1 |
5954553 |
Const of Latrine and urinal in the GP Office |
50000 |
Hand pump1 |
Commenced |
-
latitude : 19.223852641938624
Longitude : 84.4824075457973
file name : Image_07092019155349949.png
|
2019-09-07 15:53:50.020963 |
2 |
5954525 |
Digging of 2 nos of tubewell at Goudagam and Lahunia Hanuman Chaka |
160000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.22386461570764
Longitude : 84.48235916328645
file name : Image_07092019155352892.png
|
2019-09-07 15:53:52.964667 |
3 |
11054357 |
const of Boundary wall at GP office |
60000 |
Boundary wall / Side Wall / Retaining Wall1 |
Commenced |
-
latitude : 19.222505402661255
Longitude : 84.48217871269779
file name : Image_06092019080436968.png
|
2019-09-06 08:04:37.016914 |
4 |
31632740 |
Repair and colouring and aqua guard of School at Goudagam,Dauni and Lahunia |
200000 |
Water Purification System1 |
Commenced |
-
latitude : 19.2221916
Longitude : 84.4820333
file name : Image_07022020171727614.png
|
2020-02-07 17:17:27.669603 |
5 |
44604730 |
Const. Of Kalyan mandap near Thakurani mandir at Goudagaon |
1568064 |
Const. Of Kalyan mandap near Thakurani mandir at Goudagaon1 |
Completion of work |
-
latitude : 19.22559406846609
Longitude : 84.483155653915
file name : Image_08042021181318083.png
|
2021-04-08 18:13:18.21325 |
6 |
44604694 |
Completion of incomplet Odia sahi Kalyan mandap at Dauni |
100000 |
Completion of incomplet Odia sahi Kalyan mandap at Dauni1 |
Completion of work |
-
latitude : 19.212706801672585
Longitude : 84.47746996550647
file name : Image_08042021182925036.png
|
2021-04-08 18:29:25.098915 |
7 |
44604675 |
Const. Of Drain at west street Dauni |
100000 |
Const. Of Drain at west street Dauni1 |
Completion of work |
-
latitude : 19.214473754529966,19.214466366813195
Longitude : 84.47453440678032,84.47451368292305
file name : Image_08042021183300005.png
|
2021-04-08 18:33:00.067362 |
8 |
38399997 |
Completion of Incomplete Boundary wall near Kalyan Mandap Dhoba harijana sahi at Dauni |
100000 |
Completion of Incomplete Boundary wall near Kalyan Mandap Dhoba harijana sahi at Dauni1 |
Completion of work |
-
latitude : 19.214418742223877
Longitude : 84.48013609078697
file name : Image_08042021182611521.png
|
2021-04-08 18:26:11.579151 |
9 |
38398431 |
Purchase of Bleaching powder for all village |
20985 |
Purchase of Bleaching powder for all village1 |
Completion of work |
-
latitude : 19.3823775
Longitude : 84.5643427
file name : Image_13072021114139393.png
|
2021-07-13 11:41:39.502515 |
10 |
38398202 |
Payment of remuneration to SEM and Pump driver |
75000 |
Payment of remuneration to SEM and Pump driver1 |
Completion of work |
-
latitude : 19.382378
Longitude : 84.5643418
file name : Image_26072021113533711.png
|
2021-07-26 11:35:33.853822 |
11 |
48875419 |
Const of Bathing step and pavor block at Goudagam |
100000 |
Const of Bathing step and pavor block at Goudagam1 |
Completion of work |
-
latitude : 19.2236262
Longitude : 84.4813121
file name : Image_06112021141909284.png
|
2021-11-06 14:19:09.354186 |
12 |
38400174 |
Development of GP office |
100000 |
Development of GP office1 |
Completion of work |
-
latitude : 19.2236262
Longitude : 84.4813121
file name : Image_06112021140837476.png
|
2021-11-06 14:08:37.553777 |
13 |
48876682 |
Installation of Highmax street light and maintance at lahunia gaida dauni goudagam jamasahi manikyap |
200000 |
Installation of Highmax street light and maintance at lahunia gaida dauni goudagam jamasahi manikyap1 |
Completion of work |
-
latitude : 19.2240303
Longitude : 84.4823616
file name : Image_18012022175413970.png
|
2022-01-18 17:54:14.069066 |
14 |
48875890 |
Completion of Incomplete Boundary wall at thakurabni temple dauni |
150000 |
