1 |
10827044 |
CONST. OF NEW DRAIN FROM DHOBA SAHI TO DEULA SAHI |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.3644467,19.3644467
Longitude : 84.7579173,84.7579173
file name : Image_22092019095432530.png
|
2019-09-22 09:54:32.601152 |
2 |
5883980 |
CONST. OF NEW TUBE WELL AT ANKUSHAPUR |
67900 |
Hand pump1 |
Commenced |
-
latitude : 19.376704830735324
Longitude : 84.7388208562438
file name : Image_31102019140418200.png
|
2019-10-31 14:04:18.248579 |
3 |
5883980 |
CONST. OF NEW TUBE WELL AT ANKUSHAPUR |
67900 |
Hand pump1 |
Commenced |
-
latitude : 19.3740534
Longitude : 84.7456117
file name : Image_31102019140516318.png
|
2019-10-31 14:05:16.369159 |
4 |
10827098 |
CONST. OF NEW DRAIN FROM ADAP GHAR TO KAMAR BANDH |
70000 |
Drainage1 |
Commenced |
-
latitude : 19.378711037580487,19.37875358910652
Longitude : 84.7345109728329,84.73456217999875
file name : Image_31102019124941529.png
|
2019-10-31 12:49:41.589792 |
5 |
10827332 |
DRAIN CLEAN AT NEW STREET TO 10 NO CANAL |
10000 |
Drainage1 |
Commenced |
-
latitude : 19.363211911766115,19.363211911766115,19.363211911766115
Longitude : 84.75566007254366,84.75566007254366,84.75566007254366
file name : Image_14122019175756653.png
|
2019-12-14 17:57:56.723859 |
6 |
10827303 |
DRAIN CLEAN AT DANDASI SAHI TO SIBA MANDIRA |
20000 |
Drainage1 |
Commenced |
-
latitude : 19.368747775770576,19.368747775770576
Longitude : 84.75077349348622,84.75077349348622
file name : Image_16122019080715416.png
|
2019-12-16 08:07:15.471279 |
7 |
5884279 |
CONST. OF TUBE WELL PLAT FORM AT SCHOOL |
7000 |
Hand pump1 |
Commenced |
-
latitude : 19.3740534
Longitude : 84.7456117
file name : Image_31102019140832733.png
|
2019-10-31 14:08:32.78188 |
8 |
10827284 |
DRAIN CLEAN AT PANDARA SAHI |
15596 |
Drainage1 |
Commenced |
-
latitude : 19.363241242814123,19.363241242814123
Longitude : 84.75560925424769,84.75560925424769
file name : Image_14122019175812836.png
|
2019-12-14 17:58:12.910041 |
9 |
10827284 |
DRAIN CLEAN AT PANDARA SAHI |
15596 |
Drainage1 |
Commenced |
-
latitude : 19.363241242814123,19.363241242814123
Longitude : 84.75560925424769,84.75560925424769
file name : Image_14122019175809031.png
|
2019-12-14 17:58:09.094325 |
10 |
10827284 |
DRAIN CLEAN AT PANDARA SAHI |
15596 |
Drainage1 |
Commenced |
-
latitude : 19.3632380627454,19.3632380627454
Longitude : 84.75561524050119,84.75561524050119
file name : Image_14122019175805743.png
|
2019-12-14 17:58:05.956384 |
11 |
10827284 |
DRAIN CLEAN AT PANDARA SAHI |
15596 |
Drainage1 |
Commenced |
-
latitude : 19.3632380627454,19.3632380627454
Longitude : 84.75561524050119,84.75561524050119
file name : Image_14122019175759779.png
|
2019-12-14 17:57:59.852004 |
12 |
51318912 |
CONSTRUCTION OF HANDWASH IN AWC I ANKUSHPUR RAIJHOLA RANTAPUR AWC ANKUSHPUR4 AWC FADRIPALLI |
150000 |
CONSTRUCTION OF HANDWASH IN AWC I ANKUSHPUR RAIJHOLA RANTAPUR AWC ANKUSHPUR4 AWC FADRIPALLI1 |
Completion of work |
-
latitude : 19.36928511
Longitude : 84.75062932
file name : Image_02072021134213608.png
|
2021-07-02 13:42:13.744881 |
13 |
51318824 |
CONSTRUCTION OF HANDWASH AT GOPINATH PS FADRIPALLI PS |
60000 |
CONSTRUCTION OF HANDWASH AT GOPINATH PS FADRIPALLI PS1 |
Completion of work |
-
latitude : 19.37177983
Longitude : 84.72568309
file name : Image_02072021131750412.png
|
2021-07-02 13:17:50.534027 |
14 |
48324933 |
SUPPLY OF AQUA GUARD TO ALL SCHOOL AND AWCS |
160000 |
SUPPLY OF AQUA GUARD TO ALL SCHOOL AND AWCS1 |
Completion of work |
-
latitude : 19.3644216
Longitude : 84.7579799
file name : Image_26112021162523294.png
|
2021-11-26 16:25:23.444893 |
15 |
48324933 |
SUPPLY OF AQUA GUARD TO ALL SCHOOL AND AWCS |
160000 |
SUPPLY OF AQUA GUARD TO ALL SCHOOL AND AWCS1 |
Completion of work |
-
