1 |
44371309 |
Road clearing of Pandi to bhitarpandi road |
24391 |
Road clearing of Pandi to bhitarpandi road1 |
Completion of work |
-
latitude : 19.358751666666667,19.358751666666667
Longitude : 82.75888166666667,82.75888166666667
file name : Image_25032021160005791.png
|
2021-03-25 16:00:05.891857 |
2 |
44371085 |
Renovation of dhansuli Adkatabandh in convergence with MGNREGS |
100000 |
Renovation of dhansuli Adkatabandh in convergence with MGNREGS1 |
Completion of work |
-
latitude : 19.41152
Longitude : 82.78597333333333
file name : Image_25032021155959216.png
|
2021-03-25 15:59:59.32279 |
3 |
44370533 |
Const. of Tubwell Drain at sastuguda in Convergence with MGNREGA |
50000 |
Const. of Tubwell Drain at sastuguda in Convergence with MGNREGA1 |
Completion of work |
-
latitude : 19.382971666666666,19.382971666666666,19.382971666666666
Longitude : 82.74738833333335,82.74738833333335,82.74738833333335
file name : Image_25022021113607724.png
|
2021-02-25 11:36:07.812792 |
4 |
44369684 |
Cleaning and Repair of Drain at Dhansuli Ashram School with MGNREGA |
200000 |
Cleaning and Repair of Drain at Dhansuli Ashram School with MGNREGA1 |
Completion of work |
-
latitude : 19.405873333333332,19.405873333333332,19.405873333333332
Longitude : 82.78558666666667,82.78558666666667,82.78558666666667
file name : Image_25022021113552892.png
|
2021-02-25 11:35:52.974343 |
5 |
44369713 |
Repair of Toilet ,Bathing Platform at dhansuli Ramsa Ashram School with MGNREGA |
50000 |
Repair of Toilet ,Bathing Platform at dhansuli Ramsa Ashram School with MGNREGA1 |
Completion of work |
-
latitude : 19.398104999999997
Longitude : 82.78366166666667
file name : Image_25022021113544848.png
|
2021-02-25 11:35:44.927997 |
6 |
44371143 |
Renovation of Sastuguda Rajasolabandh in convergence with MGNREGS |
100000 |
Renovation of Sastuguda Rajasolabandh in convergence with MGNREGS1 |
Completion of work |
-
latitude : 19.380676666666666
Longitude : 82.73810666666668
file name : Image_04032021164809297.png
|
2021-03-04 16:48:09.403623 |
7 |
44370558 |
Const. of CC Drain At near bhalujore school in Convergence with MGNREGA |
150000 |
Const. of CC Drain At near bhalujore school in Convergence with MGNREGA1 |
Completion of work |
-
latitude : 19.370068333333332,19.370068333333332
Longitude : 82.73614,82.73614
file name : Image_10032021140723833.png
|
2021-03-10 14:07:23.893483 |
8 |
44371908 |
Repair and Maintenance of Health Sub -Centre Dhansuli |
100000 |
Repair and Maintenance of Health Sub -Centre Dhansuli1 |
Completion of work |
-
latitude : 19.39909
Longitude : 82.78379000000001
file name : Image_10032021122401565.png
|
2021-03-10 12:24:01.648037 |
9 |
44370900 |
Earth filling and Repairing at Bhalujore School |
100000 |
Earth filling and Repairing at Bhalujore School 1 |
Completion of work |
-
latitude : 19.369825
Longitude : 82.73613333333333
file name : Image_10032021140714604.png
|
2021-03-10 14:07:14.685331 |
10 |
44370900 |
Earth filling and Repairing at Bhalujore School |
100000 |
Earth filling and Repairing at Bhalujore School 1 |
Completion of work |
-
latitude : 19.369825
Longitude : 82.73613333333333
file name : Image_10032021140733839.png
|
2021-03-10 14:07:33.902196 |
11 |
44366132 |
Digging of Tube well at Sankarlakot Gadiajore pada |
80000 |
Digging of Tube well at Sankarlakot Gadiajore pada1 |
Completion of work |
-
latitude : 19.396753333333333
Longitude : 82.76956166666666
file name : Image_19042021131928781.png
|
2021-04-19 13:19:28.867299 |
12 |
44366132 |
Digging of Tube well at Sankarlakot Gadiajore pada |
80000 |
Digging of Tube well at Sankarlakot Gadiajore pada1 |
Completion of work |
-
latitude : 19.396808333333336
