1 |
20429318 |
Installation of street light. |
240000 |
Street Light1
|
Completed |
-
latitude : 21.646338333333333
Longitude : 87.12868666666667
file name : Image_20022020100343177.png
|
2020-02-20 10:03:43.454086 |
2 |
20429318 |
Installation of street light. |
240000 |
Street Light1
|
Completed |
-
latitude : 21.646293333333332
Longitude : 87.12863999999999
file name : Image_20022020124704111.png
|
2020-02-20 12:47:04.325281 |
3 |
20429318 |
Installation of street light. |
240000 |
Street Light2
|
Completed |
-
latitude : 21.648363333333336
Longitude : 87.12835500000001
file name : Image_20022020124710461.png
|
2020-02-20 12:47:10.667972 |
4 |
20429318 |
Installation of street light. |
240000 |
Street Light3
|
Completed |
-
latitude : 21.652258333333332
Longitude : 87.12688166666666
file name : Image_20022020124719706.png
|
2020-02-20 12:47:19.959657 |
5 |
20429318 |
Installation of street light. |
240000 |
Street Light4
|
Completed |
-
latitude : 21.652804999999997
Longitude : 87.14172166666667
file name : Image_24022020123715102.png
|
2020-02-24 12:37:15.452105 |
6 |
20429318 |
Installation of street light. |
240000 |
Street Light5
|
Completed |
-
latitude : 21.644209999999998
Longitude : 87.14583333333333
file name : Image_08032020125707188.png
|
2020-03-08 12:57:07.475032 |
7 |
44133510 |
Repairing of C C Road and drain from Alekha Tungi to Panchanana Das,Narasinghadiha |
150000 |
Repairing of C C Road and drain from Alekha Tungi to Panchanana Das,Narasinghadiha1 |
Completion of work |
-
latitude : 21.64197,21.64197
Longitude : 87.14402166666666,87.14402166666666
file name : Image_08112020181255356.png
|
2020-11-08 18:12:57.961026 |
8 |
38505336 |
Constn. of boundary wall and beautification of N.rajuapada school of incomplete side |
200000 |
Constn. of boundary wall and beautification of N.rajuapada school of incomplete side1 |
Commenced |
-
latitude : 21.646725
Longitude : 87.14838166666665
file name : Image_08112020181302300.png
|
2020-11-08 18:13:04.917063 |
9 |
38504694 |
Constn. of incomplete damaged c.c. road from S. Das house to M. Dsa house ,VIA-B. murmu house |
160000 |
Constn. of incomplete damaged c.c. road from S. Das house to M. Dsa house ,VIA-B. murmu house1 |
Commenced |
-
latitude : 21.642440000000004,21.642198333333333
Longitude : 87.12770666666665,87.12757500000001
file name : Image_08112020181230085.png
|
2020-11-08 18:12:32.692323 |
10 |
32715766 |
Reconstruction and repairing of Nargoda UGME school building |
400000 |
Reconstruction and repairing of Nargoda UGME school building1 |
Completed |
-
latitude : 21.63762166666667
Longitude : 87.12578166666665
file name : Image_17112020112405116.png
|
2020-11-17 11:24:05.205823 |
11 |
44133691 |
Complition of Irda-1 AWC |
100000 |
Complition of Irda-1 AWC1 |
Completion of work |
-
latitude : 21.65011666666667
Longitude : 87.12787000000002
file name : Image_08112020162516170.png
|
2020-11-08 16:25:18.733867 |
12 |
44133536 |
Repairing of C C Road and drain from Sadananda Das house to Manmath Jena house,via-Irda smasan,Deopa |
200000 |
Repairing of C C Road and drain from Sadananda Das house to Manmath Jena house,via-Irda smasan,Deopa1 |
Completion of work |
-
latitude : 21.643735,21.643735
Longitude : 87.128145,87.128145
file name : Image_08112020181226484.png
|
2020-11-08 18:12:29.073846 |
13 |
44133864 |
Construction of C C Road and drain from Khagendra Das house to Narasinghadiha Rajuapada MMSY,Narasin |
