1 |
44253244 |
Construction of Boundary wall at UGME School, Gudari |
303844 |
Construction of Boundary wall at UGME School, Gudari1 |
Plinth level |
-
latitude : 20.45580182
Longitude : 84.26671957
file name : Image_29122020173615987.png
|
2020-12-29 17:36:16.101913 |
2 |
44252779 |
Construction of Boundary wall at AWC Gudari |
200000 |
Construction of Boundary wall at AWC Gudari1 |
Plinth level |
-
latitude : 20.45610318
Longitude : 84.26735176
file name : Image_29122020173601083.png
|
2020-12-29 17:36:01.210999 |
3 |
44253385 |
Construction of Boundary wall at Datapaju ME School |
50000 |
Construction of Boundary wall at Datapaju ME School1 |
Plinth level |
-
latitude : 20.48546605
Longitude : 84.26009214
file name : Image_19122020164148783.png
|
2020-12-19 16:41:48.869447 |
4 |
44253385 |
Construction of Boundary wall at Datapaju ME School |
50000 |
Construction of Boundary wall at Datapaju ME School1 |
Plinth level |
-
latitude : 20.48547817
Longitude : 84.26009472
file name : Image_19122020164153174.png
|
2020-12-19 16:41:53.266277 |
5 |
44253385 |
Construction of Boundary wall at Datapaju ME School |
50000 |
Construction of Boundary wall at Datapaju ME School1 |
Plinth level |
-
latitude : 20.48548011
Longitude : 84.2601423
file name : Image_10122020124028037.png
|
2020-12-10 12:40:28.127499 |
6 |
44253018 |
Construction of Rest Shed at Smasanghata at Suduli |
150000 |
Construction of Rest Shed at Smasanghata at Suduli1 |
Plinth level |
-
latitude : 20.44684262
Longitude : 84.28234399
file name : Image_02022021173448453.png
|
2021-02-02 17:34:48.550007 |
7 |
44253018 |
Construction of Rest Shed at Smasanghata at Suduli |
150000 |
Construction of Rest Shed at Smasanghata at Suduli1 |
Plinth level |
-
latitude : 20.44680576
Longitude : 84.28235336
file name : Image_02022021173202817.png
|
2021-02-02 17:32:02.942523 |
8 |
48538039 |
Repair of new Sanitary well Suduli SC Sahi |
30000 |
Repair of new Sanitary well Suduli SC Sahi1 |
Completion of work |
-
latitude : 20.446973333333336
Longitude : 84.28913166666668
file name : Image_08042022165306133.png
|
2022-04-08 16:53:06.247421 |
9 |
44252695 |
Renovation of BNRGSK Building with water supply system and Construction of Barricade |
300000 |
Renovation of BNRGSK Building with water supply system and Construction of Barricade1 |
Roof laid |
-
latitude : 20.459774999999997
Longitude : 84.26449499999998
file name : Image_09042022112457039.png
|
2022-04-09 11:24:57.154993 |
10 |
44252695 |
Renovation of BNRGSK Building with water supply system and Construction of Barricade |
300000 |
Renovation of BNRGSK Building with water supply system and Construction of Barricade1 |
Completion of work |
-
latitude : 20.45990599
Longitude : 84.26450578
file name : Image_19082021103625885.png
|
2021-08-19 10:36:25.985749 |
11 |
44253193 |
Water Supply system to GP Building at Gudari |
92350 |
Water Supply system to GP Building at Gudari1 |
Completion of work |
-
latitude : 20.4599204
Longitude : 84.26452777
file name : Image_17082021165415391.png
|
2021-08-17 16:54:15.504342 |
12 |
44253193 |
Water Supply system to GP Building at Gudari |
92350 |
Water Supply system to GP Building at Gudari1 |
Completion of work |
-
latitude : 20.45790352
Longitude : 84.27025665
file name : Image_25062021153925377.png
|
2021-06-25 15:39:25.485234 |
13 |
44252745 |
Repairing of Community Center at Gudari ST Sahi |
70000 |
Repairing of Community Center at Gudari ST Sahi1 |
Completion of work |
-
latitude : 20.4557902
Longitude : 84.2672205
file name : Image_19072021152104237.png
|
2021-07-19 15:21:04.311076 |
14 |
48474426 |
Payment of Electricity Bill of PWS |
90000 |
Payment of Electricity Bill of PWS1 |
