1 |
51178229 |
PIPEWATER CONNECTION TO KHUNTAKOTA PRYSCHOOL AND AWC |
105000 |
PIPEWATER CONNECTION TO KHUNTAKOTA PRYSCHOOL AND AWC1 |
Completion of work |
-
latitude : 21.59218412,21.59219255,21.59223528
Longitude : 85.4410084,85.4409916,85.4410553
file name : Image_30102021134615727.png
|
2021-10-30 13:46:15.854544 |
2 |
51178302 |
PIPEWATER CONNECTION TO PADAKASADA UIGOTHASAHI PRYSCHOOL |
95000 |
PIPEWATER CONNECTION TO PADAKASADA UIGOTHASAHI PRYSCHOOL1 |
Plinth level |
-
latitude : 21.58117742,21.58106164
Longitude : 85.39362808,85.39347701
file name : Image_01112021134049539.png
|
2021-11-01 13:40:49.677252 |
3 |
51178302 |
PIPEWATER CONNECTION TO PADAKASADA UIGOTHASAHI PRYSCHOOL |
95000 |
PIPEWATER CONNECTION TO PADAKASADA UIGOTHASAHI PRYSCHOOL1 |
Completion of work |
-
latitude : 21.58119473,21.58117702
Longitude : 85.39363847,85.39358629
file name : Image_29102021172426865.png
|
2021-10-29 17:24:26.956194 |
4 |
51177754 |
PIPEWATER CONNECTION TO KADAKASADA AWC ALONGWITH MAINTENANCE OF TOILET |
95000 |
PIPEWATER CONNECTION TO KADAKASADA AWC ALONGWITH MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.6070264,21.6070264,21.6070264
Longitude : 85.4161141,85.4161141,85.4161141
file name : Image_31122021164339731.png
|
2021-12-31 16:43:39.872333 |
5 |
51177523 |
PIPEWATER CONNECTION TO LUNGAJHAR PRYSCHOOL AND AWC AND MAINTENANCE OF TOILET |
105000 |
PIPEWATER CONNECTION TO LUNGAJHAR PRYSCHOOL AND AWC AND MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.55032226,21.55035041
Longitude : 85.37545511,85.37541731
file name : Image_29102021172415501.png
|
2021-10-29 17:24:15.594311 |
6 |
51177523 |
PIPEWATER CONNECTION TO LUNGAJHAR PRYSCHOOL AND AWC AND MAINTENANCE OF TOILET |
105000 |
PIPEWATER CONNECTION TO LUNGAJHAR PRYSCHOOL AND AWC AND MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.5504046,21.55040137
Longitude : 85.37531464,85.37531878
file name : Image_29102021172419356.png
|
2021-10-29 17:24:19.448094 |
7 |
51178002 |
PIPEWATER CONNECTION PADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET |
95000 |
PIPEWATER CONNECTION PADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET1 |
Plinth level |
-
latitude : 21.58549617,21.58549181
Longitude : 85.42149513,85.42152796
file name : Image_01112021134053131.png
|
2021-11-01 13:40:53.234684 |
8 |
51178002 |
PIPEWATER CONNECTION PADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET |
95000 |
PIPEWATER CONNECTION PADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.58543193,21.58547107
Longitude : 85.42149583,85.42150889
file name : Image_29102021172430584.png
|
2021-10-29 17:24:30.676939 |
9 |
51177698 |
PIPEWATER CONNECTION TO KADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET |
95000 |
PIPEWATER CONNECTION TO KADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET1 |
Plinth level |
-
latitude : 21.56984729,21.56988059,21.56970881
Longitude : 85.41243104,85.41245795,85.41289569
file name : Image_01112021134045894.png
|
2021-11-01 13:40:46.011321 |
10 |
51177698 |
PIPEWATER CONNECTION TO KADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET |
95000 |
PIPEWATER CONNECTION TO KADAKASADA PRYSCHOOL AND MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.56979204,21.56979578
Longitude : 85.4125008,85.41250462
file name : Image_29102021172422985.png
|
2021-10-29 17:24:23.08533 |
11 |
51178445 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR |
200000 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR1 |
Completion of work |
-
latitude : 21.60729219
Longitude : 85.41624329
file name : Image_07102021163542622.png
|
2021-10-07 16:35:42.745959 |
12 |
51178445 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR |
200000 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR1 |
Plinth level |
-
latitude : 21.6069934
Longitude : 85.4161699
file name : Image_07102021164547308.png
|
2021-10-07 16:45:47.422318 |
13 |
51178445 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR |
200000 |
