1 |
44287763 |
MAINTANANCE OF AWC 2 |
100000 |
MAINTANANCE OF AWC 21 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120454988.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120454988.png)
latitude : 20.334427608177066
Longitude : 86.12371251918375
file name : Image_16022022120454988.png
|
2022-02-16 12:04:55.083647 |
2 |
44287763 |
MAINTANANCE OF AWC 2 |
100000 |
MAINTANANCE OF AWC 21 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120936311.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120936311.png)
latitude : 20.334437540732324
Longitude : 86.12369542010128
file name : Image_16022022120936311.png
|
2022-02-16 12:09:36.422774 |
3 |
44287466 |
CONS,OF BOUNDARY WALL AT AWC NO 2 OD SANKARPUR |
100000 |
CONS,OF BOUNDARY WALL AT AWC NO 2 OD SANKARPUR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120450218.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022120450218.png)
latitude : 20.334476474672556
Longitude : 86.12361922860146
file name : Image_16022022120450218.png
|
2022-02-16 12:04:50.346514 |
4 |
44287466 |
CONS,OF BOUNDARY WALL AT AWC NO 2 OD SANKARPUR |
100000 |
CONS,OF BOUNDARY WALL AT AWC NO 2 OD SANKARPUR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022121610838.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022121610838.png)
latitude : 20.334554677829146
Longitude : 86.12365761771798
file name : Image_16022022121610838.png
|
2022-02-16 12:16:10.966438 |
5 |
44287418 |
REPARING OR ROAD FROM R& B ROAD TO SWAIN SAHI |
150000 |
REPARING OR ROAD FROM R& B ROAD TO SWAIN SAHI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022130045672.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_16022022130045672.png)
latitude : 20.33577914815396
Longitude : 86.13233506679535
file name : Image_16022022130045672.png
|
2022-02-16 13:00:45.779156 |
6 |
47825006 |
CONS OF BOUNDARY WALL WITH GATE AT AWC-2 |
200000 |
CONS OF BOUNDARY WALL WITH GATE AT AWC-21 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_16022022121404545.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_16022022121404545.png)
latitude : 20.33457022625953
Longitude : 86.12355158664286
file name : Image_16022022121404545.png
|
2022-02-16 12:14:04.651788 |
7 |
53501413 |
CONST OF GUARD WALL NEAR HARPARBATI MANDIR |
150000 |
CONST OF GUARD WALL NEAR HARPARBATI MANDIR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_11082021145154130.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_11082021145154130.png)
latitude : 20.33528784
Longitude : 86.13069447
file name : Image_11082021145154130.png
|
2021-08-11 14:51:54.240134 |
8 |
44287725 |
MAINTANANCE OFSADAIKANA GOVT PRY SCHOOL |
100000 |
MAINTANANCE OFSADAIKANA GOVT PRY SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022141247553.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022141247553.png)
latitude : 20.33560757059604
Longitude : 86.13242978230119
file name : Image_09032022141247553.png
|
2022-03-09 14:12:47.647303 |
9 |
44325209 |
REPARING OF CC ROAD FROM R &B ROAD TO GADI GOSAIN PITHA |
150000 |
REPARING OF CC ROAD FROM R &B ROAD TO GADI GOSAIN PITHA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022141244252.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022141244252.png)
latitude : 20.333669800311327
Longitude : 86.12622407265007
file name : Image_09032022141244252.png
|
2022-03-09 14:12:44.328677 |
10 |
44287495 |
REPARING OF CC ROAD FROM R&B ROAD TO SARAT SWAIN HOUSE |
50000 |
REPARING OF CC ROAD FROM R&B ROAD TO SARAT SWAIN HOUSE1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022142326321.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_09032022142326321.png)
latitude : 20.334102641791105,20.334091745316982
Longitude : 86.13056690432131,86.13057914189994
file name : Image_09032022142326321.png
|
2022-03-09 14:23:26.414076 |
11 |
47832147 |
REPARING OF CC ROAD WITH WALL FROM SADAIKANA KOKIPADIA BHOI SAHI TO SANDHAMATHA |
400000 |
REPARING OF CC ROAD WITH WALL FROM SADAIKANA KOKIPADIA BHOI SAHI TO SANDHAMATHA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09032022141652144.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09032022141652144.png)
latitude : 20.330592594109476
Longitude : 86.1344632320106
file name : Image_09032022141652144.png
|
2022-03-09 14:16:52.220046 |
12 |
47827232 |
CONS OF GUARD WALL NEAR SIBA MANDIR OF SIBAPUR |
100000 |
CONS OF GUARD WALL NEAR SIBA MANDIR OF SIBAPUR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09052022125516210.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09052022125516210.png)
latitude : 20.33536566887051
Longitude : 86.1307487078011
file name : Image_09052022125516210.png
|
2022-05-09 12:55:16.332176 |
13 |
47827496 |
CONS OF NEW STEP HARAPARBATI MANDIR |
100000 |
