1 |
44464374 |
CFC-SINKING OF NEW TUBEWELL AT SINGHENPALI SAHARAPADA NALIA ROAD |
80000 |
CFC-SINKING OF NEW TUBEWELL AT SINGHENPALI SAHARAPADA NALIA ROAD1 |
Completion of work |
-
latitude : 21.12901229
Longitude : 83.67064314
file name : Image_19012021123420070.png
|
2021-01-19 12:34:20.169445 |
2 |
44464311 |
CFC-SINKING OF NEW TUBEWELL AT PADHANPALI JATRA ROAD |
80000 |
CFC-SINKING OF NEW TUBEWELL AT PADHANPALI JATRA ROAD1 |
Completion of work |
-
latitude : 21.12554005
Longitude : 83.69017507
file name : Image_19012021123427737.png
|
2021-01-19 12:34:27.847813 |
3 |
44464269 |
CFC-SINKING OF NEW TUBEWELL AT RESHAM BADBANDH ROAD |
80000 |
CFC-SINKING OF NEW TUBEWELL AT RESHAM BADBANDH ROAD |
Completion of work |
-
latitude : 21.1337113
Longitude : 83.67900651
file name : Image_19012021123423903.png
|
2021-01-19 12:34:23.997093 |
4 |
44464440 |
CFC-SINKING OF NEW TUBEWELL AT ICHHAPADAR SANYASIPADA |
80000 |
CFC-SINKING OF NEW TUBEWELL AT ICHHAPADAR SANYASIPADA1 |
Completion of work |
-
latitude : 21.15595016
Longitude : 83.69912704
file name : Image_19012021123431275.png
|
2021-01-19 12:34:31.375718 |
5 |
44463734 |
SFC-INSTA OF SOLAR WATER SUPPLY SYSTEM AT ICHHAPADAR |
350000 |
SFC-INSTA OF SOLAR WATER SUPPLY SYSTEM AT ICHHAPADAR1 |
Completion of work |
-
latitude : 21.15642408
Longitude : 83.69867796
file name : Image_19012021143227649.png
|
2021-01-19 14:32:27.759623 |
6 |
44464222 |
CFC-SOLAR WATER SUPPLY SINGHENPALI |
400000 |
CFC-SOLAR WATER SUPPLY SINGHENPALI1 |
Completion of work |
-
latitude : 21.13652034
Longitude : 83.66900841
file name : Image_04032021170208841.png
|
2021-03-04 17:02:08.929844 |
7 |
47529537 |
CONST OF BOUNDRYWALL AT NANDINIPUR PRYMARY SCHOOL -CFC |
300000 |
CONST OF BOUNDRYWALL AT NANDINIPUR PRYMARY SCHOOL -CFC1 |
Completion of work |
-
latitude : 21.15777921
Longitude : 83.70038639
file name : Image_18112021152557258.png
|
2021-11-18 15:25:57.378219 |
8 |
47529537 |
CONST OF BOUNDRYWALL AT NANDINIPUR PRYMARY SCHOOL -CFC |
300000 |
CONST OF BOUNDRYWALL AT NANDINIPUR PRYMARY SCHOOL -CFC1 |
Completion of work |
-
latitude : 21.15779337
Longitude : 83.70053472
file name : Image_18112021152600650.png
|
2021-11-18 15:26:00.750382 |
9 |
47747088 |
INSTLLATION OF SOLAR WATER SUPPLY SYSTEM AT RESHAM MUNTIKRA-SFC |
350000 |
INSTLLATION OF SOLAR WATER SUPPLY SYSTEM AT RESHAM MUNTIKRA-SFC1 |
Completion of work |
-
latitude : 21.1362245
Longitude : 83.6859669
file name : Image_18112021122748458.png
|
2021-11-18 12:27:48.631575 |
10 |
44463820 |
SFC-REN OF NANDINIPUR PRY SCHOOL |
300000 |
SFC-REN OF NANDINIPUR PRY SCHOOL1 |
Completion of work |
-
latitude : 21.15779129
Longitude : 83.70031176
file name : Image_16062021132006390.png
|
2021-06-16 13:20:06.484021 |
11 |
44463663 |
SFC-CONST OF PLATFORM OF TUBEWELLS IN ALL VILLAGE |
30000 |
SFC-CONST OF PLATFORM OF TUBEWELLS IN ALL VILLAGE1 |
Completion of work |
-
latitude : 21.196564
Longitude : 83.7465885
file name : Image_28102021175104109.png
|
2021-10-28 17:14:18.280944 |
12 |
44464134 |
CFC-MAINTANCE OF JALACHATRA |
95000 |
CFC-MAINTANCE OF JALACHATRA1 |
Completion of work |
-
latitude : 21.21053176
Longitude : 83.55563436
file name : Image_19082021173203491.png
|
2021-08-19 17:32:03.626134 |
13 |
52724755 |
R CFC CONST OF BOUNDARY WALL AT NANDINIPUR PRIMARY SCHOOL |
300000 |
