1 |
51717682 |
CONCRETING OF WATER SUPPLY OFFICE CAMPUS SARKANDA |
130000 |
CONCRETING OF WATER SUPPLY OFFICE CAMPUS SARKANDA1 |
Completion of work |
-
latitude : 21.358665958978236
Longitude : 83.45323540270329
file name : Image_08102021123304918.png
|
2021-10-08 12:33:05.044361 |
2 |
51717656 |
CONCRETING OF AWC BUILDING I CAMPUS SARKANDA |
100000 |
CONCRETING OF AWC BUILDING I CAMPUS SARKANDA1 |
Completion of work |
-
latitude : 21.35296856984496
Longitude : 83.45388944260776
file name : Image_08102021120256009.png
|
2021-10-08 12:02:56.074647 |
3 |
53488259 |
CONSTRICTION OF STAGE AT HIGH SCHOOL FIELD SARKANDA |
50000 |
CONSTRICTION OF STAGE AT HIGH SCHOOL FIELD SARKANDA1 |
Completion of work |
-
latitude : 21.35433586779982
Longitude : 83.44632536172867
file name : Image_08102021124209567.png
|
2021-10-08 12:42:09.675056 |
4 |
53491109 |
IMPROVEMENT OF SARKANDA TO JAMCHHAPAR ROAD |
50000 |
IMPROVEMENT OF SARKANDA TO JAMCHHAPAR ROAD 1 |
Completion of work |
-
latitude : 21.35416940320283,21.354155028238893
Longitude : 83.44109480269253,83.4411740116775
file name : Image_08102021124743393.png
|
2021-10-08 12:47:43.47765 |
5 |
51717896 |
REPAIRING OF KATABANDH BATHING STEP |
50000 |
REPAIRING OF KATABANDH BATHING STEP1 |
Completion of work |
-
latitude : 21.3530157
Longitude : 83.4534069
file name : Image_08102021125734087.png
|
2021-10-08 12:57:34.239126 |
6 |
44171253 |
REMUNERATION SEM CUM PUMP DRIVER |
50000 |
REMUNERATION SEM CUM PUMP DRIVER1 |
Completion of work |
-
latitude : 21.3087656
Longitude : 83.3802948
file name : Image_23042021092146078.png
|
2021-04-23 09:21:46.153699 |
7 |
44171289 |
JALACHHATRA OF SARKANDA |
80000 |
JALACHHATRA OF SARKANDA 1 |
Completion of work |
-
latitude : 21.36182629
Longitude : 83.45386749
file name : Image_18062021135211019.png
|
2021-06-18 13:52:11.122499 |
8 |
44171303 |
IMPRO OF SAGAR KATA AT SARAKANDA |
200000 |
IMPRO OF SAGAR KATA AT SARAKANDA1 |
Completion of work |
-
latitude : 21.36341804
Longitude : 83.45187043
file name : Image_03082021115023911.png
|
2021-08-03 11:50:24.015876 |
9 |
53486684 |
IMPROVEMENT OF KHALIA BANDH SARKANDA |
157500 |
IMPROVEMENT OF KHALIA BANDH SARKANDA1 |
Completion of work |
-
latitude : 21.34841979
Longitude : 83.45239209
file name : Image_03082021105523960.png
|
2021-08-03 10:55:24.057004 |
10 |
53486618 |
IMPROVEMENT OF TRISUL BANDH SARKANDA |
250000 |
IMPROVEMENT OF TRISUL BANDH SARKANDA1 |
Completion of work |
-
latitude : 21.35486985
Longitude : 83.45328078
file name : Image_03082021112014275.png
|
2021-08-03 11:20:14.35619 |
11 |
47935821 |
ELECTRIC BILL |
70000 |
ELECTRIC BILL1 |
Completion of work |
-
latitude : 21.3087657
Longitude : 83.3803378
file name : Image_26112021115109052.png
|
2021-11-26 11:51:09.18086 |
12 |
51714143 |
REPAIR AND MAINTENANCE OF AWC BUILDING I SARKANDA |
90000 |
REPAIR AND MAINTENANCE OF AWC BUILDING I SARKANDA1 |
Completion of work |
-
latitude : 21.35289049241692
Longitude : 83.45378316007555
file name : Image_06122021120318416.png
|
2021-12-06 12:03:18.511066 |
13 |
53491185 |
COMPLETION OF GP OFFICE GATE WITH BOUNDARY |
50000 |
COMPLETION OF GP OFFICE GATE WITH BOUNDARY1 |
Completion of work |
-
latitude : 21.3483037
Longitude : 83.4538238
file name : Image_06122021121317742.png
|
2021-12-06 12:13:17.851014 |
14 |
53490580 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL |
75000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL1 |
Completion of work |
-
latitude : 21.354704252444208
