1 |
5906884 |
CONST OF DRAIN |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.04500833333333,19.044966666666667
Longitude : 84.48470833333334,84.48466166666667
file name : Image_06012020171213698.png
|
2020-01-06 17:12:13.947519 |
2 |
5906904 |
CONST OF SMASANGHAT |
150000 |
Chaupal1 |
Commenced |
-
latitude : 19.051165
Longitude : 84.49165999999998
file name : Image_05012020135835218.png
|
2020-01-05 13:58:35.465905 |
3 |
5906948 |
REPAIRING OF BOUNDARIWALL P F WITH DRAIN |
200000 |
Drainage1 |
Commenced |
-
latitude : 19.0628286,19.0628286
Longitude : 84.484718,84.484718
file name : Image_06012020114241059.png
|
2020-01-06 11:42:41.311762 |
4 |
3593303 |
const of piller gate at gp office |
149600 |
Office Building1 |
Commenced |
-
latitude : 19.062806
Longitude : 84.4847385
file name : Image_20082019133656157.png
|
2019-08-20 13:36:56.243294 |
5 |
3593303 |
const of piller gate at gp office |
149600 |
Office Building1 |
Commenced |
-
latitude : 19.0628286
Longitude : 84.484718
file name : Image_05012020121347050.png
|
2020-01-05 12:13:47.294461 |
6 |
5906912 |
CONST OF SMASANGHAT |
150000 |
Chaupal1 |
Commenced |
-
latitude : 19.052303333333334
Longitude : 84.48234
file name : Image_05012020141034292.png
|
2020-01-05 14:10:34.530151 |
7 |
5907031 |
CONST OF DRAIN |
74542 |
Drainage1 |
Commenced |
-
latitude : 19.065095,19.065056666666667,19.065056666666667
Longitude : 84.48543333333333,84.48547833333332,84.48549999999999
file name : Image_07012020140137331.png
|
2020-01-07 14:01:37.610719 |
8 |
5907031 |
CONST OF DRAIN |
74542 |
Drainage1 |
Commenced |
-
latitude : 19.051955,19.051981666666666
Longitude : 84.479665,84.479685
file name : Image_06012020171221939.png
|
2020-01-06 17:12:22.166477 |
9 |
5906853 |
CONST OF BATHING STEPS AT NARAYANPUR SAGARA |
180000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.046013333333335
Longitude : 84.48383
file name : Image_06012020171154988.png
|
2020-01-06 17:11:55.230508 |
10 |
51360243 |
CONST OF PAVER BLOCK ROAD AT KHARIA BELAPADA VILLAGE |
150000 |
CONST OF PAVER BLOCK ROAD AT KHARIA BELAPADA VILLAGE 1 |
Completion of work |
-
latitude : 19.04970546,19.04970621,19.04970475
Longitude : 84.49533678,84.49533295,84.49533593
file name : Image_08052021125854799.png
|
2021-05-08 12:58:54.727873 |
11 |
44185501 |
Paver block road from village chakka to village end |
200000 |
Paver block road from village chakka to village end1 |
Completion of work |
-
latitude : 19.03569799,19.03568668
Longitude : 84.48010881,84.48011512
file name : Image_22052021122224537.png
|
2021-05-22 12:22:24.642362 |
12 |
44184672 |
PAVER BLOCK ROAD FROM TALA DABADA TO UPER DABADA |
300000 |
PAVER BLOCK ROAD FROM TALA DABADA TO UPER DABADA1 |
Completion of work |
-
latitude : 19.03928237,19.03927632
Longitude : 84.47721405,84.47729972
file name : Image_22052021122121044.png
|
2021-05-22 12:21:21.141065 |
13 |
47691305 |
CONST OF BOUNDARY WALL PUPS SAMANTRAPUR |
200000 |
CONST OF BOUNDARY WALL PUPS SAMANTRAPUR 1 |
Completion of work |
-
latitude : 19.06607136
Longitude : 84.48634329
file name : Image_08022022110942344.png
|
2022-02-08 11:09:42.435393 |
14 |
47693334 |
COMPLICATION OF IN COMPLETION GP OFFICE HEAD QUARTER BEAUTIFICATION |
169032 |
COMPLICATION OF IN COMPLETION GP OFFICE HEAD QUARTER BEAUTIFICATION 1 |
Completion of work |
-
latitude : 19.0628066
Longitude : 84.4847882
file name : Image_08022022112132591.png
|
2022-02-08 11:21:32.694691 |
15 |
47693334 |
COMPLICATION OF IN COMPLETION GP OFFICE HEAD QUARTER BEAUTIFICATION |
169032 |
COMPLICATION OF IN COMPLETION GP OFFICE HEAD QUARTER BEAUTIFICATION 1 |
Completion of work |
-
latitude : 19.0628685
