1 |
44339066 |
CONST OF KITCHEN SHED AT GURABADI UP SCHOOL |
200000 |
CONST OF KITCHEN SHED AT GURABADI UP SCHOOL1 |
Completion of work |
-
latitude : 19.932245
Longitude : 84.5823451
file name : Image_10032022180343250.png
|
2022-03-10 18:03:43.329042 |
2 |
44339066 |
CONST OF KITCHEN SHED AT GURABADI UP SCHOOL |
200000 |
CONST OF KITCHEN SHED AT GURABADI UP SCHOOL1 |
Completion of work |
-
latitude : 19.93226605
Longitude : 84.5823854
file name : Image_10032022174545921.png
|
2022-03-10 17:45:46.030616 |
3 |
44338871 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI |
250000 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI1 |
Completion of work |
-
latitude : 19.9322473
Longitude : 84.5823489
file name : Image_10032022180329088.png
|
2022-03-10 18:03:29.150089 |
4 |
44338871 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI |
250000 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI1 |
Completion of work |
-
latitude : 19.93225994
Longitude : 84.58237711
file name : Image_10032022180715684.png
|
2022-03-10 18:07:15.758452 |
5 |
44338871 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI |
250000 |
RENOV AND IMPV. OF THAKURANI TANK AT GURABADI1 |
Completion of work |
-
latitude : 19.9322434
Longitude : 84.5823476
file name : Image_10032022180339600.png
|
2022-03-10 18:03:39.657738 |
6 |
48646161 |
Construction of Village community centre at Kabirajpur |
75000 |
Construction of Village community centre at Kabirajpur1 |
Completion of work |
-
latitude : 19.9322754
Longitude : 84.5822063
file name : Image_12032022112259133.png
|
2022-03-12 11:22:59.197711 |
7 |
48645571 |
Const. of village drain at Nuapalli Akhupadar |
100000 |
Const. of village drain at Nuapalli Akhupadar1 |
Completion of work |
-
latitude : 19.9322435,19.93225659
Longitude : 84.5823432,84.58237883
file name : Image_10032022181610888.png
|
2022-03-10 18:16:10.940471 |
8 |
44338702 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS |
200000 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS1 |
Completion of work |
-
latitude : 19.9322717
Longitude : 84.582212
file name : Image_12032022110949193.png
|
2022-03-12 11:09:49.251741 |
9 |
44338702 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS |
200000 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS2 |
Completion of work |
-
latitude : 19.9322724
Longitude : 84.5822113
file name : Image_12032022111721788.png
|
2022-03-12 11:17:21.856645 |
10 |
44338702 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS |
200000 |
REPAIR & MAINTENANCE OF AWC BUILDING INCLUDING ELECTRIFICATION WATER SUPPLY & OVERHEAD TANK 3 NOS3 |
Completion of work |
-
latitude : 19.9322728
Longitude : 84.5822039
file name : Image_12032022111814756.png
|
2022-03-12 11:18:14.812909 |
11 |
48646019 |
Const. of Toilet water supply electrification of Mission Sakti gruha |
150000 |
Const. of Toilet water supply electrification of Mission Sakti gruha1 |
Completion of work |
-
latitude : 19.9322713
Longitude : 84.5822043
file name : Image_12032022112112685.png
|
2022-03-12 11:21:12.742558 |
12 |
48645495 |
SEM remuneration |
72000 |
SEM remuneration 1 |
Completion of work |
-
latitude : 19.9322361,19.9322361
Longitude : 84.5823361,84.5823361
file name : Image_01102022182944965.png
|
2022-10-01 18:29:45.112019 |
13 |
65750431 |
Creation of community soak pits for group of Households |
200000 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 19.9320832,19.9320397
Longitude : 84.5818627,84.5817812
file name : Image_19012023171455597.png
|
2023-01-19 17:14:55.684433 |
14 |
78332561 |
Operation and Maintenance of drinking water supply system |
216000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.9322734
Longitude : 84.5823408
file name : Image_06042024170308321.png
|
2024-04-06 17:03:08.418629 |
15 |
78332561 |
Operation and Maintenance of drinking water supply system |
216000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.9322699
Longitude : 84.5823418
file name : Image_06042024165945736.png
|
2024-04-06 16:59:45.829022 |
16 |
78332561 |
Operation and Maintenance of drinking water supply system |
216000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.932276
Longitude : 84.5823393
file name : Image_06042024165649914.png
|
2024-04-06 16:56:50.005349 |
17 |
44336904 |
DRAINAGE OF WASTE WATER (CONST OF PLATFORM/SOAK PIT) |
40000 |
DRAINAGE OF WASTE WATER (CONST OF PLATFORM/SOAK PIT)1 |
Completion of work |
-
latitude : 19.9322759,19.9322763