150000 |
Construction of C C Road and drain from Khagendra Das house to Narasinghadiha Rajuapada MMSY,Narasin1 |
Completion of work |
-
latitude : 21.64114833333333,21.641075
Longitude : 87.14407166666666,87.14402333333334
file name : Image_08112020181252068.png
|
2020-11-08 18:12:54.660414 |
14 |
32716430 |
Construction of boundary wall at Deopada New pry School |
200000 |
Construction of boundary wall at Deopada New pry School1 |
Commenced |
-
latitude : 21.642141666666664
Longitude : 87.12955666666667
file name : Image_08112020181233597.png
|
2020-11-08 18:12:36.258839 |
15 |
38504075 |
Watter supplay at Nargoda(Sandhapada) |
300000 |
Watter supplay at Nargoda(Sandhapada)1 |
Commenced |
-
latitude : 21.63486833333333,21.634819999999998
Longitude : 87.12991666666667,87.12996666666668
file name : Image_08112020181248664.png
|
2020-11-08 18:12:51.262093 |
16 |
38504142 |
Watter supply at Rajuapada Dey house |
300000 |
Watter supply at Rajuapada Dey house1 |
Commenced |
-
latitude : 21.651459999999997,21.651458333333334
Longitude : 87.14746333333332,87.147475
file name : Image_23112020125945918.png
|
2020-11-23 12:59:46.047046 |
17 |
38503804 |
Watter supplay at Kalanda Thakurani |
300000 |
Watter supplay at Kalanda Thakurani1 |
Commenced |
-
latitude : 21.646313333333335,21.646286666666665
Longitude : 87.12153333333332,87.12144000000002
file name : Image_17112020122840538.png
|
2020-11-17 12:28:40.654247 |
18 |
38503852 |
Constn. of boundary wall and beautification at Deopada New pry. school of south side of the school |
200000 |
Constn. of boundary wall and beautification at Deopada New pry. school of south side of the school1 |
Commenced |
-
latitude : 21.641846666666666
Longitude : 87.12929000000001
file name : Image_08112020181237563.png
|
2020-11-08 18:12:40.164547 |
19 |
32715731 |
Construction of boundary wall at South side of Narasinghadiha Rajuapada UP School |
100000 |
Construction of boundary wall at South side of Narasinghadiha Rajuapada UP School1 |
Commenced |
-
latitude : 21.64671
Longitude : 87.14865666666668
file name : Image_08112020181258883.png
|
2020-11-08 18:13:01.495097 |
20 |
32715801 |
Reconstruction and repairing of incomplete Deopada New pry School |
100000 |
Reconstruction and repairing of incomplete Deopada New pry School1 |
Commenced |
-
latitude : 21.642063333333333
Longitude : 87.12933
file name : Image_08112020181241489.png
|
2020-11-08 18:12:44.119254 |
21 |
32715932 |
Water supply at kalanda Uttar Sahi |
350000 |
Water supply at kalanda Uttar Sahi1 |
Commenced |
-
latitude : 21.642009999999996
Longitude : 87.12081666666667
file name : Image_17112020121533069.png
|
2020-11-17 12:15:33.169355 |
22 |
32715972 |
Reconstruction of damaged road from Sadananda Das house to Murali Das house |
340000 |
Reconstruction of damaged road from Sadananda Das house to Murali Das house1 |
Commenced |
-
latitude : 21.644728333333333
Longitude : 87.129715
file name : Image_08112020163947200.png
|
2020-11-08 16:39:49.771009 |
23 |
44133651 |
Repairing od C C road from Banshidhara Patra house to Nilakantha Patra house,Nargoda |
190000 |
Repairing od C C road from Banshidhara Patra house to Nilakantha Patra house,Nargoda1 |
Completion of work |
-
latitude : 21.634725000000003
Longitude : 87.128795
file name : Image_08112020181245117.png
|
2020-11-08 18:12:47.73889 |
24 |
44133933 |
Contigency and administrative expencess |
12312 |
