1 |
44292637 |
const. of sitalabasa AWC & u.p school Boundary wall & gate |
400000 |
const. of sitalabasa AWC & u.p school Boundary wall & gate 1 |
Completion of work |
-
latitude : 20.977194062434137
Longitude : 85.70525136776268
file name : Image_22052021123237036.png
|
2021-05-22 12:32:37.177383 |
2 |
44292637 |
const. of sitalabasa AWC & u.p school Boundary wall & gate |
400000 |
const. of sitalabasa AWC & u.p school Boundary wall & gate 2 |
Completion of work |
-
latitude : 20.976459640078247
Longitude : 85.70563232526183
file name : Image_22052021130129291.png
|
2021-05-22 13:01:29.406291 |
3 |
45717605 |
const. pipeline and overhead tank at koreipal awc building |
100000 |
const. pipeline and overhead tank at koreipal awc building 1 |
Completion of work |
-
latitude : 20.97479428164661,20.974746588617563
Longitude : 85.71112900972366,85.7111412473023
file name : Image_07062021112740522.png
|
2021-06-07 11:27:40.627864 |
4 |
45718670 |
const. pipeline and overhead tank at raibol high school |
100000 |
const. pipeline and overhead tank at raibol high school1 |
Completion of work |
-
latitude : 20.951598747633398,20.951626868918538
Longitude : 85.69093658588827,85.69094530306756
file name : Image_03062021160019870.png
|
2021-06-03 16:00:19.985164 |
5 |
45718670 |
const. pipeline and overhead tank at raibol high school |
100000 |
const. pipeline and overhead tank at raibol high school1 |
Completion of work |
-
latitude : 20.951598747633398,20.951626868918538
Longitude : 85.69093658588827,85.69094530306756
file name : Image_03062021160024204.png
|
2021-06-03 16:00:24.326363 |
6 |
45718832 |
const. pipeline and overhead tank at raibol up school |
100000 |
const. pipeline and overhead tank at raibol up school1 |
Completion of work |
-
latitude : 20.95236988272518,20.952370301820338
Longitude : 85.69150370545685,85.69150689058006
file name : Image_03062021160016517.png
|
2021-06-03 16:00:16.629825 |
7 |
45716151 |
const. of pipe line and overhead tank at sataibase govt. up school |
100000 |
const. of pipe line and overhead tank at sataibase govt. up school1 |
Completion of work |
-
latitude : 20.977132790721953,20.977126588113606
Longitude : 85.70568110793829,85.70566618815064
file name : Image_03062021162143270.png
|
2021-06-03 16:21:43.368379 |
8 |
45718278 |
const. pipeline and overhead tank at kankana govt. up school |
100000 |
const. pipeline and overhead tank at kankana govt. up school1 |
Completion of work |
-
latitude : 20.96771660260856,20.96771660260856
Longitude : 85.69171233102679,85.69171233102679
file name : Image_03062021160013058.png
|
2021-06-03 16:00:13.192785 |
9 |
45717835 |
const. pipeline and overhead tank at bhalutangar govt up school |
100000 |
const. pipeline and overhead tank at bhalutangar govt up school1 |
Completion of work |
-
latitude : 20.99598737899214,20.995972543023527
Longitude : 85.70513150654733,85.70514064282179
file name : Image_03062021163635547.png
|
2021-06-03 16:36:35.673219 |
10 |
45718093 |
const. pipeline and overhead tank at dengabahali govt up school |
100000 |
const. pipeline and overhead tank at dengabahali govt up school1 |
Completion of work |
-
latitude : 21.0003654146567,21.00036457646638
Longitude : 85.70899698883295,85.70902632549405
file name : Image_03062021163642181.png
|
2021-06-03 16:36:42.301252 |
11 |
45718472 |
const. pipeline and overhead tank at haridapeda awc building. |
100000 |
const. pipeline and overhead tank at haridapeda awc building.1 |
Completion of work |
-
latitude : 20.98062171600759,20.98062171600759
Longitude : 85.68944712169468,85.68944712169468
file name : Image_03062021154501843.png
|
2021-06-03 15:45:01.95822 |
12 |
45716362 |
const. of pipe line and overhead tank at sataibase awc building. |
100000 |
const. of pipe line and overhead tank at sataibase awc building.1 |
Completion of work |
-
latitude : 20.97711279988289,20.977097838185728
