1 |
44393449 |
Const of CC road from Balia Mohanty house to Rama Malik house |
100000 |
Const of CC road from Balia Mohanty house to Rama Malik house1 |
Completion of work |
-
latitude : 21.29552554,21.29565715,21.29570179
Longitude : 86.66437643,86.664501,86.66452989
file name : Image_08042021120952061.png
|
2021-04-08 12:09:52.145709 |
2 |
44393375 |
CC road from in complete CC road to Mahanalla polla |
100000 |
CC road from in complete CC road to Mahanalla polla1 |
Completion of work |
-
latitude : 21.29757159,21.29751498,21.29733436
Longitude : 86.64872353,86.64870354,86.64860976
file name : Image_08042021122920134.png
|
2021-04-08 12:29:20.225461 |
3 |
52210510 |
PROVISION OF PLAT FORM,SOAK PIT AND VAT OF 5 NOS TUBE WELL AT RB PUR ADIBASI SAHI,BALIPUR ADIBASI SA |
72886 |
PROVISION OF PLAT FORM,SOAK PIT AND VAT OF 5 NOS TUBE WELL AT RB PUR ADIBASI SAHI,BALIPUR ADIBASI SA1 |
Completion of work |
-
latitude : 21.301743333333334
Longitude : 86.66929833333333
file name : Image_19102021155041763.png
|
2021-10-19 15:50:41.829535 |
4 |
44393241 |
CC road from Radhagobinda Temple to Amulya Parida house |
101544 |
CC road from Radhagobinda Temple to Amulya Parida house1 |
Completion of work |
-
latitude : 21.30854138,21.30864543
Longitude : 86.64762418,86.64765324
file name : Image_19052021122414596.png
|
2021-05-19 12:24:14.686806 |
5 |
44393283 |
Beautification with cement concrete work infront of Balipur Kalyan Mandap |
500000 |
Beautification with cement concrete work infront of Balipur Kalyan Mandap1 |
Completion of work |
-
latitude : 21.31556437
Longitude : 86.65333991
file name : Image_17072021151214463.png
|
2021-07-17 15:12:14.564419 |
6 |
44393283 |
Beautification with cement concrete work infront of Balipur Kalyan Mandap |
500000 |
Beautification with cement concrete work infront of Balipur Kalyan Mandap1 |
Completion of work |
-
latitude : 21.31562362
Longitude : 86.65331558
file name : Image_23062021184632735.png
|
2021-06-23 18:46:32.833287 |
7 |
44393211 |
CC road from Chahalima main road to Raghunath Behera house Chahalima |
100000 |
CC road from Chahalima main road to Raghunath Behera house Chahalima1 |
Completion of work |
-
latitude : 21.30912576,21.30914701
Longitude : 86.64858532,86.64861304
file name : Image_17072021151611769.png
|
2021-07-17 15:16:11.85449 |
8 |
44393319 |
CC road from main road to Mayadhar panda house |
100000 |
CC road from main road to Mayadhar panda house1 |
Completion of work |
-
latitude : 21.30626938,21.30626155
Longitude : 86.65938765,86.65938711
file name : Image_06082021180251783.png
|
2021-08-06 18:02:51.86686 |
9 |
44393406 |
CC road from Natapada Barik Sahi chhaka to Murali Barik house |
100000 |
CC road from Natapada Barik Sahi chhaka to Murali Barik house1 |
Completion of work |
-
latitude : 21.29835248,21.2984026
Longitude : 86.67207001,86.67204379
file name : Image_06082021181200805.png
|
2021-08-06 18:12:00.910084 |
10 |
54138575 |
DEVELOPMENT OF ROAD FROM INCOMPLETE CC ROAD TO KAILASH MALIK HOUSE |
25000 |
DEVELOPMENT OF ROAD FROM INCOMPLETE CC ROAD TO KAILASH MALIK HOUSE1 |
Completion of work |
-
latitude : 21.31278026,21.3127878
Longitude : 86.65313849,86.65313047
file name : Image_17022022124528652.png
|
2022-02-17 12:45:28.769923 |
11 |
44393503 |
Const of CC road from Guru Prasad Behera house to Ramachandra Dalei house |
100000 |
Const of CC road from Guru Prasad Behera house to Ramachandra Dalei house1 |
Completion of work |
-
latitude : 21.30837933,21.30837016
Longitude : 86.65992775,86.65992291
file name : Image_25012022114154117.png
|
