1 |
11113816 |
Street Light LED Putabagada |
75000 |
Office Equipment1 |
Commenced |
-
latitude : 19.40308612
Longitude : 84.88078037
file name : Image_20102019150951975.png
|
2019-10-20 15:09:52.030192 |
2 |
11113729 |
Street Light LED at New Nagar Diha |
50000 |
Office Equipment1 |
Commenced |
-
latitude : 19.36506077
Longitude : 84.87681933
file name : Image_19102019124058832.png
|
2019-10-19 12:40:58.898826 |
3 |
11113750 |
Street Light LED at K Ch. Nagardhia |
100000 |
Office Equipment1
|
Commenced |
-
latitude : 19.36945649
Longitude : 84.88046446
file name : Image_19102019123658357.png
|
2019-10-19 12:36:58.424421 |
4 |
11113768 |
Street Light (LED) at Tanganapalli |
100000 |
Office Equipment1 |
Commenced |
-
latitude : 19.37149283
Longitude : 84.87815205
file name : Image_19102019123244481.png
|
2019-10-19 12:32:44.5501 |
5 |
11113792 |
Street Light LED at T.Putabagada |
75000 |
Office Equipment1 |
Commenced |
-
latitude : 19.40085765
Longitude : 84.8854836
file name : Image_20102019145509555.png
|
2019-10-20 14:55:09.626431 |
6 |
44196737 |
Const. Of CC Road from Dandasi Sahi to Brahman Sahi Tubewell at K.C.H Nagardiha |
150000 |
Const. Of CC Road from Dandasi Sahi to Brahman Sahi Tubewell at K.C.H Nagardiha1 |
Completion of work |
-
latitude : 19.369667368009686,19.36966904439032
Longitude : 84.88197019323707,84.88194345496595
file name : Image_10052021145121122.png
|
2021-05-10 14:51:21.185786 |
7 |
44196679 |
Repair and Maintenance of P.U.P.S ,Ramapalli |
300000 |
Repair and Maintenance of P.U.P.S ,Ramapalli 1 |
Completion of work |
-
latitude : 19.393941569142044
Longitude : 84.85248676501215
file name : Image_11052021114005495.png
|
2021-05-11 11:40:05.574816 |
8 |
44196679 |
Repair and Maintenance of P.U.P.S ,Ramapalli |
300000 |
Repair and Maintenance of P.U.P.S ,Ramapalli 1 |
Completion of work |
-
latitude : 19.3947378
Longitude : 84.8527207
file name : Image_11052021114333569.png
|
2021-05-11 11:43:33.651273 |
9 |
44196367 |
Digging of New Tubewell & Water Supply to AWC-1 at KTN Pur |
130000 |
Digging of New Tubewell & Water Supply to AWC-1 at KTN Pur1 |
Completion of work |
-
latitude : 19.395595989190042
Longitude : 84.87514849752188
file name : Image_11052021112031873.png
|
2021-05-11 11:20:31.950207 |
10 |
51715070 |
Completion of incomplete Toilet and Water Supply to AWC 1 at Putabagada |
126000 |
Completion of incomplete Toilet and Water Supply to AWC 1 at Putabagada1 |
Completion of work |
-
latitude : 19.403252061456442
Longitude : 84.88238669000566
file name : Image_19052021113421615.png
|
2021-05-19 11:34:21.699401 |
11 |
51715148 |
Payment towards Salary of SEM and PWS Pump Operator |
48000 |
Payment towards Salary of SEM and PWS Pump Operator1 |
Completion of work |
-
latitude : 19.35427433811128,19.35427433811128
Longitude : 84.98438984155655,84.98438984155655
file name : Image_24062021144743060.png
|
2021-06-24 14:47:43.126489 |
12 |
51714901 |
Completion of incomplete IAY Community Hall at IAY Colony Putabagada |
235952 |
Completion of incomplete IAY Community Hall at IAY Colony Putabagada1 |
Completion of work |
-
latitude : 19.400512604042888
Longitude : 84.87541948445141
file name : Image_29062021124851897.png
|
2021-06-29 12:48:51.965813 |
13 |
44197019 |
Completion of incomplete Kalyan Mandap at Harijana Sahi,Ramapalli |
250000 |
Completion of incomplete Kalyan Mandap at Harijana Sahi,Ramapalli 1 |
Completion of work |
-
latitude : 19.394990438595414
Longitude : 84.84999960288405
file name : Image_10082021105447458.png
|
2021-08-10 10:54:47.542819 |
14 |
44196083 |
Maintenance of Pipe Water Supply |
150316 |
Maintenance of Pipe Water Supply 1 |
Completion of work |
-
latitude : 19.39490791875869,19.395017847418785
Longitude : 84.85031350515783,84.8502079769969
file name : Image_26112021113102279.png
|