Longitude : 85.7056858856231,85.70568286813796
file name : Image_03062021162138988.png
|
2021-06-03 16:21:39.088964 |
13 |
75674494 |
Construction of toilets in public institutions |
154398 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.0675295
Longitude : 85.5717773
file name : Image_16102023181102148.png
|
2023-10-16 18:11:02.275376 |
14 |
48140901 |
construction of completion of sitalabasa managala community center |
300000 |
construction of completion of sitalabasa managala community center1 |
Completion of work |
-
latitude : 20.976971187628806
Longitude : 85.70612526498735
file name : Image_06102021113735522.png
|
2021-10-06 11:37:35.631426 |
15 |
44292563 |
Const. of G.P buildings |
1000000 |
Const. G.P buildings1 |
Completion of work |
-
latitude : 21.0673092
Longitude : 85.5718889
file name : Image_05012022130254126.png
|
2022-01-05 13:02:54.210125 |
16 |
44292563 |
Const. of G.P buildings |
1000000 |
Const. G.P buildings1 |
Completion of work |
-
latitude : 21.067294
Longitude : 85.5719143
file name : Image_05012022115719688.png
|
2022-01-05 11:57:19.807181 |
17 |
44292563 |
Const. of G.P buildings |
1000000 |
Const. G.P buildings1 |
Completion of work |
-
latitude : 20.954402410425246
Longitude : 85.69154343567789
file name : Image_17052021152648230.png
|
2021-05-17 15:26:48.362829 |
18 |
44292393 |
Const. of one culvert at dengabahali to bandhania school road near para soren house |
100000 |
Const. of one culvert at dengabahali to bandhania school road near para soren house1 |
Completion of work |
-
latitude : 21.0672795,21.0672795
Longitude : 85.5719311,85.5719311
file name : Image_13012022161307884.png
|
2022-01-13 16:13:07.977136 |
19 |
48142236 |
construction of bhalutangar u.p school boundary wall |
150000 |
construction of bhalutangar u.p school boundary wall1 |
Completion of work |
-
latitude : 21.0672753
Longitude : 85.5718608
file name : Image_29012022151647986.png
|
2022-01-29 15:16:48.097713 |
20 |
48134383 |
construction & repair of pipeline and over head tank at bhalutangar a..w.c building |
70000 |
construction & repair of pipeline and over head tank at bhalutangar a..w.c building 1 |
Completion of work |
-
latitude : 21.0672812,21.0672839
Longitude : 85.5718561,85.5718541
file name : Image_29012022153222587.png
|
2022-01-29 15:32:22.697557 |
21 |
48135053 |
construction & repair of pipeline and overhead tank bhalumunda school &a.w.c building |
100000 |
construction & repair of pipeline and overhead tank bhalumunda school &a.w.c building 1 |
Completion of work |
-
latitude : 21.0672791,21.0672791
Longitude : 85.5718616,85.5718616
file name : Image_29012022154443628.png
|
2022-01-29 15:44:43.72611 |
22 |
48134737 |
construction & repair of pipeline and overhead tank mahidharpur u.p school & a.w.c building |
100000 |
construction & repair of pipeline and overhead tank mahidharpur u.p school & a.w.c building 1 |
Completion of work |
-
latitude : 21.0672782,21.0672884
Longitude : 85.5718598,85.5718514
file name : Image_29012022155312544.png
|
2022-01-29 15:53:12.653126 |
23 |
48136084 |
construction & repair pipeline and overhead tank at dengabahali a.w.c building |
55635 |
construction & repair pipeline and overhead tank at dengabahali a.w.c building 1 |
Completion of work |
-
latitude : 21.0672768,21.0672824
Longitude : 85.571862,85.5718576
file name : Image_29012022160143918.png
|
2022-01-29 16:01:44.030316 |
24 |
45719221 |
const. pipeline and overhead tank at mahidharpur up school |
100000 |
const. pipeline and overhead tank at mahidharpur up school1 |
Completion of work |
-
latitude : 21.0672814,21.0672757
Longitude : 85.5718596,85.5718584
file name : Image_29012022162056988.png
|
2022-01-29 16:20:57.103335 |
25 |
44291954 |
Energy charges of G.P & all G.P Electrification PWC |
50000 |
Energy charges of G.P & all G.P Electrification PWC1 |
Completion of work |
-
latitude : 21.0674337
