1 |
44536990 |
Repair Of Road from Balarampur RD Road Kahnu ch. Sahu House to Ratnakar Bag House |
100000 |
Repair Of Road from Balarampur RD Road Kahnu ch. Sahu House to Ratnakar Bag House1 |
Roof laid |
-
latitude : 21.627644999999998,21.62727
Longitude : 87.22446999999998,87.22458
file name : Image_18122020134126867.png
|
2020-12-18 13:41:26.982842 |
2 |
44536916 |
Cost of tubewell Platform At Purusottampur Village |
20000 |
Cost of tubewell Platform At Purusottampur Village1 |
Roof laid |
-
latitude : 21.620758333333335
Longitude : 87.20531166666666
file name : Image_28122020165551165.png
|
2020-12-28 16:55:51.28461 |
3 |
44536916 |
Cost of tubewell Platform At Purusottampur Village |
20000 |
Cost of tubewell Platform At Purusottampur Village1 |
Roof laid |
-
latitude : 21.620758333333335
Longitude : 87.20531166666666
file name : Image_28122020165634196.png
|
2020-12-28 16:56:34.312285 |
4 |
44536916 |
Cost of tubewell Platform At Purusottampur Village |
20000 |
Cost of tubewell Platform At Purusottampur Village1 |
Roof laid |
-
latitude : 21.620741666666664
Longitude : 87.20537333333331
file name : Image_28122020165511440.png
|
2020-12-28 16:55:11.587021 |
5 |
44536845 |
New Const./ Miantenance of Govt. UP School upto Class VIII at Balarampur Pry. School |
400000 |
New Const./ Miantenance of Govt. UP School upto Class VIII at Balarampur Pry. School1 |
Completion of work |
-
latitude : 21.6508705
Longitude : 87.2807798
file name : Image_20042021100703387.png
|
2021-04-20 10:07:03.296347 |
6 |
44536984 |
Repair Of Road from Sunarui Muralidhara Jena Chhaka To Prabhuram Nayak House |
100000 |
Repair Of Road from Sunarui Muralidhara Jena Chhaka To Prabhuram Nayak House1 |
Completion of work |
-
latitude : 21.63533,21.635344999999997
Longitude : 87.23000666666667,87.23001333333335
file name : Image_19042021112446615.png
|
2021-04-19 11:24:46.72483 |
7 |
44536907 |
Repair of Drain From Betana RD Road to Saktipada Bera House To Athila Gadia |
100000 |
Repair of Drain From Betana RD Road to Saktipada Bera House To Athila Gadia1 |
Completion of work |
-
latitude : 21.621991666666666,21.621985000000002
Longitude : 87.21334166666665,87.21334833333334
file name : Image_27042021085647224.png
|
2021-04-27 08:56:47.33835 |
8 |
44537000 |
Repair Of Road from Kalanda RD Road Gopal Das House to Sabhu Das House |
100000 |
Repair Of Road from Kalanda RD Road Gopal Das House to Sabhu Das House1 |
Completion of work |
-
latitude : 21.626071666666668,21.626071666666668
Longitude : 87.21557166666668,87.21557166666668
file name : Image_27042021085925252.png
|
2021-04-27 08:59:25.363995 |
9 |
49279796 |
Const. Of Drain from Kuanrpur RD Road Abhilash Behera House Chhaka to Phatula Pokhari (CFC) |
150000 |
Const. Of Drain from Kuanrpur RD Road Abhilash Behera House Chhaka to Phatula Pokhari (CFC)1 |
Completion of work |
-
latitude : 21.6504596,21.6504601
Longitude : 87.2807073,87.2807077
file name : Image_05112021111605227.png
|
2021-11-05 11:16:05.302177 |
10 |
49280998 |
Repair and restoration of Itapatua Surendra Nath Primary School (CFC) |
150000 |
Repair and restoration of Itapatua Surendra Nath Primary School (CFC)1 |
Completion of work |
-
latitude : 21.6504598
Longitude : 87.2807075
file name : Image_05112021112552079.png
|
2021-11-05 11:25:52.162776 |
11 |
49274177 |
Digging of New Tube Well at Betna Hara Prasad Nodal School (CFC) |
150000 |
Digging of New Tube Well at Betna Hara Prasad Nodal School (CFC)1 |
Completion of work |
-
