1 |
44101880 |
Compl. of incomplete community hall |
150000 |
Compl. of incomplete community hall1 |
Completion of work |
-
latitude : 18.87906518
Longitude : 84.19889272
file name : Image_22122020170314447.png
|
2020-12-22 17:03:14.524806 |
2 |
44101880 |
Compl. of incomplete community hall |
150000 |
Compl. of incomplete community hall1 |
Completion of work |
-
latitude : 18.87901741
Longitude : 84.19885199
file name : Image_22122020170257526.png
|
2020-12-22 17:02:57.596652 |
3 |
44101810 |
Const. of drain with cover plate at Lalusahi |
150000 |
Const. of drain with cover plate at Lalusahi1 |
Completion of work |
-
latitude : 18.86918408,18.86918364
Longitude : 84.21889276,84.21889313
file name : Image_18012021153635119.png
|
2021-01-18 15:36:35.213189 |
4 |
44101810 |
Const. of drain with cover plate at Lalusahi |
150000 |
Const. of drain with cover plate at Lalusahi1 |
Completion of work |
-
latitude : 18.86933504,18.86927771,18.86927565
Longitude : 84.21934117,84.21923388,84.21923203
file name : Image_18012021154213399.png
|
2021-01-18 15:42:13.48937 |
5 |
44101864 |
Repair of drain and cleaning at Harijana sahi of Narayanapur |
100000 |
Repair of drain and cleaning at Harijana sahi of Narayanapur1 |
Completion of work |
-
latitude : 18.88455982,18.88456663
Longitude : 84.18697526,84.18692511
file name : Image_22032021123614725.png
|
2021-03-22 12:36:14.838169 |
6 |
44101864 |
Repair of drain and cleaning at Harijana sahi of Narayanapur |
100000 |
Repair of drain and cleaning at Harijana sahi of Narayanapur1 |
Completion of work |
-
latitude : 18.88456492,18.88456642
Longitude : 84.18688344,84.18688165
file name : Image_18012021150520155.png
|
2021-01-18 15:05:20.238562 |
7 |
44101864 |
Repair of drain and cleaning at Harijana sahi of Narayanapur |
100000 |
Repair of drain and cleaning at Harijana sahi of Narayanapur1 |
Completion of work |
-
latitude : 18.88445791,18.88445807,18.88441183
Longitude : 84.18684091,84.18684089,84.18681524
file name : Image_18012021150203760.png
|
2021-01-18 15:02:03.845119 |
8 |
44101682 |
Installation of solar pump for pipe water supply |
330000 |
Installation of solar pump for pipe water supply1 |
Completion of work |
-
latitude : 18.78287501
Longitude : 84.08268988
file name : Image_25012021123418212.png
|
2021-01-25 12:34:18.31809 |
9 |
44101682 |
Installation of solar pump for pipe water supply |
330000 |
Installation of solar pump for pipe water supply1 |
Completion of work |
-
latitude : 18.8723399
Longitude : 84.21684862
file name : Image_25012021123510205.png
|
2021-01-25 12:35:10.328692 |
10 |
44101852 |
Compl. of incomplete community hall at Harijanasahi |
100000 |
Compl. of incomplete community hall at Harijanasahi1 |
Completion of work |
-
latitude : 18.88455169
Longitude : 84.18693257
file name : Image_22032021123452568.png
|
2021-03-22 12:34:52.698342 |
11 |
44101653 |
Repair of water supply at UP School of Lalusahi |
70000 |
Repair of water supply at UP School of Lalusahi1 |
Completion of work |
-
latitude : 18.86871638,18.86875627
Longitude : 84.21811576,84.21811971
file name : Image_22032021115532024.png
|
2021-03-22 11:55:32.138777 |
12 |
44101653 |
Repair of water supply at UP School of Lalusahi |
70000 |
Repair of water supply at UP School of Lalusahi1 |
Completion of work |
-
latitude : 18.86871638,18.86875627
Longitude : 84.21811576,84.21811971
file name : Image_22032021122204902.png
|
2021-03-22 12:22:05.001035 |
13 |
44101626 |
Repair & Maintenance of pipe water supply of Badagan village |
50000 |
Repair & Maintenance of pipe water supply of Badagan village1 |
Completion of work |
-
latitude : 18.8699422,18.86995633
Longitude : 84.19277025,84.19271823
