1 |
44376766 |
CONST.TUBEWELL PLATFORM NEAR ISWAR NAYAK HOUSE WITH SOAK PIT |
25000 |
CONST.TUBEWELL PLATFORM NEAR ISWAR NAYAK HOUSE WITH SOAK PIT1 |
Roof laid |
-
latitude : 21.367925
Longitude : 86.70738166666666
file name : Image_09122020161653596.png
|
2020-12-09 16:16:53.678036 |
2 |
44376975 |
CONST.TUBEWELL PLATFORM NEAR LAXMI MANDAP WITH SOAK PIT |
25000 |
CONST.TUBEWELL PLATFORM NEAR LAXMI MANDAP WITH SOAK PIT1 |
Roof laid |
-
latitude : 21.361561666666663
Longitude : 86.70886166666666
file name : Image_09122020162330915.png
|
2020-12-09 16:23:30.997667 |
3 |
44403470 |
IMPROVEMENT ROAD WITH DRAIN FROM HARU MAJHI HOUSE TO DEBA HASDA HOUSE |
200000 |
IMPROVEMENT ROAD WITH DRAIN FROM HARU MAJHI HOUSE TO DEBA HASDA HOUSE1 |
Roof laid |
-
latitude : 21.368909999999996,21.368895
Longitude : 86.69845,86.69845666666667
file name : Image_09122020160818103.png
|
2020-12-09 16:08:18.182861 |
4 |
38835784 |
INCOMPLETE CULVERT COMPLETION PANDASUNI. |
50000 |
INCOMPLETE CULVERT COMPLETION PANDASUNI.1 |
Completed |
-
latitude : 21.355300000000003
Longitude : 86.70582166666667
file name : Image_24122020112731844.png
|
2020-12-24 11:27:31.947898 |
5 |
38835683 |
CONST. OF BATHING GHAT AT MUKUNDAPUR ADIBASI SAHI. |
100000 |
CONST. OF BATHING GHAT AT MUKUNDAPUR ADIBASI SAHI.1 |
Completed |
-
latitude : 21.368555
Longitude : 86.69957833333335
file name : Image_24122020111540237.png
|
2020-12-24 11:15:40.350445 |
6 |
38835519 |
CONST. OF CONCRETE LIBRARY TO RD ROAD. |
200000 |
CONST. OF CONCRETE LIBRARY TO RD ROAD.1 |
Completed |
-
latitude : 21.3698653,21.36987
Longitude : 86.7124803,86.7124848
file name : Image_18122020134656172.png
|
2020-12-18 13:46:56.280047 |
7 |
44404457 |
CONST.OF APPORACH ROAD FROM DHAMUDIA CHAKA TO KACHIRIPADA |
200000 |
CONST.OF APPORACH ROAD FROM DHAMUDIA CHAKA TO KACHIRIPADA1 |
Roof laid |
-
latitude : 21.363393333333338,21.363335
Longitude : 86.70347333333332,86.70352333333334
file name : Image_25032021170934342.png
|
2021-03-25 17:09:34.431738 |
8 |
44404457 |
CONST.OF APPORACH ROAD FROM DHAMUDIA CHAKA TO KACHIRIPADA |
200000 |
CONST.OF APPORACH ROAD FROM DHAMUDIA CHAKA TO KACHIRIPADA1 |
Roof laid |
-
latitude : 21.363418333333335,21.363418333333335,21.363479999999996
Longitude : 86.70341166666667,86.70341166666667,86.703285
file name : Image_25032021170939725.png
|
2021-03-25 17:09:39.830496 |
9 |
44418649 |
COMPLIATION OF INCOMPLITE LIBRARY, KANDAGARADI GP |
120000 |
COMPLIATION OF INCOMPLITE LIBRARY, KANDAGARADI GP1 |
Roof laid |
-
latitude : 21.370073333333334
Longitude : 86.71211333333333
file name : Image_18122020134933633.png
|
2020-12-18 13:49:33.750135 |
10 |
44404077 |
REPAIR OF COMMUNITY CENTER KANPUR |
100000 |
REPAIR OF COMMUNITY CENTER KANPUR1 |
Roof laid |
-
latitude : 21.375829999999997
Longitude : 86.71804500000002
file name : Image_29032021181246130.png
|
2021-03-29 18:12:46.233773 |
11 |
63738603 |
Provision of compression washing of tube wells and All PWS |
30000 |
Provision of compression washing of tube wells and All PWS1 |
Completion of work |
-
latitude : 21.369821666666667
Longitude : 86.71253833333334
file name : Image_27122023132426183.png
|
2023-12-27 13:24:26.27719 |
12 |
63738603 |
Provision of compression washing of tube wells and All PWS |
30000 |
Provision of compression washing of tube wells and All PWS1 |
Completion of work |
-
latitude : 21.3698471
Longitude : 86.7125053
file name : Image_27122023132421945.png
|
2023-12-27 13:24:22.043942 |
13 |
81014506 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.366431666666667
Longitude : 86.71343499999999
file name : Image_16012024121902766.png
|
2024-01-16 12:19:02.85513 |
14 |
81014506 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.36649
Longitude : 86.71341833333332
file name : Image_16012024121236004.png
|
2024-01-16 12:12:36.112169 |
15 |
81014506 |
Construction of toilets in public institutions |
500000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.366558333333334
Longitude : 86.71357333333331
file name : Image_16012024120402009.png
|
2024-01-16 12:04:02.086044 |
16 |
44403328 |
CONST.OF APPORACH ROAD WITH DRAIN FROM BISWAL SAHI TO BEHERA SAHI |
200000 |
CONST.OF APPORACH ROAD WITH DRAIN FROM BISWAL SAHI TO BEHERA SAHI1 |
Roof laid |
-
latitude : 21.353954999999996,21.353954999999996
Longitude : 86.70012999999999,86.700175
file name : Image_18062021140422054.png
|
2021-06-18 14:04:22.144592 |
17 |
55697498 |
CONST OF GUARDWALL FROM AKATIA SA HOUSE TO MANDIRA DHIA PADA |
70000 |
CONST OF GUARDWALL FROM AKATIA SA HOUSE TO MANDIRA DHIA PADA1 |
Completion of work |
-
latitude : 21.371299999999998
Longitude : 86.71415499999999
file name : Image_09082023170921461.png