Longitude : 84.484768
file name : Image_08022022112136475.png
|
2022-02-08 11:21:36.558327 |
16 |
44184609 |
PAVER BLOCK ROAD FROM MAIN RD ROAD TO VILLAGE END |
346000 |
PAVER BLOCK ROAD FROM MAIN RD ROAD TO VILLAGE END 1 |
Plinth level |
-
latitude : 19.04216505,19.0421627
Longitude : 84.47455928,84.47455699
file name : Image_16072021131322268.png
|
2021-07-16 13:13:22.386561 |
17 |
44177397 |
DRINKING WATER SUPPLY IN SUMMER SEASON (JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON (JALACHATRA)1 |
Completion of work |
-
latitude : 19.1285457
Longitude : 84.57588836
file name : Image_31102021081040496.png
|
2021-10-31 08:10:40.585874 |
18 |
44177397 |
DRINKING WATER SUPPLY IN SUMMER SEASON (JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON (JALACHATRA)1 |
Completion of work |
-
latitude : 19.12854711
Longitude : 84.57589467
file name : Image_31102021081044339.png
|
2021-10-31 08:10:44.420439 |
19 |
47688487 |
CONST OF PAVER BLOCK ROAD FROM PANCHAMBA NUASAHI |
300000 |
CONST OF PAVER BLOCK ROAD FROM PANCHAMBA NUASAHI 1 |
Completion of work |
-
latitude : 19.05122325,19.05112629
Longitude : 84.47904914,84.47919058
file name : Image_24092021112147324.png
|
2021-09-24 11:21:47.439642 |
20 |
47680110 |
CONST OF DRAIN AT HARIJANA SAHI PANCHAMBA |
150000 |
CONST OF DRAIN AT HARIJANA SAHI PANCHAMBA 1 |
Completion of work |
-
latitude : 19.0527111,19.0527105
Longitude : 84.4798611,84.4798616
file name : Image_24092021111107154.png
|
2021-09-24 11:11:07.252159 |
21 |
51360166 |
CONST OF NAL SE JAL TAPPING WATER SUPPLY AT BELAPADA UPS |
30000 |
CONST OF NAL SE JAL TAPPING WATER SUPPLY AT BELAPADA UPS 1 |
Completion of work |
-
latitude : 19.05354217
Longitude : 84.492019
file name : Image_11122021114548665.png
|
2021-12-11 11:45:48.781558 |
22 |
51365453 |
CONST OF NAL SE JAL TAPING WATER SUPPLY AT PANCHAMBA PRIMARY SCHOOL |
30000 |
CONST OF NAL SE JAL TAPING WATER SUPPLY AT PANCHAMBA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.05143047
Longitude : 84.47954186
file name : Image_11122021113628929.png
|
2021-12-11 11:36:29.037141 |
23 |
51360134 |
CONST OF NAL SE JAL TAPPING WATER SUPPLY AT SAMANTARAPUR AWC |
30000 |
CONST OF NAL SE JAL TAPPING WATER SUPPLY AT SAMANTARAPUR AWC1 |
Completion of work |
-
latitude : 19.074341
Longitude : 84.4971458
file name : Image_11122021112433652.png
|
2021-12-11 11:24:33.765875 |
24 |
88094438 |
MOORUM PACKING OF CYCLONE DAMAGED PLACE AT K GOBINDAPUR |
49660 |
MOORUM PACKING OF CYCLONE DAMAGED PLACE AT K GOBINDAPUR1 |
Completion of work |
-
latitude : 19.127073333333332,19.127073333333332
Longitude : 84.568635,84.568635
file name : Image_27102023193559734.png
|
2023-10-27 19:35:59.817935 |
25 |
47678432 |
CONST OF WATER SUPPLY AT UPARA DABADA |
150000 |
CONST OF WATER SUPPLY AT UPARA DABADA1 |
Completion of work |
-
latitude : 19.03561016,19.03561194
Longitude : 84.48061387,84.48061231
file name : Image_04062022124938650.png
|
2022-06-04 12:49:38.764686 |
26 |
44185257 |
Water supply to Dabada village |
200000 |
Water supply to Dabada village1 |
Completion of work |
-
latitude : 19.03917363,19.03918356
Longitude : 84.47786551,84.47786471
file name : Image_04062022125829314.png
|
2022-06-04 12:58:29.445717 |
27 |
51360200 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA |
200000 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA1 |
Completion of work |
-
latitude : 19.129358333333336
Longitude : 84.57593666666668
file name : Image_06042024115749691.png
|
2024-04-06 11:57:49.775282 |
28 |
51360200 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA |
200000 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA1 |
Completion of work |
