1 |
5904135 |
River Steps |
150000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.45462265
Longitude : 84.62555186
file name : Image_03102019150015228.png
|
2019-10-03 15:00:15.311062 |
2 |
10871922 |
MASHANI BANDHA DRAIN AND CULVERT |
75000 |
Drainage1 |
Commenced |
-
latitude : 19.46674586,19.46675951
Longitude : 84.63256938,84.63257251
file name : Image_19102019150815367.png
|
2019-10-19 15:08:15.43229 |
3 |
5904117 |
Harijan Street Canal Steps |
100000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.46261441
Longitude : 84.6208977
file name : Image_03102019163244795.png
|
2019-10-03 16:32:44.860165 |
4 |
10871836 |
PURCHASE OF LED LIGHT HARIJAN SAHI, TELI GORJI, KOTHAHAR GORJI OF PATHARAPUNJI |
146164 |
Street Light1 |
Commenced |
-
latitude : 19.4743397
Longitude : 84.63400732
file name : Image_09102019130547746.png
|
2019-10-09 13:05:47.799252 |
5 |
10872047 |
PURUNA BANDHA SAHI DRAIN AND CC ROAD AT DENGADI |
400000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.46413826,19.46413172
Longitude : 84.63277611,84.63277312
file name : Image_09102019133126407.png
|
2019-10-09 13:31:26.475916 |
6 |
10872047 |
PURUNA BANDHA SAHI DRAIN AND CC ROAD AT DENGADI |
400000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.4642455,19.46424133
Longitude : 84.63274871,84.63274475
file name : Image_19102019152558560.png
|
2019-10-19 15:25:58.622901 |
7 |
10872047 |
PURUNA BANDHA SAHI DRAIN AND CC ROAD AT DENGADI |
400000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.43627803,19.43627816
Longitude : 84.58241423,84.58241486
file name : Image_18102019074600333.png
|
2019-10-18 07:46:00.407551 |
8 |
10872009 |
HARIJAN SAHI DRAIN AND CC ROAD AT PATHAR PUNJI |
200000 |
Drainage1
|
Commenced |
-
latitude : 19.4622598,19.46224654
Longitude : 84.62053046,84.62053536
file name : Image_25102019142125663.png
|
2019-10-25 14:21:25.715746 |
9 |
10872009 |
HARIJAN SAHI DRAIN AND CC ROAD AT PATHAR PUNJI |
200000 |
Drainage1
|
Commenced |
-
latitude : 19.4622039,19.46219698
Longitude : 84.62011357,84.62011148
file name : Image_25102019142436096.png
|
2019-10-25 14:24:36.151365 |
10 |
10872028 |
DRAIN AND CC ROAD OF LENKAKHALI |
250000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.46292305,19.46292397
Longitude : 84.64312677,84.64312043
file name : Image_09102019133900443.png
|
2019-10-09 13:39:00.532514 |
11 |
10872028 |
DRAIN AND CC ROAD OF LENKAKHALI |
250000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.4632797,19.46589184
Longitude : 84.6585379,84.65196773
file name : Image_25102019131607998.png
|
2019-10-25 13:16:08.041583 |
12 |
10871935 |
MASHANI BANDHA STEPS AND DRESS CHANGE ROOM |
125000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.46647982
Longitude : 84.63268699
file name : Image_09102019122402471.png
|
2019-10-09 12:24:02.560532 |
13 |
10871935 |
MASHANI BANDHA STEPS AND DRESS CHANGE ROOM |
125000 |
Other Sanitation Asset1 |
Commenced |
-
latitude : 19.46675479
Longitude : 84.63259519
file name : Image_19102019150615276.png
|
2019-10-19 15:06:15.326714 |
14 |
10871899 |
KIABANDHA DRAIN AND GUARD WALL |
150000 |
Drainage1 |
Commenced |
-
latitude : 19.46678669,19.46667804
Longitude : 84.63261562,84.6326019
file name : Image_09102019122212905.png
|
2019-10-09 12:22:12.976687 |
15 |
10871899 |
