1 |
44316008 |
Construction of Drain at Birkapada Village. |
100000 |
Construction of Drain at Birkapada Village.1 |
Completion of work |
-
latitude : 19.82844719197601
Longitude : 83.42422538436949
file name : Image_29122020165536420.png
|
2020-12-29 16:55:36.502175 |
2 |
44633896 |
CONST. OF CC ROAD AT KUTINGPADAR |
100000 |
CONST. OF CC ROAD AT KUTINGPADAR1 |
Completion of work |
-
latitude : 19.827836947515607
Longitude : 83.39213409461081
file name : Image_29122020171116022.png
|
2020-12-29 17:11:16.087836 |
3 |
44633905 |
CONST. OF CC ROAD AT IJRUPA VLLAGE |
102419 |
CONST. OF CC ROAD AT IJRUPA VLLAGE 1 |
Completion of work |
-
latitude : 19.82954404782504
Longitude : 83.40145720168948
file name : Image_29122020170422659.png
|
2020-12-29 17:04:22.727458 |
4 |
44317207 |
Repairing of Grading of U.P School Building at Dumermunda |
200000 |
Repairing of Grading of U.P School Building at Dumermunda 1 |
Completion of work |
-
latitude : 19.828638257458806
Longitude : 83.40562996454537
file name : Image_18022021123509729.png
|
2021-02-18 12:35:09.811078 |
5 |
44316952 |
Operation and maintenance of existing PWS of Biswanathpur Village |
402419 |
Operation and maintenance of existing PWS of Biswanathpur Village1 |
Plinth level |
-
latitude : 19.810910113155842,19.810910113155842,19.810910113155842,19.810910113155842,19.810910113155842,19.810910113155842,19.810910113155842
Longitude : 83.42708537355065,83.42708537355065,83.42708537355065,83.42708537355065,83.42708537355065,83.42708537355065,83.42708537355065
file name : Image_23042021093151805.png
|
2021-04-23 09:31:51.890204 |
6 |
44316147 |
Construction of Drain at Malipada Sitapur Village. |
150000 |
Construction of Drain at Malipada Sitapur Village.1 |
Completion of work |
-
latitude : 19.817557758651674,19.817552100867033,19.817547448910773
Longitude : 83.4170949831605,83.41714795678854,83.41715482994914
file name : Image_20052021100840466.png
|
2021-05-20 10:08:40.564395 |
7 |
44316702 |
Construction of Drain at Sitapur Village. |
200000 |
Construction of Drain at Sitapur Village.1 |
Completion of work |
-
latitude : 19.812555480748415,19.8125097155571
Longitude : 83.42700951732695,83.42696836218238
file name : Image_12082021180305336.png
|
2021-08-12 18:03:05.420226 |
8 |
44316702 |
Construction of Drain at Sitapur Village. |
200000 |
Construction of Drain at Sitapur Village.1 |
Completion of work |
-
latitude : 19.80491705238819,19.80489379260689
Longitude : 83.42887826263905,83.42886158265173
file name : Image_20052021095326333.png
|
2021-05-20 09:53:26.431842 |
9 |
44317344 |
Construction of Boundary wall at Sitapur AWC |
150000 |
Construction of Boundary wall at Sitapur AWC1 |
Completion of work |
-
latitude : 19.807859645225108
Longitude : 83.42683525756001
file name : Image_18062021071253173.png
|
2021-06-18 07:12:53.268012 |
10 |
44317287 |
Construction of Boundary wall at Sitapur U.P School |
150000 |
Construction of Boundary wall at Sitapur U.P School 1 |
Completion of work |
-
latitude : 19.807491679675877
Longitude : 83.42717329971492
file name : Image_18062021070816840.png
|
2021-06-18 07:08:16.947374 |
11 |
44317382 |
Construction of Gram Panchayat level COVID Care Home of Biswanathpur Gram Panchayat |
50000 |
Construction of Gram Panchayat level COVID Care Home of Biswanathpur Gram Panchayat 1 |
Completion of work |
-
latitude : 19.813310313038528
Longitude : 83.45048504881561
file name : Image_18062021151213405.png
|
2021-06-18 15:12:13.501812 |
12 |
48323214 |
MAINTENANCE OF GOPABANDHU HIGH SCHOOL SCHOOL BISWANATHPUR |
