1 |
49163161 |
COMPLETION OF INCOMPLETE DRAIN NEAR KHADALA SAHI AT K. NUAGADA |
240980 |
COMPLETION OF INCOMPLETE DRAIN NEAR KHADALA SAHI AT K. NUAGADA1 |
Completion of work |
-
latitude : 19.7908694,19.78994468
Longitude : 84.6368549,84.63435258
file name : Image_08112021095630210.png
|
2021-11-08 09:56:30.319135 |
2 |
49174010 |
COMPLETION OF INCOMPLETE KALYANA MANDAP NEAR KOTHAGHARA AT JALAKHAI |
300000 |
COMPLETION OF INCOMPLETE KALYANA MANDAP NEAR KOTHAGHARA AT JALAKHAI1 |
Completion of work |
-
latitude : 19.79016908
Longitude : 84.63503592
file name : Image_05112021134551633.png
|
2021-11-05 13:45:51.75206 |
3 |
49174010 |
COMPLETION OF INCOMPLETE KALYANA MANDAP NEAR KOTHAGHARA AT JALAKHAI |
300000 |
COMPLETION OF INCOMPLETE KALYANA MANDAP NEAR KOTHAGHARA AT JALAKHAI1 |
Completion of work |
-
latitude : 19.79159026
Longitude : 84.64240491
file name : Image_06112021134038003.png
|
2021-11-06 13:40:38.110179 |
4 |
49163430 |
COMPLETION OF INCOMPLETE DRAIN AT KUMUTI SAHI BARITALA PAILIPADA |
200000 |
COMPLETION OF INCOMPLETE DRAIN AT KUMUTI SAHI BARITALA PAILIPADA1 |
Completion of work |
-
latitude : 19.79778041,19.79776434
Longitude : 84.61514315,84.61516666
file name : Image_05112021124432668.png
|
2021-11-05 12:44:32.772722 |
5 |
49163430 |
COMPLETION OF INCOMPLETE DRAIN AT KUMUTI SAHI BARITALA PAILIPADA |
200000 |
COMPLETION OF INCOMPLETE DRAIN AT KUMUTI SAHI BARITALA PAILIPADA1 |
Completion of work |
-
latitude : 19.79777051,19.79776002
Longitude : 84.61504557,84.61503497
file name : Image_05112021125021812.png
|
2021-11-05 12:50:21.923571 |
6 |
49175629 |
IMPROVEMENT AND BEAUTIFICATION OF SHYAMA BANDHA AT K. NUAGADA |
200000 |
IMPROVEMENT AND BEAUTIFICATION OF SHYAMA BANDHA AT K. NUAGADA1 |
Completion of work |
-
latitude : 19.79003865
Longitude : 84.63511435
file name : Image_19112021144550296.png
|
2021-11-19 14:45:50.395431 |
7 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.78999193
Longitude : 84.6352654
file name : Image_19112021144136990.png
|
2021-11-19 14:41:37.088115 |
8 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.78999439
Longitude : 84.63512021
file name : Image_02122021142607118.png
|
2021-12-02 14:26:07.259265 |
9 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.78996617
Longitude : 84.63460255
file name : Image_05112021132719523.png
|
2021-11-05 13:27:19.616035 |
10 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.78996778
Longitude : 84.63456929
file name : Image_05112021132839718.png
|
2021-11-05 13:28:39.809517 |
11 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.79000413
Longitude : 84.63464098
file name : Image_06112021122928626.png
|
2021-11-06 12:29:28.726982 |
12 |
49695959 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA |
200000 |
CONSTRUCTION AND RENOVATION OF SYAMA SUNDARA BANDHA1 |
Completion of work |
-
latitude : 19.7900266
Longitude : 84.63510392
file name : Image_08112021100144953.png
|
2021-11-08 10:01:45.035218 |
13 |
49174867 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA |
223312 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA1 |
Completion of work |
-
latitude : 19.79546777
Longitude : 84.61506814
file name : Image_01122021130619847.png
|
2021-12-01 13:06:19.932706 |
14 |
49174867 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA |
223312 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA1 |
Completion of work |
-
latitude : 19.79547352
Longitude : 84.61505281
file name : Image_02122021140715161.png
|
2021-12-02 14:07:15.301972 |
15 |
49174867 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA |
223312 |
IMPROVEMENT OF BHAGABATA TUNGI AT BANKA BAZAR PAILIPADA1 |
Completion of work |
-
latitude : 19.79547798
Longitude : 84.61511846
file name : Image_02122021141005562.png
