1 |
44289154 |
Development of community center infront of the garveswar nodal u.p. school |
71312 |
Development of community center infront of the garveswar nodal u.p. school 1 |
Completion of work |
-
latitude : 21.69124759
Longitude : 87.31415821
file name : Image_19112020111633400.png
|
2020-11-19 11:16:33.493435 |
2 |
44289385 |
Repairing And Maintenance Of CC Road From Miapatna Aswini Jena House To Aruhabruti-2 Purnachandra Je |
200000 |
Repairing And Maintenance Of CC Road From Miapatna Aswini Jena House To Aruhabruti-2 Purnachandra Je1 |
Completion of work |
-
latitude : 21.68946845,21.68948564
Longitude : 87.31882779,87.31881192
file name : Image_30122020135932653.png
|
2020-12-30 13:59:32.77911 |
3 |
44289385 |
Repairing And Maintenance Of CC Road From Miapatna Aswini Jena House To Aruhabruti-2 Purnachandra Je |
200000 |
Repairing And Maintenance Of CC Road From Miapatna Aswini Jena House To Aruhabruti-2 Purnachandra Je1 |
Completion of work |
-
latitude : 21.68947843,21.68947859
Longitude : 87.31878319,87.31878335
file name : Image_30122020135938069.png
|
2020-12-30 13:59:38.185342 |
4 |
44289145 |
Construction of c.c. road from miapatna main road to sk kashimuddin house via-sk suleman house |
100000 |
Construction of c.c. road from miapatna main road to sk kashimuddin house via-sk suleman house1 |
Completion of work |
-
latitude : 21.68620994,21.6862479
Longitude : 87.32008959,87.32005867
file name : Image_28012021141212968.png
|
2021-01-28 14:12:13.072845 |
5 |
44289344 |
Repairing And Maintenance Of CC Road From Khardpipal Gunadhar Jena House To Barendra Singh House |
130000 |
Repairing And Maintenance Of CC Road From Khardpipal Gunadhar Jena House To Barendra Singh House 1 |
Completion of work |
-
latitude : 21.70510129,21.70510089
Longitude : 87.31446214,87.31446233
file name : Image_19112020114047010.png
|
2020-11-19 11:40:47.124592 |
6 |
44289329 |
Repairing And Maintenance Of CC Road From Nayapali Iswara Patra House To Khardpipal Narayan Das Hous |
150000 |
Repairing And Maintenance Of CC Road From Nayapali Iswara Patra House To Khardpipal Narayan Das Hous1 |
Completion of work |
-
latitude : 21.69901143,21.69901113
Longitude : 87.31864114,87.31864157
file name : Image_19112020111639403.png
|
2020-11-19 11:16:39.498229 |
7 |
44289108 |
Construction of c.c. road from nayapali main road to rabindra patra via-girish Chandra patra house |
100000 |
Construction of c.c. road from nayapali main road to rabindra patra via-girish Chandra patra house 1 |
Completion of work |
-
latitude : 21.70262109,21.70262128,21.70262146
Longitude : 87.322053,87.32205305,87.32205299
file name : Image_16112020141123175.png
|
2020-11-16 14:11:29.391105 |
8 |
44289079 |
Construction of c.c. road from nayapali bhagabata patra house to barika sahi via pravakara patra |
100000 |
Construction of c.c. road from nayapali bhagabata patra house to barika sahi via pravakara patra 1 |
Completion of work |
-
latitude : 21.70231278,21.70231047,21.7023103,21.70231001,21.70230977,21.7023095
Longitude : 87.32201696,87.32201189,87.32201158,87.32201141,87.32201131,87.32201109
file name : Image_16112020140858654.png
|
2020-11-16 14:09:04.875858 |
9 |
44289122 |
Construction of c.c. road from khardipipal manasa mandir to umakanta das house |
100000 |
Construction of c.c. road from khardipipal manasa mandir to umakanta das house 1 |
Completion of work |
-
latitude : 21.7034705,21.70345035
Longitude : 87.31761058,87.31760322
file name : Image_26112020105305811.png
|
2020-11-26 10:53:05.941131 |
10 |
44339489 |
CONSTRUCTION OF HIGH PLATFORM AT ARUHABRUTI2 NUASAHI CHHAKA |
20000 |
CONSTRUCTION OF HIGH PLATFORM AT ARUHABRUTI2 NUASAHI CHHAKA1 |
Completion of work |
-
latitude : 21.70464648
Longitude : 87.3137763
file name : Image_05052021112836543.png
|
2021-05-05 11:28:36.635295 |
11 |
44339421 |
CONSTRUCTION OF HIGH PLATFORM AT ARUHABRUTI2 GOLEI CHHAKA |
20000 |
CONSTRUCTION OF HIGH PLATFORM AT ARUHABRUTI2 GOLEI CHHAKA1 |
Completion of work |
-
latitude : 21.68679581
Longitude : 87.3167036
file name : Image_05052021112735419.png
|
2021-05-05 11:27:35.518061 |
12 |
44339458 |
CONSTRUCTION OF HIGH PLATFORM AT KHARIDIPIPAL INFRONT OF MAHESWAR JENA HOUSE |
20000 |
CONSTRUCTION OF HIGH PLATFORM AT KHARIDIPIPAL INFRONT OF MAHESWAR JENA HOUSE1 |
Completion of work |
-
latitude : 21.69673234
Longitude : 87.31242477
