1 |
5961658 |
CONST OF BATHING GHAT AND DRESS CHANGING ROOM AT DEBALAYA BANDHA |
100000 |
Bathroom1 |
Commenced |
-
latitude : 19.22240496
Longitude : 84.7527073
file name : Image_28082019153308024.png
|
2019-08-28 15:33:08.178653 |
2 |
3604408 |
CONST OF DRAIN AT TALA SAHI TO KALINJI SAHI |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.22058533,19.22056593
Longitude : 84.74966403,84.75005536
file name : Image_29082019105314245.png
|
2019-08-29 10:53:14.364514 |
3 |
3602370 |
PROVISION OF NEW TUBE WELLS DTH RIG |
160000 |
Borewell1 |
Commenced |
-
latitude : 19.21984915
Longitude : 84.75235768
file name : Image_29082019105321188.png
|
2019-08-29 10:53:21.385511 |
4 |
3604368 |
CONST OF DRAIN BAURI SAHI GHADAKA NALA |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.22077116,19.2207744
Longitude : 84.74791339,84.74790013
file name : Image_28082019155743481.png
|
2019-08-28 15:57:43.592838 |
5 |
5961547 |
LED LIGHT AT GOLANTHARA CHATI |
50000 |
Street Light1 |
Commenced |
-
latitude : 19.22189323
Longitude : 84.75396171
file name : Image_16122019124605193.png
|
2019-12-16 12:46:05.422513 |
6 |
5961647 |
CONST OF KALYAN MANDOP AT GOLANTHARA |
300000 |
Marriage / Community Hall1 |
Commenced |
-
latitude : 19.21982743
Longitude : 84.74971524
file name : Image_28082019154418047.png
|
2019-08-28 15:44:18.172572 |
7 |
11101395 |
CONST OF BOUNDARY WALL OF OBB BUILDING GOLANTHARA |
100000 |
Boundary wall / Side Wall / Retaining Wall1 |
Commenced |
-
latitude : 19.21992637
Longitude : 84.75133167
file name : Image_29082019105317432.png
|
2019-08-29 10:53:17.5613 |
8 |
11101433 |
COMP OF INCOMPLETE KALYAN MANDOP AT GOLANTHARA |
143000 |
Marriage / Community Hall1 |
Commenced |
-
latitude : 19.21979339
Longitude : 84.74984218
file name : Image_28082019154421103.png
|
2019-08-28 15:44:21.239407 |
9 |
5961383 |
LED LIGHT AT MATHA DANDA |
50000 |
Street Light1 |
Commenced |
-
latitude : 19.21977558
Longitude : 84.75014582
file name : Image_08112019084515325.png
|
2019-11-08 08:45:15.519864 |
10 |
5979522 |
CONSTRUCTION OF DRAIN AT TALA SAHI TO DHOBA SAHI GOLANTHARA |
200000 |
Drainage1 |
Commenced |
-
latitude : 19.21954532,19.21916558
Longitude : 84.74900192,84.74907217
file name : Image_28082019154959583.png
|
2019-08-28 15:49:59.67794 |
11 |
3605418 |
DEVELOPMENT OF SMASAN MANDOP AT NUA SAHI |
100000 |
Marriage / Community Hall1 |
Commenced |
-
latitude : 19.21597562
Longitude : 84.7484743
file name : Image_28082019153314713.png
|
2019-08-28 15:33:14.826149 |
12 |
11101215 |
CONST OF DRAIN FROM HARIJANA SAHI TRO GHADAKA NALA GOLANTHARA |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.22056911,19.22069834
Longitude : 84.74824396,84.74807878
file name : Image_28082019155635956.png
|
2019-08-28 15:56:36.049792 |
13 |
3605425 |
DEVELOPMENT OF SMASAN MANDOP AT GOLANTHARA |
100000 |
Water Tank1 |
Commenced |
-
latitude : 19.2175296
Longitude : 84.75142057
file name : Image_28082019153311310.png
|
2019-08-28 15:33:11.404067 |
14 |
3605413 |
CONSTRUCTION OF KALYAN MANDAP |
400000 |
Marriage / Community Hall1 |
Commenced |
-
latitude : 19.21968662
Longitude : 84.74968462
file name : Image_28082019154413466.png
|
2019-08-28 15:44:13.631458 |
15 |
5961538 |
LED LIGHT AT NUA SAHI GOLANTHARA |
50000 |
Street Light1 |
Commenced |
-
latitude : 19.21295556
Longitude : 84.74938569
file name : Image_16122019124608779.png
|
2019-12-16 12:46:08.986548 |
16 |
11101247 |
REPAIR AND CONST OF DRAIN FROM TALA SAHI TO BARITOLA GOLANTHARA |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.22019808,19.22057002,19.22056742
Longitude : 84.7493159,84.74929104,84.74925416
file name : Image_28082019155334775.png
|
2019-08-28 15:53:34.935774 |
17 |
5961557 |
CLEANING OF ROAD SIDE WITH DRAIN VILLAGE CHAKA |
50000 |
Drainage1 |
Commenced |
-
latitude : 19.22047191,19.22047316
Longitude : 84.74933235,84.74931305
file name : Image_29082019105325732.png
|
2019-08-29 10:53:25.862517 |
18 |
5961557 |
CLEANING OF ROAD SIDE WITH DRAIN VILLAGE CHAKA |
50000 |
Drainage1 |
Commenced |
-
latitude : 19.21963844,19.21964944,19.21965783
Longitude : 84.74940942,84.74939924,84.74939394
file name : Image_08112019084518957.png
|
2019-11-08 08:45:19.131074 |
19 |
11101307 |
CONST OF BATHING GHAT AT BAURI SAHI GHADAKA NALA |
70000 |
Drainage1 |
Commenced |
-
