1 |
38208177 |
MAINTENANCE OF ROAD FROM TERUGAON CC ROAD TO RD ROAD. |
200000 |
MAINTENANCE OF ROAD FROM TERUGAON CC ROAD TO RD ROAD.1 |
Commenced |
-
latitude : 21.439120000000003,21.43911666666667
Longitude : 86.95573,86.95571999999999
file name : Image_29102020152109970.png
|
2020-10-29 15:21:15.902075 |
2 |
38208177 |
MAINTENANCE OF ROAD FROM TERUGAON CC ROAD TO RD ROAD. |
200000 |
MAINTENANCE OF ROAD FROM TERUGAON CC ROAD TO RD ROAD.1 |
Commenced |
-
latitude : 21.439078333333335,21.439105
Longitude : 86.95573,86.95572166666668
file name : Image_29102020152154152.png
|
2020-10-29 15:22:00.081277 |
3 |
38200312 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE. |
200000 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE.1 |
Commenced |
-
latitude : 21.456723333333336,21.456971666666664
Longitude : 86.95586499999999,86.95583666666668
file name : Image_22102020123837988.png
|
2020-10-22 12:38:42.343827 |
4 |
38200312 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE. |
200000 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE.1 |
Commenced |
-
latitude : 21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333,21.45725333333333
Longitude : 86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333,86.95595833333333
file name : Image_22102020123849481.png
|
2020-10-22 12:38:53.825576 |
5 |
38200312 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE. |
200000 |
CONST. OF CC DRAIN FROM SARANGABAG RAGHUNATH BEHERA HOUSE TO GOBINDA MALLIK HOUSE.1 |
Commenced |
-
latitude : 21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861,21.4564861
Longitude : 86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941,86.9559941
file name : Image_22102020131353474.png
|
2020-10-22 13:13:57.847441 |
6 |
38200034 |
CONST. OF CC DRAIN FROM ACHYUT NAYAK HOUSE TO KALANDA NALLAH. |
200000 |
CONST. OF CC DRAIN FROM ACHYUT NAYAK HOUSE TO KALANDA NALLAH.1 |
Commenced |
-
latitude : 21.452785000000002,21.452786666666665,21.452773333333333
Longitude : 86.95340833333333,86.95341833333332,86.95339666666665
file name : Image_22102020141405151.png
|
2020-10-22 14:14:08.588875 |
7 |
38207241 |
ELECTRIFICATION AT RANASAHI-6 AWC. |
25000 |
ELECTRIFICATION AT RANASAHI-6 AWC.1 |
Commenced |
-
latitude : 21.452995
Longitude : 86.95090333333334
file name : Image_18022021153740816.png
|
2021-02-18 15:37:40.939505 |
8 |
38207148 |
ELECTRIFICATION AT RANASAHI-1 AWC. |
25000 |
ELECTRIFICATION AT RANASAHI-1 AWC.1 |
Commenced |
-
latitude : 21.447398333333332
Longitude : 86.95704166666668
file name : Image_18022021194040522.png
|
2021-02-18 19:40:40.646746 |
9 |
38207198 |
ELECTRIFICATION AT RANASAHI-2 AWC. |
25000 |
ELECTRIFICATION AT RANASAHI-2 AWC.1 |
Commenced |
-
latitude : 21.455035
Longitude : 86.95790000000001
file name : Image_18022021194045760.png
|
2021-02-18 19:40:45.852034 |
10 |
38207105 |
INSTALLATION OF HIGH MAX LIGHT AT PANCHAYAT OFFICE CHHAK. |
55000 |
INSTALLATION OF HIGH MAX LIGHT AT PANCHAYAT OFFICE CHHAK.1 |
Commenced |
-
latitude : 21.452761666666667
Longitude : 86.95147999999999
file name : Image_18022021194034641.png
|
2021-02-18 19:40:34.743488 |
11 |
38217420 |
CONST. OF PROTECTION WALL AT HATAPOKHARI. |
150000 |
CONST. OF PROTECTION WALL AT HATAPOKHARI.1 |
Commenced |
-
latitude : 21.45336666666667
Longitude : 86.95160333333334
file name : Image_18022021194025879.png
|
2021-02-18 19:40:25.996824 |
12 |
38206982 |
INSTALLATION OF HIGH MAX LIGHT AT KAINFULIA SMSANA. |
55000 |
INSTALLATION OF HIGH MAX LIGHT AT KAINFULIA SMSANA.1 |
Commenced |
-
latitude : 21.453404999999997
Longitude : 86.95045333333334
file name : Image_18022021153648365.png
|
2021-02-18 15:36:48.481559 |
13 |
44643931 |
CONSTRUCTION OF INCOMPLETE PUCCA DRAIN FROM ACHYUTA NAYAK HOUSE TO KALANDA(BOTH SIDE) |
300000 |
CONSTRUCTION OF INCOMPLETE PUCCA DRAIN FROM ACHYUTA NAYAK HOUSE TO KALANDA(BOTH SIDE)1 |
Completion of work |
-
latitude : 21.452553333333338,21.45255166666667
Longitude : 86.95429166666666,86.95429333333335
file name : Image_26032021123229560.png
|
2021-03-26 12:32:29.668292 |
14 |
49155709 |
CONSTRUCTION OF CC ROAD FROM HENDA JENA HOUSE TO BIKARTAN JENA HOUSE |
100000 |
CONSTRUCTION OF CC ROAD FROM HENDA JENA HOUSE TO BIKARTAN JENA HOUSE1 |
Completion of work |
-
latitude : 21.46396333333333,21.46396333333333
Longitude : 86.94103333333332,86.94103333333332
file name : Image_07032022172742257.png
|
2022-03-07 17:27:42.354232 |
15 |
49155709 |
CONSTRUCTION OF CC ROAD FROM HENDA JENA HOUSE TO BIKARTAN JENA HOUSE |
100000 |
CONSTRUCTION OF CC ROAD FROM HENDA JENA HOUSE TO BIKARTAN JENA HOUSE1 |
Completion of work |
-
latitude : 21.464000000000002,21.463959999999997
Longitude : 86.94101166666665,86.94094833333332
file name : Image_17062021134259619.png
|
2021-06-17 13:42:59.970894 |
16 |
49132813 |
CONSTRUCTION OF CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NAYAK HOUSE |
200000 |
CONSTRUCTION OF CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NAYAK HOUSE1 |
Completion of work |
-
latitude : 21.452906666666664,21.452924999999997
Longitude : 86.95248333333332,86.95248333333332
file name : Image_27012022121033380.png