file name : Image_22032021113640302.png
|
2021-03-22 11:36:40.398181 |
14 |
49662812 |
CONSTRUCTION OF PWS AT PS NUASAHI NARAYANPUR TIED |
50000 |
CONSTRUCTION OF PWS AT PS NUASAHI NARAYANPUR TIED 1 |
Completion of work |
-
latitude : 18.88197571,18.88182105
Longitude : 84.19144763,84.19150515
file name : Image_22032021122406428.png
|
2021-03-22 12:24:06.544105 |
15 |
44101696 |
Repair of pipe line water tank of sevakpur |
50000 |
Repair of pipe line water tank of sevakpur1 |
Completion of work |
-
latitude : 18.88931081
Longitude : 84.1760993
file name : Image_22032021135050596.png
|
2021-03-22 13:50:50.514888 |
16 |
44101640 |
Repair of open well at main road of Narayanpur |
50000 |
Repair of open well at main road of Narayanpur1 |
Completion of work |
-
latitude : 18.8839841
Longitude : 84.1874729
file name : Image_19042021122629362.png
|
2021-04-19 12:26:29.429583 |
17 |
44101640 |
Repair of open well at main road of Narayanpur |
50000 |
Repair of open well at main road of Narayanpur1 |
Completion of work |
-
latitude : 18.88398707
Longitude : 84.18736834
file name : Image_19042021122735625.png
|
2021-04-19 12:27:35.696879 |
18 |
50651148 |
INSTALLATION OF SOLAR PUMP PWS AT HARIJANSAHI NARAYANPUR-UNTIED |
333000 |
INSTALLATION OF SOLAR PUMP PWS AT HARIJANSAHI NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88458017,18.88466476
Longitude : 84.18693807,84.18697413
file name : Image_17052021182151837.png
|
2021-05-17 18:21:51.930685 |
19 |
50651148 |
INSTALLATION OF SOLAR PUMP PWS AT HARIJANSAHI NARAYANPUR-UNTIED |
333000 |
INSTALLATION OF SOLAR PUMP PWS AT HARIJANSAHI NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88457668,18.8846227
Longitude : 84.18698842,84.18699841
file name : Image_27042021141114079.png
|
2021-04-27 14:11:14.179162 |
20 |
50652428 |
INSTALLATION OF SOLAR PUMP PWS AT SADAR STREET NARAYANPUR-UNTIED |
333000 |
INSTALLATION OF SOLAR PUMP PWS AT SADAR STREET NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88440226,18.88436867
Longitude : 84.18839417,84.18849554
file name : Image_18052021152957443.png
|
2021-05-18 15:29:57.565272 |
21 |
44101829 |
Const. of drain at upper sahi backside of christian sahi |
200000 |
Const. of drain at upper sahi backside of christian sahi1 |
Completion of work |
-
latitude : 18.88460023,18.88458697
Longitude : 84.18997372,84.18998126
file name : Image_18052021164342475.png
|
2021-05-18 16:43:42.585551 |
22 |
50659928 |
CONSTRUCTION OF GUARD WALL AT MAHABANDHA NARAYANPUR-UNTIED |
50000 |
CONSTRUCTION OF GUARD WALL AT MAHABANDHA NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88509067
Longitude : 84.18771777
file name : Image_18052021165922417.png
|
2021-05-18 16:59:22.534653 |
23 |
50659920 |
CONSTRUCTION OF SURPLUS AT MAHABANDHA NARAYANPUR-UNTIED |
50000 |
CONSTRUCTION OF SURPLUS AT MAHABANDHA NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88505338
Longitude : 84.18771117
file name : Image_18052021165918929.png
|
2021-05-18 16:59:19.043076 |
24 |
55054749 |
CONSTRUCTION OF PWS AT AWC LALUSAHI TIED |
50000 |
CONSTRUCTION OF PWS AT AWC LALUSAHI TIED1 |
Completion of work |
-
latitude : 18.86874788,18.86873913
Longitude : 84.21896485,84.2189744
file name : Image_25102021160109057.png
|
2021-10-25 16:01:09.164318 |
25 |
55054764 |
CONSTRUCTION OF PWS AT AWC MINI ARAKHAPADA TIED |
50000 |
CONSTRUCTION OF PWS AT AWC MINI ARAKHAPADA TIED1 |
Completion of work |
-
latitude : 18.86441095,18.86440623,18.86440641,18.86440635,18.86439763
Longitude : 84.22394448,84.2238982,84.22389818,84.22389766,84.22390761
file name : Image_25102021155043149.png
|
2021-10-25 15:50:43.260121 |
26 |
49662920 |