Completion of work |
-
latitude : 20.47838996
Longitude : 84.22695368
file name : Image_18122021093808320.png
|
2021-12-18 09:38:08.553573 |
15 |
44252654 |
Repair of well platform at Gudari Mallick Hariijan Sahi 1 Nos @ Rs 30000.00 |
30000 |
Repair of well platform at Gudari Mallick Hariijan Sahi 1 Nos @ Rs 30000.001 |
Completion of work |
-
latitude : 20.45870729
Longitude : 84.27192824
file name : Image_04012022140710506.png
|
2022-01-04 14:07:10.609124 |
16 |
44252530 |
Payment to Pump Driver and SEM |
160000 |
Payment to Pump Driver and SEM1 |
Completion of work |
-
latitude : 20.436603333333334
Longitude : 84.40404500000001
file name : Image_30042022081110754.png
|
2022-04-30 08:11:10.931787 |
17 |
44252610 |
Payment of hire charges of Mobile Van for repairing works and Supply of water by water tank |
192350 |
Payment of hire charges of Mobile Van for repairing works and Supply of water by water tank1 |
Completion of work |
-
latitude : 20.4370008
Longitude : 84.4042576
file name : Image_19092022145147663.png
|
2022-09-19 14:51:47.777548 |
18 |
44252452 |
Energy Charges of PWS |
80000 |
Energy Charges of PWS1 |
Completion of work |
-
latitude : 20.4320605
Longitude : 84.4049551
file name : Image_08092022131422851.png
|
2022-09-08 13:14:22.986015 |
19 |
48541555 |
BNRGSK Boundary wall |
100000 |
BNRGSK Boundary wall1 |
Completion of work |
-
latitude : 20.479143333333333
Longitude : 84.23144833333332
file name : Image_29092022054934817.png
|
2022-09-29 05:49:34.916018 |
20 |
48540918 |
Gudari Kanhar Sahi Incomplication Road |
84603 |
Gudari Kanhar Sahi Incomplication Road1 |
Completion of work |
-
latitude : 20.452105
Longitude : 84.26557666666668
file name : Image_29092022055207913.png
|
2022-09-29 05:52:08.01139 |
21 |
48473062 |
SBM-G Phase 2 ODF Plus |
531175 |
SBM-G Phase 2 ODF Plus1 |
Plinth level |
-
latitude : 20.4374
Longitude : 84.404025
file name : Image_21072023123936320.png
|
2023-07-21 12:39:36.429001 |
22 |
48473062 |
SBM-G Phase 2 ODF Plus |
531175 |
SBM-G Phase 2 ODF Plus1 |
Completion of work |
-
latitude : 20.458425
Longitude : 84.27077666666668
file name : Image_26052022101037476.png
|
2022-05-26 10:10:37.599191 |
23 |
48541177 |
Sundi Sahi C.C Repair |
69241 |
Sundi Sahi C.C Repair1 |
Completion of work |
-
latitude : 20.481451
Longitude : 84.2319569
file name : Image_27082024225925496.png
|
2024-08-27 22:59:26.338454 |
24 |
76198476 |
Upgradation of Health Sub-Centres |
73844 |
Upgradation of Health Sub-Centres1 |
Roof laid |
-
latitude : 20.481403333333333
Longitude : 84.23195666666668
file name : Image_27082024231019792.png
|
2024-08-27 23:10:19.986794 |
25 |
76198476 |
Upgradation of Health Sub-Centres |
73844 |
Upgradation of Health Sub-Centres1 |
Plinth level |
-
latitude : 20.481452
Longitude : 84.2319574
file name : Image_27082024230855753.png
|
2024-08-27 23:08:55.926921 |
26 |
76198476 |
Upgradation of Health Sub-Centres |
73844 |
Upgradation of Health Sub-Centres1 |
Completion of work |
-
latitude : 20.4814525
Longitude : 84.2319575
file name : Image_27082024230607809.png
|
2024-08-27 23:06:07.945866 |
27 |
44252576 |
Solar Dual Pumping water supply system at AWC School Sahi Gudari |
450000 |
Solar Dual Pumping water supply system at AWC School Sahi Gudari1 |
Plinth level |
-
latitude : 20.4559721
Longitude : 84.26742645
file name : Image_21122020162711287.png
|
2020-12-21 16:27:11.391764 |
28 |
48536302 |
Solar water supply Gudari S.C. Sahi |
450000 |
Solar water supply Gudari S.C. Sahi1 |
Completion of work |
-
latitude : 20.45467067
Longitude : 84.26922106
file name : Image_15122021123923138.png
|
2021-12-15 12:39:23.41138 |
29 |
48536302 |
Solar water supply Gudari S.C. Sahi |
