1 |
50772377 |
CONSTRUCTION OF PWS AT PUTTAR GUMMA AWC WITH ELECTRICAL WIRING-TIED |
100000 |
CONSTRUCTION OF PWS AT PUTTAR GUMMA AWC WITH ELECTRICAL WIRING-TIED1 |
Completion of work |
-
latitude : 18.991114999999997,18.991114999999997,18.991171666666666
Longitude : 84.24634333333333,84.24634333333333,84.24626000000002
file name : Image_01052021132433227.png
|
2021-05-01 13:24:33.318869 |
2 |
50772149 |
CONSTRUCTION OF PWS AT S PUTTAR UPS WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT S PUTTAR UPS WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.002951666666668,19.002951666666668
Longitude : 84.24605666666666,84.24605666666666
file name : Image_01052021132332360.png
|
2021-05-01 13:23:32.455692 |
3 |
32322880 |
Installation of Electricity at Puttar G.P, Office |
200000 |
Installation of Electricity at Puttar G.P, Office1 |
Commenced |
-
latitude : 19.00301
Longitude : 84.24609333333335
file name : Image_01052021132442108.png
|
2021-05-01 13:24:42.224931 |
4 |
20238981 |
Const of Drain at Badaputtar to Bandha |
150000 |
Const of Drain at Badaputtar to Bandha1 |
Commenced |
-
latitude : 19.005711666666667,19.005758333333333
Longitude : 84.25617666666668,84.25608333333334
file name : Image_20052021130609623.png
|
2021-05-20 13:06:09.707243 |
5 |
32321428 |
Repair of PWS Project with over head Tank at Rajana sahi |
260000 |
Repair of PWS Project with over head Tank at Rajana sahi1 |
Commenced |
-
latitude : 18.985619999999997,18.985619999999997
Longitude : 84.26401333333334,84.26401333333334
file name : Image_10072021123549738.png
|
2021-07-10 12:35:49.844592 |
6 |
50772450 |
CONSTRUCTION OF CC DRAIN WITH COVER PLATE AT BADA KARANJASAHI-TIED |
100000 |
CONSTRUCTION OF CC DRAIN WITH COVER PLATE AT BADA KARANJASAHI-TIED1 |
Completion of work |
-
latitude : 19.041103333333336,19.041063333333334
Longitude : 84.24524666666666,84.24520333333334
file name : Image_27112021154407325.png
|
2021-11-27 15:44:07.436748 |
7 |
64726418 |
Const of Rest Shed at Raikagumma-UT |
400000 |
Const of Rest Shed at Raikagumma-UT1 |
Completion of work |
-
latitude : 19.02014
Longitude : 84.24996166666666
file name : Image_01102022130430582.png
|
2022-10-01 13:04:30.641969 |
8 |
63913394 |
COMPLETION OF INCOMPLETE VLW QUARTER AT PUTTAR UT |
74523 |
COMPLETION OF INCOMPLETE VLW QUARTER AT PUTTAR UT1 |
Completion of work |
-
latitude : 19.0035029
Longitude : 84.230449
file name : Image_16062022114247961.png
|
2022-06-16 11:42:48.045378 |
9 |
63913394 |
COMPLETION OF INCOMPLETE VLW QUARTER AT PUTTAR UT |
74523 |
COMPLETION OF INCOMPLETE VLW QUARTER AT PUTTAR UT1 |
Completion of work |
-
latitude : 19.0035029
Longitude : 84.230449
file name : Image_16062022114251815.png
|
2022-06-16 11:42:51.897973 |
10 |
63913437 |
TRANSFORMATION OF GP CONFERENCE HALL WITH ALLUMINIUM DOOR AND WINDOW AND REILING UT |
250000 |
TRANSFORMATION OF GP CONFERENCE HALL WITH ALLUMINIUM DOOR AND WINDOW AND REILING UT1 |
Completion of work |
-
latitude : 19.003245
Longitude : 84.24617000000002
file name : Image_16062022114255699.png
|
2022-06-16 11:42:55.777725 |
11 |
63913437 |
TRANSFORMATION OF GP CONFERENCE HALL WITH ALLUMINIUM DOOR AND WINDOW AND REILING UT |
250000 |
TRANSFORMATION OF GP CONFERENCE HALL WITH ALLUMINIUM DOOR AND WINDOW AND REILING UT1 |
Completion of work |
-
latitude : 19.003148333333336
Longitude : 84.24623166666667
file name : Image_16062022114259381.png
|
2022-06-16 11:42:59.463994 |
12 |
47539849 |
INSTALLATION OF 50 NOS. DISPOSAL DUSTBIN FOR SOLID WASTE MANAGEMENT-TIED S |
300000 |