Contigency and administrative expencess1 |
Completion of work |
-
latitude : 21.7043938
Longitude : 87.0552607
file name : Image_04052021130741133.png
|
2021-05-04 13:07:41.217362 |
25 |
44133580 |
Complition and beautification of Nargoda UGME School,Nargoda |
300000 |
Complition and beautification of Nargoda UGME School,Nargoda1 |
Completion of work |
-
latitude : 21.637446666666666
Longitude : 87.12557999999999
file name : Image_31072021120142213.png
|
2021-07-31 12:01:42.292754 |
26 |
44134136 |
Construction of Deopada New pry .School gate. |
50000 |
Construction of Deopada New pry .School gate.1 |
Completion of work |
-
latitude : 21.641838333333332
Longitude : 87.12950166666666
file name : Image_31072021115331763.png
|
2021-07-31 11:53:31.867346 |
27 |
44134167 |
Construction of Rahas Mndap at Nargoda |
150000 |
Construction of Rahas Mndap at Nargoda1 |
Completion of work |
-
latitude : 21.7043913
Longitude : 87.055263
file name : Image_18112021155932400.png
|
2021-11-18 15:59:32.536803 |
28 |
48100231 |
Construction of boundary wall east,West and south side of the Rural Park |
450000 |
Construction of boundary wall east,West and south side of the Rural Park1 |
Completion of work |
-
latitude : 21.641391666666664
Longitude : 87.1415
file name : Image_02122021161713949.png
|
2021-12-02 16:17:14.05845 |
29 |
44133671 |
Complition of Bhittar Brahmattar AWC. |
100000 |
Complition of Bhittar Brahmattar AWC.1 |
Completion of work |
-
latitude : 21.650303333333333
Longitude : 87.12587333333335
file name : Image_23122021074227358.png
|
2021-12-23 07:42:27.479804 |
30 |
62039141 |
COMPLETION OF GP LIBRARY |
100000 |
COMPLETION OF GP LIBRARY1 |
Completion of work |
-
latitude : 21.650441666666666
Longitude : 87.12852833333334
file name : Image_09012023115609607.png
|
2023-01-09 11:56:09.727912 |
31 |
62039141 |
COMPLETION OF GP LIBRARY |
100000 |
COMPLETION OF GP LIBRARY1 |
Completion of work |
-
latitude : 21.65073
Longitude : 87.12862666666666
file name : Image_26072022111943454.png
|
2022-07-26 11:19:43.541831 |
32 |
48100461 |
Construction of c..c road from Deopada New Pry. school gate to office |
80000 |
Construction of c..c road from Deopada New Pry. school gate to office1 |
Completion of work |
-
latitude : 21.649484999999995,21.649484999999995,21.649484999999995
Longitude : 87.12528666666667,87.12528666666667,87.12528666666667
file name : Image_05112022113329562.png
|
2022-11-05 11:33:29.656393 |
33 |
48100461 |
Construction of c..c road from Deopada New Pry. school gate to office |
80000 |
Construction of c..c road from Deopada New Pry. school gate to office1 |
Completion of work |
-
latitude : 21.650366666666667,21.650366666666667
Longitude : 87.125785,87.125785
file name : Image_26072022110835889.png
|
2022-07-26 11:08:36.010162 |
34 |
55678775 |
Completion of Bhitara Brahmattar AWC Building |
130000 |
Completion of Bhitara Brahmattar AWC Building 1 |
Completion of work |
-
latitude : 21.65073
Longitude : 87.12862666666666
file name : Image_26072022110950458.png
|
2022-07-26 11:09:50.573791 |
35 |
44133618 |
Construction of Durga mandap at Gambhalundi chhaka |
200000 |
Construction of Durga mandap at Gambhalundi chhaka1 |
Completion of work |
-
latitude : 21.650545000000005
Longitude : 87.1289
file name : Image_27072022084013286.png
|
2022-07-27 08:40:13.388234 |
36 |
62038889 |
EXPENDITURE TOWARDS 5T HIGH SCHOOL IRDA |
450000 |
EXPENDITURE TOWARDS 5T HIGH SCHOOL IRDA1 |
