1 |
48689489 |
Maintenance of all PWDS in pratappur GP |
111656 |
Maintenance of all PWDS in pratappur GP1 |
Completion of work |
-
latitude : 21.6507396
Longitude : 87.2807295
file name : Image_12102021084641302.png
|
2021-10-12 08:46:41.417687 |
2 |
44637547 |
Const. Of Road from Pratappur Jhatu Sahu house to Purusottam Sahu house |
60000 |
Const. Of Road from Pratappur Jhatu Sahu house to Purusottam Sahu house1 |
Completion of work |
-
latitude : 21.5982137,21.5982125
Longitude : 87.2668656,87.2668656
file name : Image_29042021162113430.png
|
2021-04-29 16:21:13.508789 |
3 |
44637584 |
Construction of guard wall and cc road infront of Rajib Gandhi seva kendra Pratappur |
140000 |
Construction of guard wall and cc road infront of Rajib Gandhi seva kendra Pratappur1 |
Completion of work |
-
latitude : 21.5989338,21.59893218,21.59891554
Longitude : 87.26979807,87.26979783,87.26980228
file name : Image_29042021155544813.png
|
2021-04-29 15:55:44.893765 |
4 |
44637362 |
Const. Of Road fromRautura RD road to Muralidhar Mohanty house |
150000 |
Const. Of Road fromRautura RD road to Muralidhar Mohanty house1 |
Completion of work |
-
latitude : 21.59434252,21.59438973
Longitude : 87.25447684,87.25445596
file name : Image_29042021162802856.png
|
2021-04-29 16:28:02.943297 |
5 |
44634683 |
Const. Of Drain from Naighati Sankarnath mandap to Pita gadia |
150000 |
Const. Of Drain from Naighati Sankarnath mandap to Pita gadia1 |
Completion of work |
-
latitude : 21.6019382,21.6019379
Longitude : 87.2756063,87.2756045
file name : Image_29042021160319078.png
|
2021-04-29 16:03:19.148694 |
6 |
44634780 |
Const. Of Drain from Naighati Panchanan Das chhaka to Harendra das house |
100000 |
Const. Of Drain from Naighati Panchanan Das chhaka to Harendra das house1 |
Completion of work |
-
latitude : 21.60243479,21.60243437
Longitude : 87.27483716,87.27483848
file name : Image_29042021160545164.png
|
2021-04-29 16:05:45.233118 |
7 |
44634542 |
Payment towards remuniration to SEMs (one ) (CFC) |
24000 |
Payment towards remuniration to SEMs (one ) (CFC)1 |
Completion of work |
-
latitude : 21.57981643
Longitude : 87.22104642
file name : Image_04052021112250095.png
|
2021-05-04 11:22:50.244674 |
8 |
44634574 |
Payment toward remuniration of three pump operator @2000 |
72000 |
Payment toward remuniration of three pump operator @20001 |
Completion of work |
-
latitude : 21.5797797
Longitude : 87.22105486
file name : Image_04052021112253491.png
|
2021-05-04 11:22:53.615525 |
9 |
44634606 |
Payment of Energy Charges of all pws and GP office |
522312 |
Payment of Energy Charges of all pws and GP office 1 |
Completion of work |
-
latitude : 21.57958207
Longitude : 87.22122277
file name : Image_30062022164246597.png
|
2022-06-30 16:42:46.715181 |
10 |
44634606 |
Payment of Energy Charges of all pws and GP office |
522312 |
Payment of Energy Charges of all pws and GP office 1 |
Completion of work |
-
latitude : 21.59953984
Longitude : 87.26928578
file name : Image_28062021124549966.png
|
2021-06-28 12:45:50.07765 |
11 |
44634652 |
Const. Of Drain from Rautura Jhadesaw panigrahi pond to Gohiri pokhari |
150000 |
Const. Of Drain from Rautura Jhadesaw panigrahi pond to Gohiri pokhari1 |
Completion of work |
-
latitude : 21.59570506,21.59569125
Longitude : 87.25976194,87.25977206
file name : Image_11082021131826302.png
|
2021-08-11 13:18:26.418312 |
12 |
48692622 |
Const of CC road from Rautura Prahlad Mohanty house to Gohiri pokhari ghata |
100000 |
Const of CC road from Rautura Prahlad Mohanty house to Gohiri pokhari ghata1 |
Completion of work |
-
latitude : 21.59516031,21.59516021
Longitude : 87.2599735,87.25997352
file name : Image_06112021161053418.png
|
2021-11-06 16:10:53.5369 |
13 |
44637577 |
Culvert near naighati Srikanta Kamila Gadia |
33312 |
Culvert near naighati Srikanta Kamila Gadia1 |
Completion of work |
-
latitude : 21.6026795
Longitude : 87.27401646
file name : Image_16112021103505536.png
|
2021-11-16 10:35:05.680258 |
14 |
48692837 |
Const of uncompleted CC drain from Naighati Panchanan Das house to harendra Das house |
150000 |