|
2023-08-09 17:09:21.571255 |
18 |
67898094 |
Providing piped water supply to public institutions |
60000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.3295613
Longitude : 86.5056723
file name : Image_18102023182152916.png
|
2023-10-18 18:21:53.001383 |
19 |
67898094 |
Providing piped water supply to public institutions |
60000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.353701666666666
Longitude : 86.70426
file name : Image_13092023164106351.png
|
2023-09-13 16:41:06.439278 |
20 |
67898568 |
Const of CC Guardwall at backside of Hanuman temple in village Barudakhana |
100000 |
Const of CC Guardwall at backside of Hanuman temple in village Barudakhana1 |
Completion of work |
-
latitude : 21.370400000000004
Longitude : 86.736355
file name : Image_10102023175328401.png
|
2023-10-10 17:53:28.487941 |
21 |
55695842 |
WATER SUPPLY TO BAULAGADIA PRY SCHOOL AND AWC |
71428 |
WATER SUPPLY TO BAULAGADIA PRY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.35358833333333
Longitude : 86.70402166666666
file name : Image_28092023111803247.png
|
2023-09-28 11:18:03.33069 |
22 |
55695842 |
WATER SUPPLY TO BAULAGADIA PRY SCHOOL AND AWC |
71428 |
WATER SUPPLY TO BAULAGADIA PRY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.353673333333337
Longitude : 86.70406833333332
file name : Image_28092023111810416.png
|
2023-09-28 11:18:10.499055 |
23 |
66011457 |
Creation of community compost pits for a group of Households |
100000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.29793833333333
Longitude : 86.69027333333334
file name : Image_03042024070847176.png
|
2024-04-03 07:08:47.282341 |
24 |
44405380 |
ANM CENTER GATE |
50000 |
ANM CENTER GATE1 |
Roof laid |
-
latitude : 21.504466666666666
Longitude : 86.92572166666666
file name : Image_10122021125414270.png
|
2021-12-10 12:54:14.448606 |
25 |
35455957 |
Repair of Market Complex at Baulagadia Bazar |
15000 |
Repair of Market Complex at Baulagadia Bazar1 |
Completed |
-
latitude : 21.504433333333335
Longitude : 86.92583
file name : Image_10122021125757384.png
|
2021-12-10 12:57:57.55373 |
26 |
35449812 |
Raised tubewell platform at near UP School |
25000 |
Raised tubewell platform at near UP School1 |
Completed |
-
latitude : 21.50448333333333
Longitude : 86.92592333333332
file name : Image_10122021125139578.png
|
2021-12-10 12:51:39.794304 |
27 |
35449529 |
Raised tubewell platform at Mangala Mandir |
25000 |
Raised tubewell platform at Mangala Mandir1 |
Completed |
-
latitude : 21.504341666666665
Longitude : 86.92599833333334
file name : Image_10122021124257336.png
|
2021-12-10 12:42:57.457344 |
28 |
38835715 |
TUBE WELL PLATFORM NEAR RAMACHANDI THAKURANI. |
25000 |
TUBE WELL PLATFORM NEAR RAMACHANDI THAKURANI.1 |
Completed |
-
latitude : 21.397336666666668
Longitude : 86.82120333333333
file name : Image_05042022061930053.png
|
2022-04-05 06:19:30.192485 |
29 |
38835715 |
TUBE WELL PLATFORM NEAR RAMACHANDI THAKURANI. |
25000 |
TUBE WELL PLATFORM NEAR RAMACHANDI THAKURANI.1 |
Completed |
-
latitude : 21.504388333333335
Longitude : 86.92579833333333
file name : Image_10122021130323660.png
|
2021-12-10 13:03:23.796935 |
30 |
44403613 |
CONST OF DRAIN FROM SAPNESWER MAHADEV MANDIR TO SAHU SAHU |
80851 |
CONST OF DRAIN FROM SAPNESWER MAHADEV MANDIR TO SAHU SAHU1 |
Roof laid |
-
latitude : 21.3696926,21.3696915
Longitude : 86.7129793,86.7129794
file name : Image_15122021115904437.png
|
2021-12-15 11:59:04.57538 |
31 |
67894073 |
Const of CC Road from Baulagadia PWD Road to Rana sahi |
230000 |
Const of CC Road from Baulagadia PWD Road to Rana sahi1 |
Roof laid |
-
latitude : 21.35345166666667,21.353476666666666
Longitude : 86.70401833333332,86.70408
file name : Image_30062023164814173.png
|
2023-06-30 16:48:14.057678 |
32 |
35454545 |
Const. of Drain form Hadia badi chaka to kati nayak house |
70000 |
Const. of Drain form Hadia badi chaka to kati nayak house1 |
Completed |
-
latitude : 21.397075000000005,21.397075000000005
Longitude : 86.82149333333334,86.82149333333334
file name : Image_05042022065643238.png
|
2022-04-05 06:56:43.378499 |
33 |
35454545 |
Const. of Drain form Hadia badi chaka to kati nayak house |
70000 |
Const. of Drain form Hadia badi chaka to kati nayak house1 |
Completed |
-
latitude : 21.329562,21.32956
Longitude : 86.5056318,86.5056365
file name : Image_21042022155111018.png
|
2022-04-21 15:51:11.145948 |
34 |
55769817 |
CONST OF CULVERT WITH IMPROVEMENT OF ROAD FROM NAYAPATANA KUNJA JENA HOUSE TO KALA SIRA THAKURANI |
150000 |
CONST OF CULVERT WITH IMPROVEMENT OF ROAD FROM NAYAPATANA KUNJA JENA HOUSE TO KALA SIRA THAKURANI1 |
Roof laid |
-
latitude : 21.397003333333334,21.397049999999997