file name : Image_05052021112806914.png
|
2021-05-05 11:28:07.020569 |
13 |
44289092 |
Construction of c.c. road from khardipipal ramachandra roul house to main road |
100000 |
Construction of c.c. road from khardipipal ramachandra roul house to main road 1 |
Completion of work |
-
latitude : 21.69815625,21.69815547
Longitude : 87.31235122,87.31235461
file name : Image_28012021141131905.png
|
2021-01-28 14:11:32.080201 |
14 |
44289092 |
Construction of c.c. road from khardipipal ramachandra roul house to main road |
100000 |
Construction of c.c. road from khardipipal ramachandra roul house to main road 1 |
Completion of work |
-
latitude : 21.69815625,21.69815547
Longitude : 87.31235122,87.31235461
file name : Image_28012021141218475.png
|
2021-01-28 14:12:18.636843 |
15 |
44289051 |
Construction of c.c. road from harankuli main road to ramesh giri house |
100000 |
Construction of c.c. road from harankuli main road to ramesh giri house1 |
Plinth level |
-
latitude : 21.68380641,21.68380626
Longitude : 87.32155298,87.32155285
file name : Image_07052021121154362.png
|
2021-05-07 12:11:54.451566 |
16 |
44289063 |
Construction of c.c. road from nayapali dey sahi susanta dey house to main road via-sripati dey |
100000 |
Construction of c.c. road from nayapali dey sahi susanta dey house to main road via-sripati dey1 |
Plinth level |
-
latitude : 21.70368374,21.70368348
Longitude : 87.32070555,87.32070573
file name : Image_07052021121209883.png
|
2021-05-07 12:12:09.969343 |
17 |
44288898 |
Construction of drain from Khardipipal main Road Amulya jena house to maheswar jena house |
100000 |
Construction of drain from Khardipipal main Road Amulya jena house to maheswar jena house1 |
Plinth level |
-
latitude : 21.70328737,21.70330342
Longitude : 87.31610954,87.31610752
file name : Image_07052021121200553.png
|
2021-05-07 12:12:00.638079 |
18 |
44288848 |
Repairing of P.W.S and Pipe line |
120000 |
Repairing of P.W.S and Pipe line 1 |
Plinth level |
-
latitude : 21.70400833333333,21.70400666666667
Longitude : 87.311865,87.31183000000001
file name : Image_09032022125624532.png
|
2022-03-09 12:56:24.681763 |
19 |
44288848 |
Repairing of P.W.S and Pipe line |
120000 |
Repairing of P.W.S and Pipe line 1 |
Plinth level |
-
latitude : 21.70277668,21.70277478
Longitude : 87.31420809,87.31421014
file name : Image_07052021121218803.png
|
2021-05-07 12:12:18.89168 |
20 |
44289375 |
Repairing And Maintenance Of CC Road From Aruhabruti-2 Goshala To Nuasahi |
140000 |
Repairing And Maintenance Of CC Road From Aruhabruti-2 Goshala To Nuasahi 1 |
Plinth level |
-
latitude : 21.69112383,21.69112865
Longitude : 87.31515087,87.31519963
file name : Image_15052021052528805.png
|
2021-05-15 05:25:29.026789 |
21 |
44288798 |
Procurement of bleaching powder (6x2200) |
13200 |
Procurement of bleaching powder (6x2200)1 |
Completion of work |
-
latitude : 21.6779972
Longitude : 87.4052148
file name : Image_20072021131043765.png
|
2021-07-20 13:10:43.879928 |
22 |
44288798 |
Procurement of bleaching powder (6x2200) |
13200 |
Procurement of bleaching powder (6x2200)2 |
Completion of work |
-
latitude : 21.6780489
Longitude : 87.4052559
file name : Image_20072021131057889.png
|
2021-07-20 13:10:58.014477 |
23 |
44289023 |
Incomplete market complex near G.P. Office |
50000 |
Incomplete market complex near G.P. Office1 |
Plinth level |
-
latitude : 21.7041377
Longitude : 87.3119823
file name : Image_20122021172058548.png
|
2021-12-20 17:20:58.664048 |
24 |
44289040 |
Incomplete market complex near Sitala Mandir |
50000 |
Incomplete market complex near Sitala Mandir1 |
Plinth level |
-
latitude : 21.7044933
Longitude : 87.3111395
file name : Image_15112021123109536.png
|
2021-11-15 12:31:09.659175 |
25 |
55321713 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI MAIN ROAD TO GOPAL DEY HOUSE |
100000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI MAIN ROAD TO GOPAL DEY HOUSE1 |
Completion of work |
-
latitude : 21.70303158,21.7030316
Longitude : 87.31992747,87.31992726
file name : Image_20122021172014551.png
|
2021-12-20 17:20:14.660192 |
26 |
55321195 |
OPERATION OF COMPRESSOR WASHING OF TUBE WELL |
16000 |
OPERATION OF COMPRESSOR WASHING OF TUBE WELL1 |
Completion of work |
-
latitude : 21.6780228
Longitude : 87.4052507
file name : Image_20122021182713014.png
|
2021-12-20 18:27:13.166681 |
27 |
55321253 |
