1 |
44217485 |
CONSTRUCTION OF 2NOS OF TOILET AT PATANA PRY SCHOOL |
200000 |
CONSTRUCTION OF 2NOS OF TOILET AT PATANA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.06958937
Longitude : 85.7632011
file name : Image_29072021154909013.png
|
2021-07-29 15:49:09.134922 |
2 |
44217640 |
REPAIR OF PATANA PRIMARY SCHOOL |
200000 |
REPAIR OF PATANA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.06958332
Longitude : 85.76320707
file name : Image_29072021154916332.png
|
2021-07-29 15:49:16.442941 |
3 |
44217848 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO PATANA PRIMARY SCHOOL |
100000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO PATANA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.0695653,21.06942177
Longitude : 85.76319543,85.76307501
file name : Image_29072021154923269.png
|
2021-07-29 15:49:23.384469 |
4 |
47446037 |
WATER SUPPLY THROUGH PIPE LINE TO DEOGAON PRY SCHOOL |
70000 |
WATER SUPPLY THROUGH PIPE LINE TO DEOGAON PRY SCHOOL1 |
Completion of work |
-
latitude : 21.069416999816895,21.06941946
Longitude : 85.76312899589539,85.76312837
file name : Image_29072021154930858.png
|
2021-07-29 15:49:30.968883 |
5 |
47447283 |
WATER SUPPLY THROUGH PIPE LINE WITH OVER HEAD TANK TO YUBASHAKTI NEW PRY SCHOOL |
100000 |
WATER SUPPLY THROUGH PIPE LINE WITH OVER HEAD TANK TO YUBASHAKTI NEW PRY SCHOOL1 |
Completion of work |
-
latitude : 21.06942216,21.06942216
Longitude : 85.76313099,85.76313099
file name : Image_29072021154937268.png
|
2021-07-29 15:49:37.400527 |
6 |
47448305 |
WATER SUPPLY THROUGH PIPE LINE WITH MOTOR AND OVER HEAD TANK TO CHINGUDIPAL AWC |
100000 |
WATER SUPPLY THROUGH PIPE LINE WITH MOTOR AND OVER HEAD TANK TO CHINGUDIPAL AWC1 |
Completion of work |
-
latitude : 21.04882836341858,21.04882836341858
Longitude : 85.75150430202484,85.75150430202484
file name : Image_29072021154944273.png
|
2021-07-29 15:49:44.387586 |
7 |
47446762 |
WATER SUPPLY THROUGH PIPE LINE TO RAGADA PRY SCHOOL |
60000 |
WATER SUPPLY THROUGH PIPE LINE TO RAGADA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.0487961769104,21.04876583
Longitude : 85.75155258178711,85.75149831
file name : Image_29072021154949526.png
|
2021-07-29 15:49:49.635394 |
8 |
47446371 |
WATER SUPPLY THROUGH PIPE LINE TO PATANA PRY SCHOOL |
60000 |
WATER SUPPLY THROUGH PIPE LINE TO PATANA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.04876359,21.0487636
Longitude : 85.75155366,85.75155367
file name : Image_29072021154956411.png
|
2021-07-29 15:49:56.51796 |
9 |
44217443 |
JALA CHHATRA |
100000 |
JALA CHHATRA1 |
Completion of work |
-
latitude : 20.9615162
Longitude : 85.9146294
file name : Image_30072021152509959.png
|
2021-07-30 15:25:10.108071 |
10 |
44217123 |
EXPENDITURE TOWARDS ENTRY OF PLAN PLUS AND PRIASOFT |
6000 |
EXPENDITURE TOWARDS ENTRY OF PLAN PLUS AND PRIASOFT1 |
Completion of work |
-
latitude : 20.9615165,20.9615168,20.9615168
Longitude : 85.9146437,85.9146313,85.9146313
file name : Image_30072021152500516.png
|
2021-07-30 15:25:00.659885 |
11 |
44217188 |
GP OFFICE CONTINGENCY AND OFFICE EXPENDITURE |
66851 |
GP OFFICE CONTINGENCY AND OFFICE EXPENDITURE1 |
Completion of work |
-
latitude : 20.9615164,20.9615164
Longitude : 85.9146287,85.9146257
file name : Image_30072021152505370.png
|
2021-07-30 15:25:05.546071 |
12 |
53657819 |
Pipe water supply to Mission Sakti Gruha |
100000 |
Pipe water supply to Mission Sakti Gruha1 |
