1 |
38598695 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur |
100000 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur1 |
Roof laid |
-
latitude : 21.76625352
Longitude : 83.76906341
file name : Image_13112020163926444.png
|
2020-11-13 16:39:31.349713 |
2 |
38598695 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur |
100000 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur1 |
Roof laid |
-
latitude : 21.76627044
Longitude : 83.7690747
file name : Image_13112020163754164.png
|
2020-11-13 16:37:59.061415 |
3 |
38598695 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur |
100000 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur1 |
Plinth level |
-
latitude : 21.76625884
Longitude : 83.76908067
file name : Image_13112020163056595.png
|
2020-11-13 16:31:01.496549 |
4 |
38598695 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur |
100000 |
Imp. of Rajeeb Gandhi Seva Kendra, Lakhanpur1 |
Completion of work |
-
latitude : 21.76609782
Longitude : 83.7690695
file name : Image_13112020151820756.png
|
2020-11-13 15:18:25.622908 |
5 |
38599006 |
Imp. of Nodal M.E. School, Lakhanpur |
157000 |
Imp. of Nodal M.E. School, Lakhanpur1 |
Roof laid |
-
latitude : 21.7560971
Longitude : 83.77549308
file name : Image_16112020163719552.png
|
2020-11-16 16:37:25.795533 |
6 |
38599006 |
Imp. of Nodal M.E. School, Lakhanpur |
157000 |
Imp. of Nodal M.E. School, Lakhanpur1 |
Plinth level |
-
latitude : 21.75613106
Longitude : 83.7755294
file name : Image_16112020163052072.png
|
2020-11-16 16:30:58.311828 |
7 |
38599006 |
Imp. of Nodal M.E. School, Lakhanpur |
157000 |
Imp. of Nodal M.E. School, Lakhanpur1 |
Completion of work |
-
latitude : 21.75616748
Longitude : 83.77547345
file name : Image_16112020161429060.png
|
2020-11-16 16:14:35.294191 |
8 |
38597495 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur |
200000 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur1 |
Roof laid |
-
latitude : 21.76849438
Longitude : 83.76830092
file name : Image_15032021135911176.png
|
2021-03-15 13:59:11.321098 |
9 |
38597495 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur |
200000 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur1 |
Plinth level |
-
latitude : 21.76843221
Longitude : 83.76839012
file name : Image_15032021135420145.png
|
2021-03-15 13:54:20.297379 |
10 |
38597495 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur |
200000 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur1 |
Plinth level |
-
latitude : 21.76850005
Longitude : 83.7683021
file name : Image_15032021135516653.png
|
2021-03-15 13:55:16.780139 |
11 |
38597495 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur |
200000 |
Const. of Bathing Step & Dress Changing Room at Gountiapada Ghat, Lakhanpur1 |
Completion of work |
-
latitude : 21.76850193
Longitude : 83.76831386
file name : Image_03032021115101624.png
|
2021-03-03 11:51:01.755216 |
12 |
38598127 |
Wage Transporting cost of cleaning of dustbin market village Drain |
85000 |
Wage Transporting cost of cleaning of dustbin market village Drain1 |
Plinth level |
-
latitude : 21.76646309
Longitude : 83.76946613
file name : Image_26052021102556139.png
|
2021-05-26 10:25:56.223051 |
13 |
38598127 |
Wage Transporting cost of cleaning of dustbin market village Drain |
85000 |
Wage Transporting cost of cleaning of dustbin market village Drain1 |
Plinth level |
-
latitude : 21.76646289
Longitude : 83.76946609
file name : Image_26052021102603280.png
|
2021-05-26 10:26:03.364078 |
14 |
38598127 |
Wage Transporting cost of cleaning of dustbin market village Drain |
85000 |
Wage Transporting cost of cleaning of dustbin market village Drain1 |
Completion of work |
-
latitude : 21.76602486
Longitude : 83.76935678
file name : Image_26052021101950288.png
|
2021-05-26 10:19:50.381757 |
15 |
38598127 |
Wage Transporting cost of cleaning of dustbin market village Drain |
85000 |
Wage Transporting cost of cleaning of dustbin market village Drain1 |
Completion of work |
-
latitude : 21.76643951
Longitude : 83.76945408
file name : Image_26052021102001782.png
|
2021-05-26 10:20:01.865395 |
16 |
38598127 |
Wage Transporting cost of cleaning of dustbin market village Drain |
85000 |
Wage Transporting cost of cleaning of dustbin market village Drain1 |
Completion of work |
-
latitude : 21.75625138
Longitude : 83.77579552
file name : Image_03052021121436831.png
|
2021-05-03 12:14:36.93625 |
17 |
38598748 |
Const of COVID CARE Center at Lakhanpur |
50000 |
Const of COVID CARE Center at Lakhanpur1 |
Roof laid |
-
latitude : 21.76614807
Longitude : 83.76914265
file name : Image_21092020132343649.png
|
2020-09-21 13:23:43.748324 |
18 |
38598748 |
Const of COVID CARE Center at Lakhanpur |
50000 |
Const of COVID CARE Center at Lakhanpur1 |
Roof laid |
-
latitude : 21.76625739
Longitude : 83.76901894
file name : Image_23092020220553803.png
|
2020-09-23 22:05:53.890533 |
19 |
38598748 |
Const of COVID CARE Center at Lakhanpur |
50000 |
Const of COVID CARE Center at Lakhanpur1 |
Roof laid |
-
latitude : 21.76615479
Longitude : 83.7690872
file name : Image_23092020220624090.png
|
2020-09-23 22:06:24.162372 |
20 |
38598934 |
Compl. of Crematorial ground at Bandipahar |
160000 |
Compl. of Crematorial ground at Bandipahar1 |
Roof laid |
-
latitude : 21.77007516,21.7700729
Longitude : 83.78637947,83.78637967
file name : Image_13112020161911070.png
|
2020-11-13 16:19:15.962573 |
21 |
38598934 |
Compl. of Crematorial ground at Bandipahar |