Longitude : 86.82135000000001,86.82139166666666
file name : Image_05042022073531914.png
|
2022-04-05 07:35:32.031538 |
35 |
63739543 |
Const of CC Road with CC drain from Budha Sethi house to Sikidia Pokhari |
100000 |
Const of CC Road with CC drain from Budha Sethi house to Sikidia Pokhari1 |
Roof laid |
-
latitude : 21.366991666666664,21.36698333333333
Longitude : 86.70579333333332,86.7058
file name : Image_30062023162442806.png
|
2023-06-30 16:24:42.900349 |
36 |
55769866 |
CONST OF CULVERT NEAR RADHAKRUSHNA MANDIR |
100000 |
CONST OF CULVERT NEAR RADHAKRUSHNA MANDIR1 |
Roof laid |
-
latitude : 21.39711333333333,21.397103333333334
Longitude : 86.82149666666668,86.82149166666667
file name : Image_05042022071936200.png
|
2022-04-05 07:19:36.2827 |
37 |
55769866 |
CONST OF CULVERT NEAR RADHAKRUSHNA MANDIR |
100000 |
CONST OF CULVERT NEAR RADHAKRUSHNA MANDIR1 |
Roof laid |
-
latitude : 21.3283954,21.329631666666668
Longitude : 86.5057516,86.50556999999999
file name : Image_20042022115420158.png
|
2022-04-20 11:54:20.29109 |
38 |
55769092 |
CONST OF ROAD WITH CULVERT NEAR GOLABANDHA DASA SAHI (BAISHNABA) ROAD |
180000 |
CONST OF ROAD WITH CULVERT NEAR GOLABANDHA DASA SAHI (BAISHNABA) ROAD1 |
Roof laid |
-
latitude : 21.397215,21.397215
Longitude : 86.82141666666666,86.82141666666666
file name : Image_05042022071041642.png
|
2022-04-05 07:10:41.732391 |
39 |
55768802 |
CONST OF DRAIN WITH ROAD FROM ASWINI SA HOUSE TO BHAGIRATHI SA HOUSE |
200000 |
CONST OF DRAIN WITH ROAD FROM ASWINI SA HOUSE TO BHAGIRATHI SA HOUSE1 |
Roof laid |
-
latitude : 21.397181666666665,21.397180000000002
Longitude : 86.82148166666666,86.82150000000001
file name : Image_05042022080626480.png
|
2022-04-05 08:06:26.588418 |
40 |
55697481 |
CONST OF DRAIN FROM KADAGARADI SAHU SAHI CHHAKA TO SAPNESWAR TEMPLE |
70000 |
CONST OF DRAIN FROM KADAGARADI SAHU SAHI CHHAKA TO SAPNESWAR TEMPLE1 |
Roof laid |
-
latitude : 21.397078333333337,21.39708333333333
Longitude : 86.82141666666666,86.82141833333331
file name : Image_05042022074614518.png
|
2022-04-05 07:46:14.636209 |
41 |
55768940 |
CONST OF DRAIN WITH ROAD FROM INCOMPLETE CC ROAD TO RAMACHANDI THAKURANI |
200000 |
CONST OF DRAIN WITH ROAD FROM INCOMPLETE CC ROAD TO RAMACHANDI THAKURANI1 |
Roof laid |
-
latitude : 21.397231666666666,21.396914999999996
Longitude : 86.8214,86.82154
file name : Image_05042022070702535.png
|
2022-04-05 07:07:02.650862 |
42 |
55769687 |
CONST OF VAT AND SOAK PIT IN GP AREA |
15000 |
CONST OF VAT AND SOAK PIT IN GP AREA1 |
Roof laid |
-
latitude : 21.397115
Longitude : 86.82146333333334
file name : Image_05042022071406593.png
|
2022-04-05 07:14:06.696769 |
43 |
55697532 |
CONST OF LATRINE WITH WATER SUPPLY OF MISSION SHAKTI BUILDING |
92428 |
CONST OF LATRINE WITH WATER SUPPLY OF MISSION SHAKTI BUILDING1 |
Roof laid |
-
latitude : 21.397060000000003
Longitude : 86.821565
file name : Image_05042022081106296.png
|
2022-04-05 08:11:06.419272 |
44 |
44376128 |
CONST.TUBEWELL PLATFORM AT GHUDADIA WITH SOAK PIT |
25000 |
CONST.TUBEWELL PLATFORM AT GHUDADIA WITH SOAK PIT1 |
Roof laid |
-
latitude : 21.397166666666667
Longitude : 86.82148833333333
file name : Image_05042022063709279.png
|
2022-04-05 06:37:09.410558 |
45 |
55785693 |
COMPLETION OF INCOMPLETE DRAIN FROM GORA MOHANTY HOUSE TO AGHIRA PADA |
100000 |
COMPLETION OF INCOMPLETE DRAIN FROM GORA MOHANTY HOUSE TO AGHIRA PADA1 |
Roof laid |
-
latitude : 21.397109999999998,21.397109999999998
Longitude : 86.82142333333334,86.82142333333334
file name : Image_05042022064628597.png
|
2022-04-05 06:46:28.728256 |
46 |
44405092 |
COMPLETION OF INCOMPLETE OF CYCLONE SHELTER MUKUNDPUR SCHOOL |
250000 |
COMPLETION OF INCOMPLETE OF CYCLONE SHELTER MUKUNDPUR SCHOOL1 |
Roof laid |
-
latitude : 21.396955000000002
Longitude : 86.82136
file name : Image_05042022064038240.png
|
2022-04-05 06:40:38.376098 |
47 |
44418720 |
COMPLETION OF INCOMPLETE GATE WITH TILES & COLOUR |
100000 |
COMPLETION OF INCOMPLETE GATE WITH TILES & COLOUR1 |
Roof laid |
-
latitude : 21.397109999999998
Longitude : 86.82161666666667
file name : Image_05042022064251672.png
|
2022-04-05 06:42:51.79948 |
48 |
38835803 |
CONST. OF GUARD WALL AT MUNI POKHARI. |
100000 |
CONST. OF GUARD WALL AT MUNI POKHARI.1 |
Completed |
-
latitude : 21.3295586
Longitude : 86.5056362
file name : Image_21042022155337724.png
|
2022-04-21 15:53:37.922569 |
49 |
35454718 |
Cosnt. of drain from RD road to Sankara Patra house |
50000 |
Cosnt. of drain from RD road to Sankara Patra house1 |
Completed |
-
latitude : 21.3295554,21.3295607
Longitude : 86.5056371,86.5056315
file name : Image_21042022155629989.png
|
2022-04-21 15:56:30.120015 |
50 |