|
2021-12-02 14:10:05.703867 |
16 |
49164571 |
ACCESSORIES OF COMPUTER |
122332 |
ACCESSORIES OF COMPUTER 1 |
Completion of work |
-
latitude : 19.8860904
Longitude : 84.6320721
file name : Image_09052022102108491.png
|
2022-05-09 10:21:08.637716 |
17 |
49163583 |
ENERGY CHARGES OF GP AREA PWS AT PAILIPADA GP |
160000 |
ENERGY CHARGES OF GP AREA PWS AT PAILIPADA GP1 |
Completion of work |
-
latitude : 19.8860947
Longitude : 84.6320304
file name : Image_31012022114005295.png
|
2022-01-31 11:40:05.432851 |
18 |
49129957 |
PURCHASE OF DUSTBIN FOR PILIPADA GP |
300000 |
PURCHASE OF DUSTBIN FOR PILIPADA GP1 |
Completion of work |
-
latitude : 19.8860971
Longitude : 84.6320617
file name : Image_15032022123631708.png
|
2022-03-15 12:36:31.891459 |
19 |
56251629 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada |
45052 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada1 |
Completion of work |
-
latitude : 19.79747431
Longitude : 84.61738028
file name : Image_05082022123148034.png
|
2022-08-05 12:31:48.228648 |
20 |
56251629 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada |
45052 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada1 |
Completion of work |
-
latitude : 19.79746583
Longitude : 84.61737118
file name : Image_05082022123043025.png
|
2022-08-05 12:30:43.123345 |
21 |
56251629 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada |
45052 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada1 |
Completion of work |
-
latitude : 19.7974842
Longitude : 84.61744764
file name : Image_05082022122025079.png
|
2022-08-05 12:20:25.197145 |
22 |
56251629 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada |
45052 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada1 |
Completion of work |
-
latitude : 19.79746471
Longitude : 84.61742279
file name : Image_03082022125531151.png
|
2022-08-03 12:55:31.291547 |
23 |
56251629 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada |
45052 |
Reno & Imp of Durgadebi near Dera Sahi peripheral development Pailipada1 |
Completion of work |
-
latitude : 19.79746057
Longitude : 84.61742826
file name : Image_05082022122159964.png
|
2022-08-05 12:22:00.111201 |
24 |
56252340 |
Imp & Beautification of Nrusinghnath Temple |
150000 |
Imp & Beautification of Nrusinghnath Temple1 |
Completion of work |
-
latitude : 19.79725325,19.79724728
Longitude : 84.63769271,84.63769931
file name : Image_05082022140837007.png
|
2022-08-05 14:08:37.164558 |
25 |
56252340 |
Imp & Beautification of Nrusinghnath Temple |
150000 |
Imp & Beautification of Nrusinghnath Temple1 |
Completion of work |
-
latitude : 19.79721057,19.79721465
Longitude : 84.63767225,84.63766646
file name : Image_04082022124933273.png
|
2022-08-04 12:49:33.445427 |
26 |
56252340 |
Imp & Beautification of Nrusinghnath Temple |
150000 |
Imp & Beautification of Nrusinghnath Temple1 |
Completion of work |
-
latitude : 19.79723189,19.7972314,19.79723291
Longitude : 84.63778206,84.6377819,84.63777058
file name : Image_05082022141439127.png
|
2022-08-05 14:14:39.217999 |
27 |
56251909 |
Construction of Bhagabat Tungi |
164000 |
Construction of Bhagabat Tungi 1 |
Completion of work |
-
latitude : 19.79324882
Longitude : 84.64152783
file name : Image_24012023132611330.png
|
2023-01-24 13:26:11.433235 |
28 |
56251213 |
Reno & Imp of Bagradebi Mandap Boundary Wall at K Nuagada |
100000 |
Reno & Imp of Bagradebi Mandap Boundary Wall at K Nuagada1 |
Completion of work |
-
latitude : 19.78761246
Longitude : 84.63803095
file name : Image_08012023142935860.png
|
2023-01-08 14:29:35.959741 |
29 |
56251213 |
Reno & Imp of Bagradebi Mandap Boundary Wall at K Nuagada |
100000 |
Reno & Imp of Bagradebi Mandap Boundary Wall at K Nuagada1 |
Completion of work |
