1 |
44227155 |
Const. of Chasa Sahi Community Mandap - 15th |
20000 |
Const. of Chasa Sahi Community Mandap - 15th1 |
Completion of work |
-
latitude : 20.44533193
Longitude : 85.46891026
file name : Image_18122020112420281.png
|
2020-12-18 11:24:20.369162 |
2 |
44227516 |
Finishing Harijan Sahi Community Center - 15th |
230000 |
Finishing Harijan Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.4532717
Longitude : 85.46282648
file name : Image_18122020113925237.png
|
2020-12-18 11:39:25.337117 |
3 |
44227516 |
Finishing Harijan Sahi Community Center - 15th |
230000 |
Finishing Harijan Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.4532717
Longitude : 85.46282648
file name : Image_18122020113909810.png
|
2020-12-18 11:39:09.912024 |
4 |
44227448 |
Finishing Nalikani Sahi Community Center - 5th |
100000 |
Finishing Nalikani Sahi Community Center - 5th1 |
Completion of work |
-
latitude : 20.4453859
Longitude : 85.4667069
file name : Image_18122020112740914.png
|
2020-12-18 11:27:41.007004 |
5 |
44228368 |
Provision of New Tube Well - DtH method (5 Nos) - 15th |
515000 |
Provision of New Tube Well - DtH method (5 Nos) - 15th1 |
Completion of work |
-
latitude : 20.44500725
Longitude : 85.4726877
file name : Image_04122020153210157.png
|
2020-12-04 15:32:10.253637 |
6 |
44228368 |
Provision of New Tube Well - DtH method (5 Nos) - 15th |
515000 |
Provision of New Tube Well - DtH method (5 Nos) - 15th1 |
Completion of work |
-
latitude : 20.44616444
Longitude : 85.46431297
file name : Image_17122020203709135.png
|
2020-12-17 20:37:09.22099 |
7 |
44228368 |
Provision of New Tube Well - DtH method (5 Nos) - 15th |
515000 |
Provision of New Tube Well - DtH method (5 Nos) - 15th2 |
Completion of work |
-
latitude : 20.44826669
Longitude : 85.46078798
file name : Image_18122020114054968.png
|
2020-12-18 11:40:55.070527 |
8 |
44228123 |
Const. of CC Drain from Sulabh Behera House back side to Susama Sahoo House - 15th |
200000 |
Const. of CC Drain from Sulabh Behera House back side to Susama Sahoo House - 15th1 |
Completion of work |
-
latitude : 20.4460104,20.4460091
Longitude : 85.4638958,85.4638955
file name : Image_10012021165756073.png
|
2021-01-10 16:57:56.209257 |
9 |
44227821 |
Finishing Maa Kalapat Club - 15th |
100000 |
Finishing Maa Kalapat Club - 15th1 |
Completion of work |
-
latitude : 20.446002
Longitude : 85.4638916
file name : Image_10012021170052029.png
|
2021-01-10 17:00:52.112457 |
10 |
44227197 |
Finishing Chhatrapati Shibaji Sports Pendal - 15th |
100000 |
Finishing Chhatrapati Shibaji Sports Pendal - 15th1 |
Completion of work |
-
latitude : 20.447166666666664
Longitude : 85.46077500000001
file name : Image_10012021170544497.png
|
2021-01-10 17:05:44.572836 |
11 |
44227534 |
Finishing Surendra Patana Upar Sahi Community Center - 15th |
100000 |
Finishing Surendra Patana Upar Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.44863666666667
Longitude : 85.46500333333333
file name : Image_21012021120544599.png
|
2021-01-21 12:05:44.722973 |
12 |
44227534 |
Finishing Surendra Patana Upar Sahi Community Center - 15th |
100000 |
Finishing Surendra Patana Upar Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.44867833333333
Longitude : 85.46500333333333
file name : Image_21012021120548672.png
|
2021-01-21 12:05:48.776949 |
13 |
44227534 |
Finishing Surendra Patana Upar Sahi Community Center - 15th |
100000 |
Finishing Surendra Patana Upar Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.448623333333334
Longitude : 85.46494833333333
file name : Image_21012021120552464.png
|
2021-01-21 12:05:52.570484 |
14 |
44227534 |
Finishing Surendra Patana Upar Sahi Community Center - 15th |
100000 |
