1 |
36408885 |
Const. of incomplete Guardwall from Jagusahi polo to RD road |
100000 |
Const. of incomplete Guardwall from Jagusahi polo to RD road1 |
Completed |
-
latitude : 21.32984579075128,21.329819723032415
Longitude : 86.70122883282602,86.70130510814488
file name : Image_17042021124408278.png
|
2021-04-17 12:44:08.410021 |
2 |
36410703 |
Const. of Protectionwall at Bahabalpur Prymary school North side |
100000 |
Const. of Protectionwall at Bahabalpur Prymary school North side1 |
Commenced |
-
latitude : 21.337930094450712
Longitude : 86.72732764855027
file name : Image_17042021122444242.png
|
2021-04-17 12:24:44.347113 |
3 |
26875925 |
CONST.OF GUARDWALL FROM JAGUSAHI POLO TO PWD ROAD |
146946 |
CONST.OF GUARDWALL FROM JAGUSAHI POLO TO PWD ROAD1 |
Completed |
-
latitude : 21.32985002361238
Longitude : 86.7012731730938
file name : Image_17042021122626342.png
|
2021-04-17 12:26:26.441727 |
4 |
66054678 |
Const of new ATM House at Iswarpur CHC Gate |
100000 |
Const of new ATM House at Iswarpur CHC Gate1 |
Completion of work |
-
latitude : 21.348589999999998
Longitude : 86.72010166666665
file name : Image_16102023104718954.png
|
2023-10-16 10:47:19.039731 |
5 |
50852730 |
HONORARIUM FOR SEM |
195000 |
HONORARIUM FOR SEM1 |
Completion of work |
-
latitude : 21.46020683
Longitude : 86.77475307
file name : Image_26072021171640255.png
|
2021-07-26 17:16:40.359033 |
6 |
36410937 |
Const. of Incomplete guardwall from Muna Murmu house to Rjendr Bhumija House. |
100000 |
Const. of Incomplete guardwall from Muna Murmu house to Rjendr Bhumija House.1 |
Commenced |
-
latitude : 21.33055625,21.33057046
Longitude : 86.73886668,86.73888967
file name : Image_24072021113113796.png
|
2021-07-24 11:31:13.906569 |
7 |
36407211 |
Const. of Guard wall at Mahadev Pokhari |
100000 |
Const. of Guard wall at Mahadev Pokhari1 |
Commenced |
-
latitude : 21.36072005,21.36073721
Longitude : 86.73108567,86.73109303
file name : Image_24072021110729859.png
|
2021-07-24 11:07:29.950316 |
8 |
36409417 |
Const. of Guard wall from Dama Singh House to Tubewell Chhhaka |
100000 |
Const. of Guard wall from Dama Singh House to Tubewell Chhhaka1 |
Commenced |
-
latitude : 21.32352812,21.32352934,21.32352944
Longitude : 86.72598525,86.7259836,86.72598356
file name : Image_24072021114419659.png
|
2021-07-24 11:44:19.772018 |
9 |
36407737 |
Const. of Guardwall of Pataleswar Mahadev Pokhari |
100000 |
Const. of Guardwall of Pataleswar Mahadev Pokhari1 |
Commenced |
-
latitude : 21.34899897,21.34899834,21.3489983
Longitude : 86.7136459,86.7136439,86.71364012
file name : Image_13022022171319959.png
|
2022-02-13 17:13:20.067623 |
10 |
36407737 |
Const. of Guardwall of Pataleswar Mahadev Pokhari |
100000 |
Const. of Guardwall of Pataleswar Mahadev Pokhari1 |
Commenced |
-
latitude : 21.34906273,21.3490678
Longitude : 86.71327034,86.71327268
file name : Image_24072021131807444.png
|
2021-07-24 13:18:07.559847 |
11 |
36409952 |
Const. of Drainage from Gopinath Biswal House to Jagabandhu Behera House |
100000 |
Const. of Drainage from Gopinath Biswal House to Jagabandhu Behera House1 |
Commenced |
-
latitude : 21.3343365,21.33433925
Longitude : 86.71139164,86.71138986
file name : Image_24072021115848332.png
|
2021-07-24 11:58:48.461469 |
12 |
26868358 |
CONST.OF GUARDWALL FROM ABHIRAM PANDA CHHAK TO MAGUNI BEHERA HOUSE |
100000 |
CONST.OF GUARDWALL FROM ABHIRAM PANDA CHHAK TO MAGUNI BEHERA HOUSE1 |
Commenced |
-
latitude : 21.3503367
Longitude : 86.73114837
file name : Image_24072021111929451.png
|
2021-07-24 11:19:29.570211 |
13 |
26778377 |
CONST.OF TUBE WELL PLAT FORM AT WARD NO.11 RABI JENA HOUSETUBE WELL |
20000 |
CONST.OF TUBE WELL PLAT FORM AT WARD NO.11 RABI JENA HOUSETUBE WELL1 |
Commenced |
-
latitude : 21.33947262
Longitude : 86.7036652
file name : Image_26082021161545698.png
|
2021-08-26 16:15:45.76465 |
14 |
26778115 |
COST.OF TUBE WELL FROM PLATFORM NEAR CHAITANYA PARIDA HOUSE |
25000 |
COST.OF TUBE WELL FROM PLATFORM NEAR CHAITANYA PARIDA HOUSE1 |
Commenced |
-
latitude : 21.36028318
Longitude : 86.73061573
file name : Image_26082021164907471.png
|
2021-08-26 16:49:07.587524 |
15 |
50854234 |
CONST. OF TUBEWELL PLATFORM NEAR PARSU PALLEI HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR PARSU PALLEI HOUSE1 |
Plinth level |
-
latitude : 21.33653038
Longitude : 86.73013041
file name : Image_23082021130600786.png
|
2021-08-23 13:06:00.853645 |
16 |
50876342 |
PIPE WATER SUPPLY AT BANKIPADA PRIMARY SCHOOL WITH APPROACH ROAD |
77939 |
PIPE WATER SUPPLY AT BANKIPADA PRIMARY SCHOOL WITH APPROACH ROAD1 |
Plinth level |
-
latitude : 21.34647418,21.34645828
Longitude : 86.70835225,86.70836683
file name : Image_26082021161058857.png
|
2021-08-26 16:10:58.935678 |
17 |
36400802 |
Const. of Tubewell Plat from at near Purna ch. Malik House |
20000 |
Const. of Tubewell Plat from at near Purna ch. Malik House1 |
Commenced |
-
latitude : 21.3494937
Longitude : 86.73014266
file name : Image_23082021125514517.png
|
2021-08-23 12:55:14.602274 |
18 |
50858964 |
IMPROVEMENT OF ROAD WITH DRAIN FROM MAJHI SAHI BAULA CHHAK TO AGANI BEHERA HOUSE |
77939 |
IMPROVEMENT OF ROAD WITH DRAIN FROM MAJHI SAHI BAULA CHHAK TO AGANI BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.36087451,21.36088071
Longitude : 86.71047083,86.71047377
file name : Image_13022022175533844.png
|
2022-02-13 17:55:33.960126 |
19 |
50854318 |
CONST. OF TUBEWELL PLATFORM NEAR DULA MARANDI HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR DULA MARANDI HOUSE1 |
Roof laid |
-
latitude : 21.35563539
Longitude : 86.72884499
file name : Image_13022022160505556.png
|
2022-02-13 16:05:05.683625 |
20 |
50859103 |
IMPROVEMENT OF ROAD FROM ABHIRAPADA CHHAK TO BHAGABAN BEHERA HOUSE |
77939 |
IMPROVEMENT OF ROAD FROM ABHIRAPADA CHHAK TO BHAGABAN BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.35006447,21.35006439
Longitude : 86.73147931,86.7314793
file name : Image_13022022162422341.png
|
2022-02-13 16:24:22.479955 |
21 |
50878904 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PMGSY ROAD TO GAYA BEHERA HOUSE |
100000 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PMGSY ROAD TO GAYA BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.34306616,21.34306622,21.34306626
Longitude : 86.71736985,86.71736975,86.71736971
file name : Image_13022022173231129.png
|
2022-02-13 17:32:31.272073 |
22 |
36401655 |
Const. of Tubewell Plat from at near Kamalakanta Jena |
20000 |
Const. of Tubewell Plat from at near Kamalakanta Jena1 |
Completed |
-
latitude : 21.35165033
Longitude : 86.72801486
file name : Image_13022022162015292.png
|
2022-02-13 16:20:15.419545 |
23 |
53097831 |
CONST. OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE |
270528 |
CONST. OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE1 |
Roof laid |
-
latitude : 21.3364198,21.3364203,21.3364203
Longitude : 86.731295,86.7312978,86.7312916
file name : Image_13022022164629057.png
|
2022-02-13 16:46:29.169329 |
24 |
50878932 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PANCHALINGESWAR COLLEGE WEST SIDE GATE TO TAR |
150000 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PANCHALINGESWAR COLLEGE WEST SIDE GATE TO TAR1 |
Roof laid |
-
latitude : 21.34490854,21.34489311
Longitude : 86.70286606,86.70288756
file name : Image_23122021150123666.png
|
2021-12-23 15:01:23.751168 |
25 |
50878932 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PANCHALINGESWAR COLLEGE WEST SIDE GATE TO TAR |
150000 |
CONST. OF HUME PIPE CULVERT WITH IMPROVEMENT ROAD FROM PANCHALINGESWAR COLLEGE WEST SIDE GATE TO TAR1 |
Roof laid |
-
latitude : 21.34503545,21.34488866
Longitude : 86.70301429,86.70292117
file name : Image_21092021134825492.png
|
2021-09-21 13:48:25.559995 |
26 |
55527859 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT BABA PANCHALINGESWAR TERAKOTA PG |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT BABA PANCHALINGESWAR TERAKOTA PG1 |
Roof laid |
-
latitude : 21.43289337
Longitude : 86.77608646
file name : Image_15022022151641547.png
|
2022-02-15 15:16:41.62872 |
27 |
55527859 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT BABA PANCHALINGESWAR TERAKOTA PG |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT BABA PANCHALINGESWAR TERAKOTA PG1 |
Roof laid |
-
latitude : 21.4601423
Longitude : 86.7746981
file name : Image_15022022100647384.png
|
2022-02-15 10:06:47.478122 |
28 |
53097787 |
SINKING OF NEW TUBE WELL AT TARTUA NEAR BASANTA SA HOUSE |
110000 |
SINKING OF NEW TUBE WELL AT TARTUA NEAR BASANTA SA HOUSE1 |