300000 |
MAINTENANCE OF GOPABANDHU HIGH SCHOOL SCHOOL BISWANATHPUR1 |
Completion of work |
-
latitude : 19.820461962372065
Longitude : 83.42965300194919
file name : Image_26102021082904445.png
|
2021-10-26 08:29:04.581511 |
13 |
44317136 |
Repairing and maintenance of sanitary Well at BISWANATHPUR GP |
10000 |
Repairing and maintenance of sanitary Well at BISWANATHPUR GP 1 |
Completion of work |
-
latitude : 19.81241592206061
Longitude : 83.42696852982044
file name : Image_13082021123039369.png
|
2021-08-13 12:30:39.501684 |
14 |
44317324 |
Construction of Boundary wall at Dhanrabhata AWC |
130000 |
Construction of Boundary wall at Dhanrabhata AWC1 |
Completion of work |
-
latitude : 19.81142207980156
Longitude : 83.43153926543891
file name : Image_03112021101701903.png
|
2021-11-03 10:17:02.027986 |
15 |
44317175 |
Construction of Boundary wall at Dhanrabhata U.P School |
130000 |
Construction of Boundary wall at Dhanrabhata U.P School 1 |
Completion of work |
-
latitude : 19.811412733979523
Longitude : 83.43151981942356
file name : Image_05112021173817189.png
|
2021-11-05 17:38:17.337932 |
16 |
44316854 |
Transportation Charges Solid Waste from villages to nearest ULBs / Dumping yard |
50000 |
Transportation Charges Solid Waste from villages to nearest ULBs / Dumping yard1 |
Completion of work |
-
latitude : 19.822027031332254
Longitude : 83.43027954921126
file name : Image_19082021104041107.png
|
2021-08-19 10:40:41.237379 |
17 |
48321964 |
OPERATION AND MAINTENANCE OF PWS BISWANATHPUR GP AREA |
381209 |
OPERATION AND MAINTENANCE OF PWS BISWANATHPUR GP AREA1 |
Completion of work |
-
latitude : 19.82447408605367
Longitude : 83.43029664829373
file name : Image_16122021123156986.png
|
2021-12-16 12:31:57.090356 |
18 |
48321964 |
OPERATION AND MAINTENANCE OF PWS BISWANATHPUR GP AREA |
381209 |
OPERATION AND MAINTENANCE OF PWS BISWANATHPUR GP AREA1 |
Completion of work |
-
latitude : 19.82098256237805
Longitude : 83.43027502298355
file name : Image_26082021135914692.png
|
2021-08-26 13:59:14.799094 |
19 |
48323772 |
PAYMENT OF ENERGY CHARGES OF EXISTING PWS AT BISWANATHPUR GP AREA |
311900 |
PAYMENT OF ENERGY CHARGES OF EXISTING PWS AT BISWANATHPUR GP AREA1 |
Plinth level |
-
latitude : 19.8218855,19.8218852
Longitude : 83.4308087,83.4308119
file name : Image_16122021114705369.png
|
2021-12-16 11:47:05.481398 |
20 |
44316752 |
Construction of 5nos of Platform of Tube Well at Biswanathpur G:P Area |
75000 |
Construction of 5nos of Platform of Tube Well at Biswanathpur G:P Area1 |
Completion of work |
-
latitude : 19.82873037457466
Longitude : 83.40515152551234
file name : Image_16122021121848695.png
|
2021-12-16 12:18:48.798237 |
21 |
48323329 |
CONSTRUCTION OF BOUNDARY WALL AT ME SCHOOL BISWANATHPUR |
160000 |
CONSTRUCTION OF BOUNDARY WALL AT ME SCHOOL BISWANATHPUR1 |
Completion of work |
-
latitude : 19.825386498123407
Longitude : 83.4299286827445
file name : Image_16122021124011087.png
|
2021-12-16 12:40:11.207125 |
22 |
48324001 |
CONSTRUCTION OF DRAIN HARIJAN PADA AT DUMERMUNDA VILLAGE. |
200000 |
CONSTRUCTION OF DRAIN HARIJAN PADA AT DUMERMUNDA VILLAGE.1 |
Completion of work |
-
latitude : 19.8288864037022,19.828914985992014
Longitude : 83.40548772364855,83.4053953550756
file name : Image_16122021121624856.png
|
2021-12-16 12:16:24.983132 |
23 |
48322395 |
PROVISION FOR ASSURED SAFE PIPED WATER SUPPLY TO DUMERMUNDA GOVT UPPER PRIMARY SCHOOL |
50000 |
PROVISION FOR ASSURED SAFE PIPED WATER SUPPLY TO DUMERMUNDA GOVT UPPER PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.82871398795396,19.82868050225079