Const of uncompleted CC drain from Naighati Panchanan Das house to harendra Das house1 |
Completion of work |
-
latitude : 21.60202814,21.60203291
Longitude : 87.27489705,87.27488976
file name : Image_16112021103225816.png
|
2021-11-16 10:32:25.941999 |
15 |
44637612 |
Const. Of Road from Pratappur Padmalava Rout house to Banshidhar Rout house |
100000 |
Const. Of Road from Pratappur Padmalava Rout house to Banshidhar Rout house1 |
Completion of work |
-
latitude : 21.5998225,21.59984526
Longitude : 87.26950881,87.26954266
file name : Image_17122021121807938.png
|
2021-12-17 12:18:08.077328 |
16 |
44637289 |
Repair and construction of Govt. Naighati UP school |
150000 |
Repair and construction of Govt. Naighati UP school1 |
Completion of work |
-
latitude : 21.60231505
Longitude : 87.2722382
file name : Image_17122021122121659.png
|
2021-12-17 12:21:21.777565 |
17 |
56628176 |
CONST OF CC ROAD FROM NAIGHATI RD ROAD TO SRINIBASH DAS HOUSE |
91052 |
CONST OF CC ROAD FROM NAIGHATI RD ROAD TO SRINIBASH DAS HOUSE1 |
Completion of work |
-
latitude : 21.6019827,21.6024697
Longitude : 87.2778866,87.2779198
file name : Image_05032022160840185.png
|
2022-03-05 16:08:40.282832 |
18 |
56628176 |
CONST OF CC ROAD FROM NAIGHATI RD ROAD TO SRINIBASH DAS HOUSE |
91052 |
CONST OF CC ROAD FROM NAIGHATI RD ROAD TO SRINIBASH DAS HOUSE1 |
Completion of work |
-
latitude : 21.6009802,21.6009802
Longitude : 87.2761557,87.2761557
file name : Image_05032022160307797.png
|
2022-03-05 16:03:07.898282 |
19 |
56628212 |
CONST OF CC ROAD FROM GOSAIBINDHA TRIBIKRAM PADHI HOUSE TO AMULYA DAS HOUSE |
50000 |
CONST OF CC ROAD FROM GOSAIBINDHA TRIBIKRAM PADHI HOUSE TO AMULYA DAS HOUSE1 |
Completion of work |
-
latitude : 21.6021482,21.6019843
Longitude : 87.2778561,87.2778705
file name : Image_05032022161933666.png
|
2022-03-05 16:19:33.791536 |
20 |
56627781 |
REPAIR AND RESTORATION OF PRATAPPUR SEVEN STAR CLUB (CFC) |
150000 |
REPAIR AND RESTORATION OF PRATAPPUR SEVEN STAR CLUB (CFC)1 |
Completion of work |
-
latitude : 21.6509399
Longitude : 87.2807151
file name : Image_09032022143333739.png
|
2022-03-09 14:33:33.850068 |
21 |
48693086 |
Purchase three hume pipe for Surudiha to Biridiha road |
30000 |
Purchase three hume pipe for Surudiha to Biridiha road1 |
Completion of work |
-
latitude : 21.6507399,21.6506573
Longitude : 87.2808019,87.2807116
file name : Image_09032022143201318.png
|
2022-03-09 14:32:01.42519 |
22 |
48690731 |
Payment of energy charges in Pratappur Gp |
460656 |
Payment of energy charges in Pratappur Gp1 |
Completion of work |
-
latitude : 21.57981206
Longitude : 87.2210463
file name : Image_30062022172535435.png
|
2022-06-30 17:25:35.535379 |
23 |
56627448 |
DIGGING OF NEW TUBE WELL AT RAUTARA MURALIDHAR MOHANTY HOUSE CHHAKA |
300000 |
DIGGING OF NEW TUBE WELL AT RAUTARA MURALIDHAR MOHANTY HOUSE CHHAKA1 |
Completion of work |
-
latitude : 21.6504709
Longitude : 87.2805776
file name : Image_26072022111547350.png
|
2022-07-26 11:15:47.440264 |
24 |
48690425 |
Payment towowards remuniration to SEMs |
96000 |
Payment towowards remuniration to SEMs1 |
Completion of work |
-
latitude : 21.6503851
Longitude : 87.2804527
file name : Image_08092022105139291.png
|
2022-09-08 10:51:39.431676 |
25 |
62199270 |
ENERGY CHARGES OF PWS |
578544 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 21.6507397
Longitude : 87.2811112
file name : Image_27032024164606761.png
|
2024-03-27 16:46:06.906397 |
26 |
65617733 |
Creation of plastic waste storage unit |
320000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 21.598971666666664
Longitude : 87.269955
file name : Image_29102022190220260.png
|
2022-10-29 19:02:20.35212 |
27 |
65618745 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house |
150000 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house1 |
Roof laid |
-
latitude : 21.7974901,21.7974926
Longitude : 87.2199995,87.2200035
file name : Image_18012023182133696.png
|
2023-01-18 18:21:33.782651 |
28 |
65618745 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house |
150000 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house1 |
Plinth level |
-
latitude : 21.7976164,21.7975032
