1 |
52162578 |
CONST. OF C.C. ROAD FROM BANIAGAN ARUN DALEI HOUSE TO PLAY GROUND. |
100000 |
CONST. OF C.C. ROAD FROM BANIAGAN ARUN DALEI HOUSE TO PLAY GROUND.1 |
Completion of work |
-
latitude : 21.46153759,21.46153758
Longitude : 86.77669423,86.7766942
file name : Image_07022022124119640.png
|
2022-02-07 12:41:19.751114 |
2 |
44309285 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI MAJHI SAHI TUB-WELL TO NIMA POKHARI . |
75000 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI MAJHI SAHI TUB-WELL TO NIMA POKHARI .1 |
Completion of work |
-
latitude : 21.5119922,21.51199862,21.51197952
Longitude : 86.75198733,86.75199866,86.75196958
file name : Image_30052021112624450.png
|
2021-05-30 11:26:24.545834 |
3 |
44309303 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI AWC CHHAKA TO NIMA POKHARI . |
200000 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI AWC CHHAKA TO NIMA POKHARI .1 |
Completion of work |
-
latitude : 21.5135231,21.5135231,21.513891220092773
Longitude : 86.7424231,86.7424231,86.75344347953796
file name : Image_30052021111739286.png
|
2021-05-30 11:17:39.371631 |
4 |
44386869 |
JALACHHATRA |
54000 |
JALACHHATRA 1 |
Completion of work |
-
latitude : 21.4616812
Longitude : 86.7762962
file name : Image_06072021173924648.png
|
2021-07-06 17:39:24.7543 |
5 |
44387164 |
CONST. OF C.C. ROAD FROM BANIAGAN BASANT DAS HOUSE TO PANDU SING HOUSE . |
200000 |
CONST. OF C.C. ROAD FROM BANIAGAN BASANT DAS HOUSE TO PANDU SING HOUSE .1 |
Completion of work |
-
latitude : 21.5594292,21.55943589
Longitude : 86.7763634,86.7763308
file name : Image_13072021182303445.png
|
2021-07-13 18:23:03.533037 |
6 |
44309200 |
CONST. OF C.C. ROAD FROM MAHISAPATA GOPABANDHU SING HOUSE TO R.D. ROAD . |
100000 |
CONST. OF C.C. ROAD FROM MAHISAPATA GOPABANDHU SING HOUSE TO R.D. ROAD .1 |
Completion of work |
-
latitude : 21.4627161,21.46273434
Longitude : 86.76290846,86.76287826
file name : Image_05082021172534320.png
|
2021-08-05 17:25:34.419104 |
7 |
44387333 |
CONST. OF C.C. ROAD FROM HATIASILA BARA GACHHA TO R.D ROAD. |
500000 |
CONST. OF C.C. ROAD FROM HATIASILA BARA GACHHA TO R.D ROAD.1 |
Completion of work |
-
latitude : 21.53266266,21.53272929
Longitude : 86.75914515,86.75913239
file name : Image_19082021141819125.png
|
2021-08-19 14:18:19.220168 |
8 |
52161728 |
CONSTRUCTION OF (69nos) VAT UNDER GP ARIA |
172500 |
CONSTRUCTION OF (69nos) VAT UNDER GP ARIA1 |
Completion of work |
-
latitude : 21.53116413
Longitude : 86.77025436
file name : Image_09092021115314590.png
|
2021-09-09 11:53:14.702809 |
9 |
44309319 |
CONST. OF C.C. ROAD FROM KUANALI (G.P. OFFICE SIDE) CHANDAMANI SING HOUSE CHHAKA TO THAKURANI CHHAK |
192000 |
CONST. OF C.C. ROAD FROM KUANALI (G.P. OFFICE SIDE) CHANDAMANI SING HOUSE CHHAKA TO THAKURANI CHHAK1 |
Completion of work |
-
latitude : 21.52971463,21.5296977
Longitude : 86.75829319,86.75831757
file name : Image_09092021113042181.png
|
2021-09-09 11:30:42.334118 |
10 |
44386897 |
OFFICE CONTINGENCY |
50000 |
OFFICE CONTINGENCY1 |
Completion of work |
-
latitude : 21.529769897460938
Longitude : 86.75853967666626
file name : Image_09092021114243627.png
|
2021-09-09 11:42:43.735933 |
11 |
44386967 |
SINKING OF NEW TUB-WELL AT BANIAGAN NEAR PUDASI GADIA CHHAKA . |
100000 |
SINKING OF NEW TUB-WELL AT BANIAGAN NEAR PUDASI GADIA CHHAKA .1 |
Completion of work |
-
latitude : 21.55972922
Longitude : 86.77647228
file name : Image_09092021123305688.png
|
2021-09-09 12:33:05.800163 |
12 |
44386995 |
SINKING OF NEW TUB-WELL AT KUANALI NEAR HADHU PATRA HOUSE CHHAKA . |
100000 |
SINKING OF NEW TUB-WELL AT KUANALI NEAR HADHU PATRA HOUSE CHHAKA .1 |
Completion of work |
-
latitude : 21.52763591
Longitude : 86.75497114
file name : Image_09092021112535162.png
|
2021-09-09 11:25:35.257896 |