Longitude : 82.76955000000001
file name : Image_22032021131452898.png
|
2021-03-22 13:14:52.79145 |
13 |
44366024 |
Digging of Tube well at Kenduguda Budhianchal pada |
80000 |
Digging of Tube well at Kenduguda Budhianchal pada1 |
Completion of work |
-
latitude : 19.383564999999997
Longitude : 82.76453833333335
file name : Image_22032021131501096.png
|
2021-03-22 13:15:00.983737 |
14 |
44369653 |
Digging of Tube well at chandpur Sadargudi pada |
80000 |
Digging of Tube well at chandpur Sadargudi pada1 |
Completion of work |
-
latitude : 19.381998333333335
Longitude : 82.77816499999999
file name : Image_22032021132054899.png
|
2021-03-22 13:20:54.794769 |
15 |
44370875 |
Earth filling and Repairing at Pandi School |
100000 |
Earth filling and Repairing at Pandi School 1 |
Completion of work |
-
latitude : 19.370206666666665
Longitude : 82.76127833333334
file name : Image_05042021153847086.png
|
2021-04-05 15:38:47.188075 |
16 |
44369707 |
Construction of Tube well Platform at Dhansuli GP with MGNREGA |
113312 |
Construction of Tube well Platform at Dhansuli GP with MGNREGA1 |
Completion of work |
-
latitude : 19.36511
Longitude : 82.76124333333334
file name : Image_11052021160511227.png
|
2021-05-11 16:05:11.293909 |
17 |
44371202 |
Construction of Market Complace at Dhansuli |
200000 |
Construction of Market Complace at Dhansuli 1 |
Completion of work |
-
latitude : 19.400623333333332
Longitude : 82.78483499999999
file name : Image_11052021145853664.png
|
2021-05-11 14:58:53.032785 |
18 |
44371943 |
Maintainanace of L.I centre at Dhansuli |
100000 |
Maintainanace of L.I centre at Dhansuli1 |
Completion of work |
-
latitude : 19.40433833333333
Longitude : 82.78564666666668
file name : Image_11052021145848267.png
|
2021-05-11 14:58:47.637306 |
19 |
44370916 |
Earth filling and Repairing at Bangtisahaj School |
100000 |
Earth filling and Repairing at Bangtisahaj School 1 |
Completion of work |
-
latitude : 19.40199
Longitude : 82.73265833333335
file name : Image_20052021153000124.png
|
2021-05-20 15:30:00.213825 |
20 |
44371061 |
Renovation of chhatabanduguda khajuribandh in convergence with MGNREGS |
100000 |
Renovation of chhatabanduguda khajuribandh in convergence with MGNREGS1 |
Completion of work |
-
latitude : 19.399931666666664
Longitude : 82.79787833333333
file name : Image_20052021152956764.png
|
2021-05-20 15:29:56.865547 |
21 |
55638800 |
CONSTRUCTION OF SCHOOL BOUNDARY AND GATE AT CHHATBANDHGUDA |
150000 |
CONSTRUCTION OF SCHOOL BOUNDARY AND GATE AT CHHATBANDHGUDA 1 |
Completion of work |
-
latitude : 19.399226666666667
Longitude : 82.80082666666667
file name : Image_03122022122251337.png
|
2022-12-03 12:22:51.443366 |
22 |
55638800 |
CONSTRUCTION OF SCHOOL BOUNDARY AND GATE AT CHHATBANDHGUDA |
150000 |
CONSTRUCTION OF SCHOOL BOUNDARY AND GATE AT CHHATBANDHGUDA 1 |
Completion of work |
-
latitude : 19.399141666666665
Longitude : 82.80059000000001
file name : Image_04022022170730483.png
|
2022-02-04 17:07:30.541281 |
23 |
55639196 |
EARTH FILLING AT DHANSULI MAJHIPADA CHHAK |
90000 |
EARTH FILLING AT DHANSULI MAJHIPADA CHHAK1 |
Completion of work |
-
latitude : 19.40012,19.400111666666664
Longitude : 82.784825,82.78483166666668
file name : Image_04022022170726609.png
|
2022-02-04 17:07:26.679931 |
24 |
55638998 |
RENOVATION OF BATA BRUKSHYA BANDH AT DHANSULI |
53777 |
RENOVATION OF BATA BRUKSHYA BANDH AT DHANSULI 1 |
Completion of work |
-
latitude : 19.412275
Longitude : 82.788065
file name : Image_04022022170722466.png
|
2022-02-04 17:07:22.532855 |
25 |
44369677 |
Cleaning and Repair of Drain at Dhansuli Lankeswaripada with MGNREGA |
100000 |
Cleaning and Repair of Drain at Dhansuli Lankeswaripada with MGNREGA1 |