|
2022-01-27 12:10:33.508037 |
17 |
49132813 |
CONSTRUCTION OF CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NAYAK HOUSE |
200000 |
CONSTRUCTION OF CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NAYAK HOUSE1 |
Completion of work |
-
latitude : 21.45300666666667,21.45306833333333
Longitude : 86.952495,86.95247166666668
file name : Image_27012022121042686.png
|
2022-01-27 12:10:42.780212 |
18 |
38217223 |
DEVELOPMENT OF SALANDRI COMMUNITY CENTRE. |
150000 |
DEVELOPMENT OF SALANDRI COMMUNITY CENTRE.1 |
Commenced |
-
latitude : 21.466946666666665
Longitude : 86.94982666666668
file name : Image_31032021174414876.png
|
2021-03-31 17:44:14.998248 |
19 |
38217373 |
MAINTENANCE OF ROAD FROM CHANDAN MALLIK HOUSE TO BABULI SENAPATI. |
150000 |
MAINTENANCE OF ROAD FROM CHANDAN MALLIK HOUSE TO BABULI SENAPATI.1 |
Commenced |
-
latitude : 21.468511666666668,21.468633333333333
Longitude : 86.945845,86.94605333333332
file name : Image_31032021174422204.png
|
2021-03-31 17:44:22.29669 |
20 |
38192595 |
CONST. OF RAISED TUBE WELL PLATFORM AT HADAPADA TUBE WELL. |
20000 |
CONST. OF RAISED TUBE WELL PLATFORM AT HADAPADA TUBE WELL.1 |
Commenced |
-
latitude : 21.470601666666667
Longitude : 86.94735666666665
file name : Image_31032021175025598.png
|
2021-03-31 17:50:27.047222 |
21 |
44647052 |
MAINTENANCE OF ROAD FROM DHIRA MALLIK HOUSE TO SHRIDHAR MALLIK HOUSE |
40000 |
MAINTENANCE OF ROAD FROM DHIRA MALLIK HOUSE TO SHRIDHAR MALLIK HOUSE1 |
Completion of work |
-
latitude : 21.453760000000003,21.453791666666667
Longitude : 86.95381666666665,86.95380666666667
file name : Image_08042021133342040.png
|
2021-04-08 13:33:42.169447 |
22 |
44647165 |
CONSTRUCTION OF CULVERT AT MURALI MOHANTY HOUSE CHHAK |
50000 |
CONSTRUCTION OF CULVERT AT MURALI MOHANTY HOUSE CHHAK1 |
Completion of work |
-
latitude : 21.4529308,21.4529308
Longitude : 86.9548961,86.9548961
file name : Image_08042021132231011.png
|
2021-04-08 13:22:31.096006 |
23 |
44643926 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR CHAKRADHAR MALLIK HOUSE CHHAKA |
20000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR CHAKRADHAR MALLIK HOUSE CHHAKA1 |
Completion of work |
-
latitude : 21.469614999999997
Longitude : 86.94606833333334
file name : Image_08042021134937854.png
|
2021-04-08 13:49:37.959642 |
24 |
38207851 |
MAINTENANCE REPAIRING OF JAYNAGAR COMMUNITY CENTRE. |
50000 |
MAINTENANCE REPAIRING OF JAYNAGAR COMMUNITY CENTRE.1 |
Commenced |
-
latitude : 21.447243333333336
Longitude : 86.95715666666668
file name : Image_08042021131436193.png
|
2021-04-08 13:14:36.289799 |
25 |
44647154 |
MAINTENANCE AND REPAIR OF DIBYAJYOTI COMMUNITY CENTRE |
100000 |
MAINTENANCE AND REPAIR OF DIBYAJYOTI COMMUNITY CENTRE1 |
Completion of work |
-
latitude : 21.45481333333333
Longitude : 86.95188833333334
file name : Image_17052021121034468.png
|
2021-05-17 12:10:34.563111 |
26 |
44647375 |
MAINTENANCE AND REPAIRING OF DASI VILLAGE ROAD |
45952 |
MAINTENANCE AND REPAIRING OF DASI VILLAGE ROAD1 |
Completion of work |
-
latitude : 21.467039999999997,21.467251666666666,21.46725333333333
Longitude : 86.94577666666667,86.94575833333334,86.94576
file name : Image_08062021163857475.png
|
2021-06-08 16:38:57.578531 |
27 |
44647095 |
MAINTENANCE OF ROAD FROM ATHALAMAL CHHAK TO JUGA LENKA HOUSE |
100000 |
MAINTENANCE OF ROAD FROM ATHALAMAL CHHAK TO JUGA LENKA HOUSE1 |
Completion of work |
-
latitude : 21.435921666666665,21.435895
Longitude : 86.95731333333333,86.95724333333334
file name : Image_16062021120552459.png
|
2021-06-16 12:05:52.552068 |
28 |
44647127 |
MAINTENANCE AND REPAIR OF LAXMINARAYAN COMMUNITY CENTRE(DEWAN SAHI) |
150000 |
MAINTENANCE AND REPAIR OF LAXMINARAYAN COMMUNITY CENTRE(DEWAN SAHI)1 |
Completion of work |
-
latitude : 21.457966666666668
Longitude : 86.956845
file name : Image_08062021165945960.png
|
2021-06-08 16:59:46.071399 |
29 |
44643940 |
CONSTRUCTION OF PUCCA DRAIN FROM PRABHASH NAYAK HOUSE TO TAPASI CHHAK |
220000 |
CONSTRUCTION OF PUCCA DRAIN FROM PRABHASH NAYAK HOUSE TO TAPASI CHHAK1 |
Completion of work |
-
latitude : 21.466521,21.466521
Longitude : 86.9463051,86.9463051
file name : Image_08062021163059483.png
|
2021-06-08 16:30:59.5833 |
30 |
44643956 |
CONSTRUCTION OF PUCCA DRAIN FROM BIJAYBHANU NAYAK HOUSE TO KALANDA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM BIJAYBHANU NAYAK HOUSE TO KALANDA1 |
Completion of work |
-
latitude : 21.453411666666664,21.45342833333333
Longitude : 86.95514333333334,86.9551
file name : Image_28062021174732006.png
|
2021-06-28 17:47:32.127913 |
31 |
44647341 |
MAINTENANCE AND REPAIRING OF ROAD FROM DHIRENDRANATH DAS HOUSE TO HALADIPADA |
100000 |
MAINTENANCE AND REPAIRING OF ROAD FROM DHIRENDRANATH DAS HOUSE TO HALADIPADA1 |
Completion of work |
-
latitude : 21.5034604,21.5034537,21.5034537
Longitude : 86.9255586,86.9255604,86.9255604
file name : Image_23072021165943595.png
|
2021-07-23 16:59:43.700526 |
32 |
38200358 |
CONST. OF CC DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA. |
200000 |
CONST. OF CC DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA.1 |
Commenced |
-