Longitude : 83.451670082286
file name : Image_09122021134039156.png
|
2021-12-09 13:40:39.262973 |
15 |
53490580 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL |
75000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL1 |
Completion of work |
-
latitude : 21.354680280201137
Longitude : 83.45165139064193
file name : Image_09122021134034334.png
|
2021-12-09 13:40:34.464514 |
16 |
53490580 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL |
75000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL1 |
Completion of work |
-
latitude : 21.354712550528347
Longitude : 83.45165097154677
file name : Image_09122021132544508.png
|
2021-12-09 13:25:44.60351 |
17 |
53490580 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL |
75000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL1 |
Completion of work |
-
latitude : 21.35477122385055
Longitude : 83.4516513068229
file name : Image_09122021131722298.png
|
2021-12-09 13:17:22.415449 |
18 |
53490580 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL |
75000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASHINE AT FAKIRPADA SCHOOL1 |
Completion of work |
-
latitude : 21.354675628244877
Longitude : 83.45162549056113
file name : Image_03012022160920270.png
|
2022-01-03 16:09:20.387144 |
19 |
56077092 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASIN WITH WATER CONNECTION TO JAMCHHAPAR SCHOOL AND AWC |
80000 |
WATER SUPPLY WITH MOTOR PUMP SINTEX BASIN WITH WATER CONNECTION TO JAMCHHAPAR SCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.365531156770885
Longitude : 83.43236899003386
file name : Image_03012022161204039.png
|
2022-01-03 16:12:04.138705 |
20 |
56077300 |
CONSTRUCTION OF COMMUNITY CENTRE AT HARIJAN PADA SARKANDA |
230000 |
CONSTRUCTION OF COMMUNITY CENTRE AT HARIJAN PADA SARKANDA1 |
Completion of work |
-
latitude : 21.35326482821256
Longitude : 83.45629865303636
file name : Image_02022022131536819.png
|
2022-02-02 13:15:36.955845 |
21 |
56077319 |
COMPLETION OF FAKIR PADA COMMUNITY CENTRE SARKANDA |
200000 |
COMPLETION OF FAKIR PADA COMMUNITY CENTRE SARKANDA1 |
Completion of work |
-
latitude : 21.356037226505578
Longitude : 83.45057322643697
file name : Image_02022022130255133.png
|
2022-02-02 13:02:55.260117 |
22 |
56077023 |
CONSTRUCTION OF TOILET WITH BATHROOM AND WATER CONNECTION AT GP OFFICE SARKANDA |
140000 |
CONSTRUCTION OF TOILET WITH BATHROOM AND WATER CONNECTION AT GP OFFICE SARKANDA1 |
Completion of work |
-
latitude : 21.3482553
Longitude : 83.4537464
file name : Image_02022022132930021.png
|
2022-02-02 13:29:30.13165 |
23 |
56077162 |
CONSTRUCTION OF KALYAN MANDAP AT SARKANDA SAHARA PADA |
420000 |
CONSTRUCTION OF KALYAN MANDAP AT SARKANDA SAHARA PADA1 |
Completion of work |
-
latitude : 21.35345622897148
Longitude : 83.45279308967292
file name : Image_02022022123911148.png
|
2022-02-02 12:39:11.271647 |
24 |
63191525 |
CONSTRUCTION OF BOUNDARY WALL WITH CONCRETING AND REPAIRING OF TOILET AT FAKIRPADA SCHOOL SARKANDA |
193152 |
CONSTRUCTION OF BOUNDARY WALL WITH CONCRETING AND REPAIRING OF TOILET AT FAKIRPADA SCHOOL SARKANDA 1 |
Completion of work |
-
latitude : 21.354877590201795
Longitude : 83.451574947685
file name : Image_11052022105446161.png
|
2022-05-11 10:54:46.280227 |
25 |
63191525 |
CONSTRUCTION OF BOUNDARY WALL WITH CONCRETING AND REPAIRING OF TOILET AT FAKIRPADA SCHOOL SARKANDA |
193152 |
CONSTRUCTION OF BOUNDARY WALL WITH CONCRETING AND REPAIRING OF TOILET AT FAKIRPADA SCHOOL SARKANDA 1 |