13 |
44387018 |
SINKING OF NEW TUB-WELL AT DAMBARUGHATI NEAR SUKADEV SING HOUSE . |
100000 |
SINKING OF NEW TUB-WELL AT DAMBARUGHATI NEAR SUKADEV SING HOUSE .1 |
Completion of work |
-
latitude : 21.5141479
Longitude : 86.75260347
file name : Image_09092021111534529.png
|
2021-09-09 11:15:34.616291 |
14 |
44387205 |
CONST. OF C.C. ROAD FROM PATNA HARIHAR BEHERA HOUSE CHHAKA TO BADA POKHARI . |
200000 |
CONST. OF C.C. ROAD FROM PATNA HARIHAR BEHERA HOUSE CHHAKA TO BADA POKHARI .1 |
Completion of work |
-
latitude : 21.55259084,21.55259058
Longitude : 86.77108325,86.77108303
file name : Image_09092021121537032.png
|
2021-09-09 12:15:37.145739 |
15 |
52162163 |
IMPROVEMENT OF HATIASILA BRIDGE AT NEAR BARAGACHHA CHHAKA |
50000 |
IMPROVEMENT OF HATIASILA BRIDGE AT NEAR BARAGACHHA CHHAKA1 |
Completion of work |
-
latitude : 21.53263713
Longitude : 86.75913211
file name : Image_09092021114740172.png
|
2021-09-09 11:47:40.265307 |
16 |
52161993 |
MOBILE DRINKING WATRE TENKER USED DURING SCAIRCITY OF WATER IN SUMMER |
120000 |
MOBILE DRINKING WATRE TENKER USED DURING SCAIRCITY OF WATER IN SUMMER1 |
Completion of work |
-
latitude : 21.4615252
Longitude : 86.7764646
file name : Image_21122022181703291.png
|
2022-12-21 18:17:03.370642 |
17 |
52161993 |
MOBILE DRINKING WATRE TENKER USED DURING SCAIRCITY OF WATER IN SUMMER |
120000 |
MOBILE DRINKING WATRE TENKER USED DURING SCAIRCITY OF WATER IN SUMMER1 |
Completion of work |
-
latitude : 21.46155863
Longitude : 86.77685506
file name : Image_30082022171220319.png
|
2022-08-30 17:12:20.392365 |
18 |
52161513 |
ELECTRIC CITY BILL FOR PUMP HOUSE |
260000 |
ELECTRIC CITY BILL FOR PUMP HOUSE1 |
Completion of work |
-
latitude : 21.46279308
Longitude : 86.76289307
file name : Image_31122021110727662.png
|
2021-12-31 11:07:27.785206 |
19 |
52162997 |
CONST. OF C.C. ROAD FROM SALABANI RAJASAHI NEPALI SINGH HOUSE TO BADAL SING HOUSE |
235000 |
CONST. OF C.C. ROAD FROM SALABANI RAJASAHI NEPALI SINGH HOUSE TO BADAL SING HOUSE1 |
Completion of work |
-
latitude : 21.4615988,21.46159915
Longitude : 86.776715,86.77671421
file name : Image_31122021111544122.png
|
2021-12-31 11:15:44.22989 |
20 |
52161828 |
CONSTRUCTION OF (69nos) SOAKPIT UNDER GP ARIA |
85767 |
CONSTRUCTION OF (69nos) SOAKPIT UNDER GP ARIA1 |
Completion of work |
-
latitude : 21.462671756744385
Longitude : 86.76235914230347
file name : Image_09012023121957047.png
|
2023-01-09 12:19:57.145275 |
21 |
52161426 |
REMUNARATION OF PUMP OPERATOR & S.E.M. . |
96000 |
REMUNARATION OF PUMP OPERATOR & S.E.M. .1 |
Completion of work |
-
latitude : 21.46137128
Longitude : 86.77673774
file name : Image_25042022132846989.png
|
2022-04-25 13:28:47.160251 |
22 |
52162196 |
"CONST. OF C.C. ROAD & DRAIN FROM HATIASILA NEAR PRABHAKAR SINGH HOUSE CHHAKA TO CANAL " |
165343 |
"CONST. OF C.C. ROAD & DRAIN FROM HATIASILA NEAR PRABHAKAR SINGH HOUSE CHHAKA TO CANAL "1 |
Completion of work |
-
latitude : 21.46152768
Longitude : 86.77669593
file name : Image_02022022133313901.png
|
2022-02-02 13:33:14.006279 |
23 |
44387144 |
CONST.OF DRAIN FROM MAHISAPATA HOMIOPATHIC HOSPITAL TO POND |
193286 |
CONST.OF DRAIN FROM MAHISAPATA HOMIOPATHIC HOSPITAL TO POND1 |
Completion of work |
-
latitude : 21.46159878,21.46159728
Longitude : 86.77671636,86.77671705
file name : Image_31122021111242750.png
|
2021-12-31 11:12:42.860505 |
24 |
52162542 |
CONST. OF C.C. ROAD FROM GUJUDIHA BANAMALI BEHERA HOUSE TO BADA POKHARI . |
200000 |
CONST. OF C.C. ROAD FROM GUJUDIHA BANAMALI BEHERA HOUSE TO BADA POKHARI .1 |
Completion of work |
-
latitude : 21.46151491,21.46152834
Longitude : 86.77672113,86.77669435
file name : Image_02022022133029749.png
|
2022-02-02 13:30:29.859976 |
25 |
52162924 |
COMPLITON OF NEW COMMUNITY CENTER AT NEAR MAHADEV SAHI |
