1 |
44346776 |
CONSTRUCTION OF BOUNDRY WALL AT DEKOTE AWC |
100000 |
CONSTRUCTION OF BOUNDRY WALL AT DEKOTE AWC1 |
Completion of work |
-
latitude : 19.9629658
Longitude : 82.8402389
file name : Image_03022022142355890.png
|
2022-02-03 14:23:56.012805 |
2 |
44346732 |
CONST. OF BOUNDRY WALL AND REPAIR OF NUAPADA SCHOOL OF CHATRAPUR VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF NUAPADA SCHOOL OF CHATRAPUR VILLAGE1 |
Completion of work |
-
latitude : 19.961181543767452
Longitude : 82.85748861730099
file name : Image_03022022143626845.png
|
2022-02-03 14:36:26.929271 |
3 |
44346708 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE |
92918 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.967060736380517,19.967073602601886
Longitude : 82.8684773761779,82.86851786077023
file name : Image_03022022144737805.png
|
2022-02-03 14:47:37.895138 |
4 |
44346708 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE |
92918 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.96708609163761,19.967061658389866
Longitude : 82.86854837089777,82.8685138374567
file name : Image_03022022145603603.png
|
2022-02-03 14:56:03.690292 |
5 |
55537113 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE |
71149 |
OPERATION & MAINTATENCE OF EXISTING PIPE WATER SUPPLY OF DASPUR & DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.967049043625593,19.967055413872004
Longitude : 82.86851450800896,82.86850042641163
file name : Image_03022022160518982.png
|
2022-02-03 16:05:19.034134 |
6 |
44346620 |
CONSTRUCTION OF DRAIN AT SHANTINAGARPADA OF DASPUR VILLAGE |
100000 |
CONSTRUCTION OF DRAIN AT SHANTINAGARPADA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.960903264582157,19.960903264582157
Longitude : 82.86335662007332,82.86335662007332
file name : Image_09032022162832474.png
|
2022-03-09 16:28:32.550419 |
7 |
44346620 |
CONSTRUCTION OF DRAIN AT SHANTINAGARPADA OF DASPUR VILLAGE |
100000 |
CONSTRUCTION OF DRAIN AT SHANTINAGARPADA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.961980590596795,19.961980590596795
Longitude : 82.86740650422871,82.86740650422871
file name : Image_18082021133749809.png
|
2021-08-18 13:37:49.903461 |
8 |
44346633 |
CONST. OF DRAIN AT WATERSHED BUILDING TO ANABADI PLOT OF DEKOTE VILLAGE |
100000 |
CONST. OF DRAIN AT WATERSHED BUILDING TO ANABADI PLOT OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.963851934298873,19.963851934298873
Longitude : 82.83989449962974,82.83989449962974
file name : Image_12062021122050922.png
|
2021-06-12 12:20:51.041713 |
9 |
44346633 |
CONST. OF DRAIN AT WATERSHED BUILDING TO ANABADI PLOT OF DEKOTE VILLAGE |
100000 |
CONST. OF DRAIN AT WATERSHED BUILDING TO ANABADI PLOT OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.963856963440776,19.963856963440776
Longitude : 82.83989190123975,82.83989190123975
file name : Image_12062021122110556.png
|
2021-06-12 12:21:10.648843 |
10 |
44346612 |
CONSTRUCTION OF DRAIN AT SIVA MANDIR AREA OF DASPUR VILLAGE |
100000 |
CONSTRUCTION OF DRAIN AT SIVA MANDIR AREA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.9688506918028,19.968822109512985,19.968777014873922
Longitude : 82.86747339181602,82.86751178093255,82.86757154390216
file name : Image_06102021113351491.png
|
2021-10-06 11:33:51.618181 |
11 |
44346612 |
CONSTRUCTION OF DRAIN AT SIVA MANDIR AREA OF DASPUR VILLAGE |
100000 |
CONSTRUCTION OF DRAIN AT SIVA MANDIR AREA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.9687936110422,19.968787324614823
Longitude : 82.86748420447111,82.86755880340934
file name : Image_06102021114306294.png
|
2021-10-06 11:43:06.378342 |
12 |
44346694 |
CONSTRUCTION OF DRAIN AT SETHIPADA OF DASPUR VILLAGE |
80000 |
CONSTRUCTION OF DRAIN AT SETHIPADA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.963480993174016,19.96350836008787
Longitude : 82.86497709341347,82.86499151028693
file name : Image_26042022183259396.png
|
2022-04-26 18:32:59.542744 |
13 |
44346686 |
CONST. OF DRAIN AND CULVERT AT JHANKAR PADA OF DASPUR VILLAGE |
170000 |
CONST. OF DRAIN AND CULVERT AT JHANKAR PADA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.963101502507925,19.96310133486986
Longitude : 82.86658314988017,82.86658734083176
file name : Image_26042022184326308.png
|
2022-04-26 18:43:26.440839 |
14 |
44346643 |