INSTALLATION OF 50 NOS. DISPOSAL DUSTBIN FOR SOLID WASTE MANAGEMENT-TIED S1 |
Roof laid |
-
latitude : 19.001936666666666
Longitude : 84.24340333333333
file name : Image_28102022111811940.png
|
2022-10-28 11:18:12.020339 |
13 |
64726236 |
Augmentation of the existing source of drinking water |
150000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 18.939583333333335,18.996876666666665
Longitude : 84.153545,84.26489833333332
file name : Image_28032023131900243.png
|
2023-03-28 13:19:00.355695 |
14 |
63913186 |
CONSTRUCTION OF CC DRAIN WITH ROAD AT BULDAGUMMA-S |
300000 |
CONSTRUCTION OF CC DRAIN WITH ROAD AT BULDAGUMMA-S1 |
Roof laid |
-
latitude : 19.016973333333333,19.016955
Longitude : 84.23365666666665,84.23367833333332
file name : Image_28102022111719561.png
|
2022-10-28 11:17:19.639265 |
15 |
63913186 |
CONSTRUCTION OF CC DRAIN WITH ROAD AT BULDAGUMMA-S |
300000 |
CONSTRUCTION OF CC DRAIN WITH ROAD AT BULDAGUMMA-S1 |
Completion of work |
-
latitude : 19.017046666666666,19.017038333333335
Longitude : 84.23366833333333,84.23363333333333
file name : Image_16062022114239480.png
|
2022-06-16 11:42:39.557644 |
16 |
47535610 |
INSTALLATION OF SOLAR PUMP WATER SUPPLY AT BADA PUTTAR-TIED |
351666 |
INSTALLATION OF SOLAR PUMP WATER SUPPLY AT BADA PUTTAR-TIED1 |
Roof laid |
-
latitude : 19.005391666666664,19.005435
Longitude : 84.25590500000001,84.25588166666667
file name : Image_28102022111745927.png
|
2022-10-28 11:17:46.019439 |
17 |
47535610 |
INSTALLATION OF SOLAR PUMP WATER SUPPLY AT BADA PUTTAR-TIED |
351666 |
INSTALLATION OF SOLAR PUMP WATER SUPPLY AT BADA PUTTAR-TIED1 |
Completion of work |
-
latitude : 19.005460000000003,19.00543
Longitude : 84.25580666666669,84.25585500000001
file name : Image_19112021130724305.png
|
2021-11-19 13:07:24.42424 |
18 |
47541771 |
CONST OF CC ROAD FROM BULDAGUMA BHUYANSAHI TO RAIKASAHI |
400000 |
CONST OF CC ROAD FROM BULDAGUMA BHUYANSAHI TO RAIKASAHI1 |
Roof laid |
-
latitude : 19.020776666666666,19.020733333333332
Longitude : 84.23518833333334,84.23513
file name : Image_28102022102654679.png
|
2022-10-28 10:26:54.773893 |
19 |
47538754 |
CONST OF CULVERT AND CC ROAD AT S PUTTAR SATASANGHAGHAR-UNTIED |
400000 |
CONST OF CULVERT AND CC ROAD AT S PUTTAR SATASANGHAGHAR-UNTIED1 |
Roof laid |
-
latitude : 19.00194,19.001861666666667
Longitude : 84.24348,84.24350666666666
file name : Image_28102022111757041.png
|
2022-10-28 11:17:57.112451 |
20 |
47538754 |
CONST OF CULVERT AND CC ROAD AT S PUTTAR SATASANGHAGHAR-UNTIED |
400000 |
CONST OF CULVERT AND CC ROAD AT S PUTTAR SATASANGHAGHAR-UNTIED1 |
Completion of work |
-
latitude : 19.001913333333334,19.001786666666664
Longitude : 84.24346500000001,84.24352166666668
file name : Image_03052022194444566.png
|
2022-05-03 19:44:44.650784 |
21 |
47540670 |
CONST OF 20 NOS OF SOAK PITS FOR LIQUID WASTE MANAGEMENT AND BLEACHING FACILITY-TIED S |
81175 |
CONST OF 20 NOS OF SOAK PITS FOR LIQUID WASTE MANAGEMENT AND BLEACHING FACILITY-TIED S1 |
Plinth level |
-
latitude : 18.995471666666667
Longitude : 84.25556333333334
file name : Image_21122022174030666.png
|
2022-12-21 17:40:30.729057 |
22 |
50772035 |
CONSTRUCTION OF PWS AT RAJANSAHI AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT RAJANSAHI AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 18.981006666666666,18.981136666666664
Longitude : 84.26476666666667,84.26467499999998
file name : Image_27112021154402993.png
|
2021-11-27 15:44:03.128925 |
23 |
50771451 |
CONSTRUCTION OF CULVERT WITH CC ROAD AT UPPAR JHALIASAHI-14TH |
300000 |
CONSTRUCTION OF CULVERT WITH CC ROAD AT UPPAR JHALIASAHI-14TH1 |