Completion of work |
-
latitude : 21.05784603,21.05784515
Longitude : 85.73308934,85.73308862
file name : Image_24122021124117120.png
|
2021-12-24 12:41:17.211123 |
13 |
53657836 |
Pipe water supply to Mission Sakti Gruha 2 |
50000 |
Pipe water supply to Mission Sakti Gruha 21 |
Completion of work |
-
latitude : 21.05783926
Longitude : 85.73308695
file name : Image_24122021124942514.png
|
2021-12-24 12:49:42.624915 |
14 |
48779438 |
Repair and maintenance of water supply system |
180000 |
Repair and maintenance of water supply system1 |
Completion of work |
-
latitude : 20.9616294,20.9616298,20.9616298,20.9616298
Longitude : 85.9146088,85.9146131,85.9146131,85.9146131
file name : Image_24122021170948259.png
|
2021-12-24 17:09:48.333412 |
15 |
44217897 |
REPAIR AND MAINTENANCE OF COMPUTER |
35952 |
REPAIR AND MAINTENANCE OF COMPUTER1 |
Completion of work |
-
latitude : 20.9616298
Longitude : 85.9146131
file name : Image_24122021172238771.png
|
2021-12-24 17:22:38.872147 |
16 |
48772827 |
Repair and Maintenance Of Computer and Office Contingency |
35952 |
Repair and Maintenance Of Computer and Office Contingency1 |
Completion of work |
-
latitude : 20.9616292
Longitude : 85.914612
file name : Image_24122021172848345.png
|
2021-12-24 17:28:48.42461 |
17 |
48772827 |
Repair and Maintenance Of Computer and Office Contingency |
35952 |
Repair and Maintenance Of Computer and Office Contingency1 |
Completion of work |
-
latitude : 20.9616292
Longitude : 85.914612
file name : Image_24122021173155705.png
|
2021-12-24 17:31:55.868139 |
18 |
44217518 |
CONSTRUCTION OF 2NOS OF TOILET AT PODAHADA PRY SCHOOL |
200000 |
CONSTRUCTION OF 2NOS OF TOILET AT PODAHADA PRY SCHOOL1 |
Completion of work |
-
latitude : 21.06985366
Longitude : 85.7247639
file name : Image_24032022171422645.png
|
2022-03-24 17:14:22.710414 |
19 |
44213437 |
CONSTRUCTION OF ADDITIONAL CLASS ROOM AT BENAGADIA PRY. SCHOOL CONVERGENCE WITH MGNREGA |
400000 |
CONSTRUCTION OF ADDITIONAL CLASS ROOM AT BENAGADIA PRY. SCHOOL CONVERGENCE WITH MGNREGA1 |
Completion of work |
-
latitude : 21.04777036
Longitude : 85.73368566
file name : Image_24032022171419528.png
|
2022-03-24 17:14:19.593853 |
20 |
53658034 |
Construction of rest shed at GP office Chingudipal |
84000 |
Construction of rest shed at GP office Chingudipal1 |
Completion of work |
-
latitude : 21.04891519,21.04891541
Longitude : 85.75124627,85.75124083
file name : Image_24032022171425570.png
|
2022-03-24 17:14:25.638997 |
21 |
48772593 |
Repair of GP Office Building |
150000 |
Repair of GP Office Building1 |
Completion of work |
-
latitude : 21.04892289
Longitude : 85.7512215
file name : Image_24032022171428506.png
|
2022-03-24 17:14:28.575112 |
22 |
44217221 |
REPAIR AND MAINTENANCE OF PIPE WATER SUPPLY SYSTEM |
164000 |
REPAIR AND MAINTENANCE OF PIPE WATER SUPPLY SYSTEM1 |
Completion of work |
-
latitude : 20.9615384,20.9615388,20.9615388
Longitude : 85.9145151,85.9145104,85.9145104
file name : Image_27032022130913501.png
|
2022-03-27 13:09:13.586041 |
23 |
48775342 |
Electricity Bill |
50000 |
Electricity Bill1 |
Completion of work |
-
latitude : 20.9615376
Longitude : 85.9145225
file name : Image_28032022181316443.png
|
2022-03-28 18:13:16.497749 |
24 |
44213487 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO BENAGADIA PRY. SCHOOL |
200000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO BENAGADIA PRY. SCHOOL1 |