latitude : 19.3644225
Longitude : 84.7579807
file name : Image_28102021113333254.png
|
2021-10-28 11:33:33.378657 |
16 |
44231343 |
DRINKING WATER SUPPLY TO DE PAL NAGAR BY TANKER IN SUMMER SEASON |
30000 |
DRINKING WATER SUPPLY TO DE PAL NAGAR BY TANKER IN SUMMER SEASON1 |
Completion of work |
-
latitude : 19.3841509
Longitude : 84.73806346
file name : Image_27072021164321770.png
|
2021-07-27 16:43:21.871974 |
17 |
44231343 |
DRINKING WATER SUPPLY TO DE PAL NAGAR BY TANKER IN SUMMER SEASON |
30000 |
DRINKING WATER SUPPLY TO DE PAL NAGAR BY TANKER IN SUMMER SEASON1 |
Completion of work |
-
latitude : 19.38417873
Longitude : 84.73796968
file name : Image_27072021164502584.png
|
2021-07-27 16:45:02.705137 |
18 |
51318789 |
SEM SALARY |
120000 |
SEM SALARY1 |
Completion of work |
-
latitude : 19.3644901
Longitude : 84.75791316
file name : Image_11102021154438663.png
|
2021-10-11 15:44:38.784527 |
19 |
51318789 |
SEM SALARY |
120000 |
SEM SALARY1 |
Completion of work |
-
latitude : 19.38869974
Longitude : 84.75356697
file name : Image_28092021131351082.png
|
2021-09-28 13:13:57.10439 |
20 |
51318789 |
SEM SALARY |
120000 |
SEM SALARY1 |
Completion of work |
-
latitude : 19.3644114
Longitude : 84.7579814
file name : Image_18082021121342116.png
|
2021-08-18 12:13:42.224809 |
21 |
44231619 |
CONSTRUCTION OF TOILET AT BNRGSK BUILDING |
100000 |
CONSTRUCTION OF TOILET AT BNRGSK BUILDING1 |
Completion of work |
-
latitude : 19.38882793
Longitude : 84.75349929
file name : Image_11102021154202348.png
|
2021-10-11 15:42:02.456461 |
22 |
44231619 |
CONSTRUCTION OF TOILET AT BNRGSK BUILDING |
100000 |
CONSTRUCTION OF TOILET AT BNRGSK BUILDING1 |
Completion of work |
-
latitude : 19.36536871
Longitude : 84.75800065
file name : Image_30092021124833254.png
|
2021-09-30 12:48:33.339413 |
23 |
44234107 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION |
235000 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION1 |
Completion of work |
-
latitude : 19.40167498,19.40167498,19.40167498,19.40167498
Longitude : 84.71468262,84.71468262,84.71468262,84.71468262
file name : Image_04012022170315031.png
|
2022-01-04 17:03:15.128572 |
24 |
44234107 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION |
235000 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION1 |
Completion of work |
-
latitude : 19.38937333,19.38937333
Longitude : 84.75379686,84.75379686
file name : Image_29112021155320686.png
|
2021-11-29 15:53:20.808363 |
25 |
44234107 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION |
235000 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION1 |
Completion of work |
-
latitude : 19.38875262,19.38875262
Longitude : 84.75332433,84.75332433
file name : Image_29112021155326076.png
|
2021-11-29 15:53:26.221647 |
26 |
44234107 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION |
235000 |
CONSTRUCTION OF DRAIN CUM CC ROAD BACK SIDE OF SADAR POLICE STATION1 |
Completion of work |
-
latitude : 19.38937333,19.38937333
Longitude : 84.75379686,84.75379686
file name : Image_29112021155314935.png
|
2021-11-29 15:53:15.083289 |
27 |
48324860 |
ENERGY CHARGES OF PWS |
390425 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 19.38888042,19.38904737,19.38888042
Longitude : 84.75344594,84.75315713,84.7534451
file name : Image_31012022150852313.png
|
2022-01-31 15:08:52.477965 |
28 |
48324860 |
ENERGY CHARGES OF PWS |
390425 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 19.38885877,19.38885673
Longitude : 84.75347359,84.75348191
file name : Image_04012022172757463.png
|
2022-01-04 17:27:57.561871 |
29 |
44234804 |
COMPLETION OF BOUNDARY WALL AND INNER CONCRET OF PNUV |
203780 |
COMPLETION OF BOUNDARY WALL AND INNER CONCRET OF PNUV1 |
Completion of work |