CONSTRUCTION OF CULVERT AT BUDHARAJA MANDIR OF DASPUR VILLAGE |
50000 |
CONSTRUCTION OF CULVERT AT BUDHARAJA MANDIR OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96087673585862,19.96088662650436
Longitude : 82.86330658011138,82.86336709745228
file name : Image_26042022173152911.png
|
2022-04-26 17:31:53.00183 |
15 |
44346723 |
CONST. OF BOUNDRY WALL AND REPAIR OF UGUPS OF DASPUR VILLAGE |
315835 |
CONST. OF BOUNDRY WALL AND REPAIR OF UGUPS OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.962250404059887
Longitude : 82.86586163565516
file name : Image_19052021100057389.png
|
2021-05-19 10:00:57.521278 |
16 |
44346723 |
CONST. OF BOUNDRY WALL AND REPAIR OF UGUPS OF DASPUR VILLAGE |
315835 |
CONST. OF BOUNDRY WALL AND REPAIR OF UGUPS OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.962250152602792
Longitude : 82.8658923972398
file name : Image_01062021124342990.png
|
2021-06-01 12:43:43.101529 |
17 |
44346771 |
CONSTRUCTION OF BOUNDRY WALL AND REPAIR OF DASPUR AWC-1 |
100000 |
CONSTRUCTION OF BOUNDRY WALL AND REPAIR OF DASPUR AWC-1 1 |
Completion of work |
-
latitude : 19.968550158664584
Longitude : 82.86134798079729
file name : Image_21082021170920692.png
|
2021-08-21 17:09:20.818677 |
18 |
44346771 |
CONSTRUCTION OF BOUNDRY WALL AND REPAIR OF DASPUR AWC-1 |
100000 |
CONSTRUCTION OF BOUNDRY WALL AND REPAIR OF DASPUR AWC-1 1 |
Completion of work |
-
latitude : 19.968587374314666
Longitude : 82.86104019731283
file name : Image_21082021170932882.png
|
2021-08-21 17:09:33.0177 |
19 |
44346761 |
CONST. OF BOUNDRY WALL AND REPAIR OF COLONYPADA SCHOOL OF DASPUR VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF COLONYPADA SCHOOL OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96964357793331
Longitude : 82.86411166191101
file name : Image_21082021170926867.png
|
2021-08-21 17:09:27.006156 |
20 |
44346761 |
CONST. OF BOUNDRY WALL AND REPAIR OF COLONYPADA SCHOOL OF DASPUR VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF COLONYPADA SCHOOL OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.969668304547668
Longitude : 82.86413102410734
file name : Image_18082021133758931.png
|
2021-08-18 13:37:59.045425 |
21 |
44346715 |
CONSTRUCTION OF COLD WATER STORAGE AT JAGANNATH MANDIR OF DASPUR VILLAGE |
290000 |
CONSTRUCTION OF COLD WATER STORAGE AT JAGANNATH MANDIR OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96377528179437
Longitude : 82.86544580943882
file name : Image_21082021170938706.png
|
2021-08-21 17:09:38.837957 |
22 |
44346678 |
REPAIR AND MAINTENANCE OF MAIN ROAD DRAIN OF DASPUR VILLAGE |
182917 |
REPAIR AND MAINTENANCE OF MAIN ROAD DRAIN OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.964118520729244,19.964118520729244
Longitude : 82.86460812203586,82.86460812203586
file name : Image_21082021175754862.png
|
2021-08-21 17:57:55.022582 |
23 |
44346596 |
CONSTRUCTION OF DRAIN AT PANCHAYAT TO LIMGACH OF DASPUR VILLAGE |
149120 |
CONSTRUCTION OF DRAIN AT PANCHAYAT TO LIMGACH OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.961952762678266,19.961953768506646
Longitude : 82.86728773266077,82.86729318089783
file name : Image_06122021115946122.png
|
2021-12-06 11:59:46.237242 |
24 |
44346702 |
PAYMENT OF ELECTRI BILL OF EXISTING RPWSS OF DASPUR & DEKOTE VILLAGE |
100000 |
PAYMENT OF ELECTRI BILL OF EXISTING RPWSS OF DASPUR & DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 20.0618074,20.0618074
Longitude : 82.7828152,82.7828152
file name : Image_23122021162748246.png
|
2021-12-23 16:27:48.309772 |
25 |
55536779 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE |
90000 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96964906807989,19.969731587916613
Longitude : 82.86380404606462,82.86374830640852
file name : Image_09032022164933647.png
|
2022-03-09 16:49:33.732255 |
26 |
55536779 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE |
90000 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.969688463024795,19.969672369770706
Longitude : 82.86383103579283,82.86382156424224
file name : Image_09032022164939109.png
|
2022-03-09 16:49:39.182855 |
27 |
55536779 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE |
90000 |
CONSTRUCTION OF DRAIN AT BAZARPADIA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96964814607054,19.969684439711273