100000 |
COMPLITON OF NEW COMMUNITY CENTER AT NEAR MAHADEV SAHI1 |
Completion of work |
-
latitude : 21.53123571
Longitude : 86.76942872
file name : Image_17052022163534777.png
|
2022-05-17 16:35:34.881167 |
26 |
52161659 |
PRIYASOFT, PLAN PLUS, GEO TAGING CHARGES, & PURCHAGE OF COMPUTER PAPER & CATRIGE |
12000 |
PRIYASOFT, PLAN PLUS, GEO TAGING CHARGES, & PURCHAGE OF COMPUTER PAPER & CATRIGE1 |
Completion of work |
-
latitude : 21.46155693
Longitude : 86.77665689
file name : Image_17032022121409203.png
|
2022-03-17 12:14:09.339443 |
27 |
52162129 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT PATNA NODAL SCHOOL. |
50000 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT PATNA NODAL SCHOOL.1 |
Completion of work |
-
latitude : 21.4616103
Longitude : 86.77669933
file name : Image_29012022101528422.png
|
2022-01-29 10:15:28.515011 |
28 |
52162094 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT JAMBANI PRIMARY SCHOOL. |
50000 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT JAMBANI PRIMARY SCHOOL.1 |
Completion of work |
-
latitude : 21.46161287
Longitude : 86.77672539
file name : Image_29012022101524291.png
|
2022-01-29 10:15:24.382607 |
29 |
52162058 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT GUJUDIHA PRIMARY SCHOOL. |
50000 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT GUJUDIHA PRIMARY SCHOOL.1 |
Completion of work |
-
latitude : 21.46161225
Longitude : 86.77673045
file name : Image_29012022101519644.png
|
2022-01-29 10:15:19.732552 |
30 |
52162022 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT DAMBARU GHATI PRIMARY SCHOOL. |
50000 |
WATER MOTER CONNECTION WITH OLD TUB-WELL AT DAMBARU GHATI PRIMARY SCHOOL.1 |
Completion of work |
-
latitude : 21.46154276
Longitude : 86.77679629
file name : Image_29012022101515058.png
|
2022-01-29 10:15:15.148464 |
31 |
44386720 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING . |
100000 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING .1 |
Completion of work |
-
latitude : 21.4615356
Longitude : 86.7765793
file name : Image_11102023114930452.png
|
2023-10-11 11:49:30.562556 |
32 |
44386720 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING . |
100000 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING .1 |
Completion of work |
-
latitude : 21.4626672
Longitude : 86.7631574
file name : Image_29012022101505685.png
|
2022-01-29 10:15:05.788219 |
33 |
44386720 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING . |
100000 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING .1 |
Completion of work |
-
latitude : 21.46150334
Longitude : 86.77683243
file name : Image_29012022101510450.png
|
2022-01-29 10:15:10.543724 |
34 |
32584839 |
Purchase of Tubewell Accesories |
100000 |
Purchase of Tubewell Accesories1 |
Completion of work |
-
latitude : 21.52992572
Longitude : 86.75849701
file name : Image_17052022162743878.png
|
2022-05-17 16:27:43.98085 |
35 |
52162619 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI |
200000 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI1 |
Completion of work |
-
latitude : 21.4615752,21.4615747
Longitude : 86.7766024,86.7765999
file name : Image_29052023165552662.png
|
2023-05-29 16:55:52.756701 |
36 |
52162619 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI |
200000 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI1 |
Completion of work |
-
latitude : 21.4615758,21.4615466
Longitude : 86.7761667,86.7762459
file name : Image_25052022105503416.png
|
2022-05-25 10:55:03.539559 |
37 |
52162619 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI |
200000 |
CONST. OF C.C. ROAD FROM DAMBARUGHATI RAMA SINGH DOKAN TO NIMA POKHARI1 |
Completion of work |
-
latitude : 21.46152608,21.4615261
