1 |
44095816 |
Completion of Kitichen room at AWC Marloba |
50000 |
Completion of Kitichen room at AWC Marloba1 |
Completion of work |
-
latitude : 19.08563187
Longitude : 84.22639334
file name : Image_05012021182159875.png
|
2021-01-05 18:21:59.956485 |
2 |
44039196 |
Construction of Pucca road at Pandasahi.Kalinga |
200000 |
Construction of Pucca road at Pandasahi.Kalinga1 |
Completion of work |
-
latitude : 19.07369086
Longitude : 84.21662061
file name : Image_05012021182141153.png
|
2021-01-05 18:21:41.274124 |
3 |
44093412 |
Construction of pucca drain of village Patu(Rain water diversion) |
182350 |
Construction of pucca drain of village Patu(Rain water diversion)1 |
Completion of work |
-
latitude : 19.12086898,19.12086837
Longitude : 84.22035146,84.22035107
file name : Image_04032021083013937.png
|
2021-03-04 08:30:14.014429 |
4 |
44039013 |
Construction of Pucca road at K.Subhalada |
200000 |
Construction of Pucca road at K.Subhalada1 |
Completion of work |
-
latitude : 19.07579717
Longitude : 84.197383
file name : Image_09042021074415059.png
|
2021-04-09 07:44:14.857738 |
5 |
44021170 |
DP Solar Based water supply at Mahalapada |
390000 |
DP Solar Based water supply at Mahalapada1 |
Completion of work |
-
latitude : 19.08951813,19.08951737,19.08952798
Longitude : 84.24219882,84.24219817,84.24219906
file name : Image_09042021074344698.png
|
2021-04-09 07:43:44.522148 |
6 |
44039284 |
Construction of Pucca road and drain at Mahulapada |
150000 |
Construction of Pucca road and drain at Mahulapada1 |
Completion of work |
-
latitude : 19.0892017
Longitude : 84.24112529
file name : Image_29042021211416780.png
|
2021-04-29 21:14:16.858885 |
7 |
44039284 |
Construction of Pucca road and drain at Mahulapada |
150000 |
Construction of Pucca road and drain at Mahulapada1 |
Completion of work |
-
latitude : 19.08906463
Longitude : 84.24158617
file name : Image_29042021211426829.png
|
2021-04-29 21:14:26.894567 |
8 |
44021248 |
Construction of open well platform at Dandasisahi of Kankada Mahalapada |
50000 |
Construction of open well platform at Dandasisahi of Kankada Mahalapada1 |
Completion of work |
-
latitude : 19.10047273
Longitude : 84.24289288
file name : Image_27052021181236192.png
|
2021-05-27 18:12:36.272746 |
9 |
44038854 |
Renovation of Tank at Nayak Sahi at Betarsing |
200000 |
Renovation of Tank at Nayak Sahi at Betarsing1 |
Completion of work |
-
latitude : 19.09479607
Longitude : 84.23489746
file name : Image_16062021201255887.png
|
2021-06-16 20:12:55.997522 |
10 |
44038854 |
Renovation of Tank at Nayak Sahi at Betarsing |
200000 |
Renovation of Tank at Nayak Sahi at Betarsing1 |
Completion of work |
-
latitude : 19.09489104
Longitude : 84.23481547
file name : Image_16062021201305015.png
|
2021-06-16 20:13:05.125964 |
11 |
44038854 |
Renovation of Tank at Nayak Sahi at Betarsing |
200000 |
Renovation of Tank at Nayak Sahi at Betarsing1 |
Completion of work |
-
latitude : 19.09507052
Longitude : 84.23487523
file name : Image_16062021201332934.png
|
2021-06-16 20:13:33.02837 |
12 |
44038854 |
Renovation of Tank at Nayak Sahi at Betarsing |
200000 |
Renovation of Tank at Nayak Sahi at Betarsing1 |
Completion of work |
-
latitude : 19.09510609
Longitude : 84.23483393
file name : Image_16062021201321784.png
|
2021-06-16 20:13:21.883098 |
13 |
44038917 |
Renovation of Tank at Andarsing |
150000 |
Renovation of Tank at Andarsing1 |
Completion of work |
-
latitude : 19.11678626
Longitude : 84.22609114
file name : Image_25112021094059938.png
|
2021-11-25 09:41:00.057023 |
14 |
44038917 |
Renovation of Tank at Andarsing |
150000 |
Renovation of Tank at Andarsing1 |
Completion of work |
-
latitude : 19.11672826
Longitude : 84.2260255
file name : Image_25112021094108712.png
|
2021-11-25 09:41:08.79158 |
15 |
44038917 |
Renovation of Tank at Andarsing |
150000 |
Renovation of Tank at Andarsing1 |
Completion of work |
-
latitude : 19.1168307
Longitude : 84.22590366