Longitude : 82.86378133110702,82.86378677934408
file name : Image_09032022164944571.png
|
2022-03-09 16:49:44.64685 |
28 |
53803159 |
CONSTRUCTION OF CULVERT AND CC ROAD NEAR DASPUR GRAMPANCHAYAT |
70000 |
CONSTRUCTION OF CULVERT AND CC ROAD NEAR DASPUR GRAMPANCHAYAT1 |
Completion of work |
-
latitude : 19.962048609741032
Longitude : 82.86725588142872
file name : Image_26042022172235225.png
|
2022-04-26 17:22:35.310109 |
29 |
53802703 |
REPAIR OF DRAIN AND COVER AT RAJAPADA AND SHANTINAGARPADA OF DASPUR VILLAGE |
150000 |
REPAIR OF DRAIN AND COVER AT RAJAPADA AND SHANTINAGARPADA OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.9620191892609,19.9620191892609
Longitude : 82.867301562801,82.867301562801
file name : Image_26052022173403303.png
|
2022-05-26 17:34:03.389288 |
30 |
53802601 |
CONSTRUCTION OF DRAIN AT BANJIBAHAL ROAD TO BELKHAMAR |
50000 |
CONSTRUCTION OF DRAIN AT BANJIBAHAL ROAD TO BELKHAMAR1 |
Completion of work |
-
latitude : 19.961330029182136,19.96127726510167
Longitude : 82.87741349078715,82.87732874974608
file name : Image_26042022172231736.png
|
2022-04-26 17:22:31.827702 |
31 |
55536969 |
CONSTRUCTION OF DRAIN AT WATER SHED AREA OF DEKOTE VILLAGE |
150000 |
CONSTRUCTION OF DRAIN AT WATER SHED AREA OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.96375160291791,19.963737688958645
Longitude : 82.83987530507147,82.83989609219134
file name : Image_26052022104147001.png
|
2022-05-26 10:41:47.080094 |
32 |
53803052 |
CONSTRUCTION OF BOUNDRY WALL AT AWC BUILDING OF DEKOTE VILLAGE |
288198 |
CONSTRUCTION OF BOUNDRY WALL AT AWC BUILDING OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.9628321
Longitude : 82.840421
file name : Image_09032022175431444.png
|
2022-03-09 17:54:31.536161 |
33 |
53803052 |
CONSTRUCTION OF BOUNDRY WALL AT AWC BUILDING OF DEKOTE VILLAGE |
288198 |
CONSTRUCTION OF BOUNDRY WALL AT AWC BUILDING OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.9628334
Longitude : 82.8404201
file name : Image_09032022133917493.png
|
2022-03-09 13:39:17.572489 |
34 |
55538229 |
CONSTRUCTION OF BOUNDRY WALL AT GOVT UP SCHOOL OF DASPUR VILLAGE |
150000 |
CONSTRUCTION OF BOUNDRY WALL AT GOVT UP SCHOOL OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.962573400698602
Longitude : 82.8653743956238
file name : Image_09032022171343677.png
|
2022-03-09 17:13:43.726816 |
35 |
55536654 |
REPAIR & MAINTENANCE OF BARIKPADA DRAIN OF DASPUR VILLAGE |
119120 |
REPAIR & MAINTENANCE OF BARIKPADA DRAIN OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.964028247632086,19.964028247632086,19.963983823545277
Longitude : 82.86474097520113,82.86474097520113,82.86473611369729
file name : Image_09032022163958661.png
|
2022-03-09 16:39:58.748185 |
36 |
53803252 |
COMPLETION OF MISSION SHAKTI GRUHA OF DASPUR PANCHAYAT |
130000 |
COMPLETION OF MISSION SHAKTI GRUHA OF DASPUR PANCHAYAT1 |
Completion of work |
-
latitude : 19.969037608243525
Longitude : 82.86698481068015
file name : Image_09032022165318289.png
|
2022-03-09 16:53:18.372651 |
37 |
44346737 |
CONST. OF BOUNDRY WALL AND REPAIR OF GANJAPADA SCHOOL OF CHATRAPUR VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF GANJAPADA SCHOOL OF CHATRAPUR VILLAGE1 |
Completion of work |
-
latitude : 19.9666092870757
Longitude : 82.84862391650677
file name : Image_09032022174356652.png
|
2022-03-09 17:43:56.728927 |
38 |
44346737 |
CONST. OF BOUNDRY WALL AND REPAIR OF GANJAPADA SCHOOL OF CHATRAPUR VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF GANJAPADA SCHOOL OF CHATRAPUR VILLAGE1 |
Completion of work |
-
latitude : 19.966635438613594
Longitude : 82.84871536307037
file name : Image_09032022174501916.png
|
2022-03-09 17:45:01.983315 |
39 |
55537015 |
REPAIR OF DRAIN & COVER NEAR MOBILE TOWER OF DASPUR VILLAGE |
68000 |
REPAIR OF DRAIN & COVER NEAR MOBILE TOWER OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.964016429148614,19.964007921516895
Longitude : 82.86459068767726,82.86464869044721
file name : Image_26042022183904410.png
|
2022-04-26 18:39:04.509115 |
40 |
53802421 |
CONSTRUCTION OF PARAPET AT HARIJANPADA TUBEWELL OF DASPUR VILLAGE |
40000 |
CONSTRUCTION OF PARAPET AT HARIJANPADA TUBEWELL OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.967495128512383
Longitude : 82.86162240430713
file name : Image_26042022181409587.png