RENOVATION AND COMPLETION OF SAHARPUR MARKET COMPLEX AT SAHARPUR1 |
Completion of work |
-
latitude : 21.606998
Longitude : 85.4161692
file name : Image_07102021163547529.png
|
2021-10-07 16:35:47.629397 |
14 |
47973114 |
MAINTENANCE OF PWS AND BOREWELL. SFC |
500000 |
MAINTENANCE OF PWS AND BOREWELL. SFC1 |
Completion of work |
-
latitude : 21.6366169,21.636744999999998
Longitude : 85.6111717,85.61123166666667
file name : Image_13092023173919010.png
|
2023-09-13 17:39:19.095216 |
15 |
54829806 |
DRINKINGWATER SUPPLY THROUGH JALACHHTRA CHHUACHAHAL MOBILE TANKER AND REPAIRE AND MAINTENNACE OF TUB |
493643 |
DRINKINGWATER SUPPLY THROUGH JALACHHTRA CHHUACHAHAL MOBILE TANKER AND REPAIRE AND MAINTENNACE OF TUB1 |
Completion of work |
-
latitude : 21.6067073,21.6067077
Longitude : 85.4157738,85.4157736
file name : Image_29112021131417270.png
|
2021-11-29 13:14:17.380369 |
16 |
55726228 |
Gram Panchayat Office Expenditure |
100000 |
Gram Panchayat Office Expenditure1 |
Completion of work |
-
latitude : 21.6284039
Longitude : 85.6098465
file name : Image_26042022125555387.png
|
2022-04-26 12:55:55.534555 |
17 |
51178379 |
PIPEWATER CONNECTION TO KASADA PRYSCHOOL AND AWC MAINTENANCE OF TOILET |
105643 |
PIPEWATER CONNECTION TO KASADA PRYSCHOOL AND AWC MAINTENANCE OF TOILET1 |
Completion of work |
-
latitude : 21.58855634,21.58853707,21.58854532
Longitude : 85.45468331,85.45465799,85.45458643
file name : Image_31122021141649792.png
|
2021-12-31 14:16:49.896192 |
18 |
51178532 |
PIPEWATER KHUNTAKOTA PARIDAGOTHA PRYSCHOOL AND MAINTENANCE OF TOILET AND SANITAION SYSTEM |
65000 |
PIPEWATER KHUNTAKOTA PARIDAGOTHA PRYSCHOOL AND MAINTENANCE OF TOILET AND SANITAION SYSTEM1 |
Completion of work |
-
latitude : 21.59451381
Longitude : 85.45699838
file name : Image_31122021141655013.png
|
2021-12-31 14:16:55.120695 |
19 |
44330779 |
OPERATION AND MAINTENANCE OF EXISTING PWS. |
100000 |
OPERATION AND MAINTENANCE OF EXISTING PWS.1 |
Completion of work |
-
latitude : 21.6284039,21.6284046
Longitude : 85.6098465,85.6098449
file name : Image_26042022125953316.png
|
2022-04-26 12:59:53.456454 |
20 |
63872693 |
Cons of boundary wall at Rugudikasada pry.school. sfc |
250000 |
Cons of boundary wall at Rugudikasada pry.school. sfc1 |
Completion of work |
-
latitude : 21.56794992
Longitude : 85.4019806
file name : Image_10062022111707963.png
|
2022-06-10 11:17:08.061283 |
21 |
55783391 |
Constn of Boundary Wall at Rugudikasada Pry School |
250000 |
Constn of Boundary Wall at Rugudikasada Pry School1 |
Completion of work |
-
latitude : 21.56795401
Longitude : 85.40196388
file name : Image_08062022155148366.png
|
2022-06-08 15:51:48.482557 |
22 |
55726704 |
Supply of drinking water thru Jala Chhatra and Chua chahala |
250000 |
Supply of drinking water thru Jala Chhatra and Chua chahala1 |
Completion of work |
-
latitude : 21.6284037
Longitude : 85.6098349
file name : Image_19062022115357038.png
|
2022-06-19 11:53:57.191594 |
23 |
55783299 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000/ at Khajurimundi AWC |
20000 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000/ at Khajurimundi AWC1 |
Completion of work |
-
latitude : 21.607113333333338
Longitude : 85.41570500000002
file name : Image_05062023174421408.png
|
2023-06-05 17:44:21.524941 |
24 |
55783184 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Khajurimundi Pry School |
35000 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Khajurimundi Pry School1 |
Completion of work |
-
latitude : 21.607061666666663
Longitude : 85.41567833333332
file name : Image_05062023215643041.png
|
2023-06-05 21:56:43.184944 |
25 |
47971209 |
SUPLY D.WTER THROUGH JALACHATRA,CHUA CHAHLA IN SUMMER ,WATER SUPPLY ,M.OF T.WELL BY M.VAN ETC |
456911 |
SUPLY D.WTER THROUGH JALACHATRA,CHUA CHAHLA IN SUMMER ,WATER SUPPLY ,M.OF T.WELL BY M.VAN ETC1 |
Completion of work |
-
latitude : 21.60666666666667,21.60666,21.60666,21.60666
Longitude : 85.41585500000001,85.41587999999999,85.41587999999999,85.41587999999999
