1 |
44175252 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali |
200000 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali1 |
Completion of work |
-
latitude : 20.961830000000003
Longitude : 83.11490833333333
file name : Image_18022021161756677.png
|
2021-02-18 16:17:56.777188 |
2 |
44175252 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali |
200000 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali1 |
Completion of work |
-
latitude : 20.962373333333336
Longitude : 83.11491499999998
file name : Image_18022021160556844.png
|
2021-02-18 16:05:56.933993 |
3 |
44175252 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali |
200000 |
CFC Construction of CC road with Drain at Bija Tikra Bandupali1 |
Completion of work |
-
latitude : 20.961640000000003
Longitude : 83.11492166666667
file name : Image_18022021155710657.png
|
2021-02-18 15:57:10.783245 |
4 |
41496436 |
CFC Construction of Drain infront of School at Keutenbahali |
200000 |
CFC Construction of Drain infront of School at Keutenbahali1 |
Roof laid |
-
latitude : 20.963250000000002,20.96323
Longitude : 83.11765833333332,83.11768333333333
file name : Image_28032021190543448.png
|
2021-03-28 19:05:43.536875 |
5 |
41496436 |
CFC Construction of Drain infront of School at Keutenbahali |
200000 |
CFC Construction of Drain infront of School at Keutenbahali1 |
Plinth level |
-
latitude : 20.963235,20.963251666666665
Longitude : 83.11765833333332,83.11765166666667
file name : Image_28032021185737081.png
|
2021-03-28 18:57:37.182411 |
6 |
41496436 |
CFC Construction of Drain infront of School at Keutenbahali |
200000 |
CFC Construction of Drain infront of School at Keutenbahali1 |
Completion of work |
-
latitude : 20.976758333333336,20.97677666666667
Longitude : 83.11934333333332,83.11925666666666
file name : Image_28032021180329701.png
|
2021-03-28 18:03:29.782729 |
7 |
41496436 |
CFC Construction of Drain infront of School at Keutenbahali |
200000 |
CFC Construction of Drain infront of School at Keutenbahali1 |
Completion of work |
-
latitude : 20.97673166666667,20.97674833333333
Longitude : 83.11936666666666,83.11934333333332
file name : Image_28032021180212042.png
|
2021-03-28 18:02:12.143827 |
8 |
44175273 |
CFC Construction of Drain at Meherpada Sampia |
200000 |
CFC Construction of Drain at Meherpada Sampia1 |
Roof laid |
-
latitude : 20.963241666666665
Longitude : 83.11774500000001
file name : Image_28032021192456994.png
|
2021-03-28 19:24:57.099964 |
9 |
44175273 |
CFC Construction of Drain at Meherpada Sampia |
200000 |
CFC Construction of Drain at Meherpada Sampia1 |
Plinth level |
-
latitude : 20.96323333333333
Longitude : 83.117755
file name : Image_28032021191903096.png
|
2021-03-28 19:19:03.183174 |
10 |
44175273 |
CFC Construction of Drain at Meherpada Sampia |
200000 |
CFC Construction of Drain at Meherpada Sampia1 |
Completion of work |
-
latitude : 20.963214999999998
Longitude : 83.11770333333334
file name : Image_28032021191238483.png
|
2021-03-28 19:12:38.570942 |
11 |
44175273 |
CFC Construction of Drain at Meherpada Sampia |
200000 |
CFC Construction of Drain at Meherpada Sampia1 |
Completion of work |
-
latitude : 20.96323333333333
Longitude : 83.11773
file name : Image_28032021191121613.png
|
2021-03-28 19:11:21.703113 |
12 |
41495908 |
CFC Purchase of Table and Chair at AWC Centre (1 Nos) at Kansar |
73391 |
CFC Purchase of Table and Chair at AWC Centre (1 Nos) at Kansar 1 |
Completion of work |
-
latitude : 21.0065803
Longitude : 83.0567719
file name : Image_13042021214222442.png
|
2021-04-13 21:42:22.555714 |
13 |
79832835 |
Constructions of Hostels and Schools |
100000 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 21.000317
Longitude : 83.0605055
file name : Image_23082024183939277.png
|
2024-08-23 18:39:39.365377 |
14 |
79832835 |
Constructions of Hostels and Schools |
100000 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 21.0003174