Completion of work |
-
latitude : 21.7043937
Longitude : 87.0552206
file name : Image_01102022152445847.png
|
2022-10-01 15:24:45.973922 |
37 |
65478523 |
Construction of Community Sanitary Complex |
450000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.650245
Longitude : 87.12582833333333
file name : Image_28032023142927621.png
|
2023-03-28 14:29:27.768106 |
38 |
65478523 |
Construction of Community Sanitary Complex |
450000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.6496678
Longitude : 87.1251711
file name : Image_11102022183621760.png
|
2022-10-11 18:36:21.875338 |
39 |
44129040 |
Remuneration of SEM and Pump operator |
244800 |
Remuneration of SEM and Pump operator 1 |
Completion of work |
-
latitude : 21.7043945
Longitude : 87.0552611
file name : Image_04052021124222569.png
|
2021-05-04 12:42:22.76496 |
40 |
44133444 |
Repairing pipe line of Ganakadova PWS |
50000 |
Repairing pipe line of Ganakadova PWS1 |
Roof laid |
-
latitude : 21.650740000000003,21.650766666666662,21.650786666666665
Longitude : 87.1286,87.12872333333334,87.12879666666667
file name : Image_09012023115647540.png
|
2023-01-09 11:56:47.66849 |
41 |
44133444 |
Repairing pipe line of Ganakadova PWS |
50000 |
Repairing pipe line of Ganakadova PWS1 |
Completion of work |
-
latitude : 21.7043669,21.7043669
Longitude : 87.055224,87.055224
file name : Image_04092021170219100.png
|
2021-09-04 17:02:19.196011 |
42 |
44134033 |
Moorming work from N Rajuapada MMSY to Bhupati Panda,Rajuapada |
70000 |
Moorming work from N Rajuapada MMSY to Bhupati Panda,Rajuapada1 |
Roof laid |
-
latitude : 21.650488333333335,21.650488333333335
Longitude : 87.12863666666665,87.12863666666665
file name : Image_09012023115621159.png
|
2023-01-09 11:56:21.274719 |
43 |
44134033 |
Moorming work from N Rajuapada MMSY to Bhupati Panda,Rajuapada |
70000 |
Moorming work from N Rajuapada MMSY to Bhupati Panda,Rajuapada1 |
Completion of work |
-
latitude : 21.7043518,21.7043537
Longitude : 87.0552274,87.0552281
file name : Image_04092021170746851.png
|
2021-09-04 17:07:46.948589 |
44 |
44133770 |
Moorming work from Gajanana Behera house to Ratnakar Behera House |
75000 |
Moorming work from Gajanana Behera house to Ratnakar Behera House1 |
Roof laid |
-
latitude : 21.650545000000005,21.650545000000005
Longitude : 87.12864833333333,87.12864833333333
file name : Image_09012023115615326.png
|
2023-01-09 11:56:15.442398 |
45 |
44133770 |
Moorming work from Gajanana Behera house to Ratnakar Behera House |
75000 |
Moorming work from Gajanana Behera house to Ratnakar Behera House1 |
Completion of work |
-
latitude : 21.63857666666667,21.638551666666665
Longitude : 87.12651833333332,87.12634666666666
file name : Image_31072021121214490.png
|
2021-07-31 12:12:14.572527 |
46 |
44133900 |
Remuneration of GRS towards priyasoft online |
6000 |
Remuneration of GRS towards priyasoft online1 |
Roof laid |
-
latitude : 21.650446666666667
Longitude : 87.12881166666666
file name : Image_09012023115713129.png
|
2023-01-09 11:57:13.337754 |
47 |
44133900 |
Remuneration of GRS towards priyasoft online |
6000 |
Remuneration of GRS towards priyasoft online1 |
Completion of work |
-
latitude : 21.7043945
Longitude : 87.0552624
file name : Image_04052021130737425.png
|
2021-05-04 13:07:37.557196 |
48 |
48099124 |
Electricity charges of GP Office building |
5000 |
Electricity charges of GP Office building1 |
Roof laid |
-
latitude : 21.650446666666667