WATER SUPPLY ELECTRIC BILL AND GP OFFICE ELECTRIC BILL |
100000 |
WATER SUPPLY ELECTRIC BILL AND GP OFFICE ELECTRIC BILL1 |
Completion of work |
-
latitude : 21.67826166666667,21.67826166666667
Longitude : 87.40514333333334,87.40514333333334
file name : Image_09032022134244189.png
|
2022-03-09 13:42:44.386499 |
28 |
55321253 |
WATER SUPPLY ELECTRIC BILL AND GP OFFICE ELECTRIC BILL |
100000 |
WATER SUPPLY ELECTRIC BILL AND GP OFFICE ELECTRIC BILL1 |
Completion of work |
-
latitude : 21.7042087,21.7042087
Longitude : 87.31264,87.31264
file name : Image_18012022161702567.png
|
2022-01-18 16:17:02.684858 |
29 |
55321291 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK |
20000 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK1 |
Completion of work |
-
latitude : 21.7011436
Longitude : 87.31981069
file name : Image_22122021112227369.png
|
2021-12-22 11:22:27.460657 |
30 |
55321291 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK |
20000 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK1 |
Completion of work |
-
latitude : 21.70107051
Longitude : 87.31975445
file name : Image_10122021151111121.png
|
2021-12-10 15:11:11.217428 |
31 |
55321320 |
PROVISION OF SBM PHASE II |
270000 |
PROVISION OF SBM PHASE II1 |
Completion of work |
-
latitude : 21.70369314
Longitude : 87.31928401
file name : Image_04022022114711055.png
|
2022-02-04 11:47:11.175521 |
32 |
55402199 |
CONST OF CC ROAD FROM K.PIPAL MANASA MANDIR TO RAJENDRA DAS HOUSE |
110000 |
CONST OF CC ROAD FROM K.PIPAL MANASA MANDIR TO RAJENDRA DAS HOUSE1 |
Completion of work |
-
latitude : 21.70317577,21.70317045
Longitude : 87.3168293,87.31682722
file name : Image_20122021171842296.png
|
2021-12-20 17:18:42.400349 |
33 |
55402070 |
REPAIR AND MAINTENANCE OF CC ROAD TO BAHADURGANJ BANSHIDHAR SAHU HOUSE |
40000 |
REPAIR AND MAINTENANCE OF CC ROAD TO BAHADURGANJ BANSHIDHAR SAHU HOUSE1 |
Completion of work |
-
latitude : 21.69257878,21.69257889
Longitude : 87.31752649,87.31752635
file name : Image_20122021171930033.png
|
2021-12-20 17:19:30.135912 |
34 |
55402070 |
REPAIR AND MAINTENANCE OF CC ROAD TO BAHADURGANJ BANSHIDHAR SAHU HOUSE |
40000 |
REPAIR AND MAINTENANCE OF CC ROAD TO BAHADURGANJ BANSHIDHAR SAHU HOUSE1 |
Completion of work |
-
latitude : 21.69257878,21.69257889
Longitude : 87.31752649,87.31752635
file name : Image_20122021172143042.png
|
2021-12-20 17:21:43.144844 |
35 |
55402117 |
CONST OF TOILET AT K.PIPAL AWC (B) |
90000 |
CONST OF TOILET AT K.PIPAL AWC (B)1 |
Completion of work |
-
latitude : 21.703770000000002
Longitude : 87.314115
file name : Image_04032022110253824.png
|
2022-03-04 11:02:53.914965 |
36 |
55402093 |
CONST OF DRAIN FROM K.PIPAL AMULYA JENA HOUSE TO BASANTA JENA HOUSE |
100000 |
CONST OF DRAIN FROM K.PIPAL AMULYA JENA HOUSE TO BASANTA JENA HOUSE1 |
Completion of work |
-
latitude : 21.70330666666667,21.70330166666667,21.7033
Longitude : 87.31607833333334,87.31611,87.31610833333335
file name : Image_04032022110313451.png
|
2022-03-04 11:03:13.543087 |
37 |
55402093 |
CONST OF DRAIN FROM K.PIPAL AMULYA JENA HOUSE TO BASANTA JENA HOUSE |
100000 |
CONST OF DRAIN FROM K.PIPAL AMULYA JENA HOUSE TO BASANTA JENA HOUSE1 |
Completion of work |
-
latitude : 21.70330666666667,21.70330166666667,21.7033
Longitude : 87.31607833333334,87.31611,87.31610833333335
file name : Image_04032022110324037.png
|
2022-03-04 11:03:24.122361 |
38 |
56559666 |
DEVELOPMENT OF WATER SUPPLY AT KHARIDPIPAL UP SCHOOL |
80000 |
DEVELOPMENT OF WATER SUPPLY AT KHARIDPIPAL UP SCHOOL1 |
Completion of work |
-
latitude : 21.703548333333334
Longitude : 87.31452499999999
file name : Image_09032022105824492.png
|
2022-03-09 10:58:24.603171 |
39 |
44288818 |
Water supply Electric Bill and GP Office Electric Bill |
140000 |
Water supply Electric Bill and GP Office Electric Bill1 |
Completion of work |
-
latitude : 21.6780378,21.6779949
Longitude : 87.4052646,87.4051971
file name : Image_24062022122305550.png
|
2022-06-24 12:23:05.804089 |
40 |
64481322 |
Payment of Energy Bills of PWS |
262542 |
Payment of Energy Bills of PWS1 |
Completion of work |
-
latitude : 21.6780143,21.6780143
Longitude : 87.4052106,87.4052106
file name : Image_30072022114043911.png
|
2022-07-30 11:40:44.041219 |
41 |
55321619 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T) |
200000 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T)1 |
Completion of work |
-