R CFC CONST OF BOUNDARY WALL AT NANDINIPUR PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.1965668
Longitude : 83.7466514
file name : Image_18092021181841803.png
|
2021-09-18 18:18:41.890534 |
14 |
52724714 |
R CFC REPAIRING WITH PWS OF AWC 1 AT SINGHENPALI |
100000 |
R CFC REPAIRING WITH PWS OF AWC 1 AT SINGHENPALI1 |
Completion of work |
-
latitude : 21.1966783
Longitude : 83.746495
file name : Image_18092021175828147.png
|
2021-09-18 17:58:28.245477 |
15 |
52724660 |
R CFC REPAIRING WITH PWS OF AWC 7 AT RESHAM VILLAGE |
100000 |
R CFC REPAIRING WITH PWS OF AWC 7 AT RESHAM VILLAGE1 |
Completion of work |
-
latitude : 21.1965649,21.1965676
Longitude : 83.746649,83.7466513
file name : Image_18092021180037550.png
|
2021-09-18 18:00:37.645087 |
16 |
52724646 |
R CFC REPAIRING WITH PWS OF AWC 3 AT RESHAM VILLAGE |
100000 |
R CFC REPAIRING WITH PWS OF AWC 3 AT RESHAM VILLAGE1 |
Completion of work |
-
latitude : 21.1965672,21.19669107
Longitude : 83.7466514,83.74643105
file name : Image_18092021180456494.png
|
2021-09-18 18:04:56.583364 |
17 |
52724159 |
R CFC REPAIRING WITH PWS OF AWC 2 AT RESHAM VILLAGE |
70000 |
R CFC REPAIRING WITH PWS OF AWC 2 AT RESHAM VILLAGE1 |
Completion of work |
-
latitude : 21.19671521,21.1966409
Longitude : 83.74641488,83.746579
file name : Image_18092021181321215.png
|
2021-09-18 18:13:21.303035 |
18 |
52724808 |
R CFC COMPILATION OF GRAM PANCHAYAT OFFICE |
330000 |
R CFC COMPILATION OF GRAM PANCHAYAT OFFICE1 |
Completion of work |
-
latitude : 21.19667608
Longitude : 83.74631341
file name : Image_04102021142348282.png
|
2021-10-04 14:23:48.393976 |
19 |
47745923 |
INSTALLATION OF SOLAR WATER SUPPLY SYSTEM AT-SINGHENPALI SIBA MANDIR-TIED |
350000 |
INSTALLATION OF SOLAR WATER SUPPLY SYSTEM AT-SINGHENPALI SIBA MANDIR-TIED1 |
Completion of work |
-
latitude : 21.13468251
Longitude : 83.66702118
file name : Image_18112021123912146.png
|
2021-11-18 12:39:12.299548 |
20 |
47747322 |
SINKING OF NEW TUBE WELL AT SINGHENPALI SAHARAPADA-SFC |
80000 |
SINKING OF NEW TUBE WELL AT SINGHENPALI SAHARAPADA-SFC1 |
Completion of work |
-
latitude : 21.21056201
Longitude : 83.5557148
file name : Image_20122021190702827.png
|
2021-12-20 19:07:02.910726 |
21 |
47746193 |
SINKING OF NEWTUBEWELL AT-PADHANPALI MAHULBUREI-TIED |
80000 |
SINKING OF NEWTUBEWELL AT-PADHANPALI MAHULBUREI-TIED1 |
Completion of work |
-
latitude : 21.21052226
Longitude : 83.5558046
file name : Image_20122021190402349.png
|
2021-12-20 19:04:02.429731 |
22 |
47746071 |
SINKING OF NEW TUBE WELL AT RESHAM TO ECHHPADAR ROAD-TIED |
80000 |
SINKING OF NEW TUBE WELL AT RESHAM TO ECHHPADAR ROAD-TIED1 |
Completion of work |
-
latitude : 21.2104761
Longitude : 83.55574826
file name : Image_20122021190328178.png
|
2021-12-20 19:03:28.286263 |
23 |
47747188 |
SINKING OF NEW TUBEWELL AT-RESHAM -SFC |
80000 |
SINKING OF NEW TUBEWELL AT-RESHAM -SFC1 |
Completion of work |
-
latitude : 21.2105316
Longitude : 83.5556115
file name : Image_20122021190523673.png
|
2021-12-20 19:05:23.751161 |
24 |
44464488 |
CFC-REPAIRING OF DRAIN COVER PLATE INFRONT PUP SCHOOL |
100000 |
CFC-REPAIRING OF DRAIN COVER PLATE INFRONT PUP SCHOOL1 |
Completion of work |
-
latitude : 21.2112532,21.21053082
Longitude : 83.5554487,83.5556564
file name : Image_20122021191451111.png
|
2021-12-20 19:14:51.21608 |
25 |
44464061 |