Longitude : 83.40566189959645,83.40558319352567
file name : Image_16122021121425684.png
|
2021-12-16 12:14:25.892646 |
24 |
55444900 |
CONSTRUCTION OF BOUNDARY WALL AT BHIRKAPADA PRYMARY SCHOOL |
150000 |
CONSTRUCTION OF BOUNDARY WALL AT BHIRKAPADA PRYMARY SCHOOL 1 |
Completion of work |
-
latitude : 19.8279677471146
Longitude : 83.42412756755948
file name : Image_29122021110022245.png
|
2021-12-29 11:00:22.378913 |
25 |
48320231 |
CONSTRUCTION OF NEW TOILET AT DUMERMUNDA UP SCHOOL |
50000 |
CONSTRUCTION OF NEW TOILET AT DUMERMUNDA UP SCHOOL 1 |
Completion of work |
-
latitude : 19.828767841681838
Longitude : 83.40567044913769
file name : Image_29122021104819491.png
|
2021-12-29 10:48:19.622507 |
26 |
48320231 |
CONSTRUCTION OF NEW TOILET AT DUMERMUNDA UP SCHOOL |
50000 |
CONSTRUCTION OF NEW TOILET AT DUMERMUNDA UP SCHOOL 1 |
Completion of work |
-
latitude : 19.828767841681838
Longitude : 83.40567044913769
file name : Image_29122021105919811.png
|
2021-12-29 10:59:19.956322 |
27 |
48322206 |
EXCEEDING PIE WATER SUPPLY KENDUPADA AND DHANRABHATA HARIJANPADA |
100000 |
EXCEEDING PIE WATER SUPPLY KENDUPADA AND DHANRABHATA HARIJANPADA1 |
Completion of work |
-
latitude : 19.82959735672921,19.829566259868443
Longitude : 83.43210202641785,83.43208668753505
file name : Image_31052022182438712.png
|
2022-05-31 18:24:38.80404 |
28 |
64184181 |
CONST OF DRAIN WITH TUBEWELL PLATFORM AT IJURURA VILLAGE. |
200000 |
CONST OF DRAIN WITH TUBEWELL PLATFORM AT IJURURA VILLAGE.1 |
Completion of work |
-
latitude : 19.8816564
Longitude : 83.2390628
file name : Image_17082022104616168.png
|
2022-08-17 10:46:16.274659 |
29 |
61821075 |
Payment of SEM Salary |
264000 |
Payment of SEM Salary 1 |
Completion of work |
-
latitude : 19.8218887,19.8218867
Longitude : 83.4309416,83.430942
file name : Image_27092022153935869.png
|
2022-09-27 15:39:36.045346 |
30 |
61821125 |
Payment of PWS energy Bill |
192744 |
Payment of PWS energy Bill1 |
Completion of work |
-
latitude : 19.8218899,19.82189
Longitude : 83.4309415,83.4309417
file name : Image_29092022122857119.png
|
2022-09-29 12:28:57.309882 |
31 |
82810915 |
Installation of Street Light |
226301 |
Installation of Street Light1 |
Roof laid |
-
latitude : 20.2652568
Longitude : 85.83972974
file name : Image_12082023092024360.png
|
2023-08-12 09:20:24.461652 |
32 |
82810915 |
Installation of Street Light |
226301 |
Installation of Street Light1 |
Roof laid |
-
latitude : 19.82123499
Longitude : 83.42998864
file name : Image_11082023143138810.png
|
2023-08-11 14:31:38.922858 |
33 |
82810915 |
Installation of Street Light |
226301 |
Installation of Street Light1 |
Plinth level |
-
latitude : 19.82123955
Longitude : 83.42996995
file name : Image_11082023142832846.png
|
2023-08-11 14:28:32.956435 |
34 |
82810915 |
Installation of Street Light |
226301 |
Installation of Street Light1 |
Completion of work |
-
latitude : 19.82123049
Longitude : 83.43006435
file name : Image_11082023141900455.png
|
2023-08-11 14:19:00.566723 |
35 |
82813952 |
Piped water supply to HH |
222060 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 19.8217061
Longitude : 83.4309427
file name : Image_27032024185416101.png
|
2024-03-27 18:54:16.166801 |
36 |
82813952 |
Piped water supply to HH |
222060 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 19.8217072
Longitude : 83.4309407
file name : Image_27032024184334993.png
|
2024-03-27 18:43:35.072827 |
37 |
78429303 |
Maintenance of Panchayat Bhawan |