Completion of work |
-
latitude : 18.995133333333335,18.99421
Longitude : 84.23943666666668,84.23994666666667
file name : Image_10052021110110086.png
|
2021-05-10 11:01:10.22991 |
24 |
44232337 |
Repair of GP Godown at Puttar |
250000 |
Repair of GP Godown at Puttar1 |
Completion of work |
-
latitude : 19.003043333333334
Longitude : 84.24615666666665
file name : Image_06032021100956285.png
|
2021-03-06 10:09:56.403338 |
25 |
63913051 |
PROVISION OF SUMMER DRINKING WATER AT 14 NOS. OF JALACHATRA-W |
131175 |
PROVISION OF SUMMER DRINKING WATER AT 14 NOS. OF JALACHATRA-W1 |
Completion of work |
-
latitude : 19.003504
Longitude : 84.2304519
file name : Image_16062022114244131.png
|
2022-06-16 11:42:44.208494 |
26 |
63913152 |
PROVISION OF DRINKING WATER WIT H TANKER AT JENAPADA-W |
51932 |
PROVISION OF DRINKING WATER WIT H TANKER AT JENAPADA-W1 |
Completion of work |
-
latitude : 18.990358333333333
Longitude : 84.25603333333332
file name : Image_01102022130438082.png
|
2022-10-01 13:04:38.155366 |
27 |
63913547 |
COMPL OF INCOMPLETE OVERHEAD AT CONFERENCE HALL AT GP BNRGSK T |
214627 |
COMPL OF INCOMPLETE OVERHEAD AT CONFERENCE HALL AT GP BNRGSK T1 |
Completion of work |
-
latitude : 19.003063333333333
Longitude : 84.24620333333333
file name : Image_27062022120955428.png
|
2022-06-27 12:09:55.506351 |
28 |
50772090 |
CONSTRUCTION OF PWS AT B KARANJSAHI UPS AND AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT B KARANJSAHI UPS AND AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.041035,19.041051666666664
Longitude : 84.24345999999998,84.243475
file name : Image_03052022194448059.png
|
2022-05-03 19:44:48.17272 |
29 |
50772244 |
CONSTRUCTION OF PWS AT RAIKA GUMMA UPS WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT RAIKA GUMMA UPS WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.023104999999997,19.023086666666664
Longitude : 84.24861666666666,84.24862
file name : Image_04052022074923958.png
|
2022-05-04 07:49:24.074808 |
30 |
50771817 |
CONSTRUCTION OF PWS AT BADA PUTTAR UPS AND AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT BADA PUTTAR UPS AND AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.004546666666666,19.004515
Longitude : 84.25167833333334,84.25164833333335
file name : Image_01052021132348023.png
|
2021-05-01 13:23:48.104222 |
31 |
47538374 |
CONST OF 2 NOS CULVERT AND APPROCH ROAD AT JENAPADA-UNTIED |
300000 |
CONST OF 2 NOS CULVERT AND APPROCH ROAD AT JENAPADA-UNTIED1 |
Completion of work |
-
latitude : 18.990560000000002,18.990916666666667
Longitude : 84.25425500000001,84.25313499999999
file name : Image_03052022194441084.png
|
2022-05-03 19:44:41.187726 |
32 |
50772314 |
PAINTING OF ENGLISH ELM AT PUTTAR GP GODOWN-TIED |
100000 |
PAINTING OF ENGLISH ELM AT PUTTAR GP GODOWN-TIED1 |
Completion of work |
-
latitude : 19.003008333333334
Longitude : 84.24629166666666
file name : Image_27112021154414735.png
|
2021-11-27 15:44:14.837491 |
33 |
44229535 |
Purchase of Dustbin 11 nos & Other Expenditure |
104350 |
Purchase of Dustbin 11 nos & Other Expenditure 1 |
Completion of work |
-
latitude : 19.003081666666667
Longitude : 84.24617000000002
file name : Image_01102022130434237.png
|
2022-10-01 13:04:34.312065 |
34 |
50771877 |
CONSTRUCTION OF PWS AT BADA PUTTAR MAJHISAHI AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT BADA PUTTAR MAJHISAHI AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.005393333333334,19.005393333333334
Longitude : 84.25638333333333,84.25638333333333
file name : Image_01052021132402683.png
|