Completion of Incomplete Boundary wall at thakurabni temple dauni1 |
Completion of work |
-
latitude : 19.215612600032184
Longitude : 84.46825732135412
file name : Image_29012022143811906.png
|
2022-01-29 14:38:12.048587 |
15 |
38398824 |
Completion of Incomplete Kumbara sahi Kalyana Mandap at Goudagam |
100000 |
Completion of Incomplete Kumbara sahi Kalyana Mandap at Goudagam1 |
Completion of work |
-
latitude : 19.21375226699566
Longitude : 84.47806825267894
file name : Image_29012022142850738.png
|
2022-01-29 14:28:50.895756 |
16 |
38398491 |
Solid liquid waste management and repair and maintenance of Drain of all village |
100000 |
Solid liquid waste management and repair and maintenance of Drain of all village1 |
Completion of work |
-
latitude : 19.2154044
Longitude : 84.4791498
file name : Image_29012022144647442.png
|
2022-01-29 14:46:47.616744 |
17 |
38398271 |
Repair and maintenance of PWS and payment of electric bill Boundary wall of PWS system |
400000 |
Repair and maintenance of PWS and payment of electric bill Boundary wall of PWS system1 |
Completion of work |
-
latitude : 19.21412407191781,19.21411542779829
Longitude : 84.4831235807596,84.48300758320724
file name : Image_28042022111014191.png
|
2022-04-28 11:10:14.423974 |
18 |
65873418 |
completion of incomplete kalyan mandap at kali mandir at dauni |
150000 |
completion of incomplete kalyan mandap at kali mandir at dauni1 |
Roof laid |
-
latitude : 19.22204037
Longitude : 84.47974152
file name : Image_15072023154438750.png
|
2023-07-15 15:44:38.933736 |
19 |
65873418 |
completion of incomplete kalyan mandap at kali mandir at dauni |
150000 |
completion of incomplete kalyan mandap at kali mandir at dauni1 |
Plinth level |
-
latitude : 19.22204194
Longitude : 84.47977547
file name : Image_15072023154003863.png
|
2023-07-15 15:40:03.959714 |
20 |
65873418 |
completion of incomplete kalyan mandap at kali mandir at dauni |
150000 |
completion of incomplete kalyan mandap at kali mandir at dauni1 |
Completion of work |
-
latitude : 19.22208476
Longitude : 84.47980417
file name : Image_15072023153022152.png
|
2023-07-15 15:30:22.251626 |
21 |
48876215 |
Completion of incomplete kalyan mandap at mali sahi dauni |
100000 |
Completion of incomplete kalyan mandap at mali sahi dauni1 |
Roof laid |
-
latitude : 19.22203251
Longitude : 84.47971927
file name : Image_15072023154548563.png
|
2023-07-15 15:45:48.678328 |
22 |
48876215 |
Completion of incomplete kalyan mandap at mali sahi dauni |
100000 |
Completion of incomplete kalyan mandap at mali sahi dauni1 |
Plinth level |
-
latitude : 19.22204898
Longitude : 84.47976478
file name : Image_15072023153915321.png
|
2023-07-15 15:39:15.449971 |
23 |
48876215 |
Completion of incomplete kalyan mandap at mali sahi dauni |
100000 |
Completion of incomplete kalyan mandap at mali sahi dauni1 |
Completion of work |
-
latitude : 19.22205449
Longitude : 84.47974459
file name : Image_15072023153202133.png
|
2023-07-15 15:32:02.248706 |
24 |
65873157 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI |
250000 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI1 |
Roof laid |
-
latitude : 19.21438959
Longitude : 84.47464817
file name : Image_04102023130414453.png
|
2023-10-04 13:04:14.546013 |
25 |
65873157 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI |
250000 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI1 |
Plinth level |
-
latitude : 19.21440594
Longitude : 84.47469413
file name : Image_04102023130111253.png
|
2023-10-04 13:01:11.2106 |
26 |
65873157 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI |
250000 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI1 |
Completion of work |
-
latitude : 19.21438331
Longitude : 84.47473864
file name : Image_04102023125525730.png