Completion of work |
-
latitude : 21.354887899942696
Longitude : 83.45168164931238
file name : Image_11052022104513064.png
|
2022-05-11 10:45:13.172924 |
26 |
47931873 |
REMUNARATION OF SEM CUM PUMP DRIVER |
50000 |
REMUNARATION OF SEM CUM PUMP DRIVER1 |
Completion of work |
-
latitude : 21.3088213
Longitude : 83.3803295
file name : Image_23052022122629168.png
|
2022-05-23 12:26:29.285645 |
27 |
44171451 |
CONS OF TUBE WELL PLATEFORM AT KULTAPADA UPPARPADA GUDIPADA SARAKANDA |
50000 |
CONS OF TUBE WELL PLATEFORM AT KULTAPADA UPPARPADA GUDIPADA SARAKANDA1 |
Completion of work |
-
latitude : 21.353545244783163
Longitude : 83.4538480360061
file name : Image_23052022104755009.png
|
2022-05-23 10:47:55.116318 |
28 |
47933421 |
digging of tube well at sarkanda laxmi chowk |
90000 |
digging of tube well at sarkanda laxmi chowk1 |
Completion of work |
-
latitude : 21.354531794786453
Longitude : 83.45101604238153
file name : Image_23052022102407767.png
|
2022-05-23 10:24:07.87984 |
29 |
56076938 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA |
102000 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA1 |
Completion of work |
-
latitude : 21.34209233801812
Longitude : 83.44819293357432
file name : Image_23052022105856266.png
|
2022-05-23 10:58:56.387477 |
30 |
56076938 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA |
102000 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA1 |
Completion of work |
-
latitude : 21.342103695496917
Longitude : 83.44814356416464
file name : Image_23052022091206661.png
|
2022-05-23 09:12:06.761807 |
31 |
56076938 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA |
102000 |
DIGGING OF TUBE WELL AT NEW PLAY GROUND SARKANDA1 |
Completion of work |
-
latitude : 21.342191118746996
Longitude : 83.44816552475095
file name : Image_23052022090824362.png
|
2022-05-23 09:08:24.455271 |
32 |
56076915 |
REPAIR AND MAINTENANCE OF WATER SUPPLY |
60000 |
REPAIR AND MAINTENANCE OF WATER SUPPLY1 |
Completion of work |
-
latitude : 21.35486308950931,21.354877213016152,21.354877213016152,21.354877213016152,21.354861706495285
Longitude : 83.4504091925919,83.45041044987738,83.45041044987738,83.45041044987738,83.45040827058256
file name : Image_23052022103933644.png
|
2022-05-23 10:39:33.759202 |
33 |
53492549 |
CLEANING OF TRISUL BANDH SARKANDA |
23926 |
CLEANING OF TRISUL BANDH SARKANDA1 |
Completion of work |
-
latitude : 21.354910572990775
Longitude : 83.45345794223249
file name : Image_16062022114743583.png
|
2022-06-16 11:47:43.772331 |
34 |
53488315 |
IMPROVEMENT OF ROAD FROM MAIN ROAD TO TRISUL BNADH |
30000 |
IMPROVEMENT OF ROAD FROM MAIN ROAD TO TRISUL BNADH1 |
Completion of work |
-
latitude : 21.35574360843748,21.355709452182055
Longitude : 83.45235077664256,83.45233376137912
file name : Image_16062022113700289.png
|
2022-06-16 11:37:00.433239 |
35 |
56077206 |
IMPROVEMENT OF ROAD AT LINGA SA HOUSE TO BARIHAPALI BYPASS ROAD |
30000 |
IMPROVEMENT OF ROAD AT LINGA SA HOUSE TO BARIHAPALI BYPASS ROAD 1 |
Completion of work |
-
latitude : 21.343150888569653,21.343141961842775
Longitude : 83.4487951733172,83.44880120828748
file name : Image_16062022110514212.png
|
2022-06-16 11:05:14.346094 |
36 |
56077206 |
IMPROVEMENT OF ROAD AT LINGA SA HOUSE TO BARIHAPALI BYPASS ROAD |
30000 |
IMPROVEMENT OF ROAD AT LINGA SA HOUSE TO BARIHAPALI BYPASS ROAD 1 |
Completion of work |
-
latitude : 21.34312989190221,21.34312440175563,21.34312440175563,21.34312440175563