Longitude : 85.5717309
file name : Image_23032022145820796.png
|
2022-03-23 14:58:20.932598 |
26 |
48133534 |
repair of pipe water supply at sitalabasa sajaladhara project |
50119 |
repair of pipe water supply at sitalabasa sajaladhara project1 |
Completion of work |
-
latitude : 21.0674335,21.0674335
Longitude : 85.5717293,85.5717293
file name : Image_23032022153109079.png
|
2022-03-23 15:31:09.170274 |
27 |
48134057 |
payment of sems & pump driver |
96000 |
payment of sems & pump driver 1 |
Completion of work |
-
latitude : 21.067366
Longitude : 85.571783
file name : Image_27042022123340849.png
|
2022-04-27 12:33:40.980379 |
28 |
58916384 |
mass cleaning of road, pond, drain and segregation shed |
50000 |
mass cleaning of road, pond, drain and segregation shed1 |
Completion of work |
-
latitude : 21.0673687
Longitude : 85.5717337
file name : Image_22062022135010533.png
|
2022-06-22 13:50:10.671637 |
29 |
58914521 |
construction of leach pit |
210000 |
construction of leach pit1 |
Completion of work |
-
latitude : 21.0674443
Longitude : 85.5717129
file name : Image_30062022134045454.png
|
2022-06-30 13:40:45.551212 |
30 |
58909306 |
energy charges |
150000 |
energy charges1 |
Completion of work |
-
latitude : 21.0673691
Longitude : 85.5720128
file name : Image_17102022165333450.png
|
2022-10-17 16:53:33.612611 |
31 |
48139735 |
community toilet at g.p office |
90000 |
community toilet at g.p office1 |
Completion of work |
-
latitude : 21.067362
Longitude : 85.571696
file name : Image_01122022133743848.png
|
2022-12-01 13:37:43.961325 |
32 |
58909897 |
payment of sem and pump driver |
96000 |
payment of sem and pump driver1 |
Completion of work |
-
latitude : 21.0675386
Longitude : 85.5718649
file name : Image_31102022150429330.png
|
2022-10-31 15:04:29.438541 |
33 |
58912469 |
construction of toilet at mahidharpur awc building |
45000 |
construction of toilet at mahidharpur awc building1 |
Completion of work |
-
latitude : 21.0673622
Longitude : 85.5717019
file name : Image_04012023115135293.png
|
2023-01-04 11:51:35.409938 |
34 |
58917685 |
const. and repair of raibola school boundary wall |
350000 |
const. and repair of raibola school boundary wall1 |
Completion of work |
-
latitude : 21.0673642
Longitude : 85.5717089
file name : Image_04012023120414005.png
|
2023-01-04 12:04:14.098764 |
35 |
58919909 |
const of boundary wall and gate at li center raibola |
207372 |
const of boundary wall and gate at li center raibola1 |
Completion of work |
-
latitude : 21.0674537
Longitude : 85.5717062
file name : Image_04012023125820590.png
|
2023-01-04 12:58:20.709783 |
36 |
48141467 |
construction of boundary wall at raibol l.i center |
250000 |
construction of boundary wall at raibol l.i center1 |
Completion of work |
-
latitude : 21.0674526
Longitude : 85.5717056
file name : Image_04012023131741345.png
|
2023-01-04 13:17:41.459335 |
37 |
58915757 |
construction of guard wall and culvert at korehipal mahanta sahi to sevashram road |
293542 |
construction of guard wall and culvert at korehipal mahanta sahi to sevashram road1 |
Completion of work |
-
latitude : 21.067367
Longitude : 85.5717853
file name : Image_04042023133906977.png
|
2023-04-04 13:39:07.084923 |
38 |
48138868 |
community toilet at kankana siba mandir |
90000 |
community toilet at kankana siba mandir1 |
Completion of work |
-
latitude : 21.0674458
Longitude : 85.5717739
file name : Image_20052023150417218.png
|
2023-05-20 15:04:17.310658 |
39 |
58910681 |
construction of over head tank at raibol awc, hadagiri awc and kankana awc building |
210000 |
construction of over head tank at raibol awc, hadagiri awc and kankana awc building1 |
Completion of work |
-
latitude : 21.067404
Longitude : 85.5717452
file name : Image_20052023155917658.png
|
2023-05-20 15:59:17.754945 |
40 |
58910681 |
construction of over head tank at raibol awc, hadagiri awc and kankana awc building |