file name : Image_25112021094115524.png
|
2021-11-25 09:41:15.598642 |
16 |
59848887 |
Connection to pipe water supply at AWC -1 At Betarsing-T |
70000 |
Connection to pipe water supply at AWC -1 At Betarsing-T1 |
Completion of work |
-
latitude : 19.09265206,19.09264761
Longitude : 84.23028361,84.23026857
file name : Image_07032022085030519.png
|
2022-03-07 08:50:30.619995 |
17 |
59848611 |
Connection to pipe water supply at UPS Betarsing -T |
80000 |
Connection to pipe water supply at UPS Betarsing -T1 |
Completion of work |
-
latitude : 19.09271569,19.09271619,19.09270139
Longitude : 84.23021403,84.23021762,84.23020554
file name : Image_07032022085047822.png
|
2022-03-07 08:50:47.908296 |
18 |
59849170 |
Connection to pipe water supply at Primary School, K.Subalada- T |
80000 |
Connection to pipe water supply at Primary School, K.Subalada- T1 |
Completion of work |
-
latitude : 19.07712622,19.07712073
Longitude : 84.19810366,84.19811602
file name : Image_07032022085512615.png
|
2022-03-07 08:55:12.695293 |
19 |
59849170 |
Connection to pipe water supply at Primary School, K.Subalada- T |
80000 |
Connection to pipe water supply at Primary School, K.Subalada- T1 |
Completion of work |
-
latitude : 19.07712771,19.07712774
Longitude : 84.19808753,84.19808756
file name : Image_07032022085526498.png
|
2022-03-07 08:55:26.57625 |
20 |
59849170 |
Connection to pipe water supply at Primary School, K.Subalada- T |
80000 |
Connection to pipe water supply at Primary School, K.Subalada- T1 |
Completion of work |
-
latitude : 19.07891175,19.0789117
Longitude : 84.19770014,84.19768199
file name : Image_07032022085636530.png
|
2022-03-07 08:56:36.6016 |
21 |
59849170 |
Connection to pipe water supply at Primary School, K.Subalada- T |
80000 |
Connection to pipe water supply at Primary School, K.Subalada- T1 |
Completion of work |
-
latitude : 19.07891427,19.07891133
Longitude : 84.19770315,84.19770092
file name : Image_07032022085627134.png
|
2022-03-07 08:56:27.20451 |
22 |
59849426 |
Connection to pipe water supply at AWC K.Subalada-T |
70000 |
Connection to pipe water supply at AWC K.Subalada-T1 |
Completion of work |
-
latitude : 19.07703705,19.07705339
Longitude : 84.19819112,84.19818124
file name : Image_07032022085445559.png
|
2022-03-07 08:54:45.65346 |
23 |
59849426 |
Connection to pipe water supply at AWC K.Subalada-T |
70000 |
Connection to pipe water supply at AWC K.Subalada-T1 |
Completion of work |
-
latitude : 19.07717399,19.07713007
Longitude : 84.19828847,84.19812075
file name : Image_07032022085500367.png
|
2022-03-07 08:55:00.438045 |
24 |
59849426 |
Connection to pipe water supply at AWC K.Subalada-T |
70000 |
Connection to pipe water supply at AWC K.Subalada-T1 |
Completion of work |
-
latitude : 19.07713394,19.07713414
Longitude : 84.19807457,84.19807455
file name : Image_07032022085558059.png
|
2022-03-07 08:55:58.137796 |
25 |
59849426 |
Connection to pipe water supply at AWC K.Subalada-T |
70000 |
Connection to pipe water supply at AWC K.Subalada-T1 |
Completion of work |
-
latitude : 19.07713765,19.07713766
Longitude : 84.19806542,84.19806544
file name : Image_07032022085614403.png
|
2022-03-07 08:56:14.481905 |
26 |
59849729 |
Connection to pipe water supply at Primary School ,Marlaba- T |
80000 |
Connection to pipe water supply at Primary School ,Marlaba- T1 |
Completion of work |
-
latitude : 19.08590327,19.08584519
Longitude : 84.22665431,84.22664349
file name : Image_07032022084255779.png
|
2022-03-07 08:42:55.861048 |
27 |
59849997 |
Connection to pipe water supply at AWC Marlaba-T |
70000 |
Connection to pipe water supply at AWC Marlaba-T1 |
Completion of work |
-
latitude : 19.08557554
Longitude : 84.22631659
file name : Image_07032022084313478.png
|
2022-03-07 08:43:13.553748 |
28 |
59849997 |
Connection to pipe water supply at AWC Marlaba-T |
70000 |
Connection to pipe water supply at AWC Marlaba-T1 |
Completion of work |
-
latitude : 19.08557056
Longitude : 84.22629819