Roof laid |
-
latitude : 21.4601426
Longitude : 86.7746978
file name : Image_15022022100635827.png
|
2022-02-15 10:06:35.926553 |
29 |
53097770 |
SINKING OF NEW TUBE WELL AT MARDARAJPUR ADIBASISAHI NEAR BIKRAM MOHAN HOUSE |
110000 |
SINKING OF NEW TUBE WELL AT MARDARAJPUR ADIBASISAHI NEAR BIKRAM MOHAN HOUSE1 |
Roof laid |
-
latitude : 21.4601435
Longitude : 86.7747023
file name : Image_15022022100631747.png
|
2022-02-15 10:06:31.836683 |
30 |
53098480 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILLAGE-HAREKRUSHNAPUR |
250000 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILLAGE-HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.43260167
Longitude : 86.77585139
file name : Image_15022022155830963.png
|
2022-02-15 15:58:31.069655 |
31 |
55530687 |
CONST OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE |
285952 |
CONST OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE1 |
Roof laid |
-
latitude : 21.43770346,21.43768339
Longitude : 86.77629341,86.77627148
file name : Image_08032022121335209.png
|
2022-03-08 12:13:35.311834 |
32 |
55530687 |
CONST OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE |
285952 |
CONST OF DRAIN WITH HUME PIPE FROM UPENDRA SA HOUSE TO PURNACHANDRA SA HOUSE1 |
Roof laid |
-
latitude : 21.43769854,21.43769177
Longitude : 86.77628785,86.77628051
file name : Image_08032022121323055.png
|
2022-03-08 12:13:23.15942 |
33 |
53098137 |
CONST. OF GUARDWALL EASTERN SIDE OF PATALESWAR MAHADEV TANK |
100000 |
CONST. OF GUARDWALL EASTERN SIDE OF PATALESWAR MAHADEV TANK1 |
Roof laid |
-
latitude : 21.42642512
Longitude : 86.77422188
file name : Image_15022022160513113.png
|
2022-02-15 16:05:13.206754 |
34 |
55527869 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT CRC CENTRE OF HAREKRUSHNAPUR |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT CRC CENTRE OF HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.43289505
Longitude : 86.77608476
file name : Image_15022022151645158.png
|
2022-02-15 15:16:45.249233 |
35 |
55527869 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT CRC CENTRE OF HAREKRUSHNAPUR |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION AT CRC CENTRE OF HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.4601427
Longitude : 86.7746979
file name : Image_15022022100639865.png
|
2022-02-15 10:06:39.966842 |
36 |
55527876 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION OF ANM CENTRE AT MAREIGAN |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION OF ANM CENTRE AT MAREIGAN1 |
Roof laid |
-
latitude : 21.43287132
Longitude : 86.77610533
file name : Image_15022022151629814.png
|
2022-02-15 15:16:29.902923 |
37 |
55527876 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION OF ANM CENTRE AT MAREIGAN |
170000 |
SINKING OF NEW TUBE WELL WITH WATER SUPPLY AND ELECTRIFICATION OF ANM CENTRE AT MAREIGAN1 |
Roof laid |
-
latitude : 21.4601427
Longitude : 86.7746979
file name : Image_15022022100643753.png
|
2022-02-15 10:06:43.845501 |
38 |
55527818 |
SINKING OF NEW TUBE WELL AT MARDARAJPUR ADIBASI SAHI NEAR BIKRAM MOHAN HOUSE |
130000 |
SINKING OF NEW TUBE WELL AT MARDARAJPUR ADIBASI SAHI NEAR BIKRAM MOHAN HOUSE1 |
Roof laid |
-
latitude : 21.43289045
Longitude : 86.7760911
file name : Image_15022022151633826.png
|
2022-02-15 15:16:33.943159 |
39 |
55527827 |
SINKING OF NEW TUBE WELL AT TARTUA NEAR BASANTA SA HOUSE |
130000 |
SINKING OF NEW TUBE WELL AT TARTUA NEAR BASANTA SA HOUSE1 |
Roof laid |
-
latitude : 21.43289123
Longitude : 86.77608971
file name : Image_15022022151637811.png
|
2022-02-15 15:16:37.909701 |
40 |
36411705 |
Maintenance of Mardaraj pur Primary School |
100000 |
Maintenance of Mardaraj pur Primary School1 |
Completed |
-
latitude : 21.35909897
Longitude : 86.73142573
file name : Image_23122021132441818.png
|
2021-12-23 13:24:41.952399 |
41 |
36407930 |
Const. of Drainage Near Lambodar Jena House to PMGSY road |
100000 |
Const. of Drainage Near Lambodar Jena House to PMGSY road1 |
Completed |
-
latitude : 21.35099702,21.35102532
Longitude : 86.71275937,86.71275577
file name : Image_23122021142612507.png
|
2021-12-23 14:26:12.593771 |
42 |
26799559 |
CONST.OF CC CULVERT NEAR BAISHNAB MALIK HOUSE |
100000 |
CONST.OF CC CULVERT NEAR BAISHNAB MALIK HOUSE1 |
Completed |
-
latitude : 21.35117345,21.35116884
Longitude : 86.72822562,86.72825182
file name : Image_23122021134634166.png
|
2021-12-23 13:48:05.949358 |
43 |
50859130 |
IMPROVEMENT OF ROAD FROM FAGUBADI TO DIBAKAR BHULA HOUSE ,VIA-KATIA JENA HOUSE |
77939 |
IMPROVEMENT OF ROAD FROM FAGUBADI TO DIBAKAR BHULA HOUSE ,VIA-KATIA JENA HOUSE1 |
Roof laid |
-
latitude : 21.3507745,21.35066678
Longitude : 86.71270934,86.71262719
file name : Image_23122021142357642.png
|
2021-12-23 14:23:58.352068 |
44 |
50858679 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE1 |
Roof laid |
-
latitude : 21.34020348
Longitude : 86.72591549
file name : Image_23122021140955482.png
|
2021-12-23 14:09:55.577196 |
45 |
50858679 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE1 |
Roof laid |
-
latitude : 21.34019926
Longitude : 86.72591755
file name : Image_23122021140959073.png
|
2021-12-23 14:09:59.133272 |
46 |
50858679 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR HARIA MALIK HOUSE1 |
Roof laid |
-
latitude : 21.34023434
Longitude : 86.72591574
file name : Image_23122021141118068.png
|
2021-12-23 14:11:18.128211 |
47 |
50879162 |
CONST. OF RCC CULVERT WITH IMPROVEMENT OF ROAD FROM PMGSY ROAD TO CCH CENTRE SCHOOL AREA |
50000 |
CONST. OF RCC CULVERT WITH IMPROVEMENT OF ROAD FROM PMGSY ROAD TO CCH CENTRE SCHOOL AREA1 |
Roof laid |
-
latitude : 21.34825501,21.34820119
Longitude : 86.7215905,86.72178075
file name : Image_30122021191603335.png
|
2021-12-30 19:16:03.424952 |
48 |
50878182 |
IMPROVEMENT OF ROAD AND CULVERT FROM PANIGRAHI CHHAK TO JENA SAHI |
77939 |
IMPROVEMENT OF ROAD AND CULVERT FROM PANIGRAHI CHHAK TO JENA SAHI1 |
Roof laid |
-
latitude : 21.33966597,21.33966943
Longitude : 86.70734294,86.70732574
file name : Image_23122021145010830.png
|
2021-12-23 14:50:10.919404 |
49 |
50879072 |
CONST. OF GUARDWALL WITH IMPROVEMENT OF ROAD FROM SRIDHAR BISWAL HOUSE TO ROUT SAHI |
150000 |
CONST. OF GUARDWALL WITH IMPROVEMENT OF ROAD FROM SRIDHAR BISWAL HOUSE TO ROUT SAHI1 |
Roof laid |
-
latitude : 21.34649429
Longitude : 86.71061616
file name : Image_23122021143835111.png
|
2021-12-23 14:38:35.217655 |
50 |
50859196 |
CONST. OF DRAIN WITH IMPROVEMENT OF ROAD FROM PMGSY ROAD TO PARIDA SAHI |
77939 |
CONST. OF DRAIN WITH IMPROVEMENT OF ROAD FROM PMGSY ROAD TO PARIDA SAHI1 |
Roof laid |
-
latitude : 21.3467704,21.34681267
Longitude : 86.71238366,86.71243922
file name : Image_23122021151255443.png
|
2021-12-23 15:12:55.507255 |
51 |
50858500 |
CONST. OF TUBEWELL PLATFORM NEAR GANGADHAR NATH HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR GANGADHAR NATH HOUSE1 |
Plinth level |
-
latitude : 21.34601434
Longitude : 86.71062196
file name : Image_23122021144446382.png
|
2021-12-23 14:44:46.478647 |
52 |
36403408 |
Const. of Pipe line Conection AWC (Ward no-7) |
15000 |
Const. of Pipe line Conection AWC (Ward no-7)1 |
Completed |
-
latitude : 21.34832385,21.34829847
Longitude : 86.7144442,86.71441842
file name : Image_05012022171007643.png
|
2022-01-05 17:10:07.794029 |
53 |
81480972 |
Installation of RO/Water Supply |
22000 |
Installation of RO/Water Supply1 |
|
-
latitude : 21.3492487
Longitude : 86.7167139
file name : Image_16102023145051488.png
|
2023-10-16 14:50:51.56831 |
54 |
81480972 |
Installation of RO/Water Supply |
22000 |
Installation of RO/Water Supply1 |
|
-
latitude : 21.3492469
Longitude : 86.7167134
file name : Image_16102023104418586.png
|
2023-10-16 10:44:18.673568 |
55 |
36494208 |
Maintenance of GP office Toilet |
50000 |
Maintenance of GP office Toilet1 |
Completed |
-
latitude : 21.34931914
Longitude : 86.71636132
file name : Image_08032022122411477.png
|
2022-03-08 12:24:11.602938 |
56 |
55530730 |
CONST OF DRAIN WITH CC ROAD FROM JANARDAN MOHAPATRA HOUSE TO KANAKALATA BARIK HOUSE (GOUDASAHI) |
200000 |
CONST OF DRAIN WITH CC ROAD FROM JANARDAN MOHAPATRA HOUSE TO KANAKALATA BARIK HOUSE (GOUDASAHI)1 |
Roof laid |
-
latitude : 21.35681843,21.35681857
Longitude : 86.7130585,86.7130583
file name : Image_20042022111406935.png
|
2022-04-20 11:14:07.036907 |
57 |
55566303 |
CONST OF GUARD WALL AT KURUGADIA TANK SOUTH SIDE AT MAREIGAN |
120000 |
CONST OF GUARD WALL AT KURUGADIA TANK SOUTH SIDE AT MAREIGAN1 |
Completed |
-
latitude : 21.40653167
