.44310299,21.4430979
Longitude : 86.89908806,86.8990918
file name : Image_02022022161904707.png
|
2022-02-02 16:19:04.834838 |
112 |
57001959 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE CC ROAD TO BAULAPALA VILL SANASAUN |
114032 |
CONSTRUCTION OF CC ROAD FROM INCOMPLETE CC ROAD TO BAULAPALA VILL SANASAUN1 |
Completion of work |
-
latitude : 21.503525,21.5033081
Longitude : 86.9256142,86.9257989
file name : Image_07032022165837070.png
|
2022-03-07 16:58:37.197933 |
113 |
57003007 |
ADDITIONAL AMOUNT FOR DIGGING 3 NOS OF NEW TUBE WELL AT GENGUTI GP AS PER L.NO 6308,DT 29.11.2021 OF |
27632 |
ADDITIONAL AMOUNT FOR DIGGING 3 NOS OF NEW TUBE WELL AT GENGUTI GP AS PER L.NO 6308,DT 29.11.2021 OF1 |
Completion of work |
-
latitude : 21.51043651
Longitude : 86.92252664
file name : Image_09032022121707284.png
|
2022-03-09 12:17:07.406172 |
114 |
32402785 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR PADMALOCHAN LENKA HOUSE AT-PAKHARSAUN |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFOEM NEAR PADMALOCHAN LENKA HOUSE AT-PAKHARSAUN1 |
Commenced |
-
latitude : 21.4395382
Longitude : 86.89187868
file name : Image_08032022084824793.png
|
2022-03-08 08:48:24.918609 |
115 |
32400822 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR JUGENDRA DEHURI HOUSE CHALANAPALA PADA AT-PACHHUDIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR JUGENDRA DEHURI HOUSE CHALANAPALA PADA AT-PACHHUDIA1 |
Commenced |
-
latitude : 21.45795783
Longitude : 86.90717354
file name : Image_08032022093019292.png
|
2022-03-08 09:30:19.460567 |
116 |
32400856 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR RAGHUNATH GIRI HOUSE AT-JUDHISTIRAPUR |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR RAGHUNATH GIRI HOUSE AT-JUDHISTIRAPUR1 |
Commenced |
-
latitude : 21.4655414
Longitude : 86.9108446
file name : Image_08032022093921392.png
|
2022-03-08 09:39:21.525231 |
117 |
46489475 |
ELECTRIFICATION AND BEAUTIFICATION OF GENGUTI AWC-1 VILLAGE-GENGUTI |
25000 |
ELECTRIFICATION AND BEAUTIFICATION OF GENGUTI AWC-1 VILLAGE-GENGUTI1 |
Commenced |
-
latitude : 21.5035211
Longitude : 86.9256112
file name : Image_08032022165238591.png
|
2022-03-08 16:52:38.749229 |
118 |
44206601 |
COMPRESSOR AND WASHING OF TUBE WELL IN G.P. AREA |
100000 |
COMPRESSOR AND WASHING OF TUBE WELL IN G.P. AREA1 |
Completion of work |
-
latitude : 21.5035285
Longitude : 86.9256096
file name : Image_08032022143815102.png
|
2022-03-08 14:38:15.225369 |
119 |
52680973 |
CONST OF CC DRAIN FROM PRASAN PRADHAN HOUSE TO GOPINATH MOHANTY HOUSE AT PALASPUR |
50000 |
CONST OF CC DRAIN FROM PRASAN PRADHAN HOUSE TO GOPINATH MOHANTY HOUSE AT PALASPUR1 |
Completion of work |
-
latitude : 21.43875683,21.43875519
Longitude : 86.88844614,86.88846193
file name : Image_08032022083929863.png
|
2022-03-08 08:39:29.978758 |
120 |
60800154 |
CONST OF CC ROAD FROM CHANDAN ADI CULVERT TO SARATA MOHANTY HOUSE,VILL- GENGUTI |
100000 |
CONST OF CC ROAD FROM CHANDAN ADI CULVERT TO SARATA MOHANTY HOUSE,VILL- GENGUTI1 |
Completion of work |
-
latitude : 21.5034746,21.5035379
Longitude : 86.9256384,86.9255917
file name : Image_08032022144836440.png
|
2022-03-08 14:48:36.580011 |
121 |
57003138 |
ELECTRICITY CHARGES FOR GENGUTI PWS, GENGUTI GP |
97368 |
ELECTRICITY CHARGES FOR GENGUTI PWS, GENGUTI GP1 |
Completion of work |
-
latitude : 21.51046233
Longitude : 86.9224702
file name : Image_09032022123503014.png
|
2022-03-09 12:35:03.162535 |
122 |
60800127 |
MAINTENANCE OF CC ROAD FROM PMGSY ROAD TO GOTHANAPADA ,VILL BASANTAPUR |
66250 |
MAINTENANCE OF CC ROAD FROM PMGSY ROAD TO GOTHANAPADA ,VILL BASANTAPUR1 |
Completion of work |
-
latitude : 21.5035017,21.5034877
Longitude : 86.9256225,86.9256116
