1 |
45746924 |
Construction of Sanitary Drain from GP office to Canal |
167000 |
Construction of Sanitary Drain from GP office to Canal1 |
Plinth level |
-
latitude : 20.805071219801903,20.80507842823863
Longitude : 84.06250521540642,84.06249859370291
file name : Image_31122020111004972.png
|
2020-12-31 11:10:05.049357 |
2 |
48257767 |
Improvement of road at Gadavitar to PWD road |
164000 |
Improvement of road at Gadavitar to PWD road1 |
Plinth level |
-
latitude : 20.849081533960998,20.814645658247173
Longitude : 84.28764942102134,84.0645369887352
file name : Image_08022021160732439.png
|
2021-02-08 16:07:32.51225 |
3 |
48257767 |
Improvement of road at Gadavitar to PWD road |
164000 |
Improvement of road at Gadavitar to PWD road1 |
Plinth level |
-
latitude : 20.814631450921297,20.814639874733984
Longitude : 84.0645055565983,84.06452785246074
file name : Image_08022021160742532.png
|
2021-02-08 16:07:42.60886 |
4 |
44251769 |
Renovation of Drain at Baunsuni Chowk |
100000 |
Renovation of Drain at Baunsuni Chowk1 |
Plinth level |
-
latitude : 20.8039405,20.8039402
Longitude : 84.0606116,84.060614
file name : Image_23032021165159164.png
|
2021-03-23 16:51:59.268349 |
5 |
44251862 |
Extension of Pipe water supply system from Baunsuni Chowk to Thanapada |
349391 |
Extension of Pipe water supply system from Baunsuni Chowk to Thanapada1 |
Plinth level |
-
latitude : 20.8044452,20.8044454
Longitude : 84.0631365,84.0631358
file name : Image_25032021123342144.png
|
2021-03-25 12:33:42.250844 |
6 |
45747896 |
COMPLETEION OF INCOMPLETE VLW QUARTER |
100000 |
COMPLETEION OF INCOMPLETE VLW QUARTER 1 |
Plinth level |
-
latitude : 20.8050349
Longitude : 84.0627237
file name : Image_03032021210550968.png
|
2021-03-03 21:05:51.043435 |
7 |
45747896 |
COMPLETEION OF INCOMPLETE VLW QUARTER |
100000 |
COMPLETEION OF INCOMPLETE VLW QUARTER 1 |
Plinth level |
-
latitude : 20.8050338
Longitude : 84.0627231
file name : Image_27022021125157446.png
|
2021-02-27 12:51:57.553331 |
8 |
45747949 |
Repair and maintenance of UP School at Baudiasahi Baunsuni |
200000 |
Repair and maintenance of UP School at Baudiasahi Baunsuni1 |
Plinth level |
-
latitude : 20.82196909468621
Longitude : 84.06365839764476
file name : Image_06032021112323710.png
|
2021-03-06 11:23:23.797027 |
9 |
45747949 |
Repair and maintenance of UP School at Baudiasahi Baunsuni |
200000 |
Repair and maintenance of UP School at Baudiasahi Baunsuni1 |
Plinth level |
-
latitude : 20.822001574561
Longitude : 84.06364641152322
file name : Image_06032021112320083.png
|
2021-03-06 11:23:20.171712 |
10 |
45747949 |
Repair and maintenance of UP School at Baudiasahi Baunsuni |
200000 |
Repair and maintenance of UP School at Baudiasahi Baunsuni1 |
Plinth level |
-
latitude : 20.822017206810415
Longitude : 84.06367918476462
file name : Image_06032021112924689.png
|
2021-03-06 11:29:24.787307 |
11 |
45748034 |
Improvement of road at Chhelibahal |
200000 |
Improvement of road at Chhelibahal1 |
Plinth level |
-
latitude : 20.79199838452041,20.792004545219243
Longitude : 84.06830364838243,84.068289315328
file name : Image_19042021125255878.png
|
2021-04-19 12:52:55.963832 |
12 |
44253854 |
Incomplete of cc road at Jamaghati to Sundhimunda |
300000 |
Incomplete of cc road at Jamaghati to Sundhimunda1 |
Plinth level |
-
latitude : 20.797190009616315,20.797185860574245
Longitude : 84.05953047797084,84.05952855013311
file name : Image_28042021121654052.png
|
2021-04-28 12:16:54.148124 |
13 |
45747991 |
Improvement of road at from Jamaghati to Sundhimunda |
250000 |
Improvement of road at from Jamaghati to Sundhimunda1 |
Plinth level |
-
latitude : 20.797192566096783,20.797192566096783