latitude : 21.6508837
Longitude : 87.2807416
file name : Image_14122021114159565.png
|
2021-12-14 11:41:59.659379 |
12 |
49274177 |
Digging of New Tube Well at Betna Hara Prasad Nodal School (CFC) |
150000 |
Digging of New Tube Well at Betna Hara Prasad Nodal School (CFC)1 |
Completion of work |
-
latitude : 21.6508837
Longitude : 87.2807416
file name : Image_14122021114205955.png
|
2021-12-14 11:42:06.036344 |
13 |
44536760 |
Operation and Maintenance and Extension of Existing pipe water supply system at Sunarui PWS |
350000 |
Operation and Maintenance and Extension of Existing pipe water supply system at Sunarui PWS1 |
Completion of work |
-
latitude : 21.6509131,21.6509131
Longitude : 87.2807729,87.2807729
file name : Image_14122021114146741.png
|
2021-12-14 11:41:46.86404 |
14 |
44536832 |
Sinking of new Tubewell at Near Balarampur Pry School |
150000 |
Sinking of new Tubewell at Near Balarampur Pry School1 |
Completion of work |
-
latitude : 21.6504978
Longitude : 87.2806762
file name : Image_14122021114151977.png
|
2021-12-14 11:41:52.063499 |
15 |
49274430 |
Compressing of tubewells (CFC) |
70000 |
Compressing of tubewells (CFC)1 |
Completion of work |
-
latitude : 21.6507706
Longitude : 87.2808109
file name : Image_23022022103847122.png
|
2022-02-23 10:38:47.222806 |
16 |
49279521 |
Cleaning of Drains, Bathing Ghat, Schools, AWCs |
40000 |
Cleaning of Drains, Bathing Ghat, Schools, AWCs1 |
Completion of work |
-
latitude : 21.6506912,21.6506912
Longitude : 87.2806856,87.2806856
file name : Image_10012022150338821.png
|
2022-01-10 15:03:38.929626 |
17 |
49280956 |
Repair and restoration of Betana Haraprasad Nodal School (CFC) |
300000 |
Repair and restoration of Betana Haraprasad Nodal School (CFC)1 |
Completion of work |
-
latitude : 21.6508772
Longitude : 87.2807587
file name : Image_07032022155502461.png
|
2022-03-07 15:55:02.563373 |
18 |
49279687 |
Payment of Energy Charges of Balarampur and Sunaruhi PWDs (CFC) |
218886 |
Payment of Energy Charges of Balarampur and Sunaruhi PWDs (CFC)1 |
Completion of work |
-
latitude : 21.651066666666665,21.651003333333332
Longitude : 87.28200999999999,87.28209166666666
file name : Image_08042022181600235.png
|
2022-04-08 18:16:00.326593 |
19 |
49274257 |
Digging of New Tube Well at Gadadhara Giri High School, Sunaruhi (CFC) |
150000 |
Digging of New Tube Well at Gadadhara Giri High School, Sunaruhi (CFC)1 |
Completion of work |
-
latitude : 21.6506165
Longitude : 87.2806646
file name : Image_08072022124558123.png
|
2022-07-08 12:45:58.217145 |
20 |
62992153 |
Compressing of Tubewells |
80000 |
Compressing of Tubewells1 |
Completion of work |
-
latitude : 21.6503853
Longitude : 87.2804539
file name : Image_06092022120507198.png
|
2022-09-06 12:05:07.258642 |
21 |
62992294 |
Payment of energy charges of Balarampur and Sunarui PWDs |
127744 |
Payment of energy charges of Balarampur and Sunarui PWDs1 |
Completion of work |
-
latitude : 21.6513,21.6513
Longitude : 87.28261499999999,87.28261499999999
file name : Image_20092022171713961.png
|
2022-09-20 17:17:14.103868 |
22 |
62992067 |
Const of New water tank at Sunarui Mohadev Temple |
40000 |
Const of New water tank at Sunarui Mohadev Temple1 |
Completion of work |
-
latitude : 21.6503364
Longitude : 87.2802935
file name : Image_27092022094946714.png
|
2022-09-27 09:49:46.779424 |
23 |
62992076 |
Const of New water tank at Betana AWC |
40000 |
Const of New water tank at Betana AWC1 |
Completion of work |
-
latitude : 21.6503362