Longitude : 86.7766875,86.77668752
file name : Image_07022022122817193.png
|
2022-02-07 12:28:17.292515 |
38 |
52162306 |
CONSTRUCTION OF GUARD WALL AT HATIASILA CANAL POKHARI. |
150000 |
CONSTRUCTION OF GUARD WALL AT HATIASILA CANAL POKHARI.1 |
Completion of work |
-
latitude : 21.461427211761475
Longitude : 86.77680015563965
file name : Image_26072022194628376.png
|
2022-07-26 19:46:28.482052 |
39 |
44387289 |
CONST. OF GUARD WALL AT GUJUDIHA MATHA POKHARI NORTH SIDE |
250000 |
CONST. OF GUARD WALL AT GUJUDIHA MATHA POKHARI NORTH SIDE1 |
Completion of work |
-
latitude : 21.461470127105713,21.461470127105713
Longitude : 86.77678942680359,86.77678942680359
file name : Image_26072022194918986.png
|
2022-07-26 19:49:19.077044 |
40 |
44387243 |
COMPLETION OF REST ROOM AT JAMBANI HATA CHHAKA |
300000 |
COMPLETION OF REST ROOM AT JAMBANI HATA CHHAKA1 |
Completion of work |
-
latitude : 21.461421847343445
Longitude : 86.77680552005768
file name : Image_26072022194413808.png
|
2022-07-26 19:44:13.91828 |
41 |
44387243 |
COMPLETION OF REST ROOM AT JAMBANI HATA CHHAKA |
300000 |
COMPLETION OF REST ROOM AT JAMBANI HATA CHHAKA1 |
Completion of work |
-
latitude : 21.4615321
Longitude : 86.77669486
file name : Image_07022022124109697.png
|
2022-02-07 12:41:09.788114 |
42 |
44387410 |
ELECTRIC CITY BILL FOR PUMP HOUSE . |
150000 |
ELECTRIC CITY BILL FOR PUMP HOUSE .1 |
Completion of work |
-
latitude : 21.46155595779419
Longitude : 86.77684307098389
file name : Image_30082022165002433.png
|
2022-08-30 16:50:02.567885 |
43 |
64420499 |
PRIASOFT & GPDP |
12000 |
PRIASOFT & GPDP1 |
Completion of work |
-
latitude : 21.46167684
Longitude : 86.77672245
file name : Image_30092022122108244.png
|
2022-09-30 12:21:08.422057 |
44 |
65054243 |
Greywater management system |
400000 |
Greywater management system1 |
Completion of work |
-
latitude : 21.462913155555725,21.462913155555725
Longitude : 86.76280438899994,86.76280438899994
file name : Image_30092022102841943.png
|
2022-09-30 10:28:42.038863 |
45 |
64420516 |
HONORARIUM OF SEM & PUMP DRIVER |
120000 |
HONORARIUM OF SEM & PUMP DRIVER1 |
Completion of work |
-
latitude : 21.461684703826904
Longitude : 86.776682138443
file name : Image_30092022120738590.png
|
2022-09-30 12:07:38.721212 |
46 |
64420775 |
CONTIGENCY & OTHER ADMINISTRATIVE EXPENDITURE. |
70000 |
CONTIGENCY & OTHER ADMINISTRATIVE EXPENDITURE.1 |
Completion of work |
-
latitude : 21.4626676
Longitude : 86.7632243
file name : Image_07112022111210776.png
|
2022-11-07 11:12:10.869024 |
47 |
64420637 |
DEVELOPMENT OF G.P. OFFICE |
40000 |
DEVELOPMENT OF G.P. OFFICE 1 |
Completion of work |
-
latitude : 21.461572
Longitude : 86.7766132
file name : Image_15112023164919078.png
|
2023-11-15 16:49:19.158828 |
48 |
64420637 |
DEVELOPMENT OF G.P. OFFICE |
40000 |
DEVELOPMENT OF G.P. OFFICE 1 |
Completion of work |
-
latitude : 21.461572
Longitude : 86.7766132
file name : Image_15112023164912527.png
|
2023-11-15 16:49:12.605627 |
49 |
44387087 |
COMPLETION OF LATRINE & BATH ROOM FOR PUBLIC USE NEAR G.P OFFICE |
90000 |
COMPLETION OF LATRINE & BATH ROOM FOR PUBLIC USE NEAR G.P OFFICE1 |
Completion of work |
-
latitude : 21.46239785
Longitude : 86.76287919
file name : Image_07102022144137046.png
|
2022-10-07 14:41:37.149331 |
50 |
44309237 |
COMPLETION OF COMMUNITY CENTER AT PATAN NEAR BABA ANANDESWAR MANDIR |
50000 |
COMPLETION OF COMMUNITY CENTER AT PATAN NEAR BABA ANANDESWAR MANDIR1 |
Completion of work |
-
latitude : 21.46240043
Longitude : 86.76287046
file name : Image_07102022143938730.png
|
2022-10-07 14:39:38.823361 |
51 |
64356189 |
RENOVATION & DEVELOPMENT OF MAHISAPATA BADAPOKHARI AT MAHISAPATA |
300000 |
RENOVATION & DEVELOPMENT OF MAHISAPATA BADAPOKHARI AT MAHISAPATA1 |
Completion of work |
-