35455030 |
Const. of Baunary wall of Baradadhi UP School |
100000 |
Const. of Baunary wall of Baradadhi UP School1 |
Completed |
-
latitude : 21.3295586
Longitude : 86.505636
file name : Image_21042022154531182.png
|
2022-04-21 15:45:31.450402 |
51 |
35450920 |
Const. common Sanitation and changing room near biseswa mahadev |
100000 |
Const. common Sanitation and changing room near biseswa mahadev1 |
Completed |
-
latitude : 21.3294223
Longitude : 86.5057851
file name : Image_21042022154859459.png
|
2022-04-21 15:48:59.605101 |
52 |
35455143 |
Const. of drain from goar mohanty house to Aghrapada |
100000 |
Const. of drain from goar mohanty house to Aghrapada1 |
Completed |
-
latitude : 21.3295602,21.3295598
Longitude : 86.5056359,86.5056359
file name : Image_21042022155856135.png
|
2022-04-21 15:58:56.295151 |
53 |
38835620 |
CONST. OF CONCRETE ROAD MADHUKARKHUNTA UP SCHOOL TO AWC CENTRE. |
115000 |
CONST. OF CONCRETE ROAD MADHUKARKHUNTA UP SCHOOL TO AWC CENTRE.1 |
Completed |
-
latitude : 21.3295591,21.329422
Longitude : 86.5056429,86.5057863
file name : Image_21042022160052567.png
|
2022-04-21 16:00:52.711315 |
54 |
55769629 |
JALACHHATRA |
10000 |
JALACHHATRA1 |
Roof laid |
-
latitude : 21.369944999999998
Longitude : 86.71202333333333
file name : Image_16062022104433961.png
|
2022-06-16 10:44:34.070359 |
55 |
55695977 |
CONST OF BATHING GHAT WITH CHANGING ROOM AT BISESWAR MAHADEV POKHARI |
144000 |
CONST OF BATHING GHAT WITH CHANGING ROOM AT BISESWAR MAHADEV POKHARI1 |
Roof laid |
-
latitude : 21.37134
Longitude : 86.70217499999998
file name : Image_16062022142207513.png
|
2022-06-16 14:22:07.614069 |
56 |
44403927 |
CONST OF DRAIN FROM ASTA CHAKA TO SANKARA BEHERA HOUSE,BISHNUPUR |
100000 |
CONST OF DRAIN FROM ASTA CHAKA TO SANKARA BEHERA HOUSE,BISHNUPUR1 |
Roof laid |
-
latitude : 21.38805,21.388073333333335
Longitude : 86.70008666666666,86.70012333333334
file name : Image_07072022145435892.png
|
2022-07-07 14:54:36.004463 |
57 |
63739774 |
Renovation of Hada Gadia Tank |
50000 |
Renovation of Hada Gadia Tank1 |
Roof laid |
-
latitude : 21.356375000000003
Longitude : 86.69806333333332
file name : Image_04082022164341715.png
|
2022-08-04 16:43:41.821373 |
58 |
44418495 |
REPAIRE AND M,AINTANCE OF PWS |
70000 |
REPAIRE AND M,AINTANCE OF PWS1 |
Roof laid |
-
latitude : 21.35308
Longitude : 86.70427333333333
file name : Image_04082022163346037.png
|
2022-08-04 16:33:46.162583 |
59 |
55769900 |
COMPL OF STAFF QUARTER |
125000 |
COMPL OF STAFF QUARTER1 |
Roof laid |
-
latitude : 21.370056666666663
Longitude : 86.71214499999999
file name : Image_08092022140738525.png
|
2022-09-08 14:07:38.617544 |
60 |
63739713 |
Repair and maintenance of GP Office |
200000 |
Repair and maintenance of GP Office1 |
Roof laid |
-
latitude : 21.369858333333333
Longitude : 86.71242500000001
file name : Image_08092022140331049.png
|
2022-09-08 14:03:31.13789 |
61 |
63739703 |
Const with repairing surrounding of GP Office Boundary wall |
290000 |
Const with repairing surrounding of GP Office Boundary wall1 |
Roof laid |
-
latitude : 21.369898333333335
Longitude : 86.71235166666665
file name : Image_13102022154004633.png
|
2022-10-13 15:40:04.7669 |
62 |
44374958 |
DIGGING OF NWE TUBEWELL AT AWC,NAYAPATANA |
120000 |
DIGGING OF NWE TUBEWELL AT AWC,NAYAPATANA1 |
Roof laid |
-
latitude : 21.369923333333336
Longitude : 86.71249166666666
file name : Image_19112022110209403.png
|
2022-11-19 11:02:09.489913 |
63 |
44375220 |
DIGGING OF NWE TUBEWELL AT PANDA SAHI NEAR HANUMAN MANDIR |
120000 |
DIGGING OF NWE TUBEWELL AT PANDA SAHI NEAR HANUMAN MANDIR1 |
Roof laid |
-
latitude : 21.369984999999996
Longitude : 86.71238
file name : Image_19112022110411443.png
|
2022-11-19 11:04:11.529961 |
64 |
55697461 |
CONST OF BATHING GHAT AT SIKIDIA TAN NEAR PATRA SAHI |
100000 |
CONST OF BATHING GHAT AT SIKIDIA TAN NEAR PATRA SAHI1 |
Roof laid |
-
latitude : 21.36766
Longitude : 86.70515166666668
file name : Image_08122022160245053.png
|
2022-12-08 16:02:45.13813 |
65 |
63739719 |
Renovation of earthen canal from Dhana Gadia Nala to Kalia Badi |
50000 |
Renovation of earthen canal from Dhana Gadia Nala to Kalia Badi1 |
Roof laid |
-
latitude : 21.3574
Longitude : 86.71711833333332
file name : Image_02122022090259483.png
|
2022-12-02 09:02:59.572727 |
66 |
63739550 |
Const of CC Road with Guardwall from Abhimanyu Rout house to Benudhar Rout house in village |
100000 |
Const of CC Road with Guardwall from Abhimanyu Rout house to Benudhar Rout house in village1 |
Roof laid |
-
latitude : 21.369701666666668,21.369703333333337
Longitude : 86.71622,86.71626333333333
file name : Image_02122022084958080.png
|
2022-12-02 08:49:58.166424 |