2021-11-26 11:31:02.372792 |
15 |
44196763 |
Repair and Maintenance of West Sahi Community Hall at Putabagada |
300000 |
Repair and Maintenance of West Sahi Community Hall at Putabagada1 |
Completion of work |
-
latitude : 19.40321534872055
Longitude : 84.8797687701881
file name : Image_26112021111502476.png
|
2021-11-26 11:15:02.598016 |
16 |
44196441 |
Const. Of Drain with Cover Plate from Tubewell to Abhi Pradhan House at T.Putabagada |
100000 |
Const. Of Drain with Cover Plate from Tubewell to Abhi Pradhan House at T.Putabagada1 |
Completion of work |
-
latitude : 19.399866443127394,19.39983936958015
Longitude : 84.8866933118552,84.88669247366488
file name : Image_26112021110709649.png
|
2021-11-26 11:07:09.756152 |
17 |
44196405 |
Const. Of Drain with Cover Plate from Dasa Sahi to Dandasi Sahi,Ramapalli |
200000 |
Const. Of Drain with Cover Plate from Dasa Sahi to Dandasi Sahi,Ramapalli1 |
Completion of work |
-
latitude : 19.39438363071531,19.394353749230504
Longitude : 84.85020185820758,84.8501731082797
file name : Image_26112021103628798.png
|
2021-11-26 10:36:28.907537 |
18 |
47643981 |
Provision for Electricity Bill(PWS) and Street Light |
500000 |
Provision for Electricity Bill(PWS) and Street Light1 |
Completion of work |
-
latitude : 19.354572985321283,19.354572985321283
Longitude : 84.98439931310713,84.98439931310713
file name : Image_01022022113232106.png
|
2022-02-01 11:32:32.185848 |
19 |
44196654 |
Repair and Maintenance of ME School ,KTN Pur |
200000 |
Repair and Maintenance of ME School ,KTN Pur1 |
Completion of work |
-
latitude : 19.39607799053192
Longitude : 84.87528478726745
file name : Image_29042022151754301.png
|
2022-04-29 15:17:54.425892 |
20 |
44197068 |
Const. Of Community center at Dhoba Sahi,Ramapalli |
250000 |
Const. Of Community center at Dhoba Sahi,Ramapalli1 |
Completion of work |
-
latitude : 19.395497711375356
Longitude : 84.85079395584762
file name : Image_17052022120433047.png
|
2022-05-17 12:04:33.117215 |
21 |
51715002 |
Completion of incomplete Community Hall at Tala Bauri Sahi Ramapalli |
50000 |
Completion of incomplete Community Hall at Tala Bauri Sahi Ramapalli1 |
Completion of work |
-
latitude : 19.395027067512274
Longitude : 84.84979391098022
file name : Image_17052022115151521.png
|
2022-05-17 11:51:51.598273 |
22 |
51715127 |
Digging of Borewell and Water Supply to AWC 3 at KTN Pur |
126000 |
Digging of Borewell and Water Supply to AWC 3 at KTN Pur1 |
Completion of work |
-
latitude : 19.39318837132305
Longitude : 84.87467651255429
file name : Image_25052022115506654.png
|
2022-05-25 11:55:06.764081 |
23 |
47649434 |
Completion of incomplete Kalyan Mandap at Harijana Sahi,Ramapalli |
300000 |
Completion of incomplete Kalyan Mandap at Harijana Sahi,Ramapalli1 |
Completion of work |
-
latitude : 19.39502669032663
Longitude : 84.84998619183898
file name : Image_16062022103822896.png
|
2022-06-16 10:38:22.960646 |
24 |
76702929 |
Water Supply to villages |
532391 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.3544914,19.3544914
Longitude : 84.984741,84.984741
file name : Image_29022024195350774.png
|
2024-02-29 19:53:50.858226 |
25 |
76702929 |
Water Supply to villages |
532391 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.3544912,19.3544912
Longitude : 84.984743,84.984743
file name : Image_29022024195236045.png
|
2024-02-29 19:52:36.11622 |
26 |
76702929 |
Water Supply to villages |
532391 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.3544893,19.3544893
Longitude : 84.9847386,84.9847386
file name : Image_29022024195117390.png
|
2024-02-29 19:51:17.470961 |
27 |
64032423 |
Repair and Maintenance of street light of Tanganapalli village. |
460000 |
Repair and Maintenance of street light of Tanganapalli village.1 |
Completion of work |
-
latitude : 19.3734577
Longitude : 84.8796798