file name : Image_29072022170949814.png
|
2022-07-29 17:09:49.904885 |
123 |
44206957 |
CONSTRUCTION OF BATHING GHHAT AND PROTECTION WALL OF KACHERI POKHARI EAST SIDE |
100000 |
CONSTRUCTION OF BATHING GHHAT AND PROTECTION WALL OF KACHERI POKHARI EAST SIDE1 |
Completion of work |
-
latitude : 21.4418811
Longitude : 86.9028046
file name : Image_29072022140523080.png
|
2022-07-29 14:05:23.149441 |
124 |
63904303 |
S E M SALARY |
24000 |
S E M SALARY1 |
Completion of work |
-
latitude : 21.47082484
Longitude : 86.88943111
file name : Image_27072022114702105.png
|
2022-07-27 11:47:02.25096 |
125 |
63904851 |
COMPLETION OF HARISABHA COMMUNITY CENTRE PAKHARSAUN |
200000 |
COMPLETION OF HARISABHA COMMUNITY CENTRE PAKHARSAUN1 |
Completion of work |
-
latitude : 21.4426385
Longitude : 86.8987922
file name : Image_03012023124152912.png
|
2023-01-03 12:41:53.015613 |
126 |
63904529 |
CONST OF CC ROAD FROM ASHRAM TO RD ROAD |
100000 |
CONST OF CC ROAD FROM ASHRAM TO RD ROAD1 |
Completion of work |
-
latitude : 21.467828333333333,21.467834999999997
Longitude : 86.91483000000001,86.91483000000001
file name : Image_03012023134426119.png
|
2023-01-03 13:44:26.24014 |
127 |
63904520 |
REPAIR AND MAINTENANCE OF ROAD FROM RD ROAD TO JALADHARA BAITHA HOUSE VIA SRIHARI BARIK HOUSE |
150000 |
REPAIR AND MAINTENANCE OF ROAD FROM RD ROAD TO JALADHARA BAITHA HOUSE VIA SRIHARI BARIK HOUSE1 |
Completion of work |
-
latitude : 21.4685981,21.468576
Longitude : 86.9159138,86.9158995
file name : Image_03012023134121074.png
|
2023-01-03 13:41:21.184266 |
128 |
63904524 |
REPAIR AND MAINTENANCE OF ROAD FROM NUADAHAR SITARAM SING HOUSE TO MAKIR SING HOUSE |
100000 |
REPAIR AND MAINTENANCE OF ROAD FROM NUADAHAR SITARAM SING HOUSE TO MAKIR SING HOUSE1 |
Completion of work |
-
latitude : 21.45948,21.459513333333334
Longitude : 86.91308666666667,86.91314499999999
file name : Image_11102023092422612.png
|
2023-10-11 09:24:22.678748 |
129 |
48258232 |
Construction of CC road from Babuli Das to PMGSY road |
150000 |
Construction of CC road from Babuli Das to PMGSY road1 |
Completion of work |
-
latitude : 21.4330277,21.4330277
Longitude : 86.8826244,86.8826244
file name : Image_08102021160522763.png
|
2021-10-08 16:05:22.864683 |
130 |
48238070 |
Compressor and washing of tube well in GP area |
57656 |
Compressor and washing of tube well in GP area1 |
Completion of work |
-
latitude : 21.43974529
Longitude : 86.89289443
file name : Image_08082022122654113.png
|
2022-08-08 12:26:54.220868 |
131 |
64205813 |
Electricity charges for Genguti PWS ,Genguti GP |
58789 |
Electricity charges for Genguti PWS ,Genguti GP1 |
Completion of work |
-
latitude : 21.5036292,21.5036284
Longitude : 86.9255004,86.9254871
file name : Image_10082022180436058.png
|
2022-08-10 18:04:36.170287 |
132 |
48236591 |
Construction of CC drain from Bharat Kahnda house to Radha Sundari chhaka |
100000 |
Construction of CC drain from Bharat Kahnda house to Radha Sundari chhaka 1 |
Completion of work |
-
latitude : 21.42683781,21.42683604
Longitude : 86.90272567,86.90272913
file name : Image_29072022133047149.png
|
2022-07-29 13:30:47.295176 |
133 |
32400805 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR GOURA SETHI HOUSE AT-PACHHUDIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR GOURA SETHI HOUSE AT-PACHHUDIA1 |
Commenced |
-
latitude : 21.458623333333335
Longitude : 86.90877333333334
file name : Image_03012023131023211.png
|
2023-01-03 13:10:23.310624 |
134 |
32400597 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR MAHADEV TEMPLE AT-BARINGIA |
15000 |
CONSTRUCTION OF TUBEWELL RAISE PLATFORM NEAR MAHADEV TEMPLE AT-BARINGIA1 |
Commenced |
-
latitude : 21.453629999999997
Longitude : 86.90641666666667