latitude : 19.22090805,19.22110140323639
Longitude : 84.74651978,84.746373295784
file name : Image_28082019160040642.png
|
2019-08-28 16:00:40.734306 |
20 |
44641608 |
PROVISION FOR COMPLETION OF INCOMPLETE MODEL TANK |
300000 |
PROVISION FOR COMPLETION OF INCOMPLETE MODEL TANK 1 |
Completion of work |
-
latitude : 19.22228573,19.22228573
Longitude : 84.75303352,84.75303352
file name : Image_19122020162430112.png
|
2020-12-19 16:24:30.203793 |
21 |
44641686 |
PROVISION FOR COMPLETION OF INCOMPLETE RAULA SMASANA |
50000 |
PROVISION FOR COMPLETION OF INCOMPLETE RAULA SMASANA1 |
Completion of work |
-
latitude : 19.22236151
Longitude : 84.7530485
file name : Image_19122020162630504.png
|
2020-12-19 16:26:30.618949 |
22 |
44013164 |
provission for installation of water supply system with moter and over head tank |
80000 |
provission for installation of water supply system with moter and over head tank 1 |
Completion of work |
-
latitude : 19.22037317
Longitude : 84.75233531
file name : Image_27102020160443645.png
|
2020-10-27 16:04:50.46863 |
23 |
44641549 |
PROVISION FOR INSTALLATION OF 2 NOS OF SOLAR WATER SUPPLY SYSTEM AT GOLONTHARA VILLAGE |
552000 |
PROVISION FOR INSTALLATION OF 2 NOS OF SOLAR WATER SUPPLY SYSTEM AT GOLONTHARA VILLAGE1 |
Completion of work |
-
latitude : 19.210685
Longitude : 84.74530333333333
file name : Image_18052021164040426.png
|
2021-05-18 16:40:40.52992 |
24 |
44641549 |
PROVISION FOR INSTALLATION OF 2 NOS OF SOLAR WATER SUPPLY SYSTEM AT GOLONTHARA VILLAGE |
552000 |
PROVISION FOR INSTALLATION OF 2 NOS OF SOLAR WATER SUPPLY SYSTEM AT GOLONTHARA VILLAGE1 |
Completion of work |
-
latitude : 19.21947419
Longitude : 84.75167808
file name : Image_22092020125004859.png
|
2020-09-22 12:50:05.004147 |
25 |
44642257 |
PROVISION FOR EXPENDITURE TOWARDS TMC |
200000 |
PROVISION FOR EXPENDITURE TOWARDS TMC 1 |
Completion of work |
-
latitude : 19.2200505
Longitude : 84.7520316
file name : Image_05032021175535781.png
|
2021-03-05 17:55:35.87958 |
26 |
44642257 |
PROVISION FOR EXPENDITURE TOWARDS TMC |
200000 |
PROVISION FOR EXPENDITURE TOWARDS TMC 1 |
Completion of work |
-
latitude : 19.2591586
Longitude : 84.7741814
file name : Image_21102020171426908.png
|
2020-10-21 17:14:29.768803 |
27 |
44642066 |
PROVISION FOR INSTALLATION OF SOLAR STREET LIGHT AT VARIOUS PLACES OF GOLONTHARA G.P. |
400000 |
PROVISION FOR INSTALLATION OF SOLAR STREET LIGHT AT VARIOUS PLACES OF GOLONTHARA G.P.1 |
Completion of work |
-
latitude : 19.2201023
Longitude : 84.7520027
file name : Image_25122020131805429.png
|
2020-12-25 13:18:05.544735 |
28 |
38560811 |
COMPLITION OF INCOMPLIT P.D.S. GODAM OF GOLANTARA G.P. |
350000 |
COMPLITION OF INCOMPLIT P.D.S. GODAM OF GOLANTARA G.P.1 |
Completion of work |
-
latitude : 19.2199765
Longitude : 84.7517805
file name : Image_19012022171350420.png
|
2022-01-19 17:13:50.528374 |
29 |
38560811 |
COMPLITION OF INCOMPLIT P.D.S. GODAM OF GOLANTARA G.P. |
350000 |
COMPLITION OF INCOMPLIT P.D.S. GODAM OF GOLANTARA G.P.1 |
Completion of work |
-
latitude : 19.2201463
Longitude : 84.7520509
file name : Image_27112020083628933.png
|
2020-11-27 08:36:29.019297 |
30 |
44013583 |
beautification of gp office and bnrgsk building |
267968 |
beautification of gp office and bnrgsk building1 |
Completion of work |
-
latitude : 19.2201463
Longitude : 84.7520509
file name : Image_27112020083636185.png
|
2020-11-27 08:36:36.282775 |
31 |
44642149 |
PROVISION OF COMPLETION OF INCOMPLETE BOIUNDRI WALL AT PUPS GOLONTHARA CHATTI |
150000 |
PROVISION OF COMPLETION OF INCOMPLETE BOIUNDRI WALL AT PUPS GOLONTHARA CHATTI1 |
Completion of work |
-
latitude : 19.213183333333333
Longitude : 84.74609833333334
file name : Image_07012021173418119.png
|
2021-01-07 17:34:18.234648 |
32 |
38560744 |
PROVISION FOR JHADUDAR ON SANITATION PORPOSE. |
130000 |
PROVISION FOR JHADUDAR ON SANITATION PORPOSE.1 |
Completion of work |
-
latitude : 19.22007166666667
Longitude : 84.75196666666668
file name : Image_12052021074059910.png
|
2021-05-12 07:41:00.038804 |
33 |
38560744 |
PROVISION FOR JHADUDAR ON SANITATION PORPOSE. |
130000 |
PROVISION FOR JHADUDAR ON SANITATION PORPOSE.1 |
Completion of work |
-
latitude : 19.2201035
Longitude : 84.7520142
file name : Image_14012021083044240.png
|
2021-01-14 08:30:44.351886 |
34 |
44641781 |
