1 |
48550899 |
COSTN., OF C.C. ROAD FROM NAARPADA TELIGADIA TO JORASEPARI NARAYAN DAS HOUSE |
100000 |
COSTN., OF C.C. ROAD FROM NAARPADA TELIGADIA TO JORASEPARI NARAYAN DAS HOUSE1 |
Completion of work |
-
latitude : 20.35909496,20.35909496
Longitude : 86.15260076,86.15260076
file name : Image_17082023103909042.png
|
2023-08-17 10:39:09.103572 |
2 |
48550899 |
COSTN., OF C.C. ROAD FROM NAARPADA TELIGADIA TO JORASEPARI NARAYAN DAS HOUSE |
100000 |
COSTN., OF C.C. ROAD FROM NAARPADA TELIGADIA TO JORASEPARI NARAYAN DAS HOUSE1 |
Completion of work |
-
latitude : 20.31684979,20.31682706
Longitude : 86.2772273,86.27718575
file name : Image_15082023113249783.png
|
2023-08-15 11:32:49.85517 |
3 |
61701851 |
CONST OF CULVERT FROM ON THE WAY OF NIRANJAN MOHARANA HOUSE TO MALLICK SAHI |
100000 |
CONST OF CULVERT FROM ON THE WAY OF NIRANJAN MOHARANA HOUSE TO MALLICK SAHI1 |
Completion of work |
-
latitude : 20.32514293,20.32496037
Longitude : 86.26981718,86.26985893
file name : Image_15082023112538509.png
|
2023-08-15 11:25:38.571811 |
4 |
44999912 |
CONST OF CC ROAD FROM RD ROAD TO GOREKHANTH NODAL HIGH SCHOOL CAMPUS |
221772 |
CONST OF CC ROAD FROM RD ROAD TO GOREKHANTH NODAL HIGH SCHOOL CAMPUS1 |
Completion of work |
-
latitude : 20.32042857,20.32043897,20.32043068
Longitude : 86.27808946,86.27808576,86.27808759
file name : Image_30112021110343897.png
|
2021-11-30 11:03:43.994648 |
5 |
44999920 |
CONST OF CC ROAD FROM DONDO MAHADEV TEMPLE TO PRAFULLA OJHA HOUSE |
200000 |
CONST OF CC ROAD FROM DONDO MAHADEV TEMPLE TO PRAFULLA OJHA HOUSE1 |
Completion of work |
-
latitude : 20.32231672,20.32231306,20.32231015
Longitude : 86.27344182,86.27343572,86.27342697
file name : Image_25012022091614232.png
|
2022-01-25 09:16:14.296658 |
6 |
48551148 |
CONSTRUCTION OF BOUNDARY WALL OF GP OFFICE BIDYDHAR PUR |
200000 |
CONSTRUCTION OF BOUNDARY WALL OF GP OFFICE BIDYDHAR PUR1 |
Completion of work |
-
latitude : 20.32112852
Longitude : 86.27687888
file name : Image_26042022120838142.png
|
2022-04-26 12:08:38.236649 |
7 |
44999923 |
CONST OF CC ROAD FROM DONDO SETHY SAHI TO MALLICK SAHI WITH SIDE WALL |
100000 |
CONST OF CC ROAD FROM DONDO SETHY SAHI TO MALLICK SAHI WITH SIDE WALL1 |
Completion of work |
-
latitude : 20.32349316,20.32348695,20.32355203,20.32353793
Longitude : 86.27032302,86.27033101,86.27032705,86.27033919
file name : Image_26052022114218862.png
|
2022-05-26 11:42:18.956871 |
8 |
44999923 |
CONST OF CC ROAD FROM DONDO SETHY SAHI TO MALLICK SAHI WITH SIDE WALL |
100000 |
CONST OF CC ROAD FROM DONDO SETHY SAHI TO MALLICK SAHI WITH SIDE WALL1 |
Completion of work |
-
latitude : 20.32346206,20.32346745
Longitude : 86.27080046,86.27078819
file name : Image_26052022114222678.png
|
2022-05-26 11:42:22.760647 |
9 |
61701605 |
CONST OF CC ROAD WITH SIDE WALL FROM SETHI SAHI TO MALLICK SAHI |
200000 |
CONST OF CC ROAD WITH SIDE WALL FROM SETHI SAHI TO MALLICK SAHI1 |
Completion of work |
-
latitude : 20.32345867
Longitude : 86.27041731
file name : Image_30062022111022304.png
|
2022-06-30 11:10:22.36473 |
10 |
61701892 |
CONST OF CC ROAD FROM DONDO BANABIHARI TO SETHI SAHI |
130000 |
CONST OF CC ROAD FROM DONDO BANABIHARI TO SETHI SAHI1 |
Completion of work |
-
latitude : 20.3241441,20.32415336
Longitude : 86.26997774,86.27006159
file name : Image_30062022111556004.png
|
2022-06-30 11:15:56.070484 |
11 |
48570518 |
REPAIRING OF CC ROAD FROM SATYA BRAT SETHY HOUSE TO PRANAKRUSHNA NAYAK HOUSE |
100000 |
REPAIRING OF CC ROAD FROM SATYA BRAT SETHY HOUSE TO PRANAKRUSHNA NAYAK HOUSE1 |
Completion of work |
-
latitude : 20.32307243,20.32305685
Longitude : 86.27810894,86.27812897
file name : Image_19072022172427363.png
|
2022-07-19 17:24:27.45979 |
12 |
48570884 |
CONST OF CC ROAD FROM KHIRA DAS HOUSE TO NAGENDRA JENA HOUSE |
100000 |
CONST OF CC ROAD FROM KHIRA DAS HOUSE TO NAGENDRA JENA HOUSE1 |
Completion of work |
-
latitude : 20.31758733,20.31761012
Longitude : 86.26713636,86.26711325
