1 |
44556249 |
ELECTRIC BILL |
800000 |
ELECTRIC BILL1 |
Completion of work |
-
latitude : 21.197393333333334
Longitude : 86.28447999999999
file name : Image_26102021143158297.png
|
2021-10-26 14:31:58.450428 |
2 |
44555991 |
CONST OF BOUNDARY WALL FROM SADHA CHILDRENS PARK AT-SADHA |
500000 |
CONST OF BOUNDARY WALL FROM SADHA CHILDRENS PARK AT-SADHA1 |
Completion of work |
-
latitude : 21.19765083
Longitude : 86.28383523
file name : Image_22032021105929206.png
|
2021-03-22 10:59:29.384004 |
3 |
44556103 |
COMPLETION OF MOUDA COMMUNITY MANDAP |
250000 |
COMPLETION OF MOUDA COMMUNITY MANDAP1 |
Plinth level |
-
latitude : 21.18532335
Longitude : 86.33069315
file name : Image_22032021143709108.png
|
2021-03-22 14:37:09.305487 |
4 |
44556118 |
COMPLETION SADHA COMMUNITY MANDAP |
300000 |
COMPLETION SADHA COMMUNITY MANDAP1 |
Completion of work |
-
latitude : 21.19614329
Longitude : 86.28345456
file name : Image_22032021105934432.png
|
2021-03-22 10:59:34.539451 |
5 |
44556196 |
CONST OF 2NOS OF TOILET & URINAL FROM MOUDA HIGH SCHOOL |
60000 |
CONST OF 2NOS OF TOILET & URINAL FROM MOUDA HIGH SCHOOL1 |
Completion of work |
-
latitude : 21.1836044
Longitude : 86.3290863
file name : Image_23032021112241427.png
|
2021-03-23 11:22:41.517459 |
6 |
44556196 |
CONST OF 2NOS OF TOILET & URINAL FROM MOUDA HIGH SCHOOL |
60000 |
CONST OF 2NOS OF TOILET & URINAL FROM MOUDA HIGH SCHOOL1 |
Completion of work |
-
latitude : 21.183512806892395
Longitude : 86.32917702198029
file name : Image_22032021172405420.png
|
2021-03-22 17:24:05.549284 |
7 |
44556210 |
CONST OF 2NOS OF TOILET & URINAL FROM SADHA SARADAI GIRLS HIGH SCHOOL |
60000 |
CONST OF 2NOS OF TOILET & URINAL FROM SADHA SARADAI GIRLS HIGH SCHOOL2 |
Completion of work |
-
latitude : 21.19763314
Longitude : 86.28332546
file name : Image_23032021112253729.png
|
2021-03-23 11:22:53.828475 |
8 |
44556006 |
CONST OF BEAUTIFICATION FROM ELECTRICFICATION OF SADHA CHILDRENS PARK AT-SADHA |
300000 |
CONST OF BEAUTIFICATION FROM ELECTRICFICATION OF SADHA CHILDRENS PARK AT-SADHA1 |
Completion of work |
-
latitude : 21.19826053,21.19826025
Longitude : 86.28365134,86.28365167
file name : Image_23032021112247703.png
|
2021-03-23 11:22:47.81472 |
9 |
48545751 |
CONST. OF GATE AT NAHA SIVA MANDIR |
200000 |
CONST. OF GATE AT NAHA SIVA MANDIR 1 |
Completion of work |
-
latitude : 21.17646666666667
Longitude : 86.30678666666667
file name : Image_14022022113230766.png
|
2022-02-14 11:32:30.878844 |
10 |
48545468 |
CONST. OF BOUNDARY WALL OF MOUDA CHILDREN'S PARK |
300000 |
CONST. OF BOUNDARY WALL OF MOUDA CHILDREN'S PARK 1 |
Completion of work |
-
latitude : 21.184021666666663
Longitude : 86.31537000000002
file name : Image_14022022120015357.png
|
2022-02-14 12:00:15.470459 |
11 |
44556239 |
WATER PIPE LINE REPAIRING & TUBEWELL REPAIRING & SPAIR PARTS |
200000 |
WATER PIPE LINE REPAIRING & TUBEWELL REPAIRING & SPAIR PARTS 1 |
Completion of work |
-
latitude : 21.196368333333332
Longitude : 86.28515333333334
file name : Image_26102021143201943.png
|
2021-10-26 14:32:02.05221 |
12 |
44556129 |
MENTNANCE OF LIVE STOCK AID CENTRE AT-SADHA |
100000 |
MENTNANCE OF LIVE STOCK AID CENTRE AT-SADHA1 |
Completion of work |
-
latitude : 21.197558333333337
Longitude : 86.28412666666667
file name : Image_28092021104340389.png
|
2021-09-28 10:43:40.526378 |
13 |
44556171 |
MENTNANCE OF GP GOODOWN |
150000 |
MENTNANCE OF GP GOODOWN1 |
Completion of work |
-
latitude : 21.197476666666663