2022-01-25 11:41:54.234193 |
12 |
52211037 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BINNAGADIA VILLAGE ROAD |
100000 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO BINNAGADIA VILLAGE ROAD1 |
Completion of work |
-
latitude : 21.30846838,21.30851081
Longitude : 86.66002979,86.66003286
file name : Image_25012022114158743.png
|
2022-01-25 11:41:58.842926 |
13 |
52212011 |
DEVELOPMENT ROAD FROM SORO MANIPUR RD ROAD TO AMBA GADHIA |
110000 |
DEVELOPMENT ROAD FROM SORO MANIPUR RD ROAD TO AMBA GADHIA1 |
Completion of work |
-
latitude : 21.3088882,21.30885212
Longitude : 86.66155808,86.66157818
file name : Image_18122021123753281.png
|
2021-12-18 12:37:53.426819 |
14 |
54138547 |
CONST OF CC ROAD FROM BABULA MALIK HOUSE TO SRIDHAR DAS HOUSE |
100000 |
CONST OF CC ROAD FROM BABULA MALIK HOUSE TO SRIDHAR DAS HOUSE1 |
Completion of work |
-
latitude : 21.29592982,21.29591065
Longitude : 86.66461447,86.66468894
file name : Image_04122021110410013.png
|
2021-12-04 11:04:10.098043 |
15 |
54138547 |
CONST OF CC ROAD FROM BABULA MALIK HOUSE TO SRIDHAR DAS HOUSE |
100000 |
CONST OF CC ROAD FROM BABULA MALIK HOUSE TO SRIDHAR DAS HOUSE1 |
Completion of work |
-
latitude : 21.29588585,21.29595776
Longitude : 86.66467575,86.66467474
file name : Image_04122021110405101.png
|
2021-12-04 11:04:05.207465 |
16 |
52211395 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO MANDARUNI SENA HOUSE |
150000 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO MANDARUNI SENA HOUSE1 |
Completion of work |
-
latitude : 21.2961704,21.29617532
Longitude : 86.67331813,86.67331571
file name : Image_10122021121028313.png
|
2021-12-10 12:10:28.437981 |
17 |
52211395 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO MANDARUNI SENA HOUSE |
150000 |
CONST OF CC ROAD FROM INCOMPLETE CC ROAD TO MANDARUNI SENA HOUSE1 |
Completion of work |
-
latitude : 21.29620489,21.29619571
Longitude : 86.67328332,86.67329073
file name : Image_09122021120254365.png
|
2021-12-09 12:02:54.448381 |
18 |
52210587 |
CONST. OF DRAIN FROM DHADASAHI TO BARIK SAHI AT NATAPADA |
150000 |
CONST. OF DRAIN FROM DHADASAHI TO BARIK SAHI AT NATAPADA1 |
Completion of work |
-
latitude : 21.29917404,21.29918037
Longitude : 86.66952264,86.66951025
file name : Image_31012022114546610.png
|
2022-01-31 11:45:46.728364 |
19 |
52210654 |
CONST. OF DRAIN FROM SANKHUA SAHI TO RAMESH ROUL HOUSE |
150000 |
CONST. OF DRAIN FROM SANKHUA SAHI TO RAMESH ROUL HOUSE1 |
Completion of work |
-
latitude : 21.31223042,21.3121616
Longitude : 86.64985224,86.64985862
file name : Image_04122021112448792.png
|
2021-12-04 11:24:48.906162 |
20 |
52211939 |
COMPLETION OF CRC CENTRE AT BALIPUR CHHAKA |
100000 |
COMPLETION OF CRC CENTRE AT BALIPUR CHHAKA1 |
Completion of work |
-
latitude : 21.31543856
Longitude : 86.65378213
file name : Image_04122021112035831.png
|
2021-12-04 11:20:35.971435 |
21 |
54138577 |
COMPLETION OF CC ROAD INFRONT OF BILABANKIA POKHARI GHATA |
100000 |
COMPLETION OF CC ROAD INFRONT OF BILABANKIA POKHARI GHATA1 |
Completion of work |
-
latitude : 21.30795405,21.30793372
Longitude : 86.65962768,86.65962232
file name : Image_07012022135348314.png
|
2022-01-07 13:53:48.465848 |
22 |
52210440 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK AT PURUSOTTAM UG SCHOOL NATAPADA |
170000 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK AT PURUSOTTAM UG SCHOOL NATAPADA1 |
Completion of work |
-
latitude : 21.29539414
Longitude : 86.66475565
file name : Image_17022022075944918.png
|
2022-02-17 07:59:45.040269 |
23 |
52210356 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK TILADA PRIMARY SCHOOL |