latitude : 21.704408333333337
Longitude : 87.31016833333334
file name : Image_04032022110548027.png
|
2022-03-04 11:05:48.178604 |
42 |
57907899 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK |
20000 |
CONST OF HIGH PLATFORM AT NAYAPALI MANDAL SAHI CHHAK1 |
Completion of work |
-
latitude : 21.70109205
Longitude : 87.31980248
file name : Image_04022022115217865.png
|
2022-02-04 11:52:17.978782 |
43 |
55321381 |
CONST OF CULVERT WITH GUARDWALL FROM HARINKUL MAIN ROAD TO TAMINA BIBI HOUSE |
120000 |
CONST OF CULVERT WITH GUARDWALL FROM HARINKUL MAIN ROAD TO TAMINA BIBI HOUSE1 |
Completion of work |
-
latitude : 21.68265308
Longitude : 87.31972083
file name : Image_19012022145146422.png
|
2022-01-19 14:51:46.529555 |
44 |
55321381 |
CONST OF CULVERT WITH GUARDWALL FROM HARINKUL MAIN ROAD TO TAMINA BIBI HOUSE |
120000 |
CONST OF CULVERT WITH GUARDWALL FROM HARINKUL MAIN ROAD TO TAMINA BIBI HOUSE1 |
Completion of work |
-
latitude : 21.68265308
Longitude : 87.31972083
file name : Image_19012022145249517.png
|
2022-01-19 14:52:49.630138 |
45 |
55321576 |
CONST OF CC ROAD FROM MIANPATNA KAMALAKANTA JENA HOUSE TO ASWINI KUMAR JENA HOUSE |
70000 |
CONST OF CC ROAD FROM MIANPATNA KAMALAKANTA JENA HOUSE TO ASWINI KUMAR JENA HOUSE1 |
Completion of work |
-
latitude : 21.68963298,21.6896347
Longitude : 87.31983399,87.31983116
file name : Image_12012022105538308.png
|
2022-01-12 10:55:38.458963 |
46 |
55321625 |
CONST OF INCOMPLETE COMMUNITY CENTRE INFRONT OF ARUHABRUTI TO GARVESWAR NODAL SCHOOL |
50052 |
CONST OF INCOMPLETE COMMUNITY CENTRE INFRONT OF ARUHABRUTI TO GARVESWAR NODAL SCHOOL1 |
Completion of work |
-
latitude : 21.69128269
Longitude : 87.31414863
file name : Image_10122021150945512.png
|
2021-12-10 15:09:45.613428 |
47 |
55321625 |
CONST OF INCOMPLETE COMMUNITY CENTRE INFRONT OF ARUHABRUTI TO GARVESWAR NODAL SCHOOL |
50052 |
CONST OF INCOMPLETE COMMUNITY CENTRE INFRONT OF ARUHABRUTI TO GARVESWAR NODAL SCHOOL1 |
Completion of work |
-
latitude : 21.69128269
Longitude : 87.31414863
file name : Image_10122021151137400.png
|
2021-12-10 15:11:37.492532 |
48 |
55321843 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T) |
100000 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T)1 |
Completion of work |
-
latitude : 21.70327166666667
Longitude : 87.31613166666666
file name : Image_04032022110316763.png
|
2022-03-04 11:03:16.868027 |
49 |
55321843 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T) |
100000 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T)1 |
Completion of work |
-
latitude : 21.70463833333333
Longitude : 87.30984166666667
file name : Image_04032022110320312.png
|
2022-03-04 11:03:20.413654 |
50 |
55321843 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T) |
100000 |
DEV OF DAHAMUNDA NODAL HIGH SCHOOL (5T)1 |
Completion of work |
-
latitude : 21.70327166666667
Longitude : 87.31613166666666
file name : Image_04032022110327438.png
|
2022-03-04 11:03:27.541722 |
51 |
55321689 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI SATYABADI PATRA HOUSE TO ADB ROAD |
70000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI SATYABADI PATRA HOUSE TO ADB ROAD1 |
Completion of work |
-
latitude : 21.6998292,21.69982965
Longitude : 87.32198404,87.32198331
file name : Image_10122021151123221.png
|
2021-12-10 15:11:23.316722 |
52 |
55321797 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MAIPATNA SK FARID HOUSE TO SK KARIM HOUSE VIA SK ALALUDDIN |
40000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MAIPATNA SK FARID HOUSE TO SK KARIM HOUSE VIA SK ALALUDDIN1 |
Completion of work |
-
latitude : 21.68652666666667,21.686523333333337
Longitude : 87.31999333333333,87.31999499999999
file name : Image_04032022115705961.png
|
2022-03-04 11:57:06.074107 |
53 |
55321696 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI ADB ROAD TO KALICHARAN DAS HOUSE |
49000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM NAYAPALLI ADB ROAD TO KALICHARAN DAS HOUSE1 |
Completion of work |
-
latitude : 21.7007789,21.7007789
Longitude : 87.32168938,87.32168938
file name : Image_20122021172029541.png
|
2021-12-20 17:20:29.641008 |
54 |
55321778 |
REPAIR AND MAINTENANCE FROM BAHADURGANJ BANSHIDHAR HOUSE TO CC ROAD |
100000 |
REPAIR AND MAINTENANCE FROM BAHADURGANJ BANSHIDHAR HOUSE TO CC ROAD1 |
Completion of work |
-
latitude : 21.69276346,21.69276071