Longitude : 83.060502
file name : Image_23082024183557621.png
|
2024-08-23 18:35:57.707097 |
15 |
79832835 |
Constructions of Hostels and Schools |
100000 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 21.0003166
Longitude : 83.0604956
file name : Image_23082024183338498.png
|
2024-08-23 18:33:38.581295 |
16 |
79832835 |
Constructions of Hostels and Schools |
100000 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 21.0003179
Longitude : 83.0605022
file name : Image_23082024182736088.png
|
2024-08-23 18:27:36.182437 |
17 |
41496305 |
CFC Honorioum of SEM/PD of 5nos at Kansar |
96000 |
CFC Honorioum of SEM/PD of 5nos at Kansar 1 |
Completion of work |
-
latitude : 20.96334652
Longitude : 83.11775772
file name : Image_24072021171049252.png
|
2021-07-24 17:10:49.339487 |
18 |
44175243 |
CFC Electric charges of PWS Kansar GP |
227391 |
CFC Electric charges of PWS Kansar GP1 |
Completion of work |
-
latitude : 21.0002889
Longitude : 83.0605427
file name : Image_01082022115012918.png
|
2022-08-01 11:50:13.047541 |
19 |
44175243 |
CFC Electric charges of PWS Kansar GP |
227391 |
CFC Electric charges of PWS Kansar GP1 |
Completion of work |
-
latitude : 20.96338199
Longitude : 83.11794164
file name : Image_30072021185233615.png
|
2021-07-30 18:52:33.787577 |
20 |
41542447 |
CFC Const. of Water Supply System for AWC at Keuntenbahali |
100000 |
CFC Const. of Water Supply System for AWC at Keuntenbahali1 |
Roof laid |
-
latitude : 20.96122814
Longitude : 83.11892316
file name : Image_10112021104424869.png
|
2021-11-10 10:44:24.983517 |
21 |
41542447 |
CFC Const. of Water Supply System for AWC at Keuntenbahali |
100000 |
CFC Const. of Water Supply System for AWC at Keuntenbahali1 |
Completion of work |
-
latitude : 20.96122203
Longitude : 83.11893824
file name : Image_10112021102950750.png
|
2021-11-10 10:29:50.856231 |
22 |
41542447 |
CFC Const. of Water Supply System for AWC at Keuntenbahali |
100000 |
CFC Const. of Water Supply System for AWC at Keuntenbahali1 |
Completion of work |
-
latitude : 20.96121226
Longitude : 83.11888319
file name : Image_10112021101148097.png
|
2021-11-10 10:11:48.224293 |
23 |
55339093 |
DRINKING WATER SUPPLY TO BANUPALI PS |
100000 |
DRINKING WATER SUPPLY TO BANUPALI PS 1 |
Roof laid |
-
latitude : 20.96123635,20.96124617
Longitude : 83.11893093,83.11886199
file name : Image_10112021104646615.png
|
2021-11-10 10:46:46.75432 |
24 |
55339093 |
DRINKING WATER SUPPLY TO BANUPALI PS |
100000 |
DRINKING WATER SUPPLY TO BANUPALI PS 1 |
Completion of work |
-
latitude : 20.96120743,20.96121807
Longitude : 83.11894381,83.11891313
file name : Image_10112021103104267.png
|
2021-11-10 10:31:04.365798 |
25 |
55339093 |
DRINKING WATER SUPPLY TO BANUPALI PS |
100000 |
DRINKING WATER SUPPLY TO BANUPALI PS 1 |
Completion of work |
-
latitude : 20.96123458,20.96122208
Longitude : 83.11891839,83.11889492
file name : Image_10112021102355198.png
|
2021-11-10 10:23:55.30157 |
26 |
55339289 |
DRINKING WATER SUPPLY TO KEUNTIBAHALI PS |
110000 |
DRINKING WATER SUPPLY TO KEUNTIBAHALI PS1 |
Completion of work |
-
latitude : 20.9612464,20.96121807
Longitude : 83.1189383,83.11891903
file name : Image_10112021103212211.png
|
2021-11-10 10:32:12.32556 |
27 |
55339289 |
DRINKING WATER SUPPLY TO KEUNTIBAHALI PS |
110000 |
DRINKING WATER SUPPLY TO KEUNTIBAHALI PS1 |
Completion of work |
-
latitude : 20.96123016,20.96120992
Longitude : 83.11893115,83.11891901
file name : Image_10112021102602620.png
|
2021-11-10 10:26:02.734152 |
28 |
55339383 |
DRINKING WATER SUPPLY TO SAMPIA UGUP |
110000 |
DRINKING WATER SUPPLY TO SAMPIA UGUP1 |
Completion of work |
-
latitude : 20.9612063,20.9612056
Longitude : 83.11889514,83.11889517
file name : Image_10112021103611493.png
|
2021-11-10 10:36:11.609626 |
29 |
55339383 |
DRINKING WATER SUPPLY TO SAMPIA UGUP |
110000 |
DRINKING WATER SUPPLY TO SAMPIA UGUP1 |
Completion of work |
-