Completion of work |
-
latitude : 19.536706666666664,19.536706666666664,19.536706666666664,19.403624999999998
Longitude : 82.81278166666668,82.81278166666668,82.81278166666668,82.78364833333332
file name : Image_20112021123543203.png
|
2021-11-20 12:35:43.309285 |
26 |
44370586 |
Const. of CC Drain At dhansuli Majhipada in Convergence with MGNREGA |
100000 |
Const. of CC Drain At dhansuli Majhipada in Convergence with MGNREGA1 |
Completion of work |
-
latitude : 19.402919999999998,19.402829999999998,19.402829999999998,19.402829999999998
Longitude : 82.78496666666666,82.785135,82.785135,82.785135
file name : Image_19072021154455072.png
|
2021-07-19 15:44:55.138377 |
27 |
53437479 |
RENOVATION OF ADAKATA SAGAR DHANSULI PART 1 |
250000 |
RENOVATION OF ADAKATA SAGAR DHANSULI PART 11 |
Completion of work |
-
latitude : 19.411223333333332
Longitude : 82.78691166666667
file name : Image_03082021172345487.png
|
2021-08-03 17:23:45.580324 |
28 |
44369661 |
Amrutdhara at Dhansuli GP Office |
200000 |
Amrutdhara at Dhansuli GP Office1 |
Completion of work |
-
latitude : 19.40623
Longitude : 82.785385
file name : Image_06082021131144399.png
|
2021-08-06 13:11:44.547799 |
29 |
53700623 |
IMPROVEMENT OF ROAD NALACHOUN GHAT ROAD |
300000 |
IMPROVEMENT OF ROAD NALACHOUN GHAT ROAD1 |
Completion of work |
-
latitude : 19.39373,19.393813333333334,19.393815
Longitude : 82.72736833333332,82.72727166666667,82.72727000000002
file name : Image_12082021133431649.png
|
2021-08-12 13:34:31.760941 |
30 |
53700623 |
IMPROVEMENT OF ROAD NALACHOUN GHAT ROAD |
300000 |
IMPROVEMENT OF ROAD NALACHOUN GHAT ROAD1 |
Completion of work |
-
latitude : 19.393725,19.393775
Longitude : 82.72733500000001,82.72730166666666
file name : Image_12082021133438182.png
|
2021-08-12 13:34:38.296951 |
31 |
53437554 |
RENOVATION OF ADAKATA SAGAR DHANSULI PART 2 |
250000 |
RENOVATION OF ADAKATA SAGAR DHANSULI PART 21 |
Completion of work |
-
latitude : 19.41186
Longitude : 82.78722833333335
file name : Image_15092021142131007.png
|
2021-09-15 14:21:31.084659 |
32 |
55632424 |
DIGGING OF TUBE WELL AT KENDUGUDA AWC WITH PIPE WATER SUPPLY |
101025 |
DIGGING OF TUBE WELL AT KENDUGUDA AWC WITH PIPE WATER SUPPLY 1 |
Completion of work |
-
latitude : 19.387298333333334
Longitude : 82.77004000000001
file name : Image_15122021151105799.png
|
2021-12-15 15:11:05.863195 |
33 |
55639939 |
CONSTRUCTION OF CC DRAIN AT CHANDPUR UPERPADA |
74080 |
CONSTRUCTION OF CC DRAIN AT CHANDPUR UPERPADA1 |
Completion of work |
-
latitude : 19.376168333333332,19.376171666666668
Longitude : 82.78139666666667,82.781395
file name : Image_30122021174346978.png
|
2021-12-30 17:43:47.058518 |
34 |
55633316 |
CONSTRUCTION OF CC DRAIN WITH GUARDWALL AT PANDI TALAPADA |
256789 |
CONSTRUCTION OF CC DRAIN WITH GUARDWALL AT PANDI TALAPADA1 |
Completion of work |
-
latitude : 19.365853333333334,19.365433333333332,19.365426666666668
Longitude : 82.76124166666665,82.76104333333333,82.76104666666667
file name : Image_30122021174334518.png
|
2021-12-30 17:43:34.60214 |
35 |
55638839 |
CONSTRUCTION OF HIGH SCHOOL GATE OF SASTUGUDA |
80000 |
CONSTRUCTION OF HIGH SCHOOL GATE OF SASTUGUDA1 |
Completion of work |
-
latitude : 19.384411666666665
Longitude : 82.75047500000001
file name : Image_07012022174253767.png
|
2022-01-07 17:42:53.822997 |
36 |
86548623 |
IMPROVEMENT OF ROAD FROM PMGSY ROAD TO BUDIANCHALPADA |
100000 |
IMPROVEMENT OF ROAD FROM PMGSY ROAD TO BUDIANCHALPADA1 |
Completion of work |
-
latitude : 19.385046666666664,19.385011666666667,19.385008333333335
Longitude : 82.76689833333333,82.76702166666668,82.76701999999999
file name : Image_21072023130316688.png
|