file name : Image_07032022084325756.png
|
2022-03-07 08:43:25.824079 |
29 |
59849997 |
Connection to pipe water supply at AWC Marlaba-T |
70000 |
Connection to pipe water supply at AWC Marlaba-T1 |
Completion of work |
-
latitude : 19.07712384
Longitude : 84.19808453
file name : Image_07032022085547516.png
|
2022-03-07 08:55:47.607071 |
30 |
59850394 |
Connection to pipe water supply at Primary School Kilang -5th |
80000 |
Connection to pipe water supply at Primary School Kilang -5th1 |
Completion of work |
-
latitude : 19.07251089
Longitude : 84.21265911
file name : Image_07032022084348974.png
|
2022-03-07 08:43:49.060261 |
31 |
59850394 |
Connection to pipe water supply at Primary School Kilang -5th |
80000 |
Connection to pipe water supply at Primary School Kilang -5th1 |
Completion of work |
-
latitude : 19.07251701
Longitude : 84.21266652
file name : Image_07032022084431012.png
|
2022-03-07 08:44:31.085098 |
32 |
59850714 |
Connection to pipe water supply at AWC -Kilang- 5Th |
70000 |
Connection to pipe water supply at AWC -Kilang- 5Th1 |
Completion of work |
-
latitude : 19.07248917,19.07248912
Longitude : 84.21249504,84.21249491
file name : Image_07032022084507305.png
|
2022-03-07 08:45:07.382212 |
33 |
59850714 |
Connection to pipe water supply at AWC -Kilang- 5Th |
70000 |
Connection to pipe water supply at AWC -Kilang- 5Th1 |
Completion of work |
-
latitude : 19.07247161,19.0724721
Longitude : 84.21248611,84.21248523
file name : Image_07032022085010729.png
|
2022-03-07 08:50:10.800726 |
34 |
59851083 |
Connection to pipe water supply at AWC Mahulapada-5th |
50000 |
Connection to pipe water supply at AWC Mahulapada-5th1 |
Completion of work |
-
latitude : 19.08894763,19.08894753
Longitude : 84.24175144,84.24175144
file name : Image_07032022084202976.png
|
2022-03-07 08:42:03.056567 |
35 |
59851550 |
Connection to pipe water supply at AWC T.Andarsing -5th |
70000 |
Connection to pipe water supply at AWC T.Andarsing -5th1 |
Completion of work |
-
latitude : 19.10432834,19.10432969
Longitude : 84.227208,84.22720763
file name : Image_07032022085426975.png
|
2022-03-07 08:54:27.052018 |
36 |
44039567 |
Construction of 8 no.of tube well platforms at Betarsing ,3 nos.at Kankada,1 no.at Mahalapada,2 nos. |
48000 |
Construction of 8 no.of tube well platforms at Betarsing ,3 nos.at Kankada,1 no.at Mahalapada,2 nos.1 |
Completion of work |
-
latitude : 19.072352796792984
Longitude : 84.21240951865911
file name : Image_04062022113646504.png
|
2022-06-04 11:36:46.595141 |
37 |
47510499 |
Construction of bathing steps at Gudhu Thuta K.Subalada-Tied |
100000 |
Construction of bathing steps at Gudhu Thuta K.Subalada-Tied1 |
Completion of work |
-
latitude : 19.089941130951047
Longitude : 84.23120367340744
file name : Image_04062022113559895.png
|
2022-06-04 11:35:59.977563 |
38 |
47820257 |
Const.of drain at Kankada with MGNREGS convergence -5th |
150000 |
Const.of drain at Kankada with MGNREGS convergence -5th1 |
Completion of work |
-
latitude : 19.097581319510937,19.097551899030805
Longitude : 84.24181600101292,84.24175062216818
file name : Image_04082022225424782.png
|
2022-08-04 22:54:24.861886 |
39 |
47819442 |
Repair of open well at Kankada road saide -5th |
50000 |
Repair of open well at Kankada road saide -5th1 |
Completion of work |
-
latitude : 19.09801184
Longitude : 84.24158089
file name : Image_04112022040945372.png
|
2022-11-04 04:09:45.42371 |
40 |
47819442 |
Repair of open well at Kankada road saide -5th |
50000 |
Repair of open well at Kankada road saide -5th1 |
Completion of work |
-
latitude : 19.09801184
Longitude : 84.24158089
file name : Image_04112022040927604.png
|
2022-11-04 04:09:27.655791 |
41 |
65966630 |
Creation of Shed for segregation and processing of wet and dry waste |
120000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 19.0925293
Longitude : 84.22951773
file name : Image_16122022113848913.png
|
2022-12-16 11:38:49.006878 |
42 |