2021-05-01 13:24:02.801003 |
35 |
44232604 |
Const. of Bathing tank at B Puttar Bhaliasahi |
250000 |
Const. of Bathing tank at B Puttar Bhaliasahi1 |
Completion of work |
-
latitude : 19.012620000000002
Longitude : 84.255715
file name : Image_02102021145241937.png
|
2021-10-02 14:52:42.056338 |
36 |
50771937 |
CONSTRUCTION OF PWS AT BHALUSAHI UPS AND AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT BHALUSAHI UPS AND AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 18.997484999999998,18.997484999999998
Longitude : 84.26414500000001,84.26414500000001
file name : Image_01052021132412933.png
|
2021-05-01 13:24:13.032865 |
37 |
44229240 |
Const. of Field Chanel from B.Puttar tank to Billa |
268000 |
Const. of Field Chanel from B.Puttar tank to Billa1 |
Completion of work |
-
latitude : 19.005845,19.005801666666667
Longitude : 84.25511333333334,84.25511166666665
file name : Image_02102021145236679.png
|
2021-10-02 14:52:36.779507 |
38 |
50771212 |
COMPL. INCOMPLETE AWC WITH SITE DEVELOPMENT APPROCH ROAD AT KARANJASAHI-14TH |
150000 |
COMPL. INCOMPLETE AWC WITH SITE DEVELOPMENT APPROCH ROAD AT KARANJASAHI-14TH1 |
Completion of work |
-
latitude : 19.0024796
Longitude : 84.2302457
file name : Image_26062021172851086.png
|
2021-06-26 17:28:51.19514 |
39 |
44233135 |
Const. of Basudha PWS at Rajanasahi cost of 10 lakhs and GP Contribution 10% |
100000 |
Const. of Basudha PWS at Rajanasahi cost of 10 lakhs and GP Contribution 10%1 |
Completion of work |
-
latitude : 18.9822,18.982198333333333
Longitude : 84.26412333333334,84.26412666666666
file name : Image_10072021123535185.png
|
2021-07-10 12:35:35.31784 |
40 |
50771987 |
CONSTRUCTION OF PWS AT BURUSINGI AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT BURUSINGI AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 18.99422333333333,18.994336666666666
Longitude : 84.25480999999999,84.25484333333334
file name : Image_01052021132422972.png
|
2021-05-01 13:24:23.071672 |
41 |
50770442 |
COMPL OF INCOMPLETE BOUNDARY WALL AT SANA PUTTAR HIGH SCHOOL-14TH |
400000 |
COMPL OF INCOMPLETE BOUNDARY WALL AT SANA PUTTAR HIGH SCHOOL-14TH1 |
Completion of work |
-
latitude : 19.00247166666667
Longitude : 84.24490666666667
file name : Image_02102021145251690.png
|
2021-10-02 14:52:51.784421 |
42 |
50770442 |
COMPL OF INCOMPLETE BOUNDARY WALL AT SANA PUTTAR HIGH SCHOOL-14TH |
400000 |
COMPL OF INCOMPLETE BOUNDARY WALL AT SANA PUTTAR HIGH SCHOOL-14TH1 |
Completion of work |
-
latitude : 19.002485
Longitude : 84.24494000000001
file name : Image_02102021145246764.png
|
2021-10-02 14:52:46.876035 |
43 |
50771295 |
COMPL. OF INCOMPLETE AWC WITH SITE DEVELOPMENT APPROCH ROAD AT B PUTTARA-14TH |
150000 |
COMPL. OF INCOMPLETE AWC WITH SITE DEVELOPMENT APPROCH ROAD AT B PUTTARA-14TH1 |
Completion of work |
-
latitude : 19.0024796
Longitude : 84.2302457
file name : Image_26062021172854643.png
|
2021-06-26 17:28:54.746315 |
44 |
50771720 |
CONSTRUCTION OF PWS AT SANA PUTTAR AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT SANA PUTTAR AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.002586666666666,19.002531666666666
Longitude : 84.24492833333333,84.24491833333335
file name : Image_01052021132315489.png
|
2021-05-01 13:23:15.608648 |
45 |
50772183 |
CONSTRUCTION OF PWS AT BULDA GUMMA UPS AND AWC WITH ELECTRICAL WIRING-UNTIED |
100000 |
CONSTRUCTION OF PWS AT BULDA GUMMA UPS AND AWC WITH ELECTRICAL WIRING-UNTIED1 |
Completion of work |
-
latitude : 19.016378333333332,19.016386666666666
Longitude : 84.23420833333333,84.23424833333333