Longitude : 87.12881166666666
file name : Image_09012023115705487.png
|
2023-01-09 11:57:05.60748 |
49 |
48099124 |
Electricity charges of GP Office building |
5000 |
Electricity charges of GP Office building1 |
Completion of work |
-
latitude : 21.65036166666666
Longitude : 87.12574500000001
file name : Image_09052022133251387.png
|
2022-05-09 13:32:51.50992 |
50 |
48096301 |
Water supply at Uchadiha |
400000 |
Water supply at Uchadiha1 |
Roof laid |
-
latitude : 21.649484999999995
Longitude : 87.12528666666667
file name : Image_05112022113136513.png
|
2022-11-05 11:31:36.617666 |
51 |
48096301 |
Water supply at Uchadiha |
400000 |
Water supply at Uchadiha1 |
Completion of work |
-
latitude : 21.65048
Longitude : 87.12583000000001
file name : Image_31122021144348457.png
|
2021-12-31 14:43:48.565651 |
52 |
48101412 |
Augmentation of pipeline of G.P. Office PWS |
64032 |
Augmentation of pipeline of G.P. Office PWS1 |
Roof laid |
-
latitude : 21.650668333333336,21.650668333333336,21.650668333333336
Longitude : 87.12901166666667,87.12901166666667,87.12901166666667
file name : Image_09012023115637244.png
|
2023-01-09 11:56:37.365147 |
53 |
48101412 |
Augmentation of pipeline of G.P. Office PWS |
64032 |
Augmentation of pipeline of G.P. Office PWS1 |
Completion of work |
-
latitude : 21.613648333333337,21.60985833333333
Longitude : 87.03556666666667,87.03303333333334
file name : Image_08122021162527646.png
|
2021-12-08 16:25:27.741619 |
54 |
48097774 |
Repairing and augmention of Ganakadova PWS |
50000 |
Repairing and augmention of Ganakadova PWS1 |
Roof laid |
-
latitude : 21.650638333333337,21.650638333333337,21.650638333333337
Longitude : 87.12854666666665,87.12854666666665,87.12854666666665
file name : Image_09012023115625653.png
|
2023-01-09 11:56:25.78375 |
55 |
48097774 |
Repairing and augmention of Ganakadova PWS |
50000 |
Repairing and augmention of Ganakadova PWS1 |
Completion of work |
-
latitude : 21.570743333333333,21.5707289,21.5707289
Longitude : 87.04404333333332,87.044167,87.044167
file name : Image_27102021142924977.png
|
2021-10-27 14:29:25.072496 |
56 |
48097201 |
Water supply at Kainda |
250000 |
Water supply at Kainda1 |
Roof laid |
-
latitude : 21.64952333333333
Longitude : 87.12499000000001
file name : Image_05112022110651223.png
|
2022-11-05 11:06:51.32643 |
57 |
48097201 |
Water supply at Kainda |
250000 |
Water supply at Kainda1 |
Completion of work |
-
latitude : 21.64953666666667
Longitude : 87.12496166666666
file name : Image_26102021104144812.png
|
2021-10-26 10:41:44.925715 |
58 |
48097450 |
Water supply near Kalanda khatua house |
250000 |
Water supply near Kalanda khatua house1 |
Roof laid |
-
latitude : 21.650681666666667
Longitude : 87.12911000000001
file name : Image_09012023115630235.png
|
2023-01-09 11:56:30.348118 |
59 |
48097450 |
Water supply near Kalanda khatua house |
250000 |
Water supply near Kalanda khatua house1 |
Completion of work |
-
latitude : 21.644191666666664
Longitude : 87.12458999999998
file name : Image_26102021111310527.png
|
2021-10-26 11:13:10.645818 |
60 |
48101227 |
Water supply at Kudapada |
250000 |
Water supply at Kudapada1 |
Completion of work |
-
latitude : 21.650411666666667
Longitude : 87.12588666666667
file name : Image_07082021142502128.png
|
2021-08-07 14:25:02.207647 |
61 |
62037102 |
CO0MPLETION OF KUDAPADA PWS |
140000 |
CO0MPLETION OF KUDAPADA PWS1 |
Roof laid |
-
latitude : 21.649484999999995