65966630 |
Creation of Shed for segregation and processing of wet and dry waste |
120000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 19.09263221
Longitude : 84.22965564
file name : Image_20122022164211006.png
|
2022-12-20 16:42:11.081047 |
43 |
47506789 |
Repair & Renovation of open well at K.Subalada-Tied |
50000 |
Repair & Renovation of open well at K.Subalada-Tied1 |
Completion of work |
-
latitude : 19.07599983
Longitude : 84.19795819
file name : Image_28102022174405959.png
|
2022-10-28 17:44:06.06036 |
44 |
47506789 |
Repair & Renovation of open well at K.Subalada-Tied |
50000 |
Repair & Renovation of open well at K.Subalada-Tied1 |
Roof laid |
-
latitude : 19.07600862
Longitude : 84.19793955
file name : Image_04112022040940847.png
|
2022-11-04 04:09:40.897494 |
45 |
47506789 |
Repair & Renovation of open well at K.Subalada-Tied |
50000 |
Repair & Renovation of open well at K.Subalada-Tied1 |
Completion of work |
-
latitude : 19.089941130951047
Longitude : 84.23120367340744
file name : Image_04062022113626838.png
|
2022-06-04 11:36:26.931689 |
46 |
47816492 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary |
100000 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary1 |
Completion of work |
-
latitude : 19.08981651
Longitude : 84.23076777
file name : Image_28102022174401883.png
|
2022-10-28 17:44:02.013452 |
47 |
47816492 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary |
100000 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary1 |
Roof laid |
-
latitude : 19.08982268
Longitude : 84.23076702
file name : Image_04112022040920810.png
|
2022-11-04 04:09:20.857745 |
48 |
47816492 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary |
100000 |
Completion of incomplete steel gat at GP office Betarsing-TiedBoundary1 |
Completion of work |
-
latitude : 19.072352796792984
Longitude : 84.21240951865911
file name : Image_04062022113642209.png
|
2022-06-04 11:36:42.295092 |
49 |
47820043 |
Const.of pucca road at old post office sahi Betarsing-5th |
150000 |
Const.of pucca road at old post office sahi Betarsing-5th1 |
Roof laid |
-
latitude : 19.09420918,19.09420472
Longitude : 84.23175381,84.23175456
file name : Image_04112022040937281.png
|
2022-11-04 04:09:37.332204 |
50 |
47820043 |
Const.of pucca road at old post office sahi Betarsing-5th |
150000 |
Const.of pucca road at old post office sahi Betarsing-5th1 |
Completion of work |
-
latitude : 19.094134345650673,19.094138704240322
Longitude : 84.23180541023612,84.23189819790423
file name : Image_04082022225154847.png
|
2022-08-04 22:51:54.926169 |
51 |
47510014 |
Construction of pucca drain at Kalingo with MGNREGS convergence-Tied |
100000 |
Construction of pucca drain at Kalingo with MGNREGS convergence-Tied1 |
Roof laid |
-
latitude : 19.07248684,19.07248507
Longitude : 84.21223525,84.21223472
file name : Image_12112022074903221.png
|
2022-11-12 07:49:03.309082 |
52 |
47510014 |
Construction of pucca drain at Kalingo with MGNREGS convergence-Tied |
100000 |
Construction of pucca drain at Kalingo with MGNREGS convergence-Tied1 |
Completion of work |
-
latitude : 19.0723856119439,19.07240149565041
Longitude : 84.21211430802941,84.21209201216698
file name : Image_04062022113635981.png
|
2022-06-04 11:36:36.065975 |
53 |
47819718 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th |
150000 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th1 |
Roof laid |
-
latitude : 19.08591879,19.08592901
Longitude : 84.22658124,84.22658221
file name : Image_04112022040932460.png
|
2022-11-04 04:09:32.511177 |
54 |
47819718 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th |
150000 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th1 |
Roof laid |
-
latitude : 19.08591879,19.08592901
Longitude : 84.22658124,84.22658221
file name : Image_04112022041015211.png
|
2022-11-04 04:10:15.26589 |
55 |
47819718 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th |
150000 |
