1 |
48444255 |
ELECTRICITY BILL OF STREET LIGHT-15TH CFC |
205052 |
ELECTRICITY BILL OF STREET LIGHT-15TH CFC1 |
Completion of work |
-
latitude : 20.3905285
Longitude : 86.4067906
file name : Image_30122021095645047.png
|
2021-12-30 09:56:45.138971 |
2 |
48444255 |
ELECTRICITY BILL OF STREET LIGHT-15TH CFC |
205052 |
ELECTRICITY BILL OF STREET LIGHT-15TH CFC1 |
Completion of work |
-
latitude : 20.390359999999998
Longitude : 86.40657000000002
file name : Image_10102021162737860.png
|
2021-10-10 16:27:37.94494 |
3 |
53407851 |
const of tube well platform near pakhada pitambari thakurani 15th cfc |
40000 |
const of tube well platform near pakhada pitambari thakurani 15th cfc 1 |
Completion of work |
-
latitude : 20.3671913
Longitude : 86.3698646
file name : Image_05082021144614154.png
|
2021-08-05 14:46:14.263437 |
4 |
53407478 |
const of new tube well with platform near bangalpur basanti durga mandap 15th cfc tied |
40000 |
const of new tube well with platform near bangalpur basanti durga mandap 15th cfc tied1 |
Completion of work |
-
latitude : 20.3905548
Longitude : 86.4066736
file name : Image_11112021093701760.png
|
2021-11-11 09:37:01.861112 |
5 |
53407478 |
const of new tube well with platform near bangalpur basanti durga mandap 15th cfc tied |
40000 |
const of new tube well with platform near bangalpur basanti durga mandap 15th cfc tied1 |
Completion of work |
-
latitude : 20.3672069
Longitude : 86.3698371
file name : Image_05082021144230838.png
|
2021-08-05 14:42:30.938765 |
6 |
53407941 |
const of new tube well with platform near pakhada electricity office 15th cfc tied |
40000 |
const of new tube well with platform near pakhada electricity office 15th cfc tied1 |
Completion of work |
-
latitude : 20.3672008
Longitude : 86.3698407
file name : Image_05082021144726675.png
|
2021-08-05 14:47:26.776796 |
7 |
53407522 |
const of new tube well with platform at bamara madhei bata 15th cfc tied |
40000 |
const of new tube well with platform at bamara madhei bata 15th cfc tied1 |
Completion of work |
-
latitude : 20.3905548
Longitude : 86.4066725
file name : Image_11112021093915826.png
|
2021-11-11 09:39:15.932536 |
8 |
53407522 |
const of new tube well with platform at bamara madhei bata 15th cfc tied |
40000 |
const of new tube well with platform at bamara madhei bata 15th cfc tied1 |
Completion of work |
-
latitude : 20.3671904
Longitude : 86.3698643
file name : Image_05082021144516153.png
|
2021-08-05 14:45:16.276882 |
9 |
42162637 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC |
223391 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC1 |
Completion of work |
-
latitude : 20.390030000000003
Longitude : 86.40677833333332
file name : Image_20082021202327112.png
|
2021-08-20 20:23:27.226311 |
10 |
42162637 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC |
223391 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC1 |
Completion of work |
-
latitude : 20.39069
Longitude : 86.40701166666668
file name : Image_20082021200549113.png
|
2021-08-20 20:05:49.212257 |
11 |
42162637 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC |
223391 |
MAINTENANCE AND REPAIRING OF PWS PROJECTS-15TH CFC1 |
Completion of work |
-
latitude : 20.39080166666667
Longitude : 86.40699666666666
file name : Image_12082021184005334.png
|
2021-08-12 18:40:05.430927 |
12 |
48460341 |
repairing and maintainance of pws projects-15th cfc |
138789 |
repairing and maintainance of pws projects-15th cfc1 |
Completion of work |
-
latitude : 20.3905553
Longitude : 86.4066696
file name : Image_11112021093441664.png
|
2021-11-11 09:34:41.774541 |
13 |
53407990 |
const of new tube well with platform near bangalpur crematoriun 15th cfc tied |
40000 |
const of new tube well with platform near bangalpur crematoriun 15th cfc tied1 |
Completion of work |
-
latitude : 20.390555
Longitude : 86.4066747
file name : Image_11112021094301630.png
|
2021-11-11 09:43:01.73928 |
14 |
53409121 |
development of nuapada crematorium and const of road 15th cfc |
62000 |
development of nuapada crematorium and const of road 15th cfc1 |