file name : Image_03012023125217858.png
|
2023-01-03 12:52:17.997442 |
135 |
44206951 |
CONSTRUCTION OF CULVERT AND DEVELOPMENT OF GROUND NEAR MANKAHANI KANAKA DURGA CHHAK |
100000 |
CONSTRUCTION OF CULVERT AND DEVELOPMENT OF GROUND NEAR MANKAHANI KANAKA DURGA CHHAK1 |
Completion of work |
-
latitude : 21.431721666666665
Longitude : 86.90321666666665
file name : Image_08052021130206103.png
|
2021-05-08 13:02:06.085164 |
136 |
44206951 |
CONSTRUCTION OF CULVERT AND DEVELOPMENT OF GROUND NEAR MANKAHANI KANAKA DURGA CHHAK |
100000 |
CONSTRUCTION OF CULVERT AND DEVELOPMENT OF GROUND NEAR MANKAHANI KANAKA DURGA CHHAK1 |
Completion of work |
-
latitude : 21.431739999999998
Longitude : 86.90320833333332
file name : Image_08052021130218278.png
|
2021-05-08 13:02:18.271594 |
137 |
63904295 |
PROVISION FOR P W S ELECTRIC BILL |
114542 |
PROVISION FOR P W S ELECTRIC BILL1 |
Completion of work |
-
latitude : 21.5036389,21.5036351
Longitude : 86.9255858,86.925553
file name : Image_05122022165027360.png
|
2022-12-05 16:50:27.488507 |
138 |
48260046 |
Maintenance of CC road near Manakahani Debati drain |
50000 |
Maintenance of CC road near Manakahani Debati drain1 |
Completion of work |
-
latitude : 21.43205833333333,21.43207333333333
Longitude : 86.90157833333333,86.90158666666666
file name : Image_03012023124014765.png
|
2023-01-03 12:40:14.866718 |
139 |
48236822 |
Construction of CC drain from Club chhaka to Gouranga Shaw house |
100000 |
Construction of CC drain from Club chhaka to Gouranga Shaw house1 |
Completion of work |
-
latitude : 21.4652469,21.4652468
Longitude : 86.9110123,86.9110104
file name : Image_03012023135020514.png
|
2023-01-03 13:50:20.633125 |
140 |
63904249 |
CONST OF CC DRAIN FROM LAMBODHAR MOHANTY HOUSE TO PRAVAKAR MOHANTY HOUSE |
90000 |
CONST OF CC DRAIN FROM LAMBODHAR MOHANTY HOUSE TO PRAVAKAR MOHANTY HOUSE1 |
Completion of work |
-
latitude : 21.430991666666667
Longitude : 86.89793666666668
file name : Image_15052023181322746.png
|
2023-05-15 18:13:22.844159 |
141 |
63904246 |
CONST OF CC DRAIN FROM RABINDRA MOHANTY HOUSE TO PRANABANDHU SAHU HOUSE |
100000 |
CONST OF CC DRAIN FROM RABINDRA MOHANTY HOUSE TO PRANABANDHU SAHU HOUSE1 |
Completion of work |
-
latitude : 21.432316666666665
Longitude : 86.90029666666666
file name : Image_15052023181325542.png
|
2023-05-15 18:13:25.638141 |
142 |
63904541 |
CONST OF CC ROAD FROM PABITRAPUR CHHAK TO HEMA SING HOUSE VIA RAMA CHANDRA BEHERA HOUSE |
150000 |
CONST OF CC ROAD FROM PABITRAPUR CHHAK TO HEMA SING HOUSE VIA RAMA CHANDRA BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.455505000000002,21.455506666666665
Longitude : 86.90710666666668,86.90708000000001
file name : Image_15052023095137605.png
|
2023-05-15 09:51:37.736249 |
143 |
63904536 |
CONST OF CC ROAD FROM PAL SIR HOUSE TO RD ROAD |
100000 |
CONST OF CC ROAD FROM PAL SIR HOUSE TO RD ROAD1 |
Completion of work |
-
latitude : 21.457148333333333,21.457161666666668
Longitude : 86.90938499999999,86.909345
file name : Image_15052023095545504.png
|
2023-05-15 09:55:45.600893 |
144 |
63904548 |
CONST OF PROTECTION WALL AND MAINTENANCE OF CC ROAD AT BARBARA POKHARI WEST SIDE |
171388 |
CONST OF PROTECTION WALL AND MAINTENANCE OF CC ROAD AT BARBARA POKHARI WEST SIDE1 |
Completion of work |
-
latitude : 21.44223833333333,21.442218333333336
Longitude : 86.90169333333333,86.90167166666667
file name : Image_15052023100803350.png
|
2023-05-15 10:08:03.447848 |
145 |
63904845 |
COMPLETION OF HARISABHA COMMUNITY CENTRE BARINGIA |
150000 |
COMPLETION OF HARISABHA COMMUNITY CENTRE BARINGIA1 |
Completion of work |
-
latitude : 21.45287166666667
Longitude : 86.90809499999999
file name : Image_11102023091621623.png
|
2023-10-11 09:16:21.692412 |
146 |
63904845 |