CONSTRUCTION OF PWS AT KALAYAN MANDAP NRAYANPUR TIED |
100000 |
CONSTRUCTION OF PWS AT KALAYAN MANDAP NRAYANPUR TIED 1 |
Completion of work |
-
latitude : 18.88538946
Longitude : 84.18173331
file name : Image_07092021133530345.png
|
2021-09-07 13:35:30.484987 |
27 |
44101712 |
Repair of drain and cleaning at Badagam village |
200000 |
Repair of drain and cleaning at Badagam village1 |
Completion of work |
-
latitude : 18.87076963,18.87076965,18.8709091
Longitude : 84.1904039,84.19040391,84.1904196
file name : Image_07092021144803585.png
|
2021-09-07 14:48:03.702342 |
28 |
50659968 |
CONST OF PWS AT AWC-1 AWC-2 AWC-3 AND AWC-4 OF NARAYANPUR-UNTIED |
238000 |
CONST OF PWS AT AWC-1 AWC-2 AWC-3 AND AWC-4 OF NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88460311,18.88464405
Longitude : 84.18648647,84.1864901
file name : Image_08092021094140766.png
|
2021-09-08 09:41:40.861873 |
29 |
49663023 |
CONSTRUCTION OF INCOMPLETE TIOLET WITH WATER SUPPLY AT AWC SEVEKAPUR- TIED |
62350 |
CONSTRUCTION OF INCOMPLETE TIOLET WITH WATER SUPPLY AT AWC SEVEKAPUR- TIED 1 |
Completion of work |
-
latitude : 18.88876843,18.88877809
Longitude : 84.17593056,84.17594973
file name : Image_07092021162612240.png
|
2021-09-07 16:26:12.335377 |
30 |
47845766 |
ENGLISH ELM PAINTING OF PS AND AWC BADAGAM-UNTIED |
64000 |
ENGLISH ELM PAINTING OF PS AND AWC BADAGAM-UNTIED1 |
Completion of work |
-
latitude : 18.86995066
Longitude : 84.19258259
file name : Image_09032022141618006.png
|
2022-03-09 14:16:18.090287 |
31 |
47822156 |
SUPPLY OF DRINKING WATER THROUGH WATER TANKER BY HIRING TRACTOR ENGINE -TIED |
71149 |
SUPPLY OF DRINKING WATER THROUGH WATER TANKER BY HIRING TRACTOR ENGINE -TIED 1 |
Completion of work |
-
latitude : 18.8488262
Longitude : 84.18488178
file name : Image_12012022111432374.png
|
2022-01-12 11:14:32.52527 |
32 |
47821943 |
REPAIR OF OPEN WELL AT CHRISTIAN SAHI NARAYANPUR-TIED |
100000 |
REPAIR OF OPEN WELL AT CHRISTIAN SAHI NARAYANPUR-TIED 1 |
Completion of work |
-
latitude : 18.8828755
Longitude : 84.19032561
file name : Image_11012022163659707.png
|
2022-01-11 16:36:59.812059 |
33 |
47844476 |
CONST OF BOUNDARY WALL AT PS AT BADAGAM-UNTIED |
100000 |
CONST OF BOUNDARY WALL AT PS AT BADAGAM-UNTIED1 |
Completion of work |
-
latitude : 18.87010049
Longitude : 84.19258587
file name : Image_09032022141509076.png
|
2022-03-09 14:15:09.160417 |
34 |
47848382 |
REPAIR COMMUNITY HALL AT SEVAKPUR-UNTIED |
100000 |
REPAIR COMMUNITY HALL AT SEVAKPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88914183
Longitude : 84.17503959
file name : Image_09032022160412292.png
|
2022-03-09 16:04:12.376572 |
35 |
47846216 |
CONSTRUCTION OF DRAIN WITH COVER PLATE AT LALUSAHI-TIED S |
100000 |
CONSTRUCTION OF DRAIN WITH COVER PLATE AT LALUSAHI-TIED S1 |
Completion of work |
-
latitude : 18.8677575,18.86775558,18.86775554
Longitude : 84.21815954,84.21815615,84.21815616
file name : Image_09032022145558398.png
|
2022-03-09 14:55:58.509178 |
36 |
47822806 |
COMPLETION OF INCOMPLETE TOILETS AT AWC SEVAKPUR -TIED S |
100000 |
COMPLETION OF INCOMPLETE TOILETS AT AWC SEVAKPUR -TIED S1 |
Completion of work |
-
latitude : 18.88877884
Longitude : 84.17606746
file name : Image_09032022155614758.png
|
2022-03-09 15:56:14.886332 |
37 |
47823311 |
PURCHASE OF DUSTBIN AND COST OF 32 NOS. OF SOAK PITS- TIED S |
41149 |
PURCHASE OF DUSTBIN AND COST OF 32 NOS. OF SOAK PITS- TIED S1 |
Completion of work |
-
latitude : 18.86789139
Longitude : 84.21789334
file name : Image_09032022152426934.png
|
2022-03-09 15:24:27.037593 |
38 |
47821680 |
CONST OF BORE WELL AND MAINT OF PIPE LINE WATER SUPPLY AT NARAYANPUR-TIED |
170000 |
CONST OF BORE WELL AND MAINT OF PIPE LINE WATER SUPPLY AT NARAYANPUR-TIED1 |