Finishing Surendra Patana Upar Sahi Community Center - 15th1 |
Completion of work |
-
latitude : 20.448623333333334
Longitude : 85.46494833333333
file name : Image_21012021120040011.png
|
2021-01-21 12:00:40.155639 |
15 |
44228148 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th |
100000 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th1 |
Completion of work |
-
latitude : 20.452965,20.452973333333333
Longitude : 85.46366833333335,85.46365666666667
file name : Image_21012021120536914.png
|
2021-01-21 12:05:36.989485 |
16 |
44228148 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th |
100000 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th1 |
Completion of work |
-
latitude : 20.452994999999998,20.45298
Longitude : 85.46365666666667,85.463625
file name : Image_21012021120541048.png
|
2021-01-21 12:05:41.164303 |
17 |
44228148 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th |
100000 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th1 |
Completion of work |
-
latitude : 20.452965,20.452973333333333
Longitude : 85.46366833333335,85.46365666666667
file name : Image_21012021120025565.png
|
2021-01-21 12:00:25.669388 |
18 |
44228148 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th |
100000 |
Const. of CC Drain from Niranjan Sahoo House to Susant Dhal House - 15th1 |
Completion of work |
-
latitude : 20.452994999999998,20.45298
Longitude : 85.46365666666667,85.463625
file name : Image_21012021120029380.png
|
2021-01-21 12:00:29.513873 |
19 |
44228087 |
Const. of CC Drain from Laxmidhar Sahoo House to Amuly Sahoo House - 15th |
150000 |
Const. of CC Drain from Laxmidhar Sahoo House to Amuly Sahoo House - 15th1 |
Completion of work |
-
latitude : 20.467423333333333,20.467485,20.467523333333336
Longitude : 85.52739500000001,85.52743166666666,85.52738166666668
file name : Image_21012021121133629.png
|
2021-01-21 12:11:33.713664 |
20 |
44229760 |
Const. of CC Drain from Akula Sahoo House to Sachi Pradhan House - 15th |
100000 |
Const. of CC Drain from Akula Sahoo House to Sachi Pradhan House - 15th1 |
Completion of work |
-
latitude : 20.4442976,20.4442976
Longitude : 85.4677336,85.4677336
file name : Image_21012021120528369.png
|
2021-01-21 12:05:28.460113 |
21 |
44228853 |
Const. of CC Drain from Santosh Sahoo House to Lochan Sahoo House - 15th |
100000 |
Const. of CC Drain from Santosh Sahoo House to Lochan Sahoo House - 15th1 |
Completion of work |
-
latitude : 20.450253333333333,20.450261666666666
Longitude : 85.46399333333332,85.46402666666667
file name : Image_21012021120532646.png
|
2021-01-21 12:05:32.726592 |
22 |
44228853 |
Const. of CC Drain from Santosh Sahoo House to Lochan Sahoo House - 15th |
100000 |
Const. of CC Drain from Santosh Sahoo House to Lochan Sahoo House - 15th1 |
Completion of work |
-
latitude : 20.450253333333333,20.450261666666666
Longitude : 85.46399333333332,85.46402666666667
file name : Image_21012021120021780.png
|
2021-01-21 12:00:21.90476 |
23 |
44227419 |
Finishing Bali Sahi Community Center - 5th |
200000 |
Finishing Bali Sahi Community Center - 5th1 |
Completion of work |
-
latitude : 20.451976666666667
Longitude : 85.46355166666666
file name : Image_03072021180504426.png
|
2021-07-03 18:05:04.48728 |
24 |
44227419 |
Finishing Bali Sahi Community Center - 5th |
200000 |
Finishing Bali Sahi Community Center - 5th1 |
Completion of work |
-
latitude : 20.45185
Longitude : 85.46426166666667
file name : Image_24022021144530865.png
|
2021-02-24 14:45:31.032516 |
25 |
44227925 |
Const. of CC Drain from Majhi Sahi Brajabandhu Pal House to Puruna Pokhari - 15th |
200000 |
Const. of CC Drain from Majhi Sahi Brajabandhu Pal House to Puruna Pokhari - 15th1 |