170000 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK TILADA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.2985942
Longitude : 86.6676855
file name : Image_17022022075332546.png
|
2022-02-17 07:53:32.680683 |
24 |
52210151 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK TILADA AWC |
70000 |
PROVISION OF WATER SUPPLY ALONG WITH OVER HEAD TANK TILADA AWC1 |
Completion of work |
-
latitude : 21.29771907,21.29770649
Longitude : 86.66606857,86.66606897
file name : Image_17022022075941650.png
|
2022-02-17 07:59:41.784756 |
25 |
54138524 |
CONST OF DRAIN FROM SUNKHUA SAHI TO RAMESH ROUT HOUSE |
291149 |
CONST OF DRAIN FROM SUNKHUA SAHI TO RAMESH ROUT HOUSE1 |
Completion of work |
-
latitude : 21.31217232,21.31215509
Longitude : 86.64989788,86.64991953
file name : Image_18122021122110210.png
|
2021-12-18 12:21:10.306523 |
26 |
61643602 |
Const of CC road from incomplete CC road to Mandadori Sen house |
130000 |
Const of CC road from incomplete CC road to Mandadori Sen house1 |
Completion of work |
-
latitude : 21.29588828,21.29588162,21.29588316
Longitude : 86.67329174,86.6732894,86.67328943
file name : Image_09032022145448160.png
|
2022-03-09 14:54:48.273485 |
27 |
61643429 |
Development of Pokhari Adi road from Panda Parida house to Mahadev Mandir |
43000 |
Development of Pokhari Adi road from Panda Parida house to Mahadev Mandir1 |
Completion of work |
-
latitude : 21.307117,21.30708505
Longitude : 86.64828562,86.64825432
file name : Image_09032022150608879.png
|
2022-03-09 15:06:08.973671 |
28 |
52211443 |
CONST OF CRC WITH BEAUTIFICATION AT RADHABALLAVPUR |
217000 |
CONST OF CRC WITH BEAUTIFICATION AT RADHABALLAVPUR1 |
Completion of work |
-
latitude : 21.30855769
Longitude : 86.64880272
file name : Image_27072022122705536.png
|
2022-07-27 12:27:05.638018 |
29 |
52211621 |
SEM REMUNEARATION |
24000 |
SEM REMUNEARATION 1 |
Completion of work |
-
latitude : 21.30855769
Longitude : 86.64880272
file name : Image_27072022123416226.png
|
2022-07-27 12:34:16.455971 |
30 |
54696960 |
PROVISION OF WATER FACILITY WITH TILET ALONG WITH OVER HEAD TANK AT MISSION SHAKTI BUILDING |
200000 |
PROVISION OF WATER FACILITY WITH TILET ALONG WITH OVER HEAD TANK AT MISSION SHAKTI BUILDING1 |
Completion of work |
-
latitude : 21.3243111
Longitude : 86.6478709
file name : Image_10082022172419858.png
|
2022-08-10 17:24:19.960467 |
31 |
64311518 |
Renovation and beautification of Khajira Pokhari Natapada |
565772 |
Renovation and beautification of Khajira Pokhari Natapada1 |
Completion of work |
-
latitude : 21.29925487
Longitude : 86.66682243
file name : Image_30082022174410379.png
|
2022-08-30 17:44:10.481112 |
32 |
64696684 |
Const of CC Roadform Tilada Sasan Incomplet CC Road to Pradeep Mishra House |
100000 |
Const of CC Roadform Tilada Sasan Incomplet CC Road to Pradeep Mishra House1 |
Completion of work |
-
latitude : 21.298446,21.2986091
Longitude : 86.6674988,86.6652823
file name : Image_01102022140011453.png
|
2022-10-01 14:00:11.569927 |
33 |
64885800 |
Operation & maintenance of drinking water supply system |
80000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.2984473
Longitude : 86.6674984
file name : Image_01102022135229372.png
|
2022-10-01 13:52:29.480655 |
34 |
64311609 |
Improvement of Balipur Village road |
34228 |
Improvement of Balipur Village road1 |
Completion of work |
-
latitude : 21.31841237,21.31840264
Longitude : 86.65092558,86.65091348
file name : Image_01102022141021175.png
|
2022-10-01 14:10:21.26251 |
35 |
64881454 |