|
2023-10-04 12:55:25.89102 |
27 |
65873157 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI |
250000 |
CONSTRUCTION OF THAKURANI CULTURAL MANDAP AT DAUNI1 |
Completion of work |
-
latitude : 19.21440283
Longitude : 84.47466919
file name : Image_04102023125459998.png
|
2023-10-04 12:55:00.123035 |
28 |
65873547 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA |
200000 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA1 |
Roof laid |
-
latitude : 19.2232817
Longitude : 84.45416868
file name : Image_04102023132903557.png
|
2023-10-04 13:29:03.643055 |
29 |
65873547 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA |
200000 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA1 |
Plinth level |
-
latitude : 19.22323432
Longitude : 84.4541435
file name : Image_04102023132538263.png
|
2023-10-04 13:25:38.37974 |
30 |
65873547 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA |
200000 |
COMPLETION OF INCOMPLETE BOUNDARY WALL AT AWC LAHUNIA1 |
Completion of work |
-
latitude : 19.22327595
Longitude : 84.45417002
file name : Image_04102023131257692.png
|
2023-10-04 13:12:57.791633 |
31 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI1 |
Plinth level |
-
latitude : 19.22202231
Longitude : 84.48026585
file name : Image_12102023165030740.png
|
2023-10-12 16:50:30.837458 |
32 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI1 |
Plinth level |
-
latitude : 19.22209633
Longitude : 84.48022795
file name : Image_12102023162147284.png
|
2023-10-12 16:21:47.374234 |
33 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI1 |
Completion of work |
-
latitude : 19.22203921
Longitude : 84.48017345
file name : Image_12102023160605374.png
|
2023-10-12 16:06:05.468241 |
34 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI2 |
Plinth level |
-
latitude : 19.22202203
Longitude : 84.48025907
file name : Image_12102023165059090.png
|
2023-10-12 16:50:59.205691 |
35 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI2 |
Plinth level |
-
latitude : 19.22205169
Longitude : 84.48023023
file name : Image_12102023162228044.png
|
2023-10-12 16:22:28.159651 |
36 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI2 |
Completion of work |
-
latitude : 19.22205816
Longitude : 84.48020863
file name : Image_12102023160827848.png
|
2023-10-12 16:08:27.986869 |
37 |
48876510 |
Improvement of park in convergence with MGNREGA at dauni |
100000 |
Improvement of park in convergence with MGNREGA at dauni1 |
Roof laid |
-
latitude : 19.21493806,19.21493898
Longitude : 84.47202406,84.47202372
file name : Image_04102023123735314.png
|
2023-10-04 12:37:35.428124 |
38 |
48876510 |
Improvement of park in convergence with MGNREGA at dauni |
100000 |
Improvement of park in convergence with MGNREGA at dauni1 |
Plinth level |
-
latitude : 19.21491768,19.21491768
Longitude : 84.47203321,84.47203323
file name : Image_04102023122812606.png
|
2023-10-04 12:28:12.719567 |
39 |
48876510 |
Improvement of park in convergence with MGNREGA at dauni |
100000 |
Improvement of park in convergence with MGNREGA at dauni1 |
Completion of work |
-
latitude : 19.21481987,19.21481648
Longitude : 84.47213549,84.47213877
file name : Image_04102023121013730.png
|
2023-10-04 12:10:13.85513 |
40 |
65872947 |
Operation & maintenance of drinking water supply system |
130542 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.22173552,19.22178025
Longitude : 84.48067035,84.48056392
file name : Image_11102023133607401.png
|
2023-10-11 13:36:07.510091 |
41 |
65872947 |
Operation & maintenance of drinking water supply system |
130542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.22207754,19.22207379
Longitude : 84.47991576,84.47990941
file name : Image_11102023131048365.png
|