KIABANDHA DRAIN AND GUARD WALL |
150000 |
Drainage1 |
Commenced |
-
latitude : 19.46676106,19.46677149
Longitude : 84.63256774,84.63257072
file name : Image_19102019152155600.png
|
2019-10-19 15:21:55.665842 |
16 |
10871899 |
KIABANDHA DRAIN AND GUARD WALL |
150000 |
Drainage1 |
Commenced |
-
latitude : 19.46629121,19.46630713
Longitude : 84.63278603,84.6327812
file name : Image_19102019151411592.png
|
2019-10-19 15:14:11.651879 |
17 |
10871899 |
KIABANDHA DRAIN AND GUARD WALL |
150000 |
Drainage1 |
Commenced |
-
latitude : 19.46652088,19.46651
Longitude : 84.63269635,84.63269197
file name : Image_19102019151034151.png
|
2019-10-19 15:10:34.229198 |
18 |
10871899 |
KIABANDHA DRAIN AND GUARD WALL |
150000 |
Drainage1 |
Commenced |
-
latitude : 19.46650315,19.46649734
Longitude : 84.63266858,84.63267425
file name : Image_19102019151151120.png
|
2019-10-19 15:11:51.173511 |
19 |
5904756 |
New Street Drain and CC Road |
274000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.4523672,19.46291242,19.46291563
Longitude : 84.6278001,84.64388145,84.64387395
file name : Image_09122019165028108.png
|
2019-12-09 16:50:28.179512 |
20 |
5904046 |
Thakurani street Drain Devevlopment |
100000 |
Drainage1 |
Commenced |
-
latitude : 19.46398181,19.46398212
Longitude : 84.63366771,84.63366848
file name : Image_03102019125408552.png
|
2019-10-03 12:54:08.631508 |
21 |
5899685 |
LED LIGHT (36541X7) |
255787 |
Street Light2 |
Commenced |
-
latitude : 19.46676577
Longitude : 84.65144485
file name : Image_03102019125404583.png
|
2019-10-03 12:54:04.657299 |
22 |
5899685 |
LED LIGHT (36541X7) |
255787 |
Street Light2 |
Commenced |
-
latitude : 19.46631582
Longitude : 84.65213141
file name : Image_03102019125153917.png
|
2019-10-03 12:51:54.021101 |
23 |
5899685 |
LED LIGHT (36541X7) |
255787 |
Street Light3 |
Commenced |
-
latitude : 19.47432843
Longitude : 84.6340432
file name : Image_03102019142808296.png
|
2019-10-03 14:28:08.35901 |
24 |
5899685 |
LED LIGHT (36541X7) |
255787 |
Street Light4 |
Commenced |
-
latitude : 19.47397292
Longitude : 84.63391578
file name : Image_03102019150012394.png
|
2019-10-03 15:00:12.475178 |
25 |
19812378 |
REPAIRING OF TUBE WELL PLATFORM |
30000 |
Hand pump1 |
Commenced |
-
latitude : 19.46406421
Longitude : 84.63381036
file name : Image_25102019135524811.png
|
2019-10-25 13:55:24.87419 |
26 |
19812378 |
REPAIRING OF TUBE WELL PLATFORM |
30000 |
Hand pump2 |
Commenced |
-
latitude : 19.46415339
Longitude : 84.63294827
file name : Image_25102019135922775.png
|
2019-10-25 13:59:22.844996 |
27 |
19812869 |
PURBA PATRA SAHI DRAIN AND CC ROAD |
350000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.46351193,19.46351571
Longitude : 84.64445684,84.64445884
file name : Image_25102019133646674.png
|
2019-10-25 13:36:46.769014 |
28 |
19813563 |
DRAIN AND CC ROAD GUARD WALL FROM PWD ROAD TO LENKAKHALI VILLAGE |
400000 |
Rural Road CC1 |
Commenced |
-
latitude : 19.46510911,19.46510709
Longitude : 84.65197249,84.65197131
file name : Image_25102019132050171.png
|
2019-10-25 13:20:50.221596 |
29 |
55191193 |
CONST DRAIN AND CC ROAD AT RAGHUNATHA NAGAR DENGADI |
500000 |
CONST DRAIN AND CC ROAD AT RAGHUNATHA NAGAR DENGADI1 |
Completion of work |
-
latitude : 19.46301269,19.46301431
Longitude : 84.63408617,84.63408723
file name : Image_07022022165109120.png