Longitude : 87.31753257,87.31753417
file name : Image_10122021150913343.png
|
2021-12-10 15:09:13.466747 |
55 |
64481356 |
Payment of Energy Bills of PWS |
37458 |
Payment of Energy Bills of PWS1 |
Completion of work |
-
latitude : 21.6780632,21.6780624
Longitude : 87.405246,87.4052494
file name : Image_05112022144926179.png
|
2022-11-05 14:49:26.345831 |
56 |
64481329 |
Remuneration of SEM @ 2000 per Month for 12 Months |
24000 |
Remuneration of SEM @ 2000 per Month for 12 Months1 |
Completion of work |
-
latitude : 21.67811
Longitude : 87.4053396
file name : Image_05112022145024083.png
|
2022-11-05 14:50:24.226926 |
57 |
55321811 |
REPAIR AND MAINTENANCE FROM ARUHABRUTI II BAIRUDDIN KHAN HOUSE TO SK ISMAILE HOUSE |
50000 |
REPAIR AND MAINTENANCE FROM ARUHABRUTI II BAIRUDDIN KHAN HOUSE TO SK ISMAILE HOUSE1 |
Completion of work |
-
latitude : 21.69133102,21.69133073
Longitude : 87.32252401,87.32252328
file name : Image_12012022105512731.png
|
2022-01-12 10:55:12.865478 |
58 |
55321811 |
REPAIR AND MAINTENANCE FROM ARUHABRUTI II BAIRUDDIN KHAN HOUSE TO SK ISMAILE HOUSE |
50000 |
REPAIR AND MAINTENANCE FROM ARUHABRUTI II BAIRUDDIN KHAN HOUSE TO SK ISMAILE HOUSE1 |
Completion of work |
-
latitude : 21.69133102,21.69133073
Longitude : 87.32252401,87.32252328
file name : Image_12012022105521610.png
|
2022-01-12 10:55:21.744279 |
59 |
55321746 |
REPAIR AND MAINTENANCE OF K.PIPAL RD ROAD TO BADAL DAS HOUSE VIA JOGENDRA NAYAK |
100000 |
REPAIR AND MAINTENANCE OF K.PIPAL RD ROAD TO BADAL DAS HOUSE VIA JOGENDRA NAYAK1 |
Completion of work |
-
latitude : 21.6880479,21.6880479
Longitude : 87.3033217,87.3033217
file name : Image_12012022105549264.png
|
2022-01-12 10:55:49.389246 |
60 |
55321787 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MIYAPATNA SK MAITAJUDDIN HOUSE TO OHAPUDDIN HOUSE |
50000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MIYAPATNA SK MAITAJUDDIN HOUSE TO OHAPUDDIN HOUSE1 |
Completion of work |
-
latitude : 21.68684388,21.68684313
Longitude : 87.32140565,87.32140617
file name : Image_10122021151033685.png
|
2021-12-10 15:10:33.784614 |
61 |
55321787 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MIYAPATNA SK MAITAJUDDIN HOUSE TO OHAPUDDIN HOUSE |
50000 |
REPAIR AND MAINTENANCE OF CC ROAD FROM MIYAPATNA SK MAITAJUDDIN HOUSE TO OHAPUDDIN HOUSE1 |
Completion of work |
-
latitude : 21.68684388,21.68684313
Longitude : 87.32140565,87.32140617
file name : Image_10122021151043910.png
|
2021-12-10 15:10:43.999776 |
62 |
55321830 |
REPAIR AND MAINTENANCE OF CC ROAD FROM K.PIPAL ADB ROAD TO ARUN GHADAI HOUSE (VIA ASHOK GHADAI) |
55032 |
REPAIR AND MAINTENANCE OF CC ROAD FROM K.PIPAL ADB ROAD TO ARUN GHADAI HOUSE (VIA ASHOK GHADAI)1 |
Completion of work |
-
latitude : 21.70402656,21.70402674
Longitude : 87.31710961,87.31714053
file name : Image_12012022105459063.png
|
2022-01-12 10:54:59.214988 |
63 |
55321761 |
REPAIR AND MAINTENANCE FROM K.PIPAL MAIN ROAD TO RAMANATH JENA VIA UMAKANTA JENA HOUSE |
50000 |
REPAIR AND MAINTENANCE FROM K.PIPAL MAIN ROAD TO RAMANATH JENA VIA UMAKANTA JENA HOUSE1 |
Completion of work |
-
latitude : 21.70280128,21.70280143
Longitude : 87.31027095,87.31027105
file name : Image_20122021171957853.png
|
2021-12-20 17:19:57.967982 |
64 |
55321568 |
CONST OF CC ROAD FROM ARUHABRUTI II MAIN ROAD TO PRAVAKAR PATRA HOUSE |
80000 |
CONST OF CC ROAD FROM ARUHABRUTI II MAIN ROAD TO PRAVAKAR PATRA HOUSE1 |
Completion of work |
-
latitude : 21.69151364,21.69153939
Longitude : 87.31438632,87.31439837
file name : Image_10122021150931172.png
|
2021-12-10 15:09:31.277624 |
65 |
55321568 |
CONST OF CC ROAD FROM ARUHABRUTI II MAIN ROAD TO PRAVAKAR PATRA HOUSE |
80000 |
CONST OF CC ROAD FROM ARUHABRUTI II MAIN ROAD TO PRAVAKAR PATRA HOUSE1 |
Completion of work |
-
latitude : 21.69151364,21.69153939
Longitude : 87.31438632,87.31439837
file name : Image_10122021151130048.png
|
2021-12-10 15:11:30.151757 |
66 |
55321214 |
REPAIRING OF PWS AND PIPE LINE |
60000 |
REPAIRING OF PWS AND PIPE LINE1 |
Completion of work |
-
latitude : 21.7422199,21.7422199
Longitude : 87.3502925,87.3502925
file name : Image_29072022133006073.png
|
2022-07-29 13:30:06.213479 |
67 |
55321233 |
ENGAGEMENT OF EXTRA LABOUR (215*100) |
21500 |
ENGAGEMENT OF EXTRA LABOUR (215*100)1 |
Completion of work |
-
latitude : 21.6780341
Longitude : 87.4052611
file name : Image_28062022130329192.png
|