2023-07-21 13:03:16.924117 |
37 |
86548616 |
CONSTRUCTION OF DRAIN AND CC ROAD BASTIPADA TUBEWELL THAKURANI MANDIR AT SANKARLAKOT |
200000 |
CONSTRUCTION OF DRAIN AND CC ROAD BASTIPADA TUBEWELL THAKURANI MANDIR AT SANKARLAKOT1 |
Completion of work |
-
latitude : 19.392266666666668,19.392319999999998,19.392319999999998
Longitude : 82.76055166666666,82.76061499999999,82.760605
file name : Image_21072023131142722.png
|
2023-07-21 13:11:42.826389 |
38 |
86548596 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.393116666666668
Longitude : 82.75862000000001
file name : Image_14082023140222291.png
|
2023-08-14 14:02:22.389294 |
39 |
86548597 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.768673333333332
Longitude : 82.82818333333334
file name : Image_14082023132002711.png
|
2023-08-14 13:20:02.833803 |
40 |
86548598 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.400135
Longitude : 82.77853166666667
file name : Image_14082023133240746.png
|
2023-08-14 13:32:40.852921 |
41 |
86548599 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.397591666666663
Longitude : 82.76542833333333
file name : Image_14082023140816924.png
|
2023-08-14 14:08:17.033388 |
42 |
61836862 |
Jala Chhatra |
38544 |
Jala Chhatra1 |
Completion of work |
-
latitude : 19.406366666666667
Longitude : 82.78519666666668
file name : Image_08082022162954625.png
|
2022-08-08 16:29:54.704688 |
43 |
61838974 |
Segrgation shed |
19500 |
Segrgation shed1 |
Completion of work |
-
latitude : 19.40646333333333
Longitude : 82.78531833333334
file name : Image_19092022132328641.png
|
2022-09-19 13:23:28.75866 |
44 |
55638936 |
CONSTRUCTION OF AWC KITCHEN ROOM AT KENDUGUDA DHANSULI |
60000 |
CONSTRUCTION OF AWC KITCHEN ROOM AT KENDUGUDA DHANSULI1 |
Completion of work |
-
latitude : 19.387395
Longitude : 82.77003166666667
file name : Image_20102022124737221.png
|
2022-10-20 12:47:37.382402 |
45 |
55633181 |
COMUNITY LEACH PIT AT PANDI VILLAGE 8NOS |
28800 |
COMUNITY LEACH PIT AT PANDI VILLAGE 8NOS1 |
Completion of work |
-
latitude : 19.370279999999998
Longitude : 82.76118333333334
file name : Image_20102022125820541.png
|
2022-10-20 12:58:20.726723 |
46 |
55632568 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT PANDI PS |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT PANDI PS1 |
Completion of work |
-
latitude : 19.371568333333336
Longitude : 82.75744166666667
file name : Image_20102022130645693.png
|
2022-10-20 13:06:45.853852 |
47 |
61841297 |
Const of School Boundery waal at chhata bandhuguda |
50000 |
Const of School Boundery waal at chhata bandhuguda1 |
Completion of work |
-
latitude : 19.399228333333333
Longitude : 82.80084666666669
file name : Image_03122022122416370.png
|
2022-12-03 12:24:16.458206 |
48 |
55632875 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS1 |
Completion of work |
-
latitude : 19.369883333333334
Longitude : 82.73619333333333
file name : Image_03122022142156708.png
|
2022-12-03 14:21:56.800456 |
49 |
55632875 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS1 |
Completion of work |
-
latitude : 19.37225
Longitude : 82.73616333333332
file name : Image_03122022142205444.png
|
2022-12-03 14:22:05.540054 |
50 |
55632875 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT BHALUJORE PS1 |
Completion of work |
-
latitude : 19.372341666666667
Longitude : 82.73623
file name : Image_03122022142214599.png
|
2022-12-03 14:22:14.717823 |
51 |
55632853 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT SANKARLAKOTE PS |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT SANKARLAKOTE PS1 |
Completion of work |
-
latitude : 19.392888333333335
Longitude : 82.76089833333332
file name : Image_03122022142224042.png