file name : Image_17082022121202257.png
|
2022-08-17 12:12:02.319723 |
28 |
47649187 |
Constr of drain with cover plate from Saraswati Das house new tube well to Gurubari das plot at bada |
100000 |
Constr of drain with cover plate from Saraswati Das house new tube well to Gurubari das plot at bada1 |
Completion of work |
-
latitude : 19.37359642703086,19.37359248753637
Longitude : 84.87782282754779,84.87777261994779
file name : Image_30082022121503388.png
|
2022-08-30 12:15:03.45101 |
29 |
47649738 |
Imp. of Project Upper Primary School at Ramapalli |
225952 |
Imp. of Project Upper Primary School at Ramapalli1 |
Completion of work |
-
latitude : 19.39392702654004
Longitude : 84.85274241305888
file name : Image_30082022115940639.png
|
2022-08-30 11:59:40.718098 |
30 |
51714948 |
Imp and Water Supply to AWC at Putabagada |
100000 |
Imp and Water Supply to AWC at Putabagada1 |
Completion of work |
-
latitude : 19.403085177764297
Longitude : 84.88234603777528
file name : Image_30082022114104223.png
|
2022-08-30 11:41:04.302649 |
31 |
47648720 |
Purchase of Dust Bin |
450000 |
Purchase of Dust Bin 1 |
Completion of work |
-
latitude : 19.3544171
Longitude : 84.9847013
file name : Image_30092022191512820.png
|
2022-09-30 19:15:12.903427 |
32 |
47644399 |
Payment towards SEM Salary |
96000 |
Payment towards SEM Salary1 |
Plinth level |
-
latitude : 19.3544171
Longitude : 84.9847002
file name : Image_30092022191404156.png
|
2022-09-30 19:14:04.2416 |
33 |
47644399 |
Payment towards SEM Salary |
96000 |
Payment towards SEM Salary1 |
Completion of work |
-
latitude : 19.354591048322618
Longitude : 84.9842507019639
file name : Image_25022022142039632.png
|
2022-02-25 14:20:39.687251 |
34 |
65660952 |
Operation & maintenance of drinking water supply system |
604341 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3545575
Longitude : 84.984708
file name : Image_31102022143842536.png
|
2022-10-31 14:38:42.600826 |
35 |
51715174 |
Completion of incomplete Community center at Nua Sahi KTN Pur |
350000 |
Completion of incomplete Community center at Nua Sahi KTN Pur1 |
Completion of work |
-
latitude : 19.39429541118443
Longitude : 84.87483208067715
file name : Image_31102022175351898.png
|
2022-10-31 17:53:51.97323 |
36 |
47648947 |
Imp. of S.N Bidyapitha High School,Tanganapalli (Smart Class) |
500000 |
Imp. of S.N Bidyapitha High School,Tanganapalli (Smart Class)1 |
Completion of work |
-
latitude : 19.37794552502088
Longitude : 84.87943584609233
file name : Image_23112022124633485.png
|
2022-11-23 12:46:33.603434 |
37 |
65660994 |
Operation & maintenance of drinking water supply system |
96000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.37406782526523
Longitude : 84.87950591370463
file name : Image_09112023114646145.png
|
2023-11-09 11:46:46.23193 |
38 |
65660994 |
Operation & maintenance of drinking water supply system |
96000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3546057
Longitude : 84.9845559
file name : Image_31012023143852059.png
|
2023-01-31 14:38:52.159195 |
39 |
65661080 |
Imp. of S.N Bidya Pitha (Smart Class(HST)) at Tanganapalli |
933800 |
Imp. of S.N Bidya Pitha (Smart Class(HST)) at Tanganapalli1 |
Plinth level |
-
latitude : 19.378040625260006
Longitude : 84.87940928758152
file name : Image_25042023110354373.png
|
2023-04-25 11:03:54.440154 |
40 |
65661080 |
Imp. of S.N Bidya Pitha (Smart Class(HST)) at Tanganapalli |
933800 |
Imp. of S.N Bidya Pitha (Smart Class(HST)) at Tanganapalli1 |
Completion of work |
-
latitude : 19.3253289
Longitude : 84.9155657
file name : Image_25012023144100314.png
|
2023-01-25 14:41:00.447668 |
41 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 19.3777742
Longitude : 84.8795376
file name : Image_29022024110657836.png
|
2024-02-29 11:06:57.936993 |
42 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 19.3777747