Completion of work |
-
latitude : 20.443926666666666,20.443921666666665
Longitude : 85.47021500000001,85.47021833333335
file name : Image_01032021165431055.png
|
2021-03-01 16:54:31.193188 |
26 |
44227988 |
Const. of CC Drain from Debaraj Chand House to Mahatma Gandhi Park - 15th |
200000 |
Const. of CC Drain from Debaraj Chand House to Mahatma Gandhi Park - 15th1 |
Completion of work |
-
latitude : 20.4460107,20.4460083
Longitude : 85.4638901,85.4638878
file name : Image_02032021114107763.png
|
2021-03-02 11:41:07.905098 |
27 |
44227179 |
Const. of Sabar Sahi Community Mandap - 15th |
20851 |
Const. of Sabar Sahi Community Mandap - 15th1 |
Completion of work |
-
latitude : 20.449701666666666
Longitude : 85.468145
file name : Image_03072021175458613.png
|
2021-07-03 17:54:58.704145 |
28 |
44227589 |
Completion of Nua Sahi Roshghar - 15th |
100000 |
Completion of Nua Sahi Roshghar - 15th1 |
Completion of work |
-
latitude : 20.44488
Longitude : 85.46665833333333
file name : Image_03072021181333703.png
|
2021-07-03 18:13:33.765879 |
29 |
48119223 |
SOLID LIQUID WASTE MANAGEMENT & COMMUNITY LARTIN NEAR PATITAPABAN TEMPLE-15TH |
200000 |
SOLID LIQUID WASTE MANAGEMENT & COMMUNITY LARTIN NEAR PATITAPABAN TEMPLE-15TH1 |
Completion of work |
-
latitude : 20.443205
Longitude : 85.46444166666667
file name : Image_20092021164424014.png
|
2021-09-20 16:44:24.079603 |
30 |
48228408 |
COMPLETION OF SURENDRAPATNA UPER SAHI KOTHAGHAR-15TH |
100000 |
COMPLETION OF SURENDRAPATNA UPER SAHI KOTHAGHAR-15TH1 |
Completion of work |
-
latitude : 20.44868166666667
Longitude : 85.46497
file name : Image_23122021132434238.png
|
2021-12-23 13:24:34.317676 |
31 |
48226532 |
CONST OF CC DRAIN FROM KRUSNA GUIN HOUSE TO SANTOS BEHERA HOUSE-15TH |
100000 |
CONST OF CC DRAIN FROM KRUSNA GUIN HOUSE TO SANTOS BEHERA HOUSE-15TH1 |
Completion of work |
-
latitude : 20.447295,20.447616666666665
Longitude : 85.46879499999999,85.47012166666667
file name : Image_23122021125503082.png
|
2021-12-23 12:55:03.177154 |
32 |
44227876 |
Const. of CC Drain with Culvert from Jaya Krushna Pandit House to Amuly Pandit House - 15th |
100000 |
Const. of CC Drain with Culvert from Jaya Krushna Pandit House to Amuly Pandit House - 15th1 |
Completion of work |
-
latitude : 20.447333333333333,20.447319999999998
Longitude : 85.46878333333333,85.46878333333333
file name : Image_23122021132447494.png
|
2021-12-23 13:24:47.581326 |
33 |
44227876 |
Const. of CC Drain with Culvert from Jaya Krushna Pandit House to Amuly Pandit House - 15th |
100000 |
Const. of CC Drain with Culvert from Jaya Krushna Pandit House to Amuly Pandit House - 15th1 |
Completion of work |
-
latitude : 20.447333333333333,20.447319999999998
Longitude : 85.46878333333333,85.46878333333333
file name : Image_23122021132513085.png
|
2021-12-23 13:25:13.166874 |
34 |
48185359 |
Dual water solar projects at Bali sahi harijansahi.15th |
450000 |
Dual water solar projects at Bali sahi harijansahi.15th1 |
Completion of work |
-
latitude : 20.451973333333335
Longitude : 85.46341166666667
file name : Image_03012022120515971.png
|
2022-01-03 12:05:16.064189 |
35 |
48185359 |
Dual water solar projects at Bali sahi harijansahi.15th |
450000 |
Dual water solar projects at Bali sahi harijansahi.15th1 |
Completion of work |
-
latitude : 20.451958333333334
Longitude : 85.46338666666666
file name : Image_03012022120519143.png
|
2022-01-03 12:05:19.22682 |
36 |
48185536 |
Const of cc drain from subas Parmanik house to Kunjabana tosha billa |
100000 |
Const of cc drain from subas Parmanik house to Kunjabana tosha billa1 |
Completion of work |
-
latitude : 20.444506,20.444506
Longitude : 85.4676793,85.4676793