Longitude : 86.28438333333334
file name : Image_28092021104347533.png
|
2021-09-28 10:43:47.651408 |
14 |
48546347 |
ELECTRIFICATION OF SADHA CHILDREN'S PARK -5TH SFC |
300000 |
ELECTRIFICATION OF SADHA CHILDREN'S PARK -5TH SFC1 |
Completion of work |
-
latitude : 21.197726666666668
Longitude : 86.28339499999998
file name : Image_14122021093858424.png
|
2021-12-14 09:38:58.6106 |
15 |
48546211 |
CONST. OF 1ST FLOOR OF SADHA GP BUILDING -5TH SFC |
500000 |
CONST. OF 1ST FLOOR OF SADHA GP BUILDING -5TH SFC1 |
Plinth level |
-
latitude : 21.197321666666667
Longitude : 86.28435333333333
file name : Image_06012022133355120.png
|
2022-01-06 13:33:55.262648 |
16 |
48546211 |
CONST. OF 1ST FLOOR OF SADHA GP BUILDING -5TH SFC |
500000 |
CONST. OF 1ST FLOOR OF SADHA GP BUILDING -5TH SFC1 |
Completion of work |
-
latitude : 21.197221666666664
Longitude : 86.28432
file name : Image_14122021091831247.png
|
2021-12-14 09:18:31.346985 |
17 |
48545258 |
CONST. OF DRAIN AT SAMAL SAHI,SADHA -15TH FC |
200000 |
CONST. OF DRAIN AT SAMAL SAHI,SADHA -15TH FC1 |
Plinth level |
-
latitude : 21.195026666666664,21.195028333333333
Longitude : 86.28533166666666,86.28536666666666
file name : Image_07012022100147462.png
|
2022-01-07 10:01:47.562057 |
18 |
48545258 |
CONST. OF DRAIN AT SAMAL SAHI,SADHA -15TH FC |
200000 |
CONST. OF DRAIN AT SAMAL SAHI,SADHA -15TH FC1 |
Completion of work |
-
latitude : 21.195028333333333,21.195043333333334
Longitude : 86.28539,86.285455
file name : Image_14122021093854859.png
|
2021-12-14 09:38:55.021062 |
19 |
48545604 |
BEAUTIFICATION OF MITHIGAON CHILDREN'S PARK |
300000 |
BEAUTIFICATION OF MITHIGAON CHILDREN'S PARK 1 |
Completion of work |
-
latitude : 21.18389666666667,21.183893333333337
Longitude : 86.31546166666666,86.315465
file name : Image_27122021165952177.png
|
2021-12-27 16:59:52.322508 |
20 |
48545155 |
CONST. OF CHILLDREN'S PARK ,SADHA -15TH FC |
200000 |
CONST. OF CHILLDREN'S PARK ,SADHA -15TH FC1 |
Completion of work |
-
latitude : 21.197726666666668
Longitude : 86.28343000000001
file name : Image_14122021093901913.png
|
2021-12-14 09:39:02.041234 |
21 |
48544986 |
ELECTRIC BILL CHARGES -15TH FC |
539656 |
ELECTRIC BILL CHARGES -15TH FC1 |
Completion of work |
-
latitude : 21.197361666666666
Longitude : 86.28445166666667
file name : Image_06012022133247200.png
|
2022-01-06 13:32:47.308859 |
22 |
48544855 |
SEM HONORARIUM -15TH FC |
72000 |
SEM HONORARIUM -15TH FC1 |
Completion of work |
-
latitude : 21.19707166666667
Longitude : 86.28473000000001
file name : Image_20012022133659551.png
|
2022-01-20 13:36:59.681612 |
23 |
44556224 |
SEM SALARI |
60000 |
SEM SALARI1 |
Completion of work |
-
latitude : 21.19730666666667
Longitude : 86.284435
file name : Image_20012022140536246.png
|
2022-01-20 14:05:36.344479 |
24 |
61570412 |
ELECTRIC BILL PAYMENT - CFC TIED |
306544 |
ELECTRIC BILL PAYMENT - CFC TIED1 |
Completion of work |
-
latitude : 21.19720166666667
Longitude : 86.28422666666665
file name : Image_01062023123211783.png
|
2023-06-01 12:32:11.866627 |
25 |
61570412 |
ELECTRIC BILL PAYMENT - CFC TIED |
306544 |
ELECTRIC BILL PAYMENT - CFC TIED1 |
Completion of work |
-
latitude : 21.1657466
Longitude : 86.2508976
file name : Image_31102022161332038.png
|
2022-10-31 16:13:32.14619 |
26 |
61570950 |
CONST OF GP OFFICE BOUNDARY WALL AT SADHA - SFC |
200000 |
CONST OF GP OFFICE BOUNDARY WALL AT SADHA - SFC1 |
Plinth level |
-
latitude : 21.1973311