210000 |
construction of over head tank at raibol awc, hadagiri awc and kankana awc building1 |
Completion of work |
-
latitude : 21.0673679
Longitude : 85.5717789
file name : Image_06072022140844991.png
|
2022-07-06 14:08:45.077435 |
41 |
44292496 |
Const. adrovic building haridapada village |
123391 |
Const. adrovic building haridapada village1 |
Completion of work |
-
latitude : 21.0673915
Longitude : 85.5717206
file name : Image_17052023133230433.png
|
2023-05-17 13:32:30.539928 |
42 |
48141996 |
construction of complition of c.c building haridapada village |
100000 |
construction of complition of c.c building haridapada village1 |
Completion of work |
-
latitude : 21.0674763
Longitude : 85.5717814
file name : Image_17052023133439920.png
|
2023-05-17 13:34:40.01798 |
43 |
58916961 |
construction of drain at bhalumunda village |
135488 |
construction of drain at bhalumunda village1 |
Completion of work |
-
latitude : 21.0673863
Longitude : 85.5717225
file name : Image_17052023133847140.png
|
2023-05-17 13:38:47.237611 |
44 |
58919251 |
const of culver and guard wall at dengabahali to bandania road near karuna hembram house |
121388 |
const of culver and guard wall at dengabahali to bandania road near karuna hembram house1 |
Completion of work |
-
latitude : 21.0674348
Longitude : 85.5717694
file name : Image_17052023170702374.png
|
2023-05-17 17:07:02.469466 |
45 |
58918540 |
const of drain and cc road at sitalabasa village |
300000 |
const of drain and cc road at sitalabasa village1 |
Completion of work |
-
latitude : 21.0674598,21.0674598
Longitude : 85.5717836,85.5717836
file name : Image_21062023180746558.png
|
2023-06-21 18:07:46.648617 |
46 |
58918540 |
const of drain and cc road at sitalabasa village |
300000 |
const of drain and cc road at sitalabasa village1 |
Completion of work |
-
latitude : 21.0674599,21.0674601
Longitude : 85.5717825,85.5717827
file name : Image_21062023180918090.png
|
2023-06-21 18:09:18.173751 |
47 |
58908783 |
repair of pipe water supply on swajala dhara project |
50000 |
repair of pipe water supply on swajala dhara project1 |
Completion of work |
-
latitude : 21.0674598,21.0674601
Longitude : 85.5717836,85.5717827
file name : Image_21062023181235438.png
|
2023-06-21 18:12:35.60891 |
48 |
58908783 |
repair of pipe water supply on swajala dhara project |
50000 |
repair of pipe water supply on swajala dhara project1 |
Completion of work |
-
latitude : 21.0674068,21.0674342
Longitude : 85.5717097,85.5717282
file name : Image_27022023161102423.png
|
2023-02-27 16:11:02.536492 |
49 |
58924117 |
repair of sitalabasa village tank ambenkment washed away in YASH |
150000 |
repair of sitalabasa village tank ambenkment washed away in YASH1 |
Completion of work |
-
latitude : 21.0675334
Longitude : 85.5717715
file name : Image_16102023171809879.png
|
2023-10-16 17:18:10.072825 |
50 |
58924117 |
repair of sitalabasa village tank ambenkment washed away in YASH |
150000 |
repair of sitalabasa village tank ambenkment washed away in YASH1 |
Completion of work |
-
latitude : 21.0675234
Longitude : 85.5717727
file name : Image_16102023170834626.png
|
2023-10-16 17:08:34.724387 |
51 |
58911751 |
repairing and maintenance of raibol gp water supply |
155488 |
repairing and maintenance of raibol gp water supply1 |
Completion of work |
-
latitude : 21.0675358
Longitude : 85.5717784
file name : Image_16102023172417916.png
|
2023-10-16 17:24:18.013451 |
52 |
48141714 |
construction of at koripal mangala community center |
70335 |
construction of at koripal mangala community center1 |
Completion of work |
-
latitude : 21.0673651
Longitude : 85.571782
file name : Image_17112023165936624.png
|
2023-11-17 16:59:36.72967 |
53 |
80554607 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 21.0674561
Longitude : 85.5717824
file name : Image_21112023153544148.png
|
2023-11-21 15:35:44.277921 |
54 |