88590 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 19.823818475373482
Longitude : 83.42980272948614
file name : Image_09112023182955130.png
|
2023-11-09 18:29:55.192239 |
38 |
78429303 |
Maintenance of Panchayat Bhawan |
88590 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 19.82136477140751
Longitude : 83.43001864537374
file name : Image_09112023121916716.png
|
2023-11-09 12:19:16.93018 |
39 |
61821242 |
7 nos. Institutional Compost Pit in GP Area |
70000 |
7 nos. Institutional Compost Pit in GP Area 1 |
Completion of work |
-
latitude : 19.802261908967537
Longitude : 83.42975094024803
file name : Image_01022024153310503.png
|
2024-02-01 15:33:10.687022 |
40 |
78431518 |
Operation and Maintenance of piped water supply system |
99365 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.818102602800796
Longitude : 83.43066114474179
file name : Image_13122023110008465.png
|
2023-12-13 11:00:08.53676 |
41 |
78431518 |
Operation and Maintenance of piped water supply system |
99365 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.81813464391326
Longitude : 83.43065124560857
file name : Image_13122023105507379.png
|
2023-12-13 10:55:07.554651 |
42 |
78425715 |
Drainage Construction |
166560 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.828318786860795
Longitude : 83.42431028299447
file name : Image_12122023112503523.png
|
2023-12-12 11:25:03.580868 |
43 |
78425715 |
Drainage Construction |
166560 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.82834775515645
Longitude : 83.42434808476712
file name : Image_12122023112045365.png
|
2023-12-12 11:20:45.429984 |
44 |
78425715 |
Drainage Construction |
166560 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.828367768348283
Longitude : 83.42430372151782
file name : Image_12122023111246329.png
|
2023-12-12 11:12:46.390591 |
45 |
82813716 |
Water Supply to villages |
240000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.181446252075276
Longitude : 83.21473208992435
file name : Image_14122023220251962.png
|
2023-12-14 22:02:52.031928 |
46 |
82813716 |
Water Supply to villages |
240000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.181515257467414
Longitude : 83.2147451086635
file name : Image_14122023215722872.png
|
2023-12-14 21:57:22.944545 |
47 |
82813716 |
Water Supply to villages |
240000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.18146859
Longitude : 83.21474598
file name : Image_10082023220902303.png
|
2023-08-10 22:09:02.450351 |
48 |
78427814 |
Construction and Maintenance of Children Park |
527490 |
Construction and Maintenance of Children Park1 |
Roof laid |
-
latitude : 19.822275433102476
Longitude : 83.41906180175796
file name : Image_28032024091401670.png
|
2024-03-28 09:14:01.737393 |
49 |
78427814 |
Construction and Maintenance of Children Park |
527490 |
Construction and Maintenance of Children Park1 |
Plinth level |
-
latitude : 19.822339625782636
Longitude : 83.4190138763594
file name : Image_28032024091105562.png
|
2024-03-28 09:11:05.625725 |
50 |
78427814 |
Construction and Maintenance of Children Park |
527490 |
Construction and Maintenance of Children Park1 |
Completion of work |
-
latitude : 19.822303214909727
Longitude : 83.41881995736429
file name : Image_28032024090726921.png
|
2024-03-28 09:07:27.004781 |
51 |
103925587 |
Maintenance of school buildings |
300000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 19.828665255364925
Longitude : 83.40559929454515
file name : Image_26092024173852998.png
|
2024-09-26 17:38:53.055606 |
52 |
103925587 |
Maintenance of school buildings |