Const.of pucca drain from PUPS marloba to AWC Marloba-5th1 |
Completion of work |
-
latitude : 19.0854700980708,19.08573203254491
Longitude : 84.2261163610965,84.22632104717195
file name : Image_14072022130155356.png
|
2022-07-14 13:01:55.439648 |
56 |
47817182 |
Completion of incomplete recreation center at Betarsing-Tied |
150000 |
Completion of incomplete recreation center at Betarsing-Tied1 |
Completion of work |
-
latitude : 19.094945
Longitude : 84.23258333333334
file name : Image_18102023144721734.png
|
2023-10-18 14:47:21.853193 |
57 |
47819264 |
Construction of Kitichen Ghar of AWC T.Andarsing-5th |
100000 |
Construction of Kitichen Ghar of AWC T.Andarsing-5th1 |
Completion of work |
-
latitude : 19.104235000000003
Longitude : 84.22722
file name : Image_18102023144744515.png
|
2023-10-18 14:47:44.617641 |
58 |
47819264 |
Construction of Kitichen Ghar of AWC T.Andarsing-5th |
100000 |
Construction of Kitichen Ghar of AWC T.Andarsing-5th1 |
Completion of work |
-
latitude : 19.104235000000003
Longitude : 84.22722
file name : Image_18102023144731436.png
|
2023-10-18 14:47:31.531918 |
59 |
47816954 |
Const.of pucca drain at road sahi Betarsing with convergence MGNREGS |
150000 |
Const.of pucca drain at road sahi Betarsing with convergence MGNREGS1 |
Plinth level |
-
latitude : 19.092335,19.092351666666666,19.09236333333333
Longitude : 84.230385,84.23037833333335,84.23037833333335
file name : Image_29042023085553059.png
|
2023-04-29 08:55:53.149102 |
60 |
47816954 |
Const.of pucca drain at road sahi Betarsing with convergence MGNREGS |
150000 |
Const.of pucca drain at road sahi Betarsing with convergence MGNREGS1 |
Plinth level |
-
latitude : 19.092335,19.092351666666666,19.09236333333333
Longitude : 84.230385,84.23037833333335,84.23037833333335
file name : Image_29042023085540754.png
|
2023-04-29 08:55:40.840684 |
61 |
47817440 |
Const.of pucca drain at Mahulapada with convergence MGNREGS-Tied |
100000 |
Const.of pucca drain at Mahulapada with convergence MGNREGS-Tied1 |
Completion of work |
-
latitude : 19.091846666666665,19.09185
Longitude : 84.23937499999998,84.23937
file name : Image_29042023085546256.png
|
2023-04-29 08:55:46.361254 |
62 |
47817440 |
Const.of pucca drain at Mahulapada with convergence MGNREGS-Tied |
100000 |
Const.of pucca drain at Mahulapada with convergence MGNREGS-Tied1 |
Completion of work |
-
latitude : 19.091846666666665,19.09185
Longitude : 84.23937499999998,84.23937
file name : Image_29042023085535979.png
|
2023-04-29 08:55:36.071996 |
63 |
47820704 |
Repair of well at Kilango-5th |
50000 |
Repair of well at Kilango-5th1 |
Completion of work |
-
latitude : 19.071661666666667
Longitude : 84.21242666666667
file name : Image_01052023063027694.png
|
2023-05-01 06:30:27.806562 |
64 |
47510772 |
Construction of pucca drain at Beherasahi to Bariasahi-Tied |
100000 |
Construction of pucca drain at Beherasahi to Bariasahi-Tied1 |
Completion of work |
-
latitude : 19.089181666666665,19.08919
Longitude : 84.23156166666668,84.23157333333332
file name : Image_29042023085531197.png
|
2023-04-29 08:55:31.284913 |
65 |
65967589 |
CONSTRUCTION OF CC ROAD MAHULAPADA IAY SAHI TO MALA SAHI CONVERHENCE WITH MGNREGS MOHALAPADA |
200000 |
CONSTRUCTION OF CC ROAD MAHULAPADA IAY SAHI TO MALA SAHI CONVERHENCE WITH MGNREGS MOHALAPADA1 |
Completion of work |
-
latitude : 19.08924,19.08924
Longitude : 84.24216333333334,84.24216499999999
file name : Image_17052023100156622.png
|
2023-05-17 10:01:56.715135 |
66 |
65967589 |
CONSTRUCTION OF CC ROAD MAHULAPADA IAY SAHI TO MALA SAHI CONVERHENCE WITH MGNREGS MOHALAPADA |
200000 |
CONSTRUCTION OF CC ROAD MAHULAPADA IAY SAHI TO MALA SAHI CONVERHENCE WITH MGNREGS MOHALAPADA1 |
Completion of work |
-
latitude : 19.08924,19.08924
Longitude : 84.24216333333334,84.24216499999999
file name : Image_17052023100144687.png
|
2023-05-17 10:01:44.782995 |
67 |
65967268 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.088958333333334,19.088963333333332