80554607 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 21.0675433
Longitude : 85.5717766
file name : Image_21112023153435454.png
|
2023-11-21 15:34:35.588584 |
55 |
80554607 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 21.0675349
Longitude : 85.5717864
file name : Image_21112023153401124.png
|
2023-11-21 15:34:01.257858 |
56 |
80554607 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 21.0675405
Longitude : 85.5717858
file name : Image_21112023152712269.png
|
2023-11-21 15:27:12.462959 |
57 |
80554618 |
Drinking water facility |
144000 |
Drinking water facility1 |
Roof laid |
-
latitude : 21.0675527
Longitude : 85.5717836
file name : Image_21112023152518122.png
|
2023-11-21 15:25:18.239967 |
58 |
80554618 |
Drinking water facility |
144000 |
Drinking water facility1 |
Plinth level |
-
latitude : 21.0675155
Longitude : 85.5717873
file name : Image_21112023151339361.png
|
2023-11-21 15:13:39.474732 |
59 |
80554618 |
Drinking water facility |
144000 |
Drinking water facility1 |
Completion of work |
-
latitude : 21.0674075
Longitude : 85.5717853
file name : Image_21112023150233826.png
|
2023-11-21 15:02:33.986094 |
60 |
80558437 |
Purchase of equipment (including safety equipment) for waste management |
70000 |
Purchase of equipment (including safety equipment) for waste management1 |
Roof laid |
-
latitude : 21.0674531
Longitude : 85.5717784
file name : Image_17022024172806902.png
|
2024-02-17 17:28:06.997813 |
61 |
80558437 |
Purchase of equipment (including safety equipment) for waste management |
70000 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 21.0674595
Longitude : 85.5717834
file name : Image_17022024172438428.png
|
2024-02-17 17:24:38.528471 |
62 |
80558437 |
Purchase of equipment (including safety equipment) for waste management |
70000 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 21.0674596
Longitude : 85.5717819
file name : Image_17022024172121650.png
|
2024-02-17 17:21:21.743523 |
63 |
75674647 |
Materials required for composting |
100000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.0674597
Longitude : 85.5717839
file name : Image_20022024175849738.png
|
2024-02-20 17:58:49.832372 |
64 |
80175106 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 21.067445
Longitude : 85.5718106
file name : Image_16032024174831468.png
|
2024-03-16 17:48:31.573801 |
65 |
80175106 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 21.0674449
Longitude : 85.5717957
file name : Image_16032024173721992.png
|
2024-03-16 17:37:22.098386 |
66 |
80175106 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 21.0674607
Longitude : 85.571791
file name : Image_16032024171205916.png
|
2024-03-16 17:12:06.006581 |
67 |
80174679 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 21.0674597
Longitude : 85.5717842
file name : Image_16032024174718030.png
|
2024-03-16 17:47:18.117502 |
68 |
80174679 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 21.0674602
Longitude : 85.571783
file name : Image_16032024173900829.png
|
2024-03-16 17:39:00.929268 |
69 |
80174679 |
Repairing/Construction of Building |
50000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 21.067462
Longitude : 85.5717985
file name : Image_16032024170915763.png
|
2024-03-16 17:09:15.603585 |
70 |
80175410 |
Maintenance of Panchayat Bhawan |
100000 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 21.0674553
Longitude : 85.5717853
file name : Image_16032024175711867.png
|
2024-03-16 17:57:11.972474 |
71 |
80175410 |
Maintenance of Panchayat Bhawan |
100000 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 21.0674553
Longitude : 85.5717853
file name : Image_16032024175640059.png
|
2024-03-16 17:56:40.167225 |
72 |
80175410 |
Maintenance of Panchayat Bhawan |
100000 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 21.0674511
Longitude : 85.5717816
file name : Image_16032024173304000.png
|
2024-03-16 17:33:04.11711 |
73 |
80175410 |
