1 |
44322685 |
CONST OF PLAYGROUND OF BASANTPUR GP |
200000 |
CONST OF PLAYGROUND OF BASANTPUR GP1 |
Plinth level |
-
latitude : 20.5321532
Longitude : 84.94006058
file name : Image_11102021105510215.png
|
2021-10-11 10:55:10.363988 |
2 |
44322685 |
CONST OF PLAYGROUND OF BASANTPUR GP |
200000 |
CONST OF PLAYGROUND OF BASANTPUR GP1 |
Completion of work |
-
latitude : 20.53213361
Longitude : 84.94002414
file name : Image_10102021104601409.png
|
2021-10-10 10:46:01.528151 |
3 |
44322685 |
CONST OF PLAYGROUND OF BASANTPUR GP |
200000 |
CONST OF PLAYGROUND OF BASANTPUR GP1 |
Completion of work |
-
latitude : 20.53213723
Longitude : 84.94002878
file name : Image_10102021104604796.png
|
2021-10-10 10:46:04.921036 |
4 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Roof laid |
-
latitude : 20.52767351,20.52767255
Longitude : 84.94547175,84.94547142
file name : Image_30072021164237620.png
|
2021-07-30 16:42:37.723766 |
5 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Roof laid |
-
latitude : 20.5276922,20.5277056
Longitude : 84.94541546,84.94545785
file name : Image_30072021164248829.png
|
2021-07-30 16:42:48.922649 |
6 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Roof laid |
-
latitude : 20.52766694,20.52766694
Longitude : 84.94544604,84.9454454
file name : Image_30072021165243402.png
|
2021-07-30 16:52:43.545116 |
7 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Roof laid |
-
latitude : 20.52766616,20.52766616
Longitude : 84.94544451,84.9454444
file name : Image_30072021165328821.png
|
2021-07-30 16:53:28.959418 |
8 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Plinth level |
-
latitude : 20.52766731,20.5276455
Longitude : 84.94540498,84.94542518
file name : Image_18072021083449686.png
|
2021-07-18 08:34:49.804404 |
9 |
44322958 |
CONST OF THAKUR GADIA DRAIN & CULVERT |
200000 |
CONST OF THAKUR GADIA DRAIN & CULVERT1 |
Completion of work |
-
latitude : 20.52768274,20.5276819
Longitude : 84.94541204,84.94541308
file name : Image_17072021170314164.png
|
2021-07-17 17:03:14.279594 |
10 |
44322565 |
CONST OF MAHIGARH UP SCHOOL |
300000 |
CONST OF MAHIGARH UP SCHOOL1 |
Roof laid |
-
latitude : 20.53213704
Longitude : 84.93860483
file name : Image_11082021125257189.png
|
2021-08-11 12:52:57.308988 |
11 |
44322565 |
CONST OF MAHIGARH UP SCHOOL |
300000 |
CONST OF MAHIGARH UP SCHOOL1 |
Plinth level |
-
latitude : 20.53213675
Longitude : 84.93861391
file name : Image_09082021130939984.png
|
2021-08-09 13:09:40.086582 |
12 |
44322565 |
CONST OF MAHIGARH UP SCHOOL |
300000 |
CONST OF MAHIGARH UP SCHOOL1 |
Completion of work |
-
latitude : 20.53212085
Longitude : 84.9386055
file name : Image_07082021103454979.png
|
2021-08-07 10:34:55.102737 |
13 |
44322402 |
CONST OF DRAIN IN FRONT OF GP OFFICE |
150000 |
CONST OF DRAIN IN FRONT OF GP OFFICE1 |
Roof laid |
-
latitude : 20.5295979,20.5295979
Longitude : 84.9463652,84.9463652
file name : Image_11082021124842927.png
|
2021-08-11 12:48:43.054801 |
14 |
44322402 |
CONST OF DRAIN IN FRONT OF GP OFFICE |
150000 |
CONST OF DRAIN IN FRONT OF GP OFFICE1 |
Plinth level |
-
latitude : 20.53029053,20.53027736
Longitude : 84.94654489,84.9465335
file name : Image_09082021130253686.png
|
2021-08-09 13:02:53.765912 |
15 |
44322402 |
CONST OF DRAIN IN FRONT OF GP OFFICE |
150000 |
CONST OF DRAIN IN FRONT OF GP OFFICE1 |
Completion of work |
-
latitude : 20.53022151,20.53022158
Longitude : 84.94646561,84.94646597
file name : Image_07082021101724436.png
|
2021-08-07 10:17:24.540128 |
16 |
48408244 |
CONST. OF MARKET COMPLEX NEAR GP |
250000 |
CONST. OF MARKET COMPLEX NEAR GP1 |
Plinth level |
-
latitude : 20.5303622
Longitude : 84.9465258