-
latitude : 19.127805000000002
Longitude : 84.56826166666666
file name : Image_06042024115912516.png
|
2024-04-06 11:59:12.595511 |
29 |
51360200 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA |
200000 |
CONST OF TOILET AND WATER SUPPLY AT PRIMARY SCHOOL KAINPHULIA1 |
Completion of work |
-
latitude : 19.129358333333336
Longitude : 84.57593666666668
file name : Image_06042024115744630.png
|
2024-04-06 11:57:44.715724 |
30 |
56950413 |
COMPLETION OF INCOMPLETE PATHAGARA AND SUCHANA KENDRA AT SAMANTARAPUR |
170000 |
COMPLETION OF INCOMPLETE PATHAGARA AND SUCHANA KENDRA AT SAMANTARAPUR 1 |
Completion of work |
-
latitude : 19.128026666666663
Longitude : 84.56817500000001
file name : Image_06042024120032620.png
|
2024-04-06 12:00:32.699753 |
31 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.07032995
Longitude : 84.48916053
file name : Image_26072022144142616.png
|
2022-07-26 14:41:42.723422 |
32 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)2 |
Completion of work |
-
latitude : 19.04742648
Longitude : 84.47621526
file name : Image_26072022144122821.png
|
2022-07-26 14:41:22.989772 |
33 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)2 |
Completion of work |
-
latitude : 19.04742648
Longitude : 84.47621526
file name : Image_26072022144148251.png
|
2022-07-26 14:41:48.360518 |
34 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.0649809
Longitude : 84.485538
file name : Image_26072022144138171.png
|
2022-07-26 14:41:38.278698 |
35 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.0548502
Longitude : 84.48783897
file name : Image_26072022144128093.png
|
2022-07-26 14:41:28.19859 |
36 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.0548502
Longitude : 84.48783897
file name : Image_26072022144152881.png
|
2022-07-26 14:41:52.994734 |
37 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.05403287
Longitude : 84.48058958
file name : Image_26072022144132750.png
|
2022-07-26 14:41:32.849404 |
38 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.05403287
Longitude : 84.48058958
file name : Image_26072022144157305.png
|
2022-07-26 14:41:57.410033 |
39 |
47677939 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA) |
70000 |
DRINKING WATER SUPPLY IN SUMMER SEASON(JALACHATRA)1 |
Completion of work |
-
latitude : 19.03993811
Longitude : 84.4724078
file name : Image_26072022144108597.png
|
2022-07-26 14:41:08.707558 |
40 |
47681175 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR |
70000 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR 1 |
Completion of work |
-
latitude : 19.04523723
Longitude : 84.49785146
file name : Image_24082022172307241.png
|
2022-08-24 17:23:07.360111 |
41 |
47681175 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR |
70000 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR 2 |
Completion of work |
-
latitude : 19.0533614
Longitude : 84.49231915
file name : Image_24082022172319608.png
|
2022-08-24 17:23:19.718355 |
42 |
47681175 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR |
70000 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR 3 |
Completion of work |
-
latitude : 19.05117578
Longitude : 84.47991588
file name : Image_24082022172335985.png
|
2022-08-24 17:23:36.092562 |
43 |
47681175 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR |
70000 |
CLEANING OF 5NOS OF SCHOOL SAMANTARAPUR 4 |
Completion of work |
-
latitude : 19.04219328
Longitude : 84.47468926
file name : Image_24082022172348246.png
|
2022-08-24 17:23:48.363069 |
44 |
47680514 |
LABOUR CHARGES OF CLEANING ALL VILLAGE |
100000 |
LABOUR CHARGES OF CLEANING ALL VILLAGE 1 |
Completion of work |
-
latitude : 19.0647555