-
latitude : 19.3888602
Longitude : 84.75342388
file name : Image_31012022151724792.png
|
2022-01-31 15:17:24.899333 |
30 |
48325394 |
IMPROVEMENT OF NODAL HIGH SCHOOL ANKUSHPUR |
230000 |
IMPROVEMENT OF NODAL HIGH SCHOOL ANKUSHPUR1 |
Completion of work |
-
latitude : 19.38885682
Longitude : 84.75343076
file name : Image_31012022152249053.png
|
2022-01-31 15:22:49.200306 |
31 |
48325544 |
IMPROVEMENT OF BNRGSK BUILDING |
150000 |
IMPROVEMENT OF BNRGSK BUILDING1 |
Completion of work |
-
latitude : 19.3892417
Longitude : 84.7535244
file name : Image_05072022151734543.png
|
2022-07-05 15:17:34.642775 |
32 |
48325086 |
COMPLETION OF INCOMPLETE DRAIN AT NAIDUPALLI |
200000 |
COMPLETION OF INCOMPLETE DRAIN AT NAIDUPALLI1 |
Completion of work |
-
latitude : 19.3892418,19.3892417
Longitude : 84.7535249,84.753525
file name : Image_05072022151425980.png
|
2022-07-05 15:14:26.078909 |
33 |
44232022 |
CLEANING OF ROAD AND DRAINS OF ALL VILLAGES |
57000 |
CLEANING OF ROAD AND DRAINS OF ALL VILLAGES1 |
Completion of work |
-
latitude : 19.3892418,19.3892418,19.3892418
Longitude : 84.7535249,84.7535244,84.7535243
file name : Image_26072022161244579.png
|
2022-07-26 16:12:44.700201 |
34 |
48324789 |
HIRING OF VEHICLE IN SUMMER SEASON |
20000 |
HIRING OF VEHICLE IN SUMMER SEASON1 |
Completion of work |
-
latitude : 19.3892651,19.3892646
Longitude : 84.7535352,84.7535353
file name : Image_01082022133921560.png
|
2022-08-01 13:39:21.681078 |
35 |
66009835 |
Operation & maintenance of drinking water supply system |
358344 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.3996482
Longitude : 84.7157208
file name : Image_15122022120142228.png
|
2022-12-15 12:01:42.323876 |
36 |
66009761 |
Operation & maintenance of drinking water supply system |
192000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.37893475
Longitude : 84.73445799
file name : Image_16122022162630702.png
|
2022-12-16 16:26:30.790782 |
37 |
44232489 |
PURCHAGE OF TROLLY,DUSTBIN & LABOUR CHARGES OF SANITATION ACTIVITES |
113851 |
PURCHAGE OF TROLLY,DUSTBIN & LABOUR CHARGES OF SANITATION ACTIVITES1 |
Completion of work |
-
latitude : 19.39509656
Longitude : 84.75135481
file name : Image_26122022110623933.png
|
2022-12-26 11:06:24.030689 |
38 |
66009949 |
Any other operation and maintenance needs related to solid waste management |
200000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 19.39497742
Longitude : 84.75142145
file name : Image_27122022161009579.png
|
2022-12-27 16:10:09.668207 |
39 |
66010623 |
Repair and Maintenance of Street Light for all village |
200000 |
Repair and Maintenance of Street Light for all village1 |
Completion of work |
-
latitude : 19.39491899
Longitude : 84.75132602
file name : Image_15022023115437714.png
|
2023-02-15 11:54:37.826427 |
40 |
66011056 |
Construction of Leach Pit for all Village |
94500 |
Construction of Leach Pit for all Village1 |
Completion of work |
-
latitude : 19.36652003
Longitude : 84.75302844
file name : Image_10082023130853948.png
|
2023-08-10 13:08:54.043936 |
41 |
66011056 |
Construction of Leach Pit for all Village |
94500 |
Construction of Leach Pit for all Village1 |
Completion of work |
-
latitude : 19.36652304
Longitude : 84.75302337
file name : Image_10082023130844565.png
|
2023-08-10 13:08:44.665431 |
42 |
66011056 |
Construction of Leach Pit for all Village |
94500 |
Construction of Leach Pit for all Village1 |
Completion of work |
-
latitude : 19.36651183
Longitude : 84.75304133
file name : Image_25052023092210384.png
|
2023-05-25 09:22:10.483449 |
43 |
66011056 |
Construction of Leach Pit for all Village |
94500 |
Construction of Leach Pit for all Village1 |
Completion of work |
-
latitude : 19.36651762
Longitude : 84.75303216
