1 |
5967720 |
street light at khamarigam |
238118 |
Street Light1 |
Commenced |
-
latitude : 19.302192800815096
Longitude : 84.44717499739059
file name : Image_21102019111543642.png
|
2019-10-21 11:15:43.692192 |
2 |
31655983 |
Construction of CC Road from School to Mill Sahi |
100000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.32557188960257,19.325576800396963
Longitude : 84.4477118396951,84.44771156229848
file name : Image_11032020133942784.png
|
2020-03-11 13:39:42.906891 |
3 |
44577138 |
Development of TMCs related covid 19 Khamarigam GPs all TMC |
800000 |
Development of TMCs related covid 19 Khamarigam GPs all TMC1 |
Completion of work |
-
latitude : 19.293306127277287
Longitude : 84.46854099286708
file name : Image_22092020125225357.png
|
2020-09-22 12:52:25.441311 |
4 |
44577266 |
Construction of cc road From Harijan sahi To School at S Tikarapada |
100064 |
Construction of cc road From Harijan sahi To School at S Tikarapada1 |
Completion of work |
-
latitude : 19.304952244740292,19.304957086437074
Longitude : 84.46942038715058,84.46941683305474
file name : Image_06102020135355715.png
|
2020-10-06 13:53:55.797154 |
5 |
44577189 |
Construction of Paver Block Road at Sebaka tikarapada |
200000 |
Construction of Paver Block Road at Sebaka tikarapada1 |
Completion of work |
-
latitude : 19.30495360527109,19.30495360527109
Longitude : 84.46940158656999,84.46940158656999
file name : Image_06102020135226531.png
|
2020-10-06 13:52:26.62198 |
6 |
44577189 |
Construction of Paver Block Road at Sebaka tikarapada |
200000 |
Construction of Paver Block Road at Sebaka tikarapada1 |
Completion of work |
-
latitude : 23.0478019,23.0478019
Longitude : 72.6268029,72.6268029
file name : Image_06102020135200533.png
|
2020-10-06 13:52:00.619069 |
7 |
44577189 |
Construction of Paver Block Road at Sebaka tikarapada |
200000 |
Construction of Paver Block Road at Sebaka tikarapada1 |
Completion of work |
-
latitude : 19.30495360527109,19.30495360527109
Longitude : 84.46940158656999,84.46940158656999
file name : Image_06102020135107296.png
|
2020-10-06 13:51:07.386562 |
8 |
44577189 |
Construction of Paver Block Road at Sebaka tikarapada |
200000 |
Construction of Paver Block Road at Sebaka tikarapada1 |
Completion of work |
-
latitude : 23.0478019,23.0478019
Longitude : 72.6268029,72.6268029
file name : Image_06102020135044220.png
|
2020-10-06 13:50:44.301742 |
9 |
44577189 |
Construction of Paver Block Road at Sebaka tikarapada |
200000 |
Construction of Paver Block Road at Sebaka tikarapada1 |
Completion of work |
-
latitude : 23.0478019,23.0478019
Longitude : 72.6268029,72.6268029
file name : Image_06102020134956444.png
|
2020-10-06 13:49:56.527016 |
10 |
38609872 |
Construction of Boundary wall of ME School Khamarigam |
175000 |
Construction of Boundary wall of ME School Khamarigam1 |
Completion of work |
-
latitude : 19.305056829100035
Longitude : 84.44634661478418
file name : Image_28012021132036463.png
|
2021-01-28 13:20:36.540211 |
11 |
44577176 |
Improvement of G.P office |
400000 |
Improvement of G.P office1 |
Completion of work |
-
latitude : 19.302234755316608
Longitude : 84.44721697584852
file name : Image_28012021115424591.png
|
2021-01-28 11:54:24.695776 |
12 |
38610098 |
Construction of Paver Block Road at Bijayanagargada |
250000 |
Construction of Paver Block Road at Bijayanagargada1 |
Completion of work |
-
latitude : 19.298500770433517,19.298500770433517
Longitude : 84.45316453246632,84.45316453246632
file name : Image_15032021125715899.png
|
2021-03-15 12:57:16.009596 |
13 |
38609997 |
Construction of Paver Block road at Thakurani sahi Golanda |
173713 |
Construction of Paver Block road at Thakurani sahi Golanda1 |
Completion of work |
-
latitude : 19.308180680775475,19.308180680775475
Longitude : 84.47566564765962,84.47566564765962
file name : Image_15032021131811085.png
|
2021-03-15 13:18:11.179279 |
14 |
38610135 |
Grill fitting at BNRGSK |
250000 |
Grill fitting at BNRGSK1 |
Completion of work |
-
latitude : 19.301128474627976
Longitude : 84.44374058369415
file name : Image_29032021132854220.png
|