Longitude : 84.5822031,84.5822081
file name : Image_12032022110816306.png
|
2022-03-12 11:08:16.420609 |
18 |
44337059 |
ELECTRICITY CHARGES( RPWS)6 NOS |
200000 |
ELECTRICITY CHARGES( RPWS)6 NOS1 |
Plinth level |
-
latitude : 19.9322417,19.93216839,19.93216687
Longitude : 84.5823454,84.58247457,84.58247349
file name : Image_12032022153523010.png
|
2022-03-12 15:35:23.136048 |
19 |
44337059 |
ELECTRICITY CHARGES( RPWS)6 NOS |
200000 |
ELECTRICITY CHARGES( RPWS)6 NOS1 |
Completion of work |
-
latitude : 19.9322444,19.9322453
Longitude : 84.582345,84.5823485
file name : Image_10032022173936632.png
|
2022-03-10 17:39:36.717721 |
20 |
44337059 |
ELECTRICITY CHARGES( RPWS)6 NOS |
200000 |
ELECTRICITY CHARGES( RPWS)6 NOS1 |
Completion of work |
-
latitude : 19.9249286,19.93222,19.9322202,19.9322202
Longitude : 84.58017427,84.5823747,84.5823744,84.5823744
file name : Image_13122021121117717.png
|
2021-12-13 12:11:17.779748 |
21 |
44337213 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON |
90000 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON1 |
Plinth level |
-
latitude : 19.9322449
Longitude : 84.5823448
file name : Image_10032022174805157.png
|
2022-03-10 17:48:05.253386 |
22 |
44337213 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON |
90000 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON1 |
Completion of work |
-
latitude : 19.9322201
Longitude : 84.5823718
file name : Image_08092021172233310.png
|
2021-09-08 17:22:33.40909 |
23 |
44337213 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON |
90000 |
OPENING OF JALACHATRA DURING THE SUMMER SEASON1 |
Completion of work |
-
latitude : 19.9255894
Longitude : 84.5778938
file name : Image_08092021165603263.png
|
2021-09-08 16:56:03.370771 |
24 |
48645660 |
Provision for cleaning of village road and drain |
40000 |
Provision for cleaning of village road and drain1 |
Completion of work |
-
latitude : 19.9322653,19.9322776
Longitude : 84.5822249,84.5822032
file name : Image_12032022112514896.png
|
2022-03-12 11:25:14.969255 |
25 |
44338992 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA |
100000 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA1 |
Completion of work |
-
latitude : 19.932259
Longitude : 84.5822184
file name : Image_10032022180702707.png
|
2022-03-10 18:07:02.766972 |
26 |
44338992 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA |
100000 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA1 |
Completion of work |
-
latitude : 19.93226269
Longitude : 84.5823749
file name : Image_10032022174553508.png
|
2022-03-10 17:45:53.608056 |
27 |
44338992 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA |
100000 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA1 |
Completion of work |
-
latitude : 19.93226269
Longitude : 84.5823749
file name : Image_10032022174640558.png
|
2022-03-10 17:46:40.637552 |
28 |
44338992 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA |
100000 |
PURCHASE OF SOLAR LIGHT AT DUMAKUMPA1 |
Completion of work |
-
latitude : 19.9322474
Longitude : 84.58235
file name : Image_07032022121806278.png
|
2022-03-07 12:18:06.342201 |
29 |
65750414 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 19.9322428,19.932245
Longitude : 84.5823704,84.5823651
file name : Image_12072024184924267.png
|
2024-07-12 18:49:24.366011 |
30 |
65750414 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 19.9322431,19.932244
Longitude : 84.5823699,84.5823681
file name : Image_12072024184138634.png
|
2024-07-12 18:41:38.718268 |
31 |
65750414 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 19.9322456,19.9322446
Longitude : 84.5823659,84.5823668
file name : Image_12072024183506545.png
|
2024-07-12 18:35:06.631633 |
32 |
65734191 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA |
100000 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA1 |
Completion of work |
-
latitude : 18.9794236
Longitude : 72.8127227
file name : Image_29042023173136989.png
|
2023-04-29 17:31:37.092111 |
33 |
65734191 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA |
100000 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA1 |
Roof laid |
-
latitude : 19.9322239
Longitude : 84.5823349
file name : Image_29042023172026839.png
|
2023-04-29 17:20:26.920969 |
34 |
65734191 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA |
100000 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA1 |
Plinth level |
-
latitude : 19.9322243
Longitude : 84.5823354