Completion of work |
-
latitude : 21.04777051,21.04777178,21.04777055
Longitude : 85.73377634,85.73377844,85.73377915
file name : Image_09052022141923622.png
|
2022-05-09 14:19:23.697797 |
25 |
48774854 |
Entry of Plan Plus and Priasoft Expediture |
6000 |
Entry of Plan Plus and Priasoft Expediture1 |
Completion of work |
-
latitude : 20.9617001
Longitude : 85.9145712
file name : Image_12052022122726676.png
|
2022-05-12 12:27:26.758421 |
26 |
48775147 |
SEM Salary |
24000 |
SEM Salary1 |
Completion of work |
-
latitude : 20.9616993
Longitude : 85.91457
file name : Image_12052022122713907.png
|
2022-05-12 12:27:13.986223 |
27 |
48772354 |
Repair of Ragada Primary School |
200000 |
Repair of Ragada Primary School1 |
Completion of work |
-
latitude : 21.05857281
Longitude : 85.73663625
file name : Image_26092022110520183.png
|
2022-09-26 11:05:20.236924 |
28 |
48772186 |
Repair of Sourik High School Class Room and Gate |
300000 |
Repair of Sourik High School Class Room and Gate1 |
Completion of work |
-
latitude : 21.05638809
Longitude : 85.74437495
file name : Image_26092022110524938.png
|
2022-09-26 11:05:24.990987 |
29 |
44216838 |
CONSTRUCTION OF GP BHABAN |
700000 |
CONSTRUCTION OF GP BHABAN1 |
Completion of work |
-
latitude : 21.0491525
Longitude : 85.7519039
file name : Image_26092022110544065.png
|
2022-09-26 11:05:44.1181 |
30 |
62008867 |
PAID TO ELECTRICITY BILL |
200000 |
PAID TO ELECTRICITY BILL1 |
Completion of work |
-
latitude : 20.9616884,20.9616853
Longitude : 85.914461,85.9144669
file name : Image_29092022130747292.png
|
2022-09-29 13:07:47.371738 |
31 |
48775732 |
Water Supply System in Summer Season |
100000 |
Water Supply System in Summer Season1 |
Completion of work |
-
latitude : 20.9616868,20.9616868,20.9616847
Longitude : 85.9144655,85.9144655,85.9144693
file name : Image_29092022132530351.png
|
2022-09-29 13:25:30.433657 |
32 |
62009268 |
DRINKING WATER SUPPLY DURING SUMMER |
150000 |
DRINKING WATER SUPPLY DURING SUMMER1 |
Completion of work |
-
latitude : 20.9616853,20.9616869
Longitude : 85.9144669,85.9144649
file name : Image_29092022131930351.png
|
2022-09-29 13:19:30.462505 |
33 |
62009255 |
REPAIR OF PIPE WATTER SUPPLY SYSTEM |
170347 |
REPAIR OF PIPE WATTER SUPPLY SYSTEM1 |
Completion of work |
-
latitude : 20.9616875,20.9616875,20.9616888
Longitude : 85.9144225,85.9144225,85.9144202
file name : Image_07102022130723090.png
|
2022-10-07 13:07:23.163742 |
34 |
62009255 |
REPAIR OF PIPE WATTER SUPPLY SYSTEM |
170347 |
REPAIR OF PIPE WATTER SUPPLY SYSTEM1 |
Completion of work |
-
latitude : 20.9616114,20.9616117
Longitude : 85.9146516,85.9146522
file name : Image_29042023094621001.png
|
2023-04-29 09:46:21.061361 |
35 |
48773468 |
CC Road from Main Road to Dhabahali AWC |
200000 |
CC Road from Main Road to Dhabahali AWC1 |
Completion of work |
-
latitude : 21.05124331,21.05124672
Longitude : 85.76133868,85.76133497
file name : Image_21122022115607826.png
|
2022-12-21 11:57:32.719195 |
36 |
44217087 |
REMUNERATION OF SEM |
24000 |
REMUNERATION OF SEM 1 |
Completion of work |
-
latitude : 20.9615162,20.9615158,20.9615158
Longitude : 85.9146291,85.9146335,85.9146335
file name : Image_30072021152514795.png
|
2021-07-30 15:25:14.941921 |
37 |
48773293 |
CC Road from Village Road to Ostia AWC |
200000 |
CC Road from Village Road to Ostia AWC1 |
Completion of work |
-
latitude : 21.05668412,21.0566858