2021-03-29 13:28:54.330904 |
15 |
38610370 |
Construction of Bathing step at sagar Bandha Harijana sahi |
75000 |
Construction of Bathing step at sagar Bandha Harijana sahi1 |
Completion of work |
-
latitude : 19.299929606967538
Longitude : 84.4453325997113
file name : Image_13042021131144459.png
|
2021-04-13 13:11:44.534682 |
16 |
38609192 |
Remuneration of 03 nos of SEM and Pump drivers |
108000 |
Remuneration of 03 nos of SEM and Pump drivers1 |
Completion of work |
-
latitude : 19.2101649
Longitude : 84.5827982
file name : Image_05052021061101093.png
|
2021-05-05 06:11:01.186975 |
17 |
38609006 |
Repair and maintenance of PWS system |
300000 |
Repair and maintenance of PWS system1 |
Completion of work |
-
latitude : 19.296845,19.296836666666664
Longitude : 84.440735,84.44072166666668
file name : Image_16092021125014598.png
|
2021-09-16 12:50:14.728475 |
18 |
38609006 |
Repair and maintenance of PWS system |
300000 |
Repair and maintenance of PWS system1 |
Completion of work |
-
latitude : 19.2101649,19.2101649
Longitude : 84.5827982,84.5827982
file name : Image_05052021061448831.png
|
2021-05-05 06:14:48.936149 |
19 |
44576144 |
Construction of High school Toilets and Urinals |
150000 |
Construction of High school Toilets and Urinals1 |
Completion of work |
-
latitude : 19.306475
Longitude : 84.44643333333333
file name : Image_14062021112439575.png
|
2021-06-14 11:24:39.738939 |
20 |
38609428 |
Installation of overhead tank and water facility at Khamarigam AWC |
79921 |
Installation of overhead tank and water facility at Khamarigam AWC1 |
Completion of work |
-
latitude : 19.301058333333334
Longitude : 84.44393166666666
file name : Image_28102021043430290.png
|
2021-10-28 04:34:30.419157 |
21 |
38609124 |
Repair and maintenance of Tube well plate form |
100000 |
Repair and maintenance of Tube well plate form 1 |
Completion of work |
-
latitude : 19.305345
Longitude : 84.44640499999998
file name : Image_16092021125908093.png
|
2021-09-16 12:59:08.224924 |
22 |
38610677 |
Construction of Community hall at Padmapur |
300000 |
Construction of Community hall at Padmapur1 |
Completion of work |
-
latitude : 19.4114963
Longitude : 84.5000961
file name : Image_27092021185605273.png
|
2021-09-27 18:56:05.414334 |
23 |
38610677 |
Construction of Community hall at Padmapur |
300000 |
Construction of Community hall at Padmapur1 |
Completion of work |
-
latitude : 19.316021666666664
Longitude : 84.42949333333333
file name : Image_27092021185634902.png
|
2021-09-27 18:56:35.025355 |
24 |
47639029 |
Construction of Paver Block road at Baritala |
200000 |
Construction of Paver Block road at Baritala1 |
Completion of work |
-
latitude : 19.30871534,19.30864957
Longitude : 84.45380956,84.45394394
file name : Image_05012022112046756.png
|
2022-01-05 11:20:46.857999 |
25 |
47638521 |
Construction of Khamarigam ME School Boundary wall |
150000 |
Construction of Khamarigam ME School Boundary wall1 |
Completion of work |
-
latitude : 19.30563369
Longitude : 84.44642376
file name : Image_02052022125518164.png
|
2022-05-02 12:55:18.266189 |
26 |
47638521 |
Construction of Khamarigam ME School Boundary wall |
150000 |
Construction of Khamarigam ME School Boundary wall1 |
Completion of work |
-
latitude : 19.30563369
Longitude : 84.44642376
file name : Image_02052022125525603.png
|
2022-05-02 12:55:25.707448 |
27 |
47637049 |
Salary of SEM & Pump drivers |
108000 |
Salary of SEM & Pump drivers1 |
Completion of work |
-
latitude : 19.3824437
Longitude : 84.5643225
file name : Image_09052022124233433.png
|
2022-05-09 12:42:33.555743 |
28 |
47638873 |
Construction of Paver Block road at Golanda |
168000 |
Construction of Paver Block road at Golanda1 |
Completion of work |
-
latitude : 19.30778416,19.30779079
Longitude : 84.47548303,84.47549397
file name : Image_16052022145741356.png
|
2022-05-16 14:57:41.495493 |
29 |
38609800 |
Construction of Paver Block road at Gola sahi |
150000 |
Construction of Paver Block road at Gola sahi1 |
Completion of work |
-
latitude : 19.32569085,19.3256962
Longitude : 84.44950132,84.44949772
file name : Image_24052022110251667.png