Longitude : 84.05949393287301,84.05949393287301
file name : Image_06052021125158348.png
|
2021-05-06 12:51:58.481527 |
14 |
45747991 |
Improvement of road at from Jamaghati to Sundhimunda |
250000 |
Improvement of road at from Jamaghati to Sundhimunda1 |
Plinth level |
-
latitude : 20.79719068016857,20.797181627713144
Longitude : 84.05950432643294,84.05951262451708
file name : Image_28042021134348879.png
|
2021-04-28 13:43:49.00007 |
15 |
44251964 |
Construction of Boundary wall at Maulimunda AWC |
200000 |
Construction of Boundary wall at Maulimunda AWC1 |
Plinth level |
-
latitude : 20.804277788847685
Longitude : 84.0656837169081
file name : Image_06052021134611158.png
|
2021-05-06 13:46:11.275663 |
16 |
49825904 |
Drinking water supply system at Tikirapada AWC |
40000 |
Drinking water supply system at Tikirapada AWC1 |
Plinth level |
-
latitude : 20.811122618615627,20.811175424605608
Longitude : 84.06689087860286,84.06689247116446
file name : Image_09082021145939963.png
|
2021-08-09 14:59:40.065053 |
17 |
49825533 |
Drinking water supply system at Maulimunda AWC |
30000 |
Drinking water supply system at Maulimunda AWC1 |
Plinth level |
-
latitude : 20.8042934210971,20.8042934210971
Longitude : 84.06426960602403,84.06426960602403
file name : Image_09082021155556908.png
|
2021-08-09 15:55:57.016837 |
18 |
47045461 |
IMPROVEMENT ROAD AT DIMIRIPALI HARIJANSAHI. |
200000 |
IMPROVEMENT ROAD AT DIMIRIPALI HARIJANSAHI.1 |
Plinth level |
-
latitude : 20.805319072678685,20.805313498713076,20.80531266052276
Longitude : 84.05958973802626,84.05958487652242,84.05958638526499
file name : Image_08022022164535709.png
|
2022-02-08 16:45:35.781309 |
19 |
45747376 |
Honorarium of Pump Driver and SEM |
100000 |
Honorarium of Pump Driver and SEM1 |
Plinth level |
-
latitude : 20.806328924372792,20.806328924372792
Longitude : 84.06212844885886,84.06212844885886
file name : Image_04092021152453375.png
|
2021-09-04 15:24:53.44914 |
20 |
48560628 |
IMPROVEMENT ROAD AT PWD ROAD TO CHHELIBAHAL |
350000 |
IMPROVEMENT ROAD AT PWD ROAD TO CHHELIBAHAL1 |
Plinth level |
-
latitude : 20.791813815012574,20.791808827780187
Longitude : 84.06596668995917,84.06597264111042
file name : Image_10122021141050771.png
|
2021-12-10 14:10:50.870764 |
21 |
48557460 |
EXTENSION OF PIPELINE G.P. OFFICE TO THANAPADA AND DIMIRIPALI |
250000 |
EXTENSION OF PIPELINE G.P. OFFICE TO THANAPADA AND DIMIRIPALI1 |
Plinth level |
-
latitude : 20.805549239739776,20.805549239739776
Longitude : 84.06231536529958,84.06231536529958
file name : Image_08032022115737456.png
|
2022-03-08 11:57:37.565115 |
22 |
48557460 |
EXTENSION OF PIPELINE G.P. OFFICE TO THANAPADA AND DIMIRIPALI |
250000 |
EXTENSION OF PIPELINE G.P. OFFICE TO THANAPADA AND DIMIRIPALI1 |
Plinth level |
-
latitude : 20.805873787030578,20.805873745121062
Longitude : 84.06220723874867,84.0622073225677
file name : Image_08032022115926392.png
|
2022-03-08 11:59:26.514493 |
23 |
48591806 |
COMPLETION OF INCOMPLETE CC ROAD AT JAMAGHATI TO SUNDHIMUNDA |
200000 |
COMPLETION OF INCOMPLETE CC ROAD AT JAMAGHATI TO SUNDHIMUNDA1 |
Plinth level |
-
latitude : 20.796585883945227,20.796585883945227
Longitude : 84.06107911840081,84.06107911840081
file name : Image_23042022102812474.png
|
2022-04-23 10:28:12.617364 |
24 |
48591806 |
COMPLETION OF INCOMPLETE CC ROAD AT JAMAGHATI TO SUNDHIMUNDA |
200000 |
COMPLETION OF INCOMPLETE CC ROAD AT JAMAGHATI TO SUNDHIMUNDA1 |
Plinth level |
-
latitude : 20.79656924586743,20.79656924586743
Longitude : 84.0610869973898,84.0610869973898
file name : Image_23042022103005192.png
|
2022-04-23 10:30:05.26821 |
25 |
48557392 |
HONARIUM OF SEM |
100000 |
HONARIUM OF SEM1 |
Plinth level |
-