CONS OF NEW STEP HARAPARBATI MANDIR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09052022125704717.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_09052022125704717.png)
latitude : 20.33535129390657
Longitude : 86.1307111568749
file name : Image_09052022125704717.png
|
2022-05-09 12:57:04.853649 |
14 |
53500642 |
PIPE WATER SUPPLY TO SANKARPUR AWC 2 |
90000 |
PIPE WATER SUPPLY TO SANKARPUR AWC 21 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_23042022091952843.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_23042022091952843.png)
latitude : 20.33448393456638
Longitude : 86.12364429049194
file name : Image_23042022091952843.png
|
2022-04-23 09:19:52.945516 |
15 |
53500680 |
PIPE WATER SUPPLY TO SANKARPUR AWC 1 |
20000 |
PIPE WATER SUPPLY TO SANKARPUR AWC 11 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_23042022085920479.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_23042022085920479.png)
latitude : 20.333540635183454
Longitude : 86.12737440504134
file name : Image_23042022085920479.png
|
2022-04-23 08:59:20.64091 |
16 |
47831555 |
CONS OF CULVERT NEAR OVER CANEL NO 6 FROM GADAMA TO BIRADI CUTTACK NEAR RABINDRA SETHY LAND |
150000 |
CONS OF CULVERT NEAR OVER CANEL NO 6 FROM GADAMA TO BIRADI CUTTACK NEAR RABINDRA SETHY LAND1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_23042022075748166.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_23042022075748166.png)
latitude : 20.346372281201184
Longitude : 86.12930132076144
file name : Image_23042022075748166.png
|
2022-04-23 07:57:48.278884 |
17 |
47826939 |
REPARING OF CC ROAD NEAR GULUGULI BADAPHOKARI |
100000 |
REPARING OF CC ROAD NEAR GULUGULI BADAPHOKARI1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_23042022075145461.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_23042022075145461.png)
latitude : 20.34819345921278
Longitude : 86.13564524799585
file name : Image_23042022075145461.png
|
2022-04-23 07:51:45.578525 |
18 |
44287689 |
CONS. OF DRAIN OF VILLAGE SIBAPUR NEAR SUDARSAN JENA HOUSE TO ONWARDS |
100000 |
CONS. OF DRAIN OF VILLAGE SIBAPUR NEAR SUDARSAN JENA HOUSE TO ONWARDS1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_25042022114035961.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_25042022114035961.png)
latitude : 20.34902540501207
Longitude : 86.13383727148175
file name : Image_25042022114035961.png
|
2022-04-25 11:40:36.127837 |
19 |
47952079 |
SINKING OF NEW TUBE WELL OF SADAIKANA,SANKARPUR AND SIAPUR |
137886 |
SINKING OF NEW TUBE WELL OF SADAIKANA,SANKARPUR AND SIAPUR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_27052022082353910.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_27052022082353910.png)
latitude : 20.333859021775424
Longitude : 86.13030136562884
file name : Image_27052022082353910.png
|
2022-05-27 08:23:54.001281 |
20 |
44287672 |
CONS.OF DRAIN OF VILLAGE SIBAPUR NEAR MANGALA MANDIR |
150000 |
CONS.OF DRAIN OF VILLAGE SIBAPUR NEAR MANGALA MANDIR1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_24092022093539137.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_24092022093539137.png)
latitude : 20.336962211877108,20.3368770936504
Longitude : 86.13006105646491,86.13008259795606
file name : Image_24092022093539137.png
|
2022-09-24 09:35:39.236948 |
21 |
47828403 |
OPENING OF JALACHATRA |
30000 |
OPENING OF JALACHATRA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_30092022151434094.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_30092022151434094.png)
latitude : 20.3336377
Longitude : 86.1297123
file name : Image_30092022151434094.png
|
2022-09-30 15:14:34.202177 |
22 |
44287734 |
MAINTANANCE OF SIBAPUR PRY SCHOOL |
200000 |
MAINTANANCE OF SIBAPUR PRY SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_30092022152823387.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2020/Image_30092022152823387.png)
latitude : 20.33779809717089
Longitude : 86.1257582064718
file name : Image_30092022152823387.png
|
2022-09-30 15:28:23.496216 |
23 |
66060110 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_11012023144406213.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_11012023144406213.png)
latitude : 20.333650438115
Longitude : 86.12630177289248
file name : Image_11012023144406213.png
|
2023-01-11 14:44:06.339963 |
24 |
66060409 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
60000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_03022023131935656.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_03022023131935656.png)
latitude : 20.333181638270617
Longitude : 86.12758143804967
file name : Image_03022023131935656.png
|
2023-02-03 13:19:35.732827 |
25 |
47832397 |
REPARING OF CC ROAD FROM SANKAR BARIK HOUSE TO HADAPADIA |
120000 |