|
2022-05-24 11:02:51.79974 |
30 |
38609577 |
Construction of Pave Block Road at Nua sahi Gadasamanatarapur |
150000 |
Construction of Pave Block Road at Nua sahi Gadasamanatarapur1 |
Completion of work |
-
latitude : 19.32616251,19.32616208
Longitude : 84.44873744,84.44873697
file name : Image_24052022110315137.png
|
2022-05-24 11:03:15.224614 |
31 |
38609577 |
Construction of Pave Block Road at Nua sahi Gadasamanatarapur |
150000 |
Construction of Pave Block Road at Nua sahi Gadasamanatarapur1 |
Completion of work |
-
latitude : 19.32616251,19.32616208
Longitude : 84.44873744,84.44873697
file name : Image_24052022110320435.png
|
2022-05-24 11:03:20.531642 |
32 |
38609500 |
Solid liqued waste management at Khamarigam |
30000 |
Solid liqued waste management at Khamarigam1 |
Completion of work |
-
latitude : 19.30118453
Longitude : 84.44492936
file name : Image_30072022161148654.png
|
2022-07-30 16:11:48.753785 |
33 |
44576139 |
Solid & liquid waste management(Baritala,Khamarigam,Bijaya Nagara Gada) |
100000 |
Solid & liquid waste management(Baritala,Khamarigam,Bijaya Nagara Gada)1 |
Completion of work |
-
latitude : 19.30113187
Longitude : 84.44511091
file name : Image_30072022071937520.png
|
2022-07-30 07:19:37.606505 |
34 |
47637713 |
Construction of Drain at sankarakhali |
100000 |
Construction of Drain at sankarakhali1 |
Completion of work |
-
latitude : 19.31368534,19.3136843
Longitude : 84.44524938,84.44524872
file name : Image_12082022171545494.png
|
2022-08-12 17:15:45.582849 |
35 |
47637987 |
Construction of Drain at Manidhia |
200000 |
Construction of Drain at Manidhia1 |
Completion of work |
-
latitude : 19.30924735,19.30924974
Longitude : 84.46233725,84.46201853
file name : Image_12082022173150524.png
|
2022-08-12 17:31:50.626766 |
36 |
47639955 |
Development of Kalyan mandap at Khamarigam |
500000 |
Development of Kalyan mandap at Khamarigam1 |
Roof laid |
-
latitude : 19.297556666666665
Longitude : 84.44015666666668
file name : Image_09102023133609158.png
|
2023-10-09 13:36:09.256797 |
37 |
47639955 |
Development of Kalyan mandap at Khamarigam |
500000 |
Development of Kalyan mandap at Khamarigam1 |
Plinth level |
-
latitude : 19.297511666666665
Longitude : 84.44017000000001
file name : Image_09102023132100351.png
|
2023-10-09 13:21:00.450204 |
38 |
47639955 |
Development of Kalyan mandap at Khamarigam |
500000 |
Development of Kalyan mandap at Khamarigam1 |
Completion of work |
-
latitude : 19.297555
Longitude : 84.44019166666666
file name : Image_08102023172045445.png
|
2023-10-08 17:20:45.560909 |
39 |
66087498 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT |
250000 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT1 |
Roof laid |
-
latitude : 19.3824471
Longitude : 84.5643423
file name : Image_19012023143218423.png
|
2023-01-19 14:32:18.533182 |
40 |
66087498 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT |
250000 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT1 |
Plinth level |
-
latitude : 19.3824471
Longitude : 84.5643423
file name : Image_19012023143042178.png
|
2023-01-19 14:30:42.293069 |
41 |
66087498 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT |
250000 |
PURCHASE INSTALLATION, REPAIR & MAINTENANCE OF STREET LIGHT1 |
Completion of work |
-
latitude : 19.3824471
Longitude : 84.5643423
file name : Image_19012023142524880.png
|
2023-01-19 14:25:24.968193 |
42 |
66086513 |
Water Supply to villages |
168000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.3824467
Longitude : 84.5643214
file name : Image_31012023153814384.png
|
2023-01-31 15:38:14.492848 |
43 |
66086513 |
Water Supply to villages |
168000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.382424
Longitude : 84.5643423
file name : Image_02012023162723758.png
|
2023-01-02 16:27:23.865031 |
44 |
66086513 |
Water Supply to villages |
168000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.3824229
Longitude : 84.564343
file name : Image_02012023163635387.png
|
2023-01-02 16:36:35.524303 |
45 |
66086513 |
Water Supply to villages |
168000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.3824229