Longitude : 84.4849856
file name : Image_24082022172358239.png
|
2022-08-24 17:23:58.346246 |
45 |
47680514 |
LABOUR CHARGES OF CLEANING ALL VILLAGE |
100000 |
LABOUR CHARGES OF CLEANING ALL VILLAGE 1 |
Completion of work |
-
latitude : 19.11032767
Longitude : 84.58559402
file name : Image_24082022172408995.png
|
2022-08-24 17:24:09.105172 |
46 |
44184162 |
CLEANING OF PANCHAMA VILLAGE TANK 2nos |
41312 |
CLEANING OF PANCHAMA VILLAGE TANK 2nos1 |
Completion of work |
-
latitude : 19.129458333333332
Longitude : 84.56879333333333
file name : Image_17072023134724463.png
|
2023-07-17 13:47:24.566459 |
47 |
56945420 |
CLEANING AND SANITATION OF PANCHAAMBA AND SAMANTARAPUR VILLAGE |
98789 |
CLEANING AND SANITATION OF PANCHAAMBA AND SAMANTARAPUR VILLAGE 1 |
Completion of work |
-
latitude : 19.02209333333333
Longitude : 84.45055833333332
file name : Image_28122023131917948.png
|
2023-12-28 13:19:18.048459 |
48 |
56945420 |
CLEANING AND SANITATION OF PANCHAAMBA AND SAMANTARAPUR VILLAGE |
98789 |
CLEANING AND SANITATION OF PANCHAAMBA AND SAMANTARAPUR VILLAGE 1 |
Completion of work |
-
latitude : 19.022103333333334
Longitude : 84.45055499999998
file name : Image_28122023131654746.png
|
2023-12-28 13:16:54.843233 |
49 |
44185473 |
Const of community hall at Talapadar village |
300000 |
Const of community hall at Talapadar village1 |
Completion of work |
-
latitude : 19.04217885
Longitude : 84.46876637
file name : Image_15032023120420177.png
|
2023-03-15 12:04:20.283972 |
50 |
44185473 |
Const of community hall at Talapadar village |
300000 |
Const of community hall at Talapadar village1 |
Completion of work |
-
latitude : 19.04217189
Longitude : 84.46873644
file name : Image_15032023120407460.png
|
2023-03-15 12:04:07.5837 |
51 |
44185473 |
Const of community hall at Talapadar village |
300000 |
Const of community hall at Talapadar village1 |
Completion of work |
-
latitude : 19.04216521
Longitude : 84.46873638
file name : Image_15032023120416213.png
|
2023-03-15 12:04:16.34659 |
52 |
51360259 |
CONST OF GUARD WALL AT KUTAMBARI VILLAGE |
167312 |
CONST OF GUARD WALL AT KUTAMBARI VILLAGE 1 |
Completion of work |
-
latitude : 19.04931403
Longitude : 84.47633973
file name : Image_10052023122057627.png
|
2023-05-10 12:20:57.710576 |
53 |
56955056 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT HARIPUR VILLAGE |
169080 |
COMPLETION OF INCOMPLETE COMMUNITY HALL AT HARIPUR VILLAGE 1 |
Completion of work |
-
latitude : 19.04898582
Longitude : 84.47169237
file name : Image_10052023120840582.png
|
2023-05-10 12:08:40.666657 |
54 |
47679528 |
DIGGING OF NEW TUBE WELL AT HARIPUR |
91656 |
DIGGING OF NEW TUBE WELL AT HARIPUR 1 |
Completion of work |
-
latitude : 19.04846562
Longitude : 84.47231663
file name : Image_04052023104319375.png
|
2023-05-04 10:43:19.46678 |
55 |
47679528 |
DIGGING OF NEW TUBE WELL AT HARIPUR |
91656 |
DIGGING OF NEW TUBE WELL AT HARIPUR 1 |
Completion of work |
-
latitude : 19.04855109
Longitude : 84.47232755
file name : Image_04052023104451867.png
|
2023-05-04 10:44:51.962833 |
56 |
56949911 |
WASHING AND COLORING ALL TUBE WELL ALL VILLAGE |
100000 |
WASHING AND COLORING ALL TUBE WELL ALL VILLAGE 1 |
Completion of work |
-
latitude : 19.05730609
Longitude : 84.48184923
file name : Image_06052023121520008.png
|
2023-05-06 12:15:20.104567 |
57 |
79529539 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.04953612
Longitude : 84.47641015
file name : Image_06062023173234051.png
|
2023-06-06 17:32:34.163331 |
58 |
56944989 |
CONST OF DRAIN FROM MAIN ROAD TO MUNA PRADHAN HOUSE ,BADI SAHI,NARAYANPUR |
150000 |
CONST OF DRAIN FROM MAIN ROAD TO MUNA PRADHAN HOUSE ,BADI SAHI,NARAYANPUR 1 |