-
latitude : 19.78746027
Longitude : 84.63805778
file name : Image_08012023142615758.png
|
2023-01-08 14:26:15.85008 |
30 |
56250869 |
Reno & Imp of Thakurani Boundary wall at Barata.. |
200000 |
Reno & Imp of Thakurani Boundary wall at Barata..1 |
Completion of work |
-
latitude : 19.79511137
Longitude : 84.62293606
file name : Image_05082022124649681.png
|
2022-08-05 12:46:49.838779 |
31 |
56250869 |
Reno & Imp of Thakurani Boundary wall at Barata.. |
200000 |
Reno & Imp of Thakurani Boundary wall at Barata..1 |
Completion of work |
-
latitude : 19.79510404
Longitude : 84.62305803
file name : Image_05082022124753371.png
|
2022-08-05 12:47:53.507002 |
32 |
56250869 |
Reno & Imp of Thakurani Boundary wall at Barata.. |
200000 |
Reno & Imp of Thakurani Boundary wall at Barata..1 |
Completion of work |
-
latitude : 19.79517714
Longitude : 84.62308524
file name : Image_03082022130557342.png
|
2022-08-03 13:05:57.443281 |
33 |
56250988 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata |
200000 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata1 |
Completion of work |
-
latitude : 19.79456178
Longitude : 84.62146443
file name : Image_05082022125746076.png
|
2022-08-05 12:57:46.219306 |
34 |
56250988 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata |
200000 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata1 |
Completion of work |
-
latitude : 19.79456976
Longitude : 84.62152421
file name : Image_03082022131556461.png
|
2022-08-03 13:15:56.572122 |
35 |
56250988 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata |
200000 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata1 |
Completion of work |
-
latitude : 19.79462476
Longitude : 84.6215032
file name : Image_05082022125739587.png
|
2022-08-05 12:57:39.84779 |
36 |
56250988 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata |
200000 |
Reno & Imp of Anetaswara Kalyana Mandap at Barata1 |
Completion of work |
-
latitude : 19.7945832
Longitude : 84.62148971
file name : Image_05082022125750001.png
|
2022-08-05 12:57:50.122016 |
37 |
56251333 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada |
100000 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada1 |
Completion of work |
-
latitude : 19.78996367
Longitude : 84.63543466
file name : Image_05082022131712179.png
|
2022-08-05 13:17:12.26264 |
38 |
56251333 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada |
100000 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada1 |
Completion of work |
-
latitude : 19.78992209
Longitude : 84.63530663
file name : Image_03082022132843732.png
|
2022-08-03 13:28:43.829343 |
39 |
56251333 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada |
100000 |
Reno & Imp pf Syamasundar Kalyana mandap at Nuagada1 |
Completion of work |
-
latitude : 19.78998961
Longitude : 84.63543554
file name : Image_05082022131715893.png
|
2022-08-05 13:17:15.967862 |
40 |
56235161 |
SEM Salary |
96000 |
SEM Salary1 |
Completion of work |
-
latitude : 19.8860947
Longitude : 84.6320729
file name : Image_16072022121733517.png
|
2022-07-16 12:17:33.628078 |
41 |
56234922 |
Payment Towards 5PES Data Entry/Preparation of GPDP ETC. Other Expenditure |
200000 |
Payment Towards 5PES Data Entry/Preparation of GPDP ETC. Other Expenditure1 |
Completion of work |
-
latitude : 19.886092
Longitude : 84.63203
file name : Image_27072022155159563.png
|
2022-07-27 15:51:59.707636 |
42 |
56235313 |
Payment towards energy charges for PWS at Pailipada GP |
143789 |
Payment towards energy charges for PWS at Pailipada GP1 |
Completion of work |
-
latitude : 19.8860459,19.8860606
Longitude : 84.6320326,84.6320318
file name : Image_13122022120242344.png
|
2022-12-13 12:02:42.502665 |
43 |
66309466 |
