1 |
58261518 |
REPAIR OF CC ROAD FROM PMGSY ROAD TO ALEKHA RANASINGH HOUSE UNDER 15TH FFC |
50000 |
REPAIR OF CC ROAD FROM PMGSY ROAD TO ALEKHA RANASINGH HOUSE UNDER 15TH FFC1 |
Completion of work |
-
latitude : 20.0379955
Longitude : 85.58661619
file name : Image_09022022134437722.png
|
2022-02-09 13:44:37.81243 |
2 |
44496098 |
CONSTRUCTION OF DRAIN FROM BRAJA BADAJENA GHAR TO RD ROAD. |
125952 |
CONSTRUCTION OF DRAIN FROM BRAJA BADAJENA GHAR TO RD ROAD.1 |
Completion of work |
-
latitude : 20.04954581,20.04954332
Longitude : 85.58631801,85.58630761
file name : Image_10022021104337384.png
|
2021-02-10 10:43:37.466897 |
3 |
44487694 |
REAPIR OF CC ROAD FROM GOBINDA SRICHANDAN HOUSE TO BIJAY JAGADEB HOUSE. |
200000 |
REAPIR OF CC ROAD FROM GOBINDA SRICHANDAN HOUSE TO BIJAY JAGADEB HOUSE.1 |
Completion of work |
-
latitude : 20.02714692,20.02714477
Longitude : 85.58566131,85.58566126
file name : Image_10022021110442198.png
|
2021-02-10 11:04:42.241519 |
4 |
44487808 |
CONSTRUCTION OF CC ROAD FROM NILA SAMANTARAY BARI TO GAJABARAN TANK. |
200000 |
CONSTRUCTION OF CC ROAD FROM NILA SAMANTARAY BARI TO GAJABARAN TANK.1 |
Completion of work |
-
latitude : 20.04101167,20.04101587
Longitude : 85.58788912,85.58788601
file name : Image_10022021105456720.png
|
2021-02-10 10:54:56.802426 |
5 |
44496987 |
CONSTRUCTION OF CC ROAD BRAJA BADAJENA GHAR TO RD ROAD. |
80948 |
CONSTRUCTION OF CC ROAD BRAJA BADAJENA GHAR TO RD ROAD.1 |
Completion of work |
-
latitude : 20.04954107,20.04953858
Longitude : 85.58630433,85.58629612
file name : Image_10022021104340774.png
|
2021-02-10 10:43:40.849516 |
6 |
44496071 |
INCOMPLETE OF COMMUNITY GHAR OF KURUMPADA.. |
100000 |
INCOMPLETE OF COMMUNITY GHAR OF KURUMPADA..1 |
Completion of work |
-
latitude : 20.04092125
Longitude : 85.58760118
file name : Image_12032021161127235.png
|
2021-03-12 16:11:27.31585 |
7 |
44495912 |
IN COMPLETE MARKET SHED OF HADAPADA.. |
160000 |
IN COMPLETE MARKET SHED OF HADAPADA..1 |
Completion of work |
-
latitude : 20.03881942
Longitude : 85.58563323
file name : Image_12032021161539196.png
|
2021-03-12 16:15:39.270755 |
8 |
44496014 |
REAPIR OF CC ROAD OF HADAPADA SASAN SAHI. |
200000 |
REAPIR OF CC ROAD OF HADAPADA SASAN SAHI.1 |
Completion of work |
-
latitude : 20.03806789,20.03805431,20.03805442
Longitude : 85.58832491,85.58835397,85.58835464
file name : Image_27042021102109232.png
|
2021-04-27 10:21:09.310466 |
9 |
44487679 |
REPAIR OF CC ROAD FROM GOPINATH BALABANTARAY HOUSE TO GODABARISH GUMANSINGH HOUSE. |
200000 |
REPAIR OF CC ROAD FROM GOPINATH BALABANTARAY HOUSE TO GODABARISH GUMANSINGH HOUSE.1 |
Completion of work |
-
latitude : 20.04572105,20.04571654
Longitude : 85.58545258,85.58545614
file name : Image_27042021101617930.png
|
2021-04-27 10:16:17.99842 |
10 |
44487755 |
REPAIR OF CC ROAD FROM KHANGUN GHAR TO DULANA MANDIRA. |
200000 |
REPAIR OF CC ROAD FROM KHANGUN GHAR TO DULANA MANDIRA.1 |
Completion of work |
-
latitude : 20.04809324,20.0480892
Longitude : 85.58396903,85.58396276
file name : Image_27042021101405863.png
|
2021-04-27 10:14:05.921389 |
11 |