Longitude : 85.77306569,85.77305581
file name : Image_21122022120301358.png
|
2022-12-21 12:03:01.425765 |
38 |
44217160 |
PAID TOWARDS ELECTRICITY BILL |
30000 |
PAID TOWARDS ELECTRICITY BILL1 |
Completion of work |
-
latitude : 20.9615391,20.9615391
Longitude : 85.9145218,85.9145218
file name : Image_28032022182504163.png
|
2022-03-28 18:25:04.24814 |
39 |
65805091 |
Payment of Electricity Bill |
700000 |
Payment of Electricity Bill1 |
Completion of work |
-
latitude : 20.9616463
Longitude : 85.9146221
file name : Image_15122022154349268.png
|
2022-12-15 15:43:49.343956 |
40 |
62009462 |
GP OFFICE CONTINGENCY |
85952 |
GP OFFICE CONTINGENCY1 |
Completion of work |
-
latitude : 20.9616462
Longitude : 85.9146219
file name : Image_15122022154546474.png
|
2022-12-15 15:45:46.558191 |
41 |
62008834 |
CONSTRUCTION OF DRAIN AT YUBASAKTI NODAL SCHOOL |
133800 |
CONSTRUCTION OF DRAIN AT YUBASAKTI NODAL SCHOOL1 |
Completion of work |
-
latitude : 21.04757041,21.04755288
Longitude : 85.73363192,85.73364786
file name : Image_03012023162626550.png
|
2023-01-03 16:26:26.618764 |
42 |
48773859 |
CC Road from Village Road to Tangara Sahi AWC |
300000 |
CC Road from Village Road to Tangara Sahi AWC1 |
Completion of work |
-
latitude : 21.05414296,21.05413465
Longitude : 85.74919534,85.7491978
file name : Image_21122022130609274.png
|
2022-12-21 13:06:09.328141 |
43 |
48777729 |
Chhatatangar AWC Motor Pipe Line and Overhead Tank with Electric |
100000 |
Chhatatangar AWC Motor Pipe Line and Overhead Tank with Electric1 |
Completion of work |
-
latitude : 21.0491479,21.0491479,21.04873084
Longitude : 85.7516168,85.7516168,85.75153014
file name : Image_30012023144037931.png
|
2023-01-30 14:40:38.023314 |
44 |
48776694 |
Podohora Primary School Motor Pipe Line with Electric and Overhead Tank |
150000 |
Podohora Primary School Motor Pipe Line with Electric and Overhead Tank1 |
Completion of work |
-
latitude : 21.07010683,21.07008759
Longitude : 85.74258507,85.74258844
file name : Image_30012023140934821.png
|
2023-01-30 14:09:34.895234 |
45 |
48776333 |
Natore Primary School Motor Pipe Line with Electric and Overhead Tank |
150000 |
Natore Primary School Motor Pipe Line with Electric and Overhead Tank1 |
Completion of work |
-
latitude : 21.07031647,21.07030311
Longitude : 85.74261432,85.74261685
file name : Image_30012023135148907.png
|
2023-01-30 13:51:49.00323 |
46 |
48778966 |
Benagadia AWC boring with motor electric and overhead tank and pipe line |
200000 |
Benagadia AWC boring with motor electric and overhead tank and pipe line1 |
Completion of work |
-
latitude : 21.04345021,21.0434298
Longitude : 85.73905828,85.73906557
file name : Image_30012023133752564.png
|
2023-01-30 13:37:52.636536 |
47 |
48776065 |
Aradapal Primary School Pipe Line, Motor ,Electric with Overhead tank |
230000 |
Aradapal Primary School Pipe Line, Motor ,Electric with Overhead tank1 |
Completion of work |
-
latitude : 21.0491478,21.0491435
Longitude : 85.7516155,85.7516165
file name : Image_30012023144223918.png
|
2023-01-30 14:42:23.992008 |
48 |
48779210 |
Natore AWC motor with electric and overhead tank and pipe line |
100000 |
Natore AWC motor with electric and overhead tank and pipe line1 |
Completion of work |
-
latitude : 21.05669375,21.05670047
Longitude : 85.772994,85.77296335
file name : Image_30012023142528315.png
|
2023-01-30 14:25:28.383073 |
49 |