Completion of work |
-
latitude : 20.390555,20.390555
Longitude : 86.4066747,86.4066747
file name : Image_11112021094613719.png
|
2021-11-11 09:46:13.841371 |
15 |
53409041 |
const of cut up wall near bramhan sahi bangalpur 15th cfc |
100000 |
const of cut up wall near bramhan sahi bangalpur 15th cfc1 |
Completion of work |
-
latitude : 20.3905548
Longitude : 86.4066725
file name : Image_11112021094415122.png
|
2021-11-11 09:44:15.23845 |
16 |
53408162 |
const of new tube well with platform near nuapada crematorium 15th cfc tied |
40000 |
const of new tube well with platform near nuapada crematorium 15th cfc tied1 |
Completion of work |
-
latitude : 20.3905548
Longitude : 86.4066736
file name : Image_11112021095017173.png
|
2021-11-11 09:50:17.289886 |
17 |
53408082 |
const of new tube well with platform near bamara beura sahi bajra mahakali thakukrani 15th cfc tied |
40000 |
const of new tube well with platform near bamara beura sahi bajra mahakali thakukrani 15th cfc tied1 |
Completion of work |
-
latitude : 20.3905553
Longitude : 86.4066696
file name : Image_11112021094914364.png
|
2021-11-11 09:49:14.486933 |
18 |
53408979 |
const of cc road to pakhada melaka kumbhar sahi 15th cfc untied |
150000 |
const of cc road to pakhada melaka kumbhar sahi 15th cfc untied1 |
Completion of work |
-
latitude : 20.390688333333333,20.390688333333333
Longitude : 86.40687333333332,86.40687333333332
file name : Image_27092021202914417.png
|
2021-09-27 20:29:14.510074 |
19 |
56040542 |
ELECTRICITY BILL OF STREET LIGHT 15TH CFC |
218789 |
ELECTRICITY BILL OF STREET LIGHT 15TH CFC1 |
Completion of work |
-
latitude : 20.3905127
Longitude : 86.4067897
file name : Image_30122021102611043.png
|
2021-12-30 10:26:11.143214 |
20 |
53487392 |
ILLUMINATION CHARGES OF GP 15TH CFC |
218789 |
ILLUMINATION CHARGES OF GP 15TH CFC1 |
Completion of work |
-
latitude : 20.3904879
Longitude : 86.4067687
file name : Image_30122021174958294.png
|
2021-12-30 17:49:58.428883 |
21 |
56040831 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC |
100000 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC 1 |
Completion of work |
-
latitude : 20.39075,20.390736666666665
Longitude : 86.40680666666667,86.40679833333334
file name : Image_09032022204135364.png
|
2022-03-09 20:41:35.473116 |
22 |
56040831 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC |
100000 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC 1 |
Completion of work |
-
latitude : 20.3907,20.390686666666667,20.39068166666667,20.390676666666664
Longitude : 86.40683833333333,86.40681833333335,86.40680499999999,86.40680333333333
file name : Image_09032022204140750.png
|
2022-03-09 20:41:40.834579 |
23 |
56040831 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC |
100000 |
IMPROVEMENT OF ROAD FROM CHAULIA RD ROAD TO NAROTTAM MANGARAJ HOUSE 15TH CFC 1 |
Completion of work |
-
latitude : 20.3907,20.390686666666667,20.39068166666667,20.390676666666664
Longitude : 86.40683833333333,86.40681833333335,86.40680499999999,86.40680333333333
file name : Image_09032022204145186.png
|
2022-03-09 20:41:45.279985 |
24 |
62453122 |
SEM and PD salary 15th cfc |
72000 |
SEM and PD salary 15th cfc1 |
Completion of work |
-
latitude : 20.3905119
Longitude : 86.4067898
file name : Image_05052022191302956.png
|
2022-05-05 19:13:03.020028 |
25 |
62447084 |
Dev of gym center at pakhada karnatak gruha 5th sfc |
250000 |
Dev of gym center at pakhada karnatak gruha 5th sfc1 |
Completion of work |
-
latitude : 20.3905347
Longitude : 86.4067755
file name : Image_18052022170350664.png
|
2022-05-18 17:03:50.761734 |
26 |
53416150 |
const of gym center near pakhada karnatak building 5thsfc |
300000 |
const of gym center near pakhada karnatak building 5thsfc 1 |
Completion of work |
-
latitude : 20.391285
Longitude : 86.40579166666666
file name : Image_07062022203226366.png
|
2022-06-07 20:32:26.497355 |
27 |
64662936 |
Pipe line connection o pakhada 5T High school 15th cfc D |
150000 |
Pipe line connection o pakhada 5T High school 15th cfc D1 |
Completion of work |
-
latitude : 20.3905781,20.390578333333334