450000 |
Solar water supply Gudari S.C. Sahi1 |
Completion of work |
-
latitude : 20.45467067
Longitude : 84.26922106
file name : Image_15122021123538484.png
|
2021-12-15 12:35:38.640539 |
30 |
44253137 |
Construction of Community Center at Kudiasahi Debibali |
250000 |
Construction of Community Center at Kudiasahi Debibali1 |
Completion of work |
-
latitude : 20.47605
Longitude : 84.27155499999999
file name : Image_06032023104039080.png
|
2023-03-06 10:40:39.221731 |
31 |
67688111 |
Operation & maintenance of drinking water supply system |
150000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.43331166666667
Longitude : 84.26387000000001
file name : Image_29032023143147709.png
|
2023-03-29 14:31:47.827719 |
32 |
67688111 |
Operation & maintenance of drinking water supply system |
150000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.433291666666666
Longitude : 84.26388166666666
file name : Image_29032023142922042.png
|
2023-03-29 14:29:22.130675 |
33 |
61867572 |
JALACHHATRA |
30000 |
JALACHHATRA1 |
Completion of work |
-
latitude : 20.459088333333334
Longitude : 84.26760666666665
file name : Image_15042023204011848.png
|
2023-04-15 20:40:11.949985 |
34 |
67688053 |
Water Supply to villages |
144000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.437079999999998
Longitude : 84.404175
file name : Image_13042023114438753.png
|
2023-04-13 11:44:38.892677 |
35 |
61876610 |
CONSTS. OF BOUNDARY WALL AT SINGANIKHOL PS |
108992 |
CONSTS. OF BOUNDARY WALL AT SINGANIKHOL PS 1 |
Completion of work |
-
latitude : 20.479581666666665
Longitude : 84.27045833333335
file name : Image_22072023083226876.png
|
2023-07-22 08:32:27.099274 |
36 |
82885340 |
Creation of other water recharging structure |
168000 |
Creation of other water recharging structure1 |
Roof laid |
-
latitude : 20.480375
Longitude : 84.22911
file name : Image_11042024122351675.png
|
2024-04-11 12:23:51.765661 |
37 |
82885340 |
Creation of other water recharging structure |
168000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 20.480430000000002
Longitude : 84.22910500000002
file name : Image_11042024121512828.png
|
2024-04-11 12:15:12.932614 |
38 |
82885340 |
Creation of other water recharging structure |
168000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 20.4370223
Longitude : 84.4041965
file name : Image_12012024135253323.png
|
2024-01-12 13:52:53.453539 |
39 |
82884721 |
Construction of new Piped Water Supply schemes |
45000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 20.4370244
Longitude : 84.404237
file name : Image_05022024125944042.png
|
2024-02-05 12:59:44.119893 |
40 |
82884721 |
Construction of new Piped Water Supply schemes |
45000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 20.4370238
Longitude : 84.4042375
file name : Image_05022024125547375.png
|
2024-02-05 12:55:47.463013 |
41 |
82884721 |
Construction of new Piped Water Supply schemes |
45000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.4370234
Longitude : 84.404236
file name : Image_05022024125034758.png
|
2024-02-05 12:50:34.833173 |
42 |
82884721 |
Construction of new Piped Water Supply schemes |
45000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.4370235
Longitude : 84.4042374
file name : Image_05022024123216399.png
|
2024-02-05 12:32:16.491057 |
43 |
48536888 |
Counter in Complictiion road Jani Sahi |
62350 |
Counter in Complictiion road Jani Sahi1 |
Completion of work |
-
latitude : 20.4814537
Longitude : 84.2319581
file name : Image_06092024090353907.png
|
2024-09-06 09:04:36.371343 |
44 |
76195824 |
Tap water connections to households |
30000 |
Tap water connections to households1 |
Roof laid |
-
latitude : 20.4814451