53657984 |
Water supply through pipe line with motor and overhead tank to BNRGSK building with toilet |
169148 |
Water supply through pipe line with motor and overhead tank to BNRGSK building with toilet1 |
Completion of work |
-
latitude : 21.0491455,21.0491455,21.049145
Longitude : 85.7516223,85.7516223,85.7516183
file name : Image_21022023134813457.png
|
2023-02-21 13:48:13.530945 |
50 |
48777203 |
Ostia AWC boring with motor and overhead tank |
210425 |
Ostia AWC boring with motor and overhead tank1 |
Completion of work |
-
latitude : 21.05661675,21.05661687,21.05661789
Longitude : 85.77276712,85.77276008,85.77276059
file name : Image_30012023142339666.png
|
2023-01-30 14:23:39.743373 |
51 |
62009213 |
PRIASOFT ENTYR |
6000 |
PRIASOFT ENTYR1 |
Completion of work |
-
latitude : 20.9616111,20.9616109
Longitude : 85.9146521,85.9146518
file name : Image_29042023094730981.png
|
2023-04-29 09:47:31.05671 |
52 |
78324015 |
Repair of pipe drinking water |
150000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 20.9616631
Longitude : 85.9145566
file name : Image_15122023115113377.png
|
2023-12-15 11:51:13.473778 |
53 |
78324015 |
Repair of pipe drinking water |
150000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 20.9616649
Longitude : 85.9145525
file name : Image_15122023115915395.png
|
2023-12-15 11:59:15.450877 |
54 |
78324015 |
Repair of pipe drinking water |
150000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 20.961699
Longitude : 85.9145151
file name : Image_15122023121851235.png
|
2023-12-15 12:18:51.284694 |
55 |
78324015 |
Repair of pipe drinking water |
150000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 20.9617008
Longitude : 85.9145119
file name : Image_15122023122334691.png
|
2023-12-15 12:23:34.742852 |
56 |
78315254 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
10000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.9616992
Longitude : 85.9145143
file name : Image_15122023124530746.png
|
2023-12-15 12:45:30.798761 |
57 |
78315254 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
10000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 20.9616897
Longitude : 85.9145258
file name : Image_15122023124830756.png
|
2023-12-15 12:48:30.803557 |
58 |
91319684 |
Extension of existing pipeline |
45401 |
Extension of existing pipeline1 |
Completion of work |
-
latitude : 20.96142638,20.96142638
Longitude : 85.91478029,85.91478029
file name : Image_27022024125309573.png
|
2024-02-27 12:53:09.64001 |
59 |
91319684 |
Extension of existing pipeline |
45401 |
Extension of existing pipeline1 |
Plinth level |
-
latitude : 20.96154163,20.96154163
Longitude : 85.91459214,85.91459214
file name : Image_27022024133559351.png
|
2024-02-27 13:35:59.423867 |
60 |
91321948 |
Construction of Paver Block |
100000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 20.96156712
Longitude : 85.9146265
file name : Image_27022024133041901.png
|
2024-02-27 13:30:42.070125 |
61 |
91321948 |
Construction of Paver Block |
100000 |
Construction of Paver Block1 |
Plinth level |
-
latitude : 20.96154555
Longitude : 85.91459355
file name : Image_27022024133451750.png
|
2024-02-27 13:34:51.821439 |
62 |
62009227 |
OFFICE CONTINGENCY |
150000 |
OFFICE CONTINGENCY1 |
Completion of work |
-
latitude : 20.9616451,20.9616453
Longitude : 85.9146219,85.9146221
file name : Image_22122022150545440.png
|
2022-12-22 15:05:45.473815 |