latitude : 20.804981240071356,20.804981240071356
Longitude : 84.06263454817235,84.06263454817235
file name : Image_11052022115321060.png
|
2022-05-11 11:53:21.151811 |
26 |
44251678 |
Provision for Jalachhatra and water supply |
107000 |
Provision for Jalachhatra and water supply1 |
Plinth level |
-
latitude : 20.8030664
Longitude : 84.0636509
file name : Image_24062022175649818.png
|
2022-06-24 17:56:49.918307 |
27 |
48557283 |
JALA CHHATRA AT 6 PLACES |
107000 |
JALA CHHATRA AT 6 PLACES1 |
Plinth level |
-
latitude : 20.8030373
Longitude : 84.0635481
file name : Image_24062022175828539.png
|
2022-06-24 17:58:28.637415 |
28 |
48556894 |
SWACHHA BHARAT |
150000 |
SWACHHA BHARAT1 |
Plinth level |
-
latitude : 20.8037825
Longitude : 84.0641195
file name : Image_22082022170615416.png
|
2022-08-22 17:06:15.50227 |
29 |
48556928 |
COMPLETION OF INCOMPLETE DRAIN AT GADVITAR |
150000 |
COMPLETION OF INCOMPLETE DRAIN AT GADVITAR1 |
Plinth level |
-
latitude : 20.81899720709771,20.818961248733103
Longitude : 84.06553225591779,84.0654627699405
file name : Image_30082022135850820.png
|
2022-08-30 13:58:51.08799 |
30 |
47045535 |
CONSTRUCTION OF BOUNDRY WALL AT DIMIRIPALI AWC |
200000 |
CONSTRUCTION OF BOUNDRY WALL AT DIMIRIPALI AWC1 |
Plinth level |
-
latitude : 20.806467896327376
Longitude : 84.05897752381861
file name : Image_30082022133743307.png
|
2022-08-30 13:37:43.424582 |
31 |
48557511 |
PIPE WATER SUPPLY AT DIMIRIPALI AWC |
50000 |
PIPE WATER SUPPLY AT DIMIRIPALI AWC1 |
Plinth level |
-
latitude : 20.80643428489566
Longitude : 84.05882782302797
file name : Image_29092022124918674.png
|
2022-09-29 12:49:18.81117 |
32 |
63351004 |
ELECTRICITY BILL OF PWSS. |
150000 |
ELECTRICITY BILL OF PWSS.1 |
Plinth level |
-
latitude : 20.80450254958123,20.804495844058692
Longitude : 84.06777441501617,84.06782118603587
file name : Image_28102022171356932.png
|
2022-10-28 17:13:57.046802 |
33 |
65615434 |
Water Supply to villages |
74660 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.823083301074803
Longitude : 84.06406500376761
file name : Image_31102022154805992.png
|
2022-10-31 15:48:06.101561 |
34 |
65615422 |
CONSTRUCTION OF ELECTRIC SUPPLY SYSTEM AT A W C BAUNSUNI BOUDIA PADA. |
44660 |
CONSTRUCTION OF ELECTRIC SUPPLY SYSTEM AT A W C BAUNSUNI BOUDIA PADA.1 |
Plinth level |
-
latitude : 20.8220007782802
Longitude : 84.06372117809951
file name : Image_31122022181755787.png
|
2022-12-31 18:17:55.864501 |
35 |
83364321 |
Providing piped water supply to public institutions |
70000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 20.80432569142431
Longitude : 84.06772445887327
file name : Image_17102023132326061.png
|
2023-10-17 13:23:26.155695 |
36 |
83364321 |
Providing piped water supply to public institutions |
70000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 20.804394925944507
Longitude : 84.06782059930265
file name : Image_17102023131745577.png
|
2023-10-17 13:17:45.675012 |
37 |
83364321 |
Providing piped water supply to public institutions |
70000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 20.80432062037289
Longitude : 84.06774030067027
file name : Image_17102023131520540.png
|
2023-10-17 13:15:20.635743 |
38 |
83364321 |
Providing piped water supply to public institutions |
70000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.804379084147513
Longitude : 84.0677834674716
file name : Image_17102023130234804.png
|
2023-10-17 13:02:36.028806 |
39 |
83344915 |
Piped drinking water to public institutions |
144000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 20.804385873489082
Longitude : 84.06775522045791
file name : Image_17102023132413637.png
|
2023-10-17 13:24:13.730968 |
40 |
83344915 |