|
2022-02-07 16:51:09.230216 |
30 |
55170992 |
DIGGING OF NEW TUBE WELL 3 NOS AT DENGADI GP |
200000 |
DIGGING OF NEW TUBE WELL 3 NOS AT DENGADI GP1 |
Completion of work |
-
latitude : 19.4646694
Longitude : 84.6605094
file name : Image_06122021150759683.png
|
2021-12-06 15:07:59.779106 |
31 |
48252680 |
SANITATION |
100000 |
SANITATION1 |
Completion of work |
-
latitude : 19.4363018
Longitude : 84.5823621
file name : Image_11022022121802362.png
|
2022-02-11 12:18:02.491995 |
32 |
48253975 |
SEM & PUMP DRIVER SALLARY |
100000 |
SEM & PUMP DRIVER SALLARY1 |
Completion of work |
-
latitude : 19.4363018
Longitude : 84.5823621
file name : Image_11022022121903246.png
|
2022-02-11 12:19:03.382941 |
33 |
38541212 |
IMP OF PS LENKAKHALI |
200000 |
IMP OF PS LENKAKHALI1 |
Completion of work |
-
latitude : 19.46627405
Longitude : 84.65000555
file name : Image_11022022103726399.png
|
2022-02-11 10:37:26.520726 |
34 |
38540767 |
IMP OF PS RAJIB NAGAR |
114032 |
IMP OF PS RAJIB NAGAR1 |
Completion of work |
-
latitude : 19.47414813
Longitude : 84.63318818
file name : Image_11022022105052822.png
|
2022-02-11 10:50:52.960883 |
35 |
55191262 |
IMP OF PATHARAPUNJI UP SCHOOL |
250000 |
IMP OF PATHARAPUNJI UP SCHOOL1 |
Completion of work |
-
latitude : 19.45551456
Longitude : 84.62320091
file name : Image_11022022110406742.png
|
2022-02-11 11:04:06.854225 |
36 |
48256011 |
IMP OF DANDA BANDHA AT PATHARAPUNJI |
300000 |
IMP OF DANDA BANDHA AT PATHARAPUNJI1 |
Completion of work |
-
latitude : 19.45567095
Longitude : 84.62288225
file name : Image_11022022110627344.png
|
2022-02-11 11:06:27.432243 |
37 |
48253069 |
CONST. OF DRAIN AND CC ROAD AT PWD ROAD TO LENKAKHALI |
400000 |
CONST. OF DRAIN AND CC ROAD AT PWD ROAD TO LENKAKHALI1 |
Completion of work |
-
latitude : 19.46625045
Longitude : 84.64999451
file name : Image_11022022104252885.png
|
2022-02-11 10:42:53.014251 |
38 |
55190899 |
CONST OF MCC AND PURCHASE DUSTBIN FOR GP 1 |
823312 |
CONST OF MCC AND PURCHASE DUSTBIN FOR GP 11 |
Completion of work |
-
latitude : 19.463095
Longitude : 84.63453333333334
file name : Image_07122021134852430.png
|
2021-12-07 13:48:52.539255 |
39 |
55190784 |
MAINTAINANCE OF WATER SUPPLY AND ENERGY CHARGES |
300000 |
MAINTAINANCE OF WATER SUPPLY AND ENERGY CHARGES1 |
Completion of work |
-
latitude : 19.4362807,19.4362807
Longitude : 84.582293,84.582293
file name : Image_27012022173007291.png
|
2022-01-27 17:30:07.40616 |
40 |
48253698 |
MANTANCE OF AWC-5 AT DENGADI |
70000 |
MANTANCE OF AWC-5 AT DENGADI1 |
Completion of work |
-
latitude : 19.46432796
Longitude : 84.63537186
file name : Image_17082022113529557.png
|
2022-08-17 11:35:29.662585 |
41 |
48254417 |
DEVELOPMENT OF AWC AT HARIJAN SAHI |
200000 |
DEVELOPMENT OF AWC AT HARIJAN SAHI1 |
Completion of work |
-
latitude : 19.46179834
Longitude : 84.62052019
file name : Image_17082022120134009.png
|
2022-08-17 12:01:34.111454 |
42 |
59758239 |
MANTANCE & PAYMENT OF ENERGY CHARGESS PWS SYSTEM AND STREET LIGHT CHARGESS |
300000 |
MANTANCE & PAYMENT OF ENERGY CHARGESS PWS SYSTEM AND STREET LIGHT CHARGESS1 |
Completion of work |
-
latitude : 19.4363692
Longitude : 84.5824129
file name : Image_23112022153009726.png
|
2022-11-23 15:30:09.857825 |
43 |
59794121 |
COMPLETION OF INCOMPLETE DANDA BANDHA AT PATHARAPUNJI |