PROVISION FOR COMPLETION OF INCOMPLETE BADHAI AND KALINJI SMASANA |
150000 |
PROVISION FOR COMPLETION OF INCOMPLETE BADHAI AND KALINJI SMASANA1 |
Completion of work |
-
latitude : 19.21798989
Longitude : 84.75200319
file name : Image_13012021150844240.png
|
2021-01-13 15:08:44.342126 |
35 |
44642199 |
PROVISION FOR COMPLETION OF INCOMPLETE G.P GODAM AND G.P PERMESESS |
158000 |
PROVISION FOR COMPLETION OF INCOMPLETE G.P GODAM AND G.P PERMESESS1 |
Completion of work |
-
latitude : 19.2201032
Longitude : 84.7520139
file name : Image_13012021150838881.png
|
2021-01-13 15:08:38.973038 |
36 |
44013246 |
provission for improvement of model tank chabaka bandha |
200000 |
provission for improvement of model tank chabaka bandha1 |
Completion of work |
-
latitude : 19.210271666666664,19.210281666666667
Longitude : 84.75156,84.75157499999999
file name : Image_19012021150329682.png
|
2021-01-19 15:03:29.776746 |
37 |
44013411 |
beautification of dandasi pradhan u.p school |
65312 |
beautification of dandasi pradhan u.p school1 |
Completion of work |
-
latitude : 19.220000000000002
Longitude : 84.75155500000001
file name : Image_19012021145820311.png
|
2021-01-19 14:58:20.439794 |
38 |
44641578 |
PROVISION FOR COMPLETION OF INCOMPLETE RURAL PARK AT ISANESWARA TEMPLE |
200000 |
PROVISION FOR COMPLETION OF INCOMPLETE RURAL PARK AT ISANESWARA TEMPLE1 |
Completion of work |
-
latitude : 19.22172289,19.22171759
Longitude : 84.75363652,84.75362396
file name : Image_05102021175108941.png
|
2021-10-05 17:51:09.036236 |
39 |
44641578 |
PROVISION FOR COMPLETION OF INCOMPLETE RURAL PARK AT ISANESWARA TEMPLE |
200000 |
PROVISION FOR COMPLETION OF INCOMPLETE RURAL PARK AT ISANESWARA TEMPLE1 |
Completion of work |
-
latitude : 19.22188982,19.22187732
Longitude : 84.75306769,84.75306021
file name : Image_02022021113501231.png
|
2021-02-02 11:35:01.339662 |
40 |
44641830 |
PROVISION FOR COMPLETION OF INCOMPLETE SMASANA NEAR PALLIBANDHA |
150000 |
PROVISION FOR COMPLETION OF INCOMPLETE SMASANA NEAR PALLIBANDHA1 |
Completion of work |
-
latitude : 19.21604
Longitude : 84.74849166666667
file name : Image_24022021071007111.png
|
2021-02-24 07:10:07.219387 |
41 |
44013124 |
provission for purchase 2 nos big aqaguard for boys and girls high school |
120000 |
provission for purchase 2 nos big aqaguard for boys and girls high school1 |
Completion of work |
-
latitude : 19.20875307
Longitude : 84.75130238
file name : Image_02032021105032909.png
|
2021-03-02 10:50:33.039165 |
42 |
44642237 |
PROVISION FOR COM. OF IN COMP. COMMUNITY HALL AT BAURI SAHI , GOLONTHARA |
200000 |
PROVISION FOR COM. OF IN COMP. COMMUNITY HALL AT BAURI SAHI , GOLONTHARA1 |
Completion of work |
-
latitude : 19.220518333333334
Longitude : 84.74815333333332
file name : Image_24092022171040595.png
|
2022-09-24 17:10:40.677435 |
43 |
44642237 |
PROVISION FOR COM. OF IN COMP. COMMUNITY HALL AT BAURI SAHI , GOLONTHARA |
200000 |
PROVISION FOR COM. OF IN COMP. COMMUNITY HALL AT BAURI SAHI , GOLONTHARA1 |
Completion of work |
-
latitude : 19.22044163
Longitude : 84.74838548
file name : Image_03052021100630053.png
|
2021-05-03 10:06:30.186377 |
44 |
49735119 |
BEAUTIFICATION OF AWC AT GOLONTHARA |
200000 |
BEAUTIFICATION OF AWC AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.2199747
Longitude : 84.7517769
file name : Image_19012022171644237.png
|
2022-01-19 17:16:44.328622 |
45 |
49735119 |
BEAUTIFICATION OF AWC AT GOLONTHARA |
200000 |
BEAUTIFICATION OF AWC AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.2198892
Longitude : 84.7520838
file name : Image_03052021100613683.png
|
2021-05-03 10:06:13.809078 |
46 |
38560789 |
CONST. OF COMMUNITY HALL AT BAURISAHI OF GOLANTHARA G.P. |
200000 |
CONST. OF COMMUNITY HALL AT BAURISAHI OF GOLANTHARA G.P.1 |
Completion of work |
-
latitude : 19.22061
Longitude : 84.74818666666667
file name : Image_24092022171156052.png
|
2022-09-24 17:11:56.137337 |
47 |
38560789 |
CONST. OF COMMUNITY HALL AT BAURISAHI OF GOLANTHARA G.P. |
200000 |
CONST. OF COMMUNITY HALL AT BAURISAHI OF GOLANTHARA G.P.1 |
Completion of work |
-
latitude : 19.22063596
Longitude : 84.74825566
file name : Image_03052021100640598.png
|
2021-05-03 10:06:40.733904 |
48 |
49734884 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 2 |
605312 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 21 |