Longitude : 86.2843043
file name : Image_04112022132420469.png
|
2022-11-04 13:24:20.563509 |
27 |
61570950 |
CONST OF GP OFFICE BOUNDARY WALL AT SADHA - SFC |
200000 |
CONST OF GP OFFICE BOUNDARY WALL AT SADHA - SFC1 |
Completion of work |
-
latitude : 21.197564019821584
Longitude : 86.28430341370404
file name : Image_04112022131552442.png
|
2022-11-04 13:15:52.532823 |
28 |
61570516 |
REPARI AND MAINTENANCE OF SADHA VILLAGE DRAINAGE SYSTEM - CFC TIED |
100000 |
REPARI AND MAINTENANCE OF SADHA VILLAGE DRAINAGE SYSTEM - CFC TIED1 |
Plinth level |
-
latitude : 21.195586854591966,21.1956022772938
Longitude : 86.28423702903092,86.28426041454077
file name : Image_04112022132656309.png
|
2022-11-04 13:26:56.410498 |
29 |
61570516 |
REPARI AND MAINTENANCE OF SADHA VILLAGE DRAINAGE SYSTEM - CFC TIED |
100000 |
REPARI AND MAINTENANCE OF SADHA VILLAGE DRAINAGE SYSTEM - CFC TIED1 |
Completion of work |
-
latitude : 21.195634086616337,21.195623986423016
Longitude : 86.284245159477,86.28423342481256
file name : Image_04112022131336411.png
|
2022-11-04 13:13:36.499335 |
30 |
61596702 |
CONST OF DRAIN AT PADARUKHA VILLAGE CFC TIED |
150000 |
CONST OF DRAIN AT PADARUKHA VILLAGE CFC TIED1 |
Plinth level |
-
latitude : 21.178373233415186,21.178363845683634,21.17837017402053
Longitude : 86.31839906796813,86.31845363415778,86.31843972019851
file name : Image_23022023175605663.png
|
2023-02-23 17:56:05.742336 |
31 |
61596702 |
CONST OF DRAIN AT PADARUKHA VILLAGE CFC TIED |
150000 |
CONST OF DRAIN AT PADARUKHA VILLAGE CFC TIED1 |
Completion of work |
-
latitude : 21.178400055505335,21.17835722398013,21.178363971412182
Longitude : 86.31840116344392,86.31843829527497,86.31842664442956
file name : Image_23022023165407285.png
|
2023-02-23 16:54:07.371245 |
32 |
64500383 |
CONST OF CULVERT AT KHALAGADIA, SADHA - CFC UNTIED |
100000 |
CONST OF CULVERT AT KHALAGADIA, SADHA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.185775040648878,21.18572189938277
Longitude : 86.29651333205402,86.29645641893148
file name : Image_23022023163400802.png
|
2023-02-23 16:34:00.887703 |
33 |
61570461 |
SBM PHASE II PAYMENT |
228544 |
SBM PHASE II PAYMENT 1 |
Plinth level |
-
latitude : 21.197341666666663
Longitude : 86.28438666666668
file name : Image_31052023113847438.png
|
2023-05-31 11:38:47.52484 |
34 |
61570461 |
SBM PHASE II PAYMENT |
228544 |
SBM PHASE II PAYMENT 1 |
Completion of work |
-
latitude : 21.195254999999996
Longitude : 86.28963
file name : Image_31052023105556595.png
|
2023-05-31 10:55:56.689378 |
35 |
61570379 |
SEM SALARY - CFC TIED |
72000 |
SEM SALARY - CFC TIED1 |
Completion of work |
-
latitude : 21.1973076
Longitude : 86.2843043
file name : Image_31052023112904347.png
|
2023-05-31 11:29:04.483922 |
36 |
61570379 |
SEM SALARY - CFC TIED |
72000 |
SEM SALARY - CFC TIED1 |
Completion of work |
-
latitude : 21.1973053
Longitude : 86.2842998
file name : Image_31052023110102262.png
|
2023-05-31 11:01:02.414976 |
37 |
79644749 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.18756005,21.18755456
Longitude : 86.29601522,86.29601176
file name : Image_09042024162140219.png
|
2024-04-09 16:21:40.271952 |
38 |
79644749 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.18751763,21.18754906
Longitude : 86.29599885,86.29603336
file name : Image_09042024161534160.png
|
2024-04-09 16:15:34.212433 |
39 |
79644749 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18753766,21.18753156
Longitude : 86.29603218,86.29602982