latitude : 20.96122324,20.96120183
Longitude : 83.11894123,83.1188507
file name : Image_10112021102720696.png
|
2021-11-10 10:27:20.791282 |
30 |
47990816 |
CFC Completion of Panchayat Bhawan |
1000000 |
CFC Completion of Panchayat Bhawan1 |
Roof laid |
-
latitude : 21.0002852
Longitude : 83.0604881
file name : Image_27062023164808224.png
|
2023-06-27 16:48:08.317669 |
31 |
47990816 |
CFC Completion of Panchayat Bhawan |
1000000 |
CFC Completion of Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.96357244
Longitude : 83.11758645
file name : Image_21012022141537065.png
|
2022-01-21 14:15:37.183464 |
32 |
47990816 |
CFC Completion of Panchayat Bhawan |
1000000 |
CFC Completion of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96352686
Longitude : 83.11763712
file name : Image_21012022134328485.png
|
2022-01-21 13:43:28.630177 |
33 |
52513049 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap |
127000 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap 1 |
Roof laid |
-
latitude : 21.0065391
Longitude : 83.0566037
file name : Image_13032022131619161.png
|
2022-03-13 13:16:19.273703 |
34 |
52513049 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap |
127000 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap 1 |
Plinth level |
-
latitude : 21.0065392
Longitude : 83.056604
file name : Image_13032022130652768.png
|
2022-03-13 13:06:52.853351 |
35 |
52513049 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap |
127000 |
SFC Drinking Water Supply to Keutenbahal kalyan mandap and sinking a new borewell at kalyan mandap 1 |
Completion of work |
-
latitude : 21.0065395
Longitude : 83.0566039
file name : Image_13032022125604039.png
|
2022-03-13 12:56:04.143601 |
36 |
52512632 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati |
110000 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati1 |
Roof laid |
-
latitude : 21.0065392
Longitude : 83.0566042
file name : Image_13032022131511808.png
|
2022-03-13 13:15:11.908639 |
37 |
52512632 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati |
110000 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati1 |
Plinth level |
-
latitude : 21.0065391
Longitude : 83.0566036
file name : Image_13032022130532455.png
|
2022-03-13 13:05:32.543141 |
38 |
52512632 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati |
110000 |
SFC Drinking Water Supply to Gadbhati UGUP Gadbhati1 |
Completion of work |
-
latitude : 21.0065392
Longitude : 83.0566036
file name : Image_13032022125331719.png
|
2022-03-13 12:53:31.81973 |
39 |
41494942 |
CFC Construction of High School Boundary and Gate |
105000 |
CFC Construction of High School Boundary and Gate1 |
Roof laid |
-
latitude : 21.0065392
Longitude : 83.056604
file name : Image_13032022131358157.png
|
2022-03-13 13:13:58.232247 |
40 |
41494942 |
CFC Construction of High School Boundary and Gate |
105000 |
CFC Construction of High School Boundary and Gate1 |
Plinth level |
-
latitude : 21.0065392
Longitude : 83.0566044
file name : Image_13032022130041950.png
|
2022-03-13 13:00:42.035885 |
41 |
41494942 |
CFC Construction of High School Boundary and Gate |
105000 |
CFC Construction of High School Boundary and Gate1 |
Completion of work |
-
latitude : 21.0065391
Longitude : 83.0566037
file name : Image_13032022124828419.png
|
2022-03-13 12:48:28.52801 |
42 |
41494942 |
CFC Construction of High School Boundary and Gate |
105000 |
CFC Construction of High School Boundary and Gate1 |
Completion of work |
-
latitude : 21.0065391
Longitude : 83.0566038
file name : Image_13032022124423090.png
|
2022-03-13 12:44:23.188545 |
43 |
47993254 |
CFC Repair of Platform of Tubewell |
200000 |
CFC Repair of Platform of Tubewell1 |
Completion of work |
-
latitude : 20.96234813
Longitude : 83.11740484
file name : Image_02072022161520644.png
|
2022-07-02 16:15:20.748683 |
44 |
47992515 |
CFC Maintenance of Water Supply System Kansar |
50656 |
CFC Maintenance of Water Supply System Kansar1 |