Longitude : 83.44878402538598,83.44877949915826,83.44877949915826,83.44877949915826
file name : Image_16062022104904836.png
|
2022-06-16 10:49:04.957764 |
37 |
56077341 |
CONSTRUCTION OF BATHING WALL AT TRISUL BANDH FAKIR PADA SARKANDA |
25000 |
CONSTRUCTION OF BATHING WALL AT TRISUL BANDH FAKIR PADA SARKANDA1 |
Completion of work |
-
latitude : 21.355680031701922
Longitude : 83.45245563425124
file name : Image_16062022113109839.png
|
2022-06-16 11:31:09.966384 |
38 |
56077359 |
REPAIRING OF MEHER PADA BATHING STEP AT TRISUL BANDH SARKANDA |
50000 |
REPAIRING OF MEHER PADA BATHING STEP AT TRISUL BANDH SARKANDA1 |
Completion of work |
-
latitude : 21.3550189929083
Longitude : 83.45363404601812
file name : Image_16062022112602984.png
|
2022-06-16 11:26:03.093587 |
39 |
47932597 |
provision of jala kendra |
80000 |
provision of jala kendra1 |
Completion of work |
-
latitude : 21.361731179058552
Longitude : 83.45395515672863
file name : Image_16062022120218660.png
|
2022-06-16 12:02:18.741545 |
40 |
44184404 |
ELECTRICITY BILL |
70000 |
ELECTRICITY BILL1 |
Completion of work |
-
latitude : 21.3088091
Longitude : 83.3802936
file name : Image_24062022112201200.png
|
2022-06-24 11:22:01.298446 |
41 |
65302108 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.3088113
Longitude : 83.3803059
file name : Image_17112022125301912.png
|
2022-11-17 12:53:02.051907 |
42 |
65302108 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.3088122
Longitude : 83.3803092
file name : Image_17112022125208992.png
|
2022-11-17 12:52:09.113918 |
43 |
65302108 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.3088116
Longitude : 83.3803049
file name : Image_17112022125135666.png
|
2022-11-17 12:51:35.840805 |
44 |
56077140 |
CONSTRUCTION OF DRAIN AT RANKAMANI MEHER HOUSE TO SATYABAN MEHER HOUSE |
50000 |
CONSTRUCTION OF DRAIN AT RANKAMANI MEHER HOUSE TO SATYABAN MEHER HOUSE1 |
Completion of work |
-
latitude : 21.21850732
Longitude : 83.72740594
file name : Image_18112022092119875.png
|
2022-11-18 09:21:19.994743 |
45 |
65301914 |
Water Supply to villages |
190000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.3087683
Longitude : 83.3803382
file name : Image_19012023150415875.png
|
2023-01-19 15:04:15.949079 |
46 |
65302672 |
IMPROVEMENT OF HARJANPADA U.P SCHOOL SARKANDA |
500000 |
IMPROVEMENT OF HARJANPADA U.P SCHOOL SARKANDA1 |
Completion of work |
-
latitude : 21.35340763
Longitude : 83.4560474
file name : Image_22032023162702831.png
|
2023-03-22 16:27:02.905667 |
47 |
65302335 |
Operation & maintenance of drinking water supply system |
111857 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.30845324
Longitude : 83.38093778
file name : Image_26052023115622716.png
|
2023-05-26 11:56:22.796695 |
48 |
56077185 |
COMPLETION OF UPPAR PADA COMMUNITY CENTRE SARKANDA |
130000 |
COMPLETION OF UPPAR PADA COMMUNITY CENTRE SARKANDA1 |
Completion of work |
-
latitude : 21.21852015
Longitude : 83.72741481
file name : Image_31072023065712074.png
|
2023-07-31 06:57:12.138233 |
49 |
65708588 |
Water Supply to villages |
70000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.3088104
Longitude : 83.3802581
file name : Image_28062023171419494.png
|
2023-06-28 17:14:19.560954 |
50 |
79630548 |
Improvement of goan bandh |
443120 |
Improvement of goan bandh1 |
Completion of work |
-
latitude : 21.21849574
Longitude : 83.72737448
file name : Image_13072023082338449.png
|
2023-07-13 08:23:38.508961 |
51 |
65708334 |
IMPROVEMENT OF NEW MEHER PADA COMMUNITY CENTRE |