file name : Image_06122021114043150.png
|
2021-12-06 11:40:43.288507 |
17 |
48408244 |
CONST. OF MARKET COMPLEX NEAR GP |
250000 |
CONST. OF MARKET COMPLEX NEAR GP1 |
Completion of work |
-
latitude : 20.5303446
Longitude : 84.9465143
file name : Image_06122021113546518.png
|
2021-12-06 11:35:46.644203 |
18 |
44322620 |
CONST OF JANISAHI UP SCHOOL |
500000 |
CONST OF JANISAHI UP SCHOOL1 |
Plinth level |
-
latitude : 20.54213903
Longitude : 84.94828853
file name : Image_08092021142652119.png
|
2021-09-08 14:26:52.212079 |
19 |
44322620 |
CONST OF JANISAHI UP SCHOOL |
500000 |
CONST OF JANISAHI UP SCHOOL1 |
Completion of work |
-
latitude : 20.54203433
Longitude : 84.94824113
file name : Image_07092021094500635.png
|
2021-09-07 09:45:00.746549 |
20 |
48409760 |
CONST. OF JANISAHI UP SCHOOL WATER SUPPLY |
170000 |
CONST. OF JANISAHI UP SCHOOL WATER SUPPLY1 |
Plinth level |
-
latitude : 20.54208263,20.54207899
Longitude : 84.94826182,84.94825546
file name : Image_11022022161630704.png
|
2022-02-11 16:16:30.794508 |
21 |
48409760 |
CONST. OF JANISAHI UP SCHOOL WATER SUPPLY |
170000 |
CONST. OF JANISAHI UP SCHOOL WATER SUPPLY1 |
Completion of work |
-
latitude : 20.54206792,20.54204169
Longitude : 84.9482091,84.94825002
file name : Image_11022022161126424.png
|
2022-02-11 16:11:26.520133 |
22 |
48448747 |
WATER SUPPLY,SANITATION &ALLIED INFASTRUCTURE OF MAHIGARH GP |
100000 |
WATER SUPPLY,SANITATION &ALLIED INFASTRUCTURE OF MAHIGARH GP1 |
Plinth level |
-
latitude : 20.53204791
Longitude : 84.93810061
file name : Image_11022022163108402.png
|
2022-02-11 16:31:08.510317 |
23 |
48448747 |
WATER SUPPLY,SANITATION &ALLIED INFASTRUCTURE OF MAHIGARH GP |
100000 |
WATER SUPPLY,SANITATION &ALLIED INFASTRUCTURE OF MAHIGARH GP1 |
Completion of work |
-
latitude : 20.53200183
Longitude : 84.93814532
file name : Image_11022022162455950.png
|
2022-02-11 16:24:56.06696 |
24 |
48409449 |
CONST. OF JAGANNATHPUR HARIJANA SAHI CC |
100000 |
CONST. OF JAGANNATHPUR HARIJANA SAHI CC1 |
Plinth level |
-
latitude : 20.53343341,20.53341317
Longitude : 84.94200905,84.94199554
file name : Image_06122021112833350.png
|
2021-12-06 11:28:33.451299 |
25 |
48409449 |
CONST. OF JAGANNATHPUR HARIJANA SAHI CC |
100000 |
CONST. OF JAGANNATHPUR HARIJANA SAHI CC1 |
Completion of work |
-
latitude : 20.5334527,20.5334353
Longitude : 84.94199748,84.94199459
file name : Image_06122021111026463.png
|
2021-12-06 11:10:26.605323 |
26 |
44322723 |
REPAIRING & MAINTENANCE OF GP BUILDING |
223312 |
REPAIRING & MAINTENANCE OF GP BUILDING1 |
Plinth level |
-
latitude : 20.5303866
Longitude : 84.9464494
file name : Image_11102021105856413.png
|
2021-10-11 10:58:56.575056 |
27 |
44322723 |
REPAIRING & MAINTENANCE OF GP BUILDING |
223312 |
REPAIRING & MAINTENANCE OF GP BUILDING1 |
Plinth level |
-
latitude : 20.5303699
Longitude : 84.9465246
file name : Image_01122021091203587.png
|
2021-12-01 09:12:03.695901 |
28 |
44322723 |
REPAIRING & MAINTENANCE OF GP BUILDING |
223312 |
REPAIRING & MAINTENANCE OF GP BUILDING1 |
Completion of work |
-
latitude : 20.5303782
Longitude : 84.9464514
file name : Image_10102021104608620.png
|
2021-10-10 10:46:08.753033 |
29 |
44322921 |
MAINTENANCE & REPAIRING OF MARKET COMPLEX |
150000 |
MAINTENANCE & REPAIRING OF MARKET COMPLEX1 |
Plinth level |
-
latitude : 20.5303894
Longitude : 84.9465335
file name : Image_09122021152146619.png
|
2021-12-09 15:21:46.715496 |
30 |
44322921 |
MAINTENANCE & REPAIRING OF MARKET COMPLEX |
150000 |
MAINTENANCE & REPAIRING OF MARKET COMPLEX1 |
Completion of work |
-
latitude : 20.5303914
Longitude : 84.9465354
file name : Image_09122021151422703.png
|
2021-12-09 15:14:22.810131 |
31 |