Completion of work |
-
latitude : 20.96323897
Longitude : 83.11777671
file name : Image_02072022140558685.png
|
2022-07-02 14:05:58.769338 |
45 |
65126624 |
Creation of Shed for segregation and processing of wet and dry waste |
30000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.0002648
Longitude : 83.0604827
file name : Image_17032023121205219.png
|
2023-03-17 12:12:05.650422 |
46 |
47991858 |
CFC Electric Charges of PWS |
89000 |
CFC Electric Charges of PWS1 |
Completion of work |
-
latitude : 20.9616462
Longitude : 83.1171256
file name : Image_01082022170435299.png
|
2022-08-01 17:04:35.383826 |
47 |
60837703 |
CFC-Jalachhatra |
142544 |
CFC-Jalachhatra1 |
Completion of work |
-
latitude : 21.0002896
Longitude : 83.0605248
file name : Image_10082022135939999.png
|
2022-08-10 13:59:40.104903 |
48 |
52512685 |
SFC Sinking a new tubewell and supply of Drinking water at Kansar High School |
170000 |
SFC Sinking a new tubewell and supply of Drinking water at Kansar High School1 |
Plinth level |
-
latitude : 21.0002935
Longitude : 83.0605416
file name : Image_23082022204319422.png
|
2022-08-23 20:43:19.554504 |
49 |
52512685 |
SFC Sinking a new tubewell and supply of Drinking water at Kansar High School |
170000 |
SFC Sinking a new tubewell and supply of Drinking water at Kansar High School1 |
Completion of work |
-
latitude : 21.0002908
Longitude : 83.0605411
file name : Image_20082022115925714.png
|
2022-08-20 11:59:25.82291 |
50 |
64999951 |
const of new boundary wall and improvement of Bandupali panchayat High school Kansar |
795000 |
const of new boundary wall and improvement of Bandupali panchayat High school Kansar1 |
Roof laid |
-
latitude : 21.0002907
Longitude : 83.0605413
file name : Image_26092022194816699.png
|
2022-09-26 19:48:16.795256 |
51 |
64999951 |
const of new boundary wall and improvement of Bandupali panchayat High school Kansar |
795000 |
const of new boundary wall and improvement of Bandupali panchayat High school Kansar1 |
Plinth level |
-
latitude : 21.0002907
Longitude : 83.0605413
file name : Image_26092022194212665.png
|
2022-09-26 19:42:12.764394 |
52 |
65129126 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.0002443
Longitude : 83.0604708
file name : Image_12102022104353584.png
|
2022-10-12 10:43:53.728603 |
53 |
65129126 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.0002452
Longitude : 83.0604713
file name : Image_12102022103515188.png
|
2022-10-12 10:35:15.289861 |
54 |
65129193 |
Materials required for composting |
208896 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.0002876
Longitude : 83.0605
file name : Image_09012023180056093.png
|
2023-01-09 18:00:56.201568 |
55 |
65129193 |
Materials required for composting |
208896 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.000287
Longitude : 83.0605005
file name : Image_09012023180100783.png
|
2023-01-09 18:01:00.897536 |
56 |
65129193 |
Materials required for composting |
208896 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.000287
Longitude : 83.0605005
file name : Image_09012023180104738.png
|
2023-01-09 18:01:04.851466 |
57 |
65127250 |
Const of Boundary Wall at Sampia UP School |
200000 |
Const of Boundary Wall at Sampia UP School1 |
Completion of work |
-
latitude : 21.0002874
Longitude : 83.0605005
file name : Image_09012023173950614.png
|
2023-01-09 17:39:50.715764 |
58 |
65126339 |
School Transformation of Bandupali Panchayat High school under 5T |
500000 |
School Transformation of Bandupali Panchayat High school under 5T1 |
Completion of work |
-
latitude : 21.0002655
Longitude : 83.060479
file name : Image_13012023172828195.png
|
2023-01-13 17:28:28.3109 |
59 |
65127182 |
Repairing of UP School Building |
264780 |
Repairing of UP School Building1 |
Completion of work |
-
latitude : 21.0002659
Longitude : 83.060478
file name : Image_13012023172548886.png
|
2023-01-13 17:25:48.985653 |
60 |