Completion of work |
-
latitude : 18.8851701
Longitude : 84.189097
file name : Image_12052022105928858.png
|
2022-05-12 10:59:28.982759 |
39 |
47823055 |
REPAIR OF DRAIN WITH COVER PLATE AT SADARSAHI NARAYANPUR- TIED S |
200000 |
REPAIR OF DRAIN WITH COVER PLATE AT SADARSAHI NARAYANPUR- TIED S1 |
Completion of work |
-
latitude : 18.88411404,18.88403053
Longitude : 84.18912622,84.18919066
file name : Image_12052022110634879.png
|
2022-05-12 11:06:34.993904 |
40 |
47822417 |
REPAIR OF GRAVITY FLOW WATER TANK AT PARIDA-TIED |
100000 |
REPAIR OF GRAVITY FLOW WATER TANK AT PARIDA-TIED 1 |
Completion of work |
-
latitude : 18.87234172
Longitude : 84.21682402
file name : Image_04062022152750167.png
|
2022-06-04 15:27:50.266895 |
41 |
47845414 |
IMPROVEMENT OF HINDU SMASAN GHAT AT NARAYANPUR-UNTIED |
150000 |
IMPROVEMENT OF HINDU SMASAN GHAT AT NARAYANPUR-UNTIED1 |
Completion of work |
-
latitude : 18.88210623
Longitude : 84.19100913
file name : Image_04062022151752185.png
|
2022-06-04 15:17:52.271122 |
42 |
50659942 |
CONSTRUCTION OF SHED AT GODOWN-UNTIED |
60000 |
CONSTRUCTION OF SHED AT GODOWN-UNTIED1 |
Completion of work |
-
latitude : 18.88435332
Longitude : 84.18537239
file name : Image_04062022150615920.png
|
2022-06-04 15:06:16.031783 |
43 |
64310037 |
COST OF TRICYCLE, PUSH CART AND SEGREGATION SHED-S |
31200 |
COST OF TRICYCLE, PUSH CART AND SEGREGATION SHED-S1 |
Completion of work |
-
latitude : 18.88438955
Longitude : 84.18601409
file name : Image_11072022131504627.png
|
2022-07-11 13:15:04.72428 |
44 |
64310037 |
COST OF TRICYCLE, PUSH CART AND SEGREGATION SHED-S |
31200 |
COST OF TRICYCLE, PUSH CART AND SEGREGATION SHED-S1 |
Completion of work |
-
latitude : 18.88278901
Longitude : 84.19020174
file name : Image_11072022131851563.png
|
2022-07-11 13:18:51.674042 |
45 |
64310118 |
MAINT AND REPAIR OF PWS AT NARAYANPUR-W |
50000 |
MAINT AND REPAIR OF PWS AT NARAYANPUR-W1 |
Completion of work |
-
latitude : 18.88938387,18.88939326
Longitude : 84.17527912,84.17527713
file name : Image_22082022204255474.png
|
2022-08-22 20:42:55.599207 |
46 |
64310183 |
CONST OF WATER TANK AT TALASAHI PARIDA-UT |
40000 |
CONST OF WATER TANK AT TALASAHI PARIDA-UT1 |
Completion of work |
-
latitude : 18.87251678
Longitude : 84.21593537
file name : Image_22082022192407482.png
|
2022-08-22 19:24:07.58834 |
47 |
64787368 |
CONST OF BOUNDARY WALL AT SMASAN GHAT BAGHARLA-UT |
300000 |
CONST OF BOUNDARY WALL AT SMASAN GHAT BAGHARLA-UT1 |
Completion of work |
-
latitude : 18.87988373,18.87994144
Longitude : 84.19765271,84.19764084
file name : Image_23082022110512436.png
|
2022-08-23 11:05:12.535344 |
48 |
64788270 |
COMPL OF INCOMPLETE KALYAN MANDAP AT NARAYANPUR-5TH |
200000 |
COMPL OF INCOMPLETE KALYAN MANDAP AT NARAYANPUR-5TH1 |
Completion of work |
-
latitude : 18.88534005
Longitude : 84.18149227
file name : Image_23082022164832669.png
|
2022-08-23 16:48:32.765829 |
49 |
64787777 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
42840 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 18.88423166666667
Longitude : 84.18581833333334
file name : Image_04072024171100326.png
|
2024-07-04 17:11:00.390577 |
50 |
64787739 |
Creation of Shed for segregation and processing of wet and dry waste |
105000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 18.882794999999998
Longitude : 84.1902
file name : Image_17082023131353985.png
|
2023-08-17 13:13:54.107681 |
51 |
64788382 |
REPAIR OF REST SHED AT NARAYANPUR BUS STAND-5TH |
100000 |
REPAIR OF REST SHED AT NARAYANPUR BUS STAND-5TH1 |
Plinth level |
-
latitude : 18.8840533
Longitude : 84.18699373
file name : Image_29112022113949522.png
|