2022-06-28 13:03:29.293889 |
68 |
55321274 |
CONST OF HIGH PLATFORM AT HARINKULI DHIRENDRA SAHOO CHHAK |
20000 |
CONST OF HIGH PLATFORM AT HARINKULI DHIRENDRA SAHOO CHHAK1 |
Completion of work |
-
latitude : 21.68463824
Longitude : 87.31870982
file name : Image_10122021151013369.png
|
2021-12-10 15:10:13.482373 |
69 |
55321304 |
CONST OF HIGH PLATFORM AT BAHADULGANJ BIJAY SAHU CHHAK |
20000 |
CONST OF HIGH PLATFORM AT BAHADULGANJ BIJAY SAHU CHHAK1 |
Completion of work |
-
latitude : 21.69295556
Longitude : 87.31769363
file name : Image_08122021115640145.png
|
2021-12-08 11:56:40.292197 |
70 |
55321243 |
REMUNERATION OF PUMP DRIVER (2000*12) |
24000 |
REMUNERATION OF PUMP DRIVER (2000*12)1 |
Completion of work |
-
latitude : 21.7042312
Longitude : 87.3119241
file name : Image_08122021114813498.png
|
2021-12-08 11:48:13.828845 |
71 |
55321400 |
CONST OF CULVERT WITH GUARDWALL FROM K.PIPAL ADB ROAD TO KALI CHARAN SING HOUSE |
150000 |
CONST OF CULVERT WITH GUARDWALL FROM K.PIPAL ADB ROAD TO KALI CHARAN SING HOUSE1 |
Completion of work |
-
latitude : 21.70491666666667
Longitude : 87.31388166666666
file name : Image_04032022110250252.png
|
2022-03-04 11:02:50.338656 |
72 |
55321410 |
CONST OF DRAIN FROM ARUHABRUTI 2 GOSALA TO BIJAY DEY HOUSE |
120889 |
CONST OF DRAIN FROM ARUHABRUTI 2 GOSALA TO BIJAY DEY HOUSE1 |
Completion of work |
-
latitude : 21.69126342,21.69126281
Longitude : 87.31506869,87.31506772
file name : Image_10122021150959526.png
|
2021-12-10 15:09:59.636332 |
73 |
55321410 |
CONST OF DRAIN FROM ARUHABRUTI 2 GOSALA TO BIJAY DEY HOUSE |
120889 |
CONST OF DRAIN FROM ARUHABRUTI 2 GOSALA TO BIJAY DEY HOUSE1 |
Completion of work |
-
latitude : 21.69126342,21.69126281
Longitude : 87.31506869,87.31506772
file name : Image_10122021151146001.png
|
2021-12-10 15:11:46.107255 |
74 |
55321527 |
CONST OF CC ROAD FROM NAYAPALI HRUSHIKESH PATRA HOUSE TO ADB ROAD (VIA SRIHARI PAL) |
100000 |
CONST OF CC ROAD FROM NAYAPALI HRUSHIKESH PATRA HOUSE TO ADB ROAD (VIA SRIHARI PAL)1 |
Completion of work |
-
latitude : 21.70059591,21.70059487
Longitude : 87.32252889,87.3225291
file name : Image_20122021172045292.png
|
2021-12-20 17:20:45.416065 |
75 |
55321538 |
CONST OF CC ROAD FROM NAYAPALI MANDAL SAHI MANASA MANDIR TO BARIK SAHI VIA JAGA DANDPAT |
49000 |
CONST OF CC ROAD FROM NAYAPALI MANDAL SAHI MANASA MANDIR TO BARIK SAHI VIA JAGA DANDPAT1 |
Completion of work |
-
latitude : 21.70139973,21.70139735
Longitude : 87.3203543,87.32035406
file name : Image_10122021151104719.png
|
2021-12-10 15:11:04.812161 |
76 |
55321553 |
CONST OF CC ROAD FROM K.PIPAL MAIN ROAD TO AJAY DAS HOUSE VIA SITANSHU DAS |
80000 |
CONST OF CC ROAD FROM K.PIPAL MAIN ROAD TO AJAY DAS HOUSE VIA SITANSHU DAS1 |
Completion of work |
-
latitude : 21.70195495,21.70194809,21.70194263
Longitude : 87.31428195,87.31428756,87.31428613
file name : Image_10122021151055111.png
|
2021-12-10 15:10:55.203852 |
77 |
55321588 |
CONST OF CC ROAD FROM K.PIPAL ADB ROAD TO DEBENDRA JENA HOUSE VIA BASANTA JENA |
70000 |
CONST OF CC ROAD FROM K.PIPAL ADB ROAD TO DEBENDRA JENA HOUSE VIA BASANTA JENA1 |
Completion of work |
-
latitude : 21.70378822,21.70378827
Longitude : 87.31631913,87.31631934
file name : Image_19012022145206223.png
|
2022-01-19 14:52:06.336237 |
78 |
55321588 |
CONST OF CC ROAD FROM K.PIPAL ADB ROAD TO DEBENDRA JENA HOUSE VIA BASANTA JENA |
70000 |
CONST OF CC ROAD FROM K.PIPAL ADB ROAD TO DEBENDRA JENA HOUSE VIA BASANTA JENA1 |
Completion of work |
-
latitude : 21.70378822,21.70378827
Longitude : 87.31631913,87.31631934
file name : Image_19012022145253742.png
|
2022-01-19 14:52:53.847326 |
79 |
55321598 |
CONST OF GUARDWALL FROM HARINKUL MAIN ROAD TO NIRANJAN DAS HOUSE |
40000 |
CONST OF GUARDWALL FROM HARINKUL MAIN ROAD TO NIRANJAN DAS HOUSE1 |
Completion of work |
-
latitude : 21.6833828
Longitude : 87.32072338
file name : Image_19012022145127826.png
|
2022-01-19 14:51:27.946161 |
80 |
67356528 |
Operation & maintenance of community sanitary complex |
165084 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.6779659
Longitude : 87.4052594
file name : Image_29062023134716618.png
|
2023-06-29 13:47:16.740102 |
81 |
64481441 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house |
120000 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house1 |
Plinth level |
-
latitude : 21.6780689,21.6780689
Longitude : 87.4052528,87.4052528
