1 |
51453221 |
SFC Provision of Water Supply Bubuda PS |
63120 |
SFC Provision of Water Supply Bubuda PS1 |
Completion of work |
-
latitude : 20.967890000000004
Longitude : 83.09181666666667
file name : Image_25082022105143802.png
|
2022-08-25 10:51:43.907907 |
2 |
51453221 |
SFC Provision of Water Supply Bubuda PS |
63120 |
SFC Provision of Water Supply Bubuda PS1 |
Completion of work |
-
latitude : 20.932321666666667
Longitude : 83.09031166666666
file name : Image_25082022141451522.png
|
2022-08-25 14:14:51.607319 |
3 |
51453221 |
SFC Provision of Water Supply Bubuda PS |
63120 |
SFC Provision of Water Supply Bubuda PS1 |
Completion of work |
-
latitude : 20.93444
Longitude : 83.0858158
file name : Image_08102021133225586.png
|
2021-10-08 13:32:25.671342 |
4 |
51453221 |
SFC Provision of Water Supply Bubuda PS |
63120 |
SFC Provision of Water Supply Bubuda PS1 |
Completion of work |
-
latitude : 20.93444
Longitude : 83.0858158
file name : Image_08102021133242169.png
|
2021-10-08 13:32:42.249284 |
5 |
54187286 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS |
40000 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS1 |
Completion of work |
-
latitude : 20.945733333333337,20.94573666666667
Longitude : 83.10532666666668,83.10534000000001
file name : Image_27082022100841804.png
|
2022-08-27 10:08:42.106875 |
6 |
54187286 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS |
40000 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS1 |
Completion of work |
-
latitude : 20.93450833333333,20.934561666666664
Longitude : 83.08562833333332,83.08561499999999
file name : Image_15102022130246259.png
|
2022-10-15 13:02:46.359469 |
7 |
54187286 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS |
40000 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS1 |
Completion of work |
-
latitude : 20.934515,20.934531666666665,20.93451333333333
Longitude : 83.08568333333332,83.08560166666666,83.08560166666666
file name : Image_15102022130956905.png
|
2022-10-15 13:09:57.028143 |
8 |
54187286 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS |
40000 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS1 |
Completion of work |
-
latitude : 20.934498333333334,20.93455666666667
Longitude : 83.08564666666668,83.08568833333332
file name : Image_15102022131320157.png
|
2022-10-15 13:13:20.262994 |
9 |
54187286 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS |
40000 |
PROVISION OF WATER SUPPLY TENTULIKHUNTI PS1 |
Completion of work |
-
latitude : 20.93444,20.9344398
Longitude : 83.0858154,83.0858151
file name : Image_08102021133215952.png
|
2021-10-08 13:32:16.075556 |
10 |
51453111 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC1 |
50000 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC11 |
Completion of work |
-
latitude : 20.93456833333333
Longitude : 83.08580500000001
file name : Image_29082022183042724.png
|
2022-08-29 18:30:42.836517 |
11 |
51453111 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC1 |
50000 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC11 |
Completion of work |
-
latitude : 20.93456833333333
Longitude : 83.08580500000001
file name : Image_29082022183103449.png
|
2022-08-29 18:31:03.557044 |
12 |
51453111 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC1 |
50000 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC11 |
Completion of work |
-
latitude : 20.93444
Longitude : 83.0858157
file name : Image_08102021133233645.png
|
2021-10-08 13:32:33.728365 |
13 |
51453111 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC1 |
50000 |
SFC Provision of Drinking Water Supply UGME and Dahigaon AWC11 |
Completion of work |
-
latitude : 20.93444
Longitude : 83.0858157
file name : Image_08102021133249630.png
|
2021-10-08 13:32:49.715446 |
14 |
51452787 |
CFC Provision of Drinking Water Supply and Repairing of Toilet Dahigaon HS |