2022-11-29 11:39:49.632742 |
52 |
64787224 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 18.8832926,18.88304718
Longitude : 84.1892387,84.18971101
file name : Image_29112022115516754.png
|
2022-11-29 11:55:16.871726 |
53 |
64787972 |
Operation & maintenance of Grey water management system |
200000 |
Operation & maintenance of Grey water management system1 |
Plinth level |
-
latitude : 18.884019
Longitude : 84.1893473
file name : Image_29112022120258093.png
|
2022-11-29 12:02:58.208667 |
54 |
64787668 |
Operation & maintenance of drinking water supply system |
200000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 18.88332454
Longitude : 84.19505909
file name : Image_29112022121243000.png
|
2022-11-29 12:12:43.117833 |
55 |
64787134 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 18.871459658257663,18.87149632908404
Longitude : 84.18785456568003,84.18785355985165
file name : Image_21022023162640699.png
|
2023-02-21 16:26:40.793246 |
56 |
64788199 |
COMPLETION OF INCOMPLETE PEO QUATER-5TH |
250000 |
COMPLETION OF INCOMPLETE PEO QUATER-5TH1 |
Completion of work |
-
latitude : 18.884359449148178
Longitude : 84.18526564724743
file name : Image_23022023130759193.png
|
2023-02-23 13:07:59.305024 |
57 |
64788199 |
COMPLETION OF INCOMPLETE PEO QUATER-5TH |
250000 |
COMPLETION OF INCOMPLETE PEO QUATER-5TH1 |
Completion of work |
-
latitude : 18.884414727799594
Longitude : 84.18530772440135
file name : Image_23022023133232349.png
|
2023-02-23 13:32:32.45573 |
58 |
64787644 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.878719999999998
Longitude : 84.19906666666665
file name : Image_17082023131040271.png
|
2023-08-17 13:10:40.367546 |
59 |
64787644 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.878217567689717
Longitude : 84.19950289651752
file name : Image_04042023103729787.png
|
2023-04-04 10:37:29.893595 |
60 |
64787535 |
Operation & maintenance of drinking water supply system |
137410 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 18.884014999999998
Longitude : 84.18849833333334
file name : Image_17082023143132291.png
|
2023-08-17 14:31:32.370193 |
61 |
83316295 |
Construction and Maintenance of Community Centre |
105593 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 18.885056666666667
Longitude : 84.18163000000001
file name : Image_18102023115044954.png
|
2023-10-18 11:50:45.047963 |
62 |
83316295 |
Construction and Maintenance of Community Centre |
105593 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 18.885013333333333
Longitude : 84.18165833333333
file name : Image_12092023144924297.png
|
2023-09-12 14:49:24.391319 |
63 |
78322400 |
Development of Water Bodies |
360000 |
Development of Water Bodies1 |
Plinth level |
-
latitude : 18.877686666666666
Longitude : 84.20013499999999
file name : Image_21102023100659845.png
|
2023-10-21 10:06:59.950695 |
64 |
78322400 |
Development of Water Bodies |
360000 |
Development of Water Bodies1 |
Completion of work |
-
latitude : 18.877685
Longitude : 84.20015666666669
file name : Image_19102023170829723.png
|
2023-10-19 17:08:29.818931 |
65 |
83281639 |
Maintenance of Street Lights |
120000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 18.884223333333335
Longitude : 84.185705
file name : Image_13102023100153441.png
|
2023-10-13 10:01:53.527577 |
66 |
83281639 |
Maintenance of Street Lights |
120000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 18.884163333333333
Longitude : 84.185905
file name : Image_03102023112800077.png
|
2023-10-03 11:28:00.187933 |
67 |
78314082 |
Water Supply to villages |
242000 |
Water Supply to villages1 |
|
-
latitude : 18.849318333333333
Longitude : 84.18539166666666