44487722 |
CONSTRUCTION OF CC ROAD FROM CREMATORIUM TO PMGSY ROAD. |
200000 |
CONSTRUCTION OF CC ROAD FROM CREMATORIUM TO PMGSY ROAD.1 |
Completion of work |
-
latitude : 20.0399813,20.03998172
Longitude : 85.58226186,85.58226154
file name : Image_27042021102931376.png
|
2021-04-27 10:29:31.457853 |
12 |
44496044 |
INCOMPLETE OF COMMUNITY GHAR OFNARANGARH BHOI SAHI. |
100000 |
INCOMPLETE OF COMMUNITY GHAR OFNARANGARH BHOI SAHI.1 |
Completion of work |
-
latitude : 20.04778304
Longitude : 85.5844967
file name : Image_20052021171157019.png
|
2021-05-20 17:11:57.094505 |
13 |
44495854 |
RENOVATION OF BHOGAPUR TANK. |
100000 |
RENOVATION OF BHOGAPUR TANK.1 |
Completion of work |
-
latitude : 20.03995234
Longitude : 85.58229706
file name : Image_20052021172100864.png
|
2021-05-20 17:21:00.966039 |
14 |
44495835 |
CONSTRUCTION OF DRAIN FROM HARAMOHAN PAIKARAY TO CHUNGAN GHARA. |
200000 |
CONSTRUCTION OF DRAIN FROM HARAMOHAN PAIKARAY TO CHUNGAN GHARA.1 |
Completion of work |
-
latitude : 20.051826,20.05182955
Longitude : 85.58415182,85.58415117
file name : Image_20052021170422986.png
|
2021-05-20 17:04:23.078925 |
15 |
44495882 |
RENOVATION OF KANCHILO TANK |
100000 |
RENOVATION OF KANCHILO TANK1 |
Completion of work |
-
latitude : 20.04495993
Longitude : 85.5699571
file name : Image_15082021122518092.png
|
2021-08-15 12:25:18.184386 |
16 |
58264955 |
REPAIR CC ROAD FROM DOLA PATRA HOUSE TO DHOBA GHAR 15TH FFC |
50000 |
REPAIR CC ROAD FROM DOLA PATRA HOUSE TO DHOBA GHAR 15TH FFC1 |
Completion of work |
-
latitude : 20.04907269,20.04907258
Longitude : 85.58446943,85.58446951
file name : Image_09022022133600288.png
|
2022-02-09 13:36:00.387828 |
17 |
58264716 |
REPAIR OF CC ROAD FROM NILA MOHANTY HOUSE TO AKURA PAIKARAY HOUSE 15TH FFC |
100000 |
REPAIR OF CC ROAD FROM NILA MOHANTY HOUSE TO AKURA PAIKARAY HOUSE 15TH FFC1 |
Completion of work |
-
latitude : 20.02889201,20.02888738
Longitude : 85.58662505,85.58661681
file name : Image_09022022135036500.png
|
2022-02-09 13:50:36.621143 |
18 |
58255519 |
DRAIN FROM GOBARDHAN KANDI HOUSE TO KHAMARASAHI UNDER 15TH FFC |
100000 |
DRAIN FROM GOBARDHAN KANDI HOUSE TO KHAMARASAHI UNDER 15TH FFC1 |
Completion of work |
-
latitude : 20.03575709,20.03575713
Longitude : 85.58732522,85.58732525
file name : Image_09022022134724347.png
|
2022-02-09 13:47:24.449487 |
19 |
44495893 |
RENOVATION OF MANAPUR TANK. |
100000 |
RENOVATION OF MANAPUR TANK.1 |
Completion of work |
-
latitude : 20.03095807
Longitude : 85.58626869
file name : Image_03092021154339657.png
|
2021-09-03 15:43:39.770493 |
20 |
44496424 |
DIGGING OF 3 NOS NEW TUBE WELL. |
330000 |
DIGGING OF 3 NOS NEW TUBE WELL.1 |
Completion of work |
-
latitude : 20.1702322
Longitude : 85.6115045
file name : Image_29112021124954443.png
|
2021-11-29 12:49:54.597824 |
21 |
48003940 |
INCOMPLETE DRAIN NEAR HAT |
120000 |
INCOMPLETE DRAIN NEAR HAT1 |
Completion of work |
-
latitude : 20.04895281,20.04893738
Longitude : 85.58606113,85.58603922
file name : Image_29012022163326569.png
|
2022-01-29 16:33:26.700007 |
22 |
58255146 |