65772 |
CFC Provision of Drinking Water Supply and Repairing of Toilet Dahigaon HS1 |
Completion of work |
-
latitude : 20.93446833333333
Longitude : 83.08568833333332
file name : Image_29082022183038835.png
|
2022-08-29 18:30:38.941485 |
15 |
51452787 |
CFC Provision of Drinking Water Supply and Repairing of Toilet Dahigaon HS |
65772 |
CFC Provision of Drinking Water Supply and Repairing of Toilet Dahigaon HS1 |
Completion of work |
-
latitude : 20.968324709683657
Longitude : 83.09230260550976
file name : Image_08102021152802984.png
|
2021-10-08 15:28:03.082763 |
16 |
51453135 |
SFC Provision of Water Supply to AWC Center Dahigaon 2 |
100000 |
SFC Provision of Water Supply to AWC Center Dahigaon 21 |
Completion of work |
-
latitude : 20.932325
Longitude : 83.09023833333335
file name : Image_25082022141331748.png
|
2022-08-25 14:13:31.84499 |
17 |
51453135 |
SFC Provision of Water Supply to AWC Center Dahigaon 2 |
100000 |
SFC Provision of Water Supply to AWC Center Dahigaon 21 |
Completion of work |
-
latitude : 20.93446833333333
Longitude : 83.08567
file name : Image_29082022183047812.png
|
2022-08-29 18:30:47.924657 |
18 |
51453135 |
SFC Provision of Water Supply to AWC Center Dahigaon 2 |
100000 |
SFC Provision of Water Supply to AWC Center Dahigaon 21 |
Completion of work |
-
latitude : 20.93446833333333
Longitude : 83.08567
file name : Image_29082022183108868.png
|
2022-08-29 18:31:08.974912 |
19 |
51453135 |
SFC Provision of Water Supply to AWC Center Dahigaon 2 |
100000 |
SFC Provision of Water Supply to AWC Center Dahigaon 21 |
Completion of work |
-
latitude : 20.9344399
Longitude : 83.0858152
file name : Image_08102021133246078.png
|
2021-10-08 13:32:46.17317 |
20 |
51453135 |
SFC Provision of Water Supply to AWC Center Dahigaon 2 |
100000 |
SFC Provision of Water Supply to AWC Center Dahigaon 21 |
Completion of work |
-
latitude : 20.9344399
Longitude : 83.0858152
file name : Image_08102021133229573.png
|
2021-10-08 13:32:29.668418 |
21 |
54187357 |
PROVISION OF WATER SUPPLY BUBUDA PS |
83120 |
PROVISION OF WATER SUPPLY BUBUDA PS1 |
Completion of work |
-
latitude : 20.967968333333335,20.967958333333332,20.967950000000005,20.96794
Longitude : 83.09168,83.09168,83.09167833333335,83.09167666666666
file name : Image_25082022105822497.png
|
2022-08-25 10:58:22.608833 |
22 |
54187357 |
PROVISION OF WATER SUPPLY BUBUDA PS |
83120 |
PROVISION OF WATER SUPPLY BUBUDA PS1 |
Completion of work |
-
latitude : 20.968334726057947,20.968342437408864
Longitude : 83.09232791885734,83.09234082698822
file name : Image_09102021100743806.png
|
2021-10-09 10:07:43.887805 |
23 |
60738964 |
Provision of Paniya jala Kendra |
41149 |
Provision of Paniya jala Kendra1 |
Completion of work |
-
latitude : 20.93017166666667
Longitude : 83.09218333333335
file name : Image_18112022121003946.png
|
2022-11-18 12:10:04.041338 |
24 |
41241214 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda |
200000 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda1 |
Roof laid |
-
latitude : 20.954805000000004
Longitude : 83.09346666666667
file name : Image_26122020104245262.png
|
2020-12-26 10:42:45.36966 |
25 |
41241214 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda |
200000 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda1 |
Roof laid |
-
latitude : 20.9548
Longitude : 83.09345333333334
file name : Image_26122020104316041.png
|
2020-12-26 10:43:16.149659 |
26 |
41241214 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda |
200000 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda1 |
Plinth level |
-
latitude : 20.95478166666667
Longitude : 83.09348333333334
file name : Image_26122020093804548.png
|
2020-12-26 09:38:04.690364 |
27 |
41241214 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda |
200000 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda1 |