file name : Image_29042023151207430.png
|
2023-04-29 15:12:07.554063 |
82 |
64481441 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house |
120000 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house1 |
Plinth level |
-
latitude : 21.7422855,21.7422855
Longitude : 87.3502735,87.3502735
file name : Image_24042023142230130.png
|
2023-04-24 14:22:30.255034 |
83 |
64481441 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house |
120000 |
Construction of CC road from K.Pipal ADB road to hadibandhu jena house1 |
Completion of work |
-
latitude : 21.7423002,21.7423143
Longitude : 87.3502946,87.3503127
file name : Image_24042023132854069.png
|
2023-04-24 13:28:54.201388 |
84 |
67356614 |
Const of Galasiya fish market (kayakalpa) |
60000 |
Const of Galasiya fish market (kayakalpa)1 |
Roof laid |
-
latitude : 21.6780683
Longitude : 87.4052541
file name : Image_29042023153619103.png
|
2023-04-29 15:36:19.208936 |
85 |
67356614 |
Const of Galasiya fish market (kayakalpa) |
60000 |
Const of Galasiya fish market (kayakalpa)1 |
Plinth level |
-
latitude : 21.6780697
Longitude : 87.4052536
file name : Image_29042023153113256.png
|
2023-04-29 15:31:13.369278 |
86 |
67356614 |
Const of Galasiya fish market (kayakalpa) |
60000 |
Const of Galasiya fish market (kayakalpa)1 |
Completion of work |
-
latitude : 21.6780675
Longitude : 87.4052541
file name : Image_29042023152135122.png
|
2023-04-29 15:21:35.256897 |
87 |
64481543 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj1 |
Roof laid |
-
latitude : 21.583660000000002,21.583658333333332
Longitude : 87.23442666666666,87.23442833333333
file name : Image_04052023084534766.png
|
2023-05-04 08:45:34.854921 |
88 |
64481543 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj1 |
Completion of work |
-
latitude : 21.58365666666667,21.583675000000003
Longitude : 87.23440833333333,87.23440166666666
file name : Image_04052023084036638.png
|
2023-05-04 08:40:36.725875 |
89 |
64481543 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Baulakunja Srihari das house to LI Point via Gaj1 |
Completion of work |
-
latitude : 21.7422963,21.7422963
Longitude : 87.3502866,87.3502866
file name : Image_02052023142930370.png
|
2023-05-02 14:29:30.462006 |
90 |
64481563 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat |
120000 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat1 |
Roof laid |
-
latitude : 21.7422713,21.7422713
Longitude : 87.3502477,87.3502477
file name : Image_06062023110258245.png
|
2023-06-06 11:02:58.337443 |
91 |
64481563 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat |
120000 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat1 |
Plinth level |
-
latitude : 21.7422664,21.7422664
Longitude : 87.3502475,87.3502475
file name : Image_06062023105606400.png
|
2023-06-06 10:56:06.500121 |
92 |
64481563 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat |
120000 |
Construction of CC Road from K. Pipal Pratap singh house to Bathing ghat1 |
Completion of work |
-
latitude : 21.7422664,21.7422664
Longitude : 87.3502439,87.3502439
file name : Image_06062023102645273.png
|
2023-06-06 10:26:45.371905 |
93 |
67356626 |
Implementation of LED Street light |
139263 |
Implementation of LED Street light1 |
Completion of work |
-
latitude : 21.67803
Longitude : 87.4052591
file name : Image_09062023160952806.png
|
2023-06-09 16:09:52.977251 |
94 |
64481466 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple |
150000 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple1 |
Roof laid |
-
latitude : 21.6849516,21.6849516
Longitude : 87.4167976,87.4167976
file name : Image_30062023142910241.png
|
2023-06-30 14:29:10.143309 |
95 |
64481466 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple |
150000 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple1 |
Plinth level |
-
latitude : 21.68504666666667,21.685070000000003
Longitude : 87.417275,87.41728166666665
file name : Image_30062023142415673.png
|
2023-06-30 14:24:15.575227 |
96 |
64481466 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple |
150000 |
Const of bathing ghat at Aruhabruti 2 subarnarekha site near Tarini Temple1 |
Completion of work |
-
latitude : 21.685058333333338,21.685065
Longitude : 87.41719499999999,87.41715500000001
file name : Image_30062023142034061.png
|
2023-06-30 14:20:34.165139 |
97 |
64481455 |
Construction of incomplete market complex near Medical |