192618 |
IMPROVEMENT OF NEW MEHER PADA COMMUNITY CENTRE1 |
Completion of work |
-
latitude : 21.2184865
Longitude : 83.72739018
file name : Image_31072023074716559.png
|
2023-07-31 07:47:16.60999 |
52 |
65708282 |
REPAIRING OF FAKIRPADA SCHOOL KITCHEN ROOM |
80000 |
REPAIRING OF FAKIRPADA SCHOOL KITCHEN ROOM1 |
Completion of work |
-
latitude : 21.21849019
Longitude : 83.72738962
file name : Image_31072023075206679.png
|
2023-07-31 07:52:06.729092 |
53 |
65303446 |
ELECTRIFICATION OF M.E SCHOOL SARKANDA |
50000 |
ELECTRIFICATION OF M.E SCHOOL SARKANDA1 |
Completion of work |
-
latitude : 21.21849283
Longitude : 83.72739145
file name : Image_31072023074713260.png
|
2023-07-31 07:47:13.321623 |
54 |
65303631 |
IMPROVEMENT OF GP OFFICE |
150000 |
IMPROVEMENT OF GP OFFICE1 |
Completion of work |
-
latitude : 21.21848951
Longitude : 83.72739635
file name : Image_31072023075210835.png
|
2023-07-31 07:52:10.877978 |
55 |
65303858 |
Operation & maintenance of community sanitary complex |
33963 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.21849199
Longitude : 83.72741232
file name : Image_31072023212519654.png
|
2023-07-31 21:25:19.720075 |
56 |
65303858 |
Operation & maintenance of community sanitary complex |
33963 |
ation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.21849523
Longitude : 83.72741114
file name : Image_31072023212525692.png
|
2023-07-31 21:25:25.750362 |
57 |
65303858 |
Operation & maintenance of community sanitary complex |
33963 |
ation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.21848511
Longitude : 83.72739016
file name : Image_31072023212514458.png
|
2023-07-31 21:25:14.520783 |
58 |
82568496 |
Operation and Maintenance of drinking water supply system |
240000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.21849722
Longitude : 83.72740213
file name : Image_31102023074401619.png
|
2023-10-31 07:44:01.69174 |
59 |
82568496 |
Operation and Maintenance of drinking water supply system |
240000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.21850179
Longitude : 83.72740259
file name : Image_31102023074033777.png
|
2023-10-31 07:40:33.850278 |
60 |
82568496 |
Operation and Maintenance of drinking water supply system |
240000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.21848373
Longitude : 83.72739631
file name : Image_31102023072331061.png
|
2023-10-31 07:23:31.133343 |
61 |
87129009 |
RENIVATION OF GAON KATA SARKANDA |
400000 |
RENIVATION OF GAON KATA SARKANDA1 |
Completion of work |
-
latitude : 21.21850298
Longitude : 83.72743348
file name : Image_17092023204345685.png
|
2023-09-17 20:43:45.741698 |
62 |
87128095 |
Creation of plastic waste storage unit |
300000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 21.21854691
Longitude : 83.72741686
file name : Image_18092023090644791.png
|
2023-09-18 09:06:43.769628 |
63 |
82570274 |
Household Sanitation - Construction of IHHL for eligible HHs |
200000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Plinth level |
-
latitude : 21.2350539
Longitude : 83.68959191
file name : Image_05092024083513167.png
|
2024-09-05 08:35:13.242331 |
64 |
82570274 |
Household Sanitation - Construction of IHHL for eligible HHs |
200000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Plinth level |
-
latitude : 21.23507333
Longitude : 83.68959539
file name : Image_05092024083654836.png
|
2024-09-05 08:36:54.918301 |
65 |
82570274 |
Household Sanitation - Construction of IHHL for eligible HHs |