file name : Image_25052023092303012.png
|
2023-05-25 09:23:03.100988 |
44 |
66009873 |
Providing piped water supply to public institutions |
150000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.3888159
Longitude : 84.7535852
file name : Image_10082023131209511.png
|
2023-08-10 13:12:09.610329 |
45 |
66010312 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 19.38878639
Longitude : 84.75375478
file name : Image_20102023110836714.png
|
2023-10-20 11:08:36.784892 |
46 |
81515151 |
Water Supply to villages |
144000 |
Water Supply to villages1 |
|
-
latitude : 19.3973507
Longitude : 84.75205029
file name : Image_25102023115528252.png
|
2023-10-25 11:55:28.352076 |
47 |
81735807 |
Services of Collection & transportation of waste from household to treatment site |
106960 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 19.3888034
Longitude : 84.7535859
file name : Image_27032024145658562.png
|
2024-03-27 14:56:58.701734 |
48 |
81735807 |
Services of Collection & transportation of waste from household to treatment site |
106960 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 19.3889488
Longitude : 84.7535904
file name : Image_27032024145524619.png
|
2024-03-27 14:55:24.770224 |
49 |
81735807 |
Services of Collection & transportation of waste from household to treatment site |
106960 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 19.3973507
Longitude : 84.75205029
file name : Image_25102023115605699.png
|
2023-10-25 11:56:05.791557 |
50 |
81515334 |
Tap water connections to households |
352344 |
Tap water connections to households1 |
|
-
latitude : 19.3888263
Longitude : 84.7535757
file name : Image_20032024174026494.png
|
2024-03-20 17:40:26.626992 |
51 |
81515334 |
Tap water connections to households |
352344 |
Tap water connections to households1 |
|
-
latitude : 19.3888235
Longitude : 84.753572
file name : Image_20032024151508731.png
|
2024-03-20 15:15:08.90275 |
52 |
81515334 |
Tap water connections to households |
352344 |
Tap water connections to households1 |
|
-
latitude : 19.3888258
Longitude : 84.7535348
file name : Image_22122023143643543.png
|
2023-12-22 14:36:43.637036 |
53 |
66010703 |
Completion of incomplete Mission shakti gruha at Ankushpur |
200000 |
Completion of incomplete Mission shakti gruha at Ankushpur1 |
Completion of work |
-
latitude : 19.38873557
Longitude : 84.75378137
file name : Image_06032024160002685.png
|
2024-03-06 16:00:02.787534 |
54 |
44235028 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR |
80000 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR1 |
Roof laid |
-
latitude : 19.38881752
Longitude : 84.75352835
file name : Image_24072024173052343.png
|
2024-07-24 17:30:52.436998 |
55 |
44235028 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR |
80000 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR1 |
Plinth level |
-
latitude : 19.38878908
Longitude : 84.7535065
file name : Image_24072024172929663.png
|
2024-07-24 17:29:29.760321 |
56 |
44235028 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR |
80000 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR1 |
Completion of work |
-
latitude : 19.38883491
Longitude : 84.7538201
file name : Image_12072024095751306.png
|
2024-07-12 09:57:51.396148 |
57 |
44235028 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR |
80000 |
DEVELOPMENT OF ASHOK PATHAGARA AT ANKUSHPUR1 |
Completion of work |
-
latitude : 19.40056258
Longitude : 84.70618423
file name : Image_12072024095517350.png
|
2024-07-12 09:55:17.435859 |
58 |
81517688 |
Services of Collection & transportation of waste from household to treatment site |
61800 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 19.38881276
Longitude : 84.75357618