Longitude : 87.12528666666667
file name : Image_09012023115603622.png
|
2023-01-09 11:56:03.791017 |
62 |
62037102 |
CO0MPLETION OF KUDAPADA PWS |
140000 |
CO0MPLETION OF KUDAPADA PWS1 |
Completion of work |
-
latitude : 21.6504071
Longitude : 87.1261077
file name : Image_16082022180031463.png
|
2022-08-16 18:00:31.551989 |
63 |
48099626 |
Repairing and colouring of Uchadiha UGME School |
130000 |
Repairing and colouring of Uchadiha UGME School1 |
Completion of work |
-
latitude : 21.4926143
Longitude : 86.9383483
file name : Image_09012023120330137.png
|
2023-01-09 12:03:30.237624 |
64 |
62038295 |
EXPENDITURE TOWARDS SBM SANITATION |
178544 |
EXPENDITURE TOWARDS SBM SANITATION1 |
Completion of work |
-
latitude : 21.65007
Longitude : 87.1258299
file name : Image_15022023172650646.png
|
2023-02-15 17:26:50.788839 |
65 |
67571053 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.7043947
Longitude : 87.0552262
file name : Image_27032023155620348.png
|
2023-03-27 15:56:20.454425 |
66 |
67571053 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.7043942
Longitude : 87.055222
file name : Image_27032023153623027.png
|
2023-03-27 15:36:23.228569 |
67 |
62038056 |
ENERGY BILL OF PWS AND OTHER |
200000 |
ENERGY BILL OF PWS AND OTHER1 |
Completion of work |
-
latitude : 21.650421666666663
Longitude : 87.12611166666666
file name : Image_22092022144154914.png
|
2022-09-22 14:41:55.086196 |
68 |
62038056 |
ENERGY BILL OF PWS AND OTHER |
200000 |
ENERGY BILL OF PWS AND OTHER1 |
Completion of work |
-
latitude : 21.650616666666664
Longitude : 87.12892333333333
file name : Image_09012023115658189.png
|
2023-01-09 11:56:58.308326 |
69 |
62036967 |
PURCHASE OF BLEACHING POWDER |
5000 |
PURCHASE OF BLEACHING POWDER1 |
Completion of work |
-
latitude : 21.65015166666667
Longitude : 87.12575999999999
file name : Image_28032023142505311.png
|
2023-03-28 14:25:06.154161 |
70 |
62036881 |
Engagement of Mobile Van |
15000 |
Engagement of Mobile Van1 |
Completion of work |
-
latitude : 21.652705
Longitude : 87.14157166666668
file name : Image_28032023142233515.png
|
2023-03-28 14:22:33.640123 |
71 |
62037216 |
AUGMENTATION OF PIPELINE FROM NARSINGHPUR PWS TO PURNA DAS HOUSE |
60000 |
AUGMENTATION OF PIPELINE FROM NARSINGHPUR PWS TO PURNA DAS HOUSE1 |
Completion of work |
-
latitude : 21.650513333333333,21.650513333333333
Longitude : 87.12875833333334,87.12875833333334
file name : Image_01062023125726021.png
|
2023-06-01 12:57:26.113888 |
72 |
62037851 |
AUGMENTATION OF PIPELINE FROM NARGODA SCHOOL TO RADHAKRUSHNA MARKET COMPLEX |
50000 |
AUGMENTATION OF PIPELINE FROM NARGODA SCHOOL TO RADHAKRUSHNA MARKET COMPLEX1 |
Completion of work |
-
latitude : 21.650513333333333,21.650513333333333,21.650513333333333
Longitude : 87.12875833333334,87.12875833333334,87.12875833333334
file name : Image_01062023125932017.png
|
2023-06-01 12:59:32.122159 |
73 |
62039843 |
CONSTRUCTION OF MACHHADIHA UGME SCHOOL GATE |
150000 |
CONSTRUCTION OF MACHHADIHA UGME SCHOOL GATE1 |
Completion of work |
-
latitude : 21.650513333333333
Longitude : 87.12875833333334
file name : Image_01062023130109277.png
|
2023-06-01 13:01:09.36033 |
74 |
62038632 |
BATHING GHAT AT RAJUAPADA LANKESWARI TEMPLE NEAR PALPALA RIVER |
200000 |
BATHING GHAT AT RAJUAPADA LANKESWARI TEMPLE NEAR PALPALA RIVER1 |
Completion of work |
-
latitude : 21.7043946
Longitude : 87.0552657
file name : Image_28072023135657795.png
|