Piped drinking water to public institutions |
144000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.80441868864
Longitude : 84.0677797794342
file name : Image_17102023131857190.png
|
2023-10-17 13:18:57.291745 |
41 |
83344915 |
Piped drinking water to public institutions |
144000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.80432975664735
Longitude : 84.06769763678312
file name : Image_17102023131608944.png
|
2023-10-17 13:16:09.09264 |
42 |
83344915 |
Piped drinking water to public institutions |
144000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 20.804347903467715
Longitude : 84.06778799369931
file name : Image_17102023130412207.png
|
2023-10-17 13:04:13.043897 |
43 |
63350999 |
HONORARIUM OF SEM. |
144000 |
HONORARIUM OF SEM.1 |
Plinth level |
-
latitude : 20.804360476322472,20.804396267049015
Longitude : 84.06775446608663,84.0677646920085
file name : Image_17022023105858491.png
|
2023-02-17 10:58:58.603247 |
44 |
63351054 |
ELECTRICITY BILL OF G.P. OFFICE AND STREET LIGHT. 5TH SFC |
80000 |
ELECTRICITY BILL OF G.P. OFFICE AND STREET LIGHT. 5TH SFC1 |
Plinth level |
-
latitude : 20.8361702
Longitude : 83.9027704
file name : Image_23032023213737190.png
|
2023-03-23 21:37:37.284668 |
45 |
65615388 |
CONSTRUCTION OF C C ROAD FROM BOUDIASAHI TO GADVITAR. |
250000 |
CONSTRUCTION OF C C ROAD FROM BOUDIASAHI TO GADVITAR.1 |
Plinth level |
-
latitude : 20.820502806454897,20.820502806454897,20.8037849
Longitude : 84.0649511385709,84.0649511385709,84.0641227
file name : Image_28032023183726181.png
|
2023-03-28 18:37:26.279349 |
46 |
48557189 |
REPAIRING OF PWSS AT MAULIMUNDA |
50000 |
REPAIRING OF PWSS AT MAULIMUNDA1 |
Plinth level |
-
latitude : 20.80447765532881
Longitude : 84.06781758181751
file name : Image_28032023194842402.png
|
2023-03-28 19:48:42.63541 |
47 |
75212211 |
CONSTRUCTION OF C.C. ROAD FROM BAUNSUNI HIGH SCHOOL TO DIMIRIPALI BADBANDHA. |
300000 |
CONSTRUCTION OF C.C. ROAD FROM BAUNSUNI HIGH SCHOOL TO DIMIRIPALI BADBANDHA. 1 |
Plinth level |
-
latitude : 20.812584087252617,20.812591589055955
Longitude : 84.06046472489834,84.06044444069266
file name : Image_09062023103332137.png
|
2023-06-09 10:33:32.225365 |
48 |
75212211 |
CONSTRUCTION OF C.C. ROAD FROM BAUNSUNI HIGH SCHOOL TO DIMIRIPALI BADBANDHA. |
300000 |
CONSTRUCTION OF C.C. ROAD FROM BAUNSUNI HIGH SCHOOL TO DIMIRIPALI BADBANDHA. 1 |
Plinth level |
-
latitude : 20.81257008947432,20.812573903240263
Longitude : 84.06040848232806,84.06038392335176
file name : Image_08062023164929431.png
|
2023-06-08 16:49:29.531129 |
49 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Roof laid |
-
latitude : 20.79595967195928,20.7958843
Longitude : 84.06218217685819,84.0650695
file name : Image_05082023174833802.png
|
2023-08-05 17:48:33.89597 |
50 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Plinth level |
-
latitude : 20.7958843,20.7958847
Longitude : 84.0650695,84.0650683
file name : Image_05082023174107661.png
|
2023-08-05 17:41:07.764186 |
51 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.795979746617377,20.795932388864458
Longitude : 84.06221721321344,84.06218972057104
file name : Image_05082023173526896.png
|
2023-08-05 17:35:26.994147 |
52 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.7958847,20.7958847
Longitude : 84.0650678,84.0650678
file name : Image_05082023173532284.png
|
2023-08-05 17:35:32.376248 |
53 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.7958841,20.7958843
Longitude : 84.0650707,84.0650695
file name : Image_05082023173537771.png
|
2023-08-05 17:35:37.888716 |
54 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.7958847,20.7958847
Longitude : 84.0650678,84.0650678
file name : Image_05082023173543005.png
