1 |
31923110 |
CONST. OF BOUNDARY RESTSHED AT SETHY SAHI CREMATION GROUND |
300000 |
CONST. OF BOUNDARY RESTSHED AT SETHY SAHI CREMATION GROUND1 |
Commenced |
-
latitude : 20.96569514
Longitude : 85.9116539
file name : Image_16122020102851834.png
|
2020-12-16 10:28:51.952276 |
2 |
31923824 |
CONST OF BOUNDARY WALL AT BIRIGADA SCHOOL |
300000 |
CONST OF BOUNDARY WALL AT BIRIGADA SCHOOL1 |
Commenced |
-
latitude : 20.98395429,20.98395417,20.98391944
Longitude : 85.90590849,85.90590864,85.90592378
file name : Image_10032021094908792.png
|
2021-03-10 09:49:08.926304 |
3 |
17877522 |
CONSTRUCTION OF BOUNDARY WALL AND REST SHED AT MUSLIM SANA KABAR STAN SUKINDA |
500000 |
CONSTRUCTION OF BOUNDARY WALL AND REST SHED AT MUSLIM SANA KABAR STAN SUKINDA1 |
Commenced |
-
latitude : 20.96579583
Longitude : 85.91078013
file name : Image_15042021084342680.png
|
2021-04-15 08:43:42.624594 |
4 |
50972634 |
Renovation of nua pokhari at Brahman sasan |
250000 |
Renovation of nua pokhari at Brahman sasan1 |
Completion of work |
-
latitude : 20.97129144
Longitude : 85.90854737
file name : Image_22042021100810132.png
|
2021-04-22 10:08:10.294363 |
5 |
44380796 |
CONSTRUCTION OF BOUNDARY WALL BIRIGADA AWC AT VILLAGE MADHAPUR |
250000 |
CONSTRUCTION OF BOUNDARY WALL BIRIGADA AWC AT VILLAGE MADHAPUR1 |
Completion of work |
-
latitude : 20.98384871
Longitude : 85.90602991
file name : Image_18052021095808923.png
|
2021-05-18 09:58:09.068837 |
6 |
44380796 |
CONSTRUCTION OF BOUNDARY WALL BIRIGADA AWC AT VILLAGE MADHAPUR |
250000 |
CONSTRUCTION OF BOUNDARY WALL BIRIGADA AWC AT VILLAGE MADHAPUR1 |
Completion of work |
-
latitude : 20.9838789
Longitude : 85.90608895
file name : Image_22042021100017421.png
|
2021-04-22 10:00:17.618578 |
7 |
44381253 |
REMUNERATION OF SEM AND PUMP DRIVER |
120000 |
REMUNERATION OF SEM AND PUMP DRIVER1 |
Completion of work |
-
latitude : 20.9687356,20.96873027
Longitude : 85.9198026,85.91979979
file name : Image_19062021173856711.png
|
2021-06-19 17:38:56.829289 |
8 |
44380664 |
CONSTRUCTION OF CC ROAD AT RAGHUNATHPUR |
130851 |
CONSTRUCTION OF CC ROAD AT RAGHUNATHPUR1 |
Completion of work |
-
latitude : 20.94937669,20.94937667
Longitude : 85.91055074,85.91055079
file name : Image_16092021113004982.png
|
2021-09-16 11:30:05.098843 |
9 |
54047380 |
Provision of pipe water supply to Kendudhipi MS Gruha toilet with motor and over head tank |
150000 |
Provision of pipe water supply to Kendudhipi MS Gruha toilet with motor and over head tank1 |
Completion of work |
-
latitude : 20.96558329,20.96558354
Longitude : 85.89701402,85.89700891
file name : Image_27122021153603947.png
|
2021-12-27 15:36:04.076006 |
10 |
54047348 |
Provision of pipe water supply to Madhuban Mission Shakti Gruha Toilet with motor and over head tank |
150000 |
Provision of pipe water supply to Madhuban Mission Shakti Gruha Toilet with motor and over head tank1 |
Completion of work |
-
latitude : 20.97941476,20.97945302
Longitude : 85.89227993,85.89218139
file name : Image_27122021152029146.png
|
2021-12-27 15:20:29.279648 |
11 |
48562760 |
PAYMENT OF PWS ELECTRICITY AND OTHER |
400000 |
PAYMENT OF PWS ELECTRICITY AND OTHER1 |
Completion of work |
-
latitude : 20.9616314
Longitude : 85.9146334
file name : Image_17112021115631047.png
|
2021-11-17 11:56:31.184311 |
12 |
48522165 |
EXPENDITURE TOWARDS ENTRY OF PLAN PLUS AND PRIASOFT |
6000 |
EXPENDITURE TOWARDS ENTRY OF PLAN PLUS AND PRIASOFT1 |
Completion of work |