|
2022-04-26 18:14:09.664001 |
41 |
53802786 |
CONSTRUCTION OF COLD DRINKING WATER STORAGE NEAR DASPUR GRAM PANCHAYAT OFFICE |
280000 |
CONSTRUCTION OF COLD DRINKING WATER STORAGE NEAR DASPUR GRAM PANCHAYAT OFFICE 1 |
Completion of work |
-
latitude : 19.962023296393454
Longitude : 82.86730131134391
file name : Image_26052022104351558.png
|
2022-05-26 10:43:51.653962 |
42 |
44346698 |
CONST. OF PLATFORM & SOAKPIT AT THAKURANI GUDI TUBEWELL OF DASPUR VILLAGE |
50000 |
CONST. OF PLATFORM & SOAKPIT AT THAKURANI GUDI TUBEWELL OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96180783957243
Longitude : 82.86768277175725
file name : Image_26052022175100299.png
|
2022-05-26 17:51:00.403184 |
43 |
55536845 |
COMPLETION OF DASPUR JAGANNATH MANDIR DRINKING WATER STORAGE |
40000 |
COMPLETION OF DASPUR JAGANNATH MANDIR DRINKING WATER STORAGE1 |
Completion of work |
-
latitude : 19.96386823710054
Longitude : 82.86555100232363
file name : Image_26052022172414701.png
|
2022-05-26 17:24:14.763816 |
44 |
44346752 |
CONST. OF BOUNDRY WALL AND REPAIR OF PRIMARY SCHOOL OF BANJIBAHAL VILLAGE |
100000 |
CONST. OF BOUNDRY WALL AND REPAIR OF PRIMARY SCHOOL OF BANJIBAHAL VILLAGE1 |
Completion of work |
-
latitude : 19.96104273945093
Longitude : 82.87836492061615
file name : Image_24052022104521019.png
|
2022-05-24 10:45:21.095846 |
45 |
53802333 |
CONSTRUCTION OF PARAPET AT NARIAPADA OF DEKOTE VILLAGE |
19649 |
CONSTRUCTION OF PARAPET AT NARIAPADA OF DEKOTE VILLAGE1 |
Completion of work |
-
latitude : 19.963336866348982
Longitude : 82.84078381955624
file name : Image_17062022124028905.png
|
2022-06-17 12:40:28.988053 |
46 |
55538201 |
CONST. OF RCC RING FOR STORAGE OF SOLID WASTE MANAGEMENT AT JAGANNATH MANDIR OF DASPUR VILLAGE |
9000 |
CONST. OF RCC RING FOR STORAGE OF SOLID WASTE MANAGEMENT AT JAGANNATH MANDIR OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.963868740014732
Longitude : 82.86566675640643
file name : Image_17062022113210853.png
|
2022-06-17 11:32:10.918267 |
47 |
55536904 |
CONST. OF RCC RING FOR STORAGE OF SOLID WASTE MANAGEMENT AT SIVA MANDIR OF DASPUR VILLAGE |
4500 |
CONST. OF RCC RING FOR STORAGE OF SOLID WASTE MANAGEMENT AT SIVA MANDIR OF DASPUR VILLAGE1 |
Completion of work |
-
latitude : 19.96843909844756
Longitude : 82.86098353564739
file name : Image_17062022113904198.png
|
2022-06-17 11:39:04.268827 |
48 |
61751080 |
BANJIBAHAL PUPS BLOCK BRICK CONSTRUCTION |
99120 |
BANJIBAHAL PUPS BLOCK BRICK CONSTRUCTION1 |
Completion of work |
-
latitude : 19.96089994
Longitude : 82.87835745
file name : Image_20082022151856291.png
|
2022-08-20 15:18:56.386388 |
49 |
61750527 |
CONSTRUCTION OF ROAD (BLOCK BRICK) & BOUNDRY AT GRAM PANCHAYAT OFFICE |
200000 |
CONSTRUCTION OF ROAD (BLOCK BRICK) & BOUNDRY AT GRAM PANCHAYAT OFFICE 1 |
Completion of work |
-
latitude : 19.9630954
Longitude : 82.8659186
file name : Image_20082022150151445.png
|
2022-08-20 15:01:51.524523 |
50 |
53803006 |
REPAIR AND MAINTANENCE OF DEKOTE PRIMARY SCHOOL |
50000 |
REPAIR AND MAINTANENCE OF DEKOTE PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.96343432
Longitude : 82.8400694
file name : Image_20082022160927270.png
|
2022-08-20 16:09:27.359489 |
51 |
61751789 |
GANJAPADA PRIMARY SCHOOL BOUNDRY |
350000 |
GANJAPADA PRIMARY SCHOOL BOUNDRY1 |
Completion of work |
-
latitude : 19.96652199
Longitude : 82.84878364
file name : Image_26082022151639724.png
|
2022-08-26 15:16:39.843868 |
52 |
53802885 |
REPAIR AND MAINTENANCE OF DASPUR GOVT UP SCHOOL |
50000 |
REPAIR AND MAINTENANCE OF DASPUR GOVT UP SCHOOL1 |
Completion of work |
-
latitude : 19.9664433
Longitude : 82.84864015
file name : Image_26082022151826237.png
|
2022-08-26 15:18:26.344295 |
53 |
61751497 |
ELECTRI BILL OF RPWSS |
300000 |
ELECTRI BILL OF RPWSS1 |
Completion of work |
-
latitude : 19.88343677,19.8833346
Longitude : 82.80324773,82.80339115
file name : Image_26082022201844061.png
|
2022-08-26 20:18:44.30291 |
54 |
55536538 |
PAYMENT OF MONTHLY HONORARIUM TO SEM AND PUMP DRIVER |
144000 |
PAYMENT OF MONTHLY HONORARIUM TO SEM AND PUMP DRIVER 1 |
Completion of work |
-
latitude : 20.0618041
Longitude : 82.7828091
file name : Image_26082022173352156.png
|
2022-08-26 17:33:52.313592 |
55 |
53802956 |
REPAIR AND MAINTANENCE OF NUAPADA PRIMARY SCHOOL |