106000 |
Construction of incomplete market complex near Medical1 |
Roof laid |
-
latitude : 21.684998333333336
Longitude : 87.41713166666665
file name : Image_30062023141234815.png
|
2023-06-30 14:12:34.908225 |
98 |
64481455 |
Construction of incomplete market complex near Medical |
106000 |
Construction of incomplete market complex near Medical1 |
Plinth level |
-
latitude : 21.68515166666667
Longitude : 87.41701666666668
file name : Image_30062023140948999.png
|
2023-06-30 14:09:49.100867 |
99 |
64481455 |
Construction of incomplete market complex near Medical |
106000 |
Construction of incomplete market complex near Medical1 |
Completion of work |
-
latitude : 21.583709999999996
Longitude : 87.23427333333332
file name : Image_30062023065100504.png
|
2023-06-30 06:50:59.786185 |
100 |
64481536 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak1 |
Roof laid |
-
latitude : 21.7423131,21.7423131
Longitude : 87.3503118,87.3503118
file name : Image_10072023173559518.png
|
2023-07-10 17:35:59.606495 |
101 |
64481536 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak1 |
Plinth level |
-
latitude : 21.7423068,21.7422934
Longitude : 87.3502966,87.3502379
file name : Image_10072023173356632.png
|
2023-07-10 17:33:56.729665 |
102 |
64481536 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak |
140000 |
Repair and maintenance of CC road from Aruhabruti 2 Srimapada to Nuasahi chhak1 |
Completion of work |
-
latitude : 21.742216666666664,21.742216666666664
Longitude : 87.35021,87.35021
file name : Image_10072023173013004.png
|
2023-07-10 17:30:13.105915 |
103 |
64481460 |
Const of bathing ghat at Ring Bandha at Dahamunda |
150000 |
Const of bathing ghat at Ring Bandha at Dahamunda1 |
Roof laid |
-
latitude : 21.7423129,21.7423129
Longitude : 87.3503117,87.3503117
file name : Image_10072023172630131.png
|
2023-07-10 17:26:30.231741 |
104 |
64481460 |
Const of bathing ghat at Ring Bandha at Dahamunda |
150000 |
Const of bathing ghat at Ring Bandha at Dahamunda1 |
Plinth level |
-
latitude : 21.742313,21.742313
Longitude : 87.3503116,87.3503116
file name : Image_10072023172307325.png
|
2023-07-10 17:23:07.417147 |
105 |
64481460 |
Const of bathing ghat at Ring Bandha at Dahamunda |
150000 |
Const of bathing ghat at Ring Bandha at Dahamunda1 |
Completion of work |
-
latitude : 21.7423129,21.742228333333333
Longitude : 87.3503114,87.35033666666668
file name : Image_10072023172043632.png
|
2023-07-10 17:20:43.754337 |
106 |
83364663 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.74222333333333
Longitude : 87.35023500000001
file name : Image_13022024163145591.png
|
2024-02-13 16:31:45.712863 |
107 |
83364663 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.742128333333334
Longitude : 87.35030666666668
file name : Image_13022024162947870.png
|
2024-02-13 16:29:47.994776 |
108 |
83364663 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.742183333333333
Longitude : 87.35019333333334
file name : Image_13022024162731564.png
|
2024-02-13 16:27:31.707217 |
109 |
80524043 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6780457,21.6780457
Longitude : 87.4052781,87.4052781
file name : Image_18052024121105286.png
|
2024-05-18 12:11:05.383478 |
110 |
80524043 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6780502,21.6780502
Longitude : 87.4052718,87.4052718
file name : Image_18052024115637000.png
|
2024-05-18 11:56:37.090776 |
111 |
80524043 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.583804999999998,21.583784999999995
Longitude : 87.23438,87.23436166666667
file name : Image_05052024210830550.png
|
2024-05-05 21:08:30.62814 |
112 |
83309683 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
8000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 21.583828333333333
Longitude : 87.23457333333333
file name : Image_18072024073000900.png
|
2024-07-18 07:30:01.029975 |
113 |
67356420 |
Construction of toilets in public institutions |
126000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.678400000000003
Longitude : 87.405445
file name : Image_18112024123227573.png
|
2024-11-18 12:32:27.662007 |
114 |
67356420 |
Construction of toilets in public institutions |
126000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.58377833333333
Longitude : 87.23433833333333
file name : Image_17112024215053643.png
|
2024-11-17 21:50:53.252864 |