2023-07-28 13:56:57.889704 |
75 |
81035065 |
Operation and Maintenance of drinking water supply system |
316800 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.704478333333334
Longitude : 87.05542833333332
file name : Image_18042024123449467.png
|
2024-04-18 12:34:49.601481 |
76 |
81035065 |
Operation and Maintenance of drinking water supply system |
316800 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.650438333333334
Longitude : 87.12590833333334
file name : Image_04112023122133433.png
|
2023-11-04 12:21:33.54675 |
77 |
81035065 |
Operation and Maintenance of drinking water supply system |
316800 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.650438333333334
Longitude : 87.12590833333334
file name : Image_04112023115336364.png
|
2023-11-04 11:53:36.470111 |
78 |
81035065 |
Operation and Maintenance of drinking water supply system |
316800 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.650438333333334
Longitude : 87.12590833333334
file name : Image_04112023114836772.png
|
2023-11-04 11:48:36.880378 |
79 |
81035065 |
Operation and Maintenance of drinking water supply system |
316800 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.650415
Longitude : 87.12585333333332
file name : Image_12092023085219860.png
|
2023-09-12 08:52:19.966933 |
80 |
81034296 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.65039
Longitude : 87.12580000000001
file name : Image_04112023114558446.png
|
2023-11-04 11:45:58.555815 |
81 |
81034296 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.65039
Longitude : 87.12580000000001
file name : Image_03112023161728872.png
|
2023-11-03 16:17:29.040299 |
82 |
81473001 |
Electricity connection /Installation of Solar Energy |
170000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 21.650525000000002
Longitude : 87.12857166666666
file name : Image_27092023155722499.png
|
2023-09-27 15:57:22.614444 |
83 |
81473001 |
Electricity connection /Installation of Solar Energy |
170000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 21.650525000000002
Longitude : 87.12857166666666
file name : Image_27092023154801088.png
|
2023-09-27 15:48:01.219912 |
84 |
79546605 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.704383,21.704383
Longitude : 87.0552321,87.0552321
file name : Image_18042024121438994.png
|
2024-04-18 12:14:39.097187 |
85 |
79546605 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.704384,21.704384,21.704384
Longitude : 87.0552264,87.0552264,87.0552264
file name : Image_18042024120815931.png
|
2024-04-18 12:08:16.073697 |
86 |
79546605 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.7043872,21.7043857,21.7043872
Longitude : 87.0552274,87.0552283,87.0552274
file name : Image_18042024115337103.png
|
2024-04-18 11:53:37.353085 |
87 |
79545076 |
Construction of Building |
50000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.7043838
Longitude : 87.0552277
file name : Image_18042024121327251.png
|
2024-04-18 12:13:27.346146 |
88 |
79545076 |
Construction of Building |
50000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.7043838
Longitude : 87.0552276
file name : Image_18042024120720589.png
|
2024-04-18 12:07:20.833765 |
89 |
79545076 |
Construction of Building |
50000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.7043836
Longitude : 87.0552283
file name : Image_18042024120356809.png
|
2024-04-18 12:03:56.938524 |
90 |
67572907 |
Improvement of Irda Village Road |
65000 |