Amrit Sarovar — Construction of new water body |
327744 |
Amrit Sarovar — Construction of new water body1 |
Completion of work |
-
latitude : 21.30410901
Longitude : 86.65722285
file name : Image_31102022142810613.png
|
2022-10-31 14:28:10.714356 |
36 |
64881589 |
Completion of Renovation and Beautification of Khajira PokhariNatapada |
308992 |
Completion of Renovation and Beautification of Khajira PokhariNatapada1 |
Completion of work |
-
latitude : 21.30410901
Longitude : 86.65722285
file name : Image_31102022142800930.png
|
2022-10-31 14:28:01.042011 |
37 |
64557182 |
Repairing and Infrastrature Dev of Rajeeb gandhi Seba Kendra & G.P Office |
256588 |
Repairing and Infrastrature Dev of Rajeeb gandhi Seba Kendra & G.P Office 1 |
Completion of work |
-
latitude : 21.278127
Longitude : 86.6953888
file name : Image_05012023202801634.png
|
2023-01-05 20:28:01.729629 |
38 |
64881642 |
Const of Drinking Water Complex cum Sanitation Complex at M.M high SchoolWada under 5T Program |
206850 |
Const of Drinking Water Complex cum Sanitation Complex at M.M high SchoolWada under 5T Program1 |
Completion of work |
-
latitude : 21.32450047
Longitude : 86.6480939
file name : Image_06012023231055004.png
|
2023-01-06 23:10:55.097268 |
39 |
64881642 |
Const of Drinking Water Complex cum Sanitation Complex at M.M high SchoolWada under 5T Program |
206850 |
Const of Drinking Water Complex cum Sanitation Complex at M.M high SchoolWada under 5T Program1 |
Completion of work |
-
latitude : 21.32453982
Longitude : 86.64808605
file name : Image_06012023231109405.png
|
2023-01-06 23:11:09.487183 |
40 |
64696691 |
Const of CC Road form Ratnakar Sahu house to Kailash Malik house |
200000 |
Const of CC Road form Ratnakar Sahu house to Kailash Malik house1 |
Completion of work |
-
latitude : 21.31176131,21.3118283
Longitude : 86.65226297,86.65227111
file name : Image_15022023141455165.png
|
2023-02-15 14:14:55.290503 |
41 |
64881058 |
Creation of community compost pits for a group of Households |
67500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.27843099
Longitude : 86.69493123
file name : Image_22032023170154804.png
|
2023-03-22 17:01:54.892133 |
42 |
64881205 |
Creation of community soak pits for group of Households |
22500 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.32073624
Longitude : 86.65007255
file name : Image_10102023161801334.png
|
2023-10-10 16:18:01.448023 |
43 |
64881205 |
Creation of community soak pits for group of Households |
22500 |
Creation of community soak pits for group of Households2 |
Completion of work |
-
latitude : 21.32055331
Longitude : 86.65094167
file name : Image_10102023162100782.png
|
2023-10-10 16:21:00.98282 |
44 |
64881205 |
Creation of community soak pits for group of Households |
22500 |
Creation of community soak pits for group of Households5 |
Completion of work |
-
latitude : 21.30889856
Longitude : 86.66053433
file name : Image_10102023162707775.png
|
2023-10-10 16:27:07.880952 |
45 |
64880473 |
Operation & maintenance of community sanitary complex |
34244 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.29906509
Longitude : 86.66673726
file name : Image_20102023124641124.png
|
2023-10-20 12:46:41.297547 |
46 |
64880473 |
Operation & maintenance of community sanitary complex |
34244 |
Operation & maintenance of community sanitary complex4 |
Completion of work |
-
latitude : 21.29937421
Longitude : 86.66694054
file name : Image_20102023124848948.png
|
2023-10-20 12:48:49.252332 |
47 |
78898028 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.29796852
Longitude : 86.66629638