file name : Image_09042024155227111.png
|
2024-04-09 15:52:27.161921 |
40 |
61570912 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC |
300000 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC 1 |
Roof laid |
-
latitude : 21.18575516,21.18576295
Longitude : 86.29651145,86.29650377
file name : Image_09042024154357495.png
|
2024-04-09 15:43:57.563992 |
41 |
61570912 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC |
300000 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC 1 |
Plinth level |
-
latitude : 21.18575675,21.18576068,21.18575905,21.1857581
Longitude : 86.29652901,86.29653264,86.29653228,86.29653208
file name : Image_09042024154010844.png
|
2024-04-09 15:40:10.897331 |
42 |
61570912 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC |
300000 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC 1 |
Completion of work |
-
latitude : 21.18577228,21.18576802
Longitude : 86.29652227,86.2965193
file name : Image_09042024153305078.png
|
2024-04-09 15:33:05.137332 |
43 |
61570912 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC |
300000 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC 1 |
Completion of work |
-
latitude : 21.18577282,21.18577282
Longitude : 86.29653551,86.29653551
file name : Image_09042024152645888.png
|
2024-04-09 15:26:45.953358 |
44 |
61570912 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC |
300000 |
CONST OF CC ROAD FROM PMGSY ROAD TO CHAKUA JENA SAHI SADHA - SFC 1 |
Completion of work |
-
latitude : 21.18578583,21.18579093
Longitude : 86.2965866,86.29658435
file name : Image_09042024151651219.png
|
2024-04-09 15:16:51.27418 |
45 |
61571058 |
CONST OF CC ROAD AT RAGHUNATHPUR - SFC |
200000 |
CONST OF CC ROAD AT RAGHUNATHPUR - SFC 1 |
Completion of work |
-
latitude : 21.186160000000005,21.186143333333334,21.18613833333333,21.186151666666667
Longitude : 86.3284,86.32842666666666,86.32846333333333,86.32842666666666
file name : Image_30102023161114572.png
|
2023-10-30 16:11:14.6897 |
46 |
61571058 |
CONST OF CC ROAD AT RAGHUNATHPUR - SFC |
200000 |
CONST OF CC ROAD AT RAGHUNATHPUR - SFC 1 |
Completion of work |
-
latitude : 21.18612666666667,21.18615833333333,21.186173333333333
Longitude : 86.32841833333332,86.32842000000001,86.32843499999998
file name : Image_30102023160757889.png
|
2023-10-30 16:07:58.009974 |
47 |
61570799 |
CONST OF BOUNDARY WALL AT NAHA SHIVA MANDIRA - CFC UNTIED |
200000 |
CONST OF BOUNDARY WALL AT NAHA SHIVA MANDIRA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.176521666666666
Longitude : 86.30676333333334
file name : Image_25072023152930933.png
|
2023-07-25 15:29:31.085337 |
48 |
61570799 |
CONST OF BOUNDARY WALL AT NAHA SHIVA MANDIRA - CFC UNTIED |
200000 |
CONST OF BOUNDARY WALL AT NAHA SHIVA MANDIRA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.176483333333334
Longitude : 86.30678333333331
file name : Image_25072023140422204.png
|
2023-07-25 14:04:22.310116 |
49 |
61570765 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED |
200000 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.18466,21.184706666666663
Longitude : 86.33197666666668,86.33239999999999
file name : Image_30102023161734552.png
|
2023-10-30 16:17:34.72004 |
50 |
61570765 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED |
200000 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.185008333333332,21.185025000000003,21.185025000000003
Longitude : 86.33278333333334,86.33281333333335,86.33281000000001