Longitude : 84.8795374
file name : Image_29022024111458264.png
|
2024-02-29 11:14:58.337206 |
43 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 19.3777747
Longitude : 84.8795374
file name : Image_29022024111557061.png
|
2024-02-29 11:15:57.156372 |
44 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 19.376691235229373
Longitude : 84.87946651875973
file name : Image_29122023113341330.png
|
2023-12-29 11:33:41.418162 |
45 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 19.376651337370276
Longitude : 84.87940290011466
file name : Image_29122023112636646.png
|
2023-12-29 11:26:36.730815 |
46 |
75248150 |
Constructions of Hostels and Schools |
973952 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 19.3766717473045
Longitude : 84.8794075101614
file name : Image_29122023112639933.png
|
2023-12-29 11:26:40.004162 |
47 |
65661017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.402784271156797,19.402784271156797
Longitude : 84.88210063982899,84.88210063982899
file name : Image_23062023183016939.png
|
2023-06-23 18:30:17.023338 |
48 |
65661017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.402770539908996,19.402770539908996
Longitude : 84.88206125776578,84.88206125776578
file name : Image_22062023125041667.png
|
2023-06-22 12:50:41.747822 |
49 |
65661183 |
Imp. of AWC at Putabagada |
50000 |
Imp. of AWC at Putabagada1 |
Completion of work |
-
latitude : 19.40313836093992
Longitude : 84.88228619098663
file name : Image_16072023135939055.png
|
2023-07-16 13:59:39.143533 |
50 |
47645744 |
Digging of New Tubewell at Putabagada |
80107 |
Digging of New Tubewell at Putabagada1 |
Completion of work |
-
latitude : 19.403066905215383
Longitude : 84.88082321360707
file name : Image_10112023114153285.png
|
2023-11-10 11:41:53.383431 |
51 |
47644958 |
Digging of New Tubewell at Tanganapalli |
80107 |
Digging of New Tubewell at Tanganapalli1 |
Completion of work |
-
latitude : 19.371879184618592
Longitude : 84.8797114379704
file name : Image_09112023133000143.png
|
2023-11-09 13:30:00.279536 |
52 |
59006929 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli |
51904 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli1 |
Roof laid |
-
latitude : 19.394924137741327
Longitude : 84.8497396800667
file name : Image_20122023124740472.png
|
2023-12-20 12:47:40.591371 |
53 |
59006929 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli |
51904 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli1 |
Plinth level |
-
latitude : 19.39496022183448
Longitude : 84.84976516105235
file name : Image_20122023124055401.png
|
2023-12-20 12:40:55.495095 |
54 |
59006929 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli |
51904 |
Completion of incomplete Community Hall at Talabauri Sahi, Ramapalli1 |
Completion of work |
-
latitude : 19.39495821017772
Longitude : 84.8497557733208
file name : Image_20122023122536101.png
|
2023-12-20 12:25:36.211577 |
55 |
75172662 |
Constructions of Hostels and Schools |
400000 |
Constructions of Hostels and Schools1 |
Roof laid |
-
latitude : 19.3777746
Longitude : 84.8795374
file name : Image_29022024113102189.png
|
2024-02-29 11:31:02.273401 |
56 |
75172662 |
Constructions of Hostels and Schools |
400000 |
Constructions of Hostels and Schools1 |
Plinth level |
-
latitude : 19.3777741
Longitude : 84.8795377
file name : Image_29022024112242472.png
|
2024-02-29 11:22:42.536107 |
57 |
75172662 |
Constructions of Hostels and Schools |
400000 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 19.3777741
Longitude : 84.8795374
file name : Image_29022024103039042.png
|
2024-02-29 10:30:39.116382 |
58 |
75172662 |
Constructions of Hostels and Schools |
400000 |
Constructions of Hostels and Schools1 |
Completion of work |
-
latitude : 19.3777741
Longitude : 84.8795373
file name : Image_29022024103035497.png