400000 |
COMPLETION OF INCOMPLETE DANDA BANDHA AT PATHARAPUNJI1 |
Completion of work |
-
latitude : 19.45630886
Longitude : 84.6233932
file name : Image_03022023105653766.png
|
2023-02-03 10:56:53.877429 |
44 |
59756096 |
SEM & PUMP DRIVER SALARY |
100000 |
SEM & PUMP DRIVER SALARY1 |
Completion of work |
-
latitude : 19.4363235
Longitude : 84.5824535
file name : Image_06022023151832452.png
|
2023-02-06 15:18:32.555755 |
45 |
59794859 |
IMP OF SHYAMA SUNDRA HIGH SCHOOL DENGADI |
200000 |
IMP OF SHYAMA SUNDRA HIGH SCHOOL DENGADI1 |
Completion of work |
-
latitude : 19.4644587
Longitude : 84.6378312
file name : Image_23022023112713308.png
|
2023-02-23 11:27:13.439482 |
46 |
59788192 |
CONST OF HYGENIC TOILET AT SHYAMASUNDARA HIGH SCHOOL UNDER (HT) |
533985 |
CONST OF HYGENIC TOILET AT SHYAMASUNDARA HIGH SCHOOL UNDER (HT)1 |
Completion of work |
-
latitude : 19.4644587
Longitude : 84.6378312
file name : Image_23022023112556205.png
|
2023-02-23 11:25:56.360554 |
47 |
48256292 |
IMP OF SMART CLASS ROOM AT SHYAMSUNDAR HIGH SCHOOL |
700000 |
IMP OF SMART CLASS ROOM AT SHYAMSUNDAR HIGH SCHOOL1 |
Completion of work |
-
latitude : 19.46419757
Longitude : 84.63720883
file name : Image_23022023112853118.png
|
2023-02-23 11:28:53.250776 |
48 |
55190986 |
CONST OF MCC AND PURCHASE DUSTBIN FOR GP 2 |
153376 |
CONST OF MCC AND PURCHASE DUSTBIN FOR GP 21 |
Completion of work |
-
latitude : 19.4363467
Longitude : 84.582452
file name : Image_23022023122143581.png
|
2023-02-23 12:21:43.712117 |
49 |
59789139 |
IMP. OF S.S HIGH SCHOOL AT DENGADI |
650000 |
IMP. OF S.S HIGH SCHOOL AT DENGADI1 |
Completion of work |
-
latitude : 19.436323
Longitude : 84.582431
file name : Image_01032023144857947.png
|
2023-03-01 14:48:58.019209 |
50 |
48246011 |
INSTALLATION OF STREET LIGHT AT PATHARAPUNJI |
300000 |
INSTALLATION OF STREET LIGHT AT PATHARAPUNJI1 |
Completion of work |
-
latitude : 19.42923935
Longitude : 84.67358714
file name : Image_04082023101623849.png
|
2023-08-04 10:16:23.94032 |
51 |
68863448 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 19.46463888
Longitude : 84.6348573
file name : Image_18042024090950190.png
|
2024-04-18 09:09:50.257274 |
52 |
68863448 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 19.4646625
Longitude : 84.6603038
file name : Image_18042024084104900.png
|
2024-04-18 08:41:04.962881 |
53 |
68863448 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 19.4646637
Longitude : 84.6603054
file name : Image_18042024082758521.png
|
2024-04-18 08:27:58.581345 |
54 |
68906058 |
Appropriate flooring in classrooms and toilets |
160000 |
Appropriate flooring in classrooms and toilets1 |
Roof laid |
-
latitude : 19.45530481
Longitude : 84.62304579
file name : Image_18042024093145968.png
|
2024-04-18 09:31:46.026619 |
55 |
68906058 |
Appropriate flooring in classrooms and toilets |
160000 |
Appropriate flooring in classrooms and toilets1 |
Plinth level |
-
latitude : 19.4553122
Longitude : 84.62304606
file name : Image_18042024092936648.png
|
2024-04-18 09:29:36.706843 |
56 |
68906058 |
Appropriate flooring in classrooms and toilets |
160000 |
Appropriate flooring in classrooms and toilets1 |
Completion of work |
-
latitude : 19.45531536
Longitude : 84.62306068
file name : Image_18042024091950504.png
|