|
2022-12-03 14:22:24.136955 |
52 |
55632980 |
COMUNITY LEACH PIT AT BHALUJORE VILLAGE 2NOS |
7200 |
COMUNITY LEACH PIT AT BHALUJORE VILLAGE 2NOS1 |
Completion of work |
-
latitude : 19.369179999999997
Longitude : 82.73617
file name : Image_03122022134846805.png
|
2022-12-03 13:48:46.920766 |
53 |
55633058 |
COMUNITY LEACH PIT AT CHATABANDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT CHATABANDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.40229
Longitude : 82.80334666666667
file name : Image_03122022130842011.png
|
2022-12-03 13:08:42.106962 |
54 |
55633230 |
COMUNITY LEACH PIT AT SANKARLAKOTE VILLAGE 6NOS |
21600 |
COMUNITY LEACH PIT AT SANKARLAKOTE VILLAGE 6NOS1 |
Completion of work |
-
latitude : 19.39595166666667
Longitude : 82.76461666666667
file name : Image_03122022132750560.png
|
2022-12-03 13:27:50.698997 |
55 |
86548610 |
EARTH FILLING AT DHANSULI THAKURANI MANDIR CHOWK |
100000 |
EARTH FILLING AT DHANSULI THAKURANI MANDIR CHOWK1 |
Completion of work |
-
latitude : 19.404756666666668,19.404621666666667,19.40459333333333
Longitude : 82.78465,82.78436833333332,82.78443999999999
file name : Image_30102023145006504.png
|
2023-10-30 14:50:06.618448 |
56 |
66757926 |
CONSTRUCTION OF COMMUNITY CATTLE SHED |
173701 |
CONSTRUCTION OF COMMUNITY CATTLE SHED1 |
Completion of work |
-
latitude : 19.372741666666666
Longitude : 82.73585499999999
file name : Image_12072023153337412.png
|
2023-07-12 15:33:37.502267 |
57 |
86514647 |
RENOVATION OF CHARIKHUNTIABANDH AT DHANSULI |
168000 |
RENOVATION OF CHARIKHUNTIABANDH AT DHANSULI1 |
Completion of work |
-
latitude : 19.402829999999998
Longitude : 82.78941833333334
file name : Image_19072023132841110.png
|
2023-07-19 13:28:41.233232 |
58 |
55633129 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.383298333333336
Longitude : 82.76635833333333
file name : Image_03112023110240607.png
|
2023-11-03 11:02:40.721937 |
59 |
55633129 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.384613333333334
Longitude : 82.76521499999998
file name : Image_03112023110232782.png
|
2023-11-03 11:02:32.889539 |
60 |
55633129 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.383298333333336
Longitude : 82.76635833333333
file name : Image_03112023110224300.png
|
2023-11-03 11:02:24.398503 |
61 |
55633129 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.384613333333334
Longitude : 82.76521499999998
file name : Image_03112023110216843.png
|
2023-11-03 11:02:16.951889 |
62 |
55633129 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS |
10800 |
COMUNITY LEACH PIT AT KENDUGUDA VILLAGE 3NOS1 |
Completion of work |
-
latitude : 19.384673333333335
Longitude : 82.76521
file name : Image_03112023110205677.png
|
2023-11-03 11:02:05.788453 |
63 |
55632532 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT KENDUGUDA AWC |
22000 |
INSTITUTIONAL SOAK PIT/ LEACH PIT AND COMPOST PIT AT KENDUGUDA AWC1 |
Completion of work |
-
latitude : 19.38722166666667
Longitude : 82.77016333333334
file name : Image_03112023104917759.png
|
2023-11-03 10:49:17.861694 |
64 |
61837930 |
Community Leach pit |
43200 |
Community Leach pit1 |
Completion of work |
-
latitude : 19.394341666666666
Longitude : 82.73483333333334
file name : Image_03112023113049152.png
|
2023-11-03 11:30:49.279581 |
65 |
61837930 |
Community Leach pit |
43200 |
Community Leach pit2 |
Completion of work |
-
latitude : 19.394136666666668
Longitude : 82.73438166666668
file name : Image_03112023113257990.png
|
2023-11-03 11:32:58.094306 |
66 |
61837930 |
Community Leach pit |
43200 |
Community Leach pit3 |
Completion of work |
-
latitude : 19.402818333333336
Longitude : 82.73418333333332