file name : Image_17092022122345262.png
|
2022-09-17 12:23:45.419252 |
26 |
55726598 |
Completion of Mission Shakti house at Saharapur |
194267 |
Completion of Mission Shakti house at Saharapur1 |
Completion of work |
-
latitude : 21.60602333333333
Longitude : 85.41703666666666
file name : Image_17102022160043090.png
|
2022-10-17 16:00:43.209543 |
27 |
54829736 |
CONSTRUTION OF DRAIN FROM DEBRI SAHI TO KHUNTA KOTA PMGSY ROAD AT KHAJURIMUNDI |
87000 |
CONSTRUTION OF DRAIN FROM DEBRI SAHI TO KHUNTA KOTA PMGSY ROAD AT KHAJURIMUNDI1 |
Completion of work |
-
latitude : 21.61323333333333,21.613235,21.61326166666667,21.613268333333334
Longitude : 85.43601333333332,85.43602333333335,85.43594999999999,85.435795
file name : Image_26102022162924326.png
|
2022-10-26 16:29:27.064215 |
28 |
66172696 |
Operation & maintenance of community compost pits |
9000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.607020000000002
Longitude : 85.41569166666667
file name : Image_09052023102639977.png
|
2023-05-09 10:26:40.068686 |
29 |
47973987 |
REPAIRING OF SAHARPUR RESTSHED |
250000 |
REPAIRING OF SAHARPUR RESTSHED1 |
Completion of work |
-
latitude : 21.607529999999997
Longitude : 85.41598833333335
file name : Image_20012023115905328.png
|
2023-01-20 11:59:05.448255 |
30 |
60186156 |
30% Cost of Solid & Liqued Waste Management & Storage Shed at Saharpur |
51000 |
30% Cost of Solid & Liqued Waste Management & Storage Shed at Saharpur1 |
Completion of work |
-
latitude : 21.608391666666662
Longitude : 85.41588666666667
file name : Image_13012023133327139.png
|
2023-01-13 13:33:27.269443 |
31 |
55783169 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Uaigotha Pry School |
35000 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Uaigotha Pry School1 |
Completion of work |
-
latitude : 21.630186666666667
Longitude : 85.28163
file name : Image_18012023162443371.png
|
2023-01-18 16:24:43.476026 |
32 |
66172652 |
Operation & maintenance of community soak pits |
243000 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 21.606706666666664
Longitude : 85.41579333333333
file name : Image_06052023170354551.png
|
2023-05-06 17:03:54.672914 |
33 |
66172652 |
Operation & maintenance of community soak pits |
243000 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 21.60669833333333
Longitude : 85.41587166666667
file name : Image_27122022155116054.png
|
2022-12-27 15:51:16.178759 |
34 |
66172598 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.6067091
Longitude : 85.4157729
file name : Image_06052023171424563.png
|
2023-05-06 17:14:24.692703 |
35 |
55783327 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000/ at Kasada AWC |
20000 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000/ at Kasada AWC1 |
Completion of work |
-
latitude : 21.607128333333335
Longitude : 85.41566333333334
file name : Image_08052023153728388.png
|
2023-05-08 15:37:28.478819 |
36 |
55783207 |
Constn of Compost pit @ 20000/ and Soak Pit @ 15000/ at Khuntakata Parida gotha Pry School |
35000 |
Constn of Compost pit @ 20000/ and Soak Pit @ 15000/ at Khuntakata Parida gotha Pry School1 |
Completion of work |
-
latitude : 21.607109999999995
Longitude : 85.41568000000001
file name : Image_08052023153612560.png
|
2023-05-08 15:36:12.642549 |
37 |
66173318 |
Constn of Tubewell Platform |
195000 |
Constn of Tubewell Platform1 |
Completion of work |
-
latitude : 21.606546666666667
Longitude : 85.41569833333332
file name : Image_08052023155822890.png
|
2023-05-08 15:58:22.984249 |
38 |
55783223 |
Constn of Compost Pit @ 20000/and Soak Pit @ 15000/ at Kasada Pry School |
35000 |
Constn of Compost Pit @ 20000/and Soak Pit @ 15000/ at Kasada Pry School1 |
Completion of work |
-
latitude : 21.607203333333338
Longitude : 85.41567166666667
file name : Image_08052023155611029.png
|
2023-05-08 15:56:11.115149 |
39 |
75998631 |
Construction of addl room in new market complex of saharapur GP upper staire of KCCB |
294000 |
Construction of addl room in new market complex of saharapur GP upper staire of KCCB1 |