file name : Image_20112023101254097.png
|
2023-11-20 10:12:54.225104 |
68 |
83317108 |
Any other operation and maintenance needs related to solid waste management |
99040 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 18.884166666666665
Longitude : 84.18572
file name : Image_15022024123214669.png
|
2024-02-15 12:32:14.741672 |
69 |
83317108 |
Any other operation and maintenance needs related to solid waste management |
99040 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 18.884225
Longitude : 84.18576999999999
file name : Image_15022024121807537.png
|
2024-02-15 12:18:07.688126 |
70 |
78090473 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
42700 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Roof laid |
-
latitude : 18.884241666666664
Longitude : 84.18573666666667
file name : Image_07052024102322927.png
|
2024-05-07 10:23:22.981354 |
71 |
78090473 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
42700 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 18.884259999999998
Longitude : 84.18589500000002
file name : Image_07052024101720956.png
|
2024-05-07 10:17:21.008763 |
72 |
78090473 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
42700 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 18.884281666666666
Longitude : 84.18577666666667
file name : Image_07052024100413163.png
|
2024-05-07 10:04:13.220109 |
73 |
78090473 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
42700 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 18.88432
Longitude : 84.18585166666665
file name : Image_04052024134959878.png
|
2024-05-04 13:49:59.930239 |
74 |
83316952 |
Services of Collection & transportation of waste from household to treatment site |
58600 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 18.884165
Longitude : 84.18574166666667
file name : Image_30032024162802417.png
|
2024-03-30 16:28:02.480426 |
75 |
83316952 |
Services of Collection & transportation of waste from household to treatment site |
58600 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 18.884128333333333
Longitude : 84.18573333333333
file name : Image_30032024163300656.png
|
2024-03-30 16:33:00.713289 |
76 |
83316952 |
Services of Collection & transportation of waste from household to treatment site |
58600 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 18.884106666666664
Longitude : 84.18578166666666
file name : Image_30032024162805324.png
|
2024-03-30 16:28:05.385243 |
77 |
105299033 |
Construction of roads |
208152 |
Construction of roads1 |
Roof laid |
-
latitude : 18.869031666666668,18.869025
Longitude : 84.19488000000001,84.19488000000001
file name : Image_29062024115303232.png
|
2024-06-29 11:53:03.291822 |
78 |
105299033 |
Construction of roads |
208152 |
Construction of roads1 |
Plinth level |
-
latitude : 18.869083333333332,18.86907,18.869071666666667
Longitude : 84.19470666666666,84.19474,84.19473666666666
file name : Image_29062024114809175.png
|
2024-06-29 11:48:09.24104 |
79 |
105299033 |
Construction of roads |
208152 |
Construction of roads1 |
Plinth level |
-
latitude : 18.869048333333335,18.86909166666667
Longitude : 84.19472333333333,84.1948
file name : Image_29062024114821084.png
|
2024-06-29 11:48:21.150899 |
80 |
105299033 |
Construction of roads |
208152 |
Construction of roads1 |
Completion of work |
-
latitude : 18.869081666666666,18.86907666666667
Longitude : 84.19476333333333,84.19478
file name : Image_29062024113719348.png
|
2024-06-29 11:37:19.406596 |
81 |
106801283 |
Water Supply to villages |
115025 |
Water Supply to villages1 |
|
-
latitude : 18.884248333333336
Longitude : 84.18560666666666
file name : Image_01072024104048697.png
|
2024-07-01 10:40:48.754896 |