Longitude : 87.2199578,87.2199949
file name : Image_18012023181403465.png
|
2023-01-18 18:14:03.551506 |
29 |
65618745 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house |
150000 |
Const of Guard wall with road from Pratappur anganawadi chhaka 6 RD road to Lambodar Behera house1 |
Completion of work |
-
latitude : 21.7974778,21.7974727
Longitude : 87.2200079,87.2200079
file name : Image_18012023180359888.png
|
2023-01-18 18:03:59.959588 |
30 |
65618511 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi |
200000 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi1 |
Roof laid |
-
latitude : 21.7974656,21.7974656
Longitude : 87.220007,87.220007
file name : Image_18012023182410320.png
|
2023-01-18 18:24:10.411712 |
31 |
65618511 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi |
200000 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi1 |
Plinth level |
-
latitude : 21.7976162,21.7976162
Longitude : 87.2199587,87.2199587
file name : Image_18012023181507981.png
|
2023-01-18 18:15:08.05777 |
32 |
65618511 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi |
200000 |
Const of guard wall with CC road from pratappur khadagadia chhaka to khadagadia dakhina adi1 |
Completion of work |
-
latitude : 21.7974664,21.7974684,21.7974684
Longitude : 87.2200068,87.2200112,87.2200112
file name : Image_18012023180403571.png
|
2023-01-18 18:04:03.649086 |
33 |
65617472 |
Operation & maintenance of drinking water supply system |
192544 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.650738333333333
Longitude : 87.28098
file name : Image_28022023193932322.png
|
2023-02-28 19:39:32.398647 |
34 |
65617472 |
Operation & maintenance of drinking water supply system |
192544 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.651036666666663
Longitude : 87.28103000000002
file name : Image_28022023193302563.png
|
2023-02-28 19:33:02.630238 |
35 |
65617472 |
Operation & maintenance of drinking water supply system |
192544 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.650855
Longitude : 87.28116833333334
file name : Image_28022023193102853.png
|
2023-02-28 19:31:02.928619 |
36 |
65617446 |
Operation & maintenance of drinking water supply system |
220000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.650705000000002
Longitude : 87.28102500000001
file name : Image_28022023193716986.png
|
2023-02-28 19:37:17.060947 |
37 |
65617446 |
Operation & maintenance of drinking water supply system |
220000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.650834999999997
Longitude : 87.28127666666666
file name : Image_28022023193827278.png
|
2023-02-28 19:38:27.37048 |
38 |
65617446 |
Operation & maintenance of drinking water supply system |
220000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.650725000000005
Longitude : 87.28106166666666
file name : Image_28022023193501160.png
|
2023-02-28 19:35:01.25521 |
39 |
65617446 |
Operation & maintenance of drinking water supply system |
220000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.650348333333334
Longitude : 87.28135166666668
file name : Image_28022023192946644.png
|
2023-02-28 19:29:46.725721 |
40 |
65618948 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi |
50000 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi 1 |
Roof laid |
-
latitude : 21.650518333333334,21.650518333333334,21.650518333333334
Longitude : 87.280765,87.280765,87.280765
file name : Image_10032023175529130.png
|
2023-03-10 17:55:29.232532 |
41 |
65618948 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi |
50000 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi 1 |
Plinth level |
-
latitude : 21.6506235,21.6506235,21.6506235
Longitude : 87.2807654,87.2807654,87.2807654
file name : Image_10032023175101000.png
|
2023-03-10 17:51:01.100126 |
42 |
65618948 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi |
50000 |
Repair of road from pratappur Manmatha Nayak house to Hadibandhu Panigrahi 1 |
Completion of work |
-
latitude : 21.6506229,21.6506226,21.6506226
Longitude : 87.2807598,87.2807633,87.2807633
file name : Image_10032023174857520.png
|
2023-03-10 17:48:57.61189 |