Completion of work |
-
latitude : 21.607025
Longitude : 85.41574333333334
file name : Image_05062023174658527.png
|
2023-06-05 17:46:58.611175 |
40 |
55783164 |
Constn of Compost Pit @20000/ and Soak Pit @ 15000/ at Upar Padakasada Pry School |
35000 |
Constn of Compost Pit @20000/ and Soak Pit @ 15000/ at Upar Padakasada Pry School1 |
Completion of work |
-
latitude : 21.606988333333334
Longitude : 85.41571166666667
file name : Image_05062023174053867.png
|
2023-06-05 17:40:53.953499 |
41 |
60185052 |
Maintenance of Exiting P.W.S |
200000 |
Maintenance of Exiting P.W.S1 |
Completion of work |
-
latitude : 21.602396666666664
Longitude : 85.49577333333333
file name : Image_24062023161017671.png
|
2023-06-24 16:10:17.77974 |
42 |
66174318 |
Completion of Missionshakti Building |
100000 |
Completion of Missionshakti Building1 |
Completion of work |
-
latitude : 21.60674
Longitude : 85.41578333333334
file name : Image_21072023185854262.png
|
2023-07-21 18:58:54.372322 |
43 |
55783317 |
Constn of Compost Pit @ 10000/ and Soak Pit @10000/ at Khunta kata AWC |
20000 |
Constn of Compost Pit @ 10000/ and Soak Pit @10000/ at Khunta kata AWC1 |
Completion of work |
-
latitude : 21.636746666666667
Longitude : 85.61123833333335
file name : Image_13092023174242554.png
|
2023-09-13 17:42:42.640944 |
44 |
55783194 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Khuntakata Pry School |
35000 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000/ at Khuntakata Pry School1 |
Completion of work |
-
latitude : 21.636728333333334
Longitude : 85.61120333333335
file name : Image_13092023174132189.png
|
2023-09-13 17:41:32.272952 |
45 |
55783063 |
Constn of Compost Pit @20000/ and Soak Pit @15000 at Lingajhar Pry School |
35000 |
Constn of Compost Pit @20000/ and Soak Pit @15000 at Lingajhar Pry School1 |
Completion of work |
-
latitude : 21.63671
Longitude : 85.61105833333335
file name : Image_13092023174024373.png
|
2023-09-13 17:40:24.460404 |
46 |
55783352 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000 at Kadakasada AWC |
20000 |
Constn of Compost Pit @ 10000/ and Soak Pit @ 10000 at Kadakasada AWC1 |
Completion of work |
-
latitude : 21.636726666666664
Longitude : 85.61119166666667
file name : Image_13092023173540278.png
|
2023-09-13 17:35:40.381362 |
47 |
55783083 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000 at Kadakasada pry School |
35000 |
Constn of Compost Pit @ 20000/ and Soak Pit @ 15000 at Kadakasada pry School1 |
Completion of work |
-
latitude : 21.636806666666665
Longitude : 85.61146833333332
file name : Image_13092023173434886.png
|
2023-09-13 17:34:34.98237 |
48 |
87419346 |
Operation & maintenance of drinking water supply system |
500000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.637056,21.6370489
Longitude : 85.6098538,85.6098559
file name : Image_16092023112819090.png
|
2023-09-16 11:28:19.18226 |
49 |
82142149 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 21.60671333333333
Longitude : 85.41572833333333
file name : Image_20032024112744442.png
|
2024-03-20 11:27:44.663395 |
50 |
82142149 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 21.606724999999997
Longitude : 85.41580166666667
file name : Image_20032024113258460.png
|
2024-03-20 11:32:58.590091 |
51 |
82142149 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 21.60671166666667
Longitude : 85.41578333333334
file name : Image_20032024113158262.png
|
2024-03-20 11:31:58.442911 |
52 |
82142149 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 21.606715
Longitude : 85.41581333333333
file name : Image_20032024112638458.png
|
2024-03-20 11:26:38.660579 |
53 |
82142149 |
Piped water supply to HH |
200000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 21.606780000000004
Longitude : 85.41583999999999
file name : Image_25102023161431955.png
|
2023-10-25 16:14:32.100052 |
54 |
75998958 |
Construction of cc road from Dolimula to ganshree medha kadakasada |
213600 |