CFC-REPAIRING OF UGME SCHOOL SINGHENPALI |
150000 |
CFC-REPAIRING OF UGME SCHOOL SINGHENPALI1 |
Completion of work |
-
latitude : 21.19680958
Longitude : 83.74575053
file name : Image_21022022183858193.png
|
2022-02-21 18:38:58.307095 |
26 |
47746975 |
ELECTRICITY BILL PAYMENT -SFC |
200000 |
ELECTRICITY BILL PAYMENT -SFC1 |
Completion of work |
-
latitude : 21.1966072
Longitude : 83.7465392
file name : Image_10032022202222079.png
|
2022-03-10 20:22:22.164855 |
27 |
47749935 |
const of gp office-cfc |
150000 |
const of gp office-cfc1 |
Completion of work |
-
latitude : 21.19673831
Longitude : 83.74646944
file name : Image_13052022151044207.png
|
2022-05-13 15:10:44.272225 |
28 |
47746878 |
REMUNARATION OF SEM AND PUMP DRIVER-SFC |
72000 |
REMUNARATION OF SEM AND PUMP DRIVER-SFC1 |
Completion of work |
-
latitude : 21.19664595
Longitude : 83.74637869
file name : Image_18052022140603394.png
|
2022-05-18 14:06:03.535344 |
29 |
63801226 |
TIED TRANSFORMATION OF GOVT RESHAM NODAL HIGH SCHOOL UNDER 5T |
558789 |
TIED TRANSFORMATION OF GOVT RESHAM NODAL HIGH SCHOOL UNDER 5T1 |
Completion of work |
-
latitude : 21.1983509
Longitude : 83.7440484
file name : Image_24062022175118481.png
|
2022-06-24 17:51:18.591564 |
30 |
63996071 |
SFC R ELECTRICITY BILL PAYMENT |
134032 |
SFC R ELECTRICITY BILL PAYMENT1 |
Completion of work |
-
latitude : 21.1966089
Longitude : 83.7465478
file name : Image_05072022160647277.png
|
2022-07-05 16:06:47.395054 |
31 |
63783303 |
SFC CONST OF BATHING STEP WITH DRESS CHANGING ROOM AT SINGHENPALI UPAR BANDH |
110000 |
SFC CONST OF BATHING STEP WITH DRESS CHANGING ROOM AT SINGHENPALI UPAR BANDH1 |
Completion of work |
-
latitude : 21.2612413
Longitude : 83.8430969
file name : Image_26072022145717066.png
|
2022-07-26 14:57:17.182276 |
32 |
47745803 |
PROVISION OF JALACHHATRA -TIED |
101656 |
PROVISION OF JALACHHATRA -TIED1 |
Completion of work |
-
latitude : 21.19669866
Longitude : 83.7464408
file name : Image_26072022191131764.png
|
2022-07-26 19:11:31.857074 |
33 |
65007518 |
CFC UT Transformation of resham govt nodal high school under 5T |
242000 |
CFC UT Transformation of resham govt nodal high school under 5T1 |
Completion of work |
-
latitude : 21.19673512
Longitude : 83.74631898
file name : Image_27092022164226398.png
|
2022-09-27 16:42:26.495453 |
34 |
65005418 |
Creation of community compost pits for a group of Households |
10500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.196604
Longitude : 83.7464231
file name : Image_20122022165359057.png
|
2022-12-20 16:53:59.154001 |
35 |
65005322 |
Creation of community compost pits for a group of Households |
10500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.1966044
Longitude : 83.7464227
file name : Image_20122022165347520.png
|
2022-12-20 16:53:47.623863 |
36 |
65005372 |
Creation of community compost pits for a group of Households |
10500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.1966041
Longitude : 83.7464224
file name : Image_20122022165350746.png
|
2022-12-20 16:53:50.845892 |
37 |
65005289 |
Creation of community compost pits for a group of Households |
10500 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.1966054
Longitude : 83.7464227
file name : Image_20122022165402482.png
|
2022-12-20 16:54:02.578272 |
38 |
63801386 |