Completion of work |
-
latitude : 19.05518235,19.05517435
Longitude : 84.48962221,84.48962104
file name : Image_06062023173753350.png
|
2023-06-06 17:37:53.442763 |
59 |
56939475 |
DRINKING WATER PROVISION IN SUMMER SEASON |
70000 |
DRINKING WATER PROVISION IN SUMMER SEASON 1 |
Completion of work |
-
latitude : 19.0628286
Longitude : 84.4847386
file name : Image_15072023133230138.png
|
2023-07-15 13:32:30.241534 |
60 |
56941450 |
PAYMENT TOWARDS ELECTRIC CHARGES FOR PWS AND STREET LIGHT |
50000 |
PAYMENT TOWARDS ELECTRIC CHARGES FOR PWS AND STREET LIGHT 1 |
Completion of work |
-
latitude : 19.062941666666667
Longitude : 84.48483999999999
file name : Image_21112023111526000.png
|
2023-11-21 11:15:26.103959 |
61 |
56941450 |
PAYMENT TOWARDS ELECTRIC CHARGES FOR PWS AND STREET LIGHT |
50000 |
PAYMENT TOWARDS ELECTRIC CHARGES FOR PWS AND STREET LIGHT 1 |
Completion of work |
-
latitude : 19.132836666666666
Longitude : 84.57177000000001
file name : Image_21112023111204371.png
|
2023-11-21 11:12:04.466869 |
62 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.120441666666668
Longitude : 84.566925
file name : Image_05102023162930077.png
|
2023-10-05 16:29:30.180949 |
63 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.045345
Longitude : 84.49781166666668
file name : Image_05102023162700387.png
|
2023-10-05 16:27:00.499824 |
64 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.045385
Longitude : 84.49781999999999
file name : Image_05102023154317244.png
|
2023-10-05 15:43:17.340468 |
65 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.04532
Longitude : 84.49781333333334
file name : Image_02102023132546696.png
|
2023-10-02 13:25:46.823597 |
66 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.04531666666667
Longitude : 84.49783000000001
file name : Image_02102023132531800.png
|
2023-10-02 13:25:31.882886 |
67 |
74941108 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.04524
Longitude : 84.49778999999998
file name : Image_02102023132523624.png
|
2023-10-02 13:25:23.712731 |
68 |
56955755 |
CONST OF COMMUNITY HALL AT SINDURAPUR VILLAGE |
300000 |
CONST OF COMMUNITY HALL AT SINDURAPUR VILLAGE 1 |
Completion of work |
-
latitude : 19.045303333333333
Longitude : 84.49784
file name : Image_02102023133202752.png
|
2023-10-02 13:32:02.831326 |
69 |
56955755 |
CONST OF COMMUNITY HALL AT SINDURAPUR VILLAGE |
300000 |
CONST OF COMMUNITY HALL AT SINDURAPUR VILLAGE 1 |
Completion of work |
-
latitude : 19.045326666666664
Longitude : 84.49781333333334
file name : Image_02102023133039204.png
|
2023-10-02 13:30:39.290756 |
70 |
47678880 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT |
50000 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT 1 |
Completion of work |
-
latitude : 19.063306666666666
Longitude : 84.48495166666667
file name : Image_21112023111328792.png
|
2023-11-21 11:13:28.884122 |
71 |
47678880 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT |
50000 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT 1 |
Completion of work |
-
latitude : 19.132811666666665
Longitude : 84.57176166666667
file name : Image_21112023111200641.png
|
2023-11-21 11:12:00.740908 |
72 |
44178093 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT |
20000 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT 1 |
Completion of work |
-
latitude : 19.0628778
Longitude : 84.4847188
file name : Image_21112023111827758.png
|
2023-11-21 11:18:27.871823 |
73 |
44178093 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT |
20000 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT 1 |
Completion of work |
-
latitude : 19.132853333333333
Longitude : 84.57177833333331