-
latitude : 20.96869378
Longitude : 85.91965669
file name : Image_22042022102651467.png
|
2022-04-22 10:26:51.5669 |
13 |
44380736 |
CONSTRUCTION OF BOUNDARY WALL MADDUBAN AWC AT VILLAGE MADHAPUR |
250000 |
CONSTRUCTION OF BOUNDARY WALL MADDUBAN AWC AT VILLAGE MADHAPUR1 |
Completion of work |
-
latitude : 20.97922743
Longitude : 85.89244414
file name : Image_22042022120240303.png
|
2022-04-22 12:02:40.453388 |
14 |
48562866 |
REMUNERATION OF SEM AND PUMP DRIVER |
12000 |
REMUNERATION OF SEM AND PUMP DRIVER1 |
Completion of work |
-
latitude : 20.96878295
Longitude : 85.91966442
file name : Image_09062022122855966.png
|
2022-06-09 12:28:56.079714 |
15 |
48521028 |
CONSTRUCTION OF CC ROAD TO MADHAPUR SCHOOL |
208000 |
CONSTRUCTION OF CC ROAD TO MADHAPUR SCHOOL1 |
Completion of work |
-
latitude : 20.96159235,20.96159235,20.97448191
Longitude : 85.91472074,85.91472074,85.91091171
file name : Image_10062022141622520.png
|
2022-06-10 14:16:22.610821 |
16 |
48563343 |
CONSTRUCTION OF BOUNDARY WALL AT BISWANATHPUR AWC |
200000 |
CONSTRUCTION OF BOUNDARY WALL AT BISWANATHPUR AWC1 |
Completion of work |
-
latitude : 20.95850864
Longitude : 85.91238182
file name : Image_24062022144331528.png
|
2022-06-24 14:43:31.63475 |
17 |
44381397 |
CONSTRUCTION OF DHUBATUTHA NALA PAHACHA AND DRESS CHANGING ROOM |
300000 |
CONSTRUCTION OF DHUBATUTHA NALA PAHACHA AND DRESS CHANGING ROOM1 |
Completion of work |
-
latitude : 20.9684787
Longitude : 85.9197144
file name : Image_24062022124227398.png
|
2022-06-24 12:42:27.536461 |
18 |
62063094 |
PAYMENT TOWARDS SEM AND PUMP DRIVER SALARY |
120000 |
PAYMENT TOWARDS SEM AND PUMP DRIVER SALARY1 |
Completion of work |
-
latitude : 20.9615983,20.9615978
Longitude : 85.9145325,85.9145329
file name : Image_04082022172920483.png
|
2022-08-04 17:29:20.578661 |
19 |
53257212 |
Supply of drinking water by tanker in summer season |
100000 |
Supply of drinking water by tanker in summer season1 |
Completion of work |
-
latitude : 20.9616504
Longitude : 85.9145335
file name : Image_15072022153135394.png
|
2022-07-15 15:31:35.499133 |
20 |
53257151 |
Supply of drinking water by tanker in summer season |
100000 |
Supply of drinking water by tanker in summer season1 |
Completion of work |
-
latitude : 20.9616533
Longitude : 85.914531
file name : Image_15072022153046715.png
|
2022-07-15 15:30:46.818465 |
21 |
48562830 |
WATER SUPPLY DURING SUMMER SEASON IN GP AREA |
100000 |
WATER SUPPLY DURING SUMMER SEASON IN GP AREA1 |
Completion of work |
-
latitude : 20.961691,20.9616915
Longitude : 85.91462,85.9146211
file name : Image_25072022143749335.png
|
2022-07-25 14:37:49.444007 |
22 |
63833806 |
Water Supply through tanker during Summer Season |
200000 |
Water Supply through tanker during Summer Season 1 |
Completion of work |
-
latitude : 20.9616461
Longitude : 85.9146221
file name : Image_08082022131544883.png
|
2022-08-08 13:15:44.989173 |
23 |
48563260 |
CONSTRUCTION OF BOUNDARY WALL AT PURUNAPANI AWC |
200000 |
CONSTRUCTION OF BOUNDARY WALL AT PURUNAPANI AWC1 |
Completion of work |
-
latitude : 20.96222151
Longitude : 85.90128657
file name : Image_19082022145043650.png
|
2022-08-19 14:50:43.770809 |
24 |
48563300 |
CONSTRUCTION OF BOUNDARY WALL AT RAGHUNATHPUR AWC |
200000 |
CONSTRUCTION OF BOUNDARY WALL AT RAGHUNATHPUR AWC1 |
Completion of work |
-
latitude : 20.94855926
Longitude : 85.90997771
file name : Image_19082022143217289.png
|
2022-08-19 14:32:17.395625 |