DRAIN & REPAIR OF CC ROAD FROM BENUDHAR CHHOTRAY HOUSE TOWARDS GAJABARAN TANK 15TH FFC |
50000 |
DRAIN & REPAIR OF CC ROAD FROM BENUDHAR CHHOTRAY HOUSE TOWARDS GAJABARAN TANK 15TH FFC1 |
Completion of work |
-
latitude : 20.04063836,20.04064194
Longitude : 85.58796314,85.58796407
file name : Image_29012022154912442.png
|
2022-01-29 15:49:12.557503 |
23 |
58264159 |
CC ROAD FROM MANGALA MANDIR TO NARENDRA CHHOTARAY HOUSE 15TH FFC |
100000 |
CC ROAD FROM MANGALA MANDIR TO NARENDRA CHHOTARAY HOUSE 15TH FFC1 |
Completion of work |
-
latitude : 20.04337257,20.04337158
Longitude : 85.58125245,85.58125917
file name : Image_29012022162424883.png
|
2022-01-29 16:24:24.990896 |
24 |
58264159 |
CC ROAD FROM MANGALA MANDIR TO NARENDRA CHHOTARAY HOUSE 15TH FFC |
100000 |
CC ROAD FROM MANGALA MANDIR TO NARENDRA CHHOTARAY HOUSE 15TH FFC1 |
Completion of work |
-
latitude : 20.04335787,20.04336129
Longitude : 85.58128204,85.58127887
file name : Image_29012022162428820.png
|
2022-01-29 16:24:28.930663 |
25 |
48002775 |
REPAIR OF CC ROAD FROM HADAPADA PHULDOLA TO PHC HADAPADA |
270000 |
REPAIR OF CC ROAD FROM HADAPADA PHULDOLA TO PHC HADAPADA1 |
Completion of work |
-
latitude : 20.03830576,20.03829586
Longitude : 85.58522921,85.58523474
file name : Image_28012022102807015.png
|
2022-01-28 10:28:07.10694 |
26 |
44495986 |
REAPIR OF CC ROAD FROM KANCHILO BHOISAHI TO VIILAGE ROAD. |
200000 |
REAPIR OF CC ROAD FROM KANCHILO BHOISAHI TO VIILAGE ROAD.1 |
Completion of work |
-
latitude : 20.04513865,20.04516763
Longitude : 85.56751491,85.56744184
file name : Image_29012022160411836.png
|
2022-01-29 16:04:11.976108 |
27 |
58261790 |
REPAIR CC ROAD FROM LAXMIDHAR HOUSE TO BALI GHAR 15TH FFC |
50000 |
REPAIR CC ROAD FROM LAXMIDHAR HOUSE TO BALI GHAR 15TH FFC1 |
Completion of work |
-
latitude : 20.04780628
Longitude : 85.58372324
file name : Image_08032022131753175.png
|
2022-03-08 13:17:53.264948 |
28 |
48001163 |
CREMATORIUM AT KANCHILO |
250000 |
CREMATORIUM AT KANCHILO1 |
Completion of work |
-
latitude : 20.04696751
Longitude : 85.56716374
file name : Image_09032022110531889.png
|
2022-03-09 11:05:32.004158 |
29 |
58263913 |
REPAIR OF CC ROAD FROM MAA BHAGABATI MANDIR GATE TO KALYAN MANDAP 15TH FFC |
100000 |
REPAIR OF CC ROAD FROM MAA BHAGABATI MANDIR GATE TO KALYAN MANDAP 15TH FFC1 |
Completion of work |
-
latitude : 20.05338959,20.05338974
Longitude : 85.58026166,85.58026255
file name : Image_09032022111602258.png
|
2022-03-09 11:16:02.350129 |
30 |
61586170 |
IMP OF CHINTAMANI BIDYANIKETAN NARANGARH 15TH FFC |
400000 |
IMP OF CHINTAMANI BIDYANIKETAN NARANGARH 15TH FFC1 |
Completion of work |
-
latitude : 20.0458628
Longitude : 85.58072658
file name : Image_09032022105358592.png
|
2022-03-09 10:53:58.700785 |
31 |
57907311 |
WATER SUPPLY PROJECT |
526428 |
WATER SUPPLY PROJECT1 |
Completion of work |
-
latitude : 20.06704686,20.06705793
Longitude : 85.56132743,85.56133678
file name : Image_30032022072638338.png
|
2022-03-30 07:26:38.474064 |
32 |
65168750 |
Operation & maintenance of drinking water supply system |
700347 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06737914