file name : Image_01022022154109395.png
|
2022-02-01 15:41:09.506243 |
37 |
48225372 |
CONST OF CC DRAIN FROM PRASANNA SAHOO HOUSE TO SUSAMA SAHOO HOUSE- 15TH |
100000 |
CONST OF CC DRAIN FROM PRASANNA SAHOO HOUSE TO SUSAMA SAHOO HOUSE- 15TH1 |
Completion of work |
-
latitude : 20.44629666666667,20.446276666666666
Longitude : 85.46326166666668,85.46328166666666
file name : Image_01022022153412105.png
|
2022-02-01 15:34:12.256888 |
38 |
48230515 |
CONST OF CC DRAIN FROM SIKHAR SAHOO HOUSE TO LOCHAN GUDIA HOUSE-15TH |
100000 |
CONST OF CC DRAIN FROM SIKHAR SAHOO HOUSE TO LOCHAN GUDIA HOUSE-15TH1 |
Completion of work |
-
latitude : 20.450678333333332,20.450668333333333
Longitude : 85.464,85.46400166666666
file name : Image_31032022140154821.png
|
2022-03-31 14:01:54.900236 |
39 |
48229224 |
CONST OF CC DRAIN FROM KASI BEHERA HOUSE TOGOKULA DAS HOUSE-15TH |
100000 |
CONST OF CC DRAIN FROM KASI BEHERA HOUSE TOGOKULA DAS HOUSE-15TH1 |
Completion of work |
-
latitude : 20.4445342,20.4445342
Longitude : 85.4705615,85.4705615
file name : Image_31032022133038575.png
|
2022-03-31 13:30:38.664271 |
40 |
48231122 |
CONST OF CC DRAIN FROM MAHATMA GANDHI PARK TO MAIN ROAD-15TH |
200000 |
CONST OF CC DRAIN FROM MAHATMA GANDHI PARK TO MAIN ROAD-15TH1 |
Completion of work |
-
latitude : 20.44592246,20.44590511
Longitude : 85.46441804,85.46441503
file name : Image_02052022135355527.png
|
2022-05-02 13:53:55.612146 |
41 |
44229802 |
Const. of CC Drain from Prafull Sahoo House to Akula Sahoo House - 15th |
100000 |
Const. of CC Drain from Prafull Sahoo House to Akula Sahoo House - 15th1 |
Completion of work |
-
latitude : 20.44422142,20.44423564
Longitude : 85.46870504,85.46867119
file name : Image_02052022134602610.png
|
2022-05-02 13:46:02.69705 |
42 |
44227962 |
Const. of CC Drain from Prafulla Sahoo House to Kamar Sahi Back Side - 15th |
100000 |
Const. of CC Drain from Prafulla Sahoo House to Kamar Sahi Back Side - 15th1 |
Completion of work |
-
latitude : 20.44495118,20.44495351
Longitude : 85.46839472,85.46839632
file name : Image_03052022163415400.png
|
2022-05-03 16:34:15.531234 |
43 |
64928979 |
Creation of Shed for segregation and processing of wet and dry waste |
45000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.44452113
Longitude : 85.46344611
file name : Image_30092022114916996.png
|
2022-09-30 11:49:17.116276 |
44 |
64928759 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.44423995
Longitude : 85.46344054
file name : Image_30092022115150238.png
|
2022-09-30 11:51:50.362352 |
45 |
64929486 |
Any other operation and maintenance needs related to solid waste management |
94067 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 20.44581661
Longitude : 85.46939491
file name : Image_29092022152830697.png
|
2022-09-29 15:28:30.789399 |
46 |
61878981 |
INSTALATION OF WATTER PUREFIER AT TALASAHI SCHOOL,15 |
55000 |
INSTALATION OF WATTER PUREFIER AT TALASAHI SCHOOL,151 |
Completion of work |
-
latitude : 20.44867928
Longitude : 85.47311001
file name : Image_30092022204223137.png
|
2022-09-30 20:42:23.231481 |
47 |
61878839 |
INSTALATION OF WATTER PUREFIER AT NUAPATNA NODAL SCHOOL,15TH |
55000 |
INSTALATION OF WATTER PUREFIER AT NUAPATNA NODAL SCHOOL,15TH1 |
Completion of work |
-
latitude : 20.44865684
Longitude : 85.47309351
file name : Image_30092022203900413.png
|
2022-09-30 20:39:00.505354 |
48 |
61881820 |
Installation of purefiers and water supply at nuapatna medical, 15th |
130347 |
Installation of purefiers and water supply at nuapatna medical, 15th1 |
Completion of work |
-
latitude : 20.44868948
Longitude : 85.47311201
file name : Image_30092022205407221.png
|
2022-09-30 20:54:07.310747 |
49 |
61881820 |