latitude : 21.458438333333334,21.45792666666667
Longitude : 86.95752833333333,86.95686333333333
file name : Image_17052021121024108.png
|
2021-05-17 12:10:24.208917 |
33 |
38200358 |
CONST. OF CC DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA. |
200000 |
CONST. OF CC DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA.1 |
Commenced |
-
latitude : 21.458438333333334,21.45792666666667
Longitude : 86.95752833333333,86.95686333333333
file name : Image_17052021121045042.png
|
2021-05-17 12:10:45.142908 |
34 |
38192746 |
CONST. OF RAISED TUBE WELL PLATFORM AT DOKAN GADIA PADA TUBE WELL. |
20000 |
CONST. OF RAISED TUBE WELL PLATFORM AT DOKAN GADIA PADA TUBE WELL.1 |
Commenced |
-
latitude : 21.449736666666663
Longitude : 86.95182000000001
file name : Image_09062021141137218.png
|
2021-06-09 14:11:37.303709 |
35 |
38217485 |
DEVELOPMENT OF DIBYAJYOTI YOUTH COMMINITY CENTRE. |
100000 |
DEVELOPMENT OF DIBYAJYOTI YOUTH COMMINITY CENTRE.1 |
Commenced |
-
latitude : 21.454841666666667
Longitude : 86.95186166666666
file name : Image_17052021121029390.png
|
2021-05-17 12:10:29.502981 |
36 |
38207665 |
MAINTENANCE REPAIRING OF KUMBHARASAHI COMMUNITY CENTRE. |
100000 |
MAINTENANCE REPAIRING OF KUMBHARASAHI COMMUNITY CENTRE.1 |
Commenced |
-
latitude : 21.45259666666667
Longitude : 86.95141833333334
file name : Image_08062021171115380.png
|
2021-06-08 17:11:15.48098 |
37 |
38207499 |
CONST. OF PUCCA ROAD FROM RANASAHI-B PRIMARY HIGH SCHOOL GATE TO OFFICE. |
250000 |
CONST. OF PUCCA ROAD FROM RANASAHI-B PRIMARY HIGH SCHOOL GATE TO OFFICE.1 |
Commenced |
-
latitude : 21.45494833333333,21.454929999999997
Longitude : 86.95787,86.95790000000001
file name : Image_17052021121039969.png
|
2021-05-17 12:10:40.056316 |
38 |
49155532 |
CONSTRUCTION OF CC ROAD FROM TERUGAN MADAGADIA TO GOBINDA LENKA HOUSE |
256000 |
CONSTRUCTION OF CC ROAD FROM TERUGAN MADAGADIA TO GOBINDA LENKA HOUSE1 |
Completion of work |
-
latitude : 21.5036418,21.5036308
Longitude : 86.9254733,86.9254908
file name : Image_06112021171539191.png
|
2021-11-06 17:15:39.306762 |
39 |
44646982 |
CONSTRUCTION OF GATE OF JAYANAGAR PRIMARY SCHOOL |
100000 |
CONSTRUCTION OF GATE OF JAYANAGAR PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.447300000000002
Longitude : 86.95700166666666
file name : Image_17062021113755347.png
|
2021-06-17 11:37:55.682101 |
40 |
44647118 |
CONSTRUCTION OF CULVERT AND REPAIRING OF ROAD AT BASANTA BARIK HOUSE CHHAK |
80000 |
CONSTRUCTION OF CULVERT AND REPAIRING OF ROAD AT BASANTA BARIK HOUSE CHHAK1 |
Completion of work |
-
latitude : 21.4665502,21.4665502,21.4665502
Longitude : 86.9463341,86.9463341,86.9463341
file name : Image_17062021134306211.png
|
2021-06-17 13:43:06.550762 |
41 |
44643952 |
CONSTRUCTION OF PUCCA DRAIN FROM DEEPAK DAS HOUSE TO ARUN DAS HOUSE |
130000 |
CONSTRUCTION OF PUCCA DRAIN FROM DEEPAK DAS HOUSE TO ARUN DAS HOUSE1 |
Completion of work |
-
latitude : 21.461713333333332,21.46167666666667
Longitude : 86.94709666666668,86.94722833333331
file name : Image_17062021134228504.png
|
2021-06-17 13:42:28.871595 |
42 |
44643935 |
CONSTRUCTION OF INCOMPLETE PUCCA DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA |
150000 |
CONSTRUCTION OF INCOMPLETE PUCCA DRAIN FROM PRADEEP MALLIK HOUSE TO NUAGADIA1 |
Completion of work |
-
latitude : 21.45704166666667,21.457166666666662
Longitude : 86.95701166666667,86.95700333333335
file name : Image_17062021113747313.png
|
2021-06-17 11:37:47.622317 |
43 |
38192769 |
CONST. OF RAISED TUBE WELL PLATFORM AT JAINAGAR HARIHAT CHHAK TUBE WELL. |
20000 |
CONST. OF RAISED TUBE WELL PLATFORM AT JAINAGAR HARIHAT CHHAK TUBE WELL.1 |
Commenced |
-
latitude : 21.447223333333334
Longitude : 86.95702833333334
file name : Image_17062021113802380.png
|
2021-06-17 11:38:02.68383 |
44 |
38217261 |
DEVELOPMENT OF BHAGABAT JEW(HARI SABHA) COMMUNITY CENTRE. |
100000 |
DEVELOPMENT OF BHAGABAT JEW(HARI SABHA) COMMUNITY CENTRE.1 |
Commenced |
-
latitude : 21.461074999999997
Longitude : 86.94449166666666
file name : Image_17062021134221021.png
|
2021-06-17 13:42:21.370234 |
45 |
38207583 |
DEVELOPMENT OF ROAD FROM MADHABA JENA HOUSE TO BHIKARI NAYAK HOUSE. |
100000 |
DEVELOPMENT OF ROAD FROM MADHABA JENA HOUSE TO BHIKARI NAYAK HOUSE.1 |
Commenced |
-
latitude : 21.464184999999997,21.46412833333333
Longitude : 86.940915,86.94102
file name : Image_17062021134241991.png
|
2021-06-17 13:42:42.330434 |
46 |
38207546 |
DEVELOPMENT OF ROAD FROM RD ROAD TO KAINFULIA SMASANA. |
100000 |
DEVELOPMENT OF ROAD FROM RD ROAD TO KAINFULIA SMASANA.1 |
Commenced |
-
latitude : 21.453368333333334,21.45335
Longitude : 86.95070666666668,86.95072833333333
file name : Image_28062021174739761.png
|
2021-06-28 17:47:39.861241 |
47 |
44646996 |
MAINTENANCE OF ROAD FROM SARANGABAG CC ROAD TO RD ROAD |
150000 |
MAINTENANCE OF ROAD FROM SARANGABAG CC ROAD TO RD ROAD1 |
Completion of work |
-
latitude : 21.5034572,21.5034572
Longitude : 86.9255583,86.9255583
file name : Image_23072021172139001.png
|
2021-07-23 17:21:39.08649 |
48 |
38208085 |
MAINTENANCE OF ROAD FROM CHAKRADHAR HOUSE TO BHINAGAR ROAD. |
80000 |