67 |
63739533 |
Const of CC road from Patra sahi club house to Chandisundari Thakurani in village Baulagadia |
200000 |
Const of CC road from Patra sahi club house to Chandisundari Thakurani in village Baulagadia1 |
Plinth level |
-
latitude : 21.359765,21.35977833333333
Longitude : 86.70053000000001,86.700535
file name : Image_31012023073223195.png
|
2023-01-31 07:32:23.309845 |
68 |
63739528 |
Const of CC road from Mankada Gadia Pokhari to Manoranjan Parida house in village Kandagaradi |
100000 |
Const of CC road from Mankada Gadia Pokhari to Manoranjan Parida house in village Kandagaradi1 |
Roof laid |
-
latitude : 21.378965,21.378965,21.378968333333333
Longitude : 86.70703333333334,86.70702333333332,86.70697999999999
file name : Image_27022023175843207.png
|
2023-02-27 17:58:43.305515 |
69 |
63739450 |
Electri Bill payment in all PWS and Street light |
100000 |
Electri Bill payment in all PWS and Street light1 |
Roof laid |
-
latitude : 21.329375
Longitude : 86.5057544
file name : Image_24032023154502335.png
|
2023-03-24 15:45:02.431285 |
70 |
67726382 |
Providing piped water supply to public institutions |
111702 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 21.329375
Longitude : 86.5057548
file name : Image_29032023181446284.png
|
2023-03-29 18:14:46.401359 |
71 |
63738598 |
Honorarium of SEM / Addl SEM |
48000 |
Honorarium of SEM / Addl SEM1 |
Roof laid |
-
latitude : 21.369854999999998
Longitude : 86.71227500000002
file name : Image_23062023152515571.png
|
2023-06-23 15:25:15.682157 |
72 |
66003357 |
Const of CC Drain from Shreedhara Jena house to Gura Das house |
200000 |
Const of CC Drain from Shreedhara Jena house to Gura Das house1 |
Completed |
-
latitude : 21.353931666666668,21.353969999999997
Longitude : 86.69880666666668,86.69882000000001
file name : Image_22062023150027061.png
|
2023-06-22 15:00:27.259902 |
73 |
66003291 |
Repairing and colouring of Baulagadia Market Complex |
300000 |
Repairing and colouring of Baulagadia Market Complex1 |
Completed |
-
latitude : 21.35290166666667
Longitude : 86.70406999999999
file name : Image_01072023133259399.png
|
2023-07-01 13:32:59.502959 |
74 |
66003372 |
Repair of stone Carving Centre Baulagadia |
200000 |
Repair of stone Carving Centre Baulagadia1 |
Completed |
-
latitude : 21.35318
Longitude : 86.70446500000001
file name : Image_01072023133132244.png
|
2023-07-01 13:31:32.345609 |
75 |
66003382 |
Development of Mukundapur UGUP School Play Ground |
30000 |
Development of Mukundapur UGUP School Play Ground1 |
Completed |
-
latitude : 21.36391
Longitude : 86.70844333333335
file name : Image_01072023132629661.png
|
2023-07-01 13:26:29.765675 |
76 |
66003341 |
Renovation of Padhan Pokhari |
50000 |
Renovation of Padhan Pokhari1 |
Completed |
-
latitude : 21.355428333333332
Longitude : 86.69720333333335
file name : Image_30062023165837715.png
|
2023-06-30 16:58:37.839892 |
77 |
66003316 |
Renovation of Hada Gadia Tank |
50000 |
Renovation of Hada Gadia Tank1 |
Completed |
-
latitude : 21.356244999999998
Longitude : 86.69804500000001
file name : Image_30062023170155579.png
|
2023-06-30 17:01:55.67395 |
78 |
66003403 |
Const of CC Drain from PWD Road to Bijay Kumar Sa house with Hume Pipe |
100000 |
Const of CC Drain from PWD Road to Bijay Kumar Sa house with Hume Pipe1 |
Completed |
-
latitude : 21.35506833333333,21.354985000000003
Longitude : 86.70521500000001,86.70519
file name : Image_30062023161036312.png
|
2023-06-30 16:10:36.413395 |
79 |
66003346 |
Renovation of Gudi Pokhari |
50000 |
Renovation of Gudi Pokhari1 |
Completed |
-
latitude : 21.361711666666665
Longitude : 86.70028833333332
file name : Image_30062023161651057.png
|
2023-06-30 16:16:51.16972 |
80 |
67892723 |
Const of CC Road with Guardwall from PMGSY road to Narendra Parida house |
150000 |
Const of CC Road with Guardwall from PMGSY road to Narendra Parida house1 |
Roof laid |
-
latitude : 21.365195000000003,21.365196666666666
Longitude : 86.71884166666665,86.71883000000001
file name : Image_15092023122024654.png
|
2023-09-15 12:20:24.736751 |
81 |
67893080 |
Const of rain water harvesting structure at GP Office |
50000 |
Const of rain water harvesting structure at GP Office1 |
Roof laid |
-
latitude : 21.369935
Longitude : 86.71249166666666
file name : Image_01072023130356274.png
|
2023-07-01 13:03:56.368405 |
82 |
67892843 |
Const of Boundary wall at Balarampatana Pry School |
200000 |
Const of Boundary wall at Balarampatana Pry School1 |
Roof laid |
-
latitude : 21.362779999999997
Longitude : 86.73983333333332
file name : Image_23122023140801279.png
|
2023-12-23 14:08:00.515307 |
83 |
84076874 |
Development of GP Building (Civil work with furniture retrofittings) |