Longitude : 86.74503088
file name : Image_29042022134655628.png
|
2022-04-29 13:46:55.780745 |
58 |
50878507 |
CONST. OF GUARDWALL WITH IMPROVEMENT OF ROAD FROM BHIMA HOUSE TO KHAPARA KHUNT POKHARI |
77939 |
CONST. OF GUARDWALL WITH IMPROVEMENT OF ROAD FROM BHIMA HOUSE TO KHAPARA KHUNT POKHARI1 |
Roof laid |
-
latitude : 21.3294233
Longitude : 86.5058244
file name : Image_06052022160457657.png
|
2022-05-06 16:04:57.752102 |
59 |
50857900 |
CONST. OF TUBEWELL PLATFORM NEAR RABINDRA BEHERA HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR RABINDRA BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.3294226
Longitude : 86.5058277
file name : Image_06052022155950239.png
|
2022-05-06 15:59:50.346583 |
60 |
53098343 |
IMPROVEMENT OF ROAD FROM RAGHUNATH MAHALIK HOUSE TO MAHALIK SAHI CULVERT |
40000 |
IMPROVEMENT OF ROAD FROM RAGHUNATH MAHALIK HOUSE TO MAHALIK SAHI CULVERT1 |
Roof laid |
-
latitude : 21.3294226,21.3294233
Longitude : 86.5058277,86.5058244
file name : Image_06052022160957258.png
|
2022-05-06 16:09:57.364699 |
61 |
53098288 |
IMP. OF ROAD WITH DRAIN FROM LAXMAN KHUNTIA HOUSE TO BUDHA POLO |
60000 |
IMP. OF ROAD WITH DRAIN FROM LAXMAN KHUNTIA HOUSE TO BUDHA POLO1 |
Roof laid |
-
latitude : 21.4601656,21.4601653
Longitude : 86.7746786,86.7746822
file name : Image_27052022130526888.png
|
2022-05-27 13:05:27.000402 |
62 |
53098364 |
IMPROVEMENT OF ROAD FROM RAGHUNATH JENA HOUSE TO BAISHNAV SAHI |
60156 |
IMPROVEMENT OF ROAD FROM RAGHUNATH JENA HOUSE TO BAISHNAV SAHI1 |
Roof laid |
-
latitude : 21.4601655,21.4601655
Longitude : 86.7746809,86.7746787
file name : Image_27052022130336098.png
|
2022-05-27 13:03:36.191126 |
63 |
53098364 |
IMPROVEMENT OF ROAD FROM RAGHUNATH JENA HOUSE TO BAISHNAV SAHI |
60156 |
IMPROVEMENT OF ROAD FROM RAGHUNATH JENA HOUSE TO BAISHNAV SAHI1 |
Roof laid |
-
latitude : 21.4601588,21.4601651,21.4601659
Longitude : 86.7746743,86.7746789,86.7746811
file name : Image_27052022130209808.png
|
2022-05-27 13:02:09.896333 |
64 |
53098319 |
IMPROVEMENT OF ROAD FROM BHASUA KANTHADA CHHAKA TO PWD ROAD |
70000 |
IMPROVEMENT OF ROAD FROM BHASUA KANTHADA CHHAKA TO PWD ROAD1 |
Roof laid |
-
latitude : 21.4601656,21.4601651
Longitude : 86.7746783,86.7746789
file name : Image_27052022130047080.png
|
2022-05-27 13:00:47.193343 |
65 |
53098192 |
IMP. OF ROAD FROM JENA SAHI CHHAKA INCOMPLETE CC ROAD TO PANIGRAHI CHHAK |
68000 |
IMP. OF ROAD FROM JENA SAHI CHHAKA INCOMPLETE CC ROAD TO PANIGRAHI CHHAK1 |
Roof laid |
-
latitude : 21.4601653,21.4601578,21.4601578,21.460163
Longitude : 86.7746788,86.7746715,86.7746715,86.7746811
file name : Image_27052022125814890.png
|
2022-05-27 12:58:15.015264 |
66 |
50859009 |
IMPROVEMENT OF ROAD WITH DRAIN FROM DAITARI MALIK HOUSE TO BHANGA TUBEWELL |
77939 |
IMPROVEMENT OF ROAD WITH DRAIN FROM DAITARI MALIK HOUSE TO BHANGA TUBEWELL1 |
Roof laid |
-
latitude : 21.4601655,21.4601654
Longitude : 86.7746781,86.7746766
file name : Image_27052022125508195.png
|
2022-05-27 12:55:08.321424 |
67 |
55607649 |
CONST OF GUARDWALL FROM BHIMA SA HOUSE TO KHAPARA KHUNTA POKHARI, AT BAHABALPUR |
110000 |
CONST OF GUARDWALL FROM BHIMA SA HOUSE TO KHAPARA KHUNTA POKHARI, AT BAHABALPUR1 |
Roof laid |
-
latitude : 21.4601658
Longitude : 86.7746781
file name : Image_27052022123631139.png
|
2022-05-27 12:36:31.253638 |
68 |
50878476 |
CONST. OF GUARDWALL FROM LAXMAN DAS HOUSE TO HARIA DAS HOUSE |
77939 |
CONST. OF GUARDWALL FROM LAXMAN DAS HOUSE TO HARIA DAS HOUSE1 |
Roof laid |
-
latitude : 21.460166
Longitude : 86.7746779
file name : Image_27052022123937483.png
|
2022-05-27 12:39:37.590649 |
69 |
50856761 |
CONST. OF TUBEWELL PLATFORM NEAR ARJUNA BISWAL HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR ARJUNA BISWAL HOUSE1 |
Roof laid |
-
latitude : 21.427055000000003
Longitude : 86.75314166666666
file name : Image_23062022120258351.png
|
2022-06-23 12:02:58.435122 |
70 |
50854387 |
CONST. OF TUBEWELL PLATFORM NEAR SUKADEV BEHERA HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR SUKADEV BEHERA HOUSE1 |
Roof laid |
-
latitude : 21.427191666666666
Longitude : 86.75285333333335
file name : Image_23062022120934421.png
|
2022-06-23 12:09:34.529011 |
71 |
50857852 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE1 |
Roof laid |
-
latitude : 21.42697333333333
Longitude : 86.75284166666667
file name : Image_23022023162302457.png
|
2023-02-23 16:23:02.571172 |
72 |
50857852 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE1 |
Roof laid |
-
latitude : 21.4601661
Longitude : 86.7747171
file name : Image_23062022134744481.png
|
2022-06-23 13:47:44.603358 |
73 |
50857852 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR RANJAN ROUT HOUSE1 |
Roof laid |
-
latitude : 21.4601661
Longitude : 86.7747171
file name : Image_23062022134748329.png
|
2022-06-23 13:47:48.438341 |
74 |
55607633 |
CONST OF DRAIN NEAR HAREKRUSHNAPUR JENA SAHI, AT HAREKRUSHNAPUR |
20000 |
CONST OF DRAIN NEAR HAREKRUSHNAPUR JENA SAHI, AT HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.40586081,21.40585911
Longitude : 86.74479411,86.74479203
file name : Image_24062022114659326.png
|
2022-06-24 11:46:59.435059 |
75 |
50878830 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILL-HAREKRUSHNAPUR |
200000 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILL-HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.35600783
Longitude : 86.7241268
file name : Image_13022022155321704.png
|
2022-02-13 15:53:21.820013 |
76 |
50878830 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILL-HAREKRUSHNAPUR |
200000 |
COMPLETION OF INCOMPLETE CRC CENTRE,VILL-HAREKRUSHNAPUR1 |
Roof laid |
-
latitude : 21.35610667
Longitude : 86.72415438
file name : Image_13022022155325219.png
|
2022-02-13 15:53:25.313063 |
77 |
64073593 |
Const of Drain from Gania Rana Polo to Bancha Sahu Polo, vill Iswarpur |
40000 |
Const of Drain from Gania Rana Polo to Bancha Sahu Polo, vill Iswarpur1 |
Roof laid |
-
latitude : 21.40585271,21.40585271
Longitude : 86.74490913,86.74490913
file name : Image_30062022140725165.png
|
2022-06-30 14:07:25.249599 |
78 |
50852594 |
ENERGY CHARGES FOR PIPE WATER SUPPLY |
200000 |
ENERGY CHARGES FOR PIPE WATER SUPPLY1 |
Plinth level |
-
latitude : 21.40585271,21.40585271
Longitude : 86.74490913,86.74490913
file name : Image_30062022135102622.png
|
2022-06-30 13:51:02.721609 |
79 |
53097678 |
ENERGY CHARGES FOR PIPE WATER SUPPLY |
160000 |
ENERGY CHARGES FOR PIPE WATER SUPPLY1 |
Roof laid |
-
latitude : 21.40585271,21.40585271
Longitude : 86.74490913,86.74490913
file name : Image_30062022135212038.png
|
2022-06-30 13:52:12.154036 |
80 |
56640561 |
CONST OF DRAIN FROM GANIA RANA POLO TO BANCHA SAHU POLO, VILL ISWARPUR |
77939 |
CONST OF DRAIN FROM GANIA RANA POLO TO BANCHA SAHU POLO, VILL ISWARPUR1 |
Roof laid |
-
latitude : 21.40591141,21.40597351
Longitude : 86.74483689,86.74491408
file name : Image_30062022163014495.png
|
2022-06-30 16:30:14.607986 |
81 |
50878572 |
CONST. OF GUARDWALL FROM JENA SAHI INCOMPLETE GUARD WALL TO MANGALA MANDIR CHHAK |
77949 |
CONST. OF GUARDWALL FROM JENA SAHI INCOMPLETE GUARD WALL TO MANGALA MANDIR CHHAK1 |
Roof laid |
-
latitude : 21.40583877
Longitude : 86.74492071
file name : Image_15072022152230255.png
|
2022-07-15 15:22:30.360291 |
82 |
55583349 |
CONST OF INCOMPLETE GUARDWALL WITH CULVERT FROM MAREIGN JENA SAHI TO MANGALA MANDIR, AT MAREIGN |
150000 |
CONST OF INCOMPLETE GUARDWALL WITH CULVERT FROM MAREIGN JENA SAHI TO MANGALA MANDIR, AT MAREIGN1 |
Completed |
-
latitude : 21.40583835,21.40583841
Longitude : 86.74492125,86.74492122
file name : Image_15072022152227003.png
|
2022-07-15 15:22:27.11316 |
83 |
55529190 |
CONST OF BATHING GHAT AT BANKIPADA DUKHIA POKHARI (NORTH SIDE) |
100000 |
CONST OF BATHING GHAT AT BANKIPADA DUKHIA POKHARI (NORTH SIDE)1 |
Roof laid |
-
latitude : 21.4601429
Longitude : 86.7747169
file name : Image_16072022121037887.png
|
2022-07-16 12:10:37.990288 |
84 |
50876368 |
CONST. OF GUARDWALL FROM BISHNU BISWAL LAND TO ISWARPUR FANDI |
77939 |
CONST. OF GUARDWALL FROM BISHNU BISWAL LAND TO ISWARPUR FANDI1 |
Roof laid |
-
latitude : 21.4601427
Longitude : 86.7747177
file name : Image_16072022121159226.png
|
2022-07-16 12:11:59.319637 |
85 |
55527832 |
WATER SUPPLY AT MARDARAJPUR PRY SCHOOL AND ELECTRIFICATION |
50000 |
WATER SUPPLY AT MARDARAJPUR PRY SCHOOL AND ELECTRIFICATION1 |
Roof laid |
-
latitude : 21.4601403
Longitude : 86.7746945
file name : Image_21072022130842969.png
|
2022-07-21 13:08:43.057751 |
86 |
55527839 |
WATER SUPPLY AND ELECTRIFICATION AT BANKIPADA AWC-2 |