Installation of purefiers and water supply at nuapatna medical, 15th |
130347 |
Installation of purefiers and water supply at nuapatna medical, 15th1 |
Completion of work |
-
latitude : 20.44869031
Longitude : 85.47310581
file name : Image_30092022205410416.png
|
2022-09-30 20:54:10.505554 |
50 |
61883744 |
COMPLETION OF NUAPATNA MARKET COMPLEX,15TH |
150000 |
COMPLETION OF NUAPATNA MARKET COMPLEX,15TH1 |
Completion of work |
-
latitude : 20.44447321
Longitude : 85.46371747
file name : Image_28112022170428738.png
|
2022-11-28 17:04:28.826686 |
51 |
61883744 |
COMPLETION OF NUAPATNA MARKET COMPLEX,15TH |
150000 |
COMPLETION OF NUAPATNA MARKET COMPLEX,15TH1 |
Completion of work |
-
latitude : 20.44448636
Longitude : 85.46371597
file name : Image_28112022170701523.png
|
2022-11-28 17:07:01.612068 |
52 |
64929138 |
Operation & maintenance of community compost pits |
73500 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 20.44712226
Longitude : 85.46638004
file name : Image_30012023150814167.png
|
2023-01-30 15:08:14.280805 |
53 |
64929215 |
Operation & maintenance of Grey water management system |
52500 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 20.44630929
Longitude : 85.46626158
file name : Image_30012023150530890.png
|
2023-01-30 15:05:30.981028 |
54 |
66805271 |
RTI Act |
12980 |
RTI Act1 |
Completion of work |
-
latitude : 20.44881322
Longitude : 85.47299253
file name : Image_09022023193027046.png
|
2023-02-09 19:30:27.173068 |
55 |
66805272 |
Installation of Street Light GP Share 2021-22 |
86102 |
Installation of Street Light GP Share 2021-221 |
Completion of work |
-
latitude : 20.44866579
Longitude : 85.47314797
file name : Image_22022023220011302.png
|
2023-02-22 22:00:11.398568 |
56 |
64929643 |
CONST OF CULVERT AT BRAJABANDHU PAL HOUSE SIDE |
90000 |
CONST OF CULVERT AT BRAJABANDHU PAL HOUSE SIDE1 |
Completion of work |
-
latitude : 20.4432191,20.44404655,20.44403078
Longitude : 85.4686582,85.47017587,85.47018506
file name : Image_13052023113907021.png
|
2023-05-13 11:39:07.111406 |
57 |
61879441 |
INSTALATION OF WATTER PUREFIER OF 4 NO. OF AWC AT NUAPATNA ,15TH |
220000 |
INSTALATION OF WATTER PUREFIER OF 4 NO. OF AWC AT NUAPATNA ,15TH1 |
Completion of work |
-
latitude : 20.4467276
Longitude : 85.470281
file name : Image_13052023112313891.png
|
2023-05-13 11:23:13.998749 |
58 |
78662835 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 20.4515918
Longitude : 85.46432512
file name : Image_29122023124546959.png
|
2023-12-29 12:45:47.058568 |
59 |
78662835 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 20.45160803
Longitude : 85.46433958
file name : Image_29122023124137013.png
|
2023-12-29 12:41:37.118293 |
60 |
78662835 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 20.45159316
Longitude : 85.46434088
file name : Image_29122023123732671.png
|
2023-12-29 12:37:32.783859 |
61 |
64929700 |
CULVERT & CC DRAIN FROM VAGINA HOUSE TO RABI DAS HOUSE |
100000 |
CULVERT & CC DRAIN FROM VAGINA HOUSE TO RABI DAS HOUSE1 |
Completion of work |
-
latitude : 20.44528279,20.44533203
Longitude : 85.47111012,85.47105076
file name : Image_09062023115416094.png
|
2023-06-09 11:54:16.178618 |
62 |
44227760 |
Const. of Open Well Platform in front of Fakir Mishra House Gahamar Sahi - 15th |
30000 |
Const. of Open Well Platform in front of Fakir Mishra House Gahamar Sahi - 15th1 |
Completion of work |
-
latitude : 20.44428143
Longitude : 85.47053552
file name : Image_09062023115733028.png
|
2023-06-09 11:57:33.144333 |
63 |
64928889 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
18000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.46749864
Longitude : 85.52744308