48421225 |
CONST. OF CREMATORIUM |
100000 |
CONST. OF CREMATORIUM1 |
Completion of work |
-
latitude : 20.534253
Longitude : 84.94278946
file name : Image_12012022130136134.png
|
2022-01-12 13:01:36.248914 |
32 |
48448962 |
IMP. OF BASANTAPUR GP FIELD WATER SUPPLY,SANITATION & MATERIAL |
211656 |
IMP. OF BASANTAPUR GP FIELD WATER SUPPLY,SANITATION & MATERIAL1 |
Plinth level |
-
latitude : 20.53223986,20.53223993
Longitude : 84.940083,84.94008265
file name : Image_02022022113513302.png
|
2022-02-02 11:35:13.436714 |
33 |
48448962 |
IMP. OF BASANTAPUR GP FIELD WATER SUPPLY,SANITATION & MATERIAL |
211656 |
IMP. OF BASANTAPUR GP FIELD WATER SUPPLY,SANITATION & MATERIAL1 |
Completion of work |
-
latitude : 20.53225907,20.53225884
Longitude : 84.94012319,84.94012308
file name : Image_31012022164109281.png
|
2022-01-31 16:41:09.525843 |
34 |
48448201 |
CONST. OF WALL & WATER SUPPLY,SANITATION AT MAHIGARH SCHOOL |
231656 |
CONST. OF WALL & WATER SUPPLY,SANITATION AT MAHIGARH SCHOOL1 |
Plinth level |
-
latitude : 20.53218257
Longitude : 84.93859661
file name : Image_02022022113119926.png
|
2022-02-02 11:31:20.04337 |
35 |
55644287 |
MAINTENANCE AND REPARING OF GP BUILDING |
250000 |
MAINTENANCE AND REPARING OF GP BUILDING1 |
Plinth level |
-
latitude : 20.5303329
Longitude : 84.9461688
file name : Image_02022022112532330.png
|
2022-02-02 11:25:32.425927 |
36 |
55644287 |
MAINTENANCE AND REPARING OF GP BUILDING |
250000 |
MAINTENANCE AND REPARING OF GP BUILDING1 |
Completion of work |
-
latitude : 20.53227907
Longitude : 84.93864223
file name : Image_31012022163320812.png
|
2022-01-31 16:33:20.981388 |
37 |
55644287 |
MAINTENANCE AND REPARING OF GP BUILDING |
250000 |
MAINTENANCE AND REPARING OF GP BUILDING1 |
Completion of work |
-
latitude : 20.5303337
Longitude : 84.9461696
file name : Image_31012022164524320.png
|
2022-01-31 16:45:24.581181 |
38 |
48448804 |
COMMUNITY SANITATION AT ZILINDA |
90000 |
COMMUNITY SANITATION AT ZILINDA1 |
Completion of work |
-
latitude : 20.5308925
Longitude : 84.9446637
file name : Image_09072022083003128.png
|
2022-07-09 08:30:03.225406 |
39 |
48417866 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI |
123312 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI1 |
Plinth level |
-
latitude : 20.54286726
Longitude : 84.94757944
file name : Image_09012023140016753.png
|
2023-01-09 14:00:16.875953 |
40 |
48417866 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI |
123312 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI1 |
Plinth level |
-
latitude : 20.53913139
Longitude : 84.94534606
file name : Image_19072022103429527.png
|
2022-07-19 10:34:29.644074 |
41 |
48417866 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI |
123312 |
CONST. OF CHANGING ROOM AT KALIA POKHARI JANISAHI1 |
Completion of work |
-
latitude : 20.53911572
Longitude : 84.94533829
file name : Image_19072022103110853.png
|
2022-07-19 10:31:10.970383 |
42 |
64251094 |
PWS ELECTRI BILL |
326000 |
PWS ELECTRI BILL1 |
Plinth level |
-
latitude : 20.5314786,20.53147993
Longitude : 84.94675199,84.94675129
file name : Image_19072022102748764.png
|
2022-07-19 10:27:48.868164 |
43 |
64251094 |
PWS ELECTRI BILL |
326000 |
PWS ELECTRI BILL1 |
Completion of work |
-
latitude : 20.50679255,20.50675843
Longitude : 84.93180757,84.93180002
file name : Image_19072022101852868.png
|
2022-07-19 10:18:52.955031 |
44 |
64250436 |
CONST OF MAHIGARH VILLAGE DRAIN |
250000 |
CONST OF MAHIGARH VILLAGE DRAIN1 |
Roof laid |
-
latitude : 20.5319367,20.53186201
Longitude : 84.9373961,84.93732825
file name : Image_15102022153454968.png
|
2022-10-15 15:34:55.048834 |
45 |
64250436 |
CONST OF MAHIGARH VILLAGE DRAIN |