file name : Image_29042023171826710.png
|
2023-04-29 17:18:26.82839 |
35 |
65734191 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA |
100000 |
REPAIR AND MAINTENANCE OF AWC GUDIPADARA1 |
Completion of work |
-
latitude : 19.9322259
Longitude : 84.5823359
file name : Image_29042023171200462.png
|
2023-04-29 17:12:00.567224 |
36 |
44338809 |
CONSTRUCTION OF BOUNDARY WALL TO DUMAKUMPA UP SCHOOL |
220000 |
CONSTRUCTION OF BOUNDARY WALL TO DUMAKUMPA UP SCHOOL1 |
Plinth level |
-
latitude : 19.9322298
Longitude : 84.5823376
file name : Image_08052023172818489.png
|
2023-05-08 17:28:18.587538 |
37 |
44338809 |
CONSTRUCTION OF BOUNDARY WALL TO DUMAKUMPA UP SCHOOL |
220000 |
CONSTRUCTION OF BOUNDARY WALL TO DUMAKUMPA UP SCHOOL1 |
Completion of work |
-
latitude : 19.9322271
Longitude : 84.5823352
file name : Image_08052023162223522.png
|
2023-05-08 16:22:23.624734 |
38 |
64463765 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI |
100000 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI1 |
Roof laid |
-
latitude : 19.9322534,19.9322511
Longitude : 84.5823686,84.5823683
file name : Image_06102023121417771.png
|
2023-10-06 12:14:17.881271 |
39 |
64463765 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI |
100000 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI1 |
Plinth level |
-
latitude : 19.9322539,19.9322484
Longitude : 84.5823676,84.5823704
file name : Image_06102023121001425.png
|
2023-10-06 12:10:01.547735 |
40 |
64463765 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI |
100000 |
CONSTRUCTION OF CC ROAD AT DAHA KHADAL SAHI1 |
Completion of work |
-
latitude : 19.9322521,19.9322515
Longitude : 84.5823711,84.5823636
file name : Image_06102023115928488.png
|
2023-10-06 11:59:28.589631 |
41 |
44339264 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA |
235952 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA1 |
Roof laid |
-
latitude : 19.932251
Longitude : 84.5823699
file name : Image_06102023121522768.png
|
2023-10-06 12:15:22.883901 |
42 |
44339264 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA |
235952 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA1 |
Plinth level |
-
latitude : 19.9322512
Longitude : 84.5823686
file name : Image_06102023120655289.png
|
2023-10-06 12:06:55.379016 |
43 |
44339264 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA |
235952 |
COMPLETION OF GP OFFICE BUILDING AT DUMAKUMPA1 |
Completion of work |
-
latitude : 19.9322503
Longitude : 84.5823674
file name : Image_06102023115916519.png
|
2023-10-06 11:59:16.650733 |
44 |
64477459 |
Construction of community center |
330000 |
Construction of community center1 |
Roof laid |
-
latitude : 19.9322522
Longitude : 84.5823703
file name : Image_06102023121226804.png
|
2023-10-06 12:12:26.889997 |
45 |
64477459 |
Construction of community center |
330000 |
Construction of community center1 |
Plinth level |
-
latitude : 19.9322508
Longitude : 84.5823691
file name : Image_06102023120426420.png
|
2023-10-06 12:04:26.510223 |
46 |
64477459 |
Construction of community center |
330000 |
Construction of community center1 |
Completion of work |
-
latitude : 19.9322506
Longitude : 84.5823685
file name : Image_06102023114715528.png
|
2023-10-06 11:47:15.618837 |
47 |
65734244 |
Creation of a new source of drinking water |
135000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 19.9322541
Longitude : 84.5823669
file name : Image_06102023121126649.png
|
2023-10-06 12:11:26.758226 |
48 |
65734244 |
Creation of a new source of drinking water |
135000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 19.9322503
Longitude : 84.5823707
file name : Image_06102023120305197.png
|
2023-10-06 12:03:05.300842 |
49 |
65734244 |
Creation of a new source of drinking water |
135000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.9322531
Longitude : 84.5823676
file name : Image_06102023114215850.png
|
2023-10-06 11:42:15.938506 |
50 |
75617226 |
Construction of Child Friendly Corners in schools |
200000 |
Construction of Child Friendly Corners in schools1 |
Plinth level |
-
latitude : 19.9322546
Longitude : 84.5823639
file name : Image_12102023183652980.png
|
2023-10-12 18:36:53.081677 |
51 |
75617226 |
Construction of Child Friendly Corners in schools |
200000 |
Construction of Child Friendly Corners in schools1 |
Roof laid |
-
latitude : 19.9322577
Longitude : 84.5823639
file name : Image_12102023183808420.png
|
2023-10-12 18:38:08.517817 |
52 |
75617226 |