Longitude : 84.2319523
file name : Image_29052024173128581.png
|
2024-05-29 17:31:28.664446 |
45 |
76195824 |
Tap water connections to households |
30000 |
Tap water connections to households1 |
Plinth level |
-
latitude : 20.48145333333333
Longitude : 84.23194666666669
file name : Image_29052024172954384.png
|
2024-05-29 17:29:54.475337 |
46 |
76195824 |
Tap water connections to households |
30000 |
Tap water connections to households1 |
Completion of work |
-
latitude : 20.4814453
Longitude : 84.2319522
file name : Image_29052024172735979.png
|
2024-05-29 17:27:36.062166 |
47 |
75966194 |
Creation of community compost pits for a group of Households |
20000 |
Creation of community compost pits for a group of Households1 |
Roof laid |
-
latitude : 20.4814436
Longitude : 84.2319517
file name : Image_29052024174229917.png
|
2024-05-29 17:42:29.990168 |
48 |
75966194 |
Creation of community compost pits for a group of Households |
20000 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 20.4814455
Longitude : 84.2319522
file name : Image_29052024173941272.png
|
2024-05-29 17:39:41.365201 |
49 |
75966194 |
Creation of community compost pits for a group of Households |
20000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.4814432
Longitude : 84.231949
file name : Image_29052024173742805.png
|
2024-05-29 17:37:42.892743 |
50 |
48536652 |
Connection new CC Gudari Sartapadar |
250000 |
Connection new CC Gudari Sartapadar1 |
Completion of work |
-
latitude : 20.4814465
Longitude : 84.2319665
file name : Image_09102024062922454.png
|
2024-10-09 06:29:22.531382 |
51 |
82885022 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.437024
Longitude : 84.4042375
file name : Image_02032024123336492.png
|
2024-03-02 12:33:36.622145 |
52 |
82885022 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.437024
Longitude : 84.4042375
file name : Image_02032024123043252.png
|
2024-03-02 12:30:43.357019 |
53 |
82885022 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.4370237
Longitude : 84.4042375
file name : Image_02032024122603306.png
|
2024-03-02 12:26:03.409669 |
54 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.436885
Longitude : 84.4042803
file name : Image_19092024140847503.png
|
2024-09-19 14:08:47.621762 |
55 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.436885
Longitude : 84.4042803
file name : Image_19092024140839331.png
|
2024-09-19 14:08:39.46474 |
56 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.4368718
Longitude : 84.4042741
file name : Image_19092024140832439.png
|
2024-09-19 14:08:32.565146 |
57 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.4368927
Longitude : 84.404276
file name : Image_19092024140308547.png
|
2024-09-19 14:03:08.686344 |
58 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.4368927
Longitude : 84.404276
file name : Image_19092024140303734.png
|
2024-09-19 14:03:03.869705 |
59 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.4368949
Longitude : 84.4042871
file name : Image_19092024140258351.png
|
2024-09-19 14:02:58.455876 |
60 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.4369771
Longitude : 84.4042373
file name : Image_19092024135623383.png
|
2024-09-19 13:56:23.5481 |
61 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.4369771
Longitude : 84.4042373
file name : Image_19092024135617069.png
|
2024-09-19 13:56:17.228827 |
62 |
102230377 |
Piped/tap water supply to HH |
273000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.436778333333333
Longitude : 84.40428166666668
file name : Image_19092024135611275.png
|
2024-09-19 13:56:11.41128 |
63 |
102231083 |
Water Supply to villages |
176567 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.4368777