50000 |
WATER SUPPLY AND ELECTRIFICATION AT BANKIPADA AWC-21 |
Roof laid |
-
latitude : 21.4601308
Longitude : 86.7746928
file name : Image_21072022130839287.png
|
2022-07-21 13:08:39.369649 |
87 |
55607950 |
CONST OF GUARD WALL FROM RANJAN ROUT HOUSE TO FAGUBADI, AT ISWARPUR |
100000 |
CONST OF GUARD WALL FROM RANJAN ROUT HOUSE TO FAGUBADI, AT ISWARPUR1 |
Roof laid |
-
latitude : 21.4601423
Longitude : 86.774715
file name : Image_18082022085414357.png
|
2022-08-18 08:54:14.47916 |
88 |
64073754 |
Const of CC Road from Bhaskar Behera house land to Satrughna Malik Land at Pinchabania |
103748 |
Const of CC Road from Bhaskar Behera house land to Satrughna Malik Land at Pinchabania1 |
Roof laid |
-
latitude : 21.4601429,21.4601429
Longitude : 86.7747173,86.7747172
file name : Image_17082022122547372.png
|
2022-08-17 12:25:47.487698 |
89 |
64073600 |
Const of CC Road from PWD Road to PMGSY Road at Pinchabania |
150000 |
Const of CC Road from PWD Road to PMGSY Road at Pinchabania1 |
Roof laid |
-
latitude : 21.4601675,21.4601429
Longitude : 86.77466433,86.7747173
file name : Image_17082022123242933.png
|
2022-08-17 12:32:43.030775 |
90 |
55527849 |
WATER SUPPLY AND ELECTRIFICATION AT NAYAK BANDHA PRY SCHOOL |
66428 |
WATER SUPPLY AND ELECTRIFICATION AT NAYAK BANDHA PRY SCHOOL1 |
Roof laid |
-
latitude : 21.42091482
Longitude : 86.75107984
file name : Image_19082022164548834.png
|
2022-08-19 16:45:48.937025 |
91 |
50856753 |
CONST. OF TUBEWELL PLATFORM NEAR GIRIDHARI JENA HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR GIRIDHARI JENA HOUSE1 |
Roof laid |
-
latitude : 21.4601194
Longitude : 86.7746982
file name : Image_30092022143313565.png
|
2022-09-30 14:33:13.668277 |
92 |
50853070 |
CONST. OF TUBEWELL PLATFORM NEAR GOBINDA GIRI HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR GOBINDA GIRI HOUSE1 |
Roof laid |
-
latitude : 21.4601194
Longitude : 86.7746978
file name : Image_30092022143308256.png
|
2022-09-30 14:33:08.360065 |
93 |
55566309 |
HIGH SCHOOL TRANSFORMATION PROGRAMME AT ISWARPUR HIGH SCHOOL |
355000 |
HIGH SCHOOL TRANSFORMATION PROGRAMME AT ISWARPUR HIGH SCHOOL1 |
Completed |
-
latitude : 21.4601194
Longitude : 86.7746978
file name : Image_30092022115609168.png
|
2022-09-30 11:56:09.30201 |
94 |
64986304 |
RENOVATION OF NUA POKHARI ( AMRUT SAROVAR) |
100000 |
RENOVATION OF NUA POKHARI ( AMRUT SAROVAR)1 |
Roof laid |
-
latitude : 21.4601194
Longitude : 86.7746983
file name : Image_30092022115933971.png
|
2022-09-30 11:59:34.091293 |
95 |
64986405 |
CONST. OF DRAIN IN FRONT OF BANSIDHAR BEHERA HOUSE AT CHINTAMANIPUR |
194000 |
CONST. OF DRAIN IN FRONT OF BANSIDHAR BEHERA HOUSE AT CHINTAMANIPUR1 |
Roof laid |
-
latitude : 21.4601055,21.4601193
Longitude : 86.7746941,86.7746978
file name : Image_30092022121425811.png
|
2022-09-30 12:14:25.908833 |
96 |
50852661 |
REPAIR OF PWS AND EXTENSION OF PIPE LINE |
150000 |
REPAIR OF PWS AND EXTENSION OF PIPE LINE1 |
Roof laid |
-
latitude : 21.39884985,21.39884985
Longitude : 86.74391866,86.74391866
file name : Image_25112022121937061.png
|
2022-11-25 12:19:37.155706 |
97 |
66061238 |
Repair and development of Health Sub-centre at Mareigoan under Iswarpur CHC |
300000 |
Repair and development of Health Sub-centre at Mareigoan under Iswarpur CHC1 |
Roof laid |
-
latitude : 21.39883391
Longitude : 86.74416335
file name : Image_17122022143701793.png
|
2022-12-17 14:37:01.919072 |
98 |
66054670 |
Development of CHC Iswarpur new outdoor building |
100000 |
Development of CHC Iswarpur new outdoor building1 |
Roof laid |
-
latitude : 21.39872998
Longitude : 86.74409841
file name : Image_17122022144229685.png
|
2022-12-17 14:42:29.786149 |
99 |
64984294 |
Operation & maintenance of drinking water supply system |
30000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.39873329
Longitude : 86.74408461
file name : Image_17122022144706831.png
|
2022-12-17 14:47:06.944272 |
100 |
55607810 |
HIGH SCHOOL TRANSFORMATION PROGRAMME AT ISWARPUR HIGH SCHOOL |
649695 |
HIGH SCHOOL TRANSFORMATION PROGRAMME AT ISWARPUR HIGH SCHOOL1 |
Roof laid |
-
latitude : 21.40323026
Longitude : 86.74516487
file name : Image_22122022163018205.png
|
2022-12-22 16:30:18.329888 |
101 |
64984624 |
Operation & maintenance of community soak pits |
135000 |
Operation & maintenance of community soak pits1 |
Roof laid |
-
latitude : 21.39823341
Longitude : 86.74387187
file name : Image_02022023184922361.png
|
2023-02-02 18:49:22.49522 |
102 |
64986288 |
CONST. OF GUARD WALL AT PALIA POKHARI NORTH SIDE |
99000 |
CONST. OF GUARD WALL AT PALIA POKHARI NORTH SIDE1 |
Roof laid |
-
latitude : 21.46922239
Longitude : 86.96000616
file name : Image_23022023123337570.png
|
2023-02-23 12:33:37.65996 |
103 |
66054688 |
Const of Guardwall with CC Road from Hema Patra land to Daya Patra Land |
100000 |
Const of Guardwall with CC Road from Hema Patra land to Daya Patra Land1 |
Roof laid |
-
latitude : 21.39876189
Longitude : 86.74402559
file name : Image_22022023144102883.png
|
2023-02-22 14:41:02.986418 |
104 |
64986313 |
CONST. OF DRAIN WITH CC ROAD FROM DAYANIDHI PATRA LAND TO RADHA GOBINDA JENA HOUSE |
80000 |
CONST. OF DRAIN WITH CC ROAD FROM DAYANIDHI PATRA LAND TO RADHA GOBINDA JENA HOUSE1 |
Roof laid |
-
latitude : 21.39873622
Longitude : 86.74404591
file name : Image_22022023144420912.png
|
2023-02-22 14:44:21.010792 |
105 |
64986743 |
BEAUTIFICATION NEAR DURGAMANDAP |
70000 |
BEAUTIFICATION NEAR DURGAMANDAP1 |
Roof laid |
-
latitude : 21.39872929
Longitude : 86.74407261
file name : Image_22022023144747839.png
|
2023-02-22 14:47:47.946669 |
106 |
64986777 |
CONST. OF TUBEWELL PLATFORM NEAR BHIMA MALIK HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR BHIMA MALIK HOUSE1 |
Roof laid |
-
latitude : 21.39867771
Longitude : 86.74401279
file name : Image_28042023124503291.png
|
2023-04-28 12:45:03.482932 |
107 |
64986777 |
CONST. OF TUBEWELL PLATFORM NEAR BHIMA MALIK HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR BHIMA MALIK HOUSE1 |
Roof laid |
-
latitude : 21.398667
Longitude : 86.74432565
file name : Image_22062023170839016.png
|
2023-06-22 17:08:39.113438 |
108 |
64984556 |
Creation of community compost pits for a group of Households |
60000 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 21.39873909
Longitude : 86.74407044
file name : Image_22062023171134043.png
|
2023-06-22 17:11:34.137706 |
109 |
64984046 |
Operation & maintenance of drinking water supply system |
65000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3987065
Longitude : 86.73978419
file name : Image_22062023170539956.png
|
2023-06-22 17:05:40.22102 |
110 |
64984046 |
Operation & maintenance of drinking water supply system |
65000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3987065
Longitude : 86.73978419
file name : Image_22062023170833090.png
|
2023-06-22 17:08:33.184746 |
111 |
86186401 |
Completion of 5T Class room at Soubhagya Manjari High School Andara |
191248 |
Completion of 5T Class room at Soubhagya Manjari High School Andara1 |
Completed |
-
latitude : 21.39872203
Longitude : 86.74408093
file name : Image_14072023161632890.png
|
2023-07-14 16:16:33.016637 |
112 |
86186268 |
Const of CC Road from Jena Sahi Chhaka to Ganesh Chandra Rout house at Iswarpur Ward No 5 |
500000 |
Const of CC Road from Jena Sahi Chhaka to Ganesh Chandra Rout house at Iswarpur Ward No 51 |
Intermediate |
-
latitude : 21.39868648,21.39871346
Longitude : 86.74406295,86.74408139
file name : Image_14072023161513038.png
|
2023-07-14 16:15:13.157506 |
113 |
86186102 |
Development of GP Building with staff quarter (civil work with Furniture Retrofitting) |
400000 |
Development of GP Building with staff quarter (civil work with Furniture Retrofitting)1 |
Completed |
-
latitude : 21.39866428
Longitude : 86.74405979
file name : Image_14072023161352222.png
|
2023-07-14 16:13:52.33152 |
114 |
64983890 |
Operation & maintenance of drinking water supply system |
40000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3927504
Longitude : 86.7372081
file name : Image_20072023171256817.png
|
2023-07-20 17:12:56.871484 |
115 |
64983953 |
Operation & maintenance of drinking water supply system |
45000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.41666298
Longitude : 86.74932259
file name : Image_20072023182507223.png
|
2023-07-20 18:25:07.289608 |
116 |
64983953 |
Operation & maintenance of drinking water supply system |
45000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3927512
Longitude : 86.7372078