file name : Image_19072022160314015.png
|
2022-07-19 16:03:14.098562 |
13 |
61699771 |
SEM AND PUMP DRIVER REMUNERATION |
120000 |
SEM AND PUMP DRIVER REMUNERATION2 |
Completion of work |
-
latitude : 20.32206422
Longitude : 86.27371131
file name : Image_22112022120830694.png
|
2022-11-22 12:08:31.138383 |
14 |
106511453 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 20.3172253
Longitude : 86.2590029
file name : Image_30082024132915811.png
|
2024-08-30 13:29:16.268379 |
15 |
106511453 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 20.317227
Longitude : 86.259009
file name : Image_30082024132653801.png
|
2024-08-30 13:26:54.233828 |
16 |
106511453 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 20.3172285
Longitude : 86.2590019
file name : Image_30082024132501175.png
|
2024-08-30 13:25:01.586049 |
17 |
66546778 |
Const. of New Mission shkati Building |
100000 |
Const. of New Mission shkati Building1 |
Completion of work |
-
latitude : 20.3172281
Longitude : 86.259005
file name : Image_30082024115958180.png
|
2024-08-30 11:59:58.945809 |
18 |
81566851 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.3172259,20.317298333333333
Longitude : 86.2590209,86.25896333333334
file name : Image_30082024112458094.png
|
2024-08-30 11:24:58.495825 |
19 |
81566851 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.3172271,20.3172271
Longitude : 86.2590199,86.2590199
file name : Image_30082024112146941.png
|
2024-08-30 11:21:47.301573 |
20 |
81566851 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.3172214,20.3172214
Longitude : 86.2590531,86.2590531
file name : Image_30082024111642077.png
|
2024-08-30 11:16:42.375667 |
21 |
66546628 |
Creation of Shed for segregation and processing of wet and dry waste |
35760 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.3172268
Longitude : 86.2590126
file name : Image_30082024113747952.png
|
2024-08-30 11:37:48.522024 |
22 |
44999669 |
ELECTRIC BILL FOR PUMP HOUSE |
157772 |
ELECTRIC BILL FOR PUMP HOUSE1 |
Completion of work |
-
latitude : 20.3589046
Longitude : 86.1600655
file name : Image_23032023153859516.png
|
2023-03-23 15:38:59.57565 |
23 |
61701058 |
MOBILE, GPDP, PRIASOFT |
12000 |
MOBILE, GPDP, PRIASOFT1 |
Completion of work |
-
latitude : 20.3588836
Longitude : 86.1600649
file name : Image_04052023155110866.png
|
2023-05-04 15:51:11.000872 |
24 |
66546615 |
Services of Collection & Transportation of waste from household to treatment site |
64240 |
Services of Collection & Transportation of waste from household to treatment site 1 |
Completion of work |
-
latitude : 20.3588802
Longitude : 86.1600643
file name : Image_04052023155239872.png
|
2023-05-04 15:52:39.972969 |
25 |
61701020 |
SUMMER SEASON MOBILE VAN REGARDING TUBE WELL AND PIPE LINE REPAI |
5000 |
SUMMER SEASON MOBILE VAN REGARDING TUBE WELL AND PIPE LINE REPAI1 |
Completion of work |
-
latitude : 20.32091287
Longitude : 86.27690485
file name : Image_08052023102929148.png
|
2023-05-08 10:29:29.206146 |
26 |
61703153 |
CONST OF CC ROAD FROM DINABANDHU SAMANTARAY HOUSE TO RD ROAD |
100000 |
CONST OF CC ROAD FROM DINABANDHU SAMANTARAY HOUSE TO RD ROAD1 |
Completion of work |
-
latitude : 20.358882,20.3588832
Longitude : 86.1600657,86.1600651
file name : Image_06052023172146088.png
|
2023-05-06 17:21:46.17772 |
27 |
48580304 |
CONST OF CC ROAD FROM DONDO SETHI SAHI TO MALLICK SAHI |
100000 |
CONST OF CC ROAD FROM DONDO SETHI SAHI TO MALLICK SAHI1 |
Completion of work |
-
latitude : 20.32439084,20.32437196
Longitude : 86.26992521,86.26993786
file name : Image_08052023103032904.png
|
2023-05-08 10:30:32.980188 |
28 |
66548792 |
Expenditure on Office contingency |
21772 |
Expenditure on Office contingency1 |
Completion of work |
-
latitude : 20.3588837
Longitude : 86.1600649
file name : Image_26052023164050049.png
|
2023-05-26 16:40:50.140324 |
29 |
48576988 |
PUMP HOUSE REPAIRING |
40000 |
PUMP HOUSE REPAIRING1 |