Completion of work |
-
latitude : 20.954758333333334
Longitude : 83.09350833333335
file name : Image_26122020091703789.png
|
2020-12-26 09:17:03.895608 |
28 |
41241214 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda |
200000 |
CFC Construction of CC Road with Drain at Harijan Pada to Bandhali at Darliguda1 |
Completion of work |
-
latitude : 20.95471
Longitude : 83.09352333333332
file name : Image_26122020082238204.png
|
2020-12-26 08:22:38.330269 |
29 |
44162519 |
CFC Electric charges of PWS |
300000 |
CFC Electric charges of PWS1 |
Completion of work |
-
latitude : 20.965445
Longitude : 83.09298666666668
file name : Image_29082022183058083.png
|
2022-08-29 18:30:58.207314 |
30 |
44162519 |
CFC Electric charges of PWS |
300000 |
CFC Electric charges of PWS1 |
Completion of work |
-
latitude : 20.965445
Longitude : 83.09298666666668
file name : Image_29082022183119211.png
|
2022-08-29 18:31:19.312501 |
31 |
44162550 |
CFC Honorioum SEM/PD of 5 nos |
100000 |
CFC Honorioum SEM/PD of 5 nos1 |
Completion of work |
-
latitude : 20.965423333333334
Longitude : 83.09291833333333
file name : Image_29082022183351602.png
|
2022-08-29 18:33:51.705696 |
32 |
41239817 |
CFC Purchase of Table and Chair at AWC Centre (5 Nos) at Dahigaon G.P |
200000 |
CFC Purchase of Table and Chair at AWC Centre (5 Nos) at Dahigaon G.P1 |
Completion of work |
-
latitude : 21.0065808
Longitude : 83.0567714
file name : Image_13042021212854659.png
|
2021-04-13 21:28:54.758796 |
33 |
41240951 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti |
200000 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti1 |
Roof laid |
-
latitude : 21.0065823
Longitude : 83.0568131
file name : Image_17042021080906350.png
|
2021-04-17 08:09:06.401062 |
34 |
41240951 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti |
200000 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti1 |
Plinth level |
-
latitude : 21.0065823
Longitude : 83.0568131
file name : Image_17042021080150946.png
|
2021-04-17 08:01:50.9907 |
35 |
41240951 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti |
200000 |
CFC Const of Boundary wall & Mantenance of Primary School at Tentelkhunti1 |
Completion of work |
-
latitude : 21.0065824
Longitude : 83.0568132
file name : Image_17042021075502139.png
|
2021-04-17 07:55:02.208753 |
36 |
51452635 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon |
400000 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon1 |
Roof laid |
-
latitude : 20.968381413258612
Longitude : 83.09231677092612
file name : Image_19062021081426006.png
|
2021-06-19 08:14:26.095369 |
37 |
51452635 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon |
400000 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon1 |
Completion of work |
-
latitude : 20.968320141546428
Longitude : 83.09231735765934
file name : Image_28042021131831675.png
|
2021-04-28 13:18:31.763753 |
38 |
51452635 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon |
400000 |
CFC Construction of Boundary Wall and Maintenance of UGME School Dahigaon1 |
Completion of work |
-
latitude : 20.96836251206696
Longitude : 83.09233956970274
file name : Image_28042021130651769.png
|
2021-04-28 13:06:51.851149 |
39 |
51452867 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda |
300000 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda1 |
Roof laid |
-
latitude : 21.0065918
Longitude : 83.056761
file name : Image_19062021111531347.png
|
2021-06-19 11:15:31.403265 |
40 |
51452867 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda |
300000 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda1 |
Plinth level |
-
latitude : 21.005381690338254
Longitude : 83.05874951183796
file name : Image_19062021110938291.png
|
2021-06-19 11:09:38.345356 |
41 |
51452867 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda |
300000 |