250000 |
CONST OF MAHIGARH VILLAGE DRAIN1 |
Plinth level |
-
latitude : 20.53186738,20.53186701
Longitude : 84.93738816,84.93738767
file name : Image_15102022153219256.png
|
2022-10-15 15:32:19.335065 |
46 |
64250436 |
CONST OF MAHIGARH VILLAGE DRAIN |
250000 |
CONST OF MAHIGARH VILLAGE DRAIN1 |
Completion of work |
-
latitude : 20.53194351,20.53194414
Longitude : 84.9373752,84.93737501
file name : Image_15102022094033267.png
|
2022-10-15 09:40:33.378657 |
47 |
64796219 |
Creation of community compost pits for a group of Households |
144000 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 20.53987179
Longitude : 84.94553331
file name : Image_20122022170712114.png
|
2022-12-20 17:07:12.199013 |
48 |
64796219 |
Creation of community compost pits for a group of Households |
144000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.53983997
Longitude : 84.9454826
file name : Image_19122022100702144.png
|
2022-12-19 10:07:02.232526 |
49 |
64796766 |
Creation of Shed for segregation and processing of wet and dry waste |
51000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 20.53220602
Longitude : 84.94657767
file name : Image_20122022170345624.png
|
2022-12-20 17:03:45.710739 |
50 |
64796766 |
Creation of Shed for segregation and processing of wet and dry waste |
51000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.53217935
Longitude : 84.94653719
file name : Image_19122022100354053.png
|
2022-12-19 10:03:54.133021 |
51 |
64250344 |
IMP OF ZILINDA ME SCHOOL PENDAL |
70000 |
IMP OF ZILINDA ME SCHOOL PENDAL1 |
Plinth level |
-
latitude : 20.52705514
Longitude : 84.94591261
file name : Image_17122022141655376.png
|
2022-12-17 14:16:55.463001 |
52 |
64250344 |
IMP OF ZILINDA ME SCHOOL PENDAL |
70000 |
IMP OF ZILINDA ME SCHOOL PENDAL1 |
Completion of work |
-
latitude : 20.5270724
Longitude : 84.9459375
file name : Image_17122022140844817.png
|
2022-12-17 14:08:44.911516 |
53 |
62208760 |
CONSTRUCTION OF PRADHANSAHI CC AT SANAGAON |
100000 |
CONSTRUCTION OF PRADHANSAHI CC AT SANAGAON1 |
Plinth level |
-
latitude : 20.50629159,20.50629733
Longitude : 84.9382723,84.93828166
file name : Image_31122022103853514.png
|
2022-12-31 10:38:53.648927 |
54 |
62208760 |
CONSTRUCTION OF PRADHANSAHI CC AT SANAGAON |
100000 |
CONSTRUCTION OF PRADHANSAHI CC AT SANAGAON1 |
Completion of work |
-
latitude : 20.5062758,20.50627591
Longitude : 84.93829504,84.93829338
file name : Image_31122022101600769.png
|
2022-12-31 10:16:00.866487 |
55 |
62208597 |
GP OFFICE FURNITURE |
44000 |
GP OFFICE FURNITURE1 |
Plinth level |
-
latitude : 20.5303895
Longitude : 84.9465333
file name : Image_09012023135046793.png
|
2023-01-09 13:50:46.911258 |
56 |
62208597 |
GP OFFICE FURNITURE |
44000 |
GP OFFICE FURNITURE1 |
Completion of work |
-
latitude : 20.5303894
Longitude : 84.9465289
file name : Image_03012023152843951.png
|
2023-01-03 15:28:44.061082 |
57 |
64250476 |
CONST OF BARTHING STEP AT PURUNA POKHARI NEAR JANISAHI SCHOOL |
100052 |
CONST OF BARTHING STEP AT PURUNA POKHARI NEAR JANISAHI SCHOOL1 |
Completion of work |
-
latitude : 20.54285188
Longitude : 84.94761605
file name : Image_03012023153836808.png
|
2023-01-03 15:38:36.921597 |
58 |
64796571 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 20.53354426
Longitude : 84.94059848
file name : Image_27062023112646276.png
|
2023-06-27 11:26:46.384716 |
59 |
64796571 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 20.5334793
Longitude : 84.94058877
file name : Image_27062023110527992.png
|
2023-06-27 11:05:28.091885 |
60 |
64796571 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.53347253
Longitude : 84.94059962
file name : Image_27062023105739721.png