160000 |
Compl. of Crematorial ground at Bandipahar1 |
Plinth level |
-
latitude : 21.77001616,21.77002313
Longitude : 83.78636072,83.78637003
file name : Image_13112020161036834.png
|
2020-11-13 16:10:41.722568 |
22 |
38598934 |
Compl. of Crematorial ground at Bandipahar |
160000 |
Compl. of Crematorial ground at Bandipahar1 |
Completion of work |
-
latitude : 21.77007496,21.77007221
Longitude : 83.7863769,83.78637774
file name : Image_13112020154757819.png
|
2020-11-13 15:48:02.690673 |
23 |
51141238 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH2 |
460000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH21 |
Roof laid |
-
latitude : 21.75278675,21.75275856
Longitude : 83.77224142,83.77222724
file name : Image_02082021152242755.png
|
2021-08-02 15:22:42.843129 |
24 |
51141238 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH2 |
460000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH21 |
Roof laid |
-
latitude : 21.76577002,21.76580578
Longitude : 83.769135,83.76909862
file name : Image_09062021132934371.png
|
2021-06-09 13:29:34.449957 |
25 |
51141238 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH2 |
460000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH21 |
Plinth level |
-
latitude : 21.75962511,21.75962686
Longitude : 83.77336285,83.77336516
file name : Image_09062021132232718.png
|
2021-06-09 13:22:32.817121 |
26 |
51141238 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH2 |
460000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC AINLAPADA CHARLABHATA JUNION LAKHANPUR BASTI 1 AND LAKH21 |
Completion of work |
-
latitude : 21.76516849,21.76516545
Longitude : 83.77127678,83.77127764
file name : Image_09062021125439943.png
|
2021-06-09 12:54:40.067313 |
27 |
51141242 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL |
190000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL1 |
Roof laid |
-
latitude : 21.78806629,21.78803201
Longitude : 83.76772649,83.76770614
file name : Image_09062021124410488.png
|
2021-06-09 12:44:10.599704 |
28 |
51141242 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL |
190000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL1 |
Plinth level |
-
latitude : 21.7881068,21.78817964
Longitude : 83.76774,83.76767385
file name : Image_09062021123517970.png
|
2021-06-09 12:35:18.069174 |
29 |
51141242 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL |
190000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC PIKOL AND PS PIKOL1 |
Completion of work |
-
latitude : 21.79263082,21.79263103
Longitude : 83.76879749,83.7687977
file name : Image_09062021122859306.png
|
2021-06-09 12:28:59.400891 |
30 |
51141241 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR |
130000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR1 |
Roof laid |
-
latitude : 21.76961247,21.76964179
Longitude : 83.78988643,83.78982732
file name : Image_09062021131025033.png
|
2021-06-09 13:10:25.151696 |
31 |
51141241 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR |
130000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR1 |
Plinth level |
-
latitude : 21.76965846,21.76965726
Longitude : 83.78982851,83.78981999
file name : Image_09062021130024909.png
|
2021-06-09 13:00:25.020417 |
32 |
51141241 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR |
130000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC BANDIPAHAR1 |
Completion of work |
-
latitude : 21.78824147,21.78823926
Longitude : 83.76762737,83.76762451
file name : Image_09062021120619089.png
|
2021-06-09 12:06:19.190028 |
33 |
47058018 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION |
390000 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION1 |
Roof laid |
-
latitude : 21.75280378,21.75278102
Longitude : 83.77219874,83.77220042
file name : Image_02082021152625100.png
|
2021-08-02 15:26:25.195868 |
34 |
47058018 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION |
390000 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION1 |
Plinth level |
-
latitude : 21.75277782,21.7527698
Longitude : 83.77223614,83.77219836
file name : Image_02082021151518966.png
|
2021-08-02 15:15:19.051734 |
35 |
47058018 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION |
390000 |
INSTALLATION AND IMP OF WATER SUPPLY AT UPS BANDIPAHAR PS AINLAPADA PS BLOCK COLONY AND PS JUNION1 |
Completion of work |
-
latitude : 21.766181215652743,21.76188822
Longitude : 83.76929187579442,83.77302358
file name : Image_22072021165518150.png
|
2021-07-22 16:55:18.255779 |
36 |
51141244 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA |
150000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA1 |
Roof laid |
-
latitude : 21.73303446,21.73300421
Longitude : 83.79192347,83.79194159
file name : Image_02082021154636761.png
|
2021-08-02 15:46:36.856727 |
37 |
51141244 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA |
150000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA1 |
Plinth level |
-
latitude : 21.73330331,21.73329024
Longitude : 83.79171475,83.79168336
file name : Image_02082021154020411.png
|
2021-08-02 15:40:20.512444 |
38 |
51141244 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA |
150000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC SOLDIA AND PS SOLDIA1 |
Completion of work |
-
latitude : 21.73320228,21.73322308
Longitude : 83.79182176,83.79175239
file name : Image_22072021181147990.png
|
2021-07-22 18:11:48.08678 |
39 |
54177984 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR |
110000 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Roof laid |
-
latitude : 21.76512328,21.76512317
Longitude : 83.76896476,83.76896474
file name : Image_24122021124133499.png
|
2021-12-24 12:41:33.61335 |
40 |
54177984 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR |
110000 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Plinth level |
-
latitude : 21.76515677,21.76513535
Longitude : 83.7690802,83.76908359
file name : Image_24122021123205534.png
|
2021-12-24 12:32:05.653465 |
41 |
54177984 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR |
110000 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Completion of work |
-
latitude : 21.76610233,21.7653174
Longitude : 83.76924947,83.7693222
file name : Image_17122021130836488.png
|
2021-12-17 13:08:36.579998 |
42 |
54177984 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR |
110000 |
INSTALLATION OF WATER SUPPLY AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Completion of work |
-
latitude : 21.76510513,21.76511065
Longitude : 83.76906915,83.76907591
file name : Image_24122021121831986.png
|
2021-12-24 12:18:32.076541 |
43 |
54178049 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR |
120000 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Roof laid |
-
latitude : 21.76513756
Longitude : 83.76904217
file name : Image_24122021124457511.png
|
2021-12-24 12:44:57.608994 |
44 |
54178049 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR |
120000 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Plinth level |
-
latitude : 21.76516979
Longitude : 83.76902452
file name : Image_24122021123354668.png
|
2021-12-24 12:33:54.775229 |
45 |
54178049 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR |
120000 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Completion of work |
-
latitude : 21.7653152
Longitude : 83.76932
file name : Image_17122021131019039.png
|
2021-12-17 13:10:19.122963 |
46 |
54178049 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR |
120000 |
CONST OF TOILET AT MISSION SHAKTI GRUHA LAKHANPUR1 |
Completion of work |
-
latitude : 21.76513389
Longitude : 83.76904657
file name : Image_24122021122012830.png
|
2021-12-24 12:20:12.915389 |
47 |
38532396 |
Imp./Electrification of AWC of Pikol & Charlabhata |
173312 |
Imp./Electrification of AWC of Pikol & Charlabhata1 |
Roof laid |
-
latitude : 21.75970485
Longitude : 83.77336879
file name : Image_24122021134548465.png
|
2021-12-24 13:45:48.58454 |
48 |
38532396 |
Imp./Electrification of AWC of Pikol & Charlabhata |
173312 |
Imp./Electrification of AWC of Pikol & Charlabhata1 |
Plinth level |
-
latitude : 21.75973541
Longitude : 83.77335161
file name : Image_24122021131836842.png
|
2021-12-24 13:18:36.949067 |
49 |
38532396 |
Imp./Electrification of AWC of Pikol & Charlabhata |
173312 |
Imp./Electrification of AWC of Pikol & Charlabhata1 |
Plinth level |
-
latitude : 21.75968111
Longitude : 83.77333999
file name : Image_24122021125807142.png
|
2021-12-24 12:58:07.26314 |
50 |
38532396 |
Imp./Electrification of AWC of Pikol & Charlabhata |
173312 |
Imp./Electrification of AWC of Pikol & Charlabhata1 |
Plinth level |
-
latitude : 21.7596534
Longitude : 83.77338125
file name : Image_24122021130157086.png
|
2021-12-24 13:01:57.180227 |
51 |
38532396 |
Imp./Electrification of AWC of Pikol & Charlabhata |
173312 |
Imp./Electrification of AWC of Pikol & Charlabhata1 |
Completion of work |
-
latitude : 21.75967136
Longitude : 83.7733031
file name : Image_24122021125406689.png
|
2021-12-24 12:54:06.843471 |
52 |
54187647 |
IMP OF GP OFFICE LAKHANPUR |
240000 |
IMP OF GP OFFICE LAKHANPUR1 |
Roof laid |
-
latitude : 21.7661963
Longitude : 83.7693008
file name : Image_02032022170010009.png
|
2022-03-02 17:00:10.122075 |
53 |
54187647 |
IMP OF GP OFFICE LAKHANPUR |
240000 |
IMP OF GP OFFICE LAKHANPUR1 |
Plinth level |
-
latitude : 21.766196
Longitude : 83.7692994
file name : Image_02032022164554847.png
|
2022-03-02 16:45:54.966144 |
54 |
54187647 |
IMP OF GP OFFICE LAKHANPUR |
240000 |
IMP OF GP OFFICE LAKHANPUR1 |
Completion of work |
-
latitude : 21.7661969
Longitude : 83.7693012
file name : Image_23022022133328430.png
|
2022-02-23 13:33:28.525665 |
55 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Plinth level |
-
latitude : 21.77832,21.7783157
Longitude : 83.76293281,83.76294862
file name : Image_04032022123530038.png
|
2022-03-04 12:35:30.18015 |
56 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Plinth level |
-
latitude : 21.77833249,21.77833576
Longitude : 83.7629115,83.76293934
file name : Image_04032022123841328.png
|
2022-03-04 12:38:41.453677 |
57 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Plinth level |
-
latitude : 21.7783251,21.77833605
Longitude : 83.76294586,83.76294314
file name : Image_04032022124031644.png
|
2022-03-04 12:40:31.762908 |
58 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Plinth level |
-
latitude : 21.77833892,21.77831733
Longitude : 83.76291541,83.76293398
file name : Image_04032022124543433.png
|
2022-03-04 12:45:43.542179 |
59 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Roof laid |
-
latitude : 21.77834187,21.77834211
Longitude : 83.76295022,83.76296656
file name : Image_04032022125058325.png
|
2022-03-04 12:50:58.435048 |
60 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Completion of work |
-
latitude : 21.77832444,21.77826606
Longitude : 83.76280802,83.762887
file name : Image_04032022114352384.png
|
2022-03-04 11:43:52.537474 |