Construction of Child Friendly Corners in schools |
200000 |
Construction of Child Friendly Corners in schools1 |
Plinth level |
-
latitude : 19.9322548
Longitude : 84.5823633
file name : Image_12102023183500771.png
|
2023-10-12 18:35:00.869585 |
53 |
75617226 |
Construction of Child Friendly Corners in schools |
200000 |
Construction of Child Friendly Corners in schools1 |
Completion of work |
-
latitude : 19.9322538
Longitude : 84.5823638
file name : Image_12102023182953259.png
|
2023-10-12 18:29:53.361829 |
54 |
48645747 |
Const.of village drain at Nua hatiguda |
200000 |
Const.of village drain at Nua hatiguda1 |
Roof laid |
-
latitude : 19.9322462,19.932241
Longitude : 84.5823667,84.5823554
file name : Image_21092023190909604.png
|
2023-09-21 19:09:09.677911 |
55 |
48645747 |
Const.of village drain at Nua hatiguda |
200000 |
Const.of village drain at Nua hatiguda1 |
Plinth level |
-
latitude : 19.932236,19.9322382
Longitude : 84.5823582,84.5823566
file name : Image_21092023190631219.png
|
2023-09-21 19:06:31.35348 |
56 |
48645747 |
Const.of village drain at Nua hatiguda |
200000 |
Const.of village drain at Nua hatiguda1 |
Completion of work |
-
latitude : 19.9322454,19.9322433
Longitude : 84.5823649,84.582362
file name : Image_21092023190425019.png
|
2023-09-21 19:04:25.100891 |
57 |
75616551 |
Construction and Maintenance of Classroom Flooring |
150000 |
Construction and Maintenance of Classroom Flooring1 |
Roof laid |
-
latitude : 19.9322512
Longitude : 84.5823557
file name : Image_10112023181257412.png
|
2023-11-10 18:12:57.505352 |
58 |
75616551 |
Construction and Maintenance of Classroom Flooring |
150000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 19.932251
Longitude : 84.5823552
file name : Image_10112023181018754.png
|
2023-11-10 18:10:18.833677 |
59 |
75616551 |
Construction and Maintenance of Classroom Flooring |
150000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 19.9322514
Longitude : 84.5823568
file name : Image_10112023175913719.png
|
2023-11-10 17:59:13.805704 |
60 |
64464999 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION |
120318 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION1 |
Roof laid |
-
latitude : 19.9322546
Longitude : 84.582359
file name : Image_05012024174543593.png
|
2024-01-05 17:45:43.687226 |
61 |
64464999 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION |
120318 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION1 |
Plinth level |
-
latitude : 19.9322544
Longitude : 84.5823598
file name : Image_05012024174226219.png
|
2024-01-05 17:42:26.302147 |
62 |
64464999 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION |
120318 |
COMPLETION OF AWC BUILDING AT DUMAKUMPA WITH ELECTRIFICATION1 |
Completion of work |
-
latitude : 19.9322539
Longitude : 84.5823636
file name : Image_05012024173619991.png
|
2024-01-05 17:36:20.096873 |
63 |
44336829 |
PURCHASE TUBE WELL SPARE PARTS |
100000 |
PURCHASE TUBE WELL SPARE PARTS1 |
Roof laid |
-
latitude : 19.9322536
Longitude : 84.582363
file name : Image_05012024174616854.png
|
2024-01-05 17:46:17.019408 |
64 |
44336829 |
PURCHASE TUBE WELL SPARE PARTS |
100000 |
PURCHASE TUBE WELL SPARE PARTS1 |
Plinth level |
-
latitude : 19.9322515
Longitude : 84.582364
file name : Image_05012024174307443.png
|
2024-01-05 17:43:07.543774 |
65 |
44336829 |
PURCHASE TUBE WELL SPARE PARTS |
100000 |
PURCHASE TUBE WELL SPARE PARTS1 |
Completion of work |
-
latitude : 19.9322534
Longitude : 84.5823651
file name : Image_05012024173455101.png
|
2024-01-05 17:34:55.218352 |
66 |
65734040 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T |
500000 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T1 |
Roof laid |
-
latitude : 19.9322541
Longitude : 84.5823611
file name : Image_12012024112447433.png
|
2024-01-12 11:24:47.525464 |
67 |
65734040 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T |
500000 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T1 |
Plinth level |
-
latitude : 19.9322541
Longitude : 84.5823611
file name : Image_12012024112201720.png
|
2024-01-12 11:22:01.803621 |
68 |
65734040 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T |
500000 |
IMPROVEMENT OF THE INDAGADA HIGH SCHOOL UNDER 5T1 |
Completion of work |
-
latitude : 19.9322541
Longitude : 84.5823611
file name : Image_12012024111917058.png
|
2024-01-12 11:19:17.155378 |
69 |
48645801 |
Const. of village drain at Dumakumpa GP area |
200000 |
Const. of village drain at Dumakumpa GP area1 |
Roof laid |
-