INSTALLATION OF STREET LIGHT AT PAILIPADA |
251402 |
INSTALLATION OF STREET LIGHT AT PAILIPADA1 |
Completion of work |
-
latitude : 19.8860488
Longitude : 84.6320387
file name : Image_19012023125056766.png
|
2023-01-19 12:50:56.882138 |
44 |
56234716 |
Purchase of Dustbin |
358789 |
Purchase of Dustbin1 |
Completion of work |
-
latitude : 19.8860479
Longitude : 84.6320243
file name : Image_19012023125234006.png
|
2023-01-19 12:52:34.166373 |
45 |
56252001 |
Completion of Incomplete Bhgabata Tungi |
150032 |
Completion of Incomplete Bhgabata Tungi1 |
Completion of work |
-
latitude : 19.79155794
Longitude : 84.6423559
file name : Image_24012023134230631.png
|
2023-01-24 13:42:30.756604 |
46 |
66309200 |
CONSTRUCTION OF PAVER ROAD NEAR JAGANNATH TEMPLE |
150000 |
CONSTRUCTION OF PAVER ROAD NEAR JAGANNATH TEMPLE1 |
Completion of work |
-
latitude : 19.7983025,19.79815433
Longitude : 84.61420112,84.61421971
file name : Image_15022023123222473.png
|
2023-02-15 12:32:22.583238 |
47 |
66309200 |
CONSTRUCTION OF PAVER ROAD NEAR JAGANNATH TEMPLE |
150000 |
CONSTRUCTION OF PAVER ROAD NEAR JAGANNATH TEMPLE1 |
Completion of work |
-
latitude : 19.79815502,19.79814806
Longitude : 84.61417969,84.61418503
file name : Image_15022023124614737.png
|
2023-02-15 12:46:14.840006 |
48 |
56235237 |
Repair & maintenance of Dhanapunja and K nuagada PWS at Pailipada |
145000 |
Repair & maintenance of Dhanapunja and K nuagada PWS at Pailipada1 |
Completion of work |
-
latitude : 19.8860559,19.8860463
Longitude : 84.6320224,84.6320274
file name : Image_10022023170343739.png
|
2023-02-10 17:03:43.837729 |
49 |
56235237 |
Repair & maintenance of Dhanapunja and K nuagada PWS at Pailipada |
145000 |
Repair & maintenance of Dhanapunja and K nuagada PWS at Pailipada1 |
Completion of work |
-
latitude : 19.8017883,19.80178089
Longitude : 84.62065948,84.62060478
file name : Image_15022023125522823.png
|
2023-02-15 12:55:22.929728 |
50 |
66308996 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 19.80027997
Longitude : 84.63360125
file name : Image_06072023163145657.png
|
2023-07-06 16:31:45.742904 |
51 |
66308996 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 19.80028749
Longitude : 84.6334983
file name : Image_06072023163142401.png
|
2023-07-06 16:31:42.490113 |
52 |
66309385 |
IMPROVEMENT OF COMMUNITY CENTER NEAR ALEKHA ASHRAM USTAPALLI |
100000 |
IMPROVEMENT OF COMMUNITY CENTER NEAR ALEKHA ASHRAM USTAPALLI1 |
Completion of work |
-
latitude : 19.80164652
Longitude : 84.61640564
file name : Image_13072023132411280.png
|
2023-07-13 13:24:11.379361 |
53 |
66309385 |
IMPROVEMENT OF COMMUNITY CENTER NEAR ALEKHA ASHRAM USTAPALLI |
100000 |
IMPROVEMENT OF COMMUNITY CENTER NEAR ALEKHA ASHRAM USTAPALLI1 |
Completion of work |
-
latitude : 19.8016438
Longitude : 84.6164177
file name : Image_13072023132414995.png
|
2023-07-13 13:24:15.085635 |
54 |
66309411 |
IMPROVEMENT AND BEAUTIFICATION OF JAY HANUMAN COMMUNITY CENTER K NUAGADA |
150000 |
IMPROVEMENT AND BEAUTIFICATION OF JAY HANUMAN COMMUNITY CENTER K NUAGADA1 |
Completion of work |
-
latitude : 19.78960032
Longitude : 84.63615258
file name : Image_13072023141118523.png
|
2023-07-13 14:11:18.675113 |
55 |
66309411 |
IMPROVEMENT AND BEAUTIFICATION OF JAY HANUMAN COMMUNITY CENTER K NUAGADA |
150000 |
IMPROVEMENT AND BEAUTIFICATION OF JAY HANUMAN COMMUNITY CENTER K NUAGADA1 |
Completion of work |
-
latitude : 19.78960069
Longitude : 84.63614556
file name : Image_13072023141121822.png
|
2023-07-13 14:11:21.909786 |
56 |
66309442 |
CONSTRUCTION OF REST SHED NEAR MAA BRAHMANA DEVI TEMPLE |
100000 |
CONSTRUCTION OF REST SHED NEAR MAA BRAHMANA DEVI TEMPLE1 |
Completion of work |
-
latitude : 19.79944384
Longitude : 84.61354749
file name : Image_13072023134315165.png
|