latitude : 21.53319333333333
Longitude : 86.76305833333332
file name : Image_31072023101744466.png
|
2023-07-31 10:17:44.576056 |
52 |
52162427 |
IMPROVEMENT OF BABA BAIDYANATH ATHELETIC COMMUNITY CENTER AT KUANALI. |
130000 |
IMPROVEMENT OF BABA BAIDYANATH ATHELETIC COMMUNITY CENTER AT KUANALI.1 |
Completion of work |
-
latitude : 21.53174356
Longitude : 86.76206221
file name : Image_01112022123007297.png
|
2022-11-01 12:30:07.3991 |
53 |
52612322 |
Completion of Jamabani Market omplex |
180300 |
Completion of Jamabani Market omplex1 |
Completion of work |
-
latitude : 21.53174356
Longitude : 86.76206221
file name : Image_01112022123239319.png
|
2022-11-01 12:32:39.42702 |
54 |
64356093 |
JALACHHATRA & WATER TENKER USED FOR WATER SCARCITY ARIA |
100000 |
JALACHHATRA & WATER TENKER USED FOR WATER SCARCITY ARIA1 |
Completion of work |
-
latitude : 21.4615459
Longitude : 86.776593
file name : Image_11102023114718559.png
|
2023-10-11 11:47:18.657956 |
55 |
64356093 |
JALACHHATRA & WATER TENKER USED FOR WATER SCARCITY ARIA |
100000 |
JALACHHATRA & WATER TENKER USED FOR WATER SCARCITY ARIA1 |
Completion of work |
-
latitude : 21.4615254
Longitude : 86.7764639
file name : Image_24122022125615817.png
|
2022-12-24 12:56:15.926062 |
56 |
102144670 |
Drainage Construction |
50000 |
Drainage Construction1 |
|
-
latitude : 21.4614824
Longitude : 86.7763929
file name : Image_30082024095404231.png
|
2024-08-30 09:54:05.027606 |
57 |
102136468 |
Drainage Construction |
50000 |
Drainage Construction1 |
|
-
latitude : 21.4614832
Longitude : 86.7763944
file name : Image_30082024091651000.png
|
2024-08-30 09:16:51.293241 |
58 |
102157255 |
Procurement of Sanitation Kits |
21723 |
Procurement of Sanitation Kits1 |
Roof laid |
-
latitude : 21.4614841
Longitude : 86.7763979
file name : Image_30082024094054721.png
|
2024-08-30 09:40:55.341402 |
59 |
102157255 |
Procurement of Sanitation Kits |
21723 |
Procurement of Sanitation Kits1 |
Plinth level |
-
latitude : 21.4614825
Longitude : 86.7763897
file name : Image_30082024093404838.png
|
2024-08-30 09:34:05.364745 |
60 |
102157255 |
Procurement of Sanitation Kits |
21723 |
Procurement of Sanitation Kits1 |
Completion of work |
-
latitude : 21.4614865
Longitude : 86.7763747
file name : Image_30082024091905808.png
|
2024-08-30 09:19:06.147467 |
61 |
105606123 |
Maintenance of community toilet |
50000 |
Maintenance of community toilet1 |
Roof laid |
-
latitude : 21.4614824
Longitude : 86.7763893
file name : Image_30082024094503590.png
|
2024-08-30 09:45:04.265283 |
62 |
105606123 |
Maintenance of community toilet |
50000 |
Maintenance of community toilet1 |
Plinth level |
-
latitude : 21.461486
Longitude : 86.7763903
file name : Image_30082024093530759.png
|
2024-08-30 09:35:31.302576 |
63 |
105606123 |
Maintenance of community toilet |
50000 |
Maintenance of community toilet1 |
Completion of work |
-
latitude : 21.4614852
Longitude : 86.7763874
file name : Image_30082024092520589.png
|
2024-08-30 09:25:20.99842 |
64 |
65054326 |
Water Supply to villages |
128544 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.4615745
Longitude : 86.7765824
file name : Image_27022023134208777.png
|
2023-02-27 13:42:08.867016 |
65 |
64420614 |
DEVELOPMENT OF RURAL HATA AT DUMDUMA HATA NEAR GP OFFICE |
50000 |
DEVELOPMENT OF RURAL HATA AT DUMDUMA HATA NEAR GP OFFICE1 |
Completion of work |
-
latitude : 21.4615743
Longitude : 86.7765824
file name : Image_12052023083206706.png
|
2023-05-12 08:32:06.807527 |
66 |
52162887 |
COMPLITON OF NEW COMMUNITY CENTER AT HATIASILA |
100000 |
COMPLITON OF NEW COMMUNITY CENTER AT HATIASILA1 |
Completion of work |
-
latitude : 21.4615748
Longitude : 86.7765965
file name : Image_29052023170135635.png
|
2023-05-29 17:01:35.727783 |
67 |
44387042 |