file name : Image_03112023114446069.png
|
2023-11-03 11:44:46.166886 |
67 |
61837930 |
Community Leach pit |
43200 |
Community Leach pit4 |
Completion of work |
-
latitude : 19.402316666666664
Longitude : 82.73275333333335
file name : Image_03112023114914555.png
|
2023-11-03 11:49:14.645492 |
68 |
61837532 |
Community Leach pit |
18000 |
Community Leach pit1 |
Roof laid |
-
latitude : 19.375533333333333
Longitude : 82.77418166666666
file name : Image_11082024163052976.png
|
2024-08-11 16:30:53.083284 |
69 |
61837532 |
Community Leach pit |
18000 |
Community Leach pit1 |
Plinth level |
-
latitude : 19.378856666666664
Longitude : 82.77484833333334
file name : Image_11082024161547936.png
|
2024-08-11 16:15:48.018554 |
70 |
61837532 |
Community Leach pit |
18000 |
Community Leach pit1 |
Completion of work |
-
latitude : 19.38195
Longitude : 82.77806333333335
file name : Image_11082024160521408.png
|
2024-08-11 16:05:21.492154 |
71 |
61837532 |
Community Leach pit |
18000 |
Community Leach pit1 |
Completion of work |
-
latitude : 19.382011666666664
Longitude : 82.77805333333332
file name : Image_03112023142625633.png
|
2023-11-03 14:26:25.726262 |
72 |
61837532 |
Community Leach pit |
18000 |
Community Leach pit1 |
Completion of work |
-
latitude : 19.37887
Longitude : 82.77495500000002
file name : Image_03112023144415914.png
|
2023-11-03 14:44:16.014751 |
73 |
83056630 |
Electricity connection /Installation of Solar Energy |
35000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 19.84831
Longitude : 82.83528
file name : Image_29032024164444583.png
|
2024-03-29 16:44:44.667613 |
74 |
86548621 |
Greywater management system |
17156 |
Greywater management system1 |
Completion of work |
-
latitude : 19.48100833333333
Longitude : 82.803295
file name : Image_11092024224916888.png
|
2024-09-11 22:49:16.958603 |
75 |
61837752 |
Community Leach pit |
14400 |
Community Leach pit1 |
Completion of work |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024092008717.png
|
2024-09-30 09:20:08.78793 |
76 |
61838306 |
Community Compost pit |
3000 |
Community Compost pit1 |
Completion of work |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024091806091.png
|
2024-09-30 09:18:06.178945 |
77 |
82988098 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.48165
Longitude : 82.80561166666666
file name : Image_30092024103808054.png
|
2024-09-30 10:38:08.145716 |
78 |
82988098 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.48165
Longitude : 82.80561166666666
file name : Image_30092024103215616.png
|
2024-09-30 10:32:15.592306 |
79 |
82988098 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.483301666666666
Longitude : 82.80516833333334
file name : Image_30092024102322301.png
|
2024-09-30 10:23:22.416707 |
80 |
82988459 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.48165
Longitude : 82.80561166666666
file name : Image_30092024103702799.png
|
2024-09-30 10:37:00.165266 |
81 |
82988459 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.48165
Longitude : 82.80561166666666
file name : Image_30092024103316711.png
|
2024-09-30 10:33:15.790951 |
82 |
82988459 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024100747530.png
|
2024-09-30 10:07:47.619854 |
83 |
82989419 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024100636563.png
|
2024-09-30 10:06:36.675567 |
84 |
82989419 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024100039810.png
|
2024-09-30 10:00:39.895633 |
85 |
82989419 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.480796666666667
Longitude : 82.80535499999999
file name : Image_30092024095722396.png
|
2024-09-30 09:57:22.47165 |
86 |
77025861 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.40364476