Improvement of Irda Village Road 1 |
Completion of work |
-
latitude : 21.7044045,21.7044045,21.7044063
Longitude : 87.0552356,87.0552356,87.0552333
file name : Image_14052024124820589.png
|
2024-05-14 12:48:20.669967 |
91 |
67572888 |
Improvement of Gambhalundi Village Road |
60000 |
Improvement of Gambhalundi Village Road 1 |
Completion of work |
-
latitude : 21.7044061,21.7044038,21.698990000000002
Longitude : 87.0552332,87.0552349,87.05993833333332
file name : Image_14052024124710156.png
|
2024-05-14 12:47:10.241408 |
92 |
62039729 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE |
309432 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE1 |
Completion of work |
-
latitude : 21.7044067
Longitude : 87.0552352
file name : Image_21052024121851291.png
|
2024-05-21 12:18:51.392589 |
93 |
62039729 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE |
309432 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE1 |
Completion of work |
-
latitude : 21.7044069
Longitude : 87.0552351
file name : Image_21052024121633498.png
|
2024-05-21 12:16:33.597855 |
94 |
62039729 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE |
309432 |
COMMUNITY CENTRE AT GAMBHALUNDI SHIVA TEMPLE1 |
Completion of work |
-
latitude : 21.7044069
Longitude : 87.0552351
file name : Image_21052024121450829.png
|
2024-05-21 12:14:50.936612 |
95 |
79553917 |
Construction of roads |
80000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.7044064,21.7044064
Longitude : 87.0552323,87.0552308
file name : Image_22032024124341895.png
|
2024-03-22 12:43:41.985909 |
96 |
79553917 |
Construction of roads |
80000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.7044064,21.7044064
Longitude : 87.0552347,87.0552347
file name : Image_22032024123421730.png
|
2024-03-22 12:34:21.971254 |
97 |
79553917 |
Construction of roads |
80000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.70112333333333,21.70112333333333,21.7044063,21.7044063
Longitude : 87.05671666666667,87.05671666666667,87.0552316,87.0552316
file name : Image_22032024122109430.png
|
2024-03-22 12:21:09.568701 |
98 |
79450116 |
Operation and Maintenance of drinking water supply system |
10000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.7044068
Longitude : 87.0552278
file name : Image_22032024124203211.png
|
2024-03-22 12:42:03.375528 |
99 |
79450116 |
Operation and Maintenance of drinking water supply system |
10000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.7044071
Longitude : 87.0552263
file name : Image_22032024123957551.png
|
2024-03-22 12:39:57.669953 |
100 |
79450116 |
Operation and Maintenance of drinking water supply system |
10000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.704790000000003
Longitude : 87.05508
file name : Image_22032024123137716.png
|
2024-03-22 12:31:37.825567 |
101 |
96104563 |
Repair of pipe drinking water |
261600 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.7044044
Longitude : 87.0552351
file name : Image_04072024181938851.png
|
2024-07-04 18:19:38.923354 |
102 |
96104563 |
Repair of pipe drinking water |
261600 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.7043847
Longitude : 87.0552541
file name : Image_04072024181620615.png
|
2024-07-04 18:16:20.677975 |
103 |
96104563 |
Repair of pipe drinking water |
261600 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.7043849
Longitude : 87.055249
file name : Image_04072024181420468.png
|
2024-07-04 18:14:20.536507 |