Longitude : 84.230585,84.23059666666668
file name : Image_17052023100205850.png
|
2023-05-17 10:02:05.938038 |
68 |
65967268 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.088958333333334,19.088963333333332
Longitude : 84.230585,84.23059666666668
file name : Image_17052023100150479.png
|
2023-05-17 10:01:50.576717 |
69 |
65967328 |
Creation of drainage channel for management of grey water |
94850 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.086088333333333,19.08606
Longitude : 84.22672166666668,84.22676833333335
file name : Image_17072023175430791.png
|
2023-07-17 17:54:30.890984 |
70 |
47818356 |
Renovation of tank at Marloba with MGNREGS convergence -Untied |
100000 |
Renovation of tank at Marloba with MGNREGS convergence -Untied1 |
Completion of work |
-
latitude : 19.086953333333334
Longitude : 84.22508
file name : Image_10082023085550811.png
|
2023-08-10 08:55:50.890801 |
71 |
47818356 |
Renovation of tank at Marloba with MGNREGS convergence -Untied |
100000 |
Renovation of tank at Marloba with MGNREGS convergence -Untied1 |
Completion of work |
-
latitude : 19.086953333333334
Longitude : 84.22508
file name : Image_10082023085541130.png
|
2023-08-10 08:55:41.249369 |
72 |
65967821 |
CONSTRUCTION OF CC DRAIN AT KONKADA WITH CONVERGENCE MGNREGS |
100000 |
CONSTRUCTION OF CC DRAIN AT KONKADA WITH CONVERGENCE MGNREGS1 |
Completion of work |
-
latitude : 19.097835,19.097851666666667
Longitude : 84.24197833333334,84.24198333333334
file name : Image_10082023085555960.png
|
2023-08-10 08:55:56.049239 |
73 |
65967821 |
CONSTRUCTION OF CC DRAIN AT KONKADA WITH CONVERGENCE MGNREGS |
100000 |
CONSTRUCTION OF CC DRAIN AT KONKADA WITH CONVERGENCE MGNREGS1 |
Completion of work |
-
latitude : 19.097835,19.097851666666667
Longitude : 84.24197833333334,84.24198333333334
file name : Image_10082023085546045.png
|
2023-08-10 08:55:46.140902 |
74 |
65967712 |
CONSTRUCTION OF CC ROAD FROM NAIKA SAHI TO BANDHO |
149880 |
CONSTRUCTION OF CC ROAD FROM NAIKA SAHI TO BANDHO1 |
Completion of work |
-
latitude : 19.094611666666665,19.094738333333332
Longitude : 84.23335166666666,84.23347166666666
file name : Image_10082023085535046.png
|
2023-08-10 08:55:35.127205 |
75 |
47506977 |
Construction of water tank at Beherasahi Betarsing-Tied |
50000 |
Construction of water tank at Beherasahi Betarsing-Tied1 |
Completion of work |
-
latitude : 19.089021666666667
Longitude : 84.23129666666667
file name : Image_16112023154527607.png
|
2023-11-16 15:45:27.698289 |
76 |
65966292 |
Providing piped water supply to public institutions |
140000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.07886166666667
Longitude : 84.19761333333332
file name : Image_18012024145040954.png
|
2024-01-18 14:50:41.035869 |
77 |
65966875 |
Services of Collection & Transportation of waste from household to treatment site |
48000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.08982166666667
Longitude : 84.23070166666666
file name : Image_27012024125629342.png
|
2024-01-27 12:56:29.42787 |
78 |
65967854 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT KHILANGO |
200000 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT KHILANGO1 |
Completion of work |
-
latitude : 19.072868333333336
Longitude : 84.21108833333334
file name : Image_08022024162510187.png
|
2024-02-08 16:25:10.317697 |
79 |
65967854 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT KHILANGO |
200000 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT KHILANGO1 |
Completion of work |
-
latitude : 19.072868333333336
Longitude : 84.21108833333334
file name : Image_08022024162513142.png
|
2024-02-08 16:25:13.332439 |
80 |
65967070 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 19.072653333333335
Longitude : 84.21280833333334
file name : Image_01022024123931729.png
|
2024-02-01 12:39:31.80975 |
81 |
65966338 |
Providing piped water supply to public institutions |
37410 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.089991666666666