file name : Image_27062023154449420.png
|
2023-06-27 15:44:49.5316 |
64 |
61883951 |
CONST OF SURENDRA PATNA KOTHAGAR,15TH |
250000 |
CONST OF SURENDRA PATNA KOTHAGAR,15TH1 |
Completion of work |
-
latitude : 20.44605719
Longitude : 85.46415544
file name : Image_19072023132450412.png
|
2023-07-19 13:24:50.516966 |
65 |
82498835 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 20.44406763
Longitude : 85.46364958
file name : Image_05102023155809636.png
|
2023-10-05 15:58:10.131585 |
66 |
82498835 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.4453545
Longitude : 85.4666912
file name : Image_05102023154823976.png
|
2023-10-05 15:48:27.121794 |
67 |
82498835 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.4453575
Longitude : 85.4666901
file name : Image_05102023153858147.png
|
2023-10-05 15:38:58.253841 |
68 |
82498835 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.4453545
Longitude : 85.4666912
file name : Image_05102023153109275.png
|
2023-10-05 15:31:09.383061 |
69 |
82410878 |
Purchase of water testing kit |
280000 |
Purchase of water testing kit1 |
Completion of work |
-
latitude : 20.4453545
Longitude : 85.4666912
file name : Image_05102023154650376.png
|
2023-10-05 15:46:51.062456 |
70 |
82410878 |
Purchase of water testing kit |
280000 |
Purchase of water testing kit1 |
Plinth level |
-
latitude : 20.4453575
Longitude : 85.4666901
file name : Image_05102023155703402.png
|
2023-10-05 15:57:03.60226 |
71 |
82410878 |
Purchase of water testing kit |
280000 |
Purchase of water testing kit1 |
Completion of work |
-
latitude : 20.4453583
Longitude : 85.4666919
file name : Image_05102023154020627.png
|
2023-10-05 15:40:20.75167 |
72 |
82410878 |
Purchase of water testing kit |
280000 |
Purchase of water testing kit1 |
Completion of work |
-
latitude : 20.4453583
Longitude : 85.4666919
file name : Image_05102023153429994.png
|
2023-10-05 15:34:30.112628 |
73 |
78685475 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.4674321
Longitude : 85.5274184
file name : Image_02022024150921148.png
|
2024-02-02 15:09:21.249405 |
74 |
78685475 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.4674332
Longitude : 85.5274172
file name : Image_29012024145158817.png
|
2024-01-29 14:51:58.914012 |
75 |
78685475 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.4674324
Longitude : 85.527418
file name : Image_29012024144805720.png
|
2024-01-29 14:48:05.813791 |
76 |
78652670 |
Drainage Construction |
119921 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.4493383
Longitude : 85.4639255
file name : Image_02022024151151354.png
|
2024-02-02 15:11:51.44742 |
77 |
78735861 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.4488849
Longitude : 85.4632937
file name : Image_02022024151716299.png
|
2024-02-02 15:17:16.392542 |
78 |
78634590 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.4487398
Longitude : 85.47308431
file name : Image_19102023212956142.png
|
2023-10-19 21:29:56.221271 |
79 |
78634590 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.44874639
Longitude : 85.4730934
file name : Image_19102023212429714.png
|
2023-10-19 21:24:29.800229 |
80 |
78634590 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.44873897
Longitude : 85.4731167
file name : Image_19102023211904964.png
|
2023-10-19 21:19:05.040603 |
81 |
78734072 |
Establishment of Library |
200000 |
Establishment of Library1 |
Roof laid |
-
latitude : 20.4436231
Longitude : 85.46874
file name : Image_07032024171424974.png
|
2024-03-07 17:14:25.097658 |
82 |
78734072 |
Establishment of Library |
200000 |
Establishment of Library1 |
Plinth level |
-
latitude : 20.4435576
Longitude : 85.4687834
file name : Image_07032024171004112.png
|