Completion of work |
-
latitude : 20.358881
Longitude : 86.160063
file name : Image_26052023155227395.png
|
2023-05-26 15:52:27.461462 |
30 |
45000111 |
CONST OF CC ROAD FROM BIJAYA KHUNTIA HOUSE TO RANJAN KHUNTIA HOUSE |
100000 |
CONST OF CC ROAD FROM BIJAYA KHUNTIA HOUSE TO RANJAN KHUNTIA HOUSE1 |
Completion of work |
-
latitude : 20.35862286,20.35862286
Longitude : 86.14566089,86.14566089
file name : Image_17082023210656552.png
|
2023-08-17 21:06:56.668518 |
31 |
66548777 |
Const. of New Mission Shakti Building |
200000 |
Const. of New Mission Shakti Building1 |
Completion of work |
-
latitude : 20.32097368
Longitude : 86.27699198
file name : Image_12092023125540586.png
|
2023-09-12 12:55:40.669745 |
32 |
61701203 |
PIPE LINE WATER SUPPLY & MAINTENANCE |
169744 |
PIPE LINE WATER SUPPLY & MAINTENANCE1 |
Completion of work |
-
latitude : 20.3172113
Longitude : 86.2591341
file name : Image_29032024115657185.png
|
2024-03-29 11:56:57.298376 |
33 |
66546687 |
Const. of Tank Protection wall from Bidyadharpur Chauka pokhari and Sand filling |
100000 |
Const. of Tank Protection wall from Bidyadharpur Chauka pokhari and Sand filling1 |
Completion of work |
-
latitude : 20.3171992,20.3172008
Longitude : 86.259121,86.2591204
file name : Image_22092023123300020.png
|
2023-09-22 12:33:00.084424 |
34 |
81566540 |
Repairing/Construction of Building |
143230 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 20.358648333333335
Longitude : 86.15084166666665
file name : Image_16012024204053348.png
|
2024-01-16 20:40:53.433194 |
35 |
81566540 |
Repairing/Construction of Building |
143230 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 20.358641666666664
Longitude : 86.15087333333334
file name : Image_16012024203851435.png
|
2024-01-16 20:38:51.538118 |
36 |
81566540 |
Repairing/Construction of Building |
143230 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 20.35863833333333
Longitude : 86.15081666666669
file name : Image_16012024203645105.png
|
2024-01-16 20:36:45.193681 |
37 |
81562096 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.36186857
Longitude : 86.15518927
file name : Image_05122023090730693.png
|
2023-12-05 09:07:30.771679 |
38 |
81562096 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.36186857
Longitude : 86.15518927
file name : Image_05122023090238630.png
|
2023-12-05 09:02:38.706799 |
39 |
81562096 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.3619191
Longitude : 86.15498717
file name : Image_05122023085915953.png
|
2023-12-05 08:59:16.019483 |
40 |
81562096 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.3613626
Longitude : 86.1552973
file name : Image_13112023122623573.png
|
2023-11-13 12:26:23.630255 |
41 |
75516278 |
Construction of roads |
60000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.35870126,20.35870126
Longitude : 86.14566021,86.14566021
file name : Image_05122023202248795.png
|
2023-12-05 20:22:48.867397 |
42 |
75516278 |
Construction of roads |
60000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.35870126,20.35870126
Longitude : 86.14566021,86.14566021
file name : Image_05122023201659278.png
|
2023-12-05 20:16:59.350863 |
43 |
75516278 |
Construction of roads |
60000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.36186857,20.36186857
Longitude : 86.15518927,86.15518927
file name : Image_05122023091341675.png
|
2023-12-05 09:13:41.752312 |
44 |
48573196 |
REMUNERATION TO SEM |
120000 |
REMUNERATION TO SEM1 |
Completion of work |
-
latitude : 20.3586698
Longitude : 86.1509235
file name : Image_12022024205746890.png
|
2024-02-12 20:57:46.988988 |
45 |
81591179 |
Chlorinization of drinking water source |
30000 |
Chlorinization of drinking water source1 |
Roof laid |
-
latitude : 20.3172405
Longitude : 86.2591036
file name : Image_17122023123043339.png
|
2023-12-17 12:30:43.437914 |
46 |
81591179 |
Chlorinization of drinking water source |
30000 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 20.3172022