Longitude : 84.230745
file name : Image_08022024092920575.png
|
2024-02-08 09:29:20.675278 |
82 |
47821846 |
Const.of Pani Kundo at Mahalapada -5th |
30000 |
Const.of Pani Kundo at Mahalapada -5th1 |
Completion of work |
-
latitude : 19.08942
Longitude : 84.24204166666665
file name : Image_08022024162507172.png
|
2024-02-08 16:25:07.286952 |
83 |
78953864 |
Construction of Bus Stand Shed |
90000 |
Construction of Bus Stand Shed1 |
Roof laid |
-
latitude : 19.091956666666665
Longitude : 84.231215
file name : Image_07012024064642615.png
|
2024-01-07 06:46:42.698778 |
84 |
78953864 |
Construction of Bus Stand Shed |
90000 |
Construction of Bus Stand Shed1 |
Plinth level |
-
latitude : 19.091976666666667
Longitude : 84.231155
file name : Image_29122023193717689.png
|
2023-12-29 19:37:17.761514 |
85 |
78953864 |
Construction of Bus Stand Shed |
90000 |
Construction of Bus Stand Shed1 |
Completion of work |
-
latitude : 19.091951666666667
Longitude : 84.23118166666667
file name : Image_23122023101538980.png
|
2023-12-23 10:15:38.845532 |
86 |
79034261 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.075699999999998
Longitude : 84.197265
file name : Image_10062024084632164.png
|
2024-06-10 08:46:32.254443 |
87 |
79034261 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.075699999999998
Longitude : 84.197205
file name : Image_31052024095530698.png
|
2024-05-31 09:55:30.792949 |
88 |
79034261 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.075665
Longitude : 84.19730833333332
file name : Image_23052024091046579.png
|
2024-05-23 09:10:46.657194 |
89 |
79034261 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.075696666666666
Longitude : 84.19726833333334
file name : Image_15052024125215328.png
|
2024-05-15 12:52:15.435644 |
90 |
47817705 |
Renovation of Tank at Patu with convergence MGNREGS-Untied |
200000 |
Renovation of Tank at Patu with convergence MGNREGS-Untied1 |
Completion of work |
-
latitude : 19.116721666666667
Longitude : 84.22592666666667
file name : Image_19062024171121714.png
|
2024-06-19 17:11:21.800411 |
91 |
78976085 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.091993333333335
Longitude : 84.23210166666668
file name : Image_27052024103754321.png
|
2024-05-27 10:37:54.416572 |
92 |
78976085 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.092105
Longitude : 84.23185
file name : Image_27052024103132430.png
|
2024-05-27 10:31:32.552696 |
93 |
78976085 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.092085
Longitude : 84.23184833333335
file name : Image_27052024102430707.png
|
2024-05-27 10:24:30.802776 |
94 |
78976085 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.092085
Longitude : 84.23184833333335
file name : Image_27052024102415586.png
|
2024-05-27 10:24:15.687237 |
95 |
65967661 |
CONSTRUCTION OF ROAD AT ANDARSING MAIN ROAD WITH CONVERGENCE WITH MGNREGS |
200000 |
CONSTRUCTION OF ROAD AT ANDARSING MAIN ROAD WITH CONVERGENCE WITH MGNREGS1 |
Completion of work |
-
latitude : 19.11088833333333,19.110925
Longitude : 84.22511000000002,84.22514000000001
file name : Image_27052024102404412.png
|
2024-05-27 10:24:04.547851 |
96 |
65966543 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.085421666666665
Longitude : 84.22607500000001
file name : Image_01062024085847006.png
|
2024-06-01 08:58:47.117172 |
97 |
65967541 |
completion of incomplete gramya mandap at Betarsing |
100000 |
completion of incomplete gramya mandap at Betarsing1 |
Completion of work |
-
latitude : 19.091993333333335
Longitude : 84.23000333333333
file name : Image_01062024085850335.png
|
2024-06-01 08:58:50.444592 |
98 |
79088566 |
Maintenance of Street Lights |
40000 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 19.0985783
Longitude : 84.0495038
file name : Image_22032024133929761.png
|
2024-03-22 13:39:29.919615 |
99 |
79088566 |
Maintenance of Street Lights |
40000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 19.0985597