50000 |
REPAIR AND MAINTANENCE OF NUAPADA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.96116815
Longitude : 82.85748084
file name : Image_15122022103638341.png
|
2022-12-15 10:36:38.439905 |
56 |
53802956 |
REPAIR AND MAINTANENCE OF NUAPADA PRIMARY SCHOOL |
50000 |
REPAIR AND MAINTANENCE OF NUAPADA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.96118574
Longitude : 82.85747513
file name : Image_15122022103732067.png
|
2022-12-15 10:37:32.159663 |
57 |
61750704 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION |
150000 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION1 |
Plinth level |
-
latitude : 19.96295112
Longitude : 82.8658646
file name : Image_09022023122013327.png
|
2023-02-09 12:20:13.429664 |
58 |
61750704 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION |
150000 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION1 |
Completion of work |
-
latitude : 19.96280736
Longitude : 82.86564017
file name : Image_09022023121550259.png
|
2023-02-09 12:15:50.366368 |
59 |
61750704 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION |
150000 |
DASPUR GOVT. UP SCHOOL BOUNDRY WALL COMPLETION1 |
Completion of work |
-
latitude : 19.96285567
Longitude : 82.86561808
file name : Image_09022023121553332.png
|
2023-02-09 12:15:53.434521 |
60 |
61751627 |
MAINTATENANCE OF RPWSS |
156744 |
MAINTATENANCE OF RPWSS1 |
Completion of work |
-
latitude : 20.0618048,20.0618048
Longitude : 82.7828082,82.7828082
file name : Image_29102022153656227.png
|
2022-10-29 15:36:56.344615 |
61 |
61769217 |
MASS CLEANING OF ALL VILLAGE |
96000 |
MASS CLEANING OF ALL VILLAGE 1 |
Completion of work |
-
latitude : 20.0618043
Longitude : 82.7827813
file name : Image_09022023154933185.png
|
2023-02-09 15:49:33.3052 |
62 |
61769217 |
MASS CLEANING OF ALL VILLAGE |
96000 |
MASS CLEANING OF ALL VILLAGE 1 |
Plinth level |
-
latitude : 20.0618041
Longitude : 82.7827725
file name : Image_09022023155215691.png
|
2023-02-09 15:52:15.810677 |
63 |
105165908 |
Operation and Maintenance of drinking/piped water supply system |
163500 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 20.05949102
Longitude : 82.79084018
file name : Image_02092024142817014.png
|
2024-09-02 14:28:17.23536 |
64 |
105165908 |
Operation and Maintenance of drinking/piped water supply system |
163500 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 20.05948315
Longitude : 82.790818
file name : Image_02092024142504303.png
|
2024-09-02 14:25:04.498418 |
65 |
105165908 |
Operation and Maintenance of drinking/piped water supply system |
163500 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 20.05954335
Longitude : 82.79079492
file name : Image_02092024133635476.png
|
2024-09-02 13:36:35.675204 |
66 |
61752117 |
DEKOTE AWC BOUNDRY WALL & TOILET |
108992 |
DEKOTE AWC BOUNDRY WALL & TOILET1 |
Completion of work |
-
latitude : 19.88344775
Longitude : 82.80334404
file name : Image_28042023223650762.png
|
2023-04-28 22:36:50.851728 |
67 |
61750887 |
DEKOTE AWC BLOCK BRICK ROAD |
100000 |
DEKOTE AWC BLOCK BRICK ROAD1 |
Completion of work |
-
latitude : 19.88344927
Longitude : 82.80333474
file name : Image_28042023223959666.png
|
2023-04-28 22:39:59.776378 |
68 |
61751914 |
DASPUR GOVT. UP SCHOOL BLOCK BRICK |
100000 |
DASPUR GOVT. UP SCHOOL BLOCK BRICK1 |
Completion of work |
-
latitude : 19.88347185
Longitude : 82.80331689
file name : Image_14062023191159949.png
|
2023-06-14 19:12:00.039906 |
69 |
105184474 |
Operation and Maintenance of drinking/piped water supply system |
50000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 19.88217517
Longitude : 82.8017652
file name : Image_02092024210216546.png
|
2024-09-02 21:02:16.760831 |
70 |
105184474 |
Operation and Maintenance of drinking/piped water supply system |
50000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.88224473
Longitude : 82.80178401
file name : Image_02092024205209029.png
|
2024-09-02 20:52:09.888684 |
71 |
105184474 |
Operation and Maintenance of drinking/piped water supply system |
50000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.88212092
Longitude : 82.80173188
file name : Image_02092024202628238.png
|
2024-09-02 20:26:28.73619 |
72 |
79218302 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.88218385
Longitude : 82.80175019