300919 |
Development of GP Building (Civil work with furniture retrofittings)1 |
Completed |
-
latitude : 21.36999166666667
Longitude : 86.71227500000002
file name : Image_30062023173852025.png
|
2023-06-30 17:38:52.01292 |
84 |
44418399 |
CONTIGENCY |
39149 |
CONTIGENCY1 |
Completion of work |
-
latitude : 21.3294072,21.3294068
Longitude : 86.5057245,86.505724
file name : Image_01072023155346726.png
|
2023-07-01 15:53:46.594085 |
85 |
66011495 |
Creation of community soak pits for group of Households |
135000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.370046666666667
Longitude : 86.71216000000001
file name : Image_15072023120947497.png
|
2023-07-15 12:09:47.588637 |
86 |
67897959 |
Operation & maintenance of drinking water supply system |
50000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.370659999999997
Longitude : 86.71515666666667
file name : Image_09082023171426897.png
|
2023-08-09 17:14:26.982786 |
87 |
63739432 |
Repair and maintenance of Baulagadia PWS project |
45000 |
Repair and maintenance of Baulagadia PWS project1 |
Completion of work |
-
latitude : 21.353046666666668
Longitude : 86.70427
file name : Image_27122023115927575.png
|
2023-12-27 11:59:27.656639 |
88 |
63739437 |
Repair and maintenance of Ankurakhunta PWS |
45000 |
Repair and maintenance of Ankurakhunta PWS1 |
Completion of work |
-
latitude : 21.371785
Longitude : 86.72571833333335
file name : Image_15092023133446752.png
|
2023-09-15 13:34:46.843687 |
89 |
63738647 |
Repair and maintenance of Kandagaradi PWS Project |
45000 |
Repair and maintenance of Kandagaradi PWS Project1 |
Completion of work |
-
latitude : 21.360386666666667
Longitude : 86.71636500000001
file name : Image_15092023132716378.png
|
2023-09-15 13:27:16.452721 |
90 |
44377330 |
CONST. TUBEWELL PLATFORM AT GAUDA SAHI,GOLABANDHA WITH SOAK PIT |
25000 |
CONST. TUBEWELL PLATFORM AT GAUDA SAHI,GOLABANDHA WITH SOAK PIT1 |
Completion of work |
-
latitude : 21.3295625
Longitude : 86.5056689
file name : Image_18102023182331133.png
|
2023-10-18 18:23:31.218372 |
91 |
44374688 |
COMPLITE OF TOILET AWC,BAULAGADIA |
100000 |
COMPLITE OF TOILET AWC,BAULAGADIA1 |
Completion of work |
-
latitude : 21.353670000000005
Longitude : 86.70418999999998
file name : Image_22092023155400644.png
|
2023-09-22 15:54:00.736369 |
92 |
63739453 |
Jalachhatra in summer season |
20000 |
Jalachhatra in summer season1 |
Completion of work |
-
latitude : 21.370055
Longitude : 86.71219
file name : Image_15092023132114454.png
|
2023-09-15 13:21:14.539044 |
93 |
82397357 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.300833333333337
Longitude : 86.69188833333334
file name : Image_19102023071016663.png
|
2023-10-19 07:10:16.799382 |
94 |
82397357 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.300295
Longitude : 86.69149
file name : Image_19102023065738555.png
|
2023-10-19 06:57:38.682941 |
95 |
89106789 |
Operation & maintenance of community sanitary complex |
250000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.361788333333333
Longitude : 86.69982333333334
file name : Image_19012024102903608.png
|
2024-01-19 10:29:03.742175 |
96 |
89107020 |
Completion of CC Road from Madhurkhunta RD Road to Brajasundar Nayak house |
200000 |
Completion of CC Road from Madhurkhunta RD Road to Brajasundar Nayak house1 |
Completion of work |
-
latitude : 21.36502833333333,21.36501333333333
Longitude : 86.73161833333333,86.73169666666666
file name : Image_20062024180256786.png
|
2024-06-20 18:02:56.870658 |
97 |
89107043 |
Seating cement concrete bench at 15 nos of ward under Kandagaradi GP |
150000 |
Seating cement concrete bench at 15 nos of ward under Kandagaradi GP1 |
Completion of work |
-
latitude : 21.369758333333333
Longitude : 86.71244833333334
file name : Image_16012024132416899.png
|
2024-01-16 13:24:16.998259 |
98 |
82240989 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.374348333333334,21.374364999999997,21.37440333333333
Longitude : 86.719435,86.719445,86.719435
file name : Image_05032024130114228.png
|
2024-03-05 13:01:14.31672 |
99 |
82240989 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.3652701,21.3652701
Longitude : 86.7105612,86.7105612
file name : Image_05032024125526086.png
|
2024-03-05 12:55:26.175724 |
100 |
82240989 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3652698,21.3652711
Longitude : 86.7105599,86.7105531
file name : Image_05032024124826159.png
|
2024-03-05 12:48:26.258722 |
101 |
82059385 |
Construction of Building |
300000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.366438333333335
Longitude : 86.71346166666666
file name : Image_16012024121800079.png
|