UNTIED RE REPAIRING AND MAINTANCE OF PIPE W ATER SUPPLY AT RESHAM GP |
71740 |
UNTIED RE REPAIRING AND MAINTANCE OF PIPE W ATER SUPPLY AT RESHAM GP1 |
Completion of work |
-
latitude : 21.19657598
Longitude : 83.74648972
file name : Image_25072022181252564.png
|
2022-07-25 18:12:52.661849 |
39 |
44464100 |
CFC-REMUNERATION OF SEM & PD |
72000 |
CFC-REMUNERATION OF SEM & PD1 |
Completion of work |
-
latitude : 21.13227199
Longitude : 83.69131376
file name : Image_12052021152844114.png
|
2021-05-12 15:28:44.244434 |
40 |
44464100 |
CFC-REMUNERATION OF SEM & PD |
72000 |
CFC-REMUNERATION OF SEM & PD1 |
Completion of work |
-
latitude : 21.13228705
Longitude : 83.69132461
file name : Image_12052021152854239.png
|
2021-05-12 15:28:54.373446 |
41 |
66660473 |
SFC REV LED STREET LIGHT AT-RESHAM GP YEAR OF THE 2019-202020-21,2021-22 |
193500 |
SFC REV LED STREET LIGHT AT-RESHAM GP YEAR OF THE 2019-202020-21,2021-221 |
Completion of work |
-
latitude : 21.2105165
Longitude : 83.5555567
file name : Image_04022023185716842.png
|
2023-02-04 18:57:17.004371 |
42 |
65005808 |
Creation of community soak pits for group of Households |
17100 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.2105163
Longitude : 83.5555568
file name : Image_08022023084427725.png
|
2023-02-08 08:44:27.841256 |
43 |
65009488 |
CFC UT ELECTRICITY BILL PAYMENT OF PWS RESHAM GP |
100000 |
CFC UT ELECTRICITY BILL PAYMENT OF PWS RESHAM GP1 |
Completion of work |
-
latitude : 21.21061593
Longitude : 83.55540143
file name : Image_18032023081407491.png
|
2023-03-18 08:14:07.609712 |
44 |
65008082 |
SFC Rural park at-Resham gp |
100000 |
SFC Rural park at-Resham gp1 |
Completion of work |
-
latitude : 21.13768,21.13568781
Longitude : 83.674568,83.65287899
file name : Image_04052023091826416.png
|
2023-05-04 09:18:26.512681 |
45 |
63782029 |
CFC T WASTE SEGREGATION SHED AT RESHAM VILLAGE |
30000 |
CFC T WASTE SEGREGATION SHED AT RESHAM VILLAGE1 |
Completion of work |
-
latitude : 21.19676314
Longitude : 83.74570149
file name : Image_10052023120801521.png
|
2023-05-10 12:08:01.613372 |
46 |
44464546 |
CFC-CLEANING & SWEEPING OF STREET VILLAGE |
36312 |
CFC-CLEANING & SWEEPING OF STREET VILLAGE1 |
Completion of work |
-
latitude : 21.19664484
Longitude : 83.74646807
file name : Image_06052023165117490.png
|
2023-05-06 16:51:17.618179 |
47 |
96866546 |
Water Supply to villages |
140000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.1966087
Longitude : 83.7465259
file name : Image_02092024173820991.png
|
2024-09-02 17:38:21.579076 |
48 |
96866546 |
Water Supply to villages |
140000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.19669537
Longitude : 83.74647746
file name : Image_02092024172933847.png
|
2024-09-02 17:29:34.318693 |
49 |
65006233 |
Water Supply to villages |
60000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.19665696
Longitude : 83.74653724
file name : Image_17072023145142937.png
|
2023-07-17 14:51:43.07122 |
50 |
72770515 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 21.1966448
Longitude : 83.7464547
file name : Image_01022024172803263.png
|
2024-02-01 17:28:03.355114 |
51 |
72770515 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 21.1967136
Longitude : 83.7462554
file name : Image_01022024171801879.png
|
2024-02-01 17:18:02.062732 |
52 |
72770515 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.1966446