61 |
51141239 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA |
220000 |
INSTALLATION AND IMP OF WATER SUPPLY AT AWC MAULIBERNA AND UPS MAULIBERNA1 |
Completion of work |
-
latitude : 21.78256649,21.78258863
Longitude : 83.76215883,83.7621809
file name : Image_04032022121738633.png
|
2022-03-04 12:17:38.753437 |
62 |
54188413 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL |
126000 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 21.7619296
Longitude : 83.7730306
file name : Image_27042022081727819.png
|
2022-04-27 08:17:27.920234 |
63 |
54188413 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL |
126000 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 21.76193795
Longitude : 83.77301755
file name : Image_08032022142931750.png
|
2022-03-08 14:29:31.85732 |
64 |
54188413 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL |
126000 |
REPAIRING AND RENO OF KITCHEN SHED BLOCK COLONY AND JUNIAN PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.76187424
Longitude : 83.77286306
file name : Image_08032022102657081.png
|
2022-03-08 10:26:57.196599 |
65 |
64109871 |
Arrear Energy Bill of PWS, Ainlapada Beheraguda |
115000 |
Arrear Energy Bill of PWS, Ainlapada Beheraguda1 |
Completion of work |
-
latitude : 21.75022116
Longitude : 83.78294164
file name : Image_29062022112229282.png
|
2022-06-29 11:22:29.368315 |
66 |
64109881 |
ENERGY BILL OF PWS AINLAPADA BEHERAGUDA ARREAR DUES |
115000 |
ENERGY BILL OF PWS AINLAPADA BEHERAGUDA ARREAR DUES1 |
Completion of work |
-
latitude : 21.7502775
Longitude : 83.78300559
file name : Image_29062022112351731.png
|
2022-06-29 11:23:51.820006 |
67 |
65652743 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 21.7661496,21.7661527
Longitude : 83.7693234,83.7693226
file name : Image_10112023090251255.png
|
2023-11-10 09:02:51.339391 |
68 |
65652743 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 21.767379,21.76775346
Longitude : 83.770564,83.77036758
file name : Image_10082023173140472.png
|
2023-08-10 17:31:40.893892 |
69 |
65652743 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 21.7673818,21.7673814
Longitude : 83.7705668,83.7705664
file name : Image_10082023170739131.png
|
2023-08-10 17:07:39.259976 |
70 |
65652743 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.76602989,21.76602333,21.76602564
Longitude : 83.76945909,83.7694546,83.76945347
file name : Image_10082023165728946.png
|
2023-08-10 16:57:29.042137 |
71 |
54178023 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR |
218789 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR1 |
Roof laid |
-
latitude : 21.76675059
Longitude : 83.77683531
file name : Image_22092022172321559.png
|
2022-09-22 17:23:21.658086 |
72 |
54178023 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR |
218789 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR1 |
Plinth level |
-
latitude : 21.76676535
Longitude : 83.776821
file name : Image_22092022171213301.png
|
2022-09-22 17:12:13.3922 |
73 |
54178023 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR |
218789 |
INSTALLATION OF SINTEX AND PWS AT COLONYPADA LAKHANPUR1 |
Completion of work |
-
latitude : 21.76677671
Longitude : 83.77675736
file name : Image_22092022170422754.png
|
2022-09-22 17:04:22.843095 |
74 |
65652706 |
Operation & maintenance of drinking water supply system |
96000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7661264,21.76646049
Longitude : 83.7692933,83.76930132
file name : Image_28102022100746389.png
|
2022-10-28 10:07:46.467086 |
75 |
54188322 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR |
150000 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR1 |
Roof laid |
-
latitude : 21.7697302
Longitude : 83.78975632
file name : Image_20122022164304644.png
|
2022-12-20 16:43:04.745529 |
76 |
54188322 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR |
150000 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR1 |
Plinth level |
-
latitude : 21.7697594
Longitude : 83.78976293
file name : Image_20122022163033007.png
|
2022-12-20 16:30:33.10688 |
77 |
54188322 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR |
150000 |
CONST OF KITCHEN SHED AT AWC BANDIPAHAR1 |
Completion of work |
-
latitude : 21.76971436
Longitude : 83.78973931
file name : Image_20122022162157918.png
|
2022-12-20 16:21:58.013569 |
78 |
65411366 |
Creation of Shed for segregation and processing of wet and dry waste |
51000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 21.75438796
Longitude : 83.78502355
file name : Image_27012023115059625.png
|
2023-01-27 11:50:59.758534 |
79 |
65411366 |
Creation of Shed for segregation and processing of wet and dry waste |
51000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 21.7543128
Longitude : 83.78502583
file name : Image_27012023114544522.png
|
2023-01-27 11:45:44.63262 |
80 |
65411366 |
Creation of Shed for segregation and processing of wet and dry waste |
51000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.75431613
Longitude : 83.78502518
file name : Image_27012023111038535.png
|
2023-01-27 11:10:38.628441 |
81 |
65411442 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
72000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 21.7661513
Longitude : 83.7693219
file name : Image_27042023113619001.png
|
2023-04-27 11:36:19.127095 |
82 |
55441179 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE |
310052 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE1 |
Roof laid |
-