MAINTENANCE OF ROAD FROM CHAKRADHAR HOUSE TO BHINAGAR ROAD.1 |
Commenced |
-
latitude : 21.5034556,21.5034556,21.5034556
Longitude : 86.9255603,86.9255553,86.9255553
file name : Image_23072021172819960.png
|
2021-07-23 17:28:20.043491 |
49 |
65315394 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.44849605
Longitude : 86.9528571
file name : Image_05122022130657247.png
|
2022-12-05 13:06:57.30719 |
50 |
49132499 |
DIGGING OF NEW TUBE WELL NEAR SANYASI BEHERA HOUSE |
130000 |
DIGGING OF NEW TUBE WELL NEAR SANYASI BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.50363666666666
Longitude : 86.92544500000001
file name : Image_15022022192134774.png
|
2022-02-15 19:21:34.881738 |
51 |
44647036 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE |
40000 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE1 |
Completion of work |
-
latitude : 21.433781666666665,21.433723333333333
Longitude : 86.95753500000001,86.95755666666668
file name : Image_09062021141102335.png
|
2021-06-09 14:11:02.42976 |
52 |
44647036 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE |
40000 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE1 |
Completion of work |
-
latitude : 21.433245000000003,21.4333
Longitude : 86.95772833333334,86.95750000000001
file name : Image_12022022151620279.png
|
2022-02-12 15:16:20.395569 |
53 |
44647036 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE |
40000 |
MAINTENANCE OF ROAD FROM ATHALAMAL GOPAL HANSDA HOUSE TO BHIMA MAJHI HOUSE1 |
Completion of work |
-
latitude : 21.433726666666665,21.433796666666662
Longitude : 86.95759000000001,86.95750666666666
file name : Image_16062021120557714.png
|
2021-06-16 12:05:57.80096 |
54 |
44643922 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR KHANA MALLIK HOUSE CHHAKA |
20000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR KHANA MALLIK HOUSE CHHAKA1 |
Completion of work |
-
latitude : 21.5035485
Longitude : 86.9255826
file name : Image_16022022175105346.png
|
2022-02-16 17:51:05.820931 |
55 |
44643919 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR BARIK SAHI(tapasi) |
20000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR BARIK SAHI(tapasi)1 |
Completion of work |
-
latitude : 21.46853666666667
Longitude : 86.94801000000001
file name : Image_12022022151554112.png
|
2022-02-12 15:15:54.258172 |
56 |
3596635 |
REST SHED AT TAPSI SMASAN |
100000 |
REST SHED AT TAPSI SMASAN1 |
Commenced |
-
latitude : 21.472025
Longitude : 86.94769833333334
file name : Image_12022022131810511.png
|
2022-02-12 13:18:10.620849 |
57 |
44643965 |
HONORARIUM TO SEM RANASAHI |
48000 |
HONORARIUM TO SEM RANASAHI1 |
Completion of work |
-
latitude : 21.5036066
Longitude : 86.9255048
file name : Image_05102021165720656.png
|
2021-10-05 16:57:20.791646 |
58 |
44647334 |
MAINTENANCE AND REPAIRING OF ROAD FROM RD ROAD TO HAREKRUSHNA MALLIK HOUSE VIA BALABHADRA MALLIK HOU |
100000 |
MAINTENANCE AND REPAIRING OF ROAD FROM RD ROAD TO HAREKRUSHNA MALLIK HOUSE VIA BALABHADRA MALLIK HOU1 |
Completion of work |
-
latitude : 21.5035814,21.5035705
Longitude : 86.9255114,86.925538
file name : Image_08032022133002651.png
|
2022-03-08 13:30:02.782064 |
59 |
44647334 |
MAINTENANCE AND REPAIRING OF ROAD FROM RD ROAD TO HAREKRUSHNA MALLIK HOUSE VIA BALABHADRA MALLIK HOU |
100000 |
MAINTENANCE AND REPAIRING OF ROAD FROM RD ROAD TO HAREKRUSHNA MALLIK HOUSE VIA BALABHADRA MALLIK HOU1 |
Completion of work |
-
latitude : 21.45651666666667,21.45651,21.45650666666667,21.456508333333332
Longitude : 86.95156999999999,86.95157333333333,86.95157166666668,86.95155833333335
file name : Image_17052021121002310.png
|
2021-05-17 12:10:02.401342 |
60 |
44643985 |
SINKING OF NEW TUBE WELL NEAR TAPASI SACHINDRA SINHA HOUSE |
110000 |
SINKING OF NEW TUBE WELL NEAR TAPASI SACHINDRA SINHA HOUSE1 |
Completion of work |
-
latitude : 21.503683333333335
Longitude : 86.92550000000001
file name : Image_15022022192013595.png
|
2022-02-15 19:20:13.71831 |
61 |
56333105 |
CONST OF TOILET AND SANITATION AND MAINTENANCE OF MISSION SHAKTI HOUSE OF RANASAHI GP |
200000 |
CONST OF TOILET AND SANITATION AND MAINTENANCE OF MISSION SHAKTI HOUSE OF RANASAHI GP1 |
Completion of work |
-
latitude : 21.43798333333333
Longitude : 86.95601
file name : Image_07032022152337720.png
|
2022-03-07 15:23:37.830951 |
62 |
56332935 |
CONST OF CC ROAD FROM GOLAK NAYAK HOUSE CHHAKA TO TERUGAON CC ROAD |
250000 |
CONST OF CC ROAD FROM GOLAK NAYAK HOUSE CHHAKA TO TERUGAON CC ROAD1 |
Completion of work |
-
latitude : 21.441211666666664,21.441235
Longitude : 86.95285166666666,86.952795
file name : Image_07032022152331823.png
|
2022-03-07 15:23:31.919725 |
63 |
56332800 |
COMPLETION OF DIBYAJYOTI COMMUNITY CENTRE |
100000 |
COMPLETION OF DIBYAJYOTI COMMUNITY CENTRE1 |
Completion of work |
-
latitude : 21.45481
Longitude : 86.95176333333332
file name : Image_07032022152321850.png
|
2022-03-07 15:23:21.936439 |
64 |
44647066 |
MAINTENANCE OF ROAD FROM RAGHUNATH JENA HOUSE TO KARUNA JENA HOUSE |
100000 |
MAINTENANCE OF ROAD FROM RAGHUNATH JENA HOUSE TO KARUNA JENA HOUSE1 |
Completion of work |
-
latitude : 21.5036006,21.5036073
Longitude : 86.9254817,86.9254804