Longitude : 82.78358522
file name : Image_08102024101626446.png
|
2024-10-08 10:16:26.53744 |
87 |
77025861 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.4035822
Longitude : 82.78381482
file name : Image_08102024101335850.png
|
2024-10-08 10:13:35.941515 |
88 |
77025861 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.4035726
Longitude : 82.78390985
file name : Image_08102024101019819.png
|
2024-10-08 10:10:19.899535 |
89 |
86548608 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR |
100000 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR1 |
Roof laid |
-
latitude : 19.376861666666667
Longitude : 82.780075
file name : Image_11082024172332576.png
|
2024-08-11 17:23:32.665588 |
90 |
86548608 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR |
100000 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR1 |
Plinth level |
-
latitude : 19.376845
Longitude : 82.78008666666668
file name : Image_11082024172047840.png
|
2024-08-11 17:20:47.951665 |
91 |
86548608 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR |
100000 |
CONSTRUCTION OF SCHOOL BOUNDARY AT CHANDPUR1 |
Completion of work |
-
latitude : 19.376855
Longitude : 82.78014833333333
file name : Image_11082024170911851.png
|
2024-08-11 17:09:11.956888 |
92 |
105833382 |
Drinking water facilities/ Installation of RO/ Water Filter |
70118 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 19.48089333333333
Longitude : 82.80530166666668
file name : Image_18082024224517131.png
|
2024-08-18 22:45:17.218818 |
93 |
105833382 |
Drinking water facilities/ Installation of RO/ Water Filter |
70118 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 19.48089333333333
Longitude : 82.80530166666668
file name : Image_18082024224502101.png
|
2024-08-18 22:45:02.188724 |
94 |
105836478 |
Creation of Shed for segregation and processing of wet and dry waste |
19500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 19.40239175
Longitude : 82.80354479
file name : Image_05112024123149456.png
|
2024-11-05 12:31:49.544898 |
95 |
105836478 |
Creation of Shed for segregation and processing of wet and dry waste |
19500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 19.40239258
Longitude : 82.80353701
file name : Image_05112024122854214.png
|
2024-11-05 12:28:54.300686 |
96 |
105836478 |
Creation of Shed for segregation and processing of wet and dry waste |
19500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 19.40237373
Longitude : 82.8035089
file name : Image_05112024122355833.png
|
2024-11-05 12:23:55.937378 |
97 |
83043227 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.39906702
Longitude : 82.78376526
file name : Image_05112024124914311.png
|
2024-11-05 12:49:14.398646 |
98 |
83043227 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.39906998
Longitude : 82.78376392
file name : Image_05112024124649550.png
|
2024-11-05 12:46:49.653147 |
99 |
83043227 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.39909501
Longitude : 82.78382126
file name : Image_05112024124357270.png
|
2024-11-05 12:43:57.370331 |
100 |
83042194 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 19.38394319
Longitude : 82.76475463
file name : Image_05112024135741983.png
|
2024-11-05 13:57:42.077444 |
101 |
83042194 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 19.38392504
Longitude : 82.76474072
file name : Image_05112024135030486.png
|
2024-11-05 13:50:30.577521 |
102 |
83042194 |
Creation of drainage channel for management of grey water |
9000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 19.38391539
Longitude : 82.76473552
file name : Image_05112024134506288.png
|
2024-11-05 13:45:06.383512 |