25 |
48563453 |
CONSTRUCTION OF BOUNDARY WALL AT GOLEKHAPUR AWC |
185852 |
CONSTRUCTION OF BOUNDARY WALL AT GOLEKHAPUR AWC1 |
Completion of work |
-
latitude : 20.95224047
Longitude : 85.90621518
file name : Image_19082022143115638.png
|
2022-08-19 14:31:15.746734 |
26 |
48520514 |
CONSTRUCTION OF BOUNDARY WALL LATRINE AT SAPUAPADA SCHOOL |
300000 |
CONSTRUCTION OF BOUNDARY WALL LATRINE AT SAPUAPADA SCHOOL1 |
Completion of work |
-
latitude : 20.98518877
Longitude : 85.92972468
file name : Image_19082022151144524.png
|
2022-08-19 15:11:44.611663 |
27 |
48562973 |
WATER SUPPLY TO MADHAPUR AWC WITH OVERHEAD TANK |
150000 |
WATER SUPPLY TO MADHAPUR AWC WITH OVERHEAD TANK1 |
Completion of work |
-
latitude : 20.98457857,20.98457489
Longitude : 85.9088278,85.90882287
file name : Image_23082022125119942.png
|
2022-08-23 12:51:20.059929 |
28 |
48580808 |
DRINKING WATER SUPPLY SYSTEM TO BIRIGODA AWC |
108426 |
DRINKING WATER SUPPLY SYSTEM TO BIRIGODA AWC1 |
Completion of work |
-
latitude : 20.98393917,20.98393965
Longitude : 85.90623244,85.90624036
file name : Image_23082022124637774.png
|
2022-08-23 12:46:37.9032 |
29 |
48563014 |
WATER SUPPLY TO SAPUAPDA AWC WITH OVERHEAD TANK |
150000 |
WATER SUPPLY TO SAPUAPDA AWC WITH OVERHEAD TANK1 |
Completion of work |
-
latitude : 20.98350481,20.98350979
Longitude : 85.93229301,85.93229775
file name : Image_23082022122643576.png
|
2022-08-23 12:26:43.689592 |
30 |
44381005 |
REPAIRING OF SUKINDAGARH KENDUDHIPI SCHOOL CLASS ROOM |
200000 |
REPAIRING OF SUKINDAGARH KENDUDHIPI SCHOOL CLASS ROOM1 |
Completion of work |
-
latitude : 20.96683748
Longitude : 85.89891105
file name : Image_25082022140936484.png
|
2022-08-25 14:09:36.567975 |
31 |
44380960 |
CONSTRUCTION OF CC ROAD AT BHUMIJA SAHI AWC AT MADHAPUR |
100000 |
CONSTRUCTION OF CC ROAD AT BHUMIJA SAHI AWC AT MADHAPUR1 |
Completion of work |
-
latitude : 20.98465821,20.98465841
Longitude : 85.90859667,85.90859668
file name : Image_25082022142523226.png
|
2022-08-25 14:25:23.324379 |
32 |
44380845 |
CONSTRUCTION OF BOUNDARY WALL AT RANGITANGAR AWC AT VILLAGE MADHAPUR |
250000 |
CONSTRUCTION OF BOUNDARY WALL AT RANGITANGAR AWC AT VILLAGE MADHAPUR1 |
Completion of work |
-
latitude : 20.97063039
Longitude : 85.93079463
file name : Image_15092022095530038.png
|
2022-09-15 09:55:30.153074 |
33 |
62062700 |
CONSTRCTION OF 104 NOS OF COMMUNITY LEACH PIT NEAR TUBEWELLS AT DIFFERENCE VILLAGE OF SUKINDAGARH GP |
312000 |
CONSTRCTION OF 104 NOS OF COMMUNITY LEACH PIT NEAR TUBEWELLS AT DIFFERENCE VILLAGE OF SUKINDAGARH GP1 |
Completion of work |
-
latitude : 20.9616894
Longitude : 85.9145349
file name : Image_07112022150752594.png
|
2022-11-07 15:07:52.687396 |
34 |
65251148 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
9000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.9616893
Longitude : 85.9145353
file name : Image_07112022150808209.png
|
2022-11-07 15:08:08.391472 |
35 |
62062846 |
PURCHASE OF TRI-CYCLE |
9000 |
PURCHASE OF TRI-CYCLE1 |
Completion of work |
-
latitude : 20.9616882
Longitude : 85.9145397
file name : Image_07112022150759053.png
|
2022-11-07 15:07:59.16405 |
36 |
48520861 |
CONSTRUCTION OF BOUNDARY WALL LATRINE AT RANGITANGAR SCHOOL |
400000 |
CONSTRUCTION OF BOUNDARY WALL LATRINE AT RANGITANGAR SCHOOL1 |
Completion of work |
-
latitude : 20.9647441
Longitude : 85.9168782
file name : Image_15112022125239905.png
|
2022-11-15 12:52:40.046214 |
37 |