SINKING OF NEW TUB-WELL AT MAHISAPATA NEARBUCHUNG SING HOUSE CHHAKA . |
100000 |
SINKING OF NEW TUB-WELL AT MAHISAPATA NEARBUCHUNG SING HOUSE CHHAKA .1 |
Completion of work |
-
latitude : 21.4615753
Longitude : 86.7766001
file name : Image_01062023131507559.png
|
2023-06-01 13:15:07.637212 |
68 |
44387042 |
SINKING OF NEW TUB-WELL AT MAHISAPATA NEARBUCHUNG SING HOUSE CHHAKA . |
100000 |
SINKING OF NEW TUB-WELL AT MAHISAPATA NEARBUCHUNG SING HOUSE CHHAKA .1 |
Completion of work |
-
latitude : 21.53335605
Longitude : 86.77246406
file name : Image_09092021115635205.png
|
2021-09-09 11:56:35.30524 |
69 |
64420844 |
SANITIZING / BLICHING & CLINNING |
20000 |
SANITIZING / BLICHING & CLINNING1 |
Completion of work |
-
latitude : 21.4615747
Longitude : 86.7766016
file name : Image_01062023131247736.png
|
2023-06-01 13:12:47.819559 |
70 |
64420811 |
COMPLETION OF GP GODOWN |
300000 |
COMPLETION OF GP GODOWN 1 |
Completion of work |
-
latitude : 21.4615747
Longitude : 86.7766017
file name : Image_19072023111334411.png
|
2023-07-19 11:13:34.505245 |
71 |
75897722 |
Installation of Computer with Internet facility |
167870 |
Installation of Computer with Internet facility1 |
|
-
latitude : 21.4615522
Longitude : 86.776588
file name : Image_30122023155613857.png
|
2023-12-30 15:56:13.960428 |
72 |
52161478 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING . |
100000 |
PUMP HOUSE MOTOR REPAIR, COMPRESSOR, WASHING, BLICHING, COLOURING, DEVELOPING .1 |
Completion of work |
-
latitude : 21.4615471
Longitude : 86.776283
file name : Image_11102023125211939.png
|
2023-10-11 12:52:12.033802 |
73 |
82958092 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.4615515
Longitude : 86.7766017
file name : Image_16102023194242603.png
|
2023-10-16 19:42:42.697013 |
74 |
82958092 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.4615509
Longitude : 86.7765982
file name : Image_16102023193937144.png
|
2023-10-16 19:39:37.233744 |
75 |
82958092 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.4615515
Longitude : 86.7766017
file name : Image_16102023184433893.png
|
2023-10-16 18:44:33.97454 |
76 |
64420953 |
PURCHAGE OF GI/IRON SHEET WATER TENKER FOR USED MULTY PURPOSE |
200000 |
PURCHAGE OF GI/IRON SHEET WATER TENKER FOR USED MULTY PURPOSE1 |
Completion of work |
-
latitude : 21.4615455
Longitude : 86.7763077
file name : Image_20102023111345116.png
|
2023-10-20 11:13:45.264627 |
77 |
64420533 |
DEVELOPMENT OF GOVT. HOMIOPATHIC HOSPITAL, MAHISAPATA |
80000 |
DEVELOPMENT OF GOVT. HOMIOPATHIC HOSPITAL, MAHISAPATA1 |
Completion of work |
-
latitude : 21.4615611
Longitude : 86.7765859
file name : Image_15112023164906456.png
|
2023-11-15 16:49:06.530509 |
78 |
52163046 |
COMPLETION OF G.P. GODOWN |
200000 |
COMPLETION OF G.P. GODOWN 1 |
Completion of work |
-
latitude : 21.491480000000003
Longitude : 86.74674000000002
file name : Image_09022024100506855.png
|
2024-02-09 10:05:06.937101 |
79 |
77859492 |
Maintenance of school buildings |
400000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 21.4615568
Longitude : 86.7765772
file name : Image_12022024174049640.png
|
2024-02-12 17:40:49.749383 |
80 |
77859492 |
Maintenance of school buildings |
400000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 21.4615574
Longitude : 86.7765777
file name : Image_12022024173513854.png
|
2024-02-12 17:35:13.970648 |
81 |
77859492 |
Maintenance of school buildings |
400000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.4615568
Longitude : 86.7765772
file name : Image_12022024173311468.png
|
2024-02-12 17:33:11.561212 |
82 |
82961348 |
Construction of toilets in public institutions |
210000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.4615568
Longitude : 86.7765772
file name : Image_12022024172944078.png