file name : Image_08032022131720501.png
|
2022-03-08 13:17:20.629023 |
65 |
44647066 |
MAINTENANCE OF ROAD FROM RAGHUNATH JENA HOUSE TO KARUNA JENA HOUSE |
100000 |
MAINTENANCE OF ROAD FROM RAGHUNATH JENA HOUSE TO KARUNA JENA HOUSE1 |
Completion of work |
-
latitude : 21.5036006,21.5036073
Longitude : 86.9254817,86.9254804
file name : Image_08032022131732526.png
|
2022-03-08 13:17:32.598324 |
66 |
44647105 |
CONSTRUCTION OF BOUNDARY WALL AND GATE OF TAPASAHI-1 AWC |
200000 |
CONSTRUCTION OF BOUNDARY WALL AND GATE OF TAPASAHI-1 AWC1 |
Completion of work |
-
latitude : 21.469026666666664
Longitude : 86.94620166666667
file name : Image_07032022172757020.png
|
2022-03-07 17:27:57.123698 |
67 |
44643915 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR SARANGABAG CLUB CHHAK |
20000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR SARANGABAG CLUB CHHAK1 |
Completion of work |
-
latitude : 21.45726666666667
Longitude : 86.95479833333333
file name : Image_07032022133228552.png
|
2022-03-07 13:32:28.635823 |
68 |
44643959 |
CONSTRUCTION OF PUCCA DRAIN FROM GOBINDA JENA HOUSE TO KARUNA JENA HOUSE |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM GOBINDA JENA HOUSE TO KARUNA JENA HOUSE1 |
Completion of work |
-
latitude : 21.454751666666667,21.454751666666667
Longitude : 86.95442499999999,86.95442499999999
file name : Image_07032022133223382.png
|
2022-03-07 13:32:23.529956 |
69 |
38206943 |
CONST. OF CC DRAIN FROM UMAKANTA MALLIK HOUSE TO RD ROAD. |
150000 |
CONST. OF CC DRAIN FROM UMAKANTA MALLIK HOUSE TO RD ROAD.1 |
Commenced |
-
latitude : 21.469913333333338,21.4699
Longitude : 86.94791,86.94794333333333
file name : Image_07032022172819396.png
|
2022-03-07 17:28:19.516849 |
70 |
49137858 |
CONSTRUCTION OF PUCCA GHAT AT KANKADA JODI NALLAH |
100000 |
CONSTRUCTION OF PUCCA GHAT AT KANKADA JODI NALLAH1 |
Completion of work |
-
latitude : 21.471151666666668
Longitude : 86.94746166666667
file name : Image_27012022121051905.png
|
2022-01-27 12:10:51.996246 |
71 |
49132448 |
DIGGING OF NEW TUBE WELL NEAR PINTAL MALLIK HOUSE |
130000 |
DIGGING OF NEW TUBE WELL NEAR PINTAL MALLIK HOUSE1 |
Completion of work |
-
latitude : 21.503626666666666
Longitude : 86.92548166666666
file name : Image_15022022192058908.png
|
2022-02-15 19:20:59.056 |
72 |
49132448 |
DIGGING OF NEW TUBE WELL NEAR PINTAL MALLIK HOUSE |
130000 |
DIGGING OF NEW TUBE WELL NEAR PINTAL MALLIK HOUSE1 |
Completion of work |
-
latitude : 21.5035838
Longitude : 86.9254308
file name : Image_12012022182156779.png
|
2022-01-12 18:21:56.901603 |
73 |
49129995 |
DIGGING OF NEW TUBE WELL NEAR KALANDA NALLAH |
130000 |
DIGGING OF NEW TUBE WELL NEAR KALANDA NALLAH1 |
Completion of work |
-
latitude : 21.469593333333332
Longitude : 86.94785333333333
file name : Image_12022022131517433.png
|
2022-02-12 13:15:17.525327 |
74 |
49129995 |
DIGGING OF NEW TUBE WELL NEAR KALANDA NALLAH |
130000 |
DIGGING OF NEW TUBE WELL NEAR KALANDA NALLAH1 |
Completion of work |
-
latitude : 21.5036153
Longitude : 86.9254053
file name : Image_12012022182151415.png
|
2022-01-12 18:21:51.5391 |
75 |
49129949 |
DIGGING OF NEW TUBE WELL NEAR THAKIRI BEHERA HOUSE |
130000 |
DIGGING OF NEW TUBE WELL NEAR THAKIRI BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.455781666666667
Longitude : 86.95125666666667
file name : Image_12022022160604083.png
|
2022-02-12 16:06:04.180232 |
76 |
49129949 |
DIGGING OF NEW TUBE WELL NEAR THAKIRI BEHERA HOUSE |
130000 |
DIGGING OF NEW TUBE WELL NEAR THAKIRI BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.5035723
Longitude : 86.9254847
file name : Image_12012022182146602.png
|
2022-01-12 18:21:46.736908 |
77 |
49130053 |
DIGGING OF NEW TUBE WELL NEAR JOGENDRA BEHERA HOUSE WARD NO-8 |
130000 |
DIGGING OF NEW TUBE WELL NEAR JOGENDRA BEHERA HOUSE WARD NO-81 |
Completion of work |
-
latitude : 21.4667069
Longitude : 86.94667
file name : Image_12022022131511313.png
|
2022-02-12 13:15:11.438711 |
78 |
49130053 |
DIGGING OF NEW TUBE WELL NEAR JOGENDRA BEHERA HOUSE WARD NO-8 |
130000 |
DIGGING OF NEW TUBE WELL NEAR JOGENDRA BEHERA HOUSE WARD NO-81 |
Completion of work |
-
latitude : 21.5036211
Longitude : 86.9255012
file name : Image_27012022123226652.png
|
2022-01-27 12:32:26.809031 |
79 |
38207709 |
MAINTENANCE REPAIRING OF KRSHNESWAR COMMUNITY CENTRE. |
50000 |
MAINTENANCE REPAIRING OF KRSHNESWAR COMMUNITY CENTRE.1 |
Commenced |
-
latitude : 21.5035474
Longitude : 86.9255762
file name : Image_08032022131708797.png
|
2022-03-08 13:17:08.907269 |
80 |
56154132 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS) |
22500 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS)1 |
Completion of work |
-
latitude : 21.470658333333336
Longitude : 86.94738000000001
file name : Image_02042022134849317.png
|
2022-04-02 13:48:49.449402 |
81 |
56154132 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS) |
22500 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS)1 |
Completion of work |
-
latitude : 21.46420333333333
Longitude : 86.94602333333333
file name : Image_02042022135644753.png
|
2022-04-02 13:56:44.858092 |
82 |