file name : Image_20102023131128560.png
|
2023-10-20 13:11:28.667204 |
48 |
78898028 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.29798604
Longitude : 86.66626418
file name : Image_20102023130521399.png
|
2023-10-20 13:05:21.500294 |
49 |
78898028 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.29792444
Longitude : 86.66644504
file name : Image_20102023125338549.png
|
2023-10-20 12:53:38.665562 |
50 |
64881837 |
Repair of Street Light in Natapada Gp |
100000 |
Repair of Street Light in Natapada Gp1 |
Completion of work |
-
latitude : 21.2777597
Longitude : 86.6954606
file name : Image_17022024143301608.png
|
2024-02-17 14:33:01.667691 |
51 |
106215450 |
Const of GP Office Gate |
70074 |
Const of GP Office Gate1 |
Completion of work |
-
latitude : 21.2985324
Longitude : 86.6675641
file name : Image_24062024150022555.png
|
2024-06-24 15:00:22.625211 |
52 |
105407069 |
Creation of a new source of drinking water |
39000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.2989927
Longitude : 86.66769703
file name : Image_12092024140614661.png
|
2024-09-12 14:06:14.728013 |
53 |
105407069 |
Creation of a new source of drinking water |
39000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.2985068
Longitude : 86.6675174
file name : Image_12092024140346382.png
|
2024-09-12 14:03:46.44598 |
54 |
105407069 |
Creation of a new source of drinking water |
39000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.2985071
Longitude : 86.6675119
file name : Image_12092024135531030.png
|
2024-09-12 13:55:31.089796 |
55 |
79128933 |
Construction and repairing of Gate doors, window, fixtures etc. |
55482 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Roof laid |
-
latitude : 21.2985293
Longitude : 86.6675576
file name : Image_19062024191515103.png
|
2024-06-19 19:15:15.15748 |
56 |
79128933 |
Construction and repairing of Gate doors, window, fixtures etc. |
55482 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Plinth level |
-
latitude : 21.2985293
Longitude : 86.6675576
file name : Image_19062024191230041.png
|
2024-06-19 19:12:30.096037 |
57 |
79128933 |
Construction and repairing of Gate doors, window, fixtures etc. |
55482 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 21.2985316
Longitude : 86.6675567
file name : Image_19062024190728078.png
|
2024-06-19 19:07:28.13821 |
58 |
79128933 |
Construction and repairing of Gate doors, window, fixtures etc. |
55482 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 21.29596841
Longitude : 86.68874692
file name : Image_19062024185857407.png
|
2024-06-19 18:58:57.456818 |
59 |
78891582 |
Chlorinization of drinking water source |
45811 |
Chlorinization of drinking water source1 |
Roof laid |
-
latitude : 21.30409129
Longitude : 86.65732385
file name : Image_19092024155027805.png
|
2024-09-19 15:50:27.866885 |
60 |
78891582 |
Chlorinization of drinking water source |
45811 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 21.30409975
Longitude : 86.65735064
file name : Image_19092024154406709.png
|
2024-09-19 15:44:06.770822 |
61 |
78891582 |
Chlorinization of drinking water source |
45811 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 21.30415828
Longitude : 86.65726668
file name : Image_19092024154032399.png
|
2024-09-19 15:40:32.464261 |
62 |
78891582 |
Chlorinization of drinking water source |
45811 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 21.30415206
Longitude : 86.6573416
file name : Image_19092024153316006.png
|
2024-09-19 15:33:16.068914 |
63 |
106215465 |
Const of boundary wall and gate of GP Office |
150000 |