2024-03-07 17:10:04.217688 |
83 |
78734072 |
Establishment of Library |
200000 |
Establishment of Library1 |
Completion of work |
-
latitude : 20.4435575
Longitude : 85.4687845
file name : Image_07032024165114780.png
|
2024-03-07 16:51:14.898948 |
84 |
64929294 |
Services of Collection & Transportation of waste from household to treatment site |
36000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
|
-
latitude : 20.46744534
Longitude : 85.52744808
file name : Image_08052024093850794.png
|
2024-05-08 09:38:50.876889 |
85 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.467454999999998
Longitude : 85.52744833333333
file name : Image_09102024161918728.png
|
2024-10-09 16:19:18.829257 |
86 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.44747166666667
Longitude : 85.46456333333332
file name : Image_09102024105327696.png
|
2024-10-09 10:53:29.156171 |
87 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.447417
Longitude : 85.4647287
file name : Image_09102024105315679.png
|
2024-10-09 10:53:16.215116 |
88 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.4474149
Longitude : 85.4647302
file name : Image_09102024105309437.png
|
2024-10-09 10:53:09.546155 |
89 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.4474182
Longitude : 85.4647282
file name : Image_09102024105300084.png
|
2024-10-09 10:53:00.188412 |
90 |
78656552 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.447263333333336
Longitude : 85.46454999999999
file name : Image_07102024152017219.png
|
2024-10-07 15:20:17.323459 |
91 |
78660501 |
Drainage Construction |
70000 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.450848333333333
Longitude : 85.46217333333334
file name : Image_09102024170754813.png
|
2024-10-09 17:07:54.884318 |
92 |
78660501 |
Drainage Construction |
70000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.450863333333334
Longitude : 85.46232
file name : Image_09102024170048596.png
|
2024-10-09 17:00:48.686671 |
93 |
78660501 |
Drainage Construction |
70000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.450771666666665
Longitude : 85.46224833333332
file name : Image_07102024105133954.png
|
2024-10-07 10:51:34.040985 |
94 |
105619384 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc. |
200000 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc.1 |
Roof laid |
-
latitude : 20.4515941
Longitude : 85.4642162
file name : Image_09102024165309503.png
|
2024-10-09 16:53:09.609534 |
95 |
105619384 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc. |
200000 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc.1 |
Plinth level |
-
latitude : 20.4515979
Longitude : 85.464223
file name : Image_09102024164403294.png
|
2024-10-09 16:44:03.371405 |
96 |
105619384 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc. |
200000 |
Construction/ Maintenance/ Upgradation of Gym Youth Club, Child friendly Park etc.1 |
Completion of work |
-
latitude : 20.4515972
Longitude : 85.4642226
file name : Image_09102024163443167.png
|
2024-10-09 16:34:43.248692 |
97 |
105621028 |
Piped/tap water supply to HH |
200000 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.44604
Longitude : 85.47034000000001
file name : Image_24102024143159294.png
|
2024-10-24 14:31:59.4417 |
98 |
105621028 |
Piped/tap water supply to HH |
200000 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.44295333333333
Longitude : 85.469265
file name : Image_24102024140153986.png
|
2024-10-24 14:01:54.084725 |
99 |
105621028 |
Piped/tap water supply to HH |
200000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.467331666666666
Longitude : 85.52745833333331
file name : Image_23102024134846139.png
|
2024-10-23 13:48:46.243959 |