Longitude : 87.2802913
file name : Image_27092022095347799.png
|
2022-09-27 09:53:47.887797 |
24 |
62992183 |
Extension of Pipe line water supply at Betana RD road to AWC |
50000 |
Extension of Pipe line water supply at Betana RD road to AWC1 |
Completion of work |
-
latitude : 21.6503599,21.6503599
Longitude : 87.2803041,87.2803041
file name : Image_27092022100023257.png
|
2022-09-27 10:00:23.326003 |
25 |
62992171 |
Extension of Pipe line water supply at Betana Bhagabat Panda house to Sanjay Panda house |
50000 |
Extension of Pipe line water supply at Betana Bhagabat Panda house to Sanjay Panda house1 |
Completion of work |
-
latitude : 21.65033,21.6503362
Longitude : 87.2802957,87.2802913
file name : Image_27092022095927715.png
|
2022-09-27 09:59:27.783385 |
26 |
62992160 |
Extension of Pipe line water supply at Balichatara RD Road Ramesh Das house to Surath Pramanik house |
50000 |
Extension of Pipe line water supply at Balichatara RD Road Ramesh Das house to Surath Pramanik house1 |
Completion of work |
-
latitude : 21.650788333333335,21.6503372
Longitude : 87.28065666666667,87.2802954
file name : Image_27092022095820321.png
|
2022-09-27 09:58:20.399142 |
27 |
62992090 |
Const of New water tank at Balarampur Sitala Mandap |
40000 |
Const of New water tank at Balarampur Sitala Mandap1 |
Completion of work |
-
latitude : 21.6503727
Longitude : 87.2803214
file name : Image_27092022095357200.png
|
2022-09-27 09:53:57.269945 |
28 |
62992273 |
Payment towards reuneration to SEMs |
24000 |
Payment towards reuneration to SEMs1 |
Completion of work |
-
latitude : 21.6503592
Longitude : 87.2803058
file name : Image_27092022095526895.png
|
2022-09-27 09:55:27.051757 |
29 |
62992311 |
S B M |
100000 |
S B M1 |
Completion of work |
-
latitude : 21.6508058
Longitude : 87.2807976
file name : Image_31032023095953068.png
|
2023-03-31 09:59:53.130619 |
30 |
62992257 |
Cleaning of Drains, Bathing ghat ,Schools , AWCs |
20000 |
Cleaning of Drains, Bathing ghat ,Schools , AWCs1 |
Completion of work |
-
latitude : 21.6506036
Longitude : 87.2807505
file name : Image_31032023095957020.png
|
2023-03-31 09:59:57.082894 |
31 |
62992327 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri |
150000 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri1 |
Roof laid |
-
latitude : 21.6505285
Longitude : 87.2807295
file name : Image_29042023093932519.png
|
2023-04-29 09:39:32.582322 |
32 |
62992327 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri |
150000 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri1 |
Completion of work |
-
latitude : 21.650506
Longitude : 87.2807258
file name : Image_29042023093744718.png
|
2023-04-29 09:37:44.773671 |
33 |
62992327 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri |
150000 |
Const of Drain from Budhi kiari Sunkabari to Kala Gohiri1 |
Completion of work |
-
latitude : 21.650535
Longitude : 87.2807274
file name : Image_29042023093455777.png
|
2023-04-29 09:34:55.830745 |
34 |
76299984 |
Sinking of New Mini Water Supply from Purusottampur |
350000 |
Sinking of New Mini Water Supply from Purusottampur1 |
Completed |
-
latitude : 21.6451411
Longitude : 87.3216371
file name : Image_25052023091739900.png
|
2023-05-25 09:17:39.992995 |
35 |
76299984 |
Sinking of New Mini Water Supply from Purusottampur |
350000 |
Sinking of New Mini Water Supply from Purusottampur1 |
Commenced |
-
latitude : 21.6451371
Longitude : 87.3216378
file name : Image_25052023083534585.png
|
2023-05-25 08:35:34.705747 |