48521220 |
CONSTRUCTION OF BOUNDARY WALL OF RANGITANGAR AWC |
172851 |
CONSTRUCTION OF BOUNDARY WALL OF RANGITANGAR AWC1 |
Completion of work |
-
latitude : 20.96917245
Longitude : 85.93047504
file name : Image_24112022163846291.png
|
2022-11-24 16:38:46.38064 |
38 |
98388671 |
Procurement of Furniture |
120000 |
Procurement of Furniture1 |
|
-
latitude : 20.97218955
Longitude : 85.91208125
file name : Image_09042024120800053.png
|
2024-04-09 12:08:00.13847 |
39 |
44380616 |
CONSTRUCTION OF SUKINDAGARH GP BHAWAN |
985952 |
CONSTRUCTION OF SUKINDAGARH GP BHAWAN1 |
Completion of work |
-
latitude : 20.9721714
Longitude : 85.9118908
file name : Image_23122022133525196.png
|
2022-12-23 13:35:25.30771 |
40 |
44380616 |
CONSTRUCTION OF SUKINDAGARH GP BHAWAN |
985952 |
CONSTRUCTION OF SUKINDAGARH GP BHAWAN1 |
Completion of work |
-
latitude : 20.9721782
Longitude : 85.9119066
file name : Image_23122022133353164.png
|
2022-12-23 13:33:53.267493 |
41 |
63578676 |
Const of Hata Pindi at Sukinda Hata ,Sukindagarh |
1000000 |
Const of Hata Pindi at Sukinda Hata ,Sukindagarh1 |
Commenced |
-
latitude : 20.96762141
Longitude : 85.92287546
file name : Image_02012023135719151.png
|
2023-01-02 13:57:19.26577 |
42 |
62063060 |
PAYMENT TOWARDS PLAN PLUS AND PRIASOFT ENTRY |
6000 |
PAYMENT TOWARDS PLAN PLUS AND PRIASOFT ENTRY1 |
Completion of work |
-
latitude : 20.96850566,20.9685029
Longitude : 85.91962465,85.91962263
file name : Image_20042023083709385.png
|
2023-04-20 08:37:09.488579 |
43 |
72523223 |
Electricity |
465168 |
Electricity1 |
Plinth level |
-
latitude : 20.9616122
Longitude : 85.9146522
file name : Image_22122023133226889.png
|
2023-12-22 13:32:27.027676 |
44 |
72523223 |
Electricity |
465168 |
Electricity1 |
Completion of work |
-
latitude : 20.9616121
Longitude : 85.9146517
file name : Image_20102023133553746.png
|
2023-10-20 13:35:53.873625 |
45 |
72522238 |
Drinking water facility |
120000 |
Drinking water facility1 |
Completion of work |
-
latitude : 20.9616113
Longitude : 85.9146521
file name : Image_20102023133306882.png
|
2023-10-20 13:33:07.042062 |
46 |
72531768 |
Electricity |
50000 |
Electricity1 |
Completion of work |
-
latitude : 20.9616121
Longitude : 85.9146518
file name : Image_20102023133442408.png
|
2023-10-20 13:34:42.533468 |
47 |
62062643 |
CONSTRUCTION OF SEGREGATION SHED AT GP LEVEL |
90000 |
CONSTRUCTION OF SEGREGATION SHED AT GP LEVEL1 |
Completion of work |
-
latitude : 20.9616104
Longitude : 85.9146501
file name : Image_20102023133803319.png
|
2023-10-20 13:38:03.453137 |
48 |
62092962 |
EXPENDITURE TOWARDS JALACHHATRA |
100000 |
EXPENDITURE TOWARDS JALACHHATRA1 |
Completion of work |
-
latitude : 20.9616071
Longitude : 85.9146147
file name : Image_16012024122945599.png
|
2024-01-16 12:29:45.693894 |
49 |
72536417 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.98476489,20.98477525
Longitude : 85.91053139,85.9106001
file name : Image_20022024135201901.png
|
2024-02-20 13:52:01.98818 |
50 |
72536417 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.98482154,20.98477605
Longitude : 85.91046537,85.9105668
file name : Image_20022024134537524.png
|
2024-02-20 13:45:37.60926 |
51 |
72536417 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.98483261,20.98476942
Longitude : 85.91047042,85.91056038
file name : Image_20022024133500739.png
|
2024-02-20 13:35:00.826659 |
52 |
72520888 |
Piped drinking water to public institutions |