file name : Image_30102023160308406.png
|
2023-10-30 16:03:08.604065 |
51 |
61570765 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED |
200000 |
IMP OF ROAD FROM MALLICK SAHI TO KAILASH JENA HOUSE MOUDA - CFC UNTIED1 |
Completion of work |
-
latitude : 21.18503333333333,21.185026666666666
Longitude : 86.33279833333333,86.33279499999999
file name : Image_30102023155911991.png
|
2023-10-30 15:59:12.116582 |
52 |
83199853 |
Piped drinking water to public institutions |
220000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 21.46062075,21.46062419
Longitude : 86.03906257,86.03903863
file name : Image_03072024134135898.png
|
2024-07-03 13:41:35.95654 |
53 |
83199853 |
Piped drinking water to public institutions |
220000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 21.197468333333337,21.19747
Longitude : 86.28393333333334,86.28392666666666
file name : Image_14122023170037749.png
|
2023-12-14 17:00:37.848339 |
54 |
83199853 |
Piped drinking water to public institutions |
220000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 21.197529999999997,21.197528333333334
Longitude : 86.28437666666666,86.28433333333332
file name : Image_14122023165746552.png
|
2023-12-14 16:57:46.636108 |
55 |
83199853 |
Piped drinking water to public institutions |
220000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 21.197553333333335,21.197551666666662
Longitude : 86.28394166666666,86.28395
file name : Image_14122023163938584.png
|
2023-12-14 16:39:38.690166 |
56 |
61596635 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED |
100000 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED1 |
Roof laid |
-
latitude : 21.197186666666667
Longitude : 86.28424333333332
file name : Image_27022024140950870.png
|
2024-02-27 14:09:50.967175 |
57 |
61596635 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED |
100000 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED1 |
Plinth level |
-
latitude : 21.197205
Longitude : 86.28433666666666
file name : Image_27022024140504414.png
|
2024-02-27 14:05:04.599664 |
58 |
61596635 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED |
100000 |
DRINKING WATER SUPPLY TO GP OFFICE AT SADHA CFC TIED1 |
Completion of work |
-
latitude : 21.1973319
Longitude : 86.2844364
file name : Image_26022024173258755.png
|
2024-02-26 17:32:58.859519 |
59 |
83196173 |
Piped water supply to HH |
129544 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 21.19722644
Longitude : 86.28436185
file name : Image_07052024140105889.png
|
2024-05-07 14:01:05.950276 |
60 |
83196173 |
Piped water supply to HH |
129544 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 21.1960902
Longitude : 86.2841183
file name : Image_07052024135159912.png
|
2024-05-07 13:51:59.96431 |
61 |
83196173 |
Piped water supply to HH |
129544 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 21.1960898
Longitude : 86.2841198
file name : Image_07052024134312181.png
|
2024-05-07 13:43:12.239164 |
62 |
80500649 |
Construction and repairing of Gate doors, window, fixtures etc. |
100000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Roof laid |
-
latitude : 21.19217291
Longitude : 86.31016877
file name : Image_14052024133349398.png
|
2024-05-14 13:33:49.463975 |
63 |
80500649 |
Construction and repairing of Gate doors, window, fixtures etc. |
100000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Plinth level |
-
latitude : 21.19218531
Longitude : 86.31010162