65126395 |
Providing piped water supply to public institutions |
200000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.0002658
Longitude : 83.0604774
file name : Image_19012023114838465.png
|
2023-01-19 11:48:38.620162 |
61 |
65126395 |
Providing piped water supply to public institutions |
200000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.0002649
Longitude : 83.0604778
file name : Image_19012023115012610.png
|
2023-01-19 11:50:12.76721 |
62 |
65126395 |
Providing piped water supply to public institutions |
200000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.000398333333337
Longitude : 83.06100999999998
file name : Image_18012023173105367.png
|
2023-01-18 17:31:05.489495 |
63 |
65126420 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002653
Longitude : 83.060476
file name : Image_19012023115836087.png
|
2023-01-19 11:58:36.240395 |
64 |
66817788 |
SFC- Installationof Streetlightv at Kansar GP |
173000 |
SFC- Installationof Streetlightv at Kansar GP1 |
Completion of work |
-
latitude : 21.0002596
Longitude : 83.0604796
file name : Image_17032023121836706.png
|
2023-03-17 12:18:37.142739 |
65 |
66817739 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 21.0002646
Longitude : 83.0604801
file name : Image_17032023130122573.png
|
2023-03-17 13:01:22.690674 |
66 |
67367307 |
Const of cement concret road inside the bandhupali panchayat high schoolkansar |
430000 |
Const of cement concret road inside the bandhupali panchayat high schoolkansar1 |
Completion of work |
-
latitude : 20.9967579
Longitude : 83.0524469
file name : Image_15042023080331302.png
|
2023-04-15 08:03:31.422018 |
67 |
65126474 |
Water Supply to villages |
165344 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002655
Longitude : 83.0604994
file name : Image_15042023095900961.png
|
2023-04-15 09:59:01.044342 |
68 |
65129258 |
Any other operation and maintenance needs related to solid waste management |
150000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 20.9967618
Longitude : 83.0524206
file name : Image_13052023195328043.png
|
2023-05-13 19:53:28.12297 |
69 |
66817663 |
Creation of community compost pits for a group of Households |
105000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.9968626
Longitude : 83.0524644
file name : Image_20062023211429208.png
|
2023-06-20 21:14:29.300524 |
70 |
67367549 |
School Colouring at kansar UP school |
129132 |
School Colouring at kansar UP school1 |
Completion of work |
-
latitude : 21.0002925
Longitude : 83.0604851
file name : Image_27062023164455904.png
|
2023-06-27 16:44:56.017211 |
71 |
65126501 |
Water Supply to villages |
117567 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002878
Longitude : 83.0604865
file name : Image_27062023185422456.png
|
2023-06-27 18:54:22.541519 |
72 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Roof laid |
-
latitude : 21.0002821
Longitude : 83.0604928
file name : Image_14082023112523893.png
|
2023-08-14 11:25:23.980504 |
73 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Completion of work |
-
latitude : 21.0002801
Longitude : 83.0604961
file name : Image_13082023125612665.png
|
2023-08-13 12:56:12.748327 |
74 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Plinth level |
-
latitude : 20.999303333333334
Longitude : 83.06646666666666
file name : Image_13082023170144900.png
|
2023-08-13 17:01:45.014501 |
75 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Plinth level |
-
latitude : 20.999295
Longitude : 83.06632666666668
file name : Image_13082023170402493.png
|
2023-08-13 17:04:02.627352 |
76 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Completion of work |
-
latitude : 21.00027
Longitude : 83.0605078
file name : Image_11082023171150888.png
|
2023-08-11 17:11:50.977724 |
77 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Completion of work |
-
latitude : 21.000279
Longitude : 83.0604954
file name : Image_11082023171155727.png