file name : Image_20072023181953809.png
|
2023-07-20 18:19:53.884945 |
117 |
64983874 |
Operation & maintenance of drinking water supply system |
45000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3927493
Longitude : 86.737209
file name : Image_20072023171040939.png
|
2023-07-20 17:10:41.001398 |
118 |
67923582 |
Operation & maintenance of community sanitary complex |
175000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.46025276
Longitude : 86.77465471
file name : Image_28092023122010687.png
|
2023-09-28 12:20:10.77854 |
119 |
67923582 |
Operation & maintenance of community sanitary complex |
175000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.46033819
Longitude : 86.77471917
file name : Image_28092023122007039.png
|
2023-09-28 12:20:07.128023 |
120 |
77767654 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.329328333333333,21.32933666666667
Longitude : 86.50573833333334,86.50572333333334
file name : Image_05012024125826202.png
|
2024-01-05 12:58:26.313825 |
121 |
77767654 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.32937666666667,21.329373333333333
Longitude : 86.50576333333332,86.50575333333333
file name : Image_05012024125510456.png
|
2024-01-05 12:55:10.540656 |
122 |
77767654 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.3293872,21.3293872
Longitude : 86.5058032,86.5058032
file name : Image_05012024124116416.png
|
2024-01-05 12:41:17.015642 |
123 |
75340196 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.329359999999998
Longitude : 86.50569666666667
file name : Image_30112023114843477.png
|
2023-11-30 11:48:43.609147 |
124 |
75340196 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.329359999999998
Longitude : 86.505705
file name : Image_30112023113823857.png
|
2023-11-30 11:38:23.966575 |
125 |
75340196 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.3295594
Longitude : 86.5056736
file name : Image_18102023165603215.png
|
2023-10-18 16:56:03.353028 |
126 |
75340196 |
Operation and Maintenance of drinking water supply system |
192000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3295647
Longitude : 86.5056741
file name : Image_18102023165358899.png
|
2023-10-18 16:53:59.077521 |
127 |
75346630 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.349411666666665
Longitude : 86.71629999999999
file name : Image_27112023163253007.png
|
2023-11-27 16:32:53.093202 |
128 |
75346630 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.349458333333338
Longitude : 86.71631000000001
file name : Image_27112023161929526.png
|
2023-11-27 16:19:29.612272 |
129 |
75346630 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.34943333333333
Longitude : 86.71629
file name : Image_27112023155241803.png
|
2023-11-27 15:52:41.892928 |
130 |
81477246 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.349505,21.349499999999995
Longitude : 86.716285,86.71627833333332
file name : Image_27112023162419659.png
|
2023-11-27 16:24:19.745078 |
131 |
81477246 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.34935833333333,21.34936
Longitude : 86.71620499999999,86.71621166666667
file name : Image_27112023161428508.png
|
2023-11-27 16:14:28.607788 |
132 |
81477246 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.349456666666665,21.349456666666665
Longitude : 86.71630333333333,86.71630333333333
file name : Image_27112023161414704.png
|
2023-11-27 16:14:14.795803 |
133 |
81477246 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.349745,21.349151666666664
Longitude : 86.71613,86.71656333333334
file name : Image_27112023154054916.png
|
2023-11-27 15:40:55.003695 |
134 |
64984277 |
Operation & maintenance of drinking water supply system |
20000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.349451666666663
Longitude : 86.71624833333333
file name : Image_28112023131421561.png
|
2023-11-28 13:14:21.650056 |
135 |
64984104 |
Operation & maintenance of drinking water supply system |
20000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.349381666666666
Longitude : 86.71624500000001
file name : Image_28112023131233981.png
|
2023-11-28 13:12:34.082106 |
136 |
64986715 |
REPAIR AND MAINTANCE OF RAJIB GANDHI SEBA KENDRA |
152000 |
REPAIR AND MAINTANCE OF RAJIB GANDHI SEBA KENDRA1 |
Completion of work |
-
latitude : 21.34932666666667
Longitude : 86.71633500000002
file name : Image_27112023145134948.png
|
2023-11-27 14:51:35.035128 |
137 |
68114331 |
Completion of Iswarpur High School new Building with approach road |
100000 |
Completion of Iswarpur High School new Building with approach road1 |
Completion of work |
-
latitude : 21.349304999999998
Longitude : 86.71620499999999
file name : Image_27112023153501934.png
|
2023-11-27 15:35:02.012591 |
138 |
77905201 |
Construction and repairing of Gate doors, window, fixtures etc. |
200000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Roof laid |
-
latitude : 21.349474999999998
Longitude : 86.71626666666667
file name : Image_27112023152128511.png
|
2023-11-27 15:21:28.592315 |
139 |
77905201 |
Construction and repairing of Gate doors, window, fixtures etc. |
200000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Plinth level |
-
latitude : 21.349211666666665
Longitude : 86.715965
file name : Image_27112023151602382.png
|
2023-11-27 15:16:02.472015 |
140 |
77905201 |
Construction and repairing of Gate doors, window, fixtures etc. |
200000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 21.349339999999998
Longitude : 86.71629333333334
file name : Image_27112023144948569.png
|
2023-11-27 14:49:48.646855 |
141 |
75344519 |
Construction of toilets in public institutions |
600000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.329338333333332
Longitude : 86.50572333333334
file name : Image_30112023121417964.png
|
2023-11-30 12:14:18.06012 |
142 |
75344519 |
Construction of toilets in public institutions |
600000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.337583333333335
Longitude : 86.71086333333332
file name : Image_28112023123536985.png
|
2023-11-28 12:35:37.093401 |
143 |
75344519 |
Construction of toilets in public institutions |
600000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.337550000000004
Longitude : 86.71094999999998
file name : Image_27112023143808933.png
|
2023-11-27 14:38:09.029199 |
144 |
75344519 |
Construction of toilets in public institutions |
600000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.337386666666664
Longitude : 86.71082499999999
file name : Image_16102023145035894.png
|
2023-10-16 14:50:36.005243 |
145 |
78077406 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.32933666666667,21.329349999999998
Longitude : 86.50568833333334,86.50568
file name : Image_18042024122701488.png
|
2024-04-18 12:27:01.579221 |
146 |
78077406 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.329348333333336,21.32935166666667
Longitude : 86.50574166666665,86.50575333333333
file name : Image_18042024121515555.png
|
2024-04-18 12:15:15.642251 |
147 |
78077406 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.329185,21.329196666666668
Longitude : 86.50574833333333,86.50575833333332
file name : Image_18042024115732203.png
|
2024-04-18 11:57:32.279327 |
148 |
75344559 |
Repair of pipe drinking water |
49000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.3293844
Longitude : 86.505724
file name : Image_28052024102342711.png
|
2024-05-28 10:23:42.804398 |
149 |
75344559 |
Repair of pipe drinking water |
49000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.3293884
Longitude : 86.505769
file name : Image_28052024102028860.png
|
2024-05-28 10:20:28.956699 |
150 |
75344559 |
Repair of pipe drinking water |
49000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.3293849
Longitude : 86.5057516
file name : Image_28052024101303058.png
|
2024-05-28 10:13:03.160433 |
151 |
75348612 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3293846
Longitude : 86.5057727
file name : Image_28052024102445204.png
|
2024-05-28 10:24:45.286972 |
152 |
75348612 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.3293874
Longitude : 86.5057195
file name : Image_28052024101939241.png
|
2024-05-28 10:19:39.336345 |
153 |
75348612 |
Operation and Maintenance of drinking water supply system |
49000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.3293911
Longitude : 86.5057474
file name : Image_28052024101400837.png
|
2024-05-28 10:14:00.929721 |
154 |
78069882 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.160511666666668,21.160506666666667
Longitude : 86.63376000000001,86.63379166666667