100347 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 20.97376017
Longitude : 85.93156907
file name : Image_20022024163220389.png
|
2024-02-20 16:32:20.482149 |
53 |
72520888 |
Piped drinking water to public institutions |
100347 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.97375418
Longitude : 85.93157112
file name : Image_20022024162039729.png
|
2024-02-20 16:20:39.847885 |
54 |
72520888 |
Piped drinking water to public institutions |
100347 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 20.97376215
Longitude : 85.93159948
file name : Image_20022024161558698.png
|
2024-02-20 16:15:58.623397 |
55 |
72515802 |
Piped drinking water to public institutions |
150000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 20.96081498
Longitude : 85.90243601
file name : Image_23042024110035690.png
|
2024-04-23 11:00:35.778193 |
56 |
72515802 |
Piped drinking water to public institutions |
150000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.9608222
Longitude : 85.90248804
file name : Image_23042024105621105.png
|
2024-04-23 10:56:21.188634 |
57 |
72515802 |
Piped drinking water to public institutions |
150000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 20.9608562
Longitude : 85.90245133
file name : Image_23042024104415401.png
|
2024-04-23 10:44:15.485541 |
58 |
72514408 |
Piped drinking water to public institutions |
150000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.94732719
Longitude : 85.90889054
file name : Image_23042024112231412.png
|
2024-04-23 11:22:31.49236 |
59 |
72514408 |
Piped drinking water to public institutions |
150000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 20.94738933
Longitude : 85.90891557
file name : Image_23042024111857040.png
|
2024-04-23 11:18:57.133632 |
60 |
72518465 |
Construction of new Piped Water Supply schemes |
150000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 20.98335921
Longitude : 85.90543454
file name : Image_23042024102139339.png
|
2024-04-23 10:21:39.430325 |
61 |
72518465 |
Construction of new Piped Water Supply schemes |
150000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 20.98332857
Longitude : 85.905461
file name : Image_23042024101355410.png
|
2024-04-23 10:13:55.49531 |
62 |
72518465 |
Construction of new Piped Water Supply schemes |
150000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.98333193
Longitude : 85.90543979
file name : Image_23042024100525736.png
|
2024-04-23 10:05:25.834702 |
63 |
63833778 |
Water Supply with overhead tank and Const of latrine at BNRGSK Building |
200000 |
Water Supply with overhead tank and Const of latrine at BNRGSK Building 1 |
Completion of work |
-
latitude : 20.9721122
Longitude : 85.911569
file name : Image_23042024093820985.png
|
2024-04-23 09:38:21.078692 |
64 |
72526465 |
Providing piped water supply to public institutions |
6000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 20.9616122
Longitude : 85.9146523
file name : Image_30042024133609019.png
|
2024-04-30 13:36:09.153144 |
65 |
72526465 |
Providing piped water supply to public institutions |
6000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.9580276
Longitude : 85.9159197
file name : Image_30042024133253303.png
|
2024-04-30 13:32:53.395026 |
66 |
87877685 |
Development of GP Office |
500000 |
Development of GP Office1 |
Completion of work |
-
latitude : 20.9720891
Longitude : 85.9115688
file name : Image_09042024055714574.png
|
2024-04-09 05:57:14.655175 |