|
2023-08-05 17:35:43.105289 |
55 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.7958841,20.7958843
Longitude : 84.0650707,84.0650695
file name : Image_05082023173547809.png
|
2023-08-05 17:35:47.940123 |
56 |
63351044 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC |
260000 |
CONSTRUCTION OF C.C. ROAD JAMGHATI TO SUNDHIMUNDA. 5TH SFC1 |
Completion of work |
-
latitude : 20.795961851254106,20.7958847
Longitude : 84.06217069365084,84.0650683
file name : Image_05082023173644132.png
|
2023-08-05 17:36:44.232457 |
57 |
75211689 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA. |
278650 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA.1 |
Roof laid |
-
latitude : 20.81356363836676,20.81362696364522
Longitude : 84.06074359081686,84.060730766505
file name : Image_05082023181941495.png
|
2023-08-05 18:19:41.588955 |
58 |
75211689 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA. |
278650 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA.1 |
Plinth level |
-
latitude : 20.813315701670945,20.81337919458747
Longitude : 84.06071718782187,84.06071123667061
file name : Image_05082023181540810.png
|
2023-08-05 18:15:40.907498 |
59 |
75211689 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA. |
278650 |
CONSTRUCTION OF C.C. ROAD FROM PWD ROAD TO DANTA BANDHA.1 |
Completion of work |
-
latitude : 20.81404786091298,20.814026445150375
Longitude : 84.0613925177604,84.06136376783252
file name : Image_05082023180312725.png
|
2023-08-05 18:03:12.825068 |
60 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Plinth level |
-
latitude : 20.8049863
Longitude : 84.0626826
file name : Image_05082023191510391.png
|
2023-08-05 19:15:10.476724 |
61 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Roof laid |
-
latitude : 20.8049872
Longitude : 84.0626829
file name : Image_05082023192032365.png
|
2023-08-05 19:20:32.452853 |
62 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Roof laid |
-
latitude : 20.8049858
Longitude : 84.0626822
file name : Image_05082023192206281.png
|
2023-08-05 19:22:06.383855 |
63 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Plinth level |
-
latitude : 20.8049865
Longitude : 84.0626827
file name : Image_05082023190139231.png
|
2023-08-05 19:01:39.314532 |
64 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Completion of work |
-
latitude : 20.8049834
Longitude : 84.0626838
file name : Image_05082023183902972.png
|
2023-08-05 18:39:03.05236 |
65 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Completion of work |
-
latitude : 20.8049865
Longitude : 84.0626827
file name : Image_05082023183956337.png
|
2023-08-05 18:39:56.442109 |
66 |
75211946 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI |
200000 |
PROVISION FOR LIBRABRY COM V.C. HALL AT G.P. OFFICE BAUNSUNI1 |
Completion of work |
-
latitude : 20.8049857
Longitude : 84.0626818
file name : Image_05082023185040924.png
|
2023-08-05 18:50:41.009401 |
67 |
75211319 |
Providing piped water supply to public institutions |
125000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 20.812530065886676
Longitude : 84.06084325164557
file name : Image_07102023124143333.png
|
2023-10-07 12:41:43.424293 |
68 |
75211319 |
Providing piped water supply to public institutions |
125000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 20.812594103626907
Longitude : 84.06075867824256
file name : Image_07102023123343085.png
|
2023-10-07 12:33:43.16813 |
69 |
75211319 |
Providing piped water supply to public institutions |
125000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.812460873275995
Longitude : 84.06094676814973
file name : Image_07102023121814830.png
|
2023-10-07 12:18:14.92487 |
70 |
83297497 |