latitude : 21.76608838
Longitude : 83.76917939
file name : Image_19042023133419857.png
|
2023-04-19 13:34:19.958515 |
83 |
55441179 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE |
310052 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE1 |
Plinth level |
-
latitude : 21.76603365
Longitude : 83.7691702
file name : Image_19042023132430990.png
|
2023-04-19 13:24:31.101791 |
84 |
55441179 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE |
310052 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL AT GP OFFICE AND LAKHANPUR VILLAGE1 |
Completion of work |
-
latitude : 21.76607144
Longitude : 83.76926116
file name : Image_19042023131638398.png
|
2023-04-19 13:16:38.539735 |
85 |
65652747 |
Imp. & Colouring of GP Office Lakhanpur |
300000 |
Imp. & Colouring of GP Office Lakhanpur1 |
Roof laid |
-
latitude : 21.766151
Longitude : 83.7693219
file name : Image_13042023123043718.png
|
2023-04-13 12:30:43.840669 |
86 |
65652747 |
Imp. & Colouring of GP Office Lakhanpur |
300000 |
Imp. & Colouring of GP Office Lakhanpur1 |
Plinth level |
-
latitude : 21.766151
Longitude : 83.7693222
file name : Image_13042023122336925.png
|
2023-04-13 12:23:37.033644 |
87 |
65652747 |
Imp. & Colouring of GP Office Lakhanpur |
300000 |
Imp. & Colouring of GP Office Lakhanpur1 |
Completion of work |
-
latitude : 21.7661501
Longitude : 83.7693152
file name : Image_13042023090014492.png
|
2023-04-13 09:00:14.59721 |
88 |
54187611 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA |
65000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA1 |
Roof laid |
-
latitude : 21.7645766
Longitude : 83.7715306
file name : Image_19042023133000608.png
|
2023-04-19 13:30:00.712459 |
89 |
54187611 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA |
65000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA1 |
Roof laid |
-
latitude : 21.76585009
Longitude : 83.76905223
file name : Image_19042023133140101.png
|
2023-04-19 13:31:40.205515 |
90 |
54187611 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA |
65000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA1 |
Plinth level |
-
latitude : 21.76579686
Longitude : 83.76903076
file name : Image_19042023132227857.png
|
2023-04-19 13:22:27.975582 |
91 |
54187611 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA |
65000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF SOLDIA REVENUE VILLAGE AREA1 |
Completion of work |
-
latitude : 21.76582203
Longitude : 83.76903377
file name : Image_19042023131337034.png
|
2023-04-19 13:13:37.135913 |
92 |
38532384 |
Operation & Maintenance of Ainlapada PWS & others PWS |
150000 |
Operation & Maintenance of Ainlapada PWS & others PWS1 |
Completion of work |
-
latitude : 21.76604527
Longitude : 83.76920079
file name : Image_21012023140805952.png
|
2023-01-21 14:08:06.03569 |
93 |
65652712 |
Water Supply to villages |
190000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.75016823
Longitude : 83.78254376
file name : Image_26052023225105957.png
|
2023-05-26 22:51:06.04318 |
94 |
65652728 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur |
206880 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur1 |
Roof laid |
-
latitude : 21.76664066,21.76665129
Longitude : 83.769312,83.7693045
file name : Image_10072023155749455.png
|
2023-07-10 15:57:49.557703 |
95 |
65652728 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur |
206880 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur1 |
Plinth level |
-
latitude : 21.76658807,21.76660279
Longitude : 83.76933319,83.76930831
file name : Image_10072023153818507.png
|
2023-07-10 15:38:18.607978 |
96 |
65652728 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur |
206880 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur1 |
Plinth level |
-
latitude : 21.76679502,21.76679846
Longitude : 83.76915885,83.76916024
file name : Image_10072023153821825.png
|
2023-07-10 15:38:21.923401 |
97 |
65652728 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur |
206880 |
Const. of Drain & C.C. Road at Harijanpada Lakhanpur1 |
Completion of work |
-
latitude : 21.76655893,21.76654951,21.76657798
Longitude : 83.7693481,83.76931195,83.76928198
file name : Image_10072023151619635.png
|
2023-07-10 15:16:19.745549 |
98 |
55441207 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA |
50000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA1 |
Roof laid |
-
latitude : 21.7882238
Longitude : 83.76779793
file name : Image_10072023175706242.png
|
2023-07-10 17:57:06.337413 |
99 |
55441207 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA |
50000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA1 |
Plinth level |
-
latitude : 21.78820101
Longitude : 83.76779709
file name : Image_10072023175207097.png
|
2023-07-10 17:52:07.185523 |
100 |
55441207 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA |
50000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA1 |
Completion of work |
-
latitude : 21.78818142
Longitude : 83.76776038
file name : Image_10072023173941998.png
|
2023-07-10 17:39:42.099032 |
101 |
55441207 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA |
50000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF PIKOL REVENUE VILLAGE AREA1 |
Completion of work |
-
latitude : 21.78817669
Longitude : 83.76775897
file name : Image_10072023174439802.png
|
2023-07-10 17:44:39.896284 |
102 |
65652718 |
Imp. of Market Complex at Block Office |
200000 |
Imp. of Market Complex at Block Office1 |
Roof laid |
-