CFC Const of Boundary Wall and Maintenance of AWC Centre at Bubuda1 |
Completion of work |
-
latitude : 21.0065918
Longitude : 83.0567609
file name : Image_19062021105556963.png
|
2021-06-19 10:55:57.040616 |
42 |
51453430 |
SFC Improvement of Culvert at Kalangamunda Darliguda |
250000 |
SFC Improvement of Culvert at Kalangamunda Darliguda1 |
Completion of work |
-
latitude : 20.9342596,20.9342598
Longitude : 83.085941,83.0859412
file name : Image_09082021122044634.png
|
2021-08-09 12:20:44.723618 |
43 |
51453430 |
SFC Improvement of Culvert at Kalangamunda Darliguda |
250000 |
SFC Improvement of Culvert at Kalangamunda Darliguda1 |
Completion of work |
-
latitude : 20.93426,20.9342602
Longitude : 83.0859414,83.0859415
file name : Image_09082021121720379.png
|
2021-08-09 12:17:20.465031 |
44 |
51453430 |
SFC Improvement of Culvert at Kalangamunda Darliguda |
250000 |
SFC Improvement of Culvert at Kalangamunda Darliguda1 |
Completion of work |
-
latitude : 20.9342596,20.9342608
Longitude : 83.085941,83.0859416
file name : Image_09082021120947670.png
|
2021-08-09 12:09:47.755828 |
45 |
51452406 |
CFC Provision of Drinking Water Supply Darliguda AWC |
65772 |
CFC Provision of Drinking Water Supply Darliguda AWC1 |
Completion of work |
-
latitude : 20.968326469883323
Longitude : 83.09242221526802
file name : Image_05112021161853906.png
|
2021-11-05 16:18:53.998641 |
46 |
55312210 |
CFC Provision of Drinking Water Supply Brahmindihi PS and Brahmindihi AWC1 |
100000 |
CFC Provision of Drinking Water Supply Brahmindihi PS and Brahmindihi AWC11 |
Completion of work |
-
latitude : 20.968402745202184,20.968381706625223
Longitude : 83.09234619140625,83.09241366572678
file name : Image_05112021155419226.png
|
2021-11-05 15:54:19.321516 |
47 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.968135,20.968083333333333
Longitude : 83.09204333333334,83.09196333333333
file name : Image_25082022105356501.png
|
2022-08-25 10:53:56.602449 |
48 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.93446666666667,20.93449333333333
Longitude : 83.08570833333333,83.08572333333335
file name : Image_29082022183053415.png
|
2022-08-29 18:30:53.5194 |
49 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.93446666666667,20.93449333333333
Longitude : 83.08570833333333,83.08572333333335
file name : Image_29082022183114208.png
|
2022-08-29 18:31:14.32698 |
50 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.96669476479292,20.96666358411312
Longitude : 83.09334942139685,83.09328169561923
file name : Image_03092021162048164.png
|
2021-09-03 16:20:48.255689 |
51 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.966646862216294,20.966646862216294
Longitude : 83.0933035723865,83.0933035723865
file name : Image_08102021105118381.png
|
2021-10-08 10:51:18.493377 |
52 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.9344417,20.93444
Longitude : 83.0858161,83.0858158
file name : Image_08102021133221701.png
|
2021-10-08 13:32:21.778649 |
53 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.9344417,20.93444
Longitude : 83.0858161,83.0858158
file name : Image_08102021133238434.png
|
2021-10-08 13:32:38.520279 |
54 |
54187229 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA |
120000 |
PROVISION OF WATER SUPPLY TO AWC CENTER BUBUDA1 |
Completion of work |
-
latitude : 20.96663780976087,20.966645143926144
Longitude : 83.09330784715712,83.09333969838917
file name : Image_03092021162056363.png
|
2021-09-03 16:20:56.456693 |
55 |
64831370 |
Water Supply to villages |
144800 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.93446333333333
Longitude : 83.08569833333334
file name : Image_27082022115346102.png
|
2022-08-27 11:53:46.214973 |
56 |
66764497 |
Operation & maintenance of drinking water supply system |
50349 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.934483
Longitude : 83.0857315