Longitude : 85.5615365
file name : Image_29092022200755770.png
|
2022-09-29 20:07:55.857202 |
33 |
65201596 |
IMPROVEMENT OF PATRA POKHARI. |
143796 |
IMPROVEMENT OF PATRA POKHARI.1 |
Completion of work |
-
latitude : 20.03572796
Longitude : 85.59285238
file name : Image_17112022131854214.png
|
2022-11-17 13:18:54.316264 |
34 |
65185855 |
Creation of community compost pits for a group of Households |
54000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.06715222
Longitude : 85.56162054
file name : Image_15032023111709586.png
|
2023-03-15 11:17:09.680778 |
35 |
65185920 |
Operation & maintenance of Grey water management system |
150000 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 20.06689346
Longitude : 85.56152793
file name : Image_15032023112104900.png
|
2023-03-15 11:21:04.994076 |
36 |
65185780 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
35000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.0489269
Longitude : 85.5793796
file name : Image_15022023123710481.png
|
2023-02-15 12:37:10.584243 |
37 |
65185830 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.06715641
Longitude : 85.56156269
file name : Image_15032023111559658.png
|
2023-03-15 11:15:59.790843 |
38 |
65201667 |
CONS OF MINI SOLAR LIGHT AT BHOGAPUR NEAR SASMAN. |
150000 |
CONS OF MINI SOLAR LIGHT AT BHOGAPUR NEAR SASMAN.1 |
Completion of work |
-
latitude : 20.03997328
Longitude : 85.58233237
file name : Image_28122022140138394.png
|
2022-12-28 14:01:38.467204 |
39 |
64058299 |
CONST OF CC ROAD FROM PRAVAT CHAKRABATI HOUSE TO RANJAN SAMANTARY HOUSE |
321000 |
CONST OF CC ROAD FROM PRAVAT CHAKRABATI HOUSE TO RANJAN SAMANTARY HOUSE 1 |
Completion of work |
-
latitude : 20.05519026,20.05519244
Longitude : 85.57852795,85.57852469
file name : Image_30122022155253219.png
|
2022-12-30 15:52:53.32168 |
40 |
65250272 |
IMPROVEMENT OF CC ROAD FROM TRINATH BALABANTARAY BARI TO THAKURANI TEMPLE. |
100000 |
IMPROVEMENT OF CC ROAD FROM TRINATH BALABANTARAY BARI TO THAKURANI TEMPLE.1 |
Completion of work |
-
latitude : 20.04207395,20.04207127
Longitude : 85.58215215,85.58215319
file name : Image_15032023100851279.png
|
2023-03-15 10:08:51.375058 |
41 |
47964509 |
WATER SUPPLY PROJECT |
250000 |
WATER SUPPLY PROJECT1 |
Completion of work |
-
latitude : 20.06720362,20.06717574
Longitude : 85.56158882,85.56155864
file name : Image_15032023111422783.png
|
2023-03-15 11:14:22.877864 |
42 |
65200849 |
REAIR OF CC RAOD FROM PANI TANKI TO PRADIP CHAUDHARY HOUSE. |
200000 |
REAIR OF CC RAOD FROM PANI TANKI TO PRADIP CHAUDHARY HOUSE.1 |
Completion of work |
-
latitude : 20.05222178,20.05222185
Longitude : 85.58584181,85.58584195
file name : Image_23032023110940213.png
|
2023-03-23 11:09:40.30618 |
43 |
65200744 |
REAPIR OF CC ROAD FROM DHUSASAN HOUSE TO GANDU NAYAK HOUSE. |
200000 |
REAPIR OF CC ROAD FROM DHUSASAN HOUSE TO GANDU NAYAK HOUSE.1 |
Completion of work |
-
latitude : 20.05222677,20.05222755
Longitude : 85.58584653,85.58584685
file name : Image_23032023111151252.png
|
2023-03-23 11:11:51.361343 |
44 |
65200994 |