2023-07-13 13:43:15.255343 |
57 |
66309442 |
CONSTRUCTION OF REST SHED NEAR MAA BRAHMANA DEVI TEMPLE |
100000 |
CONSTRUCTION OF REST SHED NEAR MAA BRAHMANA DEVI TEMPLE1 |
Completion of work |
-
latitude : 19.79942223
Longitude : 84.61341686
file name : Image_13072023134318631.png
|
2023-07-13 13:43:18.73458 |
58 |
66309347 |
IMPROVEMENT COMMUNITY CENTER NEAR MAUSIMA TEMPLE |
100000 |
IMPROVEMENT COMMUNITY CENTER NEAR MAUSIMA TEMPLE1 |
Completion of work |
-
latitude : 19.79766319
Longitude : 84.61855322
file name : Image_13072023135603815.png
|
2023-07-13 13:56:03.930219 |
59 |
66309347 |
IMPROVEMENT COMMUNITY CENTER NEAR MAUSIMA TEMPLE |
100000 |
IMPROVEMENT COMMUNITY CENTER NEAR MAUSIMA TEMPLE1 |
Completion of work |
-
latitude : 19.797619
Longitude : 84.61854995
file name : Image_13072023135607200.png
|
2023-07-13 13:56:07.293896 |
60 |
66309260 |
IMPROVEMENT AND BEAUTIFICATION OF BYAGHRADEVI MANDAP AT K NUAGDA |
150000 |
IMPROVEMENT AND BEAUTIFICATION OF BYAGHRADEVI MANDAP AT K NUAGDA1 |
Completion of work |
-
latitude : 19.78780359
Longitude : 84.638033
file name : Image_13072023142725546.png
|
2023-07-13 14:27:25.655933 |
61 |
66309260 |
IMPROVEMENT AND BEAUTIFICATION OF BYAGHRADEVI MANDAP AT K NUAGDA |
150000 |
IMPROVEMENT AND BEAUTIFICATION OF BYAGHRADEVI MANDAP AT K NUAGDA1 |
Completion of work |
-
latitude : 19.78779538
Longitude : 84.63802147
file name : Image_13072023142728755.png
|
2023-07-13 14:27:28.855207 |
62 |
56252538 |
Completion of incomplete Mission Shakti Building |
200000 |
Completion of incomplete Mission Shakti Building 1 |
Completion of work |
-
latitude : 19.789398333333335
Longitude : 84.6362
file name : Image_12122023121831141.png
|
2023-12-12 12:18:31.250209 |
63 |
81771285 |
Water Supply to villages |
205409 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.886578333333333
Longitude : 84.63628833333333
file name : Image_19032024090605328.png
|
2024-03-19 09:06:04.992822 |
64 |
81771285 |
Water Supply to villages |
205409 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.886568333333333
Longitude : 84.63628500000002
file name : Image_19032024090356699.png
|
2024-03-19 09:03:56.689239 |
65 |
81771285 |
Water Supply to villages |
205409 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.88658666666667
Longitude : 84.63640500000001
file name : Image_14122023090440155.png
|
2023-12-14 09:04:40.368067 |
66 |
81730070 |
Electricity |
200000 |
Electricity1 |
Completion of work |
-
latitude : 19.886543333333336
Longitude : 84.63630666666668
file name : Image_08072024122106108.png
|
2024-07-08 12:21:06.289314 |
67 |
103530984 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
226824 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 19.795261666666665
Longitude : 84.61474000000001
file name : Image_03082024123409064.png
|
2024-08-03 12:34:09.151972 |
68 |
103530984 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
226824 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 19.7971423
Longitude : 84.6151754
file name : Image_26072024124622314.png
|
2024-07-26 12:46:22.492602 |
69 |
103530984 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
226824 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 19.7971422
Longitude : 84.6151752
file name : Image_26072024124442024.png
|
2024-07-26 12:44:42.168744 |
70 |
81771446 |
Water Supply to villages |
58000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.886556666666667
Longitude : 84.63642666666668
file name : Image_07102024095859894.png
|
2024-10-07 09:59:00.014397 |
71 |
81771446 |
Water Supply to villages |
58000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.886765
Longitude : 84.63630666666668
file name : Image_07102024095609072.png
|
2024-10-07 09:56:09.24662 |