file name : Image_30062023182439402.png
|
2023-06-30 18:24:39.488663 |
57 |
53888896 |
Cont.of Community compost Pit /Soke pit |
200000 |
Cont.of Community compost Pit /Soke pit1 |
Completion of work |
-
latitude : 20.9035255
Longitude : 83.0613184
file name : Image_06082022180042825.png
|
2022-08-06 18:00:42.934393 |
58 |
53889566 |
Const of Panchayat Bhawan at Dahigoan |
500000 |
Const of Panchayat Bhawan at Dahigoan1 |
Completion of work |
-
latitude : 20.934264999999996
Longitude : 83.08591
file name : Image_13032023130801233.png
|
2023-03-13 13:08:01.284278 |
59 |
53888269 |
Const. of Panchayat Bhawan at Dahigoan |
500000 |
Const. of Panchayat Bhawan at Dahigoan1 |
Completion of work |
-
latitude : 20.93421166666667
Longitude : 83.08595333333332
file name : Image_13032023130700886.png
|
2023-03-13 13:07:00.960406 |
60 |
66764646 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.968404421582818
Longitude : 83.09253579005599
file name : Image_30062023182217128.png
|
2023-06-30 18:22:17.216481 |
61 |
66764646 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.968372486531734
Longitude : 83.09243294410408
file name : Image_03062023191122926.png
|
2023-06-03 19:11:23.021158 |
62 |
66764393 |
CFCUT CONST OF GUADWALL AT BANDHALI AT DARLIGUDA |
300000 |
CFCUT CONST OF GUADWALL AT BANDHALI AT DARLIGUDA1 |
Completion of work |
-
latitude : 21.0002324
Longitude : 83.0604153
file name : Image_11102023121430981.png
|
2023-10-11 12:14:31.069443 |
63 |
66764701 |
SFC CONST OF GUARD WALL AT RUGUDIMUNDA DARLIGUDA |
300000 |
SFC CONST OF GUARD WALL AT RUGUDIMUNDA DARLIGUDA1 |
Completion of work |
-
latitude : 21.0002114
Longitude : 83.0604205
file name : Image_11102023121427290.png
|
2023-10-11 12:14:27.382189 |
64 |
82298164 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.0001985
Longitude : 83.0538034
file name : Image_12072024142543478.png
|
2024-07-12 14:25:43.575782 |
65 |
82298164 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.000207
Longitude : 83.0538049
file name : Image_12072024141835932.png
|
2024-07-12 14:18:36.036061 |
66 |
82298164 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002651
Longitude : 83.0604642
file name : Image_02122023134019804.png
|
2023-12-02 13:40:19.895861 |
67 |
82298164 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002782
Longitude : 83.0605115
file name : Image_11102023125547386.png
|
2023-10-11 12:55:47.553921 |
68 |
53889678 |
Const of Gard wall at Rugudimunda |
143120 |
Const of Gard wall at Rugudimunda1 |
Completion of work |
-
latitude : 21.0002761
Longitude : 83.0605124
file name : Image_11102023122741252.png
|
2023-10-11 12:27:41.341338 |
69 |
66764488 |
Creation of cattle troughs |
103651 |
Creation of cattle troughs1 |
Completion of work |
-
latitude : 21.0002813
Longitude : 83.0604711
file name : Image_11102023132723863.png
|
2023-10-11 13:27:24.019723 |
70 |
82297648 |
Creation of a new source of drinking water |
96000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.968462759628892
Longitude : 83.09222280979156
file name : Image_19022024181320662.png
|
2024-02-19 18:13:20.755265 |
71 |
82297648 |
Creation of a new source of drinking water |
96000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.96873647067696
Longitude : 83.0925403162837
file name : Image_19022024181204031.png
|
2024-02-19 18:12:04.128805 |
72 |
82297648 |
Creation of a new source of drinking water |
96000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.968579184263945
Longitude : 83.09246370568871
file name : Image_19022024180817017.png
|
2024-02-19 18:08:17.114884 |
73 |
82297648 |
Creation of a new source of drinking water |
96000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.96843929030001
Longitude : 83.09225826524198
file name : Image_19022024180353997.png
|
2024-02-19 18:03:54.097857 |
74 |
82297648 |