Longitude : 84.564343
file name : Image_02012023164730496.png
|
2023-01-02 16:47:30.641239 |
46 |
66086128 |
Operation & maintenance of drinking water supply system |
300000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.3824202
Longitude : 84.5643392
file name : Image_02012023170458690.png
|
2023-01-02 17:04:58.810815 |
47 |
66086128 |
Operation & maintenance of drinking water supply system |
300000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.3824201
Longitude : 84.5643414
file name : Image_02012023165712648.png
|
2023-01-02 16:57:12.806208 |
48 |
66086128 |
Operation & maintenance of drinking water supply system |
300000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3824229
Longitude : 84.564343
file name : Image_02012023165009382.png
|
2023-01-02 16:50:09.555856 |
49 |
47640123 |
Construction of Community hall near Nimeisuni Temple Patrapada |
314032 |
Construction of Community hall near Nimeisuni Temple Patrapada1 |
Completion of work |
-
latitude : 19.310875
Longitude : 84.43223833333334
file name : Image_15022023155730855.png
|
2023-02-15 15:57:30.988361 |
50 |
47640123 |
Construction of Community hall near Nimeisuni Temple Patrapada |
314032 |
Construction of Community hall near Nimeisuni Temple Patrapada1 |
Plinth level |
-
latitude : 19.310995
Longitude : 84.43240499999999
file name : Image_15022023164306044.png
|
2023-02-15 16:43:06.308629 |
51 |
47640123 |
Construction of Community hall near Nimeisuni Temple Patrapada |
314032 |
Construction of Community hall near Nimeisuni Temple Patrapada1 |
Roof laid |
-
latitude : 19.310891666666667
Longitude : 84.432265
file name : Image_15022023164537734.png
|
2023-02-15 16:45:37.858754 |
52 |
47640123 |
Construction of Community hall near Nimeisuni Temple Patrapada |
314032 |
Construction of Community hall near Nimeisuni Temple Patrapada1 |
Completion of work |
-
latitude : 19.3109388
Longitude : 84.43235903
file name : Image_02052022125508334.png
|
2022-05-02 12:55:08.445198 |
53 |
66087471 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA |
300000 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA1 |
Completion of work |
-
latitude : 19.299111666666665
Longitude : 84.48675
file name : Image_27032023090735110.png
|
2023-03-27 09:07:35.208315 |
54 |
66087471 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA |
300000 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA1 |
Plinth level |
-
latitude : 19.299335
Longitude : 84.48688500000002
file name : Image_27032023092010253.png
|
2023-03-27 09:20:10.351758 |
55 |
66087471 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA |
300000 |
CONSTRUCTION OF CULTURAL MANDAP AT GOLANDA1 |
Roof laid |
-
latitude : 19.299156666666665
Longitude : 84.48679333333332
file name : Image_27032023092521784.png
|
2023-03-27 09:25:21.873893 |
56 |
66087515 |
PAYMENT OF ENERGY BILL |
150000 |
PAYMENT OF ENERGY BILL1 |
Completion of work |
-
latitude : 19.3819828
Longitude : 84.5646908
file name : Image_31032023172032651.png
|
2023-03-31 17:20:32.772122 |
57 |
66087515 |
PAYMENT OF ENERGY BILL |
150000 |
PAYMENT OF ENERGY BILL1 |
Plinth level |
-
latitude : 19.3820172
Longitude : 84.5646808
file name : Image_31032023173212130.png
|
2023-03-31 17:32:12.275957 |
58 |
66087515 |
PAYMENT OF ENERGY BILL |
150000 |
PAYMENT OF ENERGY BILL1 |
Roof laid |
-
latitude : 19.382017
Longitude : 84.5646815
file name : Image_31032023173548085.png
|
2023-03-31 17:35:48.214304 |
59 |
66087679 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY |
164032 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY1 |
Completion of work |
-
latitude : 19.3819828
Longitude : 84.5646908
file name : Image_31032023172146686.png
|
2023-03-31 17:21:46.794387 |
60 |
66087679 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY |
164032 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY1 |
Plinth level |
-
latitude : 19.3820172
Longitude : 84.5646808
file name : Image_31032023173129656.png
|
2023-03-31 17:31:29.781092 |
61 |
66087679 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY |
164032 |