|
2023-06-27 10:57:39.813519 |
61 |
62211037 |
CONSTRUCTION OF KEUTASAHI CC |
150000 |
CONSTRUCTION OF KEUTASAHI CC1 |
Roof laid |
-
latitude : 20.50463724
Longitude : 84.93736916
file name : Image_27062023115139081.png
|
2023-06-27 11:51:39.183101 |
62 |
62211037 |
CONSTRUCTION OF KEUTASAHI CC |
150000 |
CONSTRUCTION OF KEUTASAHI CC1 |
Plinth level |
-
latitude : 20.50466526
Longitude : 84.9373162
file name : Image_27062023113945239.png
|
2023-06-27 11:39:45.385265 |
63 |
62211037 |
CONSTRUCTION OF KEUTASAHI CC |
150000 |
CONSTRUCTION OF KEUTASAHI CC1 |
Completion of work |
-
latitude : 20.50463269
Longitude : 84.93736263
file name : Image_27062023112717146.png
|
2023-06-27 11:27:17.26609 |
64 |
62211037 |
CONSTRUCTION OF KEUTASAHI CC |
150000 |
CONSTRUCTION OF KEUTASAHI CC1 |
Completion of work |
-
latitude : 20.50463269
Longitude : 84.93736263
file name : Image_27062023112658344.png
|
2023-06-27 11:26:58.469569 |
65 |
86850992 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T |
500000 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T1 |
Roof laid |
-
latitude : 20.53024911
Longitude : 84.94640381
file name : Image_26102023110830071.png
|
2023-10-26 11:08:30.173281 |
66 |
86850992 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T |
500000 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T1 |
Plinth level |
-
latitude : 20.52908
Longitude : 84.9429972
file name : Image_21102023094225842.png
|
2023-10-21 09:42:25.92342 |
67 |
86850992 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T |
500000 |
DEVELOPMENT OF MAA BINDHYABASINI GIRLS HIGH SCHOOL UNDER 5T1 |
Completion of work |
-
latitude : 20.5291249
Longitude : 84.9429559
file name : Image_18102023103030427.png
|
2023-10-18 10:30:30.531432 |
68 |
83131746 |
Repair of pipe drinking water |
200000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 20.53032282
Longitude : 84.94639706
file name : Image_22102023090735436.png
|
2023-10-22 09:07:35.62959 |
69 |
83131746 |
Repair of pipe drinking water |
200000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 20.53032484
Longitude : 84.94633493
file name : Image_22102023085632599.png
|
2023-10-22 08:56:32.788494 |
70 |
83131746 |
Repair of pipe drinking water |
200000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 20.53028705
Longitude : 84.94636382
file name : Image_22102023084521354.png
|
2023-10-22 08:45:21.568768 |
71 |
64796863 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.46073171
Longitude : 85.08222452
file name : Image_17062024181140270.png
|
2024-06-17 18:11:40.341243 |
72 |
64796863 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.53027682
Longitude : 84.94639951
file name : Image_02022024184954390.png
|
2024-02-02 18:49:54.481024 |
73 |
64796863 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.53026653
Longitude : 84.94639866
file name : Image_02022024184343987.png
|
2024-02-02 18:43:44.138748 |
74 |
64796893 |
Water Supply to villages |
128910 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.53031229
Longitude : 84.9464025
file name : Image_02022024191510888.png
|
2024-02-02 19:15:10.986379 |
75 |
64796893 |
Water Supply to villages |
128910 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.53031764
Longitude : 84.94639481
file name : Image_02022024190812786.png
|
2024-02-02 19:08:12.884334 |
76 |
62208811 |
CONSTRUCTION OF PRADHANSAHI MANDAP |
125000 |
CONSTRUCTION OF PRADHANSAHI MANDAP1 |
Plinth level |
-
latitude : 20.53042961
Longitude : 84.94628895
file name : Image_11122023144028425.png
|
2023-12-11 14:40:28.517175 |
77 |
62208811 |
CONSTRUCTION OF PRADHANSAHI MANDAP |
125000 |
CONSTRUCTION OF PRADHANSAHI MANDAP1 |