latitude : 19.9322558,19.9322558
Longitude : 84.5823679,84.5823679
file name : Image_30012024183853014.png
|
2024-01-30 18:38:53.174485 |
70 |
48645801 |
Const. of village drain at Dumakumpa GP area |
200000 |
Const. of village drain at Dumakumpa GP area1 |
Plinth level |
-
latitude : 19.9322578,19.9322611
Longitude : 84.5823675,84.5823657
file name : Image_30012024182534641.png
|
2024-01-30 18:25:34.728233 |
71 |
48645801 |
Const. of village drain at Dumakumpa GP area |
200000 |
Const. of village drain at Dumakumpa GP area1 |
Completion of work |
-
latitude : 19.9322604,19.9322606
Longitude : 84.5823655,84.5823633
file name : Image_30012024182144863.png
|
2024-01-30 18:21:44.945981 |
72 |
65734230 |
Operation & maintenance of drinking water supply system |
136428 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.9322579
Longitude : 84.5823541
file name : Image_20112023120124405.png
|
2023-11-20 12:01:24.521275 |
73 |
65734230 |
Operation & maintenance of drinking water supply system |
136428 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.9322571
Longitude : 84.5823533
file name : Image_20112023120002199.png
|
2023-11-20 12:00:02.301414 |
74 |
65734230 |
Operation & maintenance of drinking water supply system |
136428 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.9322568
Longitude : 84.5823534
file name : Image_20112023115831482.png
|
2023-11-20 11:58:31.611654 |
75 |
58913196 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT |
285952 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT1 |
Roof laid |
-
latitude : 19.9322399
Longitude : 84.5823697
file name : Image_06072024133129800.png
|
2024-07-06 13:31:29.913857 |
76 |
58913196 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT |
285952 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT1 |
Roof laid |
-
latitude : 19.9322576
Longitude : 84.5823542
file name : Image_20112023115603889.png
|
2023-11-20 11:56:03.998073 |
77 |
58913196 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT |
285952 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT1 |
Plinth level |
-
latitude : 19.9322579
Longitude : 84.5823533
file name : Image_20112023115426470.png
|
2023-11-20 11:54:26.569633 |
78 |
58913196 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT |
285952 |
REPAIR AND MAINTENANCE AND ELECTRIC CHARGES OF STREET LIGHT1 |
Completion of work |
-
latitude : 19.9322019
Longitude : 84.5822344
file name : Image_20112023114204088.png
|
2023-11-20 11:42:04.185489 |
79 |
75616828 |
Construction of Child Friendly Corners in schools |
180000 |
Construction of Child Friendly Corners in schools1 |
Roof laid |
-
latitude : 19.932244
Longitude : 84.5823633
file name : Image_22122023160149182.png
|
2023-12-22 16:01:49.273426 |
80 |
75616828 |
Construction of Child Friendly Corners in schools |
180000 |
Construction of Child Friendly Corners in schools1 |
Plinth level |
-
latitude : 19.9322496
Longitude : 84.5823591
file name : Image_22122023155953861.png
|
2023-12-22 15:59:53.96686 |
81 |
75616828 |
Construction of Child Friendly Corners in schools |
180000 |
Construction of Child Friendly Corners in schools1 |
Completion of work |
-
latitude : 19.9322527
Longitude : 84.5823585
file name : Image_22122023154839096.png
|
2023-12-22 15:48:39.200596 |
82 |
65734171 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI |
151904 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI1 |
Roof laid |
-
latitude : 19.9322493
Longitude : 84.5823591
file name : Image_07062024134242470.png
|
2024-06-07 13:42:42.55076 |
83 |
65734171 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI |
151904 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI1 |
Plinth level |
-
latitude : 19.9322484
Longitude : 84.5823649
file name : Image_07062024134021469.png
|
2024-06-07 13:40:21.582446 |
84 |
65734171 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI |
151904 |
CONSTRUCTION OF COMMUNITY CENTRE AT KHAMAREDI HARIJANA SAHI1 |
Completion of work |
-
latitude : 19.932248
Longitude : 84.5823608
file name : Image_07062024133308097.png
|
2024-06-07 13:33:08.191248 |
85 |
64477416 |
construction of village drain at Akhupadar |
100000 |
construction of village drain at Akhupadar1 |
Completion of work |
-
latitude : 19.9322339
Longitude : 84.5823345
file name : Image_01102022133005399.png
|
2022-10-01 13:30:05.513904 |
86 |
48646542 |
Repair and maintenance of Bhimsen Nagar Approach road |
100000 |
Repair and maintenance of Bhimsen Nagar Approach road1 |