PAYMENT TOWARDS ONLINE WORKS PURCHASE OF OFFICE STATIONARY1 |
Roof laid |
-
latitude : 19.382017
Longitude : 84.5646815
file name : Image_31032023173418028.png
|
2023-03-31 17:34:18.157994 |
62 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3824221
Longitude : 84.5643387
file name : Image_22052023131736355.png
|
2023-05-22 13:17:36.445563 |
63 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3824221
Longitude : 84.5643387
file name : Image_22052023131729553.png
|
2023-05-22 13:17:29.650079 |
64 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3824205
Longitude : 84.5643427
file name : Image_22052023131741789.png
|
2023-05-22 13:17:41.87518 |
65 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3824205
Longitude : 84.5643427
file name : Image_22052023131752843.png
|
2023-05-22 13:17:52.934157 |
66 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.382118333333334
Longitude : 84.56452666666668
file name : Image_22052023132353319.png
|
2023-05-22 13:23:53.408244 |
67 |
66086030 |
Operation & maintenance of drinking water supply system |
110542 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.382093333333334
Longitude : 84.56451999999999
file name : Image_22052023132544355.png
|
2023-05-22 13:25:44.448713 |
68 |
82364183 |
Construction of Building |
280372 |
Construction of Building1 |
Roof laid |
-
latitude : 19.302113333333335
Longitude : 84.44722666666667
file name : Image_28022024140847199.png
|
2024-02-28 14:08:47.267208 |
69 |
82364183 |
Construction of Building |
280372 |
Construction of Building1 |
Plinth level |
-
latitude : 19.302133333333334
Longitude : 84.44727499999999
file name : Image_28022024140427149.png
|
2024-02-28 14:04:27.233873 |
70 |
82364183 |
Construction of Building |
280372 |
Construction of Building1 |
Completion of work |
-
latitude : 19.302116666666667
Longitude : 84.44711333333335
file name : Image_28022024135315388.png
|
2024-02-28 13:53:15.464691 |
71 |
82364183 |
Construction of Building |
280372 |
Construction of Building1 |
Completion of work |
-
latitude : 19.30212
Longitude : 84.44719333333333
file name : Image_28022024135311265.png
|
2024-02-28 13:53:11.351205 |
72 |
66087548 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE |
500000 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE1 |
Roof laid |
-
latitude : 19.297596666666667
Longitude : 84.44016166666667
file name : Image_09102023133822763.png
|
2023-10-09 13:38:22.848053 |
73 |
66087548 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE |
500000 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE1 |
Plinth level |
-
latitude : 19.297585
Longitude : 84.44012333333333
file name : Image_09102023132205569.png
|
2023-10-09 13:22:05.663946 |
74 |
66087548 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE |
500000 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE1 |
Completion of work |
-
latitude : 19.29773833333333
Longitude : 84.44023333333334
file name : Image_08102023173615088.png
|
2023-10-08 17:36:15.197955 |
75 |
66087548 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE |
500000 |
COMPLETION OF INCOMPLETE KALYAN MANDAP NEAR UJALESWAR TEMPLE1 |
Completion of work |
-
latitude : 19.297748333333335
Longitude : 84.44021333333333
file name : Image_08102023172748115.png
|
2023-10-08 17:27:48.249036 |
76 |
66087416 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.324965000000002,19.324953333333333
Longitude : 84.4489,84.44891166666666
file name : Image_09102023140414911.png
|
2023-10-09 14:04:15.012107 |
77 |
66087416 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.324831666666668,19.324786666666668
Longitude : 84.448775,84.44872833333332
file name : Image_09102023140053762.png
|
2023-10-09 14:00:53.846919 |
78 |
66087416 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.324991666666666,19.325038333333335
Longitude : 84.44892999999999,84.44890666666667
file name : Image_09102023135239807.png
|
2023-10-09 13:52:39.90455 |
79 |
38609648 |
Construction of Paver Block road at Sankarakhali |
150000 |
Construction of Paver Block road at Sankarakhali1 |
Roof laid |
-