file name : Image_21112023111156242.png
|
2023-11-21 11:11:56.335073 |
74 |
44178093 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT |
20000 |
PAYMENTS TOWARDS ELECTRICITY CHARGES FOR PWS & STREET LIGHT 1 |
Completion of work |
-
latitude : 19.13287
Longitude : 84.57170666666667
file name : Image_21112023111152435.png
|
2023-11-21 11:11:52.525418 |
75 |
56943148 |
PAYMENT TOWARDS SEM AND PUMP DRIVER SALARY |
69753 |
PAYMENT TOWARDS SEM AND PUMP DRIVER SALARY 1 |
Completion of work |
-
latitude : 19.027396666666668
Longitude : 84.41233666666668
file name : Image_27102023101606170.png
|
2023-10-27 10:16:06.271432 |
76 |
60037828 |
DEMO WORK-1 |
155443 |
DEMO WORK-11 |
Completion of work |
-
latitude : 19.0628068
Longitude : 84.4848129
file name : Image_01122023140354624.png
|
2023-12-01 14:03:54.747301 |
77 |
60037828 |
DEMO WORK-1 |
155443 |
DEMO WORK-11 |
Completion of work |
-
latitude : 19.0628328
Longitude : 84.4848099
file name : Image_01122023140350870.png
|
2023-12-01 14:03:50.984359 |
78 |
60037828 |
DEMO WORK-1 |
155443 |
DEMO WORK-11 |
Completion of work |
-
latitude : 19.0628068
Longitude : 84.4848129
file name : Image_01122023140417586.png
|
2023-12-01 14:04:17.704528 |
79 |
74940010 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 19.128868333333333
Longitude : 84.575785
file name : Image_21022024182129264.png
|
2024-02-21 18:21:29.393896 |
80 |
74940010 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.1287
Longitude : 84.57588333333334
file name : Image_21022024172734419.png
|
2024-02-21 17:27:34.581618 |
81 |
74940010 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.128791666666665
Longitude : 84.57591166666667
file name : Image_21022024172909728.png
|
2024-02-21 17:29:09.864277 |
82 |
74940010 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.05058166666667
Longitude : 84.48052666666666
file name : Image_20022024135609833.png
|
2024-02-20 13:56:09.93056 |
83 |
74940010 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.022238333333334
Longitude : 84.45061666666668
file name : Image_20022024135603781.png
|
2024-02-20 13:56:03.881899 |
84 |
88095672 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.132748333333332
Longitude : 84.57179666666667
file name : Image_20122023163916214.png
|
2023-12-20 16:39:16.306296 |
85 |
56944131 |
CONST OF WATER SUPPLY AT GUDIPADARA VILLAGE |
200000 |
CONST OF WATER SUPPLY AT GUDIPADARA VILLAGE 1 |
Completion of work |
-
latitude : 19.13262,19.13262
Longitude : 84.57178,84.57178
file name : Image_20122023163351638.png
|
2023-12-20 16:33:51.726223 |
86 |
81546774 |
Repair of pipe drinking water |
340542 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.130393333333334
Longitude : 84.56917833333334
file name : Image_18032024211921443.png
|
2024-03-18 21:19:21.560789 |
87 |
81546774 |
Repair of pipe drinking water |
340542 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.1287933
Longitude : 84.5761362
file name : Image_20032024181431122.png
|
2024-03-20 18:14:31.226757 |
88 |
81546774 |
Repair of pipe drinking water |
340542 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.1286047
Longitude : 84.5760446
file name : Image_18032024171520399.png
|
2024-03-18 17:15:20.586218 |
89 |
74929405 |
Drainage Construction |
290000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.06461973
Longitude : 84.48562768
file name : Image_19092024150235427.png
|
2024-09-19 15:02:35.515618 |
90 |
74929405 |
Drainage Construction |
290000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.06416737
Longitude : 84.48553042
file name : Image_18092024163519341.png
|
2024-09-18 16:35:19.419953 |
91 |
74929405 |
Drainage Construction |