Roof laid |
-
latitude : 19.9322441
Longitude : 84.582363
file name : Image_06072024141311843.png
|
2024-07-06 14:13:11.934313 |
87 |
48646542 |
Repair and maintenance of Bhimsen Nagar Approach road |
100000 |
Repair and maintenance of Bhimsen Nagar Approach road1 |
Plinth level |
-
latitude : 19.9322414
Longitude : 84.5823701
file name : Image_06072024135737721.png
|
2024-07-06 13:57:37.805063 |
88 |
48646542 |
Repair and maintenance of Bhimsen Nagar Approach road |
100000 |
Repair and maintenance of Bhimsen Nagar Approach road1 |
Completion of work |
-
latitude : 19.9322451
Longitude : 84.5823753
file name : Image_06072024133841511.png
|
2024-07-06 13:38:41.611059 |
89 |
64477498 |
Construction of Drain at Akhupadar |
300000 |
Construction of Drain at Akhupadar1 |
Roof laid |
-
latitude : 19.9322454
Longitude : 84.5823712
file name : Image_06072024135625340.png
|
2024-07-06 13:56:25.44614 |
90 |
64477498 |
Construction of Drain at Akhupadar |
300000 |
Construction of Drain at Akhupadar1 |
Plinth level |
-
latitude : 19.9322441
Longitude : 84.5823665
file name : Image_06072024134043926.png
|
2024-07-06 13:40:44.026566 |
91 |
64477498 |
Construction of Drain at Akhupadar |
300000 |
Construction of Drain at Akhupadar1 |
Completion of work |
-
latitude : 19.9322415
Longitude : 84.5823654
file name : Image_04072024174225610.png
|
2024-07-04 17:42:25.706156 |
92 |
65750464 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA |
150000 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA1 |
Roof laid |
-
latitude : 19.9322464
Longitude : 84.5823693
file name : Image_06072024140143338.png
|
2024-07-06 14:01:43.440326 |
93 |
65750464 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA |
150000 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA1 |
Plinth level |
-
latitude : 19.9322398
Longitude : 84.5823664
file name : Image_06072024132602918.png
|
2024-07-06 13:26:03.019386 |
94 |
65750464 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA |
150000 |
INSTALLATION OF NEW STREET LIGHT OF DUMAKUMPA GP AREA1 |
Completion of work |
-
latitude : 19.9322444
Longitude : 84.5823704
file name : Image_04072024174404642.png
|
2024-07-04 17:44:04.76845 |
95 |
65750486 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK |
400000 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK1 |
Roof laid |
-
latitude : 19.9322411
Longitude : 84.582372
file name : Image_06072024141545510.png
|
2024-07-06 14:15:45.610751 |
96 |
65750486 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK |
400000 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK1 |
Plinth level |
-
latitude : 19.9322456
Longitude : 84.5823691
file name : Image_06072024141050306.png
|
2024-07-06 14:10:50.398026 |
97 |
65750486 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK |
400000 |
CONSTRUCTION OF GUARD WALL AT AKUPADARA TANK1 |
Completion of work |
-
latitude : 19.9322405
Longitude : 84.5823668
file name : Image_06072024132308777.png
|
2024-07-06 13:23:08.886435 |
98 |
74593244 |
Operation and Maintenance of drinking water supply system |
105000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.9322434
Longitude : 84.5823626
file name : Image_06072024140737741.png
|
2024-07-06 14:07:37.82695 |
99 |
74593244 |
Operation and Maintenance of drinking water supply system |
105000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.9322413
Longitude : 84.5823662
file name : Image_06072024135436917.png
|
2024-07-06 13:54:37.011666 |
100 |
74593244 |
Operation and Maintenance of drinking water supply system |
105000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.932244
Longitude : 84.5823667
file name : Image_06072024134209415.png
|
2024-07-06 13:42:09.525956 |
101 |
48646275 |
Electricity Charges of RPWS |
101904 |
Electricity Charges of RPWS1 |
Roof laid |
-
latitude : 19.932244
Longitude : 84.5823673
file name : Image_06072024174800580.png
|
2024-07-06 17:48:00.676384 |
102 |
48646275 |
Electricity Charges of RPWS |
101904 |
Electricity Charges of RPWS1 |
Plinth level |
-
latitude : 19.9322407
Longitude : 84.5823678
file name : Image_06072024174516480.png
|
2024-07-06 17:45:16.573826 |
103 |
48646275 |
Electricity Charges of RPWS |
101904 |
Electricity Charges of RPWS1 |
Completion of work |
-
latitude : 19.9322427
Longitude : 84.5823644
file name : Image_06072024173847694.png
|
2024-07-06 17:38:47.785746 |
104 |
78335780 |
Operation and Maintenance of piped water supply system |