2024-04-18 09:19:50.560416 |
57 |
59790110 |
INCOMPLETE OF COMPLETE CC ROAD AT PWD ROAD TO LENKAKHALI |
200000 |
INCOMPLETE OF COMPLETE CC ROAD AT PWD ROAD TO LENKAKHALI1 |
Completion of work |
-
latitude : 19.46509118,19.4650925
Longitude : 84.6519262,84.65192896
file name : Image_18042024090315263.png
|
2024-04-18 09:03:15.317361 |
58 |
68866076 |
Creation of drainage channel for management of grey water |
451294 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.46514045
Longitude : 84.65193963
file name : Image_18042024090214307.png
|
2024-04-18 09:02:14.369913 |
59 |
68866076 |
Creation of drainage channel for management of grey water |
451294 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.46517123
Longitude : 84.65193019
file name : Image_18042024085937527.png
|
2024-04-18 08:59:37.595052 |
60 |
68866076 |
Creation of drainage channel for management of grey water |
451294 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.46495506
Longitude : 84.65194562
file name : Image_18042024085614327.png
|
2024-04-18 08:56:14.389601 |
61 |
59796233 |
IMP OF MISSION SHAKTI GRUHA AT DENGADI |
200000 |
IMP OF MISSION SHAKTI GRUHA AT DENGADI1 |
Completion of work |
-
latitude : 19.46305065
Longitude : 84.63465764
file name : Image_18042024084748211.png
|
2024-04-18 08:47:48.267704 |
62 |
80422042 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 19.4363467
Longitude : 84.5824135
file name : Image_14122023140714979.png
|
2023-12-14 14:07:15.080753 |
63 |
80422042 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 19.4363467
Longitude : 84.5824135
file name : Image_14122023140507414.png
|
2023-12-14 14:05:07.494138 |
64 |
80422042 |
Construction of new Piped Water Supply schemes |
72000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 19.4363464
Longitude : 84.5824133
file name : Image_14122023140227714.png
|
2023-12-14 14:02:27.793096 |
65 |
68865517 |
Connecting septic tanks with soak pits |
133985 |
Connecting septic tanks with soak pits1 |
Roof laid |
-
latitude : 19.45109659
Longitude : 84.60812554
file name : Image_18062024104502753.png
|
2024-06-18 10:45:02.836721 |
66 |
68865517 |
Connecting septic tanks with soak pits |
133985 |
Connecting septic tanks with soak pits1 |
Plinth level |
-
latitude : 19.45109659
Longitude : 84.60812554
file name : Image_18062024103853299.png
|
2024-06-18 10:38:53.388115 |
67 |
68865517 |
Connecting septic tanks with soak pits |
133985 |
Connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 19.45109659
Longitude : 84.60812554
file name : Image_18062024103715701.png
|
2024-06-18 10:37:15.777987 |
68 |
99667331 |
Procurement of LED lights for Playground/ AWC/ Schools |
170000 |
Procurement of LED lights for Playground/ AWC/ Schools1 |
Roof laid |
-
latitude : 19.436325
Longitude : 84.5824533
file name : Image_30092024181900011.png
|
2024-09-30 18:19:00.10295 |
69 |
99667331 |
Procurement of LED lights for Playground/ AWC/ Schools |
170000 |
Procurement of LED lights for Playground/ AWC/ Schools1 |
Plinth level |
-
latitude : 19.43628763
Longitude : 84.58242704
file name : Image_30092024181731119.png
|
2024-09-30 18:17:31.216236 |
70 |
99667331 |
Procurement of LED lights for Playground/ AWC/ Schools |
170000 |
Procurement of LED lights for Playground/ AWC/ Schools1 |
Completion of work |