file name : Image_01052021132507052.png
|
2021-05-01 13:25:07.161184 |
46 |
64726400 |
Const of CC Road with Sewerage of Waste Water at Puttar High School-5th |
200000 |
Const of CC Road with Sewerage of Waste Water at Puttar High School-5th 1 |
Plinth level |
-
latitude : 19.00293196,19.00264601
Longitude : 84.24606732,84.24486364
file name : Image_17032023094303506.png
|
2023-03-17 09:43:03.613334 |
47 |
64726261 |
Creation of other water recharging structure |
175516 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 18.994933333333332
Longitude : 84.25609333333333
file name : Image_30032023102928419.png
|
2023-03-30 10:29:28.529175 |
48 |
86113242 |
Construction of Boundary wall at S Puttar A W C -5th SFC |
100000 |
Construction of Boundary wall at S Puttar A W C -5th SFC1 |
Completion of work |
-
latitude : 19.002911666666666
Longitude : 84.24613166666668
file name : Image_14072023121045125.png
|
2023-07-14 12:10:45.259669 |
49 |
64726243 |
Operation & maintenance of drinking water supply system |
200000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 18.99068,18.990408333333335
Longitude : 84.25508999999998,84.25603666666666
file name : Image_09072023125853783.png
|
2023-07-09 12:58:53.874023 |
50 |
86112637 |
Creation of other water recharging structure |
108990 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 19.016920000000002
Longitude : 84.25272500000001
file name : Image_14072023121129900.png
|
2023-07-14 12:11:30.001217 |
51 |
76318301 |
Repair of pipe drinking water |
55000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.04111168
Longitude : 84.24399059
file name : Image_20052024134016815.png
|
2024-05-20 13:40:16.886946 |
52 |
76318301 |
Repair of pipe drinking water |
55000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.04059487
Longitude : 84.24315751
file name : Image_20052024122421629.png
|
2024-05-20 12:24:21.703386 |
53 |
76318301 |
Repair of pipe drinking water |
55000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.04005489
Longitude : 84.24348885
file name : Image_20052024120722097.png
|
2024-05-20 12:07:22.177209 |
54 |
64726287 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
51600 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 19.0027731
Longitude : 84.2455987
file name : Image_20052024120709868.png
|
2024-05-20 12:07:09.960937 |
55 |
76317925 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.0027992
Longitude : 84.2301998
file name : Image_23052024111443536.png
|
2024-05-23 11:14:43.600537 |
56 |
76317925 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.0027992
Longitude : 84.2301998
file name : Image_23052024110817736.png
|
2024-05-23 11:08:17.804693 |
57 |
76317925 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.0027992
Longitude : 84.2301998
file name : Image_23052024105941085.png
|
2024-05-23 10:59:41.211659 |
58 |
82754117 |
Construction of new Piped Water Supply schemes |
280000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 18.972635
Longitude : 84.15636333333332
file name : Image_27102023153046716.png
|
2023-10-27 15:30:46.784351 |
59 |
82754117 |
Construction of new Piped Water Supply schemes |
280000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 18.9726958
Longitude : 84.1564751
file name : Image_01112023122333988.png
|
2023-11-01 12:23:34.089363 |
60 |
82754117 |
Construction of new Piped Water Supply schemes |
280000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 18.972571666666667
Longitude : 84.15639166666666
file name : Image_27102023153059660.png
|
2023-10-27 15:30:59.723239 |