43 |
65617537 |
Operation & maintenance of drinking water supply system |
96000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.599727
Longitude : 87.2684122
file name : Image_30032023110403215.png
|
2023-03-30 11:04:03.315343 |
44 |
65619312 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka |
150000 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka1 |
Roof laid |
-
latitude : 21.6505216,21.6505006
Longitude : 87.2807288,87.2807222
file name : Image_29042023102708033.png
|
2023-04-29 10:27:08.132638 |
45 |
65619312 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka |
150000 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka1 |
Plinth level |
-
latitude : 21.598981666666667,21.6505431
Longitude : 87.26972666666667,87.2807327
file name : Image_29042023102228810.png
|
2023-04-29 10:22:28.916542 |
46 |
65619312 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka |
150000 |
Const of CC road from and guard wall from Harijan sahi chhaka uttar gadia to kamila chhaka1 |
Completion of work |
-
latitude : 21.6505057,21.650506
Longitude : 87.2807222,87.2807258
file name : Image_29042023101615513.png
|
2023-04-29 10:16:15.623525 |
47 |
65618657 |
Const of CC road from Pratappur G patra house to jena house |
100000 |
Const of CC road from Pratappur G patra house to jena house1 |
Roof laid |
-
latitude : 21.598981666666667,21.598981666666667
Longitude : 87.26972666666667,87.26972666666667
file name : Image_29042023102840639.png
|
2023-04-29 10:28:40.732538 |
48 |
65618657 |
Const of CC road from Pratappur G patra house to jena house |
100000 |
Const of CC road from Pratappur G patra house to jena house1 |
Plinth level |
-
latitude : 21.6505374,21.6505374
Longitude : 87.2807312,87.2807312
file name : Image_29042023102110735.png
|
2023-04-29 10:21:10.841518 |
49 |
65618657 |
Const of CC road from Pratappur G patra house to jena house |
100000 |
Const of CC road from Pratappur G patra house to jena house1 |
Completion of work |
-
latitude : 21.6505059,21.598981666666667
Longitude : 87.280721,87.26972666666667
file name : Image_29042023101701606.png
|
2023-04-29 10:17:01.708187 |
50 |
82960725 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.650751666666665,21.650751666666665
Longitude : 87.28107166666665,87.28107166666665
file name : Image_05112023120238821.png
|
2023-11-05 12:02:38.912295 |
51 |
82960725 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6506994,21.6506994
Longitude : 87.2811144,87.2811144
file name : Image_05112023114117082.png
|
2023-11-05 11:41:17.173141 |
52 |
82960725 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.601429999999997,21.601429999999997
Longitude : 87.27769333333332,87.27769333333332
file name : Image_05112023113741333.png
|
2023-11-05 11:37:41.423326 |
53 |
82959851 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507152,21.6507152
Longitude : 87.2811294,87.2811294
file name : Image_05112023120011507.png
|
2023-11-05 12:00:11.593838 |
54 |
82959851 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507125,21.6507125
Longitude : 87.2811279,87.2811279
file name : Image_05112023114220922.png
|
2023-11-05 11:42:21.016377 |
55 |
82959851 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507149,21.6507149
Longitude : 87.2811277,87.2811277
file name : Image_05112023113609419.png
|
2023-11-05 11:36:09.514394 |
56 |
82960254 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507121,21.6507121
Longitude : 87.2811234,87.2811234
file name : Image_05112023115849698.png
|
2023-11-05 11:58:49.781513 |
57 |
82960254 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507139,21.6507139
Longitude : 87.2811274,87.2811274
file name : Image_05112023114356559.png
|
2023-11-05 11:43:56.64743 |
58 |
82960254 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507077,21.6507077
Longitude : 87.2811239,87.2811239
file name : Image_05112023113411348.png
|
2023-11-05 11:34:11.433691 |
59 |
82983458 |
Construction of new Piped Water Supply schemes |
489279 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.6507135
Longitude : 87.2811289
file name : Image_05112023115756887.png
|