latitude : 19.308868333333333,19.308846666666668,19.30885333333333
Longitude : 84.442535,84.44250833333332,84.44253333333333
file name : Image_28022024143623918.png
|
2024-02-28 14:36:24.022989 |
80 |
38609648 |
Construction of Paver Block road at Sankarakhali |
150000 |
Construction of Paver Block road at Sankarakhali1 |
Plinth level |
-
latitude : 19.308845,19.308805
Longitude : 84.44257333333334,84.44250333333333
file name : Image_28022024142619773.png
|
2024-02-28 14:26:19.868891 |
81 |
38609648 |
Construction of Paver Block road at Sankarakhali |
150000 |
Construction of Paver Block road at Sankarakhali1 |
Completion of work |
-
latitude : 19.30881,19.308843333333336
Longitude : 84.442555,84.442535
file name : Image_28022024142126918.png
|
2024-02-28 14:21:27.046084 |
82 |
47638741 |
Construction of Paver Block road at Paik Sahi |
150000 |
Construction of Paver Block road at Paik Sahi1 |
Roof laid |
-
latitude : 19.324465,19.324486666666665
Longitude : 84.45147333333334,84.45142
file name : Image_25112023142110911.png
|
2023-11-25 14:21:11.017788 |
83 |
47638741 |
Construction of Paver Block road at Paik Sahi |
150000 |
Construction of Paver Block road at Paik Sahi1 |
Plinth level |
-
latitude : 19.324506666666665,19.324271666666668
Longitude : 84.45148333333333,84.451385
file name : Image_25112023141756481.png
|
2023-11-25 14:17:56.581795 |
84 |
47638741 |
Construction of Paver Block road at Paik Sahi |
150000 |
Construction of Paver Block road at Paik Sahi1 |
Completion of work |
-
latitude : 19.32454166666667,19.324481666666667
Longitude : 84.45142666666668,84.45141666666665
file name : Image_25112023141357975.png
|
2023-11-25 14:13:58.064838 |
85 |
47638741 |
Construction of Paver Block road at Paik Sahi |
150000 |
Construction of Paver Block road at Paik Sahi1 |
Completion of work |
-
latitude : 19.324485,19.324476666666666
Longitude : 84.45144499999999,84.45144
file name : Image_25112023141354907.png
|
2023-11-25 14:13:55.018658 |
86 |
82345020 |
Water Supply to villages |
168000 |
Water Supply to villages1 |
|
-
latitude : 19.3821202
Longitude : 84.5646289
file name : Image_13062024113710515.png
|
2024-06-13 11:37:10.587087 |
87 |
82350831 |
Water Supply to villages |
400000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.382078333333332
Longitude : 84.56465166666666
file name : Image_27032024145445686.png
|
2024-03-27 14:54:45.799318 |
88 |
82350831 |
Water Supply to villages |
400000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.3793858
Longitude : 84.563559
file name : Image_27032024145125299.png
|
2024-03-27 14:51:25.389162 |
89 |
82350831 |
Water Supply to villages |
400000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.3793858
Longitude : 84.563559
file name : Image_27032024144838819.png
|
2024-03-27 14:48:38.924795 |
90 |
82355350 |
Construction of Paver Block |
100000 |
Construction of Paver Block1 |
Roof laid |
-
latitude : 19.297340000000002
Longitude : 84.46168166666666
file name : Image_19062024103743369.png
|
2024-06-19 10:37:43.49973 |
91 |
82355350 |
Construction of Paver Block |
100000 |
Construction of Paver Block1 |
Plinth level |
-
latitude : 19.297508333333333
Longitude : 84.461665
file name : Image_19062024102959886.png
|
2024-06-19 10:30:00.023395 |
92 |
82355350 |
Construction of Paver Block |
100000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 19.297755
Longitude : 84.461665
file name : Image_19062024102105649.png
|
2024-06-19 10:21:05.774567 |
93 |
82356192 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 19.301526666666668,19.30153
Longitude : 84.47754833333332,84.47752999999999
file name : Image_19062024111335974.png
|
2024-06-19 11:13:36.068121 |
94 |
82356192 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 19.301463333333334,19.301516666666664
Longitude : 84.47755833333333,84.47754000000002
file name : Image_19062024111016227.png
|
2024-06-19 11:10:16.312061 |
95 |
82356192 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 19.30153,19.301546666666663
Longitude : 84.477545,84.47753833333333
file name : Image_19062024110323682.png
|
2024-06-19 11:03:23.786353 |