36 |
62992051 |
Repairing of Sunarui and Balarampur PWDs |
56744 |
Repairing of Sunarui and Balarampur PWDs1 |
Roof laid |
-
latitude : 21.6509983
Longitude : 87.2812482
file name : Image_03082023113834583.png
|
2023-08-03 11:38:34.633037 |
37 |
62992051 |
Repairing of Sunarui and Balarampur PWDs |
56744 |
Repairing of Sunarui and Balarampur PWDs1 |
Plinth level |
-
latitude : 21.6509999
Longitude : 87.2812431
file name : Image_03082023113655087.png
|
2023-08-03 11:36:55.142453 |
38 |
62992051 |
Repairing of Sunarui and Balarampur PWDs |
56744 |
Repairing of Sunarui and Balarampur PWDs1 |
Completion of work |
-
latitude : 21.6509985
Longitude : 87.2812479
file name : Image_03082023113500712.png
|
2023-08-03 11:35:00.8769 |
39 |
82890562 |
Operation and Maintenance of piped water supply system |
462060 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 21.6507208,21.6507208
Longitude : 87.2811241,87.2811241
file name : Image_18102023105032982.png
|
2023-10-18 10:50:33.089803 |
40 |
82890562 |
Operation and Maintenance of piped water supply system |
462060 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.6507226,21.6507206
Longitude : 87.2811293,87.281129
file name : Image_18102023104642813.png
|
2023-10-18 10:46:42.969174 |
41 |
82890562 |
Operation and Maintenance of piped water supply system |
462060 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.6507231,21.6507231
Longitude : 87.2811184,87.2811184
file name : Image_18102023104126642.png
|
2023-10-18 10:41:26.773152 |
42 |
82987517 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507292,21.6507292
Longitude : 87.2811404,87.2811404
file name : Image_19012024110851615.png
|
2024-01-19 11:08:51.675628 |
43 |
82987517 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507257,21.6507257
Longitude : 87.2811362,87.2811362
file name : Image_19012024110659870.png
|
2024-01-19 11:06:59.934377 |
44 |
82987517 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.650731,21.650731
Longitude : 87.2811333,87.2811333
file name : Image_19012024110145525.png
|
2024-01-19 11:01:45.586211 |
45 |
62992343 |
Repair and restoration of Balarampur PRY school |
100000 |
Repair and restoration of Balarampur PRY school1 |
Roof laid |
-
latitude : 21.6507225
Longitude : 87.281124
file name : Image_07122023121517304.png
|
2023-12-07 12:15:17.371495 |
46 |
62992343 |
Repair and restoration of Balarampur PRY school |
100000 |
Repair and restoration of Balarampur PRY school1 |
Plinth level |
-
latitude : 21.6507239
Longitude : 87.2811292
file name : Image_07122023121258324.png
|
2023-12-07 12:12:58.310402 |
47 |
62992343 |
Repair and restoration of Balarampur PRY school |
100000 |
Repair and restoration of Balarampur PRY school1 |
Completion of work |
-
latitude : 21.6507253
Longitude : 87.281127
file name : Image_07122023120819844.png
|
2023-12-07 12:08:19.900017 |
48 |
82928644 |
Solar Street Lighting Installation |
70000 |
Solar Street Lighting Installation1 |
Roof laid |
-
latitude : 21.6507338
Longitude : 87.2811337
file name : Image_30122023154639087.png
|
2023-12-30 15:46:39.212706 |
49 |
82928644 |
Solar Street Lighting Installation |
70000 |
Solar Street Lighting Installation1 |
Plinth level |
-
latitude : 21.6507317
Longitude : 87.2811314
file name : Image_30122023154323231.png
|
2023-12-30 15:43:23.362806 |
50 |
82928644 |
Solar Street Lighting Installation |
70000 |
Solar Street Lighting Installation1 |
Completion of work |
-
latitude : 21.6507327
Longitude : 87.2811309