Maintenance of Panchayat Bhawan |
100000 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 21.0674596
Longitude : 85.5717837
file name : Image_16032024172805190.png
|
2024-03-16 17:28:05.283133 |
74 |
80176069 |
Preparation and maintenance of Playground |
156000 |
Preparation and maintenance of Playground1 |
Roof laid |
-
latitude : 21.0674579,21.0674581
Longitude : 85.571805,85.5717882
file name : Image_16032024175610660.png
|
2024-03-16 17:56:10.754653 |
75 |
80176069 |
Preparation and maintenance of Playground |
156000 |
Preparation and maintenance of Playground1 |
Roof laid |
-
latitude : 21.0674579,21.0674581
Longitude : 85.571805,85.5717882
file name : Image_16032024175543962.png
|
2024-03-16 17:55:44.063722 |
76 |
80176069 |
Preparation and maintenance of Playground |
156000 |
Preparation and maintenance of Playground1 |
Plinth level |
-
latitude : 21.0674581,21.0674586
Longitude : 85.5717912,85.5717946
file name : Image_16032024174055020.png
|
2024-03-16 17:40:55.115276 |
77 |
80176069 |
Preparation and maintenance of Playground |
156000 |
Preparation and maintenance of Playground1 |
Completion of work |
-
latitude : 21.0674609,21.0674629
Longitude : 85.5717864,85.5718636
file name : Image_16032024170443130.png
|
2024-03-16 17:04:43.091958 |
78 |
76155884 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.0674586
Longitude : 85.5717848
file name : Image_16032024174955164.png
|
2024-03-16 17:49:55.25286 |
79 |
76155884 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.0674587
Longitude : 85.5718289
file name : Image_16032024173442348.png
|
2024-03-16 17:34:42.451869 |
80 |
76155884 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.06746
Longitude : 85.5717839
file name : Image_16032024171440451.png
|
2024-03-16 17:14:40.221566 |
81 |
80177139 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.935843
Longitude : 85.5388232
file name : Image_23032024180048516.png
|
2024-03-23 18:00:48.605437 |
82 |
80177139 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.9358429
Longitude : 85.5388232
file name : Image_23032024175630277.png
|
2024-03-23 17:56:30.350811 |
83 |
80177139 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.9358431
Longitude : 85.5388238
file name : Image_23032024175419282.png
|
2024-03-23 17:54:19.369219 |
84 |
75674748 |
Creation of plastic waste storage unit |
70000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 21.0674201
Longitude : 85.571779
file name : Image_27032024191032845.png
|
2024-03-27 19:10:32.943246 |
85 |
75674994 |
Setting up of Faecal Sludge Management Plant |
50000 |
Setting up of Faecal Sludge Management Plant1 |
Completion of work |
-
latitude : 21.0674251
Longitude : 85.5717794
file name : Image_27032024191814185.png
|
2024-03-27 19:18:14.276388 |
86 |
80176557 |
Computer in GP Bhawan |
20000 |
Computer in GP Bhawan1 |
Roof laid |
-
latitude : 20.9358243
Longitude : 85.5389053
file name : Image_31032024212632980.png
|
2024-03-31 21:26:33.067345 |
87 |
80176557 |
Computer in GP Bhawan |
20000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 20.9358247
Longitude : 85.5389103
file name : Image_31032024212437643.png
|
2024-03-31 21:24:37.729716 |
88 |
80176557 |
Computer in GP Bhawan |
20000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 20.96550589
Longitude : 85.69679951
file name : Image_31032024212128054.png
|
2024-03-31 21:21:28.156475 |
89 |
80554597 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.6549069
Longitude : 85.5912432
file name : Image_04072024222329216.png
|
2024-07-04 22:23:29.296543 |
90 |
80554597 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.65476739
Longitude : 85.5913238
file name : Image_04072024221654652.png
|
2024-07-04 22:16:54.733326 |
91 |
80554597 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.65477743
Longitude : 85.59132428
file name : Image_04072024221157863.png
|
2024-07-04 22:11:57.955199 |