Completion of work |
-
latitude : 20.53045256
Longitude : 84.946278
file name : Image_11122023143356357.png
|
2023-12-11 14:33:56.446774 |
78 |
64250398 |
CONST OF LARTINE AT GP OFFICE |
50000 |
CONST OF LARTINE AT GP OFFICE1 |
Roof laid |
-
latitude : 20.53035479
Longitude : 84.94642426
file name : Image_11122023172122087.png
|
2023-12-11 17:21:22.167349 |
79 |
64250398 |
CONST OF LARTINE AT GP OFFICE |
50000 |
CONST OF LARTINE AT GP OFFICE1 |
Plinth level |
-
latitude : 20.53035786
Longitude : 84.94641721
file name : Image_11122023171732276.png
|
2023-12-11 17:17:32.362718 |
80 |
64250398 |
CONST OF LARTINE AT GP OFFICE |
50000 |
CONST OF LARTINE AT GP OFFICE1 |
Completion of work |
-
latitude : 20.53037099
Longitude : 84.94643658
file name : Image_11122023171420699.png
|
2023-12-11 17:14:20.782931 |
81 |
83030925 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 20.53032967
Longitude : 84.94646364
file name : Image_11122023174401371.png
|
2023-12-11 17:44:01.470293 |
82 |
83030925 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 20.53034179
Longitude : 84.94645217
file name : Image_11122023174041711.png
|
2023-12-11 17:40:41.79575 |
83 |
83030925 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 20.53035131
Longitude : 84.94647325
file name : Image_11122023173830098.png
|
2023-12-11 17:38:30.190716 |
84 |
82748945 |
Installation of Tubewell |
87570 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 20.5299014
Longitude : 84.9464741
file name : Image_11122023182748145.png
|
2023-12-11 18:27:48.236003 |
85 |
82748945 |
Installation of Tubewell |
87570 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 20.53033111
Longitude : 84.9464466
file name : Image_11122023181250876.png
|
2023-12-11 18:12:50.964068 |
86 |
82748945 |
Installation of Tubewell |
87570 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 20.53033044
Longitude : 84.94646939
file name : Image_11122023180721600.png
|
2023-12-11 18:07:21.744344 |
87 |
83130059 |
Drainage Construction |
92000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.5302522
Longitude : 84.9465362
file name : Image_11122023191703067.png
|
2023-12-11 19:17:03.167081 |
88 |
83130059 |
Drainage Construction |
92000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.5302647
Longitude : 84.9465348
file name : Image_11122023191422156.png
|
2023-12-11 19:14:22.277884 |
89 |
48407395 |
CONST. OF LARTINE AT GP OFFICE |
74032 |
CONST. OF LARTINE AT GP OFFICE1 |
Plinth level |
-
latitude : 20.5303427
Longitude : 84.9465313
file name : Image_11122023193313237.png
|
2023-12-11 19:33:13.31493 |
90 |
48407395 |
CONST. OF LARTINE AT GP OFFICE |
74032 |
CONST. OF LARTINE AT GP OFFICE1 |
Completion of work |
-
latitude : 20.5303401
Longitude : 84.9465335
file name : Image_11122023192937404.png
|
2023-12-11 19:29:37.52632 |
91 |
83030547 |
Installation of Electricity/Solar Energy system |
83800 |
Installation of Electricity/Solar Energy system1 |
Plinth level |
-
latitude : 20.51418927
Longitude : 85.61980472
file name : Image_28032024204838115.png
|
2024-03-28 20:48:38.212254 |
92 |
83030547 |
Installation of Electricity/Solar Energy system |
83800 |
Installation of Electricity/Solar Energy system1 |
Plinth level |
-
latitude : 20.5139178
Longitude : 84.8943846
file name : Image_19032024190441331.png
|
2024-03-19 19:04:41.581612 |
93 |
83030547 |
Installation of Electricity/Solar Energy system |
83800 |
Installation of Electricity/Solar Energy system1 |
Completion of work |
-
latitude : 20.51392789
Longitude : 84.89439008
file name : Image_19032024185848512.png
|
2024-03-19 18:58:48.734654 |
94 |
82753474 |
Maintenance of Street Lights |