Longitude : 86.4068129,86.40644833333333
file name : Image_08082022164041880.png
|
2022-08-08 16:40:41.986094 |
28 |
64662916 |
Illumination charges of bamara village 15th cfc untid |
100000 |
Illumination charges of bamara village 15th cfc untid1 |
Completion of work |
-
latitude : 20.3905781
Longitude : 86.4068129
file name : Image_25082022172411471.png
|
2022-08-25 17:24:11.557833 |
29 |
64662897 |
Improvement of road from bamara lenka sahi to canal bandha 5th sfc |
150000 |
Improvement of road from bamara lenka sahi to canal bandha 5th sfc1 |
Completion of work |
-
latitude : 20.3671203,20.3671204
Longitude : 86.3699761,86.3699787
file name : Image_25082022123752266.png
|
2022-08-25 12:37:52.358489 |
30 |
62453065 |
electric bill of street light in all villages 15th cfc |
207544 |
electric bill of street light in all villages 15th cfc1 |
Completion of work |
-
latitude : 20.390685
Longitude : 86.40662499999999
file name : Image_28092022185312746.png
|
2022-09-28 18:53:12.842096 |
31 |
62452963 |
pump house electric bill 15th cfc |
134000 |
pump house electric bill 15th cfc1 |
Completion of work |
-
latitude : 20.390785
Longitude : 86.40679999999999
file name : Image_28092022193235819.png
|
2022-09-28 19:32:35.920317 |
32 |
64662939 |
Pipeline connection with water cooler installation at pakhada awc 15th cfc d |
122544 |
Pipeline connection with water cooler installation at pakhada awc 15th cfc d1 |
Completion of work |
-
latitude : 20.390668333333334,20.3906235
Longitude : 86.40681500000001,86.4068117
file name : Image_08112022122629648.png
|
2022-11-08 12:26:29.736748 |
33 |
53188497 |
const of 12 nos of tube well platform in all villages of gp 15th cfc |
123789 |
const of 12 nos of tube well platform in all villages of gp 15th cfc1 |
Completion of work |
-
latitude : 20.3670945
Longitude : 86.3699967
file name : Image_11012023122455459.png
|
2023-01-11 12:24:55.555196 |
34 |
52554262 |
const of community toilet at bamara sai mandira 15th cfc |
120000 |
const of community toilet at bamara sai mandira 15th cfc1 |
Completion of work |
-
latitude : 20.386806
Longitude : 86.3678633
file name : Image_17102023132115695.png
|
2023-10-17 13:21:15.785753 |
35 |
62453164 |
water supply pipelien connection in all villages 15th cfc |
100000 |
water supply pipelien connection in all villages 15th cfc1 |
Completion of work |
-
latitude : 20.399501666666666,20.399501666666666
Longitude : 86.40351833333334,86.40351833333334
file name : Image_21052023161934652.png
|
2023-05-21 16:19:34.738274 |
36 |
64662900 |
Improvement of road from sartola school to mallik sahi 5th sfc |
100000 |
Improvement of road from sartola school to mallik sahi 5th sfc1 |
Completion of work |
-
latitude : 20.3670929,20.3663779
Longitude : 86.3700547,86.3680538
file name : Image_04032023123510538.png
|
2023-03-04 12:35:10.633788 |
37 |
105277733 |
Chlorinization of drinking water source |
175000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 20.391948333333335
Longitude : 86.41263666666667
file name : Image_29082024165330147.png
|
2024-08-29 16:53:30.917493 |
38 |
62453621 |
paid towards sbm phase 2 15th cfc |
270000 |
paid towards sbm phase 2 15th cfc1 |
Completion of work |
-
latitude : 20.3670487
Longitude : 86.3700136
file name : Image_24022023124520925.png
|
2023-02-24 12:45:21.067899 |
39 |
64662905 |
Repair maintenance of street lights in all gp 5th sfc |
90000 |
Repair maintenance of street lights in all gp 5th sfc1 |
Completion of work |
-
latitude : 20.3671545
Longitude : 86.3698823
file name : Image_06062023110214707.png
|
2023-06-06 11:02:14.816529 |
40 |
64666228 |
Expenditure towards mass cleaning of gp 15th cfc s |
170760 |
Expenditure towards mass cleaning of gp 15th cfc s1 |
Completion of work |
-
latitude : 20.3905533
Longitude : 86.4067915
file name : Image_13072023083554587.png
|
2023-07-13 08:35:54.684455 |
41 |
42167245 |
EXPENDITURE FOR DEVELOPMENT AND MAINTAINANCE OF PWS PROJECT-15TH CFC |
200000 |
EXPENDITURE FOR DEVELOPMENT AND MAINTAINANCE OF PWS PROJECT-15TH CFC1 |
Completion of work |
-