file name : Image_02092024210423724.png
|
2024-09-02 21:04:23.854813 |
73 |
79218302 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.88218637
Longitude : 82.80178769
file name : Image_02092024205705679.png
|
2024-09-02 20:57:06.515895 |
74 |
79218302 |
Repair of pipe drinking water |
50000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.88223986
Longitude : 82.8017965
file name : Image_02092024203211341.png
|
2024-09-02 20:32:11.844027 |
75 |
79214627 |
Operation and Maintenance of piped water supply system |
76060 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.88218192
Longitude : 82.80175914
file name : Image_02092024210326922.png
|
2024-09-02 21:03:27.041527 |
76 |
79214627 |
Operation and Maintenance of piped water supply system |
76060 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.8821851
Longitude : 82.80179997
file name : Image_02092024205615669.png
|
2024-09-02 20:56:16.500422 |
77 |
79214627 |
Operation and Maintenance of piped water supply system |
76060 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.88213568
Longitude : 82.80176563
file name : Image_02092024202928099.png
|
2024-09-02 20:29:28.571564 |
78 |
77039796 |
Purchase of segregation bins to be fixed at public places |
19500 |
Purchase of segregation bins to be fixed at public places1 |
Roof laid |
-
latitude : 19.88218701
Longitude : 82.80174142
file name : Image_02092024211451730.png
|
2024-09-02 21:14:51.880013 |
79 |
77039796 |
Purchase of segregation bins to be fixed at public places |
19500 |
Purchase of segregation bins to be fixed at public places1 |
Plinth level |
-
latitude : 19.88220303
Longitude : 82.80177618
file name : Image_02092024211205391.png
|
2024-09-02 21:12:05.577737 |
80 |
77039796 |
Purchase of segregation bins to be fixed at public places |
19500 |
Purchase of segregation bins to be fixed at public places1 |
Completion of work |
-
latitude : 19.88218347
Longitude : 82.80174826
file name : Image_02092024210524212.png
|
2024-09-02 21:05:24.356866 |
81 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.88339666
Longitude : 82.80330231
file name : Image_28092023191702638.png
|
2023-09-28 19:17:02.737696 |
82 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.88337974
Longitude : 82.80330633
file name : Image_28092023191713235.png
|
2023-09-28 19:17:13.331992 |
83 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.88338054
Longitude : 82.80328842
file name : Image_28092023182935741.png
|
2023-09-28 18:29:35.841953 |
84 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.88338054
Longitude : 82.80328842
file name : Image_28092023182303911.png
|
2023-09-28 18:23:04.00693 |
85 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.88341231
Longitude : 82.8033261
file name : Image_28092023183420208.png
|
2023-09-28 18:34:20.293498 |
86 |
82005563 |
Operation and Maintenance of drinking water supply system |
290000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.88341457
Longitude : 82.80328802
file name : Image_28092023183413438.png
|
2023-09-28 18:34:13.534855 |
87 |
79222288 |
Construction of Building |
200000 |
Construction of Building1 |
Roof laid |
-
latitude : 19.88215089
Longitude : 82.80177498
file name : Image_04092024152627941.png
|
2024-09-04 15:26:28.033475 |
88 |
79222288 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-
latitude : 19.88215662
Longitude : 82.80173979
file name : Image_04092024151457151.png
|
2024-09-04 15:14:57.253402 |
89 |
79222288 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 19.88216303
Longitude : 82.80177437
file name : Image_04092024145533762.png
|
2024-09-04 14:55:33.951835 |
90 |
61767102 |
SOAKPIT AT DASPUR GOVT. UPS TUBEWELL |
12000 |
SOAKPIT AT DASPUR GOVT. UPS TUBEWELL1 |
Completion of work |
-
latitude : 20.04773456
Longitude : 83.362958
file name : Image_13112023132159449.png
|
2023-11-13 13:21:59.541877 |
91 |
61767201 |
SOAKPIT AT DASPUR HIGH SCHOOL |
12000 |
SOAKPIT AT DASPUR HIGH SCHOOL1 |
Completion of work |
-
latitude : 20.1972935
Longitude : 83.52371443
file name : Image_13112023132821078.png
|
2023-11-13 13:28:21.180068 |
92 |
61767309 |
SOAKPIT AT DEKOTE AWC |
12000 |
SOAKPIT AT DEKOTE AWC1 |
Completion of work |
-
latitude : 20.1972824
Longitude : 83.52371162
file name : Image_13112023133109780.png
|