200000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Completion of work |
-
latitude : 21.23508687
Longitude : 83.68969356
file name : Image_05092024083142042.png
|
2024-09-05 08:31:42.136119 |
66 |
82574382 |
Repair of School Doors/Windows/Gates/Fixtures |
350000 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Plinth level |
-
latitude : 21.30892029
Longitude : 83.38114181
file name : Image_22112023120116396.png
|
2023-11-22 12:01:16.455024 |
67 |
82574382 |
Repair of School Doors/Windows/Gates/Fixtures |
350000 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Plinth level |
-
latitude : 21.30888922
Longitude : 83.3811416
file name : Image_22112023120408337.png
|
2023-11-22 12:04:08.394047 |
68 |
82574382 |
Repair of School Doors/Windows/Gates/Fixtures |
350000 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Plinth level |
-
latitude : 21.30888978
Longitude : 83.38112224
file name : Image_22112023150224632.png
|
2023-11-22 15:02:24.69673 |
69 |
82574382 |
Repair of School Doors/Windows/Gates/Fixtures |
350000 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Completion of work |
-
latitude : 21.21843912
Longitude : 83.72740544
file name : Image_21112023201919540.png
|
2023-11-21 20:19:19.587183 |
70 |
82574382 |
Repair of School Doors/Windows/Gates/Fixtures |
350000 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Completion of work |
-
latitude : 21.30889017
Longitude : 83.3812102
file name : Image_21112023125030182.png
|
2023-11-21 12:50:30.243871 |
71 |
82572890 |
Construction of Child Friendly Corner in AWC |
300000 |
Construction of Child Friendly Corner in AWC1 |
Roof laid |
-
latitude : 21.23510005
Longitude : 83.68968028
file name : Image_08122023093939130.png
|
2023-12-08 09:39:39.190773 |
72 |
82572890 |
Construction of Child Friendly Corner in AWC |
300000 |
Construction of Child Friendly Corner in AWC1 |
Plinth level |
-
latitude : 21.23510207
Longitude : 83.68967134
file name : Image_08122023093500346.png
|
2023-12-08 09:35:00.410959 |
73 |
82572890 |
Construction of Child Friendly Corner in AWC |
300000 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 21.23510843
Longitude : 83.68966962
file name : Image_08122023092911016.png
|
2023-12-08 09:29:11.068876 |
74 |
87128708 |
COMPLETION OF UPPAR PADA COMMUNTY CENTRE SARKANDA |
80000 |
COMPLETION OF UPPAR PADA COMMUNTY CENTRE SARKANDA1 |
Completion of work |
-
latitude : 21.23508119
Longitude : 83.68967357
file name : Image_08122023101841845.png
|
2023-12-08 10:18:41.923676 |
75 |
82574882 |
Construction of Store Room in GP Bhawan |
93120 |
Construction of Store Room in GP Bhawan1 |
Roof laid |
-
latitude : 21.21850004
Longitude : 83.72737924
file name : Image_23042024170230161.png
|
2024-04-23 17:02:30.214079 |
76 |
82574882 |
Construction of Store Room in GP Bhawan |
93120 |
Construction of Store Room in GP Bhawan1 |
Plinth level |
-
latitude : 21.21851457
Longitude : 83.72744026
file name : Image_23042024163325142.png
|
2024-04-23 16:33:25.205544 |
77 |
82574882 |
Construction of Store Room in GP Bhawan |
93120 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 21.21863025
Longitude : 83.72737081
file name : Image_23042024114839047.png
|
2024-04-23 11:48:39.099643 |
78 |
87129296 |
Creation of plastic waste storage unit |
165000 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 21.21852959
Longitude : 83.72749701
file name : Image_23042024184033861.png
|
2024-04-23 18:40:33.953635 |
79 |
87129296 |
Creation of plastic waste storage unit |