100000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 20.53025569
Longitude : 84.94643881
file name : Image_29032024163901657.png
|
2024-03-29 16:39:01.760734 |
95 |
82753474 |
Maintenance of Street Lights |
100000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 20.53026567
Longitude : 84.94638627
file name : Image_29032024163525075.png
|
2024-03-29 16:35:25.175332 |
96 |
64798142 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP |
121880 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP1 |
Roof laid |
-
latitude : 20.46071601
Longitude : 85.08223761
file name : Image_17062024180753874.png
|
2024-06-17 18:07:53.929662 |
97 |
64798142 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP |
121880 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP1 |
Plinth level |
-
latitude : 20.46073062
Longitude : 85.08222061
file name : Image_17062024180425720.png
|
2024-06-17 18:04:25.77406 |
98 |
64798142 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP |
121880 |
CONSTRUCTION OF DEHURY SAHI RK MANDAP1 |
Completion of work |
-
latitude : 20.46076111
Longitude : 85.08224713
file name : Image_17062024175709112.png
|
2024-06-17 17:57:09.178359 |
99 |
82754397 |
Construction and Maintenance of Community Centre |
18000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 20.53026842
Longitude : 84.94633723
file name : Image_29032024190022178.png
|
2024-03-29 19:00:22.482008 |
100 |
82754397 |
Construction and Maintenance of Community Centre |
18000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 20.53023382
Longitude : 84.94634026
file name : Image_29032024185814814.png
|
2024-03-29 18:58:15.12962 |
101 |
62208863 |
CONSTRUCTION OF BHOGANALLI RK MANDAP |
100000 |
CONSTRUCTION OF BHOGANALLI RK MANDAP1 |
Roof laid |
-
latitude : 20.46072479
Longitude : 85.08224389
file name : Image_17062024184510113.png
|
2024-06-17 18:45:10.158834 |
102 |
62208863 |
CONSTRUCTION OF BHOGANALLI RK MANDAP |
100000 |
CONSTRUCTION OF BHOGANALLI RK MANDAP1 |
Plinth level |
-
latitude : 20.46071036
Longitude : 85.08225562
file name : Image_17062024184155085.png
|
2024-06-17 18:41:55.136137 |
103 |
62208863 |
CONSTRUCTION OF BHOGANALLI RK MANDAP |
100000 |
CONSTRUCTION OF BHOGANALLI RK MANDAP1 |
Completion of work |
-
latitude : 20.4607259
Longitude : 85.08223319
file name : Image_17062024182359733.png
|
2024-06-17 18:23:59.789535 |
104 |
83131830 |
Operation and Maintenance of piped water supply system |
72000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 20.51282676
Longitude : 84.89366237
file name : Image_29022024200351004.png
|
2024-02-29 20:03:51.099627 |
105 |
83131830 |
Operation and Maintenance of piped water supply system |
72000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 20.5303183
Longitude : 84.94639724
file name : Image_22102023090856501.png
|
2023-10-22 09:08:56.72409 |
106 |
83131830 |
Operation and Maintenance of piped water supply system |
72000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 20.53032794
Longitude : 84.94633307
file name : Image_22102023085508553.png
|
2023-10-22 08:55:08.753418 |
107 |
83131830 |
Operation and Maintenance of piped water supply system |
72000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.53029388
Longitude : 84.94636513
file name : Image_22102023084708118.png
|
2023-10-22 08:47:08.307935 |
108 |
105783505 |
Construction of roads |
100000 |
Construction ofHARIJANSAHI CC AT BASANTAPUR |
Roof laid |
-
latitude : 20.45908126,20.45908126
Longitude : 85.07048332,85.07048332
file name : Image_23102024135411228.png
|
2024-10-23 13:54:11.32801 |
109 |
105783505 |
Construction of roads |
100000 |