file name : Image_14052024132556953.png
|
2024-05-14 13:25:57.011524 |
64 |
80500649 |
Construction and repairing of Gate doors, window, fixtures etc. |
100000 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 21.19218782
Longitude : 86.31013286
file name : Image_14052024131516414.png
|
2024-05-14 13:15:16.468324 |
65 |
105814397 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.18465208,21.18472758,21.18471341
Longitude : 86.29709744,86.29708078,86.29707434
file name : Image_11052024110801420.png
|
2024-05-11 11:08:01.500319 |
66 |
105814397 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.18468029,21.18467066,21.18466809
Longitude : 86.2971064,86.29710018,86.29710149
file name : Image_11052024110026885.png
|
2024-05-11 11:00:26.95878 |
67 |
105814397 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18467143,21.18467164
Longitude : 86.29707787,86.29707223
file name : Image_11052024105725419.png
|
2024-05-11 10:57:25.471061 |
68 |
78922487 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.19177904
Longitude : 86.31054359
file name : Image_11052024113159612.png
|
2024-05-11 11:31:59.669561 |
69 |
78922487 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.19180885
Longitude : 86.31051552
file name : Image_11052024112551721.png
|
2024-05-11 11:25:51.781112 |
70 |
78922487 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.19181587
Longitude : 86.31052078
file name : Image_11052024112153822.png
|
2024-05-11 11:21:53.881126 |
71 |
61570587 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED |
100000 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED1 |
Roof laid |
-
latitude : 21.1656873
Longitude : 86.2505642
file name : Image_28032024193242781.png
|
2024-03-28 19:32:42.897147 |
72 |
61570587 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED |
100000 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED1 |
Plinth level |
-
latitude : 21.16569
Longitude : 86.2505524
file name : Image_28032024192805048.png
|
2024-03-28 19:28:05.169329 |
73 |
61570587 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED |
100000 |
CONST OF COMMUNITY TOILET AT SADHA - CFC TIED1 |
Completion of work |
-
latitude : 21.1656881
Longitude : 86.2505826
file name : Image_28032024192044275.png
|
2024-03-28 19:20:44.383818 |
74 |
61596611 |
DRINKING WATER SUPPLY TO AWC II DARADA SAHI SADHA CFC TIED |
100000 |
DRINKING WATER SUPPLY TO AWC II DARADA SAHI SADHA CFC TIED1 |
Plinth level |
-
latitude : 21.1656873,21.1656873
Longitude : 86.2505812,86.2505812
file name : Image_28032024194029471.png
|
2024-03-28 19:40:29.58564 |
75 |
61596611 |
DRINKING WATER SUPPLY TO AWC II DARADA SAHI SADHA CFC TIED |
100000 |
DRINKING WATER SUPPLY TO AWC II DARADA SAHI SADHA CFC TIED1 |
Completion of work |
-
latitude : 21.1656878,21.1656875
Longitude : 86.2505507,86.2505542
file name : Image_28032024193624529.png
|
2024-03-28 19:36:24.630863 |
76 |
83197458 |
Providing piped water supply to public institutions |
72000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 21.19756685
Longitude : 86.28393791
file name : Image_04072024172708768.png
|
2024-07-04 17:27:08.842944 |
77 |
83197458 |
Providing piped water supply to public institutions |
72000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 21.19757622
Longitude : 86.28391228
file name : Image_04072024172131045.png
|
2024-07-04 17:21:31.127198 |
78 |
83197458 |
Providing piped water supply to public institutions |