file name : Image_30032024093401025.png
|
2024-03-30 09:34:01.138881 |
155 |
78069882 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.160489999999996,21.160489999999996
Longitude : 86.63378833333333,86.63379166666667
file name : Image_30032024091410385.png
|
2024-03-30 09:14:10.460083 |
156 |
78069882 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.160463333333336,21.16055833333333
Longitude : 86.63378333333334,86.63376500000001
file name : Image_30032024083941206.png
|
2024-03-30 08:39:41.297554 |
157 |
78020799 |
Toilet with Water Supply |
3000 |
Toilet with Water Supply1 |
Roof laid |
-
latitude : 21.16055666666667
Longitude : 86.63377333333334
file name : Image_30032024093149278.png
|
2024-03-30 09:31:49.417564 |
158 |
78020799 |
Toilet with Water Supply |
3000 |
Toilet with Water Supply1 |
Plinth level |
-
latitude : 21.160528333333332
Longitude : 86.63379166666667
file name : Image_30032024091554321.png
|
2024-03-30 09:15:54.429524 |
159 |
78020799 |
Toilet with Water Supply |
3000 |
Toilet with Water Supply1 |
Plinth level |
-
latitude : 21.160528333333332
Longitude : 86.63379166666667
file name : Image_30032024091522776.png
|
2024-03-30 09:15:22.887745 |
160 |
78020799 |
Toilet with Water Supply |
3000 |
Toilet with Water Supply1 |
Plinth level |
-
latitude : 21.160466666666668
Longitude : 86.63375166666668
file name : Image_30032024091447937.png
|
2024-03-30 09:14:48.042298 |
161 |
78020799 |
Toilet with Water Supply |
3000 |
Toilet with Water Supply1 |
Completion of work |
-
latitude : 21.160441666666664
Longitude : 86.63381
file name : Image_30032024083604386.png
|
2024-03-30 08:36:04.505583 |
162 |
78017158 |
Separate Toilet Facility facilities for male and female |
5664 |
Separate Toilet Facility facilities for male and female1 |
Roof laid |
-
latitude : 21.160516666666663
Longitude : 86.63376000000001
file name : Image_30032024093251151.png
|
2024-03-30 09:32:51.25018 |
163 |
78017158 |
Separate Toilet Facility facilities for male and female |
5664 |
Separate Toilet Facility facilities for male and female1 |
Plinth level |
-
latitude : 21.160455000000002
Longitude : 86.63378333333334
file name : Image_30032024091730499.png
|
2024-03-30 09:17:30.599875 |
164 |
78017158 |
Separate Toilet Facility facilities for male and female |
5664 |
Separate Toilet Facility facilities for male and female1 |
Completion of work |
-
latitude : 21.160471666666663
Longitude : 86.63378166666668
file name : Image_30032024083930299.png
|
2024-03-30 08:39:30.40722 |
165 |
89112495 |
Const of CC Road from Huna Rout house to Mahadev Temple Mareigan |
50000 |
Const of CC Road from Huna Rout house to Mahadev Temple Mareigan1 |
Completion of work |
-
latitude : 21.160491666666665,21.160623333333334
Longitude : 86.63378333333334,86.63383666666665
file name : Image_30032024094047860.png
|
2024-03-30 09:40:47.968258 |
166 |
89112495 |
Const of CC Road from Huna Rout house to Mahadev Temple Mareigan |
50000 |
Const of CC Road from Huna Rout house to Mahadev Temple Mareigan1 |
Completion of work |
-
latitude : 21.160508333333336,21.160818333333335
Longitude : 86.63378499999999,86.633665
file name : Image_30032024085443393.png
|
2024-03-30 08:54:43.479729 |
167 |
89112443 |
Const of CC Road with Culvert Nilakantheswar Mahadev Temple to Mugunipur PMGSY Road Mareigan |
100000 |
Const of CC Road with Culvert Nilakantheswar Mahadev Temple to Mugunipur PMGSY Road Mareigan1 |
Completion of work |
-
latitude : 21.16053,21.16054
Longitude : 86.63377333333334,86.633775
file name : Image_03042024065621427.png
|
2024-04-03 06:56:21.514576 |
168 |
64984490 |
Operation & maintenance of composting shed/center |
90000 |
Operation & maintenance of composting shed/center1 |
Completion of work |
-
latitude : 21.300623333333338
Longitude : 86.69169833333332
file name : Image_20062024113532483.png
|
2024-06-20 11:35:32.621304 |
169 |
101104775 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.360758333333333,21.360758333333333
Longitude : 86.73108333333333,86.73108333333333
file name : Image_25092024085755353.png
|
2024-09-25 08:57:55.334948 |
170 |
101104775 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.349426666666666,21.349355
Longitude : 86.71629499999999,86.71629499999999
file name : Image_25092024081016149.png
|
2024-09-25 08:10:16.243376 |
171 |
101104775 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.349808333333332,21.34972833333334
Longitude : 86.71609333333332,86.71613833333335
file name : Image_25092024080448321.png
|
2024-09-25 08:04:48.433286 |
172 |
101103429 |
Construction of Retaining Walls/ Fencing Work |
250000 |
Construction of Retaining Walls/ Fencing Work1 |
Roof laid |
-
latitude : 21.34282166666667
Longitude : 86.73141333333334
file name : Image_25092024083116122.png
|
2024-09-25 08:31:16.216468 |
173 |
101103429 |
Construction of Retaining Walls/ Fencing Work |
250000 |
Construction of Retaining Walls/ Fencing Work1 |
Plinth level |
-
latitude : 21.349471666666666
Longitude : 86.71625166666666
file name : Image_25092024070335946.png
|
2024-09-25 07:03:36.028883 |
174 |
101103429 |
Construction of Retaining Walls/ Fencing Work |
250000 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 21.349600000000002
Longitude : 86.71691666666666
file name : Image_25092024065846916.png
|
2024-09-25 06:58:47.004864 |
175 |
101343539 |
Electric connection |
26570 |
Electric connection1 |
Roof laid |
-
latitude : 21.349615000000004
Longitude : 86.71614999999998
file name : Image_25092024080238101.png
|
2024-09-25 08:02:38.209471 |
176 |
101343539 |
Electric connection |
26570 |
Electric connection1 |
Plinth level |
-
latitude : 21.349488333333337
Longitude : 86.71630333333333
file name : Image_25092024075409336.png
|
2024-09-25 07:54:09.426888 |
177 |
101343539 |
Electric connection |
26570 |
Electric connection1 |
Completion of work |
-
latitude : 21.349316666666663
Longitude : 86.716495
file name : Image_24092024145810478.png
|
2024-09-24 14:58:10.572557 |
178 |
77905945 |
Books Journals and Periodicals |
2500 |
Books Journals and Periodicals1 |
|
-
latitude : 21.349379999999996
Longitude : 86.71628166666666
file name : Image_25092024081935103.png
|
2024-09-25 08:19:35.198632 |
179 |
77907636 |
Hand washing units |
500 |
Hand washing units1 |
|
-
latitude : 21.349563333333336
Longitude : 86.71636166666667
file name : Image_25092024071738708.png
|
2024-09-25 07:17:38.839037 |
180 |
64984020 |
Operation & maintenance of drinking water supply system |
65341 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.34920833333333
Longitude : 86.73123833333332
file name : Image_25092024084738897.png
|
2024-09-25 08:47:38.729337 |
181 |
64983968 |
Operation & maintenance of drinking water supply system |
50000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.347583333333333
Longitude : 86.73280500000001
file name : Image_25092024084401856.png
|
2024-09-25 08:44:01.610441 |
182 |
101368923 |
Pipeline connection for water supply |
2600 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 21.349228333333333
Longitude : 86.71631166666666
file name : Image_25092024080128764.png
|
2024-09-25 08:01:28.847626 |
183 |
101368923 |
Pipeline connection for water supply |
2600 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 21.349308333333337
Longitude : 86.71628833333334
file name : Image_25092024075558158.png
|
2024-09-25 07:55:58.268454 |
184 |
101368923 |
Pipeline connection for water supply |
2600 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 21.349206666666667
Longitude : 86.71630166666667
file name : Image_24092024145907402.png
|
2024-09-24 14:59:07.490348 |
185 |
82599091 |
Operation and Maintenance of drinking water supply system |
308498 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3698231
Longitude : 86.7124666
file name : Image_05032024124623331.png
|
2024-03-05 12:46:23.432081 |
186 |
82599091 |
Operation and Maintenance of drinking water supply system |
308498 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.3698231
Longitude : 86.7124666
file name : Image_20022024163603775.png
|
2024-02-20 16:36:03.882744 |
187 |
82599091 |
Operation and Maintenance of drinking water supply system |
308498 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.3698231
Longitude : 86.7124666
file name : Image_20022024163348432.png
|
2024-02-20 16:33:48.538542 |
188 |
82599091 |
Operation and Maintenance of drinking water supply system |
308498 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.369996666666665
Longitude : 86.71232666666668