165000 |
Creation of plastic waste storage unit 1 |
Roof laid |
-
latitude : 21.21852854
Longitude : 83.72748731
file name : Image_23042024183944803.png
|
2024-04-23 18:39:44.895532 |
80 |
87129296 |
Creation of plastic waste storage unit |
165000 |
Creation of plastic waste storage unit 1 |
Plinth level |
-
latitude : 21.218536
Longitude : 83.72749235
file name : Image_23042024183655130.png
|
2024-04-23 18:36:55.220224 |
81 |
87129296 |
Creation of plastic waste storage unit |
165000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 21.21850341
Longitude : 83.72752377
file name : Image_23042024183121062.png
|
2024-04-23 18:31:21.152747 |
82 |
82569168 |
Household Sanitation - Construction of IHHL for eligible HHs |
40000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Plinth level |
-
latitude : 21.21853142
Longitude : 83.7274302
file name : Image_23042024190056062.png
|
2024-04-23 19:00:56.154125 |
83 |
82569168 |
Household Sanitation - Construction of IHHL for eligible HHs |
40000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Completion of work |
-
latitude : 21.21853299
Longitude : 83.72741876
file name : Image_23042024185829790.png
|
2024-04-23 18:58:29.891311 |
84 |
65306479 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 21.21853422
Longitude : 83.72727909
file name : Image_23042024181826893.png
|
2024-04-23 18:18:26.979897 |
85 |
65306479 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 21.21836903
Longitude : 83.72737477
file name : Image_28032024214533909.png
|
2024-03-28 21:45:33.968827 |
86 |
65306479 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 21.21836963
Longitude : 83.72738001
file name : Image_28032024214300497.png
|
2024-03-28 21:43:00.55425 |
87 |
65306479 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.2183601
Longitude : 83.72734754
file name : Image_28032024213620379.png
|
2024-03-28 21:36:20.431979 |
88 |
82564143 |
Repair of pipe drinking water |
96000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.23517866
Longitude : 83.68944852
file name : Image_01092024204949656.png
|
2024-09-01 20:49:49.758021 |
89 |
82564143 |
Repair of pipe drinking water |
96000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.24684441
Longitude : 83.70588443
file name : Image_19062024121242021.png
|
2024-06-19 12:12:42.1384 |
90 |
82568013 |
Operation and Maintenance of drinking water supply system |
126060 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.30883218
Longitude : 83.38117655
file name : Image_24062024145826622.png
|
2024-06-24 14:58:26.718519 |
91 |
82568013 |
Operation and Maintenance of drinking water supply system |
126060 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.30884367
Longitude : 83.38119338
file name : Image_24062024144719705.png
|
2024-06-24 14:47:19.786074 |
92 |
82568013 |
Operation and Maintenance of drinking water supply system |
126060 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.30884989
Longitude : 83.381193
file name : Image_24062024144121840.png
|
2024-06-24 14:41:21.921139 |
93 |
105422751 |
Repair of pipe drinking water |
300000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 21.3515146
Longitude : 83.6078768
file name : Image_25092024114941752.png
|
2024-09-25 11:49:41.831535 |
94 |
105422751 |
Repair of pipe drinking water |
300000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.3515146
Longitude : 83.6078765
file name : Image_25092024114728318.png
|
2024-09-25 11:47:28.387674 |