Completion of work |
-
latitude : 19.212486666666667,19.212561666666666
Longitude : 84.74395666666666,84.743995
file name : Image_04052021084629807.png
|
2021-05-04 08:46:29.901339 |
49 |
44641513 |
PROVISION FOR INSTALLATION OF 3 NOS OF SOLAR PENAL WITH SOLAR MOTOR AT PWS GOLONTHARACHHATI |
560000 |
PROVISION FOR INSTALLATION OF 3 NOS OF SOLAR PENAL WITH SOLAR MOTOR AT PWS GOLONTHARACHHATI1 |
Completion of work |
-
latitude : 19.217085
Longitude : 84.74308833333335
file name : Image_18052021163413080.png
|
2021-05-18 16:34:13.194922 |
50 |
44013353 |
construction of drain at santi nagar street golanthar gp |
150000 |
construction of drain at santi nagar street golanthar gp1 |
Completion of work |
-
latitude : 19.214236666666668,19.214209999999998
Longitude : 84.750515,84.75054166666665
file name : Image_13062021091157961.png
|
2021-06-13 09:11:58.057568 |
51 |
44013435 |
provission for rwss comunity toilet |
80000 |
provission for rwss comunity toilet1 |
Completion of work |
-
latitude : 19.220426666666665
Longitude : 84.752345
file name : Image_01072021162755872.png
|
2021-07-01 16:27:56.042708 |
52 |
49734317 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 1 |
250000 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 11 |
Completion of work |
-
latitude : 19.21256354
Longitude : 84.74381344
file name : Image_18092021180403585.png
|
2021-09-18 18:04:03.700005 |
53 |
49734317 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 1 |
250000 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 11 |
Completion of work |
-
latitude : 19.21256738
Longitude : 84.7437147
file name : Image_18092021180412300.png
|
2021-09-18 18:04:12.414839 |
54 |
49734317 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 1 |
250000 |
CONSTRUCTION OF MCC AND MRF FOR SBM II AT GOLONTHARA GP 11 |
Completion of work |
-
latitude : 19.21256738
Longitude : 84.7437147
file name : Image_18092021180417951.png
|
2021-09-18 18:04:18.06364 |
55 |
47394492 |
SALARY OF JHADUDAR AT GOLONTHARA G.P |
151000 |
SALARY OF JHADUDAR AT GOLONTHARA G.P1 |
Completion of work |
-
latitude : 19.219645,19.219638333333332
Longitude : 84.74940333333333,84.74936166666666
file name : Image_21072022085519072.png
|
2022-07-21 08:55:19.172694 |
56 |
47394492 |
SALARY OF JHADUDAR AT GOLONTHARA G.P |
151000 |
SALARY OF JHADUDAR AT GOLONTHARA G.P1 |
Completion of work |
-
latitude : 19.219938,19.22014
Longitude : 84.7518617,84.75209666666666
file name : Image_28052022121032026.png
|
2022-05-28 12:10:32.12826 |
57 |
47394492 |
SALARY OF JHADUDAR AT GOLONTHARA G.P |
151000 |
SALARY OF JHADUDAR AT GOLONTHARA G.P1 |
Completion of work |
-
latitude : 19.2200297,19.2200293
Longitude : 84.7520109,84.7520111
file name : Image_24112021172135973.png
|
2021-11-24 17:21:36.054473 |
58 |
47393035 |
MAINTANCE OF LED LIGHT AT GOLONTHARA G.P |
107789 |
MAINTANCE OF LED LIGHT AT GOLONTHARA G.P1 |
Completion of work |
-
latitude : 19.22057936,19.22057211
Longitude : 84.75003416,84.75001176
file name : Image_08122021160037215.png
|
2021-12-08 16:00:37.364896 |
59 |
54833881 |
installation of solar water supply at arnapurna street at golanthara gp |
300000 |
installation of solar water supply at arnapurna street at golanthara gp1 |
Completion of work |
-
latitude : 19.21071124
Longitude : 84.74534801
file name : Image_21122021174929142.png
|
2021-12-21 17:49:29.261302 |
60 |
47392358 |
CONSTRUCTION OF ADDITIONAL CLASS ROOM IN BNH ST SCHOOL AT GOLONTHARA |
600000 |
CONSTRUCTION OF ADDITIONAL CLASS ROOM IN BNH ST SCHOOL AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.20881196
Longitude : 84.75100337
file name : Image_21122021174932429.png
|
2021-12-21 17:49:32.540514 |
61 |
47395542 |
PROVISION FOR INSTALLATION OF PAVER BLOCK IN BADADANDA GOLONTHARA INFRONT OF KALYANA MANDAP |
250000 |
PROVISION FOR INSTALLATION OF PAVER BLOCK IN BADADANDA GOLONTHARA INFRONT OF KALYANA MANDAP1 |
Completion of work |
-
latitude : 19.21978606
Longitude : 84.74994995
file name : Image_22122021100117316.png
|
2021-12-22 10:01:17.400613 |
62 |
47395847 |
COMPLITE OF INCOMPLITED KALYANA MANDAP NEAR BHUBANESWARA TEMPLE AT NUA SAHI GOLNTHARA |
300000 |
COMPLITE OF INCOMPLITED KALYANA MANDAP NEAR BHUBANESWARA TEMPLE AT NUA SAHI GOLNTHARA1 |
Completion of work |
-
latitude : 19.213405