2024-01-16 12:18:00.16963 |
102 |
82059385 |
Construction of Building |
300000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.36641666666667
Longitude : 86.71347166666668
file name : Image_16012024121138178.png
|
2024-01-16 12:11:38.273959 |
103 |
82059385 |
Construction of Building |
300000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.366516666666666
Longitude : 86.71338499999999
file name : Image_16012024120358695.png
|
2024-01-16 12:03:58.787959 |
104 |
82237069 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.363641666666663,21.363655
Longitude : 86.70983166666669,86.70989999999999
file name : Image_04122023162140822.png
|
2023-12-04 16:21:40.894751 |
105 |
82237069 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.36366666666667,21.363661666666665
Longitude : 86.70985833333334,86.70985166666667
file name : Image_04122023160601891.png
|
2023-12-04 16:06:01.992477 |
106 |
82237069 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.38828,21.388223333333332
Longitude : 86.69831166666667,86.69814333333333
file name : Image_27112023172012877.png
|
2023-11-27 17:20:13.058505 |
107 |
63739554 |
Const of CC Road from RD Road to infront of Sanjay Pradhan Gate in village Ankurakhunta |
100000 |
Const of CC Road from RD Road to infront of Sanjay Pradhan Gate in village Ankurakhunta1 |
Completion of work |
-
latitude : 21.375233333333334,21.375173333333336
Longitude : 86.72799666666667,86.72790333333333
file name : Image_27112023170406961.png
|
2023-11-27 17:04:07.04807 |
108 |
66011228 |
Services of mechanical Cleaning collection of Faecal Sludge, |
63341 |
Services of mechanical Cleaning collection of Faecal Sludge,1 |
Completion of work |
-
latitude : 21.363636666666668
Longitude : 86.70983833333334
file name : Image_04122023161025185.png
|
2023-12-04 16:10:25.275947 |
109 |
82064147 |
Construction of Retaining Walls |
100000 |
Construction of Retaining Walls1 |
Roof laid |
-
latitude : 21.30077833333333,21.30077833333333
Longitude : 86.69186166666665,86.69187166666667
file name : Image_20022024153636951.png
|
2024-02-20 15:36:37.048846 |
110 |
82064147 |
Construction of Retaining Walls |
100000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 21.300799999999995,21.300825
Longitude : 86.69185,86.69181666666667
file name : Image_12022024214630996.png
|
2024-02-12 21:46:31.083752 |
111 |
82064147 |
Construction of Retaining Walls |
100000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 21.37180166666667,21.371781666666667
Longitude : 86.71509166666668,86.71509666666667
file name : Image_16012024123409800.png
|
2024-01-16 12:34:09.904613 |
112 |
44377098 |
CONST. TUBEWELL PLATFORM AT SINGHA SAHI, KHULIA WITH SOAK PIT |
25000 |
CONST. TUBEWELL PLATFORM AT SINGHA SAHI, KHULIA WITH SOAK PIT1 |
Completion of work |
-
latitude : 21.386675
Longitude : 86.70048
file name : Image_23122023162007433.png
|
2023-12-23 16:20:07.550338 |
113 |
55785987 |
ELECTRIC WIRING TO BALARAMPATNA PRY SCHOOL |
16000 |
ELECTRIC WIRING TO BALARAMPATNA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.362743333333334
Longitude : 86.73969666666666
file name : Image_23122023140914471.png
|
2023-12-23 14:09:14.561826 |
114 |
55785827 |
ELECTRIC WIRING TO BAULAGADIA AWC BUILDING |
12000 |
ELECTRIC WIRING TO BAULAGADIA AWC BUILDING1 |
Completion of work |
-
latitude : 21.353644999999997
Longitude : 86.70414166666666
file name : Image_27122023115505433.png
|
2023-12-27 11:55:05.526637 |
115 |
55695891 |
WATER SUPPLY TO BALARAM PATANA PRY SCHOOL |
50000 |
WATER SUPPLY TO BALARAM PATANA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.362730000000003
Longitude : 86.73968333333332
file name : Image_23122023161416308.png
|
2023-12-23 16:14:16.246712 |
116 |
55695855 |
WATER SUPPLY TO KHULIA PRY SCHOOL AND AWC |
60000 |
WATER SUPPLY TO KHULIA PRY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.38906666666667
Longitude : 86.698415
file name : Image_23122023161423541.png
|
2023-12-23 16:14:23.514818 |
117 |
55695855 |
WATER SUPPLY TO KHULIA PRY SCHOOL AND AWC |
60000 |
WATER SUPPLY TO KHULIA PRY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.38906666666667
Longitude : 86.698415
file name : Image_23122023161912394.png
|
2023-12-23 16:19:12.373292 |
118 |
82237912 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 21.300788333333337
Longitude : 86.69188666666666
file name : Image_06052024105139623.png
|
2024-05-06 10:51:39.75243 |
119 |
82237912 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 21.28588333333333
Longitude : 86.68991499999998
file name : Image_06052024104704265.png
|
2024-05-06 10:47:04.349002 |
120 |
82237912 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.300676666666664