Water Supply to villages |
115000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.8049854
Longitude : 84.0626742
file name : Image_18102023171209038.png
|
2023-10-18 17:12:09.133037 |
71 |
83297497 |
Water Supply to villages |
115000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.8049849
Longitude : 84.0626774
file name : Image_18102023170614369.png
|
2023-10-18 17:06:14.462699 |
72 |
83297497 |
Water Supply to villages |
115000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.8049851
Longitude : 84.0626797
file name : Image_18102023165124707.png
|
2023-10-18 16:51:24.80238 |
73 |
63351023 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR |
240000 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR1 |
Roof laid |
-
latitude : 20.819038320332766
Longitude : 84.0655198507011
file name : Image_19102023142745276.png
|
2023-10-19 14:27:45.407637 |
74 |
63351023 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR |
240000 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR1 |
Plinth level |
-
latitude : 20.8037805
Longitude : 84.064077
file name : Image_19102023133408597.png
|
2023-10-19 13:34:08.686795 |
75 |
63351023 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR |
240000 |
CONSTRUCTION OF 50 NOS. OF TUBEWELL PLATFORM WITH COMMUNITY LEACH PIT IN DIFFERENT PLACES OF G.P. AR1 |
Completion of work |
-
latitude : 20.8037792
Longitude : 84.0640039
file name : Image_18102023174658569.png
|
2023-10-18 17:46:58.664987 |
76 |
83301200 |
Establishment of Library |
50000 |
Establishment of Library1 |
Roof laid |
-
latitude : 20.837871367111802
Longitude : 83.90457456931472
file name : Image_24042024131555463.png
|
2024-04-24 13:15:55.553224 |
77 |
83301200 |
Establishment of Library |
50000 |
Establishment of Library1 |
Plinth level |
-
latitude : 20.83788658026606
Longitude : 83.90452260151505
file name : Image_24042024130638224.png
|
2024-04-24 13:06:38.318804 |
78 |
83301200 |
Establishment of Library |
50000 |
Establishment of Library1 |
Completion of work |
-
latitude : 20.83790397271514
Longitude : 83.90454447828233
file name : Image_24042024125710479.png
|
2024-04-24 12:57:10.57317 |
79 |
83299455 |
Repair of drainage channel |
136916 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 20.762430843897164
Longitude : 84.01684387587011
file name : Image_27032024133856424.png
|
2024-03-27 13:38:56.506316 |
80 |
83299455 |
Repair of drainage channel |
136916 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 20.762422503903508
Longitude : 84.01684035547078
file name : Image_27032024133428050.png
|
2024-03-27 13:34:28.129459 |
81 |
83299455 |
Repair of drainage channel |
136916 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 20.76257769484073
Longitude : 84.01665335521102
file name : Image_27032024132701068.png
|
2024-03-27 13:27:01.143439 |
82 |
48557024 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA |
161656 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA1 |
Roof laid |
-
latitude : 20.8490603,20.849061
Longitude : 84.2876366,84.2876418
file name : Image_27032024192511354.png
|
2024-03-27 19:25:11.450418 |
83 |
48557024 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA |
161656 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA1 |
Plinth level |
-
latitude : 20.8490599,20.849061
Longitude : 84.287685,84.2876863
file name : Image_27032024192303058.png
|
2024-03-27 19:23:03.139665 |
84 |
48557024 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA |
161656 |
CONSTRUCTION OF DRAIN AT MAULIMUNDA1 |
Completion of work |
-
latitude : 20.8490604,20.8490569
Longitude : 84.287642,84.2876864
file name : Image_27032024191944297.png
|
2024-03-27 19:19:44.388076 |