|
2023-08-11 17:11:55.811258 |
78 |
82246614 |
Piped water to mela ground |
202464 |
Piped water to mela ground1 |
Completion of work |
-
latitude : 21.000279
Longitude : 83.0604954
file name : Image_11082023171204613.png
|
2023-08-11 17:12:04.703448 |
79 |
65129297 |
Completion of Panchayat Bhawan at Kansar |
254948 |
Completion of Panchayat Bhawan at Kansar1 |
Completion of work |
-
latitude : 21.0002974
Longitude : 83.0605616
file name : Image_18092023131311200.png
|
2023-09-18 13:13:11.284687 |
80 |
82246163 |
Piped drinking water to public institutions |
382815 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 21.0003306
Longitude : 83.0605293
file name : Image_20042024133455430.png
|
2024-04-20 13:34:55.609146 |
81 |
82246163 |
Piped drinking water to public institutions |
382815 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 21.000317
Longitude : 83.0605179
file name : Image_02032024190043034.png
|
2024-03-02 19:00:41.803115 |
82 |
82246163 |
Piped drinking water to public institutions |
382815 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 21.000284
Longitude : 83.0605369
file name : Image_30092023131609666.png
|
2023-09-30 13:16:09.766013 |
83 |
82246933 |
Creation of Small-bore pipe conveyance system |
120000 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 21.000271
Longitude : 83.0604855
file name : Image_05032024190419787.png
|
2024-03-05 19:04:19.87262 |
84 |
82246933 |
Creation of Small-bore pipe conveyance system |
120000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 21.0003076
Longitude : 83.0605041
file name : Image_05032024190126799.png
|
2024-03-05 19:01:26.884992 |
85 |
82246933 |
Creation of Small-bore pipe conveyance system |
120000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 21.0002838
Longitude : 83.0604945
file name : Image_05032024185919868.png
|
2024-03-05 18:59:19.953591 |
86 |
82246933 |
Creation of Small-bore pipe conveyance system |
120000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 21.0002931
Longitude : 83.0604906
file name : Image_05032024185641864.png
|
2024-03-05 18:56:41.945186 |
87 |
82247687 |
Any other operation and maintenance needs related to solid waste management |
150000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 21.0003227
Longitude : 83.0605169
file name : Image_01052024121541429.png
|
2024-05-01 12:15:41.516465 |
88 |
82247687 |
Any other operation and maintenance needs related to solid waste management |
150000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 21.0003176
Longitude : 83.0605204
file name : Image_01052024120924562.png
|
2024-05-01 12:09:24.647686 |
89 |
82247687 |
Any other operation and maintenance needs related to solid waste management |
150000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.0003208
Longitude : 83.0605194
file name : Image_01052024120634567.png
|
2024-05-01 12:06:34.65522 |
90 |
97160028 |
Maintenance of school buildings |
50000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 21.0002589
Longitude : 83.0604903
file name : Image_10052024125945169.png
|
2024-05-10 12:59:45.275223 |
91 |
97160028 |
Maintenance of school buildings |
50000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 21.0002587
Longitude : 83.0604915
file name : Image_10052024125038923.png
|
2024-05-10 12:50:39.024396 |
92 |
97160028 |
Maintenance of school buildings |
50000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.0002558
Longitude : 83.0604938
file name : Image_10052024122232020.png
|
2024-05-10 12:22:32.110803 |
93 |
65126365 |
Construction of School Boundary at Kudasingha Primary School |
271882 |
Construction of School Boundary at Kudasingha Primary School1 |
Completion of work |
-
latitude : 21.000264
Longitude : 83.0604799
file name : Image_27012023112729419.png
|
2023-01-27 11:27:29.525602 |
94 |
44175214 |
CFC Construction of Primary School Boundary Kudasingha |
150000 |