56154132 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS) |
22500 |
CONSTRUCTION OF SOAK PIT NEAR VILLAGE TUBE WELL (30 NOS)1 |
Completion of work |
-
latitude : 21.461576666666662
Longitude : 86.94499666666667
file name : Image_02042022135649111.png
|
2022-04-02 13:56:49.223634 |
83 |
21187001 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND. |
50000 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND.1 |
Commenced |
-
latitude : 21.5035862
Longitude : 86.9255396
file name : Image_08032022131713884.png
|
2022-03-08 13:17:13.991963 |
84 |
21187001 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND. |
50000 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND.1 |
Commenced |
-
latitude : 21.5035862
Longitude : 86.9255396
file name : Image_08032022131725849.png
|
2022-03-08 13:17:25.928854 |
85 |
21187001 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND. |
50000 |
CONSTRUCTION OF LADIES DRESS CHANGING ROOM AT DEWANSAHI NUAGADIA POND.1 |
Commenced |
-
latitude : 21.456409999999998
Longitude : 86.958145
file name : Image_26032021123622598.png
|
2021-03-26 12:36:22.717673 |
86 |
64144313 |
WATER SUPPLY OF COMMUNITY TOILET AT GP OFFICE CHHAK |
100000 |
WATER SUPPLY OF COMMUNITY TOILET AT GP OFFICE CHHAK1 |
Completion of work |
-
latitude : 21.45264618
Longitude : 86.95138516
file name : Image_16092022160109748.png
|
2022-09-16 16:01:09.881023 |
87 |
64144205 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR RANASAHI UNION NODAL SCHOOL |
25000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR RANASAHI UNION NODAL SCHOOL1 |
Completion of work |
-
latitude : 21.45253665
Longitude : 86.95086138
file name : Image_16092022161727132.png
|
2022-09-16 16:17:27.300743 |
88 |
64158214 |
REPAIR AND MAINTENANCE OF RAJIB GANDHI BHABAN |
280000 |
REPAIR AND MAINTENANCE OF RAJIB GANDHI BHABAN1 |
Completion of work |
-
latitude : 21.4527144
Longitude : 86.9515131
file name : Image_16092022161121079.png
|
2022-09-16 16:11:21.207365 |
89 |
64144454 |
WATER SUPPLY OF RAJIB GANDHI BHABAN TOILET |
132341 |
WATER SUPPLY OF RAJIB GANDHI BHABAN TOILET1 |
Completion of work |
-
latitude : 21.4527137,21.4527137
Longitude : 86.9515127,86.9515127
file name : Image_16092022161410445.png
|
2022-09-16 16:14:10.589053 |
90 |
21187054 |
COMPLETION OF TAPASI SMASAN REST SHED. |
100000 |
COMPLETION OF TAPASI SMASAN REST SHED.1 |
Commenced |
-
latitude : 21.47195106
Longitude : 86.9477303
file name : Image_21012023113404797.png
|
2023-01-21 11:34:04.904218 |
91 |
21187482 |
CONSTRUCTION OF TOILET AT RANA SAHI PRIMARY SCHOOL . |
100000 |
CONSTRUCTION OF TOILET AT RANA SAHI PRIMARY SCHOOL .1 |
Commenced |
-
latitude : 21.452701
Longitude : 86.9514723
file name : Image_05112022105057273.png
|
2022-11-05 10:50:57.402441 |
92 |
21187409 |
MAINTENANCE AND REPAIRING OF MANASA CC. |
100000 |
MAINTENANCE AND REPAIRING OF MANASA CC.1 |
Commenced |
-
latitude : 21.4665733,21.4665733
Longitude : 86.9463371,86.9463371
file name : Image_05112022112733955.png
|
2022-11-05 11:27:34.076275 |
93 |
38207396 |
CONST. OF UNION HIGH SCHOOL GATE. |
100000 |
CONST. OF UNION HIGH SCHOOL GATE.1 |
Commenced |
-
latitude : 21.4526914
Longitude : 86.9514649
file name : Image_05112022104726889.png
|
2022-11-05 10:47:27.025599 |
94 |
64144435 |
RENOVATION OF COMMUNITY POND MADA GADIA ATHILAMAL |
50000 |
RENOVATION OF COMMUNITY POND MADA GADIA ATHILAMAL1 |
Completion of work |
-
latitude : 21.43770307
Longitude : 86.95652746
file name : Image_16092022171430262.png
|
2022-09-16 17:14:30.396116 |
95 |
49137483 |
CONSTRUCTION OF CC ROAD FROM BANGURU PUHAN HOUSE TO RABINDRA DAS HOUSE |
80000 |
CONSTRUCTION OF CC ROAD FROM BANGURU PUHAN HOUSE TO RABINDRA DAS HOUSE1 |
Completion of work |
-
latitude : 21.44606969,21.44608128
Longitude : 86.95762363,86.95763734
file name : Image_16092022165205964.png
|
2022-09-16 16:52:06.099924 |
96 |
56332959 |
SANITATION OF RANASAHI 6 AWC |
30000 |
SANITATION OF RANASAHI 6 AWC1 |
Completion of work |
-
latitude : 21.4527133
Longitude : 86.9515112
file name : Image_16092022162527396.png
|
2022-09-16 16:25:27.517608 |
97 |
56332883 |
MAINTENANCE AND REPAIR OF ROAD FROM JAYANAGAR SCHOOL TO SMASAN |
100000 |
MAINTENANCE AND REPAIR OF ROAD FROM JAYANAGAR SCHOOL TO SMASAN1 |
Completion of work |
-
latitude : 21.44758982,21.44759083
Longitude : 86.95679712,86.95676311
file name : Image_16092022164736890.png
|
2022-09-16 16:47:37.05477 |
98 |
56332755 |
CONST OF PUCCA CHATANA OF BUDHI KALANDRI COMMUNITY CENTRE |
100000 |
CONST OF PUCCA CHATANA OF BUDHI KALANDRI COMMUNITY CENTRE1 |
Completion of work |
-
latitude : 21.4527142
Longitude : 86.9515126
file name : Image_16092022162914598.png
|
2022-09-16 16:29:14.728659 |
99 |
56333047 |
CONST OF INCOMPLETE CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NATH HOUSE |
45559 |
CONST OF INCOMPLETE CC ROAD FROM RAMESH DAS HOUSE TO UPENDRA NATH HOUSE1 |
Completion of work |
-
latitude : 21.45292557,21.45292502
Longitude : 86.95255243,86.95255441
file name : Image_16092022163850747.png
|
2022-09-16 16:38:50.928365 |
100 |
64144373 |
ENERGY CHARGES OF PWS (03 NOS) |
200000 |
ENERGY CHARGES OF PWS (03 NOS)1 |