2023-11-05 11:57:57.036823 |
60 |
82983458 |
Construction of new Piped Water Supply schemes |
489279 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.6507095
Longitude : 87.2811252
file name : Image_05112023114450826.png
|
2023-11-05 11:44:50.980234 |
61 |
82983458 |
Construction of new Piped Water Supply schemes |
489279 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.6507098
Longitude : 87.2811256
file name : Image_05112023113222457.png
|
2023-11-05 11:32:22.63205 |
62 |
82983458 |
Construction of new Piped Water Supply schemes |
489279 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.6507158
Longitude : 87.2811301
file name : Image_05112023113229721.png
|
2023-11-05 11:32:29.861575 |
63 |
82949355 |
Repairing and maintenance of roads |
180000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 21.6507295,21.6507295
Longitude : 87.2811408,87.2811408
file name : Image_11012024133051951.png
|
2024-01-11 13:30:52.197155 |
64 |
82949355 |
Repairing and maintenance of roads |
180000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 21.6507299,21.6507299
Longitude : 87.2811365,87.2811365
file name : Image_11012024132515802.png
|
2024-01-11 13:25:15.898699 |
65 |
82949355 |
Repairing and maintenance of roads |
180000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 21.6507286,21.6507295
Longitude : 87.2811412,87.2811348
file name : Image_11012024131210215.png
|
2024-01-11 13:12:10.318721 |
66 |
82959346 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507295,21.6507298
Longitude : 87.2811408,87.281134
file name : Image_11012024133146159.png
|
2024-01-11 13:31:46.285379 |
67 |
82959346 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507299,21.6507299
Longitude : 87.2811365,87.2811365
file name : Image_11012024132415578.png
|
2024-01-11 13:24:15.675286 |
68 |
82959346 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507295,21.6507295
Longitude : 87.2811348,87.2811348
file name : Image_11012024131314281.png
|
2024-01-11 13:13:14.434615 |
69 |
82950038 |
Repairing and maintenance of roads |
120000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 21.6507295,21.6507295
Longitude : 87.2811408,87.2811408
file name : Image_11012024133501054.png
|
2024-01-11 13:35:01.144277 |
70 |
82950038 |
Repairing and maintenance of roads |
120000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 21.6507299,21.6507299
Longitude : 87.2811365,87.2811365
file name : Image_11012024132309828.png
|
2024-01-11 13:23:09.926349 |
71 |
82950038 |
Repairing and maintenance of roads |
120000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 21.6507295,21.6507295
Longitude : 87.2811348,87.2811348
file name : Image_11012024131414082.png
|
2024-01-11 13:14:14.311665 |
72 |
65617514 |
Operation & maintenance of drinking water supply system |
20000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6507392
Longitude : 87.2811085
file name : Image_27032024160213473.png
|
2024-03-27 16:02:13.611617 |
73 |
65617824 |
Operation & maintenance of community sanitary complex |
16394 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.6507398
Longitude : 87.2811091
file name : Image_27032024160059796.png
|
2024-03-27 16:00:59.89641 |
74 |
82984372 |
Piped drinking water to public institutions |
96000 |
Piped drinking water to public institutions1 |
|
-
latitude : 21.6507366
Longitude : 87.2811108
file name : Image_29032024180204429.png
|
2024-03-29 18:02:04.583439 |
75 |
65619410 |
Repair of drainage channel |
64780 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 21.6507399
Longitude : 87.2811092
file name : Image_30032024094104032.png
|
2024-03-30 09:41:04.126633 |
76 |
65617560 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.650738
Longitude : 87.2811115
file name : Image_30032024094207619.png
|
2024-03-30 09:42:07.726233 |
77 |
99369324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 21.650727
Longitude : 87.2811095
file name : Image_29062024120052279.png
|
2024-06-29 12:00:52.33894 |
78 |
99369324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 21.6507264
Longitude : 87.2811107
file name : Image_29062024114253830.png
|