file name : Image_20022024161844780.png
|
2024-02-20 16:18:44.901985 |
189 |
107028439 |
Operation & maintenance of composting shed/center |
30000 |
Operation & maintenance of composting shed/center1 |
Completion of work |
-
latitude : 21.369791666666668
Longitude : 86.71311333333333
file name : Image_15072024154324283.png
|
2024-07-15 15:43:24.362811 |
190 |
101254838 |
Construction of new Piped Water Supply schemes |
312000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.349271666666663
Longitude : 86.71629999999999
file name : Image_02102024163147394.png
|
2024-10-02 16:31:47.586461 |
191 |
101254838 |
Construction of new Piped Water Supply schemes |
312000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.349391666666666
Longitude : 86.71639833333332
file name : Image_02102024160229048.png
|
2024-10-02 16:02:29.167641 |
192 |
101254838 |
Construction of new Piped Water Supply schemes |
312000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.349348333333335
Longitude : 86.71643666666665
file name : Image_02102024155729639.png
|
2024-10-02 15:57:29.755577 |
193 |
101254838 |
Construction of new Piped Water Supply schemes |
312000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.34945
Longitude : 86.71624166666668
file name : Image_02102024155114146.png
|
2024-10-02 15:51:14.263913 |
194 |
101256311 |
Construction of new Piped Water Supply schemes |
338675 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.349429999999998
Longitude : 86.71637166666666
file name : Image_02102024165008328.png
|
2024-10-02 16:50:08.473144 |
195 |
101256311 |
Construction of new Piped Water Supply schemes |
338675 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.349274999999995
Longitude : 86.71638666666668
file name : Image_02102024163958593.png
|
2024-10-02 16:39:58.808956 |
196 |
101256311 |
Construction of new Piped Water Supply schemes |
338675 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.349259999999997
Longitude : 86.71633166666668
file name : Image_02102024163712103.png
|
2024-10-02 16:37:12.276281 |
197 |
78009071 |
Procurement of Furniture |
50000 |
Procurement of Furniture1 |
|
-
latitude : 21.334158333333335
Longitude : 86.72283333333334
file name : Image_17102024205911704.png
|
2024-10-17 20:59:11.857267 |
198 |
78013377 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall |
50000 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall1 |
|
-
latitude : 21.34947833333333
Longitude : 86.71604166666665
file name : Image_13102024062141276.png
|
2024-10-13 06:21:41.37178 |
199 |
107028400 |
Operation & maintenance of community sanitary complex |
120000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.301941666666668
Longitude : 86.69259833333332
file name : Image_19072024145900243.png
|
2024-07-19 14:59:00.333207 |
200 |
64984376 |
Services of mechanical Cleaning collection of Faecal Sludge, |
72341 |
Services of mechanical Cleaning collection of Faecal Sludge,1 |
Completion of work |
-
latitude : 21.350443333333335
Longitude : 86.714775
file name : Image_19072024145732488.png
|
2024-07-19 14:57:32.58069 |
201 |
64984260 |
Operation & maintenance of drinking water supply system |
20000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.369868333333336
Longitude : 86.71232333333334
file name : Image_31072024115048884.png
|
2024-07-31 11:50:48.992389 |
202 |
64984243 |
Operation & maintenance of drinking water supply system |
20000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.345311666666664
Longitude : 86.731755
file name : Image_31072024103318343.png
|
2024-07-31 10:33:18.435108 |
203 |
107244853 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Roof laid |
-
latitude : 21.34935666666667
Longitude : 86.71677333333334
file name : Image_09082024162514066.png
|
2024-08-09 16:25:14.146336 |
204 |
107244853 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.349368333333338
Longitude : 86.71679999999999
file name : Image_09082024155951832.png
|
2024-08-09 15:59:51.924783 |
205 |
107244853 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.345188333333333
Longitude : 86.71561666666666
file name : Image_09082024093957185.png
|
2024-08-09 09:39:57.288578 |
206 |
107244839 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Roof laid |
-
latitude : 21.349283333333332
Longitude : 86.71649666666666
file name : Image_09122024132754746.png
|
2024-12-09 13:27:54.840033 |
207 |
107244839 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.34867166666667
Longitude : 86.71586666666666
file name : Image_09122024125750025.png
|
2024-12-09 12:57:50.111367 |
208 |
107244839 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.349259999999997
Longitude : 86.71693833333332
file name : Image_09122024124040481.png
|
2024-12-09 12:40:40.561207 |
209 |
107244815 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Roof laid |
-
latitude : 21.349319999999995
Longitude : 86.71674499999999
file name : Image_09082024163059287.png
|
2024-08-09 16:30:59.365232 |
210 |
107244815 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.349256666666665
Longitude : 86.71679
file name : Image_09082024162615502.png
|
2024-08-09 16:26:15.571925 |
211 |
107244815 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.349319999999995
Longitude : 86.71678666666666
file name : Image_09082024160442886.png
|
2024-08-09 16:04:42.976734 |
212 |
107244815 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.349339999999998
Longitude : 86.71676666666666
file name : Image_09082024160113749.png
|
2024-08-09 16:01:13.864301 |
213 |
107244815 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.348765000000004
Longitude : 86.71979000000002
file name : Image_09082024094536203.png
|
2024-08-09 09:45:36.296962 |
214 |
77789124 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.334204999999997,21.334236666666666
Longitude : 86.71149666666666,86.71140666666666
file name : Image_16102023142539582.png
|
2023-10-16 14:25:39.678724 |
215 |
77789124 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.33424166666667,21.33416833333333
Longitude : 86.71153666666666,86.71151
file name : Image_16102023142318463.png
|
2023-10-16 14:23:18.562942 |
216 |
77789124 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.33415,21.33415166666667
Longitude : 86.71161666666667,86.71160833333333
file name : Image_16102023142034169.png
|
2023-10-16 14:20:34.267556 |
217 |
77789124 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.334101666666665,21.33420833333333
Longitude : 86.71182833333333,86.71166166666666
file name : Image_16102023103628993.png
|
2023-10-16 10:36:29.123055 |
218 |
64986788 |
CONST. OF TUBEWELL PLATFORM NEAR LAXMIDHAR DAS HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR LAXMIDHAR DAS HOUSE1 |
Completion of work |
-
latitude : 21.33007
Longitude : 86.70002000000001
file name : Image_23082024131527629.png
|
2024-08-23 13:15:27.747915 |
219 |
64986788 |
CONST. OF TUBEWELL PLATFORM NEAR LAXMIDHAR DAS HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR LAXMIDHAR DAS HOUSE1 |
Completion of work |
-
latitude : 21.349415
Longitude : 86.71675166666667
file name : Image_23082024131456470.png
|
2024-08-23 13:14:56.569259 |
220 |
64986374 |
RENOVATION OF ISWARPUR HIGH SCHOOL TANK |
30800 |
RENOVATION OF ISWARPUR HIGH SCHOOL TANK1 |
Completion of work |
-
latitude : 21.34928
Longitude : 86.71624500000001
file name : Image_27082024134615979.png
|
2024-08-27 13:46:16.688618 |
221 |
78075358 |
Construction of Building |
100000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.349288333333334
Longitude : 86.716735
file name : Image_22082024073125669.png
|
2024-08-22 07:31:25.783785 |
222 |
78075358 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.349390000000003
Longitude : 86.71683833333333
file name : Image_22082024072753719.png
|
2024-08-22 07:27:53.82566 |
223 |
78075358 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.349336666666666
Longitude : 86.7167
file name : Image_22082024072508045.png
|
2024-08-22 07:25:08.147299 |
224 |
101130584 |
Retrofitting of single pit toilets to twin pit toilets |
210000 |
Retrofitting of single pit toilets to twin pit toilets1 |
Roof laid |
-
latitude : 21.349676666666664
Longitude : 86.71605333333333
file name : Image_16112024100829182.png
|
2024-11-16 10:08:29.266797 |
225 |
101130584 |
Retrofitting of single pit toilets to twin pit toilets |
210000 |
Retrofitting of single pit toilets to twin pit toilets1 |
Plinth level |
-
latitude : 21.34922333333333