2023-10-11 13:10:48.488931 |
42 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI3 |
Plinth level |
-
latitude : 19.22202508
Longitude : 84.48024508
file name : Image_12102023165124399.png
|
2023-10-12 16:51:24.494815 |
43 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI3 |
Plinth level |
-
latitude : 19.22205329
Longitude : 84.48021464
file name : Image_12102023162304450.png
|
2023-10-12 16:23:04.543362 |
44 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI3 |
Completion of work |
-
latitude : 19.22205838
Longitude : 84.48020044
file name : Image_12102023160856691.png
|
2023-10-12 16:08:56.78126 |
45 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI4 |
Plinth level |
-
latitude : 19.22202877
Longitude : 84.4802435
file name : Image_12102023165149688.png
|
2023-10-12 16:51:49.784084 |
46 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI4 |
Plinth level |
-
latitude : 19.22204395
Longitude : 84.48022357
file name : Image_12102023162333735.png
|
2023-10-12 16:23:33.833521 |
47 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI4 |
Completion of work |
-
latitude : 19.22205704
Longitude : 84.4801996
file name : Image_12102023160927610.png
|
2023-10-12 16:09:27.698919 |
48 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI5 |
Plinth level |
-
latitude : 19.22202901
Longitude : 84.48024472
file name : Image_12102023165217127.png
|
2023-10-12 16:52:17.235579 |
49 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI5 |
Plinth level |
-
latitude : 19.22204171
Longitude : 84.48022248
file name : Image_12102023162402260.png
|
2023-10-12 16:24:02.35355 |
50 |
60087305 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI |
114032 |
COMPLETION OF INCOMPLETE OF CULTURAL MANDAP AT HARIJAN SAHI DAUNI5 |
Completion of work |
-
latitude : 19.22205175
Longitude : 84.48019528
file name : Image_12102023160955289.png
|
2023-10-12 16:09:55.386737 |
51 |
81039406 |
Water Supply to villages |
110000 |
Water Supply to villages1 |
|
-
latitude : 19.22404436
Longitude : 84.48226804
file name : Image_08122023132015995.png
|
2023-12-08 13:20:16.089154 |
52 |
65872917 |
Water Supply to villages |
376000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.22401267
Longitude : 84.48225967
file name : Image_08122023133334305.png
|
2023-12-08 13:33:34.421605 |
53 |
65872917 |
Water Supply to villages |
376000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.2241726
Longitude : 84.4822126
file name : Image_08122023133331104.png
|
2023-12-08 13:33:31.223312 |
54 |
65872917 |
Water Supply to villages |
376000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.22404256
Longitude : 84.48227877
file name : Image_08122023132518916.png
|
2023-12-08 13:25:19.018473 |
55 |
65872917 |
Water Supply to villages |
376000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.223822908234894
Longitude : 84.48212116034297
file name : Image_30032023133623365.png
|
2023-03-30 13:36:23.457418 |
56 |
65872917 |
Water Supply to villages |
376000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.22382536560842
Longitude : 84.4823026176264
file name : Image_30032023133450405.png
|
2023-03-30 13:34:50.503992 |
57 |
48874640 |
Energy bill payment of PWS payment of SEM & Pump Driver |
536656 |
Energy bill payment of PWS payment of SEM & Pump Driver1 |
Plinth level |
-
latitude : 19.22190468
Longitude : 84.47992291
file name : Image_30032024140821808.png
|
2024-03-30 14:08:21.945022 |
58 |
48874640 |
Energy bill payment of PWS payment of SEM & Pump Driver |
536656 |
Energy bill payment of PWS payment of SEM & Pump Driver1 |
Completion of work |
-
latitude : 19.22183729
Longitude : 84.47997525
file name : Image_30032024140437649.png
|
2024-03-30 14:04:40.314526 |
59 |
48874640 |