Completion of work |
-
latitude : 21.5036581,21.5036581,21.5036581
Longitude : 86.9253818,86.9253818,86.9253818
file name : Image_27092022181222177.png
|
2022-09-27 18:12:22.324664 |
101 |
65316235 |
Construction of cc road from incomplete cc road to manmath mishra house |
650000 |
Construction of cc road from incomplete cc road to manmath mishra house1 |
Completion of work |
-
latitude : 21.4644822,21.4644822
Longitude : 86.9435965,86.9435965
file name : Image_05112022111302090.png
|
2022-11-05 11:13:02.208478 |
102 |
56332873 |
MAINTENANCE OF ROAD FROM BRUNDABATI PATRA HOUSE TO UMAKANTA BEHERA HOUSE |
60000 |
MAINTENANCE OF ROAD FROM BRUNDABATI PATRA HOUSE TO UMAKANTA BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.46245138,21.46244995
Longitude : 86.94703673,86.94703529
file name : Image_05112022113445652.png
|
2022-11-05 11:34:45.787694 |
103 |
65315380 |
Creation of community compost pits for a group of Households |
25000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.46513391
Longitude : 86.9459142
file name : Image_05122022121501386.png
|
2022-12-05 12:15:01.453238 |
104 |
65315366 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.45215201
Longitude : 86.95593821
file name : Image_05122022131451525.png
|
2022-12-05 13:14:51.596284 |
105 |
65315300 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.43816511
Longitude : 86.95646623
file name : Image_05122022125540431.png
|
2022-12-05 12:55:40.515744 |
106 |
65315608 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.46244316
Longitude : 86.94684936
file name : Image_05122022123620523.png
|
2022-12-05 12:36:20.608469 |
107 |
65315331 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.45875707
Longitude : 86.94366161
file name : Image_05122022124315318.png
|
2022-12-05 12:43:15.402162 |
108 |
65315345 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.46507695
Longitude : 86.94045597
file name : Image_05122022122604954.png
|
2022-12-05 12:26:05.034155 |
109 |
65315263 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.4527211
Longitude : 86.9514511
file name : Image_05122022133049943.png
|
2022-12-05 13:30:50.014758 |
110 |
65315276 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.45531662
Longitude : 86.95772649
file name : Image_05122022132238641.png
|
2022-12-05 13:22:38.699936 |
111 |
65316437 |
Completion of CC Chatana infront of Budhi Kalandi |
100000 |
Completion of CC Chatana infront of Budhi Kalandi1 |
Completion of work |
-
latitude : 21.452951
Longitude : 86.9516509
file name : Image_25012023111144386.png
|
2023-01-25 11:11:44.448208 |
112 |
65316383 |
Completion of Radhakrushna Community centre at Sarangabag |
70000 |
Completion of Radhakrushna Community centre at Sarangabag1 |
Completion of work |
-
latitude : 21.45742043
Longitude : 86.95483948
file name : Image_21012023114452216.png
|
2023-01-21 11:44:52.28882 |
113 |
21187298 |
CONSTRUCTION OF BOUNDARY WALL AND GATE OF RANASAHI B-PRIMARY SCHOOL. |
200000 |
CONSTRUCTION OF BOUNDARY WALL AND GATE OF RANASAHI B-PRIMARY SCHOOL.1 |
Commenced |
-
latitude : 21.45526279
Longitude : 86.95792845
file name : Image_21012023114955029.png
|
2023-01-21 11:49:55.106329 |
114 |
65316419 |
Construction of Pucca Chatana in front of Gopal Jew CC |
100000 |
Construction of Pucca Chatana in front of Gopal Jew CC1 |
Completion of work |
-
latitude : 21.4524757
Longitude : 86.95386842
file name : Image_14022023150432722.png
|
2023-02-14 15:04:32.783539 |
115 |
65315218 |
Repair of drainage channel |
236046 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 21.4522047,21.45220533
Longitude : 86.95062257,86.95062309
file name : Image_14022023151309390.png
|
2023-02-14 15:13:09.448072 |
116 |
65314766 |
Repair and restoration of Ranasahi Govt School 5T |
420000 |
Repair and restoration of Ranasahi Govt School 5T1 |
Commenced |
-
latitude : 21.45219092
Longitude : 86.95061833
file name : Image_14022023151101109.png
|
2023-02-14 15:11:01.163788 |
117 |
64158015 |
CONST OF CC ROAD FROM RD ROAD TO MURALI JENA HOUSE |
150000 |
CONST OF CC ROAD FROM RD ROAD TO MURALI JENA HOUSE1 |
Completion of work |
-
latitude : 21.45762456,21.45762163
Longitude : 86.95726509,86.95728986
file name : Image_14022023125205092.png
|
2023-02-14 12:52:05.182571 |
118 |
64158050 |
CONST OF CC ROAD FROM RD ROAD TO KATA BARIK HOUSE |
140000 |
CONST OF CC ROAD FROM RD ROAD TO KATA BARIK HOUSE1 |
Completion of work |
-
latitude : 21.46803329,21.46803131
Longitude : 86.94802526,86.94802514
file name : Image_14022023130250477.png
|
2023-02-14 13:02:50.529394 |
119 |
65314849 |
Repair and maintenance of Badadeulabad village road |
20000 |
Repair and maintenance of Badadeulabad village road1 |
Commenced |
-
latitude : 21.46512183,21.46512182
Longitude : 86.94233429,86.94233426
file name : Image_30052023075710117.png
|
2023-05-30 07:57:10.184121 |
120 |
65314856 |
Repair and maintenance of Kaidhari village road |
20000 |
Repair and maintenance of Kaidhari village road1 |
Commenced |
-
latitude : 21.46376607,21.46376784
Longitude : 86.94620306,86.94620333
file name : Image_30052023075208568.png
|