CFC Construction of Primary School Boundary Kudasingha1 |
Completion of work |
-
latitude : 21.000553333333333
Longitude : 83.06101666666667
file name : Image_21092024180414873.png
|
2024-09-21 18:04:14.946119 |
95 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.0003147
Longitude : 83.0605043
file name : Image_30072024175315463.png
|
2024-07-30 17:53:15.549216 |
96 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.0003151
Longitude : 83.0605073
file name : Image_30072024175102046.png
|
2024-07-30 17:51:02.149309 |
97 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.0003153
Longitude : 83.0604996
file name : Image_30072024173926294.png
|
2024-07-30 17:39:26.382752 |
98 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0003032
Longitude : 83.0604992
file name : Image_26072024170838978.png
|
2024-07-26 17:08:39.071526 |
99 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.000274
Longitude : 83.0604971
file name : Image_26072024170522047.png
|
2024-07-26 17:05:22.144839 |
100 |
99011655 |
Water Supply to villages |
214000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.0002748
Longitude : 83.0605009
file name : Image_26072024170335645.png
|
2024-07-26 17:03:35.741976 |
101 |
66817703 |
Any other operation and maintenance needs related to solid waste management |
61956 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.000315
Longitude : 83.0605037
file name : Image_26072024173222559.png
|
2024-07-26 17:32:22.656359 |
102 |
66817703 |
Any other operation and maintenance needs related to solid waste management |
61956 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.0003059
Longitude : 83.0605017
file name : Image_26072024173028692.png
|
2024-07-26 17:30:28.798666 |
103 |
66817703 |
Any other operation and maintenance needs related to solid waste management |
61956 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.0003127
Longitude : 83.0605053
file name : Image_26072024172839461.png
|
2024-07-26 17:28:39.559264 |
104 |
66817703 |
Any other operation and maintenance needs related to solid waste management |
61956 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.0003152
Longitude : 83.0605039
file name : Image_26072024172645687.png
|
2024-07-26 17:26:45.789236 |
105 |
97159625 |
Drinking water facility |
100000 |
Drinking water facility1 |
|
-
latitude : 21.001374
Longitude : 83.060132
file name : Image_02082024170424329.png
|
2024-08-02 17:04:24.426605 |
106 |
65129088 |
Creation of a new source of drinking water |
200000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.0003046
Longitude : 83.0605042
file name : Image_16082024165250091.png
|
2024-08-16 16:52:50.182609 |
107 |
65129088 |
Creation of a new source of drinking water |
200000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.0002987
Longitude : 83.0605046
file name : Image_16082024165018226.png
|
2024-08-16 16:50:18.333153 |
108 |
65129088 |
Creation of a new source of drinking water |
200000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.0002971
Longitude : 83.060496
file name : Image_16082024164738161.png
|
2024-08-16 16:47:38.253791 |
109 |
105002183 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
200000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Completion of work |
-
latitude : 21.0003172
Longitude : 83.0605032
file name : Image_16082024170722551.png
|
2024-08-16 17:07:22.680753 |
110 |
105002183 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
200000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Completion of work |
-
latitude : 21.000292
Longitude : 83.0605003
file name : Image_16082024170514772.png
|
2024-08-16 17:05:14.911222 |
111 |
105002251 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground |
160000 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground1 |
Completion of work |
-
latitude : 20.94823815
Longitude : 83.33070487
file name : Image_12112024202003497.png
|
2024-11-12 20:20:03.566567 |