Construction ofHARIJANSAHI CC AT BASANTAPUR |
Plinth level |
-
latitude : 20.46080666,20.46080666
Longitude : 85.07886403,85.07886403
file name : Image_23102024134318082.png
|
2024-10-23 13:43:18.175204 |
110 |
105783505 |
Construction of roads |
100000 |
Construction ofHARIJANSAHI CC AT BASANTAPUR |
Completion of work |
-
latitude : 20.45903415,20.45896538
Longitude : 85.07053476,85.07056473
file name : Image_15102024151323563.png
|
2024-10-15 15:13:23.66395 |
111 |
105783602 |
Construction of roads |
300000 |
SANAGOAN CC ROAD |
Roof laid |
-
latitude : 20.45900119,20.45898296
Longitude : 85.07052925,85.07054047
file name : Image_23102024135926586.png
|
2024-10-23 13:59:26.3675 |
112 |
105783602 |
Construction of roads |
300000 |
SANAGOAN CC ROAD |
Plinth level |
-
latitude : 20.4570583,20.45713623985648
Longitude : 85.0764287,85.07626279257238
file name : Image_08102024182345315.png
|
2024-10-08 18:23:45.393773 |
113 |
105783602 |
Construction of roads |
300000 |
SANAGOAN CC ROAD |
Completion of work |
-
latitude : 20.4570583,20.4570579
Longitude : 85.0764266,85.0764279
file name : Image_08102024182146519.png
|
2024-10-08 18:21:46.597145 |
114 |
82757523 |
Construction and Maintenance of Community Centre |
100000 |
harijana sahi cc road |
Roof laid |
-
latitude : 20.4570591
Longitude : 85.0764411
file name : Image_08102024181753291.png
|
2024-10-08 18:17:53.411089 |
115 |
82757523 |
Construction and Maintenance of Community Centre |
100000 |
harijana sahi cc road |
Plinth level |
-
latitude : 20.4570557
Longitude : 85.0764387
file name : Image_08102024181449139.png
|
2024-10-08 18:14:49.220592 |
116 |
82757523 |
Construction and Maintenance of Community Centre |
100000 |
harijana sahi cc road |
Completion of work |
-
latitude : 20.4571243
Longitude : 85.076489
file name : Image_08102024181047897.png
|
2024-10-08 18:10:47.98463 |
117 |
105793359 |
Drinking water facilities/ Installation of RO/ Water Filter |
171000 |
SEM SALARIES |
Roof laid |
-
latitude : 20.4588878
Longitude : 85.07080088
file name : Image_15102024151946764.png
|
2024-10-15 15:19:46.874805 |
118 |
105793359 |
Drinking water facilities/ Installation of RO/ Water Filter |
171000 |
SEM SALARIES |
Plinth level |
-
latitude : 20.45879726
Longitude : 85.07076659
file name : Image_15102024140139653.png
|
2024-10-15 14:01:41.814823 |
119 |
105793359 |
Drinking water facilities/ Installation of RO/ Water Filter |
171000 |
SEM SALARIES |
Completion of work |
-
latitude : 20.45883566
Longitude : 85.07073116
file name : Image_15102024135556085.png
|
2024-10-15 13:55:56.375414 |
120 |
64250370 |
WATER SUPPLY AT JAGANNATHPUR VILLAGE |
125000 |
WATER SUPPLY AT JAGANNATHPUR VILLAGE1 |
Plinth level |
-
latitude : 20.45882174
Longitude : 85.07071096
file name : Image_14112024064931266.png
|
2024-11-14 06:49:31.355864 |
121 |
64250370 |
WATER SUPPLY AT JAGANNATHPUR VILLAGE |
125000 |
WATER SUPPLY AT JAGANNATHPUR VILLAGE1 |
Completion of work |
-
latitude : 20.4588209
Longitude : 85.07071288
file name : Image_14112024064414565.png
|
2024-11-14 06:44:14.644334 |
122 |
83129908 |
Drainage Construction |
100779 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.5302639
Longitude : 84.9465354
file name : Image_11122023185949820.png
|
2023-12-11 18:59:49.932476 |
123 |
83129908 |
Drainage Construction |
100779 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.5303094
Longitude : 84.9465311
file name : Image_11122023185734021.png
|
2023-12-11 18:57:34.142232 |
124 |
83129908 |
Drainage Construction |
100779 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.5302851
Longitude : 84.9465338
file name : Image_11122023185131276.png
|
2023-12-11 18:51:31.359295 |