157498 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.9322444
Longitude : 84.5823705
file name : Image_06072024174648760.png
|
2024-07-06 17:46:48.876149 |
105 |
78335780 |
Operation and Maintenance of piped water supply system |
157498 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.9322444
Longitude : 84.5823699
file name : Image_06072024174407732.png
|
2024-07-06 17:44:07.842377 |
106 |
78335780 |
Operation and Maintenance of piped water supply system |
157498 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.9322399
Longitude : 84.5823667
file name : Image_06072024174018435.png
|
2024-07-06 17:40:18.531616 |
107 |
58881925 |
REMUNERATION OF PUMP OPERATOR |
72000 |
REMUNERATION OF PUMP OPERATOR1 |
Roof laid |
-
latitude : 19.9322352
Longitude : 84.5823361
file name : Image_10072024173242735.png
|
2024-07-10 17:32:42.542275 |
108 |
58881925 |
REMUNERATION OF PUMP OPERATOR |
72000 |
REMUNERATION OF PUMP OPERATOR1 |
Plinth level |
-
latitude : 19.9322398
Longitude : 84.58236
file name : Image_10072024172323067.png
|
2024-07-10 17:23:23.429884 |
109 |
58881925 |
REMUNERATION OF PUMP OPERATOR |
72000 |
REMUNERATION OF PUMP OPERATOR1 |
Completion of work |
-
latitude : 19.932227
Longitude : 84.582335
file name : Image_29042023173836643.png
|
2023-04-29 17:38:36.761509 |
110 |
58882776 |
REMUNERATION OF SEM |
144000 |
REMUNERATION OF SEM1 |
Roof laid |
-
latitude : 19.9322332
Longitude : 84.582344
file name : Image_10072024173332109.png
|
2024-07-10 17:33:32.250954 |
111 |
58882776 |
REMUNERATION OF SEM |
144000 |
REMUNERATION OF SEM1 |
Plinth level |
-
latitude : 19.9322403
Longitude : 84.5823488
file name : Image_10072024172354321.png
|
2024-07-10 17:23:54.405119 |
112 |
58882776 |
REMUNERATION OF SEM |
144000 |
REMUNERATION OF SEM1 |
Completion of work |
-
latitude : 19.9322239
Longitude : 84.5823349
file name : Image_29042023173951046.png
|
2023-04-29 17:39:51.147256 |
113 |
48640449 |
Repair and maintenance of water supply pipe line |
154428 |
Repair and maintenance of water supply pipe line1 |
Roof laid |
-
latitude : 19.9322392,19.9322346
Longitude : 84.582343,84.5823407
file name : Image_10072024172542555.png
|
2024-07-10 17:25:42.659995 |
114 |
48640449 |
Repair and maintenance of water supply pipe line |
154428 |
Repair and maintenance of water supply pipe line1 |
Plinth level |
-
latitude : 19.9322348,19.9322287
Longitude : 84.5823411,84.5823407
file name : Image_10072024171415183.png
|
2024-07-10 17:14:15.268727 |
115 |
48640449 |
Repair and maintenance of water supply pipe line |
154428 |
Repair and maintenance of water supply pipe line1 |
Completion of work |
-
latitude : 19.9322301,19.9322283
Longitude : 84.5823562,84.5823561
file name : Image_08022022131618697.png
|
2022-02-08 13:16:18.759787 |
116 |
48646215 |
Installation of Solar Water supply project |
450000 |
Installation of Solar Water supply project1 |
Roof laid |
-
latitude : 19.9322393,19.9322393
Longitude : 84.5823585,84.5823585
file name : Image_10072024172633957.png
|
2024-07-10 17:26:34.050536 |
117 |
48646215 |
Installation of Solar Water supply project |
450000 |
Installation of Solar Water supply project1 |
Plinth level |
-
latitude : 19.9322365,19.9322365
Longitude : 84.5823424,84.5823424
file name : Image_10072024172045323.png
|
2024-07-10 17:20:45.416936 |
118 |
48646215 |
Installation of Solar Water supply project |
450000 |
Installation of Solar Water supply project1 |
Completion of work |
-
latitude : 19.9322417,19.9322417,19.9322431
Longitude : 84.5823454,84.5823454,84.5823466
file name : Image_10032022181209258.png
|
2022-03-10 18:12:09.322972 |
119 |
65750362 |
Operation & maintenance of drinking water supply system |
198000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.9322462
Longitude : 84.5823666
file name : Image_12072024185019076.png
|
2024-07-12 18:50:19.166163 |
120 |
65750362 |
Operation & maintenance of drinking water supply system |
198000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.9322427
Longitude : 84.5823745
file name : Image_12072024184233839.png
|
2024-07-12 18:42:33.928161 |
121 |
65750362 |
Operation & maintenance of drinking water supply system |
198000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.9322433
Longitude : 84.5823706
file name : Image_12072024183614139.png
|
2024-07-12 18:36:14.223079 |
122 |
44337104 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS |
300000 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS1 |