Longitude : 86.2590981
file name : Image_17122023122834354.png
|
2023-12-17 12:28:34.453415 |
47 |
81591179 |
Chlorinization of drinking water source |
30000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 20.3172227
Longitude : 86.2591009
file name : Image_17122023122640981.png
|
2023-12-17 12:26:41.075566 |
48 |
75516944 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.359673333333333,20.359673333333333
Longitude : 86.15593500000001,86.15593500000001
file name : Image_14122023204347456.png
|
2023-12-14 20:43:47.537152 |
49 |
75516944 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.359673333333333,20.359673333333333
Longitude : 86.15593500000001,86.15593500000001
file name : Image_14122023203747377.png
|
2023-12-14 20:37:47.471099 |
50 |
75516944 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.359673333333333,20.359673333333333
Longitude : 86.15593500000001,86.15593500000001
file name : Image_14122023203418150.png
|
2023-12-14 20:34:18.231573 |
51 |
48579652 |
CONST OF CULVERT NEAR PALLI GADA GANDA |
150000 |
CONST OF CULVERT NEAR PALLI GADA GANDA1 |
Completion of work |
-
latitude : 20.359035,20.359035
Longitude : 86.14574666666667,86.14574666666667
file name : Image_16122023215132681.png
|
2023-12-16 21:51:32.776832 |
52 |
81574080 |
Creation of a new source of drinking water |
71035 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.3172329
Longitude : 86.2590952
file name : Image_17122023125754764.png
|
2023-12-17 12:57:54.85078 |
53 |
81574080 |
Creation of a new source of drinking water |
71035 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.3172393
Longitude : 86.2591071
file name : Image_17122023125629535.png
|
2023-12-17 12:56:29.635399 |
54 |
81574080 |
Creation of a new source of drinking water |
71035 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.3172173
Longitude : 86.2590926
file name : Image_17122023125444490.png
|
2023-12-17 12:54:44.585801 |
55 |
45349599 |
SUPPLY OF WATER TO DONDUA AWC BUILDING |
50000 |
SUPPLY OF WATER TO DONDUA AWC BUILDING1 |
Completion of work |
-
latitude : 20.358689,20.3586877
Longitude : 86.1508976,86.1509002
file name : Image_23022024204547439.png
|
2024-02-23 20:45:47.533656 |
56 |
45349670 |
WATER SUPPLY TO BIDYADHARPUR AWC BUILDING |
50000 |
WATER SUPPLY TO BIDYADHARPUR AWC BUILDING1 |
Completion of work |
-
latitude : 20.3586882,20.3586882
Longitude : 86.150899,86.150899
file name : Image_23022024205426742.png
|
2024-02-23 20:54:26.850611 |
57 |
81589969 |
Services of Collection & transportation of waste from household to treatment site |
36985 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 20.3172063
Longitude : 86.2590519
file name : Image_10062024153723905.png
|
2024-06-10 15:37:24.059155 |
58 |
81569086 |
Services of Collection & transportation of waste from household to treatment site |
69255 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 20.3172089
Longitude : 86.259127
file name : Image_10062024154332599.png
|
2024-06-10 15:43:32.7781 |
59 |
81569086 |
Services of Collection & transportation of waste from household to treatment site |
69255 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 20.3172148
Longitude : 86.2591238
file name : Image_10062024154009964.png
|
2024-06-10 15:40:10.130443 |
60 |
81569086 |
Services of Collection & transportation of waste from household to treatment site |
69255 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 20.3172016
Longitude : 86.2590414
file name : Image_10062024153827343.png
|
2024-06-10 15:38:27.547023 |
61 |
81561548 |
Operation and Maintenance of drinking water supply system |
165025 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.317224
Longitude : 86.2591445
file name : Image_29032024115458211.png
|
2024-03-29 11:54:58.32103 |
62 |
81561548 |
Operation and Maintenance of drinking water supply system |
165025 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.3172331