COMPLETION OF HARISABHA COMMUNITY CENTRE BARINGIA |
150000 |
COMPLETION OF HARISABHA COMMUNITY CENTRE BARINGIA1 |
Completion of work |
-
latitude : 21.452926666666666
Longitude : 86.90820333333335
file name : Image_11072023125944782.png
|
2023-07-11 12:59:44.89823 |
147 |
48236666 |
Construction of CC drain from Budhi Baisnabani temple to Harimohan Senapati house |
100000 |
Construction of CC drain from Budhi Baisnabani temple to Harimohan Senapati house 1 |
Completion of work |
-
latitude : 21.46093
Longitude : 86.90838000000001
file name : Image_11072023130922151.png
|
2023-07-11 13:09:22.26976 |
148 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.5036552
Longitude : 86.9254827
file name : Image_23032024131950236.png
|
2024-03-23 13:19:50.341794 |
149 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.5036562
Longitude : 86.9254845
file name : Image_23032024131103168.png
|
2024-03-23 13:11:03.346699 |
150 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.50365
Longitude : 86.925508
file name : Image_12012024114349865.png
|
2024-01-12 11:43:49.932061 |
151 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.5036496
Longitude : 86.9254761
file name : Image_06112023114405768.png
|
2023-11-06 11:44:05.875337 |
152 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.5036506
Longitude : 86.9254734
file name : Image_06112023104202786.png
|
2023-11-06 10:42:02.903274 |
153 |
83559556 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.5036537
Longitude : 86.9254686
file name : Image_06112023104159045.png
|
2023-11-06 10:41:59.152415 |
154 |
81678323 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036522,21.5036563
Longitude : 86.925494,86.9254848
file name : Image_07022024182810569.png
|
2024-02-07 18:28:10.664899 |
155 |
81678323 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.5036571,21.5036571
Longitude : 86.9255036,86.9255036
file name : Image_22122023164423840.png
|
2023-12-22 16:44:23.93829 |
156 |
81678323 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.503838091157377,21.5036545
Longitude : 86.92558312788606,86.9255075
file name : Image_22122023163905131.png
|
2023-12-22 16:39:05.251461 |
157 |
81678323 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.5036596,21.5036592
Longitude : 86.9255018,86.9255035
file name : Image_22122023163403901.png
|
2023-12-22 16:34:03.986614 |
158 |
105605158 |
Services of Collection & transportation of waste from household to treatment site |
30000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 21.49061010684818
Longitude : 86.91523826681077
file name : Image_05102024094319653.png
|
2024-10-05 09:43:19.726958 |
159 |
105605158 |
Services of Collection & transportation of waste from household to treatment site |
30000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 21.49067012127489
Longitude : 86.9152055773884
file name : Image_05102024093654368.png
|
2024-10-05 09:36:54.444545 |
160 |
105605158 |
Services of Collection & transportation of waste from household to treatment site |
30000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.490711611695588
Longitude : 86.91519141197205
file name : Image_05102024092543336.png
|
2024-10-05 09:25:43.414243 |
161 |
105604108 |
Operation and Maintenance of drinking/piped water supply system |
250000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 21.490689651109278
Longitude : 86.91521069034934
file name : Image_05102024094323471.png
|
2024-10-05 09:43:23.576391 |
162 |
105604108 |
Operation and Maintenance of drinking/piped water supply system |
250000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 21.49069053120911
Longitude : 86.91522183828056
file name : Image_05102024093703774.png
|
2024-10-05 09:37:03.84872 |