ELECTRIFICATION OF NARANGARH ANGANWADI CENTER-1 |
10000 |
ELECTRIFICATION OF NARANGARH ANGANWADI CENTER-11 |
Completion of work |
-
latitude : 20.04707547
Longitude : 85.58213941
file name : Image_09052023091203123.png
|
2023-05-09 09:12:03.23215 |
45 |
65201338 |
ELECTRIFICATION OF KURUMPADA BARAL SAHI ANGANWADI CENTER. |
10000 |
ELECTRIFICATION OF KURUMPADA BARAL SAHI ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.03951754
Longitude : 85.58689899
file name : Image_09052023093338706.png
|
2023-05-09 09:33:38.82078 |
46 |
65201313 |
ELECTRIFICATION OF KURUMPADA ANGANWADI CENTER. |
10000 |
ELECTRIFICATION OF KURUMPADA ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.04125053
Longitude : 85.587724
file name : Image_09052023093621937.png
|
2023-05-09 09:36:22.024121 |
47 |
65201382 |
ELECTRIFICATION OF KANCHILO ANGANWADI CENTER. |
10000 |
ELECTRIFICATION OF KANCHILO ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.04492858
Longitude : 85.56848518
file name : Image_09052023095503999.png
|
2023-05-09 09:55:04.082715 |
48 |
65201288 |
ELECYTRIFICATION OF HADAPADA ANGANWADI CENTER. |
10000 |
ELECYTRIFICATION OF HADAPADA ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.03983519
Longitude : 85.58698625
file name : Image_09052023093201744.png
|
2023-05-09 09:32:01.846719 |
49 |
65201095 |
ELECTRIFICATION OF NARANGARH ANGANWADI CENTER -2 |
10000 |
ELECTRIFICATION OF NARANGARH ANGANWADI CENTER -21 |
Completion of work |
-
latitude : 20.05121138
Longitude : 85.58392581
file name : Image_09052023091620724.png
|
2023-05-09 09:16:20.84361 |
50 |
65201159 |
ELECTRIFICATION OF BHOGAPUR ANGANWADI CENTER. |
10000 |
ELECTRIFICATION OF BHOGAPUR ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.04080621
Longitude : 85.58324566
file name : Image_09052023094706611.png
|
2023-05-09 09:47:06.746897 |
51 |
65201358 |
ELECTRIFICATION OF BALAPUR ANGANWADI CENTER. |
10000 |
ELECTRIFICATION OF BALAPUR ANGANWADI CENTER.1 |
Completion of work |
-
latitude : 20.03414191
Longitude : 85.58949609
file name : Image_09052023094147868.png
|
2023-05-09 09:41:47.965169 |
52 |
61638440 |
dummy project for untied scheme |
296180 |
dummy project for untied scheme1 |
Completion of work |
-
latitude : 20.04202885
Longitude : 85.58220225
file name : Image_27062023111507995.png
|
2023-06-27 11:15:08.101874 |
53 |
58265271 |
EXTENTION PIPE FOR WATER SUPPLY FROM DEVA PATRA HOUSE TO DURYODHAN BHUYAN HOUSE 15TH FFC |
51904 |
EXTENTION PIPE FOR WATER SUPPLY FROM DEVA PATRA HOUSE TO DURYODHAN BHUYAN HOUSE 15TH FFC1 |
Completion of work |
-
latitude : 20.05112562
Longitude : 85.58411174
file name : Image_13112023094726797.png
|
2023-11-13 09:47:26.875368 |
54 |
65201790 |
IMPROVEMENT OF OPEN WELL AT NERA BABULI HOTA HOUSE. |
25000 |
IMPROVEMENT OF OPEN WELL AT NERA BABULI HOTA HOUSE.1 |
Completion of work |
-
latitude : 20.04827215,20.04827217
Longitude : 85.5800513,85.58005131
file name : Image_20112023113552740.png
|
2023-11-20 11:35:52.830652 |
55 |
65201757 |
IMPROVEMENT OF OPEN WELL AT APARTI BHOI HOUSE NARANGARH |
25000 |
IMPROVEMENT OF OPEN WELL AT APARTI BHOI HOUSE NARANGARH1 |