Const of boundary wall and gate of GP Office1 |
Completion of work |
-
latitude : 21.2985319
Longitude : 86.6675644
file name : Image_24062024150153756.png
|
2024-06-24 15:01:53.826569 |
64 |
79046128 |
Operation and Maintenance of drinking water supply system |
24000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.29865431
Longitude : 86.66555964
file name : Image_20102023131320410.png
|
2023-10-20 13:13:20.652964 |
65 |
79046128 |
Operation and Maintenance of drinking water supply system |
24000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.2986397
Longitude : 86.6651813
file name : Image_20102023130308106.png
|
2023-10-20 13:03:08.273926 |
66 |
79046128 |
Operation and Maintenance of drinking water supply system |
24000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.29860976
Longitude : 86.66549139
file name : Image_20102023125643544.png
|
2023-10-20 12:56:43.70727 |
67 |
105408706 |
Construction of new Piped Water Supply schemes |
386817 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.2985148
Longitude : 86.6675156
file name : Image_27092024144828789.png
|
2024-09-27 14:48:28.873035 |
68 |
105408706 |
Construction of new Piped Water Supply schemes |
386817 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.2985145
Longitude : 86.667513
file name : Image_27092024143319445.png
|
2024-09-27 14:33:19.55622 |
69 |
105408706 |
Construction of new Piped Water Supply schemes |
386817 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.2985149
Longitude : 86.667513
file name : Image_27092024135619029.png
|
2024-09-27 13:56:19.083141 |
70 |
78885570 |
Repair of pipe drinking water |
112249 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.29806784
Longitude : 86.66652687
file name : Image_05082024123016825.png
|
2024-08-05 12:30:16.897715 |
71 |
78885570 |
Repair of pipe drinking water |
112249 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.2985537
Longitude : 86.6653486
file name : Image_05082024122721301.png
|
2024-08-05 12:27:21.373479 |
72 |
78885570 |
Repair of pipe drinking water |
112249 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.29804219
Longitude : 86.66647558
file name : Image_05082024122252898.png
|
2024-08-05 12:22:52.978846 |
73 |
78887273 |
Repair of hand pump platform |
30000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.29804274,21.29807589,21.29808245
Longitude : 86.66243681,86.66242492,86.66241308
file name : Image_05082024125232139.png
|
2024-08-05 12:52:32.205351 |
74 |
78887273 |
Repair of hand pump platform |
30000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 21.29803381,21.29812411
Longitude : 86.6624086,86.6624248
file name : Image_05082024124554384.png
|
2024-08-05 12:45:54.451542 |
75 |
78887273 |
Repair of hand pump platform |
30000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 21.29802572,21.29802763
Longitude : 86.66242076,86.66242329
file name : Image_05082024124202358.png
|
2024-08-05 12:42:02.426812 |
76 |
79285198 |
Repair of pipe drinking water |
30000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 21.30806227
Longitude : 86.64423072
file name : Image_09082024164418013.png
|
2024-08-09 16:44:18.088031 |
77 |
79285198 |
Repair of pipe drinking water |
30000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.30807006
Longitude : 86.64419152
file name : Image_09082024164203527.png
|
2024-08-09 16:42:03.596883 |
78 |
79285198 |
Repair of pipe drinking water |
30000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.30804351
Longitude : 86.64421977
file name : Image_09082024163903000.png
|
2024-08-09 16:39:03.074138 |