Construction of cc road from Dolimula to ganshree medha kadakasada1 |
Completion of work |
-
latitude : 21.6517399,21.606978333333338,21.606978333333338,21.606978333333338
Longitude : 85.6053328,85.41566333333334,85.41566333333334,85.41566333333334
file name : Image_11012024214644874.png
|
2024-01-11 21:46:44.95292 |
55 |
82149212 |
Piped water connection to markets |
72000 |
Piped water connection to markets1 |
Roof laid |
-
latitude : 21.606721666666665
Longitude : 85.41587
file name : Image_20032024111311500.png
|
2024-03-20 11:13:11.739832 |
56 |
82149212 |
Piped water connection to markets |
72000 |
Piped water connection to markets1 |
Plinth level |
-
latitude : 21.606738333333336
Longitude : 85.41576333333333
file name : Image_20032024111008423.png
|
2024-03-20 11:10:08.702936 |
57 |
82149212 |
Piped water connection to markets |
72000 |
Piped water connection to markets1 |
Completion of work |
-
latitude : 21.613478333333333
Longitude : 85.41974166666665
file name : Image_25102023161121536.png
|
2023-10-25 16:11:21.72376 |
58 |
82149212 |
Piped water connection to markets |
72000 |
Piped water connection to markets1 |
Completion of work |
-
latitude : 21.6069997
Longitude : 85.4161753
file name : Image_21102023184235574.png
|
2023-10-21 18:42:35.658995 |
59 |
82142678 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.607273333333335,21.607273333333335
Longitude : 85.41637333333334,85.41637333333334
file name : Image_31052024155955139.png
|
2024-05-31 15:59:55.223539 |
60 |
82142678 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6070376,21.6070376
Longitude : 85.4161726,85.4161726
file name : Image_31052024155433654.png
|
2024-05-31 15:54:33.741092 |
61 |
82142678 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.63646833333333,21.63646833333333
Longitude : 85.60836833333333,85.60836833333333
file name : Image_31052024125844542.png
|
2024-05-31 12:58:44.629747 |
62 |
82142600 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6070376,21.6070376,21.6070376,21.6070376
Longitude : 85.4161726,85.4161726,85.4161726,85.4161726
file name : Image_31052024155836542.png
|
2024-05-31 15:58:36.631321 |
63 |
82142600 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6070376,21.6070376
Longitude : 85.4161726,85.4161726
file name : Image_31052024155336416.png
|
2024-05-31 15:53:36.497831 |
64 |
82142600 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.63646833333333,21.63646833333333
Longitude : 85.60836833333333,85.60836833333333
file name : Image_31052024125652011.png
|
2024-05-31 12:56:52.10094 |
65 |
82142011 |
Piped water connection to markets |
113279 |
Piped water connection to markets1 |
Roof laid |
-
latitude : 21.606701666666662
Longitude : 85.41575666666668
file name : Image_20032024111945296.png
|
2024-03-20 11:19:45.470089 |
66 |
82142011 |
Piped water connection to markets |
113279 |
Piped water connection to markets1 |
Plinth level |
-
latitude : 21.606696666666668
Longitude : 85.41578166666667
file name : Image_20032024111726651.png
|
2024-03-20 11:17:26.885434 |
67 |
82142011 |
Piped water connection to markets |
113279 |
Piped water connection to markets1 |
Completion of work |
-
latitude : 21.606718333333333
Longitude : 85.41580333333334
file name : Image_20032024111503881.png
|
2024-03-20 11:15:04.144656 |
68 |
66172571 |
Operation & maintenance of drinking water supply system |
357385 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6068928
Longitude : 85.4157297
file name : Image_22032024184713594.png
|
2024-03-22 18:47:13.733808 |
69 |
66172548 |
Operation & maintenance of drinking water supply system |
154000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6068771
Longitude : 85.4152444
file name : Image_22032024190249031.png
|
2024-03-22 19:02:49.199682 |
70 |
98708141 |
Piped/tap water supply to HH |
350000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 21.613670000000003
Longitude : 85.47658000000001
file name : Image_13062024141036808.png
|
2024-06-13 14:10:36.895496 |