2024-06-29 11:42:53.883946 |
79 |
99369324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 21.6507263
Longitude : 87.2811097
file name : Image_29062024114119476.png
|
2024-06-29 11:41:19.529681 |
80 |
99369324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 21.6507271
Longitude : 87.2811075
file name : Image_29062024113026677.png
|
2024-06-29 11:30:26.732997 |
81 |
99365577 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507282,21.6507282,21.6507282
Longitude : 87.2811094,87.2811094,87.2811092
file name : Image_29062024120557886.png
|
2024-06-29 12:05:57.946118 |
82 |
99365577 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507254,21.6507276
Longitude : 87.2811102,87.2811102
file name : Image_29062024113754820.png
|
2024-06-29 11:37:54.880011 |
83 |
99365577 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507272,21.6507237
Longitude : 87.2811076,87.2810961
file name : Image_29062024112123032.png
|
2024-06-29 11:21:23.092063 |
84 |
99369046 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507278,21.6507271
Longitude : 87.2811093,87.2811082
file name : Image_29062024120325911.png
|
2024-06-29 12:03:25.971909 |
85 |
99369046 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507262,21.6507268
Longitude : 87.2811106,87.2811088
file name : Image_29062024113908434.png
|
2024-06-29 11:39:08.487804 |
86 |
99369046 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507241,21.6507239
Longitude : 87.2811044,87.2811077
file name : Image_29062024112652821.png
|
2024-06-29 11:26:52.889007 |
87 |
99366238 |
Boundary wall and Gate |
100000 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 21.6507258
Longitude : 87.2811111
file name : Image_29062024120216140.png
|
2024-06-29 12:02:16.208125 |
88 |
99366238 |
Boundary wall and Gate |
100000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 21.6507251
Longitude : 87.2811099
file name : Image_29062024114017328.png
|
2024-06-29 11:40:17.381231 |
89 |
99366238 |
Boundary wall and Gate |
100000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 21.6507249
Longitude : 87.2811093
file name : Image_29062024112819087.png
|
2024-06-29 11:28:19.145407 |
90 |
99368663 |
Operation and Maintenance of piped water supply system |
200000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.653606666666665,21.653606666666665
Longitude : 87.28177333333333,87.28177333333333
file name : Image_10072024190803854.png
|
2024-07-10 19:08:03.925721 |
91 |
99368663 |
Operation and Maintenance of piped water supply system |
200000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.589808333333334,21.589808333333334,21.589808333333334
Longitude : 87.26096166666666,87.26096166666666,87.26096166666666
file name : Image_10072024190457105.png
|
2024-07-10 19:04:57.156806 |
92 |
103496058 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6507284,21.6507284
Longitude : 87.2810993,87.2810993
file name : Image_01102024183457251.png
|
2024-10-01 18:34:57.319183 |
93 |
103496058 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6507289,21.6507289
Longitude : 87.2811027,87.2811027
file name : Image_01102024182900282.png
|
2024-10-01 18:29:00.346894 |
94 |
103496058 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6507281,21.6507281
Longitude : 87.2810999,87.2810999
file name : Image_01102024181125454.png
|
2024-10-01 18:11:25.533442 |
95 |
103742969 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
500000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Roof laid |
-
latitude : 21.6507143
Longitude : 87.2811039
file name : Image_12082024154653745.png
|
2024-08-12 15:46:53.819852 |
96 |
103742969 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
500000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Plinth level |
-
latitude : 21.6507135
Longitude : 87.2811047
file name : Image_12082024154309691.png
|
2024-08-12 15:43:09.764753 |
97 |
103742969 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
500000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Completion of work |
-
latitude : 21.6507143
Longitude : 87.2811034
file name : Image_12082024153846859.png
|
2024-08-12 15:38:46.944419 |