300000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 19.82865845103585
Longitude : 83.40561739202298
file name : Image_26092024173050996.png
|
2024-09-26 17:30:51.046916 |
53 |
103925587 |
Maintenance of school buildings |
300000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 19.828614334249085
Longitude : 83.40564153834403
file name : Image_26092024171833356.png
|
2024-09-26 17:18:33.418983 |
54 |
103713509 |
Electric connection |
400000 |
Electric connection1 |
Roof laid |
-
latitude : 19.820914912157757
Longitude : 83.43015337053824
file name : Image_26092024165316111.png
|
2024-09-26 16:53:16.191591 |
55 |
103713509 |
Electric connection |
400000 |
Electric connection1 |
Plinth level |
-
latitude : 19.820889664858544
Longitude : 83.43011638736422
file name : Image_26092024164915620.png
|
2024-09-26 16:49:15.69895 |
56 |
103713509 |
Electric connection |
400000 |
Electric connection1 |
Completion of work |
-
latitude : 19.820935098676973
Longitude : 83.42993760101146
file name : Image_26092024114401381.png
|
2024-09-26 11:44:01.451655 |
57 |
103930727 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
250000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 19.828881067513855
Longitude : 83.40542612524845
file name : Image_26092024171612120.png
|
2024-09-26 17:16:12.184719 |
58 |
103930727 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
250000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 19.828914182813087
Longitude : 83.40542662689525
file name : Image_26092024171458115.png
|
2024-09-26 17:14:58.187842 |
59 |
103930727 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
250000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 19.828878282233728
Longitude : 83.40550222864466
file name : Image_26092024170857327.png
|
2024-09-26 17:08:57.407198 |
60 |
103930727 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
250000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 19.828877314177667
Longitude : 83.40550084526087
file name : Image_26092024170509357.png
|
2024-09-26 17:05:09.430469 |
61 |
103946206 |
Creation of a new source of drinking water |
362500 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 19.821754972961582
Longitude : 83.4310458627302
file name : Image_30072024191503607.png
|
2024-07-30 19:15:03.675473 |
62 |
103946206 |
Creation of a new source of drinking water |
362500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.821560129649804
Longitude : 83.43083096945954
file name : Image_30072024191230228.png
|
2024-07-30 19:12:30.302407 |
63 |
103949653 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.181001670511098
Longitude : 83.21506031280768
file name : Image_08082024193805283.png
|
2024-08-08 19:38:05.350094 |
64 |
103949653 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.1810156750616
Longitude : 83.21509316485282
file name : Image_08082024193105898.png
|
2024-08-08 19:31:05.960066 |
65 |
103949653 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.18097296167902
Longitude : 83.21498873790627
file name : Image_08082024185417974.png
|
2024-08-08 18:54:18.048741 |
66 |
103714100 |
Electric connection |
300000 |
Electric connection1 |
Plinth level |
-
latitude : 19.8217556
Longitude : 83.430982
file name : Image_22082024123032983.png
|
2024-08-22 12:30:33.065911 |
67 |
103714100 |
Electric connection |
300000 |
Electric connection1 |
Completion of work |
-
latitude : 19.82125517161867
Longitude : 83.43007325229114
file name : Image_20082024093333205.png
|
2024-08-20 09:33:33.283637 |