Longitude : 86.69177999999998
file name : Image_06052024103848097.png
|
2024-05-06 10:38:48.173746 |
121 |
55785941 |
ELECTRIC WIRING TO NAYAPATANA AWC BUILDING |
12000 |
ELECTRIC WIRING TO NAYAPATANA AWC BUILDING1 |
Completion of work |
-
latitude : 21.300810000000002
Longitude : 86.69167666666665
file name : Image_29052024104303006.png
|
2024-05-29 10:43:03.105407 |
122 |
66011183 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.371048333333338
Longitude : 86.72595333333332
file name : Image_20062024180943805.png
|
2024-06-20 18:09:43.886773 |
123 |
66011183 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.300683333333335
Longitude : 86.69165166666669
file name : Image_03042024070948018.png
|
2024-04-03 07:09:48.102176 |
124 |
82398320 |
Operation and Maintenance of drinking water supply system |
361498 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.370068333333332
Longitude : 86.71230333333332
file name : Image_20022024154347620.png
|
2024-02-20 15:43:47.813103 |
125 |
82398320 |
Operation and Maintenance of drinking water supply system |
361498 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.369948333333333
Longitude : 86.71234333333332
file name : Image_20022024153954806.png
|
2024-02-20 15:39:54.913215 |
126 |
82398320 |
Operation and Maintenance of drinking water supply system |
361498 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.300813333333334
Longitude : 86.6918
file name : Image_28092023113610259.png
|
2023-09-28 11:36:10.377858 |
127 |
82398320 |
Operation and Maintenance of drinking water supply system |
361498 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.30071666666667
Longitude : 86.69201166666666
file name : Image_28092023113555428.png
|
2023-09-28 11:35:55.579042 |
128 |
82398320 |
Operation and Maintenance of drinking water supply system |
361498 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.300786666666667
Longitude : 86.69175500000001
file name : Image_28092023113620076.png
|
2023-09-28 11:36:20.187034 |
129 |
96179756 |
Operation and Maintenance of drinking/piped water supply system |
750675 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 21.351744999999998
Longitude : 86.71599999999998
file name : Image_02102024172303113.png
|
2024-10-02 17:23:03.266675 |
130 |
96179756 |
Operation and Maintenance of drinking/piped water supply system |
750675 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 21.425606666666667
Longitude : 86.75113166666667
file name : Image_02102024172047783.png
|
2024-10-02 17:20:47.950988 |
131 |
96179756 |
Operation and Maintenance of drinking/piped water supply system |
750675 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.34983333333333
Longitude : 86.71634666666665
file name : Image_02102024171104926.png
|
2024-10-02 17:11:05.142172 |
132 |
89106829 |
Operation & maintenance of drinking water supply system |
25000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.37021333333333
Longitude : 86.73649500000002
file name : Image_31072024110011902.png
|
2024-07-31 11:00:11.990701 |
133 |
89106829 |
Operation & maintenance of drinking water supply system |
25000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.37019666666667
Longitude : 86.73647333333332
file name : Image_31072024105948007.png
|
2024-07-31 10:59:48.102554 |
134 |
55785768 |
ELECTRIC WIRING TO BARADADIHI AWC BUILDING |
12000 |
ELECTRIC WIRING TO BARADADIHI AWC BUILDING1 |
Completion of work |
-
latitude : 21.34935666666667
Longitude : 86.71677666666668
file name : Image_09082024154235215.png
|
2024-08-09 15:42:35.300777 |
135 |
55695886 |
WATER SUPPLY TO MADHUKARKHUNTA PRY SCHOOL |
50000 |
WATER SUPPLY TO MADHUKARKHUNTA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.349336666666666
Longitude : 86.71678833333333
file name : Image_09082024153850035.png
|
2024-08-09 15:38:50.117729 |
136 |
55695898 |
WATER SUPPLY TO BARADADHI PRY SCHOOL WITH AWC |
60000 |
WATER SUPPLY TO BARADADHI PRY SCHOOL WITH AWC1 |
Completion of work |
-
latitude : 21.349390000000003
Longitude : 86.71676833333335
file name : Image_09082024155130719.png
|
2024-08-09 15:51:30.804233 |
137 |
63739444 |
Const of Tube well raised platform with vat and soak pit at Baradadihi Malik Sahi |
26171 |
Const of Tube well raised platform with vat and soak pit at Baradadihi Malik Sahi1 |
Completion of work |
-
latitude : 21.349286666666664
Longitude : 86.71674
file name : Image_22082024080019702.png
|
2024-08-22 08:00:19.788807 |
138 |
89106849 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.349293333333335
Longitude : 86.71673833333334
file name : Image_22082024075858685.png
|
2024-08-22 07:58:58.753843 |