Longitude : 84.4042898
file name : Image_26092024122333972.png
|
2024-09-26 12:23:34.131064 |
64 |
102231083 |
Water Supply to villages |
176567 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.436977
Longitude : 84.4042371
file name : Image_26092024113811669.png
|
2024-09-26 11:38:11.799842 |
65 |
102231083 |
Water Supply to villages |
176567 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.4369771
Longitude : 84.404236
file name : Image_26092024112419224.png
|
2024-09-26 11:24:19.325008 |
66 |
75969194 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 20.4369775
Longitude : 84.4042366
file name : Image_19072024155937751.png
|
2024-07-19 15:59:37.832962 |
67 |
75969194 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 20.436978
Longitude : 84.404237
file name : Image_19072024154558295.png
|
2024-07-19 15:45:58.37228 |
68 |
75969194 |
Construction of toilets in public institutions |
50000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 20.436978
Longitude : 84.4042372
file name : Image_19072024153324455.png
|
2024-07-19 15:33:24.537083 |
69 |
48540111 |
Khamara Chhaka Drain Construction |
100000 |
Khamara Chhaka Drain Construction1 |
Completion of work |
-
latitude : 20.4369771
Longitude : 84.4042374
file name : Image_19072024160535953.png
|
2024-07-19 16:05:36.046799 |
70 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.4369772
Longitude : 84.4042374
file name : Image_19072024155953417.png
|
2024-07-19 15:59:53.49959 |
71 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.4369771
Longitude : 84.4042371
file name : Image_19072024155947555.png
|
2024-07-19 15:59:47.638228 |
72 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.4369772
Longitude : 84.4042374
file name : Image_19072024155942949.png
|
2024-07-19 15:59:43.024902 |
73 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 20.4369773
Longitude : 84.4042375
file name : Image_19072024154602498.png
|
2024-07-19 15:46:02.57127 |
74 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.436978
Longitude : 84.404237
file name : Image_19072024154424736.png
|
2024-07-19 15:44:24.814025 |
75 |
76192251 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.4369771
Longitude : 84.4042372
file name : Image_19072024153327703.png
|
2024-07-19 15:33:27.79356 |
76 |
61876405 |
IMPROV. OF DATAPAJU PS |
200000 |
IMPROV. OF DATAPAJU PS1 |
Completion of work |
-
latitude : 20.4369772
Longitude : 84.4042374
file name : Image_19072024160517521.png
|
2024-07-19 16:05:17.612577 |
77 |
76187181 |
Maintenance of Panchayat Bhawan |
500000 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.4813904
Longitude : 84.2320441
file name : Image_09102024063940669.png
|
2024-10-09 06:39:40.759363 |
78 |
76187181 |
Maintenance of Panchayat Bhawan |
500000 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.481447
Longitude : 84.2319664
file name : Image_09102024063739854.png
|
2024-10-09 06:37:39.919925 |
79 |
76187181 |
Maintenance of Panchayat Bhawan |
500000 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.4813919
Longitude : 84.2320444
file name : Image_09102024063055507.png
|
2024-10-09 06:30:55.601788 |
80 |
102233101 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground |
40000 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground1 |
Completion of work |
-
latitude : 20.4814158
Longitude : 84.2320315
file name : Image_04112024085810548.png
|
2024-11-04 08:58:10.632876 |
81 |
102233101 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground |
40000 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground1 |
Completion of work |
-
latitude : 20.4814618
Longitude : 84.2319691
file name : Image_04112024085716120.png
|