Completion of work |
-
latitude : 19.9322446,19.9322455
Longitude : 84.5823471,84.5823463
file name : Image_10032022175628599.png
|
2022-03-10 17:56:28.705443 |
123 |
44337104 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS |
300000 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS1 |
Completion of work |
-
latitude : 19.9322446,19.9322455
Longitude : 84.5823471,84.5823463
file name : Image_10032022175713529.png
|
2022-03-10 17:57:13.608308 |
124 |
44337104 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS |
300000 |
REPAIR & MAINTENANCE OF PIPE LINES 6 NOS1 |
Completion of work |
-
latitude : 19.9322288,19.9322273
Longitude : 84.5823573,84.5823546
file name : Image_08022022131743920.png
|
2022-02-08 13:17:43.989615 |
125 |
44337275 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS) |
100000 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS)1 |
Completion of work |
-
latitude : 19.9322412,19.932241,19.932241
Longitude : 84.5823442,84.5823419,84.5823427
file name : Image_10032022181202724.png
|
2022-03-10 18:12:02.781423 |
126 |
44337275 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS) |
100000 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS)1 |
Completion of work |
-
latitude : 19.9322438,19.932244
Longitude : 84.5823475,84.5823416
file name : Image_10032022181735282.png
|
2022-03-10 18:17:35.344684 |
127 |
44337275 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS) |
100000 |
LABOUR CHARGES FOR (CLEANING OF VILLAGE ROAD ,DRAIN& OTHERS)1 |
Completion of work |
-
latitude : 19.3092671,19.3092671
Longitude : 84.7927448,84.7927448
file name : Image_12102021142051458.png
|
2021-10-12 14:20:51.572355 |
128 |
48640237 |
Pump operators remuneration |
72000 |
Pump operators remuneration 1 |
Completion of work |
-
latitude : 19.9322361,19.9322361
Longitude : 84.5823361,84.5823361
file name : Image_01102022182849664.png
|
2022-10-01 18:28:49.806609 |
129 |
48646332 |
Provision for Expenditure towards IEC activities data entry and office contingency |
64428 |
Provision for Expenditure towards IEC activities data entry and office contingency 1 |
Completion of work |
-
latitude : 19.9322435
Longitude : 84.5823432
file name : Image_10032022181740378.png
|
2022-03-10 18:17:40.435067 |
130 |
103763506 |
Operation and Maintenance of drinking/piped water supply system |
390000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 19.932256666666667
Longitude : 84.58232000000001
file name : Image_20112024133804463.png
|
2024-11-20 13:38:04.592862 |
131 |
103763506 |
Operation and Maintenance of drinking/piped water supply system |
390000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.932268
Longitude : 84.5821955
file name : Image_20112024133118672.png
|
2024-11-20 13:31:18.839977 |
132 |
103763506 |
Operation and Maintenance of drinking/piped water supply system |
390000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.9321718
Longitude : 84.5821461
file name : Image_20112024131909867.png
|
2024-11-20 13:19:10.089697 |
133 |
103763506 |
Operation and Maintenance of drinking/piped water supply system |
390000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.932270000000003
Longitude : 84.58226166666667
file name : Image_20112024131913880.png
|
2024-11-20 13:19:14.042007 |
134 |
103763506 |
Operation and Maintenance of drinking/piped water supply system |
390000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.932270000000003
Longitude : 84.58226166666667
file name : Image_20112024132018840.png
|
2024-11-20 13:20:18.986848 |
135 |
103764236 |
Emergency breakdown and up-gradation post disasters/ exigencies |
250672 |
Emergency breakdown and up-gradation post disasters/ exigencies1 |
Roof laid |
-
latitude : 19.932213333333333
Longitude : 84.58228499999998
file name : Image_20112024133845663.png
|
2024-11-20 13:38:45.819734 |
136 |
103764236 |
Emergency breakdown and up-gradation post disasters/ exigencies |
250672 |
Emergency breakdown and up-gradation post disasters/ exigencies1 |
Plinth level |
-
latitude : 19.9322914
Longitude : 84.5822049
file name : Image_20112024133231695.png
|
2024-11-20 13:32:32.030575 |
137 |
103764236 |
Emergency breakdown and up-gradation post disasters/ exigencies |
250672 |
Emergency breakdown and up-gradation post disasters/ exigencies1 |
Completion of work |
-
latitude : 19.932256666666667
Longitude : 84.58228833333332
file name : Image_20112024132628907.png
|
2024-11-20 13:26:29.105812 |