-
latitude : 19.43628763
Longitude : 84.58242704
file name : Image_30092024181555470.png
|
2024-09-30 18:15:55.574528 |
71 |
80421515 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 19.4363251
Longitude : 84.5824518
file name : Image_30092024190540472.png
|
2024-09-30 19:05:40.555321 |
72 |
80421515 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 19.4363274
Longitude : 84.5824135
file name : Image_07112023174453845.png
|
2023-11-07 17:44:53.944723 |
73 |
80421515 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 19.436343
Longitude : 84.5824125
file name : Image_07112023174236142.png
|
2023-11-07 17:42:36.262925 |
74 |
80421515 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 19.4363429
Longitude : 84.5824111
file name : Image_07112023174054874.png
|
2023-11-07 17:40:55.003259 |
75 |
99662228 |
Drainage Construction |
182118 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.4363237
Longitude : 84.5824499
file name : Image_07102024185454616.png
|
2024-10-07 18:54:54.689085 |
76 |
99662228 |
Drainage Construction |
182118 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.4363241
Longitude : 84.5824497
file name : Image_07102024183454849.png
|
2024-10-07 18:34:54.941284 |
77 |
99666976 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
100000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 19.4363249
Longitude : 84.5824503
file name : Image_07102024185619280.png
|
2024-10-07 18:56:19.354643 |
78 |
99666976 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
100000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 19.4363221
Longitude : 84.5824406
file name : Image_07102024183604511.png
|
2024-10-07 18:36:04.609451 |
79 |
99668114 |
Construction of Retaining Walls/ Fencing Work |
144780 |
Construction of Retaining Walls/ Fencing Work1 |
Plinth level |
-
latitude : 19.4363219
Longitude : 84.5824403
file name : Image_07102024190445360.png
|
2024-10-07 19:04:45.447631 |
80 |
99668114 |
Construction of Retaining Walls/ Fencing Work |
144780 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 19.4363251
Longitude : 84.5824514
file name : Image_07102024184151143.png
|
2024-10-07 18:41:51.234057 |
81 |
99668114 |
Construction of Retaining Walls/ Fencing Work |
144780 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 19.4363228
Longitude : 84.5824387
file name : Image_07102024183335690.png
|
2024-10-07 18:33:35.772207 |
82 |
68906629 |
Construction of Building |
160000 |
Construction of Building1 |
Roof laid |
-
latitude : 19.43048541
Longitude : 84.67180934
file name : Image_28082024155842683.png
|
2024-08-28 15:58:43.589791 |
83 |
68906629 |
Construction of Building |
160000 |
Construction of Building1 |
Plinth level |
-
latitude : 19.43048541
Longitude : 84.67180934
file name : Image_28082024130027559.png
|
2024-08-28 13:00:27.709721 |
84 |
68906629 |
Construction of Building |
160000 |
Construction of Building1 |
Completion of work |
-
latitude : 19.45605386
Longitude : 84.62263557
file name : Image_27082024165005653.png
|
2024-08-27 16:50:06.389546 |
85 |
55191106 |
CONST OF BATHING STEPS AT PATHARAPUNJI |
120000 |
CONST OF BATHING STEPS AT PATHARAPUNJI1 |
Completion of work |
-
latitude : 19.45621283
Longitude : 84.62304247
file name : Image_27082024164843907.png
|
2024-08-27 16:48:44.63925 |