Energy bill payment of PWS payment of SEM & Pump Driver |
536656 |
Energy bill payment of PWS payment of SEM & Pump Driver1 |
Completion of work |
-
latitude : 19.214179353054192
Longitude : 84.4826107684238
file name : Image_18012022174100539.png
|
2022-01-18 17:41:00.624828 |
60 |
81043217 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.12723274
Longitude : 84.56860635
file name : Image_11092024153023527.png
|
2024-09-11 15:30:23.612401 |
61 |
81043217 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.12707358
Longitude : 84.56863535
file name : Image_11092024152510499.png
|
2024-09-11 15:25:10.617857 |
62 |
78509140 |
Construction of Boundary Wall |
200000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.12720894
Longitude : 84.56861444
file name : Image_11092024153912938.png
|
2024-09-11 15:39:13.025 |
63 |
78509140 |
Construction of Boundary Wall |
200000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.12720923
Longitude : 84.56858989
file name : Image_11092024153608939.png
|
2024-09-11 15:36:09.037266 |
64 |
81033696 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.2241186,19.2241155
Longitude : 84.4822971,84.4822825
file name : Image_20062024145610733.png
|
2024-06-20 14:56:10.825572 |
65 |
81033696 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.2241166,19.2241168
Longitude : 84.4822927,84.4822083
file name : Image_20062024144911812.png
|
2024-06-20 14:49:11.912396 |
66 |
78509092 |
Electricity connection /Installation of Solar Energy |
300000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 19.10996379
Longitude : 84.58567631
file name : Image_07102024191449724.png
|
2024-10-07 19:14:49.818379 |
67 |
78509092 |
Electricity connection /Installation of Solar Energy |
300000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 19.11003894
Longitude : 84.58562836
file name : Image_07102024190917604.png
|
2024-10-07 19:09:17.704134 |
68 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON1 |
Plinth level |
-
latitude : 19.2241155
Longitude : 84.4822155
file name : Image_08082024185103436.png
|
2024-08-08 18:51:03.513493 |
69 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON1 |
Completion of work |
-
latitude : 19.2241194
Longitude : 84.482293
file name : Image_08082024184256749.png
|
2024-08-08 18:42:56.830064 |
70 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON2 |
Plinth level |
-
latitude : 19.2241161
Longitude : 84.4822159
file name : Image_08082024185138345.png
|
2024-08-08 18:51:38.426717 |
71 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON2 |
Plinth level |
-
latitude : 19.2241161
Longitude : 84.4822159
file name : Image_08082024185112274.png
|
2024-08-08 18:51:12.358726 |
72 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON2 |
Completion of work |
-
latitude : 19.2241162
Longitude : 84.4822131
file name : Image_08082024184536064.png
|
2024-08-08 18:45:36.163916 |
73 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON3 |
Plinth level |
-
latitude : 19.2241161
Longitude : 84.4822162
file name : Image_08082024185155951.png
|
2024-08-08 18:51:56.029353 |
74 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON3 |
Plinth level |
-
latitude : 19.2241161
Longitude : 84.4822162
file name : Image_08082024185122055.png
|
2024-08-08 18:51:22.133101 |
75 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON3 |
Completion of work |
-
latitude : 19.2241171
Longitude : 84.4822297
file name : Image_08082024184544889.png
|
2024-08-08 18:45:44.973406 |
76 |
60086531 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON |
100000 |
IMPROVEMENT OF GRAM PANCHAYAT OFFICE AT GOUDAGAON3 |
Completion of work |
-
latitude : 19.2241171
Longitude : 84.4822297
file name : Image_08082024184539412.png
|
2024-08-08 18:45:39.490121 |