file name : Image_30122023154039753.png
|
2023-12-30 15:40:39.876613 |
51 |
82987009 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 21.6507294,21.6507294
Longitude : 87.2811441,87.2811441
file name : Image_27022024183701443.png
|
2024-02-27 18:37:01.499497 |
52 |
82987009 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 21.6507289,21.6507289
Longitude : 87.281144,87.281144
file name : Image_27022024183423413.png
|
2024-02-27 18:34:23.465529 |
53 |
82987009 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 21.650728,21.650728
Longitude : 87.2811404,87.2811404
file name : Image_27022024183144317.png
|
2024-02-27 18:31:44.371312 |
54 |
82983824 |
Repairing and maintenance of roads |
85000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 21.6507412,21.6507412
Longitude : 87.2811539,87.2811539
file name : Image_20032024154940155.png
|
2024-03-20 15:49:40.201657 |
55 |
82983824 |
Repairing and maintenance of roads |
85000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 21.6507427,21.6507427
Longitude : 87.2811535,87.2811535
file name : Image_29022024132127521.png
|
2024-02-29 13:21:27.56865 |
56 |
82983824 |
Repairing and maintenance of roads |
85000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 21.6507423,21.6507423
Longitude : 87.2811507,87.2811507
file name : Image_29022024131724769.png
|
2024-02-29 13:17:24.816389 |
57 |
62992355 |
Repair and restoration of Sunarui Gadadhara Girls High School under 5T |
350000 |
Repair and restoration of Sunarui Gadadhara Girls High School under 5T1 |
Completion of work |
-
latitude : 21.6507272
Longitude : 87.281113
file name : Image_03072024094409962.png
|
2024-07-03 09:44:10.019126 |
58 |
97667811 |
Repair of pipe drinking water |
45500 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.6507281
Longitude : 87.2811001
file name : Image_05102024134848706.png
|
2024-10-05 13:48:48.860572 |
59 |
97667811 |
Repair of pipe drinking water |
45500 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.6507274
Longitude : 87.2811023
file name : Image_05102024134728413.png
|
2024-10-05 13:47:28.56728 |
60 |
97667811 |
Repair of pipe drinking water |
45500 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.650795000000002
Longitude : 87.28125666666668
file name : Image_05102024134522921.png
|
2024-10-05 13:45:23.070106 |
61 |
82941343 |
Bio-Fertilizer Purchase/Distribution |
10000 |
Bio-Fertilizer Purchase/Distribution1 |
Plinth level |
-
latitude : 21.6507291
Longitude : 87.2810682
file name : Image_09102024095943495.png
|
2024-10-09 09:59:43.633333 |
62 |
82941343 |
Bio-Fertilizer Purchase/Distribution |
10000 |
Bio-Fertilizer Purchase/Distribution1 |
Completion of work |
-
latitude : 21.6507261
Longitude : 87.2810699
file name : Image_09102024095750533.png
|
2024-10-09 09:57:50.622642 |
63 |
101481374 |
Construction of new Piped Water Supply schemes |
444067 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.6507124
Longitude : 87.2811028
file name : Image_09082024175912921.png
|
2024-08-09 17:59:13.033547 |
64 |
101481374 |
Construction of new Piped Water Supply schemes |
444067 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.6507137
Longitude : 87.2811055
file name : Image_09082024175156766.png
|
2024-08-09 17:51:56.871552 |
65 |
101481374 |
Construction of new Piped Water Supply schemes |
444067 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.650714
Longitude : 87.2811044
file name : Image_09082024174424104.png
|
2024-08-09 17:44:24.316811 |