Longitude : 84.74581500000001
file name : Image_11012022171118564.png
|
2022-01-11 17:11:18.66336 |
63 |
49735574 |
PROVISION FOR BEAUTIFICATION OF DINING HALL AT UPS GOLONTHARA |
250000 |
PROVISION FOR BEAUTIFICATION OF DINING HALL AT UPS GOLONTHARA 1 |
Completion of work |
-
latitude : 19.219952
Longitude : 84.7518025
file name : Image_05032022085611872.png
|
2022-03-05 08:56:12.020424 |
64 |
47394961 |
CONSTRUCTION OF SMART CLASS ROOM IN BNH ST SCHOOL AT GOLONTHARA |
300000 |
CONSTRUCTION OF SMART CLASS ROOM IN BNH ST SCHOOL AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.208655,19.20868
Longitude : 84.75120166666666,84.751115
file name : Image_06052022171907643.png
|
2022-05-06 17:19:07.731046 |
65 |
47396078 |
COMP. OF INCOM. KALINJI & BADHAI CREMATORIUM MANDAP AT GOLONTHARA |
64032 |
COMP. OF INCOM. KALINJI & BADHAI CREMATORIUM MANDAP AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.217961666666667
Longitude : 84.75189166666665
file name : Image_13052022093918432.png
|
2022-05-13 09:39:18.559 |
66 |
64017320 |
PROVISION FOR PAYMENT OF ENERGY CHARGES |
258789 |
PROVISION FOR PAYMENT OF ENERGY CHARGES 1 |
Completion of work |
-
latitude : 19.2199723
Longitude : 84.7517928
file name : Image_05072022113509400.png
|
2022-07-05 11:35:09.514199 |
67 |
66553845 |
INSTALLATION OF STREET LIGHT AT GOLONTHARA |
200000 |
INSTALLATION OF STREET LIGHT AT GOLONTHARA1 |
Completion of work |
-
latitude : 19.212929999999997
Longitude : 84.74947833333333
file name : Image_24012023163253104.png
|
2023-01-24 16:32:53.293485 |
68 |
65604936 |
COMPLETION OF INCOMPLETE DINNING HALL AT DANDASI PRADHAN PRIMARY SCHOOL AT GOLONTHARA |
200000 |
COMPLETION OF INCOMPLETE DINNING HALL AT DANDASI PRADHAN PRIMARY SCHOOL AT GOLONTHARA 1 |
Plinth level |
-
latitude : 19.220086666666667
Longitude : 84.75151166666667
file name : Image_19062024132821433.png
|
2024-06-19 13:28:21.516695 |
69 |
65604936 |
COMPLETION OF INCOMPLETE DINNING HALL AT DANDASI PRADHAN PRIMARY SCHOOL AT GOLONTHARA |
200000 |
COMPLETION OF INCOMPLETE DINNING HALL AT DANDASI PRADHAN PRIMARY SCHOOL AT GOLONTHARA 1 |
Completion of work |
-
latitude : 19.219931666666664
Longitude : 84.75133
file name : Image_09032023130824143.png
|
2023-03-09 13:08:24.241287 |
70 |
65474708 |
PROVISION FOR REPAIR OF CULVERT INFRONT OF AWC 1 |
70000 |
PROVISION FOR REPAIR OF CULVERT INFRONT OF AWC 11 |
Plinth level |
-
latitude : 19.2196318,19.2196309
Longitude : 84.7502759,84.7502754
file name : Image_19102023175612091.png
|
2023-10-19 17:56:12.180957 |
71 |
65474708 |
PROVISION FOR REPAIR OF CULVERT INFRONT OF AWC 1 |
70000 |
PROVISION FOR REPAIR OF CULVERT INFRONT OF AWC 11 |
Completion of work |
-
latitude : 19.2199334,19.2199342
Longitude : 84.7519607,84.751961
file name : Image_06122022130629968.png
|
2022-12-06 13:06:30.058091 |
72 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Plinth level |
-
latitude : 19.22008,19.220073333333335
Longitude : 84.75121333333333,84.75122333333333
file name : Image_01122023110101124.png
|
2023-12-01 11:01:01.208767 |
73 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Plinth level |
-
latitude : 19.22004666666667,19.220016666666666
Longitude : 84.752015,84.75199333333333
file name : Image_13092023113820752.png
|
2023-09-13 11:38:20.842745 |
74 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.2199578,19.2199566
Longitude : 84.751967,84.7519671
file name : Image_15022023102814151.png
|
2023-02-15 10:28:14.23924 |
75 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.2199337,19.2199395
Longitude : 84.7519481,84.7519555
file name : Image_04012023172810894.png
|
2023-01-04 17:28:10.984263 |
76 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.2199339,19.2199515
Longitude : 84.7519455,84.7519662
file name : Image_04012023173040499.png
|
2023-01-04 17:30:40.611785 |
77 |
65472838 |
Services of Collection & Transportation of waste from household to treatment site |
251000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.21274833333333,19.212750000000003
Longitude : 84.74977500000001,84.74978833333334
file name : Image_24112022172307721.png
|
2022-11-24 17:23:07.822484 |
78 |
65472733 |
Operation & maintenance of drinking water supply system |
72000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2207
Longitude : 84.75228333333334
file name : Image_15022023103749710.png
|
2023-02-15 10:37:49.802543 |
79 |
65472733 |
Operation & maintenance of drinking water supply system |
72000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.21279333333333
Longitude : 84.74975333333332
file name : Image_24112022172055112.png
|
2022-11-24 17:20:55.279665 |
80 |
65472328 |
Operation & maintenance of drinking water supply system |
378542 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.212576666666667
Longitude : 84.74942166666666
file name : Image_02082023125931750.png
|
2023-08-02 12:59:31.832928 |
81 |
65472328 |
Operation & maintenance of drinking water supply system |
378542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2133089
Longitude : 84.7489356
file name : Image_28102022194936364.png
|
2022-10-28 19:49:36.463141 |
82 |
65604786 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI |
414080 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI1 |
Completion of work |
-
latitude : 19.212600000000002
Longitude : 84.74924166666666
file name : Image_02012024184645661.png
|
2024-01-02 18:46:45.756767 |
83 |
65604786 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI |
414080 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI1 |
Completion of work |
-
latitude : 19.2125
Longitude : 84.74935166666667
file name : Image_13092023101713550.png
|
2023-09-13 10:17:13.648036 |
84 |
65604786 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI |
414080 |
IMPROVEMENT OF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI1 |
Completion of work |
-
latitude : 19.212480000000003
Longitude : 84.74906333333332
file name : Image_23032023133148889.png
|
2023-03-23 13:31:48.976904 |
85 |
65474608 |
Operation & maintenance of community sanitary complex |
157541 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 19.212341666666667
Longitude : 84.74934833333333
file name : Image_02082023124853334.png
|
2023-08-02 12:48:53.430124 |
86 |
65474608 |
Operation & maintenance of community sanitary complex |
157541 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 19.21231
Longitude : 84.74943166666665
file name : Image_05042023173824445.png
|
2023-04-05 17:38:24.542428 |
87 |
65472787 |
Providing piped water supply to public institutions |
128000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.219668333333335
Longitude : 84.74935833333332
file name : Image_19102023174438170.png
|
2023-10-19 17:44:38.249138 |
88 |
65472787 |
Providing piped water supply to public institutions |
128000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.22171666666667
Longitude : 84.75358999999999
file name : Image_27052023204830658.png
|
2023-05-27 20:48:30.75968 |
89 |
65473184 |
Services of Collection & Transportation of waste from household to treatment site |
170000 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 19.2199426,19.2199426
Longitude : 84.7519521,84.7519521
file name : Image_17062023182044985.png
|
2023-06-17 18:20:45.069922 |
90 |
65604890 |
APPROACH ROAD FROM PUPS NUA SAHI GOLONTHARA CHANTI |
200000 |
APPROACH ROAD FROM PUPS NUA SAHI GOLONTHARA CHANTI1 |
Completion of work |
-
latitude : 19.213418333333333,19.213501666666666
Longitude : 84.74677000000001,84.74666166666665
file name : Image_13092023111556799.png
|
2023-09-13 11:15:56.959528 |
91 |
65474753 |
IMPROVEMENT OF SANA TA=HAKURANI KALYNA MANDAP PERMISES AT GOLONTHARA |
150000 |
IMPROVEMENT OF SANA TA=HAKURANI KALYNA MANDAP PERMISES AT GOLONTHARA 1 |
Completion of work |
-
latitude : 19.219488333333334
Longitude : 84.75149000000002
file name : Image_17102023114328562.png
|
2023-10-17 11:43:28.702411 |
92 |
65474670 |
IMPROVEMENT OF PUPS AT GOLONTHARA CHANTI |
80000 |
IMPROVEMENT OF PUPS AT GOLONTHARA CHANTI1 |
Completion of work |
-
latitude : 19.213171666666664
Longitude : 84.74618000000001
file name : Image_17102023121824752.png
|
2023-10-17 12:18:26.930644 |
93 |
65474797 |
IMPROVEMENT IF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI |
421389 |
IMPROVEMENT IF CLASSROOM AT ANCHALIKA BALIKA VIDYALAYA GOLONTHARA CHATI 1 |
Completion of work |
-
latitude : 19.212478333333333
Longitude : 84.74941500000001
file name : Image_19102023182834503.png
|
2023-10-19 18:28:34.626285 |
94 |
75541235 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 19.21257166666667
Longitude : 84.74918666666666
file name : Image_04012024163026556.png
|
2024-01-04 16:30:26.665166 |
95 |
75541235 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 19.212513333333334
Longitude : 84.74916333333334
file name : Image_04012024114738861.png
|
2024-01-04 11:47:38.946672 |
96 |
75541235 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 19.21255
Longitude : 84.749225
file name : Image_02012024190719582.png
|
2024-01-02 19:07:19.701433 |
97 |
75541235 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 19.21252666666667
Longitude : 84.74921833333335
file name : Image_02012024184150001.png
|
2024-01-02 18:41:50.124144 |
98 |
75541235 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 19.2127584
Longitude : 84.7487404
file name : Image_02012024183307748.png
|
2024-01-02 18:33:07.875449 |
99 |
75538585 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-
latitude : 19.21245
Longitude : 84.74923666666668
file name : Image_21032024123605991.png
|
2024-03-21 12:36:06.113661 |
100 |
75538585 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-
latitude : 19.2127981
Longitude : 84.7491648
file name : Image_21032024122728313.png
|
2024-03-21 12:27:28.439682 |
101 |
75538585 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 19.212546666666665
Longitude : 84.74920166666668
file name : Image_02012024184055490.png
|
2024-01-02 18:40:55.600436 |
102 |
75538585 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 19.2127558
Longitude : 84.748737
file name : Image_02012024183607425.png
|
2024-01-02 18:36:07.505982 |
103 |
75542008 |
Establishment of Library |
200000 |
Establishment of Library1 |
Roof laid |
-
latitude : 19.219898333333333
Longitude : 84.74686500000001
file name : Image_26042024113605971.png
|
2024-04-26 11:36:06.071702 |
104 |
75542008 |
Establishment of Library |
200000 |
Establishment of Library1 |
Plinth level |
-
latitude : 19.219791666666666
Longitude : 84.74716333333332
file name : Image_19042024120926049.png
|
2024-04-19 12:09:26.158402 |
105 |
75542008 |
Establishment of Library |
200000 |
Establishment of Library1 |
Completion of work |
-
latitude : 19.219898333333333
Longitude : 84.746945
file name : Image_16042024092654329.png
|
2024-04-16 09:26:54.421715 |
106 |
80855533 |
Operation and Maintenance of piped water supply system |
150000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.219668333333335
Longitude : 84.74963000000001
file name : Image_30032024181728931.png
|
2024-03-30 18:17:29.010334 |
107 |
80855533 |
Operation and Maintenance of piped water supply system |
150000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.21998166666667
Longitude : 84.75192166666666
file name : Image_22032024121559457.png
|
2024-03-22 12:15:59.535897 |
108 |
80855533 |
Operation and Maintenance of piped water supply system |
150000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.220458333333333
Longitude : 84.74959333333332
file name : Image_08032024084703071.png
|
2024-03-08 08:47:03.176097 |
109 |
80855533 |
Operation and Maintenance of piped water supply system |
150000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.22058333333333
Longitude : 84.74969833333334
file name : Image_12122023134748928.png
|
2023-12-12 13:47:49.009264 |
110 |
80855533 |
Operation and Maintenance of piped water supply system |
150000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.220573333333334
Longitude : 84.74972833333335
file name : Image_12122023134745459.png
|
2023-12-12 13:47:45.537961 |
111 |
75542323 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 19.220041666666667
Longitude : 84.751315
file name : Image_26062024120643819.png
|
2024-06-26 12:06:43.899526 |
112 |
75542323 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 19.2202652
Longitude : 84.7509794
file name : Image_26062024120333119.png
|
2024-06-26 12:03:33.211808 |
113 |
75542323 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 19.22002666666667
Longitude : 84.75128500000001
file name : Image_19062024133210124.png
|
2024-06-19 13:32:10.210187 |
114 |
80856765 |
Operation and Maintenance of piped water supply system |
116362 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.220615000000002
Longitude : 84.75223666666668
file name : Image_21102024111927237.png
|
2024-10-21 11:19:27.332298 |
115 |
80856765 |
Operation and Maintenance of piped water supply system |
116362 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.220615000000002
Longitude : 84.75223666666668
file name : Image_21102024111922670.png
|
2024-10-21 11:19:22.802687 |
116 |
80856765 |
Operation and Maintenance of piped water supply system |
116362 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.22062
Longitude : 84.75226833333333
file name : Image_30092024140407299.png
|
2024-09-30 14:04:07.381838 |
117 |
80856765 |
Operation and Maintenance of piped water supply system |
116362 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.220734999999998
Longitude : 84.75230666666667
file name : Image_07102024144746723.png
|
2024-10-07 14:47:46.799659 |
118 |
80856765 |
Operation and Maintenance of piped water supply system |
116362 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.220655
Longitude : 84.75228333333334
file name : Image_26092024143848938.png
|
2024-09-26 14:38:49.291933 |
119 |
80879634 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.220725
Longitude : 84.75227500000001
file name : Image_21102024111918017.png
|
2024-10-21 11:19:18.13142 |
120 |
80879634 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.219691666666666
Longitude : 84.74934
file name : Image_26042024105146808.png
|
2024-04-26 10:51:46.484297 |
121 |
80879634 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.219691666666666
Longitude : 84.74934
file name : Image_26042024104609673.png
|
2024-04-26 10:46:09.756454 |
122 |
80879634 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.219578333333335
Longitude : 84.75332166666666
file name : Image_24022024151252686.png
|
2024-02-24 15:12:52.808918 |
123 |
98263385 |
Operation and Maintenance of drinking/piped water supply system |
102000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.22090166666667
Longitude : 84.75228999999999
file name : Image_14102024120445162.png
|
2024-10-14 12:04:45.249895 |
124 |
98263385 |
Operation and Maintenance of drinking/piped water supply system |
102000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.220801666666667
Longitude : 84.75240166666666
file name : Image_10102024131521643.png
|
2024-10-10 13:15:21.740781 |
125 |
98263385 |
Operation and Maintenance of drinking/piped water supply system |
102000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.219686666666668
Longitude : 84.74937666666668
file name : Image_09102024081036379.png
|
2024-10-09 08:10:36.466814 |
126 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 19.219805
Longitude : 84.74931166666666
file name : Image_16112024131924483.png
|
2024-11-16 13:19:24.589609 |
127 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 19.2199471
Longitude : 84.7519947
file name : Image_15102024133603388.png
|
2024-10-15 13:36:09.080193 |
128 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.2199476
Longitude : 84.751995
file name : Image_15102024132817984.png
|
2024-10-15 13:28:18.094196 |
129 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.219944
Longitude : 84.7519911
file name : Image_14102024125554658.png
|
2024-10-14 12:55:54.735261 |
130 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.2199409
Longitude : 84.7519965
file name : Image_10102024131721786.png
|
2024-10-10 13:17:21.883282 |
131 |
101567573 |
Operation and Maintenance of drinking/piped water supply system |
368118 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.220776666666666
Longitude : 84.75228166666666
file name : Image_10102024131404807.png
|
2024-10-10 13:14:04.90904 |
132 |
102078159 |
Any other operation and maintenance needs related to solid waste management |
144000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 19.2199507
Longitude : 84.7519922
file name : Image_15102024133748041.png
|
2024-10-15 13:37:48.933253 |
133 |
102078159 |
Any other operation and maintenance needs related to solid waste management |
144000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 19.2199475
Longitude : 84.7519901
file name : Image_15102024132652096.png
|
2024-10-15 13:26:52.506719 |
134 |
102078159 |
Any other operation and maintenance needs related to solid waste management |
144000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 19.2199396
Longitude : 84.7520007
file name : Image_14102024120848651.png
|
2024-10-14 12:08:48.736807 |