latitude : 21.7611082
Longitude : 83.7727778
file name : Image_10072023182917170.png
|
2023-07-10 18:29:17.271501 |
103 |
65652718 |
Imp. of Market Complex at Block Office |
200000 |
Imp. of Market Complex at Block Office1 |
Plinth level |
-
latitude : 21.7611082
Longitude : 83.7727778
file name : Image_10072023182112834.png
|
2023-07-10 18:21:12.925468 |
104 |
65652718 |
Imp. of Market Complex at Block Office |
200000 |
Imp. of Market Complex at Block Office1 |
Plinth level |
-
latitude : 21.76129476
Longitude : 83.77295834
file name : Image_10072023181017784.png
|
2023-07-10 18:10:17.865338 |
105 |
65652718 |
Imp. of Market Complex at Block Office |
200000 |
Imp. of Market Complex at Block Office1 |
Completion of work |
-
latitude : 21.76130714
Longitude : 83.77297065
file name : Image_10072023180656899.png
|
2023-07-10 18:06:56.990081 |
106 |
65652718 |
Imp. of Market Complex at Block Office |
200000 |
Imp. of Market Complex at Block Office1 |
Completion of work |
-
latitude : 21.76127477
Longitude : 83.77302488
file name : Image_10072023163152553.png
|
2023-07-10 16:31:52.649131 |
107 |
65652710 |
Operation & maintenance of drinking water supply system |
92910 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7644304
Longitude : 83.7716441
file name : Image_13072023112639214.png
|
2023-07-13 11:26:39.307385 |
108 |
65652719 |
Imp. & Electrification of AC Club Lakhanpur |
45000 |
Imp. & Electrification of AC Club Lakhanpur1 |
Roof laid |
-
latitude : 21.76628638
Longitude : 83.76929166
file name : Image_13072023180445990.png
|
2023-07-13 18:04:46.086714 |
109 |
65652719 |
Imp. & Electrification of AC Club Lakhanpur |
45000 |
Imp. & Electrification of AC Club Lakhanpur1 |
Plinth level |
-
latitude : 21.76634508
Longitude : 83.76925113
file name : Image_13072023175506105.png
|
2023-07-13 17:55:06.203868 |
110 |
65652719 |
Imp. & Electrification of AC Club Lakhanpur |
45000 |
Imp. & Electrification of AC Club Lakhanpur1 |
Completion of work |
-
latitude : 21.76638325
Longitude : 83.76923421
file name : Image_13072023111903005.png
|
2023-07-13 11:19:03.094861 |
111 |
65652705 |
Operation & maintenance of drinking water supply system |
200000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7610585
Longitude : 83.7732623
file name : Image_10082023123504487.png
|
2023-08-10 12:35:04.633031 |
112 |
87363202 |
Rejuvenation and Desilting of tank/waterbody |
300000 |
Rejuvenation and Desilting of tank/waterbody1 |
Roof laid |
-
latitude : 21.73719691
Longitude : 83.79387482
file name : Image_12092023090905679.png
|
2023-09-12 09:09:05.78217 |
113 |
87363202 |
Rejuvenation and Desilting of tank/waterbody |
300000 |
Rejuvenation and Desilting of tank/waterbody1 |
Plinth level |
-
latitude : 21.73721424
Longitude : 83.79368401
file name : Image_12092023085657027.png
|
2023-09-12 08:56:57.136697 |
114 |
87363202 |
Rejuvenation and Desilting of tank/waterbody |
300000 |
Rejuvenation and Desilting of tank/waterbody1 |
Completion of work |
-
latitude : 21.73741112
Longitude : 83.79338486
file name : Image_12092023084637011.png
|
2023-09-12 08:46:37.112344 |
115 |
65652753 |
Imp. & Repairing of Community Centre Saraipali Mauliberna |
120000 |
Imp. & Repairing of Community Centre Saraipali Mauliberna1 |
Roof laid |
-
latitude : 21.78374304
Longitude : 83.76251608
file name : Image_10112023134009828.png
|
2023-11-10 13:40:09.969589 |
116 |
65652753 |
Imp. & Repairing of Community Centre Saraipali Mauliberna |
120000 |
Imp. & Repairing of Community Centre Saraipali Mauliberna1 |
Plinth level |
-
latitude : 21.78365815
Longitude : 83.76243104
file name : Image_10112023132547047.png
|
2023-11-10 13:25:47.143841 |
117 |
65652753 |
Imp. & Repairing of Community Centre Saraipali Mauliberna |
120000 |
Imp. & Repairing of Community Centre Saraipali Mauliberna1 |
Completion of work |
-
latitude : 21.78382599
Longitude : 83.76252786
file name : Image_10112023131212036.png
|
2023-11-10 13:12:12.124624 |
118 |
55441199 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA |
80000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA1 |
Roof laid |
-
latitude : 21.7826634
Longitude : 83.76214782
file name : Image_10112023135557862.png
|
2023-11-10 13:55:57.95416 |
119 |
55441199 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA |
80000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA1 |
Plinth level |
-
latitude : 21.7824516
Longitude : 83.76236087
file name : Image_10112023133448239.png
|
2023-11-10 13:34:48.334943 |
120 |
55441199 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA |
80000 |
CONST OF INSTITUTIONAL COMPOST PIT AND SOAK PIT AT AWC AND SCHOOL OF MAULIBERNA REVENUE VILLAGE AREA1 |
Completion of work |
-
latitude : 21.77839267
Longitude : 83.76321474
file name : Image_10112023130918825.png
|
2023-11-10 13:09:18.924986 |
121 |
82574113 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 21.7664652,21.76644304
Longitude : 83.76922519,83.76922329
file name : Image_10112023141122564.png
|
2023-11-10 14:11:22.65835 |
122 |
82574113 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.77353649,21.77353744
Longitude : 83.76658989,83.76659104
file name : Image_10112023140520919.png
|
2023-11-10 14:05:21.020628 |
123 |
82574113 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.7735222,21.77352608
Longitude : 83.76662754,83.7666136
file name : Image_10112023140150885.png
|
2023-11-10 14:01:50.981484 |
124 |
65411593 |
Creation of community soak pits for group of Households |