|
2024-02-12 17:29:44.176628 |
83 |
82961348 |
Construction of toilets in public institutions |
210000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.4615558
Longitude : 86.7765877
file name : Image_02012024122935511.png
|
2024-01-02 12:29:35.723553 |
84 |
82961348 |
Construction of toilets in public institutions |
210000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.4615579
Longitude : 86.7765865
file name : Image_30122023093636491.png
|
2023-12-30 09:36:36.597409 |
85 |
82963046 |
Construction of new Piped Water Supply schemes |
96000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.4615775
Longitude : 86.7766023
file name : Image_01032024160128510.png
|
2024-03-01 16:01:28.653953 |
86 |
82963046 |
Construction of new Piped Water Supply schemes |
96000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.4615775
Longitude : 86.7766023
file name : Image_01032024155626337.png
|
2024-03-01 15:56:26.544368 |
87 |
82963046 |
Construction of new Piped Water Supply schemes |
96000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.4615775
Longitude : 86.7766023
file name : Image_01032024154944332.png
|
2024-03-01 15:49:44.498166 |
88 |
75897316 |
Functional Electricity Connection |
440000 |
Functional Electricity Connection1 |
Plinth level |
-
latitude : 21.4615775
Longitude : 86.7766023
file name : Image_01032024160123696.png
|
2024-03-01 16:01:23.884367 |
89 |
75897316 |
Functional Electricity Connection |
440000 |
Functional Electricity Connection1 |
Completion of work |
-
latitude : 21.4615775
Longitude : 86.7766023
file name : Image_01032024155743040.png
|
2024-03-01 15:57:43.24424 |
90 |
52162657 |
COMPLITION OF GUARD WALL AT BABA BAIDYANATH TEMPLE SOUTH SIDE |
120000 |
COMPLITION OF GUARD WALL AT BABA BAIDYANATH TEMPLE SOUTH SIDE1 |
Completion of work |
-
latitude : 21.591391666666663,21.59138833333333
Longitude : 86.833645,86.83364666666667
file name : Image_24042024102156630.png
|
2024-04-24 10:21:56.710119 |
91 |
52162355 |
CONSTRUCTION OF NEW GATE AT MAHISAPATA UGME SCHOOL. |
150000 |
CONSTRUCTION OF NEW GATE AT MAHISAPATA UGME SCHOOL.1 |
Completion of work |
-
latitude : 21.46184333333333
Longitude : 86.76679666666665
file name : Image_13052024094429112.png
|
2024-05-13 09:44:29.194089 |
92 |
82958767 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.4615514
Longitude : 86.7766018
file name : Image_16102023194457636.png
|
2023-10-16 19:44:57.74593 |
93 |
82958767 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.4615468
Longitude : 86.7765804
file name : Image_16102023194027104.png
|
2023-10-16 19:40:27.229101 |
94 |
82958767 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.4615515
Longitude : 86.7766018
file name : Image_16102023184537479.png
|
2023-10-16 18:45:37.626769 |
95 |
82963278 |
Construction of new Piped Water Supply schemes |
100000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.280843333333337
Longitude : 86.46794833333334
file name : Image_24032024124627630.png
|
2024-03-24 12:46:27.727047 |
96 |
82963278 |
Construction of new Piped Water Supply schemes |
100000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.280781666666666
Longitude : 86.46803833333334
file name : Image_24032024123607238.png
|
2024-03-24 12:36:07.354046 |
97 |
77860964 |
Procurement of Sanitation Kits |
20000 |
Procurement of Sanitation Kits1 |
Plinth level |
-
latitude : 21.280843333333337
Longitude : 86.46794833333334
file name : Image_24032024124538822.png
|
2024-03-24 12:45:38.915336 |
98 |
77860964 |
Procurement of Sanitation Kits |
20000 |
Procurement of Sanitation Kits1 |
Completion of work |
-
latitude : 21.280835000000003
Longitude : 86.46807500000001
file name : Image_24032024123713830.png
|
2024-03-24 12:37:13.916121 |
99 |