Completion of work |
-
latitude : 20.04823998,20.0478287
Longitude : 85.58004325,85.5800227
file name : Image_20112023113436917.png
|
2023-11-20 11:34:37.002938 |
56 |
65168964 |
Creation of community soak pits for group of Households |
40000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.04830278
Longitude : 85.58003774
file name : Image_20112023113033922.png
|
2023-11-20 11:30:34.012398 |
57 |
83158931 |
Construction of new Piped Water Supply schemes |
700498 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 20.1702339
Longitude : 85.6115141
file name : Image_28022024141640908.png
|
2024-02-28 14:16:41.165351 |
58 |
83158931 |
Construction of new Piped Water Supply schemes |
700498 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 20.0671257
Longitude : 85.56156156
file name : Image_28112023140158602.png
|
2023-11-28 14:01:58.701842 |
59 |
83158931 |
Construction of new Piped Water Supply schemes |
700498 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.06712022
Longitude : 85.56157604
file name : Image_28112023134715342.png
|
2023-11-28 13:47:15.441054 |
60 |
83167262 |
Construction of Building |
296000 |
Construction of Building1 |
Completion of work |
-
latitude : 20.1702339
Longitude : 85.6115141
file name : Image_28022024141904296.png
|
2024-02-28 14:19:04.58284 |
61 |
83165999 |
Construction and Maintenance of Classroom Flooring |
200000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 20.05136226
Longitude : 85.58334812
file name : Image_15032024111312395.png
|
2024-03-15 11:13:12.504501 |
62 |
83165999 |
Construction and Maintenance of Classroom Flooring |
200000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 20.04630878
Longitude : 85.58535666
file name : Image_12032024115228319.png
|
2024-03-12 11:52:28.41484 |
63 |
83166498 |
Creation of other water recharging structure |
208436 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 20.1701948
Longitude : 85.6114924
file name : Image_28032024154132361.png
|
2024-03-28 15:41:32.624047 |
64 |
83166498 |
Creation of other water recharging structure |
208436 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 20.1701929
Longitude : 85.6115101
file name : Image_28032024152512020.png
|
2024-03-28 15:25:12.188639 |
65 |
83166265 |
Safe Drinking water Facilities |
66340 |
Safe Drinking water Facilities1 |
Plinth level |
-
latitude : 20.1701948
Longitude : 85.6114924
file name : Image_28032024154222754.png
|
2024-03-28 15:42:23.046059 |
66 |
83166265 |
Safe Drinking water Facilities |
66340 |
Safe Drinking water Facilities1 |
Completion of work |
-
latitude : 20.1701941
Longitude : 85.6115026
file name : Image_28032024152602216.png
|
2024-03-28 15:26:02.369885 |
67 |
81345680 |
Electricity |
100000 |
Electricity1 |
Plinth level |
-
latitude : 20.1701948
Longitude : 85.6114924
file name : Image_28032024154009581.png
|
2024-03-28 15:40:09.785383 |
68 |
81345680 |
Electricity |
100000 |
Electricity1 |
Completion of work |
-
latitude : 20.1701929
Longitude : 85.6115101
file name : Image_28032024152412031.png
|
2024-03-28 15:24:12.167343 |