Longitude : 86.71581999999998
file name : Image_16112024100348911.png
|
2024-11-16 10:03:49.000168 |
226 |
101130584 |
Retrofitting of single pit toilets to twin pit toilets |
210000 |
Retrofitting of single pit toilets to twin pit toilets1 |
Completion of work |
-
latitude : 21.349355
Longitude : 86.71676833333335
file name : Image_16112024093404093.png
|
2024-11-16 09:34:04.175152 |
227 |
101130399 |
Services of Collection & transportation of waste from household to treatment site |
200000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 21.34878666666667
Longitude : 86.71628333333335
file name : Image_16112024111720233.png
|
2024-11-16 11:17:20.317604 |
228 |
101130399 |
Services of Collection & transportation of waste from household to treatment site |
200000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 21.34949333333333
Longitude : 86.71632999999999
file name : Image_16112024111356779.png
|
2024-11-16 11:13:56.858421 |
229 |
101130399 |
Services of Collection & transportation of waste from household to treatment site |
200000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 21.349466666666665
Longitude : 86.71602833333333
file name : Image_16112024111043412.png
|
2024-11-16 11:10:43.50873 |
230 |
101131228 |
Construction/Maintenenace/Upgradation of Segregation Unit |
100000 |
Construction/Maintenenace/Upgradation of Segregation Unit1 |
Roof laid |
-
latitude : 21.34907333333333
Longitude : 86.71615666666666
file name : Image_16112024100247209.png
|
2024-11-16 10:02:47.284032 |
231 |
101131228 |
Construction/Maintenenace/Upgradation of Segregation Unit |
100000 |
Construction/Maintenenace/Upgradation of Segregation Unit1 |
Plinth level |
-
latitude : 21.349339999999998
Longitude : 86.71673666666666
file name : Image_16112024093642900.png
|
2024-11-16 09:36:42.984214 |
232 |
101131228 |
Construction/Maintenenace/Upgradation of Segregation Unit |
100000 |
Construction/Maintenenace/Upgradation of Segregation Unit1 |
Completion of work |
-
latitude : 21.351178333333337
Longitude : 86.72203499999999
file name : Image_16112024085642347.png
|
2024-11-16 08:56:42.436093 |
233 |
101106899 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.348781666666664,21.34932666666667
Longitude : 86.71648333333333,86.71570333333332
file name : Image_31122024084407582.png
|
2024-12-31 08:44:07.655349 |
234 |
101106899 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.348781666666664,21.348781666666664
Longitude : 86.71648333333333,86.71648333333333
file name : Image_31122024083949089.png
|
2024-12-31 08:39:49.167068 |
235 |
101106899 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.348075,21.350158333333336
Longitude : 86.71179666666667,86.71458666666668
file name : Image_31122024083446830.png
|
2024-12-31 08:34:46.899749 |
236 |
101131802 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.330418333333334,21.33044
Longitude : 86.73871333333334,86.73870666666666
file name : Image_03122024132706749.png
|
2024-12-03 13:27:06.854489 |
237 |
101131802 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.33047333333333,21.330409999999997
Longitude : 86.73879000000001,86.73871499999998
file name : Image_03122024132241901.png
|
2024-12-03 13:22:42.010025 |
238 |
101131802 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.33039833333333,21.330336666666668
Longitude : 86.73887333333332,86.73879666666666
file name : Image_03122024111349783.png
|
2024-12-03 11:13:49.877055 |
239 |
101132374 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
300000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 21.346881666666665
Longitude : 86.73412666666667
file name : Image_03122024135754202.png
|
2024-12-03 13:57:54.289985 |
240 |
101132374 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
300000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 21.346868333333337
Longitude : 86.73411833333333
file name : Image_03122024135401815.png
|
2024-12-03 13:54:01.91586 |
241 |
101132374 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
300000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.346883333333334
Longitude : 86.73417666666667
file name : Image_03122024134724741.png
|
2024-12-03 13:47:24.722724 |
242 |
64986708 |
CONST. OF DRAIN WITH ROAD FROM PMGSY ROAD TO GIRISAHI |
150000 |
CONST. OF DRAIN WITH ROAD FROM PMGSY ROAD TO GIRISAHI1 |
Completion of work |
-
latitude : 21.332486666666668
Longitude : 86.71444000000001
file name : Image_28112024152736464.png
|
2024-11-28 15:27:36.643098 |
243 |
50857956 |
CONST. OF TUBEWELL PLATFORM NEAR PRAFULLA PARIDA HOUSE |
20000 |
CONST. OF TUBEWELL PLATFORM NEAR PRAFULLA PARIDA HOUSE1 |
Completion of work |
-
latitude : 21.329238333333333
Longitude : 86.50573666666666
file name : Image_11122024124327925.png
|
2024-12-11 12:43:28.010202 |
244 |
64986759 |
BEAUTIFICATION OF GP OFFICE CAMPOUS |
20000 |
BEAUTIFICATION OF GP OFFICE CAMPOUS1 |
Completion of work |
-
latitude : 21.34954
Longitude : 86.71626499999999
file name : Image_09122024132122396.png
|
2024-12-09 13:21:22.483888 |
245 |
89112470 |
Renovation of Kanthigadia Pokhari at Pinchhabania |
30000 |
Renovation of Kanthigadia Pokhari at Pinchhabania1 |
Completion of work |
-
latitude : 21.349543333333333
Longitude : 86.71627333333332
file name : Image_09122024132219417.png
|
2024-12-09 13:22:19.51415 |
246 |
81476739 |
Maintenance of Sports Equipments |
10000 |
Maintenance of Sports Equipments1 |
Roof laid |
-
latitude : 21.329236666666663,21.329250000000002
Longitude : 86.50575500000001,86.50575166666667
file name : Image_11122024125229628.png
|
2024-12-11 12:52:29.727576 |
247 |
81476739 |
Maintenance of Sports Equipments |
10000 |
Maintenance of Sports Equipments1 |
Plinth level |
-
latitude : 21.329250000000002,21.329333333333338
Longitude : 86.505735,86.50568
file name : Image_11122024124857271.png
|
2024-12-11 12:48:57.402838 |
248 |
81476739 |
Maintenance of Sports Equipments |
10000 |
Maintenance of Sports Equipments1 |
Completion of work |
-
latitude : 21.329304999999998,21.32933666666667
Longitude : 86.50574999999999,86.50562833333333
file name : Image_11122024124546255.png
|
2024-12-11 12:45:46.339583 |
249 |
100470485 |
Purchase/ installtion of various Equipments |
10000 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-
latitude : 21.349383333333336
Longitude : 86.716315
file name : Image_11122024094430101.png
|
2024-12-11 09:44:30.185621 |
250 |
100470485 |
Purchase/ installtion of various Equipments |
10000 |
Purchase/ installtion of various Equipments1 |
Completion of work |
-
latitude : 21.349393333333335
Longitude : 86.71633166666668
file name : Image_11122024093846379.png
|
2024-12-11 09:38:46.478157 |
251 |
100469472 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Roof laid |
-
latitude : 21.349415
Longitude : 86.71638999999999
file name : Image_11122024094250266.png
|
2024-12-11 09:42:50.367938 |
252 |
100469472 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Plinth level |
-
latitude : 21.349398333333337
Longitude : 86.71635999999998
file name : Image_11122024093842476.png
|
2024-12-11 09:38:42.561501 |
253 |
100469472 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Completion of work |
-
latitude : 21.349366666666665
Longitude : 86.71629166666668
file name : Image_11122024093216095.png
|
2024-12-11 09:32:16.189711 |
254 |
107244872 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Roof laid |
-
latitude : 21.349453333333333
Longitude : 86.71612666666667
file name : Image_09122024133104315.png
|
2024-12-09 13:31:04.403065 |
255 |
107244872 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.348775
Longitude : 86.71596
file name : Image_09122024125706695.png
|
2024-12-09 12:57:06.788513 |
256 |
107244872 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.35038833333333
Longitude : 86.733135
file name : Image_09122024093750837.png
|
2024-12-09 09:37:50.944247 |
257 |
107244780 |
Drainage Construction |
70000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.349456666666665
Longitude : 86.71623833333334
file name : Image_21122024100706548.png
|
2024-12-21 10:07:06.615409 |
258 |
107244780 |
Drainage Construction |
70000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.349186666666665
Longitude : 86.71610000000001
file name : Image_21122024100316339.png
|
2024-12-21 10:03:16.444411 |
259 |
107244780 |
Drainage Construction |
70000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.34917833333333
Longitude : 86.716135
file name : Image_21122024100046538.png
|
2024-12-21 10:00:46.613921 |