321165 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 21.76175224
Longitude : 83.77297408
file name : Image_30112023140029678.png
|
2023-11-30 14:00:29.764398 |
125 |
65411593 |
Creation of community soak pits for group of Households |
321165 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 21.761719
Longitude : 83.77297739
file name : Image_30112023135703485.png
|
2023-11-30 13:57:03.574341 |
126 |
65411593 |
Creation of community soak pits for group of Households |
321165 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.76138339
Longitude : 83.77018807
file name : Image_30112023134332746.png
|
2023-11-30 13:43:32.830924 |
127 |
106384349 |
Creation of other water recharging structure |
148312 |
Creation of other water recharging structure1 |
Roof laid |
-
latitude : 21.78879883
Longitude : 83.7693765
file name : Image_28052024115332750.png
|
2024-05-28 11:53:32.860917 |
128 |
106384349 |
Creation of other water recharging structure |
148312 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 21.78878186
Longitude : 83.76938889
file name : Image_28052024104209235.png
|
2024-05-28 10:42:09.336732 |
129 |
106384349 |
Creation of other water recharging structure |
148312 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 21.78883358
Longitude : 83.76944721
file name : Image_28052024092703573.png
|
2024-05-28 09:27:03.657338 |
130 |
82575918 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 21.767024
Longitude : 83.7709601
file name : Image_16042024104543441.png
|
2024-04-16 10:45:43.542935 |
131 |
82575918 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 21.7632672
Longitude : 83.7721968
file name : Image_16042024103959603.png
|
2024-04-16 10:39:59.690664 |
132 |
82575918 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.7670254
Longitude : 83.7709609
file name : Image_16042024095120193.png
|
2024-04-16 09:51:20.296282 |
133 |
54178064 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA |
238789 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA1 |
Roof laid |
-
latitude : 21.75396527,21.7539694
Longitude : 83.77226676,83.77228492
file name : Image_20032024090439340.png
|
2024-03-20 09:04:39.455478 |
134 |
54178064 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA |
238789 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA1 |
Plinth level |
-
latitude : 21.75400605,21.75401195
Longitude : 83.7722842,83.77228635
file name : Image_19032024150350059.png
|
2024-03-19 15:03:50.156596 |
135 |
54178064 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA |
238789 |
CONST OF DRAIN FROM RAMESH PADHAN HOUSE TO VILLAGE END AINLAPADA1 |
Completion of work |
-
latitude : 21.75358751,21.75358952
Longitude : 83.77232368,83.77233186
file name : Image_19032024075332219.png
|
2024-03-19 07:53:32.29941 |
136 |
82578018 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Roof laid |
-
latitude : 21.79597162
Longitude : 83.75990299
file name : Image_28052024120549105.png
|
2024-05-28 12:05:49.222081 |
137 |
82578018 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Plinth level |
-
latitude : 21.7959422
Longitude : 83.75996854
file name : Image_28052024102550306.png
|
2024-05-28 10:25:50.396508 |
138 |
82578018 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Completion of work |
-
latitude : 21.79582987
Longitude : 83.760315
file name : Image_28052024093803047.png
|
2024-05-28 09:38:03.14814 |
139 |
82575305 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Roof laid |
-
latitude : 21.77919117
Longitude : 83.76330529
file name : Image_28052024122109478.png
|
2024-05-28 12:21:09.5679 |
140 |
82575305 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Plinth level |
-
latitude : 21.77921903
Longitude : 83.76337326
file name : Image_28052024100550605.png
|
2024-05-28 10:05:50.702273 |
141 |
82575305 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Completion of work |
-
latitude : 21.77914468
Longitude : 83.76328571
file name : Image_28052024095238540.png
|
2024-05-28 09:52:38.636776 |
142 |
82575097 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Roof laid |
-
latitude : 21.78025008
Longitude : 83.7633975
file name : Image_28052024121350893.png
|
2024-05-28 12:13:50.993584 |
143 |
82575097 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Plinth level |
-
latitude : 21.78026655
Longitude : 83.76341196
file name : Image_28052024101432373.png
|
2024-05-28 10:14:32.460539 |
144 |
82575097 |
Construction of Ghats |
100000 |
Construction of Ghats1 |
Completion of work |
-
latitude : 21.78023837
Longitude : 83.76338442
file name : Image_28052024094746848.png
|
2024-05-28 09:47:46.962407 |
145 |
82574485 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.75016314
Longitude : 83.78246718
file name : Image_12062024102001153.png
|
2024-06-12 10:20:01.256516 |
146 |
82574485 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.75015796
Longitude : 83.78262298
file name : Image_12062024101303326.png
|
2024-06-12 10:13:03.433191 |
147 |
82574485 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.767023
Longitude : 83.7709389
file name : Image_11062024101849459.png
|
2024-06-11 10:18:49.543735 |
148 |
65652726 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.7652189
Longitude : 83.7688761
file name : Image_01062024115940426.png
|
2024-06-01 11:59:40.516769 |
149 |
65652726 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.76633592
Longitude : 83.76885686
file name : Image_01062024115510728.png