Creation of a new source of drinking water |
96000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.0002343
Longitude : 83.0604903
file name : Image_02122023134227465.png
|
2023-12-02 13:42:27.556743 |
75 |
105349218 |
Water Supply to villages |
195000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.0003209
Longitude : 83.0605221
file name : Image_06092024132356044.png
|
2024-09-06 13:24:42.009842 |
76 |
105349218 |
Water Supply to villages |
195000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.0003193
Longitude : 83.0605152
file name : Image_06092024132029349.png
|
2024-09-06 13:21:15.243426 |
77 |
105349218 |
Water Supply to villages |
195000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0003208
Longitude : 83.060513
file name : Image_06092024131722328.png
|
2024-09-06 13:18:08.202138 |
78 |
66764713 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON |
400000 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON1 |
Roof laid |
-
latitude : 20.934439483098686
Longitude : 83.08562725782394
file name : Image_02072024122122414.png
|
2024-07-02 12:21:22.503523 |
79 |
66764713 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON |
400000 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON1 |
Plinth level |
-
latitude : 20.934628075920045
Longitude : 83.08562658727169
file name : Image_02072024121901028.png
|
2024-07-02 12:19:01.11643 |
80 |
66764713 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON |
400000 |
SFC REPAIRING OF UPPER PRIMARY SCHOOL BUILDING AT DAHIGAON1 |
Completion of work |
-
latitude : 20.9345164289698
Longitude : 83.0856588575989
file name : Image_02072024121529484.png
|
2024-07-02 12:15:29.573179 |
81 |
76866323 |
Drinking water facilities |
144800 |
Drinking water facilities1 |
Roof laid |
-
latitude : 20.9344733459875
Longitude : 83.0856781359762
file name : Image_02072024123006991.png
|
2024-07-02 12:30:07.112154 |
82 |
76866323 |
Drinking water facilities |
144800 |
Drinking water facilities1 |
Plinth level |
-
latitude : 20.93452351167798
Longitude : 83.0856586061418
file name : Image_02072024122755044.png
|
2024-07-02 12:27:55.13835 |
83 |
76866323 |
Drinking water facilities |
144800 |
Drinking water facilities1 |
Completion of work |
-
latitude : 20.9344864
Longitude : 83.0858162
file name : Image_28062024124230804.png
|
2024-06-28 12:42:30.898353 |
84 |
66764511 |
Materials required for composting |
112000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.0002612
Longitude : 83.0604801
file name : Image_07022023174800932.png
|
2023-02-07 17:48:01.002647 |
85 |
82299347 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 20.968609610572457
Longitude : 83.09231635183096
file name : Image_16092024200811246.png
|
2024-09-16 20:08:11.328747 |
86 |
82299347 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 20.9686295
Longitude : 83.0933407
file name : Image_16092024195454783.png
|
2024-09-16 19:54:54.852371 |
87 |
82299347 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 20.96826477907598
Longitude : 83.09228517115116
file name : Image_16092024080144644.png
|
2024-09-16 08:01:44.716097 |
88 |
66764776 |
SFC OFFICE CONTIGENCY |
140000 |
SFC OFFICE CONTIGENCY1 |
Plinth level |
-
latitude : 20.934435459785163
Longitude : 83.08569255284965
file name : Image_02072024163059675.png
|
2024-07-02 16:30:59.767587 |
89 |
66764776 |
SFC OFFICE CONTIGENCY |
140000 |
SFC OFFICE CONTIGENCY1 |
Completion of work |
-
latitude : 20.934512405656278
Longitude : 83.0856900382787
file name : Image_02072024161818663.png
|
2024-07-02 16:18:18.755404 |
90 |
105349419 |
Rejuvenation maintenance and desilting of tank/ water body/pond |
244567 |
Rejuvenation maintenance and desilting of tank/ water body/pond1 |
Completion of work |
-
latitude : 21.0002072
Longitude : 83.0538316
file name : Image_12072024152214403.png
|
2024-07-12 15:22:14.483734 |