163 |
105604108 |
Operation and Maintenance of drinking/piped water supply system |
250000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.490678251720965
Longitude : 86.9151799287647
file name : Image_05102024092538343.png
|
2024-10-05 09:25:38.48001 |
164 |
63904289 |
JALACHHATRA OF GENGUTI GP (PALASHPUR CHHACK) |
10000 |
JALACHHATRA OF GENGUTI GP (PALASHPUR CHHACK)1 |
Completion of work |
-
latitude : 21.490654572844505
Longitude : 86.91509661264718
file name : Image_05102024094754400.png
|
2024-10-05 09:47:54.474066 |
165 |
105604674 |
Operation and Maintenance of drinking/piped water supply system |
20000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 21.490511787123978
Longitude : 86.91514112055302
file name : Image_05102024094327387.png
|
2024-10-05 09:43:27.466343 |
166 |
105604674 |
Operation and Maintenance of drinking/piped water supply system |
20000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 21.490669241175056
Longitude : 86.91519157961011
file name : Image_05102024093658788.png
|
2024-10-05 09:36:58.870435 |
167 |
105604674 |
Operation and Maintenance of drinking/piped water supply system |
20000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.490713539533317
Longitude : 86.91516509279609
file name : Image_05102024092547746.png
|
2024-10-05 09:25:47.843223 |
168 |
81679319 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036503,21.5036503
Longitude : 86.9255001,86.9255001
file name : Image_01082024143648277.png
|
2024-08-01 14:36:48.386071 |
169 |
81679319 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.5036543,21.5036543
Longitude : 86.9254947,86.9254947
file name : Image_01082024142736437.png
|
2024-08-01 14:27:36.548179 |
170 |
81679319 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.5036443,21.503648
Longitude : 86.9254953,86.9254979
file name : Image_01082024140347648.png
|
2024-08-01 14:03:47.758069 |
171 |
81678782 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036443,21.5036443
Longitude : 86.9254972,86.9254972
file name : Image_01082024143928540.png
|
2024-08-01 14:39:28.658795 |
172 |
81678782 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.5036468,21.5036468
Longitude : 86.9255023,86.9255023
file name : Image_01082024142603288.png
|
2024-08-01 14:26:03.407907 |
173 |
81678782 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.5036481,21.5036481
Longitude : 86.9255009,86.9255009
file name : Image_01082024140542496.png
|
2024-08-01 14:05:42.608003 |
174 |
81676068 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036519,21.5036519
Longitude : 86.9254993,86.9254993
file name : Image_01082024145020374.png
|
2024-08-01 14:50:20.49358 |
175 |
81676068 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.503652,21.5036522
Longitude : 86.9254949,86.9254919
file name : Image_01082024142953061.png
|
2024-08-01 14:29:53.175939 |
176 |
81676068 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.5036448,21.5036496
Longitude : 86.9254986,86.9254917
file name : Image_01082024140903703.png
|
2024-08-01 14:09:03.826912 |
177 |
81676627 |
Construction of roads |
75000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036507,21.5036507
Longitude : 86.9254957,86.9254957
file name : Image_01082024144451535.png
|
2024-08-01 14:44:51.656278 |
178 |
81676627 |
Construction of roads |
75000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.5036535,21.5036535
Longitude : 86.925492,86.925492
file name : Image_01082024143136057.png
|
2024-08-01 14:31:36.169637 |
179 |
81676627 |
Construction of roads |
75000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.5036467,21.5036489
Longitude : 86.925499,86.9254979
file name : Image_01082024141246464.png
|
2024-08-01 14:12:46.569932 |