REPARING OF CC ROAD FROM SANKAR BARIK HOUSE TO HADAPADIA1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023194940834.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023194940834.png)
latitude : 20.333868619054556
Longitude : 86.13023816607893
file name : Image_11062023194940834.png
|
2023-06-11 19:49:40.886102 |
26 |
47836084 |
Maintenance/cons a new lartin near rajib gandhi sevakendra |
160000 |
Maintenance/cons a new lartin near rajib gandhi sevakendra1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195925772.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195925772.png)
latitude : 20.333830607123673
Longitude : 86.1302222404629
file name : Image_11062023195925772.png
|
2023-06-11 19:59:25.832322 |
27 |
47835620 |
Const of cycle stand near uper pry school campus of sibapur |
120000 |
Const of cycle stand near uper pry school campus of sibapur1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_24042023103341092.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_24042023103341092.png)
latitude : 20.337913096882403
Longitude : 86.12553290091455
file name : Image_24042023103341092.png
|
2023-04-24 10:33:41.180009 |
28 |
47826087 |
CONS/MAINTANANCE OF GATE OF SANKARPUR PRY SCHOOL |
100000 |
CONS/MAINTANANCE OF GATE OF SANKARPUR PRY SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195533914.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195533914.png)
latitude : 20.3338629193604
Longitude : 86.13031326793134
file name : Image_11062023195533914.png
|
2023-06-11 19:55:33.971618 |
29 |
47826087 |
CONS/MAINTANANCE OF GATE OF SANKARPUR PRY SCHOOL |
100000 |
CONS/MAINTANANCE OF GATE OF SANKARPUR PRY SCHOOL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195521789.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_11062023195521789.png)
latitude : 20.333811873570085
Longitude : 86.13025518134236
file name : Image_11062023195521789.png
|
2023-06-11 19:55:21.840721 |
30 |
65907539 |
Creation of a new source of drinking water |
30000 |
Creation of a new source of drinking water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024080827600.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024080827600.png)
latitude : 20.24695078
Longitude : 86.16685488
file name : Image_25022024080827600.png
|
2024-02-25 08:08:27.69216 |
31 |
65916552 |
NET PACK |
6000 |
NET PACK1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_17112023162234334.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_17112023162234334.png)
latitude : 20.3357036
Longitude : 86.0733527
file name : Image_17112023162234334.png
|
2023-11-17 16:22:34.450897 |
32 |
65916616 |
CONTIGENCY |
26990 |
CONTIGENCY1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_17112023170237130.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_17112023170237130.png)
latitude : 20.3357026
Longitude : 86.0733572
file name : Image_17112023170237130.png
|
2023-11-17 17:02:37.208006 |
33 |
65907374 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_20022024131855259.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_20022024131855259.png)
latitude : 20.3353229
Longitude : 86.0540492
file name : Image_20022024131855259.png
|
2024-02-20 13:18:55.375498 |
34 |
65916485 |
CONS OF CC ROAD AND SIDEWALL SADAIKANA DRAIN BRIDZE TO GRAMYA FOREST |
190000 |
CONS OF CC ROAD AND SIDEWALL SADAIKANA DRAIN BRIDZE TO GRAMYA FOREST1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024080623539.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024080623539.png)
latitude : 20.24689009
Longitude : 86.16685602
file name : Image_25022024080623539.png
|
2024-02-25 08:06:23.637419 |
35 |
65916443 |
CONS OF CC ROAD FROM ELECTRIC OFFICE TO AWC-2 |
50000 |
CONS OF CC ROAD FROM ELECTRIC OFFICE TO AWC-21 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024081810801.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2022/Image_25022024081810801.png)
latitude : 20.2461771
Longitude : 86.1667511
file name : Image_25022024081810801.png
|
2024-02-25 08:18:10.898485 |
36 |
77322485 |
Electricity/Solar Power Installation |
172495 |
Electricity/Solar Power Installation1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2023/Image_28032024155253348.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2023/Image_28032024155253348.png)
latitude : 20.33524714
Longitude : 86.05407911
file name : Image_28032024155253348.png
|
2024-03-28 15:52:53.472177 |
37 |
47831812 |
CONS OF CULVERT NEAR RABINDRA JENA HOUSE OVER CANEL |
110000 |
CONS OF CULVERT NEAR RABINDRA JENA HOUSE OVER CANEL1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_13062024111639674.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/21/2021/Image_13062024111639674.png)
latitude : 20.24681481
Longitude : 86.16676179
file name : Image_13062024111639674.png
|
2024-06-13 11:16:39.790187 |