72000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.19758277
Longitude : 86.28392034
file name : Image_04072024171806305.png
|
2024-07-04 17:18:06.360442 |
79 |
61570675 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED |
200000 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED1 |
Roof laid |
-
latitude : 21.18382608
Longitude : 86.31539348
file name : Image_09082024132018014.png
|
2024-08-09 13:20:18.065459 |
80 |
61570675 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED |
200000 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED1 |
Plinth level |
-
latitude : 21.183952
Longitude : 86.31550982
file name : Image_09082024131622636.png
|
2024-08-09 13:16:22.696227 |
81 |
61570675 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED |
200000 |
CONST OF WELCOME GATE AT MITHIGAON CHILDREN PARK - CFC UNTIED1 |
Completion of work |
-
latitude : 21.18386937
Longitude : 86.3154989
file name : Image_09082024122925171.png
|
2024-08-09 12:29:25.258326 |
82 |
79669512 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.18601272,21.18602696
Longitude : 86.29492331,86.29487256
file name : Image_18072024170907119.png
|
2024-07-18 17:09:07.177887 |
83 |
79669512 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.18596626,21.18609206,21.18606605
Longitude : 86.29481481,86.29494807,86.29493526
file name : Image_18072024165743891.png
|
2024-07-18 16:57:43.94333 |
84 |
79669512 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18595603,21.1859789,21.18607544,21.18605136
Longitude : 86.29480354,86.29481411,86.29493992,86.29491383
file name : Image_18072024164441477.png
|
2024-07-18 16:44:41.535846 |
85 |
80499324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 21.1850345
Longitude : 86.3299944
file name : Image_18072024161524686.png
|
2024-07-18 16:15:24.755736 |
86 |
80499324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 21.1850243
Longitude : 86.3299814
file name : Image_18072024160531806.png
|
2024-07-18 16:05:31.862072 |
87 |
80499324 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 21.1850371
Longitude : 86.3300004
file name : Image_18072024144235689.png
|
2024-07-18 14:42:35.766432 |
88 |
80498039 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.1850243
Longitude : 86.3299814
file name : Image_18072024160227526.png
|
2024-07-18 16:02:27.577194 |
89 |
80498039 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.1850227
Longitude : 86.329977
file name : Image_18072024155119069.png
|
2024-07-18 15:51:19.131356 |
90 |
80498039 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.1850228
Longitude : 86.3299782
file name : Image_18072024143626121.png
|
2024-07-18 14:36:26.186284 |
91 |
83201260 |
Operation and Maintenance of piped water supply system |
81735 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 21.18290353,21.18290367
Longitude : 86.32913378,86.32913793
file name : Image_09082024135802746.png
|
2024-08-09 13:58:02.823264 |
92 |
83201260 |
Operation and Maintenance of piped water supply system |
81735 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.18291178,21.1829009
Longitude : 86.3291308,86.32913099
file name : Image_09082024135351482.png
|
2024-08-09 13:53:51.543818 |
93 |
83201260 |
Operation and Maintenance of piped water supply system |
81735 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.18293568,21.18290495
Longitude : 86.32912289,86.32913881
file name : Image_09082024134746110.png
|
2024-08-09 13:47:46.159957 |