Longitude : 83.7464536
file name : Image_01022024162831204.png
|
2024-02-01 16:28:31.304089 |
53 |
80572302 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.1966225
Longitude : 83.7464567
file name : Image_01022024172922621.png
|
2024-02-01 17:29:22.728979 |
54 |
80572302 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.1967133
Longitude : 83.7462547
file name : Image_01022024171805438.png
|
2024-02-01 17:18:05.535021 |
55 |
80572302 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.1967135
Longitude : 83.7462491
file name : Image_01022024162827835.png
|
2024-02-01 16:28:27.93443 |
56 |
72746706 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.13595693
Longitude : 83.66808779
file name : Image_23112023162017839.png
|
2023-11-23 16:20:17.932618 |
57 |
72746706 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.1359885
Longitude : 83.66810588
file name : Image_23112023161229081.png
|
2023-11-23 16:12:29.175246 |
58 |
72746706 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.13598675
Longitude : 83.66810654
file name : Image_23112023161519629.png
|
2023-11-23 16:15:19.723749 |
59 |
72746706 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.13596099
Longitude : 83.6680493
file name : Image_22112023130748088.png
|
2023-11-22 13:07:48.198724 |
60 |
72767781 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.13626206
Longitude : 83.68589928
file name : Image_23112023160038003.png
|
2023-11-23 16:00:38.091307 |
61 |
72767781 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.1362024
Longitude : 83.68594811
file name : Image_23112023155603222.png
|
2023-11-23 15:56:03.316263 |
62 |
72767781 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.13622844
Longitude : 83.68585997
file name : Image_22112023134003553.png
|
2023-11-22 13:40:03.648546 |
63 |
65006298 |
Operation & maintenance of drinking water supply system |
168544 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.13653076
Longitude : 83.66892557
file name : Image_24112023121233772.png
|
2023-11-24 12:12:33.937531 |
64 |
65005528 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 21.1942179
Longitude : 83.7508827
file name : Image_08022024140256756.png
|
2024-02-08 14:02:56.863665 |
65 |
65005678 |
Creation of community compost pits for a group of Households |
16200 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.2105381
Longitude : 83.5555155
file name : Image_13122023104242596.png
|
2023-12-13 10:42:42.683811 |
66 |
44464171 |
CFC-ELECTRICITY BILL PAYMENT |
200000 |
CFC-ELECTRICITY BILL PAYMENT1 |
Completion of work |
-
latitude : 21.2105201
Longitude : 83.5555425
file name : Image_25022024211825585.png
|
2024-02-25 21:18:25.681411 |
67 |
72766982 |
Water Supply to villages |
105000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.19653673
Longitude : 83.74643863
file name : Image_25092023133056452.png
|
2023-09-25 13:30:56.552602 |
68 |
72766982 |
Water Supply to villages |
105000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.196585
Longitude : 83.74633889
file name : Image_01072024140005958.png
|
2024-07-01 14:00:06.105747 |
69 |
72766982 |
Water Supply to villages |
105000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.14722935
Longitude : 83.63870004
file name : Image_01072024135316620.png
|
2024-07-01 13:53:16.826298 |