2023-11-13 13:31:09.876124 |
93 |
61767420 |
SOAKPIT AT COLONY PADA AWC TUBEWELL |
12000 |
SOAKPIT AT COLONY PADA AWC TUBEWELL1 |
Completion of work |
-
latitude : 20.19728456
Longitude : 83.52369308
file name : Image_13112023133311783.png
|
2023-11-13 13:33:11.874199 |
94 |
61767524 |
COMPOST PIT AT DASPUR GOVT. UP SCHOOL |
10000 |
COMPOST PIT AT DASPUR GOVT. UP SCHOOL1 |
Completion of work |
-
latitude : 20.2049416
Longitude : 83.5214421
file name : Image_13112023143837150.png
|
2023-11-13 14:38:37.244652 |
95 |
61767524 |
COMPOST PIT AT DASPUR GOVT. UP SCHOOL |
10000 |
COMPOST PIT AT DASPUR GOVT. UP SCHOOL1 |
Completion of work |
-
latitude : 20.20536911
Longitude : 83.52347713
file name : Image_13112023141658689.png
|
2023-11-13 14:16:58.775336 |
96 |
61767660 |
COMPOST PIT AT DASPUR COLONYPADA PUPS |
10000 |
COMPOST PIT AT DASPUR COLONYPADA PUPS1 |
Completion of work |
-
latitude : 20.1972666
Longitude : 83.52374146
file name : Image_13112023161633523.png
|
2023-11-13 16:16:33.617241 |
97 |
61767766 |
COMPOST PIT AT DASPUR AWC-1 |
10000 |
COMPOST PIT AT DASPUR AWC-11 |
Completion of work |
-
latitude : 20.20535066
Longitude : 83.52349041
file name : Image_13112023143831110.png
|
2023-11-13 14:38:31.205685 |
98 |
61767901 |
COMPOST PIT AT NUAPADA AWC |
10000 |
COMPOST PIT AT NUAPADA AWC1 |
Completion of work |
-
latitude : 20.20535385
Longitude : 83.52348885
file name : Image_13112023143840162.png
|
2023-11-13 14:38:40.26861 |
99 |
61767901 |
COMPOST PIT AT NUAPADA AWC |
10000 |
COMPOST PIT AT NUAPADA AWC1 |
Completion of work |
-
latitude : 20.20535385
Longitude : 83.52348885
file name : Image_13112023143834109.png
|
2023-11-13 14:38:34.210345 |
100 |
79249544 |
Drainage Construction |
130080 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.9618091
Longitude : 82.86730312
file name : Image_19022024124321954.png
|
2024-02-19 12:43:22.041464 |
101 |
79249544 |
Drainage Construction |
130080 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.96459279
Longitude : 82.86309629
file name : Image_19022024122739217.png
|
2024-02-19 12:27:39.308295 |
102 |
79249544 |
Drainage Construction |
130080 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.95681043
Longitude : 82.84864138
file name : Image_19022024121504270.png
|
2024-02-19 12:15:04.360107 |
103 |
79249544 |
Drainage Construction |
130080 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.95681549
Longitude : 82.84864265
file name : Image_19022024121454959.png
|
2024-02-19 12:14:55.049848 |
104 |
79219860 |
Construction of Store Room in GP Bhawan |
273800 |
Construction of Store Room in GP Bhawan1 |
Roof laid |
-
latitude : 19.8834802
Longitude : 82.80332533
file name : Image_19122023160712352.png
|
2023-12-19 16:07:12.442081 |
105 |
79219860 |
Construction of Store Room in GP Bhawan |
273800 |
Construction of Store Room in GP Bhawan1 |
Plinth level |
-
latitude : 19.8834879
Longitude : 82.80330997
file name : Image_19122023155738498.png
|
2023-12-19 15:57:38.588435 |
106 |
79219860 |
Construction of Store Room in GP Bhawan |
273800 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 19.88346783
Longitude : 82.80329322
file name : Image_19122023154210250.png
|
2023-12-19 15:42:10.346302 |
107 |
79219860 |
Construction of Store Room in GP Bhawan |
273800 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 19.88343246
Longitude : 82.8032699
file name : Image_19122023154206222.png
|
2023-12-19 15:42:06.302702 |
108 |
79585368 |
Construction of Boundary Wall |
80000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.8822296
Longitude : 82.80181134
file name : Image_09062024123053605.png
|
2024-06-09 12:30:53.686228 |
109 |
79585368 |
Construction of Boundary Wall |
80000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.88219223
Longitude : 82.80180027
file name : Image_09062024121835142.png
|
2024-06-09 12:18:35.225283 |
110 |
79585368 |
Construction of Boundary Wall |
80000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.88217601
Longitude : 82.80180379
file name : Image_09062024112950801.png
|
2024-06-09 11:29:50.881261 |
111 |
79585368 |
Construction of Boundary Wall |
80000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.88217601
Longitude : 82.80180379
file name : Image_09062024112939530.png
|
2024-06-09 11:29:39.617726 |