2023-05-30 07:52:08.629308 |
121 |
65314808 |
Repair and maintenance of Jhagadapashi village road |
20000 |
Repair and maintenance of Jhagadapashi village road1 |
Commenced |
-
latitude : 21.45833658,21.45834191
Longitude : 86.94460552,86.94460106
file name : Image_30052023074416822.png
|
2023-05-30 07:44:16.885296 |
122 |
65316409 |
Renovation and beautification of Baida Pond |
200000 |
Renovation and beautification of Baida Pond1 |
Completion of work |
-
latitude : 21.45839062
Longitude : 86.94353138
file name : Image_29072023090909009.png
|
2023-07-29 09:09:09.104164 |
123 |
65316343 |
Water supply of Ranasahi Nodal School Toilet |
45341 |
Water supply of Ranasahi Nodal School Toilet1 |
Completion of work |
-
latitude : 21.4527768
Longitude : 86.9509291
file name : Image_20072023131352203.png
|
2023-07-20 13:13:52.279444 |
124 |
64144151 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR NIRANJAN BEHERA HOUSE |
25000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR NIRANJAN BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.46578119
Longitude : 86.94779181
file name : Image_20072023125316051.png
|
2023-07-20 12:53:16.175194 |
125 |
64158206 |
REPAIR AND RESTORATION OF CC ROAD FROM SURYA MALIK HOUSE TO ROYAL CLUB VIA KANKADA DODI NALA |
200000 |
REPAIR AND RESTORATION OF CC ROAD FROM SURYA MALIK HOUSE TO ROYAL CLUB VIA KANKADA DODI NALA1 |
Completion of work |
-
latitude : 21.47069861
Longitude : 86.94519713
file name : Image_20072023124532612.png
|
2023-07-20 12:45:32.706461 |
126 |
64158008 |
ANM CENTRE MAINTENANCE |
100000 |
ANM CENTRE MAINTENANCE1 |
Completion of work |
-
latitude : 21.45362617
Longitude : 86.95155318
file name : Image_20072023130707717.png
|
2023-07-20 13:07:07.823528 |
127 |
64144134 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR ANCHALA JENA HOUSE |
25000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR ANCHALA JENA HOUSE1 |
Completion of work |
-
latitude : 21.4564804
Longitude : 86.9556812
file name : Image_20072023121255593.png
|
2023-07-20 12:12:55.717845 |
128 |
64144059 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR SURIYA MALIK HOUSE |
25000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR SURIYA MALIK HOUSE1 |
Completion of work |
-
latitude : 21.47003628
Longitude : 86.9448577
file name : Image_20072023123815860.png
|
2023-07-20 12:38:16.067443 |
129 |
64144191 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR KARTIKA JENA HOUSE |
25000 |
CONSTRUCTION OF RISING TUBE WELL PLATFORM NEAR KARTIKA JENA HOUSE1 |
Completion of work |
-
latitude : 21.44853561
Longitude : 86.96924532
file name : Image_20072023122204116.png
|
2023-07-20 12:22:04.226883 |
130 |
82755775 |
Operation and Maintenance of piped water supply system |
510043 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 21.5036559
Longitude : 86.9254978
file name : Image_02032024173518007.png
|
2024-03-02 17:35:18.126404 |
131 |
82755775 |
Operation and Maintenance of piped water supply system |
510043 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.5036556
Longitude : 86.9255027
file name : Image_02032024173104784.png
|
2024-03-02 17:31:04.954721 |
132 |
82755775 |
Operation and Maintenance of piped water supply system |
510043 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.5036292
Longitude : 86.9254974
file name : Image_01112023181832769.png
|
2023-11-01 18:18:32.858565 |
133 |
78296723 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036526,21.5036502
Longitude : 86.9254856,86.9254766
file name : Image_27032024195944514.png
|
2024-03-27 19:59:44.593809 |
134 |
78296723 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.5036543,21.5036543
Longitude : 86.9254997,86.9254997
file name : Image_01032024185610929.png
|
2024-03-01 18:56:11.015814 |
135 |
78296723 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.45667646,21.4566776
Longitude : 86.9558003,86.95579635
file name : Image_01032024184127866.png
|
2024-03-01 18:41:27.965546 |
136 |
78296723 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.5036613,21.5036613
Longitude : 86.9254989,86.9254989
file name : Image_01032024184502931.png
|
2024-03-01 18:45:03.027603 |
137 |
78296723 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.456613,21.45660111
Longitude : 86.95573045,86.95573482
file name : Image_01022024130439358.png
|
2024-02-01 13:04:39.473224 |
138 |
65315411 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.46724227
Longitude : 86.94951351
file name : Image_04122023160101452.png
|
2023-12-04 16:01:01.514803 |
139 |
65315471 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.46911926
Longitude : 86.94617249
file name : Image_04122023155356181.png
|
2023-12-04 15:53:56.268073 |
140 |
65315622 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.5036511
Longitude : 86.9255135
file name : Image_06122023104909348.png
|
2023-12-06 10:49:09.41493 |
141 |
65315597 |
Creation of community compost pits for a group of Households |
7500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.47130898
Longitude : 86.94524587
file name : Image_04122023153510239.png
|
2023-12-04 15:35:10.301387 |