|
2024-02-29 10:30:35.564579 |
59 |
76750158 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.3544564
Longitude : 84.9847407
file name : Image_05062024173317040.png
|
2024-06-05 17:33:17.144656 |
60 |
76750158 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.3545359
Longitude : 84.984807
file name : Image_05062024172912740.png
|
2024-06-05 17:29:12.828072 |
61 |
76750158 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.3544579
Longitude : 84.9847406
file name : Image_05062024171619487.png
|
2024-06-05 17:16:19.572131 |
62 |
65661061 |
Creation of drainage channel for management of grey water |
185341 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.395181252621114,19.395173876546323
Longitude : 84.85003665089607,84.85008400864899
file name : Image_29032024114946615.png
|
2024-03-29 11:49:46.679075 |
63 |
65661061 |
Creation of drainage channel for management of grey water |
185341 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.395153718069196,19.395212098024786
Longitude : 84.85006875358522,84.85012105666101
file name : Image_29032024113918468.png
|
2024-03-29 11:39:18.531639 |
64 |
65661061 |
Creation of drainage channel for management of grey water |
185341 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.39493624959141,19.39497116021812
Longitude : 84.84991670586169,84.84988032840192
file name : Image_28032024112758718.png
|
2024-03-28 11:27:58.796526 |
65 |
75248800 |
Construction and Maintenance of Community Centre |
211186 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.403041591867805
Longitude : 84.8797756433487
file name : Image_30092024181104388.png
|
2024-09-30 18:11:04.44242 |
66 |
75248800 |
Construction and Maintenance of Community Centre |
211186 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.40310973674059
Longitude : 84.8797529283911
file name : Image_30092024180925932.png
|
2024-09-30 18:09:26.010632 |
67 |
75248800 |
Construction and Maintenance of Community Centre |
211186 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.403162458911538
Longitude : 84.87974965944886
file name : Image_30092024180426043.png
|
2024-09-30 18:04:24.419235 |
68 |
59006852 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli |
250000 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli1 |
Roof laid |
-
latitude : 19.395474158227444
Longitude : 84.85075950622559
file name : Image_22072024112144165.png
|
2024-07-22 11:21:44.239823 |
69 |
59006852 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli |
250000 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli1 |
Plinth level |
-
latitude : 19.395513511262834
Longitude : 84.85077140852809
file name : Image_22072024111805425.png
|
2024-07-22 11:18:05.496256 |
70 |
59006852 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli |
250000 |
Completion of incomplete Community Hall Dhoba Sahi at Ramapalli1 |
Completion of work |
-
latitude : 19.395397547632456
Longitude : 84.85071533359587
file name : Image_22072024111431355.png
|
2024-07-22 11:14:31.425346 |
71 |
75247210 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Roof laid |
-
latitude : 19.394998108036816
Longitude : 84.84990899451077
file name : Image_22072024111050550.png
|
2024-07-22 11:10:50.62383 |
72 |
75247210 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Plinth level |
-
latitude : 19.394971621222794
Longitude : 84.84993212856352
file name : Image_22072024110453011.png
|
2024-07-22 11:04:53.094566 |
73 |
75247210 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 19.39494505058974
Longitude : 84.8499056417495
file name : Image_22072024110320732.png
|
2024-07-22 11:03:20.811617 |
74 |
75247210 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 19.39487837255001
Longitude : 84.84994478523731
file name : Image_22072024105257915.png
|
2024-07-22 10:52:57.980654 |