112 |
79216197 |
Construction of community washing & bathing complex |
150000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 19.88222337
Longitude : 82.80181734
file name : Image_09062024122839094.png
|
2024-06-09 12:28:39.18103 |
113 |
79216197 |
Construction of community washing & bathing complex |
150000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 19.88219742
Longitude : 82.8017829
file name : Image_09062024115321974.png
|
2024-06-09 11:53:22.056507 |
114 |
79216197 |
Construction of community washing & bathing complex |
150000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 19.88202564
Longitude : 82.80189704
file name : Image_09062024112927737.png
|
2024-06-09 11:29:27.818002 |
115 |
79229543 |
Boundary wall and Gate |
86000 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 19.88222935
Longitude : 82.80181037
file name : Image_09062024122938234.png
|
2024-06-09 12:29:38.317781 |
116 |
79229543 |
Boundary wall and Gate |
86000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 19.88219239
Longitude : 82.80180268
file name : Image_09062024121744778.png
|
2024-06-09 12:17:44.867393 |
117 |
79229543 |
Boundary wall and Gate |
86000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 19.88212935
Longitude : 82.80185497
file name : Image_09062024112944937.png
|
2024-06-09 11:29:45.018423 |
118 |
79229543 |
Boundary wall and Gate |
86000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 19.88212935
Longitude : 82.80185497
file name : Image_09062024112934059.png
|
2024-06-09 11:29:34.172861 |
119 |
82006207 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.88345388
Longitude : 82.80333929
file name : Image_03012024170458533.png
|
2024-01-03 17:04:58.748301 |
120 |
82006207 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.88392604
Longitude : 82.80283737
file name : Image_03012024165004164.png
|
2024-01-03 16:50:04.255172 |
121 |
82006207 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.8834674
Longitude : 82.80328922
file name : Image_20102023143853037.png
|
2023-10-20 14:38:54.765082 |
122 |
82006207 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.88349155
Longitude : 82.80330201
file name : Image_20102023123710624.png
|
2023-10-20 12:37:10.936569 |
123 |
79232644 |
Construction of Boundary Wall |
119320 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.88341859
Longitude : 82.80334407
file name : Image_28032024222735555.png
|
2024-03-28 22:27:35.653125 |
124 |
79232644 |
Construction of Boundary Wall |
119320 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.88340973
Longitude : 82.80333785
file name : Image_28032024221915418.png
|
2024-03-28 22:19:15.514081 |
125 |
79232644 |
Construction of Boundary Wall |
119320 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.88343515
Longitude : 82.80335277
file name : Image_28032024221129350.png
|
2024-03-28 22:11:29.465048 |
126 |
105165019 |
Operation and Maintenance of drinking/piped water supply system |
156067 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 19.88238857
Longitude : 82.80187733
file name : Image_23092024161723096.png
|
2024-09-23 16:17:23.334407 |
127 |
105165019 |
Operation and Maintenance of drinking/piped water supply system |
156067 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 19.88239122
Longitude : 82.80185506
file name : Image_23092024161220121.png
|
2024-09-23 16:12:20.375049 |
128 |
105165019 |
Operation and Maintenance of drinking/piped water supply system |
156067 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 19.8822304
Longitude : 82.80172533
file name : Image_23092024160417710.png
|
2024-09-23 16:04:17.898356 |
129 |
79584104 |
Construction of Boundary Wall |
70000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 20.0594965
Longitude : 82.7908491
file name : Image_27112024132730031.png
|
2024-11-27 13:27:30.170568 |
130 |
79584104 |
Construction of Boundary Wall |
70000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 20.0594987
Longitude : 82.7908508
file name : Image_27112024130532586.png
|
2024-11-27 13:05:30.93366 |
131 |
79584104 |
Construction of Boundary Wall |
70000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 20.0594988
Longitude : 82.7908507
file name : Image_27112024124505631.png
|
2024-11-27 12:45:05.736038 |