Longitude : 86.2591452
file name : Image_29032024115244277.png
|
2024-03-29 11:52:44.385529 |
63 |
81561548 |
Operation and Maintenance of drinking water supply system |
165025 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.36191323
Longitude : 86.15506299
file name : Image_02112023202130340.png
|
2023-11-02 20:21:30.40669 |
64 |
87919682 |
Improvement of Bidyadharpur GP Office Campus |
290000 |
Improvement of Bidyadharpur GP Office Campus1 |
Completion of work |
-
latitude : 20.3172084
Longitude : 86.2591305
file name : Image_29032024141752672.png
|
2024-03-29 14:17:52.78269 |
65 |
48573377 |
ELECTRIC BILL FOR 2 NOS PUMP HOUSE |
152886 |
ELECTRIC BILL FOR 2 NOS PUMP HOUSE1 |
Completion of work |
-
latitude : 20.3172328
Longitude : 86.2591504
file name : Image_30032024155226469.png
|
2024-03-30 15:52:26.568771 |
66 |
106511785 |
Services of Collection & transportation of waste from household to treatment site |
171500 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 20.3172108
Longitude : 86.2591119
file name : Image_13062024111403694.png
|
2024-06-13 11:14:03.829726 |
67 |
106511785 |
Services of Collection & transportation of waste from household to treatment site |
171500 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 20.3172284
Longitude : 86.2591368
file name : Image_13062024111235883.png
|
2024-06-13 11:12:36.034493 |
68 |
106511785 |
Services of Collection & transportation of waste from household to treatment site |
171500 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 20.3172089
Longitude : 86.259097
file name : Image_13062024110959615.png
|
2024-06-13 11:09:59.770668 |
69 |
106511785 |
Services of Collection & transportation of waste from household to treatment site |
171500 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 20.3171995
Longitude : 86.2590571
file name : Image_13062024110444569.png
|
2024-06-13 11:04:44.742096 |
70 |
104931485 |
BharatNet Wifi Facility/ Internet / Telephone |
63000 |
BharatNet Wifi Facility/ Internet / Telephone1 |
|
-
latitude : 20.317231
Longitude : 86.2590464
file name : Image_06082024170658681.png
|
2024-08-06 17:06:58.781932 |
71 |
104919810 |
Procurement of Computer Printer, UPS, etc. |
100000 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 20.3172213
Longitude : 86.2590649
file name : Image_14082024161137531.png
|
2024-08-14 16:11:37.728118 |
72 |
104881848 |
Operation and Maintenance of drinking/piped water supply system |
30000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 20.3172254
Longitude : 86.259011
file name : Image_30082024130716372.png
|
2024-08-30 13:07:16.542096 |
73 |
104881848 |
Operation and Maintenance of drinking/piped water supply system |
30000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 20.3172263
Longitude : 86.2590217
file name : Image_30082024130534472.png
|
2024-08-30 13:05:34.619613 |
74 |
104881848 |
Operation and Maintenance of drinking/piped water supply system |
30000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 20.3172307
Longitude : 86.2590002
file name : Image_30082024130357185.png
|
2024-08-30 13:03:57.319397 |
75 |
104881848 |
Operation and Maintenance of drinking/piped water supply system |
30000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 20.3172253
Longitude : 86.2590002
file name : Image_30082024125322528.png
|
2024-08-30 12:53:23.325418 |
76 |
75516603 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.3172322,20.3172322
Longitude : 86.2590469,86.2590469
file name : Image_14082024180938975.png
|
2024-08-14 18:09:39.067533 |
77 |
75516603 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.3172297,20.3172297
Longitude : 86.2590504,86.2590504
file name : Image_14082024180543649.png
|
2024-08-14 18:05:43.747952 |
78 |
75516603 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.317219,20.3172339
Longitude : 86.2590676,86.2590391
file name : Image_14082024180123168.png
|
2024-08-14 18:01:23.261337 |