file name : Image_04052024123427240.png
|
2024-05-04 12:34:27.372593 |
59 |
101679611 |
Electric connection |
200672 |
Electric connection1 |
Roof laid |
-
latitude : 19.3888132
Longitude : 84.7535511
file name : Image_01102024110053655.png
|
2024-10-01 11:00:53.782702 |
60 |
101679611 |
Electric connection |
200672 |
Electric connection1 |
Plinth level |
-
latitude : 19.3888141
Longitude : 84.7535513
file name : Image_01102024105935585.png
|
2024-10-01 10:59:35.711042 |
61 |
101679611 |
Electric connection |
200672 |
Electric connection1 |
Completion of work |
-
latitude : 19.3888143
Longitude : 84.7535537
file name : Image_01102024104725377.png
|
2024-10-01 10:47:25.50463 |
62 |
66010549 |
Repair of AWC at Raijhola |
100000 |
Repair of AWC at Raijhola1 |
Roof laid |
-
latitude : 19.48773094
Longitude : 84.74162975
file name : Image_04102024203743897.png
|
2024-10-04 20:37:44.000626 |
63 |
66010549 |
Repair of AWC at Raijhola |
100000 |
Repair of AWC at Raijhola1 |
Plinth level |
-
latitude : 19.38882932
Longitude : 84.75352076
file name : Image_04102024163821279.png
|
2024-10-04 16:38:21.504873 |
64 |
66010549 |
Repair of AWC at Raijhola |
100000 |
Repair of AWC at Raijhola1 |
Completion of work |
-
latitude : 19.38881141
Longitude : 84.75381265
file name : Image_04102024162006179.png
|
2024-10-04 16:20:06.549871 |
65 |
66011272 |
Repair & Maintenance of PWS & TWs for all village |
145800 |
Repair & Maintenance of PWS & TWs for all village1 |
Roof laid |
-
latitude : 19.48770341
Longitude : 84.74163428
file name : Image_04102024204341470.png
|
2024-10-04 20:43:41.566047 |
66 |
66011272 |
Repair & Maintenance of PWS & TWs for all village |
145800 |
Repair & Maintenance of PWS & TWs for all village1 |
Plinth level |
-
latitude : 19.48775243
Longitude : 84.74161908
file name : Image_04102024203634621.png
|
2024-10-04 20:36:34.713742 |
67 |
66011272 |
Repair & Maintenance of PWS & TWs for all village |
145800 |
Repair & Maintenance of PWS & TWs for all village1 |
Completion of work |
-
latitude : 19.38881048
Longitude : 84.75381743
file name : Image_04102024162651952.png
|
2024-10-04 16:26:52.11564 |
68 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 19.38876856
Longitude : 84.75355462
file name : Image_07082024153218278.png
|
2024-08-07 15:32:19.661817 |
69 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 19.3887492
Longitude : 84.75356035
file name : Image_07082024143113478.png
|
2024-08-07 14:31:13.637945 |
70 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 19.38876073
Longitude : 84.75355625
file name : Image_07082024142928574.png
|
2024-08-07 14:29:28.725473 |
71 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 19.38876073
Longitude : 84.75355625
file name : Image_07082024142925847.png
|
2024-08-07 14:29:25.983898 |
72 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 19.38875628
Longitude : 84.75356212
file name : Image_07082024142829462.png
|
2024-08-07 14:28:29.578036 |
73 |
81736022 |
Services of Collection & transportation of waste from household to treatment site |
41260 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 19.38875703
Longitude : 84.75354007
file name : Image_07082024135917674.png
|
2024-08-07 13:59:17.7932 |
74 |
75861964 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 19.3888338
Longitude : 84.7536146
file name : Image_09082024142916763.png
|
2024-08-09 14:29:16.870436 |
75 |
75861964 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.3888331
Longitude : 84.7536135
file name : Image_09082024142651949.png
|
2024-08-09 14:26:52.04407 |
76 |
75861964 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.38881589
Longitude : 84.75382456
file name : Image_09082024140848105.png
|
2024-08-09 14:08:48.244734 |