290000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.06416737
Longitude : 84.48553042
file name : Image_18092024163506904.png
|
2024-09-18 16:35:06.990117 |
92 |
74929405 |
Drainage Construction |
290000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.06414947
Longitude : 84.48557961
file name : Image_18092024163457055.png
|
2024-09-18 16:34:57.146935 |
93 |
74929405 |
Drainage Construction |
290000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.0640122
Longitude : 84.48551336
file name : Image_16092024114332965.png
|
2024-09-16 11:43:33.042223 |
94 |
56951670 |
COMPLETION OF INCOMPLETE MISSION SHAKTI GRUHA SAMANTARAPUR |
156336 |
COMPLETION OF INCOMPLETE MISSION SHAKTI GRUHA SAMANTARAPUR 1 |
Completion of work |
-
latitude : 19.1288169
Longitude : 84.5761496
file name : Image_03072024191211518.png
|
2024-07-03 19:12:11.681179 |
95 |
81546536 |
Repair of pipe drinking water |
90000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.128656666666664
Longitude : 84.57593166666666
file name : Image_12072024173138017.png
|
2024-07-12 17:31:37.998381 |
96 |
81546536 |
Repair of pipe drinking water |
90000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.128678333333333
Longitude : 84.57591499999998
file name : Image_12072024172717093.png
|
2024-07-12 17:27:17.177671 |
97 |
81546536 |
Repair of pipe drinking water |
90000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.128753333333336
Longitude : 84.57585499999999
file name : Image_12072024172044213.png
|
2024-07-12 17:20:44.303642 |
98 |
81546975 |
Repair of pipe drinking water |
48000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.3069653
Longitude : 84.8163392
file name : Image_09102024161434749.png
|
2024-10-09 16:14:34.847905 |
99 |
81546975 |
Repair of pipe drinking water |
48000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.3068776
Longitude : 84.8163436
file name : Image_05102024091135853.png
|
2024-10-05 09:11:35.931208 |
100 |
81546975 |
Repair of pipe drinking water |
48000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.3068776
Longitude : 84.8163436
file name : Image_05102024091120487.png
|
2024-10-05 09:11:20.56187 |
101 |
81546975 |
Repair of pipe drinking water |
48000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.3069542
Longitude : 84.81639925
file name : Image_05102024091116076.png
|
2024-10-05 09:11:16.160422 |
102 |
102513028 |
Repair of pipe drinking water |
78000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.3069467
Longitude : 84.8163396
file name : Image_09102024161515238.png
|
2024-10-09 16:15:15.347332 |
103 |
74935006 |
Construction and Maintenance of Community Centre |
120000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 19.203375
Longitude : 84.61137166666667
file name : Image_31072024123908875.png
|
2024-07-31 12:39:09.360048 |
104 |
74935006 |
Construction and Maintenance of Community Centre |
120000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 20.274341666666665
Longitude : 85.79497833333335
file name : Image_30072024161930059.png
|
2024-07-30 16:19:30.146868 |
105 |
74927326 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.2035645
Longitude : 84.6116884
file name : Image_31072024130937473.png
|
2024-07-31 13:09:37.606441 |
106 |
74927326 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.2035632
Longitude : 84.6115846
file name : Image_31072024123620324.png
|
2024-07-31 12:36:20.431208 |
107 |
74927326 |
Operation and Maintenance of drinking water supply system |
100000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.266985
Longitude : 85.810555
file name : Image_30072024161803420.png
|
2024-07-30 16:18:03.520962 |