|
2024-06-01 11:55:10.828872 |
150 |
65652726 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.7661305
Longitude : 83.7694048
file name : Image_01062024114904712.png
|
2024-06-01 11:49:04.815061 |
151 |
82573668 |
Drainage Construction |
220000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.76867905
Longitude : 83.77020536
file name : Image_20032024085201812.png
|
2024-03-20 08:52:01.915288 |
152 |
82573668 |
Drainage Construction |
220000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.76865181
Longitude : 83.77029905
file name : Image_19032024145649006.png
|
2024-03-19 14:56:49.111202 |
153 |
82573668 |
Drainage Construction |
220000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.76867857
Longitude : 83.77005836
file name : Image_19032024074507865.png
|
2024-03-19 07:45:07.959095 |
154 |
65412057 |
Any other operation and maintenance needs related to solid waste management |
78245 |
Any other operation and maintenance needs related to solid waste management1 |
|
-
latitude : 21.76600801
Longitude : 83.76916901
file name : Image_21092024071001632.png
|
2024-09-21 07:10:01.740209 |
155 |
54187568 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR |
200000 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR1 |
Roof laid |
-
latitude : 21.76762256
Longitude : 83.76962604
file name : Image_21092024122206382.png
|
2024-09-21 12:22:06.453197 |
156 |
54187568 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR |
200000 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR1 |
Roof laid |
-
latitude : 21.7676742
Longitude : 83.7697543
file name : Image_21092024115529225.png
|
2024-09-21 11:55:29.310955 |
157 |
54187568 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR |
200000 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR1 |
Plinth level |
-
latitude : 21.76755777
Longitude : 83.76946284
file name : Image_21092024114744278.png
|
2024-09-21 11:47:44.351455 |
158 |
54187568 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR |
200000 |
COMPL OF DRAIN AND REPAIRING AT MANDIRPADA AND HALDIAPADA LAKHANPUR1 |
Completion of work |
-
latitude : 21.76736075
Longitude : 83.76958156
file name : Image_21092024073703097.png
|
2024-09-21 07:37:03.200696 |
159 |
82574302 |
Operation and Maintenance of drinking water supply system |
109279 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.75033517
Longitude : 83.7831174
file name : Image_21092024121230832.png
|
2024-09-21 12:12:30.914901 |
160 |
82574302 |
Operation and Maintenance of drinking water supply system |
109279 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.75024972
Longitude : 83.78300435
file name : Image_21092024120825179.png
|
2024-09-21 12:08:25.284817 |
161 |
82574302 |
Operation and Maintenance of drinking water supply system |
109279 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.75631293
Longitude : 83.776027
file name : Image_21092024074445273.png
|
2024-09-21 07:44:45.376474 |
162 |
65652723 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.75038426
Longitude : 83.77308929
file name : Image_03102024154007521.png
|
2024-10-03 15:40:07.610593 |
163 |
65652723 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.75034654
Longitude : 83.77310386
file name : Image_03102024153437321.png
|
2024-10-03 15:34:37.407886 |
164 |
65652723 |
Creation of a new source of drinking water |
150000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.75032406
Longitude : 83.77312346
file name : Image_03102024152850156.png
|
2024-10-03 15:28:50.252868 |
165 |
82572694 |
Any other operation and maintenance needs related to solid waste management |
117279 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 21.76607456
Longitude : 83.76920415
file name : Image_22102024161116336.png
|
2024-10-22 16:11:16.438404 |
166 |
82572694 |
Any other operation and maintenance needs related to solid waste management |
117279 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 21.7611148
Longitude : 83.77331
file name : Image_22102024135711084.png
|
2024-10-22 13:57:11.194577 |
167 |
82572694 |
Any other operation and maintenance needs related to solid waste management |
117279 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.7659761
Longitude : 83.76917883
file name : Image_22102024091042694.png
|
2024-10-22 09:10:42.786023 |
168 |
82573402 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.75974649
Longitude : 83.77322477
file name : Image_22102024160507668.png
|
2024-10-22 16:05:07.812973 |
169 |
82573402 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.75989647
Longitude : 83.7733452
file name : Image_22102024140008822.png
|
2024-10-22 14:00:07.793583 |
170 |
82573402 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.75973438
Longitude : 83.77315496
file name : Image_22102024092108020.png
|
2024-10-22 09:21:08.103177 |
171 |
104224916 |
Piped/tap water supply to HH |
171000 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 21.76573894
Longitude : 83.7694164
file name : Image_02112024140726456.png
|
2024-11-02 14:07:26.5337 |
172 |
104224916 |
Piped/tap water supply to HH |
171000 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 21.7608012
Longitude : 83.7735228
file name : Image_02112024135623070.png
|
2024-11-02 13:56:23.148304 |
173 |
104224916 |
Piped/tap water supply to HH |
171000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 21.75493084
Longitude : 83.77998913
file name : Image_02112024134958583.png
|
2024-11-02 13:49:58.665687 |