102122682 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
|
-
latitude : 21.529715000000003
Longitude : 86.75827
file name : Image_20062024145338516.png
|
2024-06-20 14:53:38.619818 |
100 |
77836578 |
Water Supply to villages |
89276 |
Water Supply to villages1 |
|
-
latitude : 21.52977333333333
Longitude : 86.75828833333335
file name : Image_20062024155625774.png
|
2024-06-20 15:56:25.873826 |
101 |
102125807 |
Construction of new Piped Water Supply schemes |
220000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.4615692
Longitude : 86.7765976
file name : Image_21062024154927629.png
|
2024-06-21 15:49:27.729512 |
102 |
102125807 |
Construction of new Piped Water Supply schemes |
220000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.4615687
Longitude : 86.7765967
file name : Image_21062024154748239.png
|
2024-06-21 15:47:48.335318 |
103 |
102125807 |
Construction of new Piped Water Supply schemes |
220000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.4615688
Longitude : 86.7765969
file name : Image_21062024154551348.png
|
2024-06-21 15:45:51.435329 |
104 |
105613586 |
Repair of pipe drinking water |
156000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.4615456
Longitude : 86.7765972
file name : Image_12072024145710488.png
|
2024-07-12 14:57:10.620706 |
105 |
105613586 |
Repair of pipe drinking water |
156000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.4615455
Longitude : 86.7765967
file name : Image_12072024145334987.png
|
2024-07-12 14:53:35.20988 |
106 |
105613586 |
Repair of pipe drinking water |
156000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.4615454
Longitude : 86.7765966
file name : Image_12072024145015743.png
|
2024-07-12 14:50:15.896372 |
107 |
103573077 |
Construction of new Piped Water Supply schemes |
350000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.4615454
Longitude : 86.7765966
file name : Image_12072024152232538.png
|
2024-07-12 15:22:32.6414 |
108 |
103573077 |
Construction of new Piped Water Supply schemes |
350000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.4615455
Longitude : 86.7765969
file name : Image_12072024151635794.png
|
2024-07-12 15:16:35.920898 |
109 |
103573077 |
Construction of new Piped Water Supply schemes |
350000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.4615456
Longitude : 86.7765972
file name : Image_12072024151435162.png
|
2024-07-12 15:14:35.298656 |
110 |
64420589 |
CONST. OF CC ROAD FROM MAHADEV SAHI AWC TO RD ROAD |
200000 |
CONST. OF CC ROAD FROM MAHADEV SAHI AWC TO RD ROAD1 |
Completion of work |
-
latitude : 21.281675000000003,21.281675000000003
Longitude : 86.46333333333332,86.46333333333332
file name : Image_10102024091255118.png
|
2024-10-10 09:12:55.222748 |
111 |
102167657 |
Development of Water Bodies |
50000 |
Development of Water Bodies1 |
Plinth level |
-
latitude : 21.28150333333333
Longitude : 86.46822333333333
file name : Image_10102024094009533.png
|
2024-10-10 09:40:09.616816 |
112 |
102167657 |
Development of Water Bodies |
50000 |
Development of Water Bodies1 |
Completion of work |
-
latitude : 21.281675000000003
Longitude : 86.46333333333332
file name : Image_10102024092351910.png
|
2024-10-10 09:23:51.994816 |
113 |
64420786 |
PURCHAGE OF DESK BENCH & UTENSILS FOR SCHOOL & AWC |
200000 |
PURCHAGE OF DESK BENCH & UTENSILS FOR SCHOOL & AWC1 |
Completion of work |
-
latitude : 21.461791666666667
Longitude : 86.76656166666668
file name : Image_02082024135030245.png
|
2024-08-02 13:50:30.324345 |
114 |
64420786 |
PURCHAGE OF DESK BENCH & UTENSILS FOR SCHOOL & AWC |
200000 |
PURCHAGE OF DESK BENCH & UTENSILS FOR SCHOOL & AWC1 |
Completion of work |
-
latitude : 21.4615571
Longitude : 86.7765857
file name : Image_02082024134942329.png
|
2024-08-02 13:49:42.419473 |