Longitude : 84.049512
file name : Image_22032024132941757.png
|
2024-03-22 13:29:41.900048 |
100 |
79088566 |
Maintenance of Street Lights |
40000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 19.0985584
Longitude : 84.0495118
file name : Image_22032024132152529.png
|
2024-03-22 13:21:52.670098 |
101 |
79062859 |
Purchase of equipment (including safety equipment) for waste management |
15000 |
Purchase of equipment (including safety equipment) for waste management1 |
|
-
latitude : 19.09004333333333
Longitude : 84.2306
file name : Image_01072024175817295.png
|
2024-07-01 17:58:17.389921 |
102 |
78986797 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.08594
Longitude : 84.22656
file name : Image_09072024093643513.png
|
2024-07-09 09:36:43.607071 |
103 |
78986797 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.085964999999998
Longitude : 84.22665
file name : Image_04072024065946333.png
|
2024-07-04 06:59:46.42414 |
104 |
78986797 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.085964999999998
Longitude : 84.22665
file name : Image_04072024065937735.png
|
2024-07-04 06:59:37.83152 |
105 |
78986797 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.085958333333334
Longitude : 84.22664833333334
file name : Image_01072024175826177.png
|
2024-07-01 17:58:26.272096 |
106 |
78986797 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.085958333333334
Longitude : 84.22664833333334
file name : Image_01072024175821586.png
|
2024-07-01 17:58:21.694195 |
107 |
65967747 |
ELECTRICAL CONNECTION TO 7 NOS.OF AWC OF BETARSING |
100000 |
ELECTRICAL CONNECTION TO 7 NOS.OF AWC OF BETARSING1 |
Completion of work |
-
latitude : 19.08564
Longitude : 84.22634833333335
file name : Image_13072024101350471.png
|
2024-07-13 10:13:50.555509 |
108 |
65967747 |
ELECTRICAL CONNECTION TO 7 NOS.OF AWC OF BETARSING |
100000 |
ELECTRICAL CONNECTION TO 7 NOS.OF AWC OF BETARSING1 |
Completion of work |
-
latitude : 19.08564
Longitude : 84.22634833333335
file name : Image_13072024101338791.png
|
2024-07-13 10:13:38.879403 |
109 |
65966667 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
39000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 19.090028333333333
Longitude : 84.23088166666666
file name : Image_04072024065923756.png
|
2024-07-04 06:59:23.840285 |
110 |
79026863 |
Repairing/Construction of Building |
105593 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 19.08947
Longitude : 84.23076666666665
file name : Image_10092024132102740.png
|
2024-09-10 13:21:06.194961 |
111 |
79026863 |
Repairing/Construction of Building |
105593 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 19.089499999999997
Longitude : 84.23075166666668
file name : Image_10092024124007494.png
|
2024-09-10 12:42:09.600436 |
112 |
79026863 |
Repairing/Construction of Building |
105593 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 19.089499999999997
Longitude : 84.23075166666668
file name : Image_10092024124000094.png
|
2024-09-10 12:42:02.207192 |
113 |
79026863 |
Repairing/Construction of Building |
105593 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 19.08959666666667
Longitude : 84.230855
file name : Image_13072024101323561.png
|
2024-07-13 10:13:23.653017 |
114 |
78954886 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 19.088306666666664
Longitude : 84.24262500000002
file name : Image_10092024161450224.png
|
2024-09-10 16:14:53.766645 |
115 |
78954886 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 19.088345
Longitude : 84.24256833333332
file name : Image_10092024132135966.png
|
2024-09-10 13:21:39.416831 |
116 |
78954886 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 19.088345
Longitude : 84.24256833333332
file name : Image_10092024132119759.png
|
2024-09-10 13:21:23.206009 |
117 |
78954886 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 19.08833333333333
Longitude : 84.24258999999999
file name : Image_10092024123954206.png
|
2024-09-10 12:41:56.313306 |