latitude : 20.3908608
Longitude : 86.4067179
file name : Image_15092023185936904.png
|
2023-09-15 18:59:37.050136 |
42 |
64662937 |
Repair and maintenance o pipe line of Pakhada PWS 15th cfc D |
100000 |
Repair and maintenance o pipe line of Pakhada PWS 15th cfc D1 |
Completion of work |
-
latitude : 20.3868047
Longitude : 86.3678563
file name : Image_01022024124030669.png
|
2024-02-01 12:40:30.729292 |
43 |
48456422 |
ELECTRICITY BILL OF PWS PROJECT-15TH CFC |
100000 |
ELECTRICITY BILL OF PWS PROJECT-15TH CFC2 |
Completion of work |
-
latitude : 20.39042
Longitude : 86.40664
file name : Image_10102021162827064.png
|
2021-10-10 16:28:27.15719 |
44 |
83704353 |
Water Supply to villages |
210279 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.3868301
Longitude : 86.3678426
file name : Image_22042024085149076.png
|
2024-04-22 08:51:49.158363 |
45 |
83704353 |
Water Supply to villages |
210279 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.3868322
Longitude : 86.3678485
file name : Image_22042024085019602.png
|
2024-04-22 08:50:19.660878 |
46 |
83704353 |
Water Supply to villages |
210279 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.3868376
Longitude : 86.3678512
file name : Image_22042024084623641.png
|
2024-04-22 08:46:23.691243 |
47 |
83704353 |
Water Supply to villages |
210279 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.3868489
Longitude : 86.3678665
file name : Image_22042024084443333.png
|
2024-04-22 08:44:43.385958 |
48 |
83675150 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.386847,20.3868491
Longitude : 86.3678502,86.3678508
file name : Image_22042024090523345.png
|
2024-04-22 09:05:23.405717 |
49 |
83675150 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.3868492,20.3868449
Longitude : 86.3678555,86.3678588
file name : Image_22042024090402011.png
|
2024-04-22 09:04:02.061153 |
50 |
83675150 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.386826,20.3868359
Longitude : 86.3678434,86.3678546
file name : Image_22042024090315700.png
|
2024-04-22 09:03:15.753761 |
51 |
83675150 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.3868281,20.3868281
Longitude : 86.3678468,86.3678468
file name : Image_22042024085805458.png
|
2024-04-22 08:58:05.517097 |
52 |
83675150 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.3868344,20.386837
Longitude : 86.3678475,86.3678512
file name : Image_22042024085600870.png
|
2024-04-22 08:56:00.926099 |
53 |
83703512 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.386817
Longitude : 86.3678413
file name : Image_09052024091427195.png
|
2024-05-09 09:14:27.262657 |
54 |
83703512 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.3868153
Longitude : 86.3678364
file name : Image_09052024091254157.png
|
2024-05-09 09:12:54.218307 |
55 |
83703512 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.386824
Longitude : 86.3678423
file name : Image_09052024091129357.png
|
2024-05-09 09:11:29.425054 |
56 |
83703880 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.3868494
Longitude : 86.3678483
file name : Image_21032024112034966.png
|
2024-03-21 11:20:35.046407 |
57 |
83703880 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.3868484
Longitude : 86.3678508
file name : Image_21032024111840890.png
|
2024-03-21 11:18:40.976547 |
58 |
83703880 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.3868574
Longitude : 86.36785
file name : Image_21032024111624831.png
|
2024-03-21 11:16:24.923865 |
59 |
83703880 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.386805
Longitude : 86.36732500000001
file name : Image_21032024111420162.png
|
2024-03-21 11:14:20.264346 |
60 |
83703880 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.386805
Longitude : 86.36732500000001
file name : Image_21032024111424973.png
|
2024-03-21 11:14:25.057028 |
61 |
62452789 |
const of badhei sahi nadi bandha ghata at bamara 15th cfc |
250000 |
const of badhei sahi nadi bandha ghata at bamara 15th cfc1 |
Completion of work |
-
latitude : 20.3868501
Longitude : 86.3678564
file name : Image_28032024133430446.png
|
2024-03-28 13:34:30.526909 |