1 |
17939898 |
MOTOR FITTING AND EXTENSION OF EXISTING PIPE LINE AT KAITHAAPALLI SCHOOL |
60000 |
Water supply pipe line1 |
Commenced |
-
latitude : 19.21970598399639,19.219708456657827
Longitude : 84.79113609530032,84.79113534092903
file name : Image_26082019133749481.png
|
2019-08-26 13:37:49.632714 |
2 |
10803258 |
COMP OF INCOMPLETE BNRGSK BUILDING PADMAPUR |
300000 |
Bharat Nirman Rajiv Gandhi Seva Kendra1 |
Commenced |
-
latitude : 19.22650735359639
Longitude : 84.79001300409436
file name : Image_23082019101559298.png
|
2019-08-23 10:15:59.375462 |
3 |
5865103 |
CONST OF DRAIN WITH CONNECTIVITY FROM BNRGSK TO GULA SAHI |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.226516196504235,19.2259325645864,19.225926236249506
Longitude : 84.7900487948209,84.78961913846433,84.78962123394012
file name : Image_23082019101829841.png
|
2019-08-23 10:18:29.925286 |
4 |
5865132 |
COMPLETION OF INCOMPLETE KALYAN MANDOP AT MAJHIGAM |
155937 |
Cultural Stage1 |
Commenced |
-
latitude : 19.230725546367466
Longitude : 84.79258926585317
file name : Image_23082019095011072.png
|
2019-08-23 09:50:11.159068 |
5 |
5865108 |
CONST OF BATHING STEPS AT MAGURIA BANDHA |
100000 |
Bathroom1 |
Commenced |
-
latitude : 19.22749704681337
Longitude : 84.7889958601445
file name : Image_26082019131707138.png
|
2019-08-26 13:17:07.24687 |
6 |
17940503 |
MOTOR FITTING AND EXTENSION OF EXISTING PIPE LINE AT MAJHIGAM SCHOOL |
60000 |
Water supply pipe line1 |
Commenced |
-
latitude : 19.23121366649866,19.23121366649866
Longitude : 84.79349920526147,84.79349920526147
file name : Image_26082019134813140.png
|
2019-08-26 13:48:13.247057 |
7 |
17939770 |
MOTOR FITTING AND EXTENSION OF EXISTING PIPE LINE AT N.U.P.S. SCHOOL AT PADMAPUR |
80000 |
Water supply pipe line1 |
Commenced |
-
latitude : 19.226016928441823,19.22613502945751
Longitude : 84.78962324559689,84.78970513679087
file name : Image_26082019132132580.png
|
2019-08-26 13:21:32.670766 |
8 |
10803128 |
ELECTRIFICATION OF BNRGSK BUILDING PADMAPUR |
30000 |
Sub Station1 |
Commenced |
-
latitude : 19.226490086875856
Longitude : 84.790014680475
file name : Image_23082019101439987.png
|
2019-08-23 10:14:40.077956 |
9 |
5865187 |
REPAIR OF MAHILA SANGHA GHARA AT GP OFFICE |
50000 |
Cultural Stage1 |
Commenced |
-
latitude : 19.2257736
Longitude : 84.7889142
file name : Image_23082019102334337.png
|
2019-08-23 10:23:34.439328 |
10 |
5865142 |
COMPLETION OF INCOMPLETE GOLA SAHI MANDOP AT PADMAPUR |
100000 |
Cultural Stage1 |
Commenced |
-
latitude : 19.2257736
Longitude : 84.7889142
file name : Image_23082019104223986.png
|
2019-08-23 10:42:24.08681 |
11 |
44686675 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING |
300000 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING1 |
Completion of work |
-
latitude : 19.2259303
Longitude : 84.7909189
file name : Image_27042022162757722.png
|
2022-04-27 16:27:57.82476 |
12 |
44686675 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING |
300000 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING1 |
Completion of work |
-
latitude : 19.22662596
Longitude : 84.79004875
file name : Image_08102021130206395.png
|
2021-10-08 13:02:06.466151 |
13 |
44686675 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING |
300000 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING1 |
Completion of work |
-
latitude : 19.22658345
Longitude : 84.79013385
file name : Image_08102021130418679.png
|
2021-10-08 13:04:18.760705 |
14 |
44686675 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING |
300000 |
IMPROVEMENT AND REPAIR OF BNREGSK BUILDING1 |
Completion of work |
-
latitude : 19.22658345
Longitude : 84.79013385
file name : Image_08102021130549888.png
|
2021-10-08 13:05:49.966165 |
15 |
44686574 |
PIPELINE CONNECTION OF G.P BUILDING ( ONGOING) |
120000 |
PIPELINE CONNECTION OF G.P BUILDING ( ONGOING)1 |
Completion of work |
-
latitude : 19.2252493,19.2252491
Longitude : 84.7888222,84.788822
file name : Image_23122020091031800.png
|
2020-12-23 09:10:31.921811 |
16 |
44686741 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING) |
385000 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING)1 |
Completion of work |
-
latitude : 19.225555
Longitude : 84.80384833333333
file name : Image_04052021105825644.png
|
2021-05-04 10:58:25.778692 |
17 |
44686741 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING) |
385000 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING)1 |
Completion of work |
-
latitude : 19.2257751
Longitude : 84.80371983
file name : Image_22122020123404570.png
|
2020-12-22 12:34:04.720952 |
18 |
44686741 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING) |
385000 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING)1 |
Completion of work |
-
latitude : 19.22576036
Longitude : 84.80367119
file name : Image_26112020131226569.png
|
2020-11-26 13:12:26.659885 |
19 |
44686741 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING) |
385000 |
COMPILATION OF INCOMPLETE BOUNDARY WALL AT DUMDUMI SCHOOL ( ONGOING)1 |
Completion of work |
-
latitude : 19.2258194
Longitude : 84.80366314
file name : Image_21112020120203152.png
|
2020-11-21 12:02:03.227406 |
20 |
44691244 |
CONSTRUCTION OF GUARD WALL OF C.C. ROAD FROM KIRTANA PANDA HOUSE TO RASHA MALANA HOUSE ( ONGOING) |
50000 |
CONSTRUCTION OF GUARD WALL OF C.C. ROAD FROM KIRTANA PANDA HOUSE TO RASHA MALANA HOUSE ( ONGOING)1 |
Completion of work |
-
latitude : 19.2180703,19.21803123,19.21803764
Longitude : 84.79213887,84.79213669,84.79210862
file name : Image_29122020172544361.png
|
2020-12-29 17:25:44.455957 |
21 |
44691244 |
CONSTRUCTION OF GUARD WALL OF C.C. ROAD FROM KIRTANA PANDA HOUSE TO RASHA MALANA HOUSE ( ONGOING) |
50000 |
CONSTRUCTION OF GUARD WALL OF C.C. ROAD FROM KIRTANA PANDA HOUSE TO RASHA MALANA HOUSE ( ONGOING)1 |
Completion of work |
-
latitude : 19.2180703,19.21803123,19.21803764
Longitude : 84.79213887,84.79213669,84.79210862
file name : Image_29122020172611588.png
|
2020-12-29 17:26:11.694648 |
22 |
44686707 |
COMPLICATION OF INCOMPETENT DRAIN FROM ARUA SAHI TO SIBA MANDIR MAIN ROAD ( ONGOING) |
150000 |
COMPLICATION OF INCOMPETENT DRAIN FROM ARUA SAHI TO SIBA MANDIR MAIN ROAD ( ONGOING)1 |
Completion of work |
-
latitude : 19.22344659,19.22346724
Longitude : 84.78850824,84.78842107
file name : Image_29122020172537688.png
|
2020-12-29 17:25:37.781292 |
23 |
44686353 |
INSTALLATION OF SOLAR LIGHT OF DUMDUMI VILLAGE AT PADAMAPUR G.P |
200000 |
INSTALLATION OF SOLAR LIGHT OF DUMDUMI VILLAGE AT PADAMAPUR G.P1 |
Completion of work |
-
latitude : 19.22444833333333
Longitude : 84.80139333333334
file name : Image_12022021120036355.png
|
2021-02-12 12:00:36.480903 |
24 |
44686462 |
INSTALLATION OF SOLAR LIGHT OF PATAPUR AND HINJILAPALLI VILLAGE AT PADAMAPUR G.P |
200000 |
INSTALLATION OF SOLAR LIGHT OF PATAPUR AND HINJILAPALLI VILLAGE AT PADAMAPUR G.P1 |
Completion of work |
-
latitude : 19.237006666666666
Longitude : 84.78526666666667
file name : Image_12022021121237256.png
|
2021-02-12 12:12:37.356703 |
25 |
44686371 |
INSTALLATION OF SOLAR LIGHT OF PADAMAPUR VILLAGE AT PADAMAPUR G.P |
200000 |
INSTALLATION OF SOLAR LIGHT OF PADAMAPUR VILLAGE AT PADAMAPUR G.P1 |
Completion of work |
-
latitude : 19.224071666666667
Longitude : 84.78869833333334
file name : Image_12022021120029857.png
|
2021-02-12 12:00:29.97479 |
26 |
44686434 |
INSTALLATION OF SOLAR LIGHT OF MAJHIGAN VILLAGE AT PADAMAPUR G.P |
200000 |
INSTALLATION OF SOLAR LIGHT OF MAJHIGAN VILLAGE AT PADAMAPUR G.P1 |
Completion of work |
-
latitude : 19.227125
Longitude : 84.79452666666666
file name : Image_12022021120420968.png
|
2021-02-12 12:04:21.066905 |
27 |
44686389 |
INSTALLATION OF SOLAR LIGHT OF KOITHAPALLI VILLAGE AT PADAMAPUR G.P |
200000 |
INSTALLATION OF SOLAR LIGHT OF KOITHAPALLI VILLAGE AT PADAMAPUR G.P1 |
Completion of work |
-
latitude : 19.219548333333332
Longitude : 84.79132333333334
file name : Image_12022021120033125.png
|
2021-02-12 12:00:33.232336 |
28 |
38556517 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM |
50000 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM1 |
Completion of work |
-
latitude : 19.226218471303582
Longitude : 84.7899026144296
file name : Image_27042022162436504.png
|
2022-04-27 16:24:36.629208 |
29 |
38556517 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM |
50000 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM1 |
Completion of work |
-
latitude : 19.224936666666668
Longitude : 84.78719166666666
file name : Image_15032021130314273.png
|
2021-03-15 13:03:14.394429 |
30 |
38556517 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM |
50000 |
PROVISION FOR CONST. OF TUBE WELL PLATFORM1 |
Completion of work |
-
latitude : 19.22496
Longitude : 84.78716333333332
file name : Image_15032021115332702.png
|
2021-03-15 11:53:32.806778 |
31 |
38556576 |
PROVISION FOR PURCHASE OF AQUAGUARD FOR G.P. OFFICE |
80000 |
PROVISION FOR PURCHASE OF AQUAGUARD FOR G.P. OFFICE1 |
Completion of work |
-
latitude : 19.225826666666666
Longitude : 84.78931666666668
file name : Image_15032021103626623.png
|
2021-03-15 10:36:26.737075 |
32 |
38556759 |
PROVISION FOR PURCHASE OF AQUAGUARD FOR AWC1 PADMAPUR |
40105 |
PROVISION FOR PURCHASE OF AQUAGUARD FOR AWC1 PADMAPUR1 |
Completion of work |
-
latitude : 19.22636
Longitude : 84.78993166666666
file name : Image_15032021112046892.png
|
2021-03-15 11:20:46.991823 |
33 |
44686473 |
INSTALLATION OF AQAGUARD AND WATER SUPPLY FOR SCHOOLS ( ALL VILLAGES ) |
140000 |
INSTALLATION OF AQAGUARD AND WATER SUPPLY FOR SCHOOLS ( ALL VILLAGES )1 |
Completion of work |
-
latitude : 19.226041666666667
Longitude : 84.789515
file name : Image_15032021115316905.png
|
2021-03-15 11:53:17.0171 |
34 |
44686473 |
INSTALLATION OF AQAGUARD AND WATER SUPPLY FOR SCHOOLS ( ALL VILLAGES ) |
140000 |
INSTALLATION OF AQAGUARD AND WATER SUPPLY FOR SCHOOLS ( ALL VILLAGES )1 |
Completion of work |
-
latitude : 19.226041666666667
Longitude : 84.789515
file name : Image_15032021104752719.png
|
2021-03-15 10:47:52.822496 |
35 |
44686652 |
COMPLICATION OF INCOMPLTION RURAL PARK TUTA SAHI AT KOTHAPALLI |
650000 |
COMPLICATION OF INCOMPLTION RURAL PARK TUTA SAHI AT KOTHAPALLI1 |
Completion of work |
-
latitude : 19.225771666666667,19.218320000000002
Longitude : 84.78895166666668,84.791195
file name : Image_26032021113138887.png
|
2021-03-26 11:31:38.990415 |
36 |
44691236 |
COMPLICATION OF INCOMPLETE BOUNDARY AT BNRGSK BUILDING ( ONGOING) |
100000 |
COMPLICATION OF INCOMPLETE BOUNDARY AT BNRGSK BUILDING ( ONGOING)1 |
Completion of work |
-
latitude : 19.226253333333332
Longitude : 84.79001833333332
file name : Image_26032021120649266.png
|
2021-03-26 12:06:49.363731 |
37 |
44691347 |
COMPILATION OF INCOMPLETE AWC HINJILAPALLI |
150000 |
COMPILATION OF INCOMPLETE AWC HINJILAPALLI1 |
Completion of work |
-
latitude : 19.236723333333334
Longitude : 84.78498499999999
file name : Image_26032021122216572.png
|
2021-03-26 12:22:16.684593 |
38 |
44691214 |
CONNECTIVITY OF PAVER BLOCK FROM PATAPUR KOTHIGHARA TO CHIKARADA ROAD ( ONGOING) |
150000 |
CONNECTIVITY OF PAVER BLOCK FROM PATAPUR KOTHIGHARA TO CHIKARADA ROAD ( ONGOING)1 |
Completion of work |
-
latitude : 19.233045,19.233015
Longitude : 84.78219666666668,84.78221166666665
file name : Image_23042021114436168.png
|
2021-04-23 11:44:36.252228 |
39 |
38557488 |
PROVISION FOR PITCHING OF PAVER BLOCK AT AWC TO R.D ROAD KAITHAPALLI |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT AWC TO R.D ROAD KAITHAPALLI1 |
Completion of work |
-
latitude : 19.218496666666667,19.21853666666667
Longitude : 84.79185000000001,84.79184166666667
file name : Image_23042021114427326.png
|
2021-04-23 11:44:27.438023 |
40 |
44691386 |
CONNECTIVITY OF PAVER BLOCK AND DRAIN FROM TALA SAHI TO AWC BUILDING TOTA SAHI KOITHAPALLI |
300000 |
CONNECTIVITY OF PAVER BLOCK AND DRAIN FROM TALA SAHI TO AWC BUILDING TOTA SAHI KOITHAPALLI1 |
Completion of work |
-
latitude : 19.218281666666666,19.218173333333333
Longitude : 84.79201333333334,84.79227833333334
file name : Image_22042021113047330.png
|
2021-04-22 11:30:47.233461 |
41 |
44691386 |
CONNECTIVITY OF PAVER BLOCK AND DRAIN FROM TALA SAHI TO AWC BUILDING TOTA SAHI KOITHAPALLI |
300000 |
CONNECTIVITY OF PAVER BLOCK AND DRAIN FROM TALA SAHI TO AWC BUILDING TOTA SAHI KOITHAPALLI1 |
Completion of work |
-
latitude : 19.218281666666666,19.218173333333333
Longitude : 84.79201333333334,84.79227833333334
file name : Image_22042021113143710.png
|
2021-04-22 11:31:43.601869 |
42 |
38557367 |
PROVISION FOR PITCHING OF PAVER BLOCK AT PATAPUR TALA SAHI TO CHIKARADA ROAD |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT PATAPUR TALA SAHI TO CHIKARADA ROAD1 |
Completion of work |
-
latitude : 19.233038333333333,19.233046666666667
Longitude : 84.78221666666668,84.782185
file name : Image_23042021114447455.png
|
2021-04-23 11:44:47.547769 |
43 |
38557215 |
CON. OF DRAIN WITH PAVER BLOCK FROM TOTASAHI TO KAITHAPALLI |
180651 |
CON. OF DRAIN WITH PAVER BLOCK FROM TOTASAHI TO KAITHAPALLI1 |
Completion of work |
-
latitude : 19.21833666666667,19.218343333333333
Longitude : 84.79188500000001,84.79192499999999
file name : Image_22042021113037150.png
|
2021-04-22 11:30:37.053483 |
44 |
38557252 |
PROVISION FOR PITCHING OF PAVER BLOCK AT BRAHMANA SAHI BARIMALA SAHI |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT BRAHMANA SAHI BARIMALA SAHI1 |
Completion of work |
-
latitude : 19.2258226,19.225831666666668
Longitude : 84.7891426,84.78856666666667
file name : Image_22042021113211079.png
|
2021-04-22 11:32:10.992537 |
45 |
38557252 |
PROVISION FOR PITCHING OF PAVER BLOCK AT BRAHMANA SAHI BARIMALA SAHI |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT BRAHMANA SAHI BARIMALA SAHI1 |
Completion of work |
-
latitude : 19.2258226,19.225831666666668
Longitude : 84.7891426,84.78856666666667
file name : Image_22042021113131107.png
|
2021-04-22 11:31:31.021592 |
46 |
38557327 |
PROVISION FOR PITCHING OF PAVER BLOCK AT R.D ROAD TO TOTASAHI KAITHAPALLI |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT R.D ROAD TO TOTASAHI KAITHAPALLI1 |
Completion of work |
-
latitude : 19.21907333333333,19.21904333333333
Longitude : 84.791445,84.79146999999999
file name : Image_22042021113152882.png
|
2021-04-22 11:31:52.788527 |
47 |
38557327 |
PROVISION FOR PITCHING OF PAVER BLOCK AT R.D ROAD TO TOTASAHI KAITHAPALLI |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT R.D ROAD TO TOTASAHI KAITHAPALLI1 |
Completion of work |
-
latitude : 19.21907333333333,19.21904333333333
Longitude : 84.791445,84.79146999999999
file name : Image_22042021113102396.png
|
2021-04-22 11:31:02.320348 |
48 |
44686691 |
CONNECTIVITY OF C.C. ROAD PAVER BLOCK FRM G.P OFFICE TO BRAHMAN SAHI BARIMALA |
100000 |
CONNECTIVITY OF C.C. ROAD PAVER BLOCK FRM G.P OFFICE TO BRAHMAN SAHI BARIMALA1 |
Completion of work |
-
latitude : 19.225825,19.22585666666667
Longitude : 84.7891437,84.78900999999999
file name : Image_22042021113201348.png
|
2021-04-22 11:32:01.249788 |
49 |
44686691 |
CONNECTIVITY OF C.C. ROAD PAVER BLOCK FRM G.P OFFICE TO BRAHMAN SAHI BARIMALA |
100000 |
CONNECTIVITY OF C.C. ROAD PAVER BLOCK FRM G.P OFFICE TO BRAHMAN SAHI BARIMALA1 |
Completion of work |
-
latitude : 19.225825,19.22585666666667
Longitude : 84.7891437,84.78900999999999
file name : Image_22042021113121512.png
|
2021-04-22 11:31:21.408553 |
50 |
44686593 |
PWC PIPE LINE CONNECTION FROM G.P OFFICE TO BNRGSK BUILDING ( ONGOING) |
150000 |
PWC PIPE LINE CONNECTION FROM G.P OFFICE TO BNRGSK BUILDING ( ONGOING)1 |
Completion of work |
-
latitude : 19.226315,19.226283333333335
Longitude : 84.790005,84.78999999999999
file name : Image_19012022164530755.png
|
2022-01-19 16:45:30.836369 |
51 |
44686593 |
PWC PIPE LINE CONNECTION FROM G.P OFFICE TO BNRGSK BUILDING ( ONGOING) |
150000 |
PWC PIPE LINE CONNECTION FROM G.P OFFICE TO BNRGSK BUILDING ( ONGOING)1 |
Completion of work |
-
latitude : 19.226253333333332,19.226325
Longitude : 84.78991333333333,84.78998166666666
file name : Image_04052021105818944.png
|
2021-05-04 10:58:19.102784 |
52 |
44691226 |
IMPROVEMENT AND REPAIR OF DUMDUMI PRIMARY SCHOOL (ONGOING 18-19) |
120000 |
IMPROVEMENT AND REPAIR OF DUMDUMI PRIMARY SCHOOL (ONGOING 18-19)1 |
Completion of work |
-
latitude : 19.225591666666666
Longitude : 84.804205
file name : Image_04052021105829068.png
|
2021-05-04 10:58:29.194071 |
53 |
44691323 |
CONSTRUCTION OF KITCHEN HALL AT AWC PADAMAPUR ( ONGOING) |
100000 |
CONSTRUCTION OF KITCHEN HALL AT AWC PADAMAPUR ( ONGOING)1 |
Completion of work |
-
latitude : 19.226305
Longitude : 84.78989166666666
file name : Image_19012022164534325.png
|
2022-01-19 16:45:34.417018 |
54 |
44691323 |
CONSTRUCTION OF KITCHEN HALL AT AWC PADAMAPUR ( ONGOING) |
100000 |
CONSTRUCTION OF KITCHEN HALL AT AWC PADAMAPUR ( ONGOING)1 |
Completion of work |
-
latitude : 19.226271666666666
Longitude : 84.78987833333333
file name : Image_04052021105822385.png
|
2021-05-04 10:58:22.506872 |
55 |
38556705 |
PROVISSION FOR COLLERING OF ALL TUBWELL |
8000 |
PROVISSION FOR COLLERING OF ALL TUBWELL 1 |
Completion of work |
-
latitude : 19.224858333333334
Longitude : 84.78713333333332
file name : Image_04052021092803362.png
|
2021-05-04 09:28:03.478125 |
56 |
44691230 |
IMPROVEMENT AND REPAIR OF MAJHIGAN SCHOOL ( ONGOING 18-19) |
80000 |
IMPROVEMENT AND REPAIR OF MAJHIGAN SCHOOL ( ONGOING 18-19)1 |
Completion of work |
-
latitude : 19.231271666666665
Longitude : 84.79358666666667
file name : Image_22072021174538186.png
|
2021-07-22 17:45:38.292282 |
57 |
44691230 |
IMPROVEMENT AND REPAIR OF MAJHIGAN SCHOOL ( ONGOING 18-19) |
80000 |
IMPROVEMENT AND REPAIR OF MAJHIGAN SCHOOL ( ONGOING 18-19)1 |
Completion of work |
-
latitude : 19.231248333333333
Longitude : 84.793605
file name : Image_04052021105832477.png
|
2021-05-04 10:58:32.64156 |
58 |
44686732 |
CONST OF TMC CENTER AT PADAMAPUR |
325000 |
CONST OF TMC CENTER AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.22598772
Longitude : 84.78955424
file name : Image_20092021114444622.png
|
2021-09-20 11:44:44.725666 |
59 |
44686732 |
CONST OF TMC CENTER AT PADAMAPUR |
325000 |
CONST OF TMC CENTER AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.226046666666665
Longitude : 84.78961166666667
file name : Image_04052021105815731.png
|
2021-05-04 10:58:15.859026 |
60 |
44691248 |
CONSTRUCTION OF AWC BOUNDARY WALL AT KOITHAPALLI |
150000 |
CONSTRUCTION OF AWC BOUNDARY WALL AT KOITHAPALLI 1 |
Completion of work |
-
latitude : 19.218861666666665
Longitude : 84.791555
file name : Image_05052021123046271.png
|
2021-05-05 12:30:46.42567 |
61 |
44691336 |
CONNECTIVITY OF U.P SCHOOL REPAIR KOITHAPALLI |
150000 |
CONNECTIVITY OF U.P SCHOOL REPAIR KOITHAPALLI1 |
Completion of work |
-
latitude : 19.219743333333334
Longitude : 84.79109833333332
file name : Image_05052021123029010.png
|
2021-05-05 12:30:29.109414 |
62 |
44005667 |
maintainance of covid care home |
50000 |
maintainance of covid care home1 |
Completion of work |
-
latitude : 19.22650666666667
Longitude : 84.79011333333334
file name : Image_04062021090651838.png
|
2021-06-04 09:06:51.935342 |
63 |
44005654 |
improvement of bnrgsk building |
137808 |
improvement of bnrgsk building1 |
Completion of work |
-
latitude : 19.226391666666665
Longitude : 84.79011
file name : Image_04062021090626588.png
|
2021-06-04 09:06:26.668341 |
64 |
38557553 |
PROVISION FOR RENOVATION OF SCHOOL ROOM OF PATAPUR |
155266 |
PROVISION FOR RENOVATION OF SCHOOL ROOM OF PATAPUR1 |
Completion of work |
-
latitude : 19.233783333333335
Longitude : 84.78418666666667
file name : Image_16062021103451340.png
|
2021-06-16 10:34:51.438268 |
65 |
49355425 |
INFRASTRUCTURE DEVELOPMENT OF PRIMEARY SCHOOL AT MAJHIGAON |
182034 |
INFRASTRUCTURE DEVELOPMENT OF PRIMEARY SCHOOL AT MAJHIGAON1 |
Completion of work |
-
latitude : 19.231371666666668
Longitude : 84.793565
file name : Image_22072021174513856.png
|
2021-07-22 17:45:13.99258 |
66 |
44686636 |
ELECTRIFICATION OF AWC MAJHIGAN 1 , KOTHAPALLI, PADMAPUR 2, HINJILAPALLI |
80000 |
ELECTRIFICATION OF AWC MAJHIGAN 1 , KOTHAPALLI, PADMAPUR 2, HINJILAPALLI1 |
Completion of work |
-
latitude : 19.23135166666667
Longitude : 84.79352833333333
file name : Image_22072021173856858.png
|
2021-07-22 17:38:56.975164 |
67 |
44691222 |
CONNECTIVITY OF FAVER BLOAK FROM PWD ROAD TO KALYAN MANDAP MAJHIGAN ( ONGOING) |
150000 |
CONNECTIVITY OF FAVER BLOAK FROM PWD ROAD TO KALYAN MANDAP MAJHIGAN ( ONGOING)1 |
Completion of work |
-
latitude : 19.230611666666668,19.230591666666665
Longitude : 84.79268166666667,84.79270333333334
file name : Image_22072021173416441.png
|
2021-07-22 17:34:16.548744 |
68 |
44686661 |
CONSTRUCTION OF KALYANA MANDAP AT DUMDUMI BANGALA CHAKA |
500000 |
CONSTRUCTION OF KALYANA MANDAP AT DUMDUMI BANGALA CHAKA1 |
Completion of work |
-
latitude : 19.225271666666668
Longitude : 84.80070333333333
file name : Image_14112021131706000.png
|
2021-11-14 13:17:06.154947 |
69 |
44686661 |
CONSTRUCTION OF KALYANA MANDAP AT DUMDUMI BANGALA CHAKA |
500000 |
CONSTRUCTION OF KALYANA MANDAP AT DUMDUMI BANGALA CHAKA1 |
Completion of work |
-
latitude : 19.22529666666667
Longitude : 84.80074666666665
file name : Image_29102021094321879.png
|
2021-10-29 09:43:22.010871 |
70 |
53694303 |
NAL SE JAL AT PATAPUR PRIMARY SCHOOL |
35600 |
NAL SE JAL AT PATAPUR PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.233953333333332,19.233954999999998
Longitude : 84.78387,84.78390499999999
file name : Image_14112021134128324.png
|
2021-11-14 13:41:28.452353 |
71 |
53694008 |
NAL SE JAL AT KAIHAPALLI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT KAIHAPALLI PRIMARY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 19.21982734,19.21977812
Longitude : 84.79129766,84.79126451
file name : Image_06102021083852440.png
|
2021-10-06 08:38:52.52185 |
72 |
53694008 |
NAL SE JAL AT KAIHAPALLI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT KAIHAPALLI PRIMARY SCHOOL AND AWC1 |
Completion of work |
-
latitude : 19.21982734,19.21977812
Longitude : 84.79129766,84.79126451
file name : Image_06102021083839328.png
|
2021-10-06 08:38:39.418034 |
73 |
53694220 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC 1 |
Completion of work |
-
latitude : 19.236343349330127,19.236315269954503,19.23633228521794
Longitude : 84.78468915447593,84.78470658883452,84.7847028169781
file name : Image_27042022163718226.png
|
2022-04-27 16:37:18.37017 |
74 |
53694220 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC 1 |
Completion of work |
-
latitude : 19.23639912,19.23639552
Longitude : 84.78472018,84.78471226
file name : Image_06102021083903316.png
|
2021-10-06 08:39:03.418251 |
75 |
53694220 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT HIJILAPALLI PRIMARY SCHOOL AND AWC 1 |
Completion of work |
-
latitude : 19.23638868,19.23639508
Longitude : 84.78468683,84.78470268
file name : Image_06102021084003060.png
|
2021-10-06 08:40:03.143667 |
76 |
44691332 |
CONSTRUCTION OF BOUNDARY WALL AT MAJHIGAN SCHOOL |
300000 |
CONSTRUCTION OF BOUNDARY WALL AT MAJHIGAN SCHOOL1 |
Completion of work |
-
latitude : 19.231463333333334
Longitude : 84.7938
file name : Image_10012022170857186.png
|
2022-01-10 17:08:57.275229 |
77 |
53694068 |
NAL SE JAL MAJHIGAON PRIMARY SCHOOL |
35600 |
NAL SE JAL MAJHIGAON PRIMARY SCHOOL 1 |
Completion of work |
-
latitude : 19.231013333333333,19.230975
Longitude : 84.79346,84.79348499999999
file name : Image_10012022171249985.png
|
2022-01-10 17:12:50.059687 |
78 |
38556803 |
PROVISION FOR REPAIR AND MENTANANCE OF PWS ENARGY CHARGES |
100000 |
PROVISION FOR REPAIR AND MENTANANCE OF PWS ENARGY CHARGES1 |
Completion of work |
-
latitude : 19.233338333333332
Longitude : 84.79151833333331
file name : Image_31012022165908320.png
|
2022-01-31 16:59:08.429951 |
79 |
38557442 |
PROVISION FOR PITCHING OF PAVER BLOCK AT ARUASAHI PADMAPUR |
150000 |
PROVISION FOR PITCHING OF PAVER BLOCK AT ARUASAHI PADMAPUR1 |
Completion of work |
-
latitude : 19.224928286857903,19.224916049279273
Longitude : 84.7883396409452,84.78833327069879
file name : Image_27042022162013010.png
|
2022-04-27 16:20:13.128965 |
80 |
54960106 |
INFRASTRUCTURE DEVELOPMENT AND COMPOUND WALL OF AWC 1 AT MAJHIGAON |
100000 |
INFRASTRUCTURE DEVELOPMENT AND COMPOUND WALL OF AWC 1 AT MAJHIGAON 1 |
Completion of work |
-
latitude : 19.231456741690636
Longitude : 84.793505910784
file name : Image_27042022160450865.png
|
2022-04-27 16:04:51.002407 |
81 |
54960175 |
INFRASTRUCTURE DEVELOPMENT OF PRIMARY SCHOOL AT MAJHIGAON |
150000 |
INFRASTRUCTURE DEVELOPMENT OF PRIMARY SCHOOL AT MAJHIGAON 1 |
Completion of work |
-
latitude : 19.231109605170786
Longitude : 84.79337699711323
file name : Image_27042022160621152.png
|
2022-04-27 16:06:21.283338 |
82 |
54960062 |
IMPROVEMENT OF HIGH SCHOOL PADAMAPUR |
441149 |
IMPROVEMENT OF HIGH SCHOOL PADAMAPUR 1 |
Completion of work |
-
latitude : 19.226045720279217
Longitude : 84.78959701023996
file name : Image_12052022152036934.png
|
2022-05-12 15:20:37.049334 |
83 |
44691358 |
COMPILATION OF INCOMPLETE OF KOTHOGHARA HINJILAPALLI |
200000 |
COMPILATION OF INCOMPLETE OF KOTHOGHARA HINJILAPALLI1 |
Completion of work |
-
latitude : 19.236645265482366
Longitude : 84.78340454399586
file name : Image_12052022150758240.png
|
2022-05-12 15:07:58.324646 |
84 |
54960028 |
INFRASTRUCTURE DEVELOPMENT OF HIGH SCHOOL AT PADAMAPUR |
441149 |
INFRASTRUCTURE DEVELOPMENT OF HIGH SCHOOL AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.2258072
Longitude : 84.7896279
file name : Image_06062022102859410.png
|
2022-06-06 10:28:59.508469 |
85 |
53611826 |
NAL SE JAL AT PADAMAPUR GP AWC I AWC II AND HIGH SCHOOL |
115200 |
NAL SE JAL AT PADAMAPUR GP AWC I AWC II AND HIGH SCHOOL1 |
Completion of work |
-
latitude : 19.226327394135296
Longitude : 84.78993471711874
file name : Image_24062022102711091.png
|
2022-06-24 10:27:11.198237 |
86 |
54959963 |
COM OF INCOM MISSION SHAKTI GRUHA AT PADAMAPUR |
288198 |
COM OF INCOM MISSION SHAKTI GRUHA AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.22635679
Longitude : 84.79015592
file name : Image_29062022122252281.png
|
2022-06-29 12:22:52.375179 |
87 |
54900812 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR |
225614 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR 1 |
Completion of work |
-
latitude : 19.2257573
Longitude : 84.7889149
file name : Image_17122022133251982.png
|
2022-12-17 13:32:52.079271 |
88 |
54900812 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR |
225614 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR 1 |
Completion of work |
-
latitude : 19.2257973
Longitude : 84.7889247
file name : Image_14092022150841268.png
|
2022-09-14 15:08:41.353392 |
89 |
54900812 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR |
225614 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR 1 |
Completion of work |
-
latitude : 19.225796
Longitude : 84.7889238
file name : Image_14092022150915589.png
|
2022-09-14 15:09:15.673028 |
90 |
54900812 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR |
225614 |
IMPROVEMENT OF GP OFFICE AT PADMAPUR 1 |
Completion of work |
-
latitude : 19.225796
Longitude : 84.7889238
file name : Image_14092022150857720.png
|
2022-09-14 15:08:57.807117 |
91 |
54900787 |
COMPILATION OF INCOMPLETE RURAL PARK AT TOTA SAHI KOTHAPALLI |
500000 |
COMPILATION OF INCOMPLETE RURAL PARK AT TOTA SAHI KOTHAPALLI 1 |
Completion of work |
-
latitude : 19.21848956029862,19.218483064323664
Longitude : 84.79145561344922,84.79143398813903
file name : Image_20022023110647753.png
|
2023-02-20 11:06:47.857122 |
92 |
54900787 |
COMPILATION OF INCOMPLETE RURAL PARK AT TOTA SAHI KOTHAPALLI |
500000 |
COMPILATION OF INCOMPLETE RURAL PARK AT TOTA SAHI KOTHAPALLI 1 |
Completion of work |
-
latitude : 19.21866168268025,19.21863892581314,19.21863892581314
Longitude : 84.79140305891633,84.79138327762485,84.79138327762485
file name : Image_21092022134540279.png
|
2022-09-21 13:45:40.434378 |
93 |
54959934 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE |
190000 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE 1 |
Completion of work |
-
latitude : 19.2257837
Longitude : 84.7889208
file name : Image_26092022123311547.png
|
2022-09-26 12:33:11.643236 |
94 |
53694145 |
NAL SE JAL AT DUMDUMI PRIMARY SCHOOL AND AWC |
71200 |
NAL SE JAL AT DUMDUMI PRIMARY SCHOOL AND AWC 1 |
Completion of work |
-
latitude : 19.22542214859277,19.225591672584414
Longitude : 84.80466423556209,84.8041764087975
file name : Image_19102022173535699.png
|
2022-10-19 17:35:35.813048 |
95 |
65667693 |
Operation & maintenance of drinking water supply system |
144000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2594485
Longitude : 84.7739721
file name : Image_28062023160204913.png
|
2023-06-28 16:02:05.06108 |
96 |
65667693 |
Operation & maintenance of drinking water supply system |
144000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2594568
Longitude : 84.7739694
file name : Image_18112022163041091.png
|
2022-11-18 16:30:41.219311 |
97 |
49355156 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE AT PADAMAPUR |
150000 |
INFRASTRUCTURE DEVELOPMENT OF GP OFFICE AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.2257595
Longitude : 84.7889157
file name : Image_17122022133501805.png
|
2022-12-17 13:35:01.901733 |
98 |
65667849 |
COMPLETION OF INCOMPLETE PADAMAPUR HIGH SCHOOL AT PADAMAPUR |
300000 |
COMPLETION OF INCOMPLETE PADAMAPUR HIGH SCHOOL AT PADAMAPUR 1 |
Completion of work |
-
latitude : 19.226019401103258
Longitude : 84.78960916399956
file name : Image_20122022103055970.png
|
2022-12-20 10:30:56.069957 |
99 |
65667683 |
Operation & maintenance of drinking water supply system |
132744 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.232713608071208
Longitude : 84.79382584802806
file name : Image_31012023164757480.png
|
2023-01-31 16:47:57.582235 |
100 |
65667900 |
IMPROVEMENT OF PATAPUR PRIMARY SCHOOL |
190000 |
IMPROVEMENT OF PATAPUR PRIMARY SCHOOL 1 |
Completion of work |
-
latitude : 19.23376416
Longitude : 84.784104
file name : Image_28062023121607358.png
|
2023-06-28 12:16:07.467532 |
101 |
65667900 |
IMPROVEMENT OF PATAPUR PRIMARY SCHOOL |
190000 |
IMPROVEMENT OF PATAPUR PRIMARY SCHOOL 1 |
Completion of work |
-
latitude : 19.233841099776328
Longitude : 84.78413921780884
file name : Image_09022023120228905.png
|
2023-02-09 12:02:28.98758 |
102 |
65667870 |
IMPROVEMENT OF UPPER PRIMARY SCHOOL AT DUMDUMI |
258990 |
IMPROVEMENT OF UPPER PRIMARY SCHOOL AT DUMDUMI 1 |
Completion of work |
-
latitude : 19.22528278
Longitude : 84.80454689
file name : Image_09032023130127413.png
|
2023-03-09 13:01:27.505998 |
103 |
65667925 |
IMPROVEMENT IF PRIMARY SCHOOL MAJHIGAM |
230000 |
IMPROVEMENT IF PRIMARY SCHOOL MAJHIGAM1 |
Completion of work |
-
latitude : 19.23117309
Longitude : 84.79352448
file name : Image_28032023133407505.png
|
2023-03-28 13:34:07.594658 |
104 |
65667651 |
Operation & maintenance of drinking water supply system |
180000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2594513
Longitude : 84.7739478
file name : Image_24032023120628194.png
|
2023-03-24 12:06:28.374821 |
105 |
65667805 |
Creation of plastic waste storage unit |
106744 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 19.25905727
Longitude : 84.77421486
file name : Image_03102023161635705.png
|
2023-10-03 16:16:35.797578 |
106 |
75552960 |
Construction of Child Friendly Corner in AWC |
154020 |
Construction of Child Friendly Corner in AWC1 |
Roof laid |
-
latitude : 19.22623194
Longitude : 84.78993938
file name : Image_20062024175029514.png
|
2024-06-20 17:50:29.610962 |
107 |
75552960 |
Construction of Child Friendly Corner in AWC |
154020 |
Construction of Child Friendly Corner in AWC1 |
Plinth level |
-
latitude : 19.22624942
Longitude : 84.7899112
file name : Image_20062024174738441.png
|
2024-06-20 17:47:38.54445 |
108 |
75552960 |
Construction of Child Friendly Corner in AWC |
154020 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 19.22619307
Longitude : 84.78992465
file name : Image_20062024174505413.png
|
2024-06-20 17:45:05.516449 |
109 |
75554545 |
Construction and Maintenance of Children Park |
350000 |
Construction and Maintenance of Children Park1 |
Roof laid |
-
latitude : 19.22340147
Longitude : 84.80321661
file name : Image_06032024181051808.png
|
2024-03-06 18:10:51.903191 |
110 |
75554545 |
Construction and Maintenance of Children Park |
350000 |
Construction and Maintenance of Children Park1 |
Plinth level |
-
latitude : 19.22328
Longitude : 84.8034778
file name : Image_06032024180815500.png
|
2024-03-06 18:08:15.588943 |
111 |
75554545 |
Construction and Maintenance of Children Park |
350000 |
Construction and Maintenance of Children Park1 |
Completion of work |
-
latitude : 19.2234475
Longitude : 84.8033445
file name : Image_06032024180411362.png
|
2024-03-06 18:04:11.454369 |
112 |
75554545 |
Construction and Maintenance of Children Park |
350000 |
Construction and Maintenance of Children Park1 |
Completion of work |
-
latitude : 19.223387
Longitude : 84.8033978
file name : Image_06032024180316742.png
|
2024-03-06 18:03:16.834033 |
113 |
78774306 |
Operation and Maintenance of drinking water supply system |
206060 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.2594507
Longitude : 84.7739701
file name : Image_09032024182448834.png
|
2024-03-09 18:24:48.926904 |
114 |
78774306 |
Operation and Maintenance of drinking water supply system |
206060 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.259454
Longitude : 84.7739714
file name : Image_09032024182435129.png
|
2024-03-09 18:24:35.213778 |
115 |
78774306 |
Operation and Maintenance of drinking water supply system |
206060 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.2594538
Longitude : 84.7739735
file name : Image_09032024182003412.png
|
2024-03-09 18:20:03.499869 |
116 |
78774306 |
Operation and Maintenance of drinking water supply system |
206060 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2594536
Longitude : 84.7739736
file name : Image_09032024180901949.png
|
2024-03-09 18:09:02.085384 |
117 |
65667789 |
Creation of plastic waste storage unit |
200000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 19.22657895
Longitude : 84.79281461
file name : Image_25032024121804131.png
|
2024-03-25 12:18:04.247739 |
118 |
78790972 |
Operation and Maintenance of drinking water supply system |
156000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.2594256
Longitude : 84.7739905
file name : Image_29032024233226648.png
|
2024-03-29 23:32:26.733074 |
119 |
78790972 |
Operation and Maintenance of drinking water supply system |
156000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.2594267
Longitude : 84.7739883
file name : Image_29032024233021783.png
|
2024-03-29 23:30:21.872224 |
120 |
78790972 |
Operation and Maintenance of drinking water supply system |
156000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.2258468
Longitude : 84.7890667
file name : Image_29032024213106783.png
|
2024-03-29 21:31:06.895813 |
121 |
101239115 |
Operation and Maintenance of drinking/piped water supply system |
411567 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.2594415
Longitude : 84.7739481
file name : Image_15102024153237782.png
|
2024-10-15 15:32:38.849781 |
122 |
78778724 |
Construction of Ramp in AWC for special need children |
160807 |
Construction of Ramp in AWC for special need children1 |
Roof laid |
-
latitude : 19.22581224
Longitude : 84.78941573
file name : Image_06082024144301001.png
|
2024-08-06 14:43:01.119284 |
123 |
78778724 |
Construction of Ramp in AWC for special need children |
160807 |
Construction of Ramp in AWC for special need children1 |
Roof laid |
-
latitude : 19.2257509
Longitude : 84.7889042
file name : Image_06082024144202831.png
|
2024-08-06 14:42:02.967809 |
124 |
78778724 |
Construction of Ramp in AWC for special need children |
160807 |
Construction of Ramp in AWC for special need children1 |
Plinth level |
-
latitude : 19.2257498
Longitude : 84.7889038
file name : Image_06082024143802026.png
|
2024-08-06 14:38:02.125702 |
125 |
78778724 |
Construction of Ramp in AWC for special need children |
160807 |
Construction of Ramp in AWC for special need children1 |
Completion of work |
-
latitude : 19.2257492
Longitude